Mechanical Vibration Test Machine Model: CZ-100A Operation Manual ISO 9001 Test Machine Manufacture Content Preface I. Caution Matters II. Overview III. Out Appearance&Control Panel Introduction IV. Installation Method V. Operation Steps VI. Regular Maintenance Method VII. Simple Fault Diagnosis Table Dongguan Zhongzhi Testing Instruments Co.,Ltd http://www.dgzhongzhi.com 1 TEL:0769-89369332 FAX:0769-88808258 E-mail:sky@dgzhongzhi.com ISO 9001 Test Machine Manufacture Preface Thank you for choose our company's products, we are not only provide high quality products, but also the reliable after-sale services; In order to ensure the use personnel personal safety and equipment integrity, before using the instrument, please fully read this operation manual, do pay attention to their use matters; This operating manual in detail for the design principle of the instrument, standard, structure, operation steps, maintenance and possible failure conditions and eliminated method; If mentioned the below related in this manual, such as the various "test rules", "standard" are for reference only, if you have any objections, please review its own copy of standards or data. Special statement: This manual may not be used as the basis for any request to the company; Power of interpretation of this manual in charge of the company; Dongguan Zhongzhi Testing Instruments Co.,Ltd http://www.dgzhongzhi.com 2 TEL:0769-89369332 FAX:0769-88808258 E-mail:sky@dgzhongzhi.com ISO 9001 Test Machine Manufacture Ⅰ.Caution Matters marks for Safety: In the manual, the below marks on safety and caution and warning when use the machine, please take a high importance on them to avoid the accident and danger!Please keep in mind! Danger: ! It means that the operator maybe get hurt if don’t obey the instruction. Warning: ! It means that the machine maybe get damaged if don’t obey the instruction. Caution: It means that the testing result and quality maybe get affected. Below marks on the machine means Caution, Warning. ! Warning Danger voltage Earth grounding protection It means the occasions that needs to obey to the manual. It means high voltage is dangerous. It means the earth grounding terminal of the machine. Dongguan Zhongzhi Testing Instruments Co.,Ltd http://www.dgzhongzhi.com 3 TEL:0769-89369332 FAX:0769-88808258 E-mail:sky@dgzhongzhi.com ISO 9001 Test Machine Manufacture Ⅱ.Overview Application This series of mechanical vibration test machine is combined with vibration platform, vibration table, and control cabinet ,it is designed in humanized controlled idea , beautiful appearance, smooth lines.The use of the machine is simple and convenient without special foundation when installation; This series of machines are widely used in electronics, components, mechanical and electrical products, instruments and meters, communication, automobile, motorcycle, household appliances and other industrial products for the vibration of the quality system certification and inspection.They are used for founding early failure, and analog assessment of actual working condition and structure strength test. The series of products also can be applied to various products of scientific research and production line of resistance vibration test.It is provide a powerful guarantee for you to optimize the quality of the products. This series of machines are meet with GB,UL,IEC standards for low frequency vibration test; Specifications Model CZ-100A Test loading 100 kg Frequency range 10-55 Hz Sweep frequency range 10-55 Hz Amplitude 1.5mm p-p Vibration direction vertical Vibration waveform Sine wave Test mode Working size of platform fixed frequency, sweep frequency(logarithmic frequency sweep,linear sweep) 650*600 mm(W*D) Size of the machine 650*600*680 mm(W*D*H) Size of control cabinet 400*300*880 mm(W*D*H) Power/voltage Dongguan Zhongzhi Testing Instruments Co.,Ltd http://www.dgzhongzhi.com AC220V ±10%, 5A, 50Hz ±2% 4 TEL:0769-89369332 FAX:0769-88808258 E-mail:sky@dgzhongzhi.com ISO 9001 Test Machine Manufacture Ⅲ.Out Appearance&Control Panel Introduction Whole machine out appearance instruction 4 1 5 2 3 1. 2. 3. 4. 5. vibration platform transportation handle vibration body operation panel( see operation panel manual) control cabinet Warning: ! When move it, must use transportation handle(see 2 in above picture), don’t add force to the platform in case of damage the machine; When move the machine, don’t let the machine dump in case of hurting people or damage the machine Dongguan Zhongzhi Testing Instruments Co.,Ltd http://www.dgzhongzhi.com 5 TEL:0769-89369332 FAX:0769-88808258 E-mail:sky@dgzhongzhi.com ISO 9001 Test Machine Manufacture Control panel 1. Emergency stop switch If under the emergency condition, push this button can stop the machine; 2. Power switch after connected with cable, turn it on, the machine gets power and starts to work; 3. Data transferring port Can be connected with U disk, download test data 4. Vibration controller deal with the related setting and operation for vibration test, see details in instruction; Dongguan Zhongzhi Testing Instruments Co.,Ltd http://www.dgzhongzhi.com 6 TEL:0769-89369332 FAX:0769-88808258 E-mail:sky@dgzhongzhi.com ISO 9001 Test Machine Manufacture IV.Installation Method 4.1.Installation and positioning: This machine don’t need special basic infrastructure, only need to be fixed on the firm flat cement floor or firm horizontal table ; Notice:the floor or the table must be in horizontal level and stable and firm; must keep the test platform is in horizontal level; 4.2.Power information:please equip connect with the right power as the nameplate showed; Notice: please check the power capacity, try to avoid using one power source for several machines in case of reduction voltage affects the machine even worse to accident shutdown; Danger ! Input voltage error should keep within ± 10%, make sure the machine is right well earth grounding, in case of electric leakage lead to hurt ; 4.3.Connect with wire: connect the related wires rightly and firmly as the mark showed; 4.4. Running environmental requirement: room temperature condition; 4.5. Fix the test sample: the test sample must be fixed by grips or use the equipped fixed rope and tieback positioned tightly on the working platform, put the center of the test sample on the center of the working platform when fixing it; Before the machine starts working after power connected, please take notice to the below matters: check whether the power switch is turned off or not; check whether the sample is fixed well or not; check the output line of control cabinet is connected well or not, the control cabinet wires is connected well; turn on the power check indicate light is on the site of “on”; Dongguan Zhongzhi Testing Instruments Co.,Ltd http://www.dgzhongzhi.com 7 TEL:0769-89369332 FAX:0769-88808258 E-mail:sky@dgzhongzhi.com ISO 9001 V.Operation Steps Test Machine Manufacture Major function:fixed frequency testing and sweep frequency testing two working modes;(sweep frequency test include:logarithmic frequency sweep,linear sweep) vertical vibration direction; Fixed frequency test: set the needed frequency points up to the testing requirement, keep on fixed frequency vibration test on the set point when the testing starts; 5.1. Fixed frequency test: Turn on the power switch, the vibration controller will display the starting screen, wait for a while, it will automatically jumped to the fixed frequency test screen Fixed frequency test screen menu:click it to switch over to menu screen curve:click it to switch over to curve screen Dongguan Zhongzhi Testing Instruments Co.,Ltd http://www.dgzhongzhi.com 8 TEL:0769-89369332 FAX:0769-88808258 E-mail:sky@dgzhongzhi.com ISO 9001 Test Machine Manufacture status display frame:display current running status set time:click set frame, input the needed test time, unit is “S” run time:display current tested time, unit is “S” zero:click it to clear the running time to zero Notice: To prevent wrong operation, the buttons need to be long pressed one second; this button can’t be operated under the running condition; set freq:input the test needed frequency in set frame, unit is Hz out freq:display the vibration table current working frequency, unit is Hz vertical:click it if displays in green color, the vibration table will switch over to vertical vibration status, press it again it will display in red, then the vibration table switch over to the horizontal vibration status; Notice: A type machine without horizontal vibration function, so this key can’t be operated start:press it will appear a drip ring, the controller will go to a calculation status, after delayed for several seconds, it will display in green, the vibration table starts working, status frame also displays in working status Notice:after clicked the start key, the controller need different calculation times up to different test methods, start testing after calculation finished; If it doesn’t start at once after you clicked “start”, it is normal phenomenon, if over 10 seconds or longer time, it still do not work, then it has the problem ; stop:click it the test will stop; out frequency will drop to 0 Hz, running time also will stop; Notice:It is need to wait for over five seconds to restart the testing after stop. After set the related set freq and set time ,then click start to test,when the set time is reached, the testing will stop automatically and record the tested time; Dongguan Zhongzhi Testing Instruments Co.,Ltd http://www.dgzhongzhi.com 9 TEL:0769-89369332 FAX:0769-88808258 E-mail:sky@dgzhongzhi.com ISO 9001 Test Machine Manufacture test screen,switch over to menu screen after clicked “menu” Menu screen Dongguan Zhongzhi Testing Instruments Co.,Ltd http://www.dgzhongzhi.com 10 TEL:0769-89369332 FAX:0769-88808258 E-mail:sky@dgzhongzhi.com ISO 9001 Test Machine Manufacture Manufacturer data screen Menu or test screen,switch over to curve screen after clicked “curve” Curve screen menu:click it to switch over to menu screen curve:click it to back to the previous screen; out freq:display the current working frequency of the vibration table, unit is Hz view freq:click curve, the black mark line will display in the graph, the remark line frequency is view frequency, unit is Hz Save data:before testing, connect the USB with the data transmission interface, click this button after Dongguan Zhongzhi Testing Instruments Co.,Ltd http://www.dgzhongzhi.com 11 TEL:0769-89369332 FAX:0769-88808258 E-mail:sky@dgzhongzhi.com ISO 9001 Test Machine Manufacture finished test, save the data to USB in recognized format; If the USB doesn’t connect before test, the data can’t be transferred out; If data transferred function isn’t selected to equip for this machine, this button without effect; curve clear:click it, clear the test process curve to zero controller will clear all the curve to zero automatically before test, after finished test,it will automatically stop record curve 5.2. linear sweep test: linear sweep:according to the set lower limit and upper limit frequency range and the set of frequency sweep speed, automatic do reciprocating frequency point scanning; end frequency:the lowest frequency point when automatic sweep frequency start frequency:the highest frequency point when automatic sweep frequency sweep frequency speed: the increasing or decreasing speed rate when automatic sweep frequency Menu screen, click linear sweep, and enter to linear sweep screen Dongguan Zhongzhi Testing Instruments Co.,Ltd http://www.dgzhongzhi.com 12 TEL:0769-89369332 FAX:0769-88808258 E-mail:sky@dgzhongzhi.com ISO 9001 Test Machine Manufacture Linear sweep test screen set time:click set frame, input the needed test time, unit is “S” run time:display current tested time, unit is “S” zero:click it to clear the running time to zero Notice: To prevent wrong operation, the buttons need to be long pressed one second;this button can’t be operated under the running condition; set cycle:click the set frame site, input the needed test cycles, the set cycle and run time could be set at the same time, it will stop test at the fastest reached set value; run cycle:display current tested cycle zero:click it, the run cycle will be cleared to zero Notice: To prevent wrong operation, the buttons need to be long pressed one second;this button can’t be operated under the running condition; end freq:click the set frame place, input the needed lower limit frequency, unit is Hz Dongguan Zhongzhi Testing Instruments Co.,Ltd http://www.dgzhongzhi.com 13 TEL:0769-89369332 FAX:0769-88808258 E-mail:sky@dgzhongzhi.com ISO 9001 Test Machine Manufacture start freq:click the set frame place, input the needed upper limit frequency, unit is Hz sweep spd:click the set frame place, input the needed sweep frequency speed, unit is Hz/s out freq:display the current working frequency of the vibration table, unit is Hz vertical:click it if displays in green color, the vibration table will switch over to vertical vibration status, press it again it will display in red, then the vibration table switch over to the horizontal vibration status; Notice: A type machine without horizontal vibration function, so this key can’t be operated start:press it will appear a drip ring, the controller will go to a calculation status, after delayed for several seconds, it will display in green, the vibration table starts working, status frame also displays in working status Notice:after clicked the start key, the controller need different calculation times up to different test methods, start testing after calculation finished; If it doesn’t start at once after you clicked “start”, it is normal phenomenon, if over 10 seconds or longer time, it still do not work, then it has the problem ; stop:click it the test will stop; out frequency will drop to 0 Hz, running time also will stop; Notice:It is need to wait for over five seconds to restart the testing after stop. After the related test requirements are set, then can click start to test, when the set time and set cycle are reached, it will stop test and record the test time and test cycle automatically; 5.3.logarithmic frequency sweep test: logarithmic frequency sweep:according to the set lower limit and upper limit frequency range and the set of frequency sweep speed, automatic do reciprocating frequency point scanning; end frequency:the lowest frequency point when automatic sweep frequency start frequency:the highest frequency point when automatic sweep frequency sweep frequency speed: the increasing or decreasing speed rate when automatic sweep frequency Dongguan Zhongzhi Testing Instruments Co.,Ltd http://www.dgzhongzhi.com 14 TEL:0769-89369332 FAX:0769-88808258 E-mail:sky@dgzhongzhi.com ISO 9001 Test Machine Manufacture Menu screen, click logarithmic frequency sweep, switch over to its test screen logarithmic frequency sweep test screen set time:click set frame, input the needed test time, unit is “S” run time:display current tested time, unit is “S” zero:click it to clear the running time to zero Notice: To prevent wrong operation, the buttons need to be long pressed one second;this button can’t be operated under the running condition; set cycle:click the set frame site, input the needed test cycles, the set cycle and run time could be set at the same time, it will stop test at the fastest reached set value; run cycle:display current tested cycle zero:click it, the run cycle will be cleared to zero Notice: To prevent wrong operation, the buttons need to be long pressed one second;this button can’t be operated under the running condition; end freq:click the set frame place, input the needed lower limit frequency, unit is Hz start freq:click the set frame place, input the needed upper limit frequency, unit is Hz 15 Dongguan Zhongzhi Testing Instruments Co.,Ltd TEL:0769-89369332 FAX:0769-88808258 http://www.dgzhongzhi.com E-mail:sky@dgzhongzhi.com ISO 9001 Test Machine Manufacture sweep spd:click the set frame place, input the needed sweep frequency speed, unit is oct/min out freq:display the current working frequency of the vibration table, unit is Hz vertical:click it if displays in green color, the vibration table will switch over to vertical vibration status, press it again it will display in red, then the vibration table switch over to the horizontal vibration status; Notice: A type machine without horizontal vibration function, so this key can’t be operated start:press it will appear a drip ring, the controller will go to a calculation status, after delayed for several seconds, it will display in green, the vibration table starts working, status frame also displays in working status Notice:after clicked the start key, the controller need different calculation times up to different test methods, start testing after calculation finished; If it doesn’t start at once after you clicked “start”, it is normal phenomenon, if over 10 seconds or longer time, it still do not work, then it has the problem ; stop:click it the test will stop; out frequency will drop to 0 Hz, running time also will stop; Notice:It is need to wait for over five seconds to restart the testing after stop. After the related test requirements are set, then can click start to test, when the set time and set cycle are reached, it will stop test and record the test time and test cycle automatically; 5.4. Test example: 5.4.1. fixed frequency test, vertical, frequency 20Hz, time 30 mins operation method instruction: 1. switch over to fixed frequency screen 2. click set frame of set time , input 1800 S (30*60) 3. click set frame of set freq , input 20 Hz 4. click start , after the controller finished the calculation, will starts test; 5. when the set time reached, it stops test automatically; 5.4.2. sweep frequency test, vertical,10Hz-55Hz-10Hz、1 cycle/min, test time 2 hours Dongguan Zhongzhi Testing Instruments Co.,Ltd http://www.dgzhongzhi.com 16 TEL:0769-89369332 FAX:0769-88808258 E-mail:sky@dgzhongzhi.com ISO 9001 Test Machine Manufacture operation method instruction: 6. switch over to linear sweep screen 1. click set frame of end freq ,input 10 Hz 2. click set frame of start freq ,input 55 Hz 3. click set frame of sweep spd ,input 1.5 Hz/S ((55-10)*2/60 ) 4. click set frame of set time ,input 7200 S (2*60*60) 5. click set frame of set cycle ,input 999999 6. click start , after the controller finished the calculation, will starts test; 7. when the set time reached, it stops test automatically; 5.4.3. sweep frequency test,vertical,10Hz-55Hz-10Hz,1oct/min, test 2 cycles operation method instruction: 1. click set frame of end freq ,input 10 Hz 2. click set frame of start freq ,input 55 Hz 3. click set frame of sweep spd ,input 1 oct/min 4. click set frame of set time ,input 7200 S (2*60*60) 5. click set frame of set cycle ,input 999999 6. click set frame of set cycle ,input 2 7. click start , after the controller finished the calculation, will starts test; 8. when the set time reached, it stops test automatically; VI.Regular Maintenance Method 1. Keep the out shell of the machine clean, clean the dirty always. 2. The plating part please use oil or rust-proof oil to wipe in order to prevent rust and keep light. 3. Check the vibration table and motor fixed screws regularly , tighten it always; 4. The control cabinet and vibration table are forbidden to get wet or water in case of damage to the electronic components. VII.Simple Fault Diagnosis Table Dongguan Zhongzhi Testing Instruments Co.,Ltd http://www.dgzhongzhi.com 17 TEL:0769-89369332 FAX:0769-88808258 E-mail:sky@dgzhongzhi.com ISO 9001 1 no power, the power indicate light doesn’t light up can’t start the test 1 doesn’t connect with power 2 fuse protector is damaged 3 power switch problem the fuse burned for many times, can’t use any more 1 input power and voltage abnormal 2 motor problem 1 ask electrician to check, recover normal power supply or add voltage stabilizer 2 motor is damaged, repair or change it, or contact with us large running noise large electrostatic on the surface of the table 1 motor abnormal 1 motor is damaged, repair or change it, or contact with us 1 connect with earth grounding wire 2 reconnect with earth grounding wire 2 3 4 5 Test Machine Manufacture 1 set time doesn’t reach on 2 set time doesn’t set 3 run cycle reached 4 set cycle doesn’t set 5 emergency stop switch is turned on 6 emergency stop switch is damaged 7 power and voltage are input abnormal, driver self-protection 1 earth grounding wire isn’t connected 2 earth grounding resistance is too large Dongguan Zhongzhi Testing Instruments Co.,Ltd http://www.dgzhongzhi.com 18 1 connect with power 2 change fuse protector (change after checked the problem) 3 change the power switch 1 clear run time 2 set test time 3 clear run cycle 4 set test cycle 5 rotary to right of emergency stop switch 6 change emergency switch 7 ask electrician to check, recover normal power supply or add voltage stabilizer TEL:0769-89369332 FAX:0769-88808258 E-mail:sky@dgzhongzhi.com