Mechanical Vibration Test Machine
Model: CZ-100A
Operation Manual
ISO 9001
Test Machine Manufacture
Content
Preface
I. Caution Matters
II. Overview
III. Out Appearance&Control Panel Introduction
IV. Installation Method
V. Operation Steps
VI. Regular Maintenance Method
VII. Simple Fault Diagnosis Table
Dongguan Zhongzhi Testing Instruments Co.,Ltd
http://www.dgzhongzhi.com
1
TEL:0769-89369332 FAX:0769-88808258
E-mail:sky@dgzhongzhi.com
ISO 9001
Test Machine Manufacture
Preface
Thank you for choose our company's products, we are not only provide high quality products, but also the
reliable after-sale services;
In order to ensure the use personnel personal safety and equipment integrity, before using the instrument,
please fully read this operation manual, do pay attention to their use matters;
This operating manual in detail for the design principle of the instrument, standard, structure, operation steps,
maintenance and possible failure conditions and eliminated method;
If mentioned the below related in this manual, such as the various "test rules", "standard" are for reference
only, if you have any objections, please review its own copy of standards or data.
Special statement:
This manual may not be used as the basis for any request to the company;
Power of interpretation of this manual in charge of the company;
Dongguan Zhongzhi Testing Instruments Co.,Ltd
http://www.dgzhongzhi.com
2
TEL:0769-89369332 FAX:0769-88808258
E-mail:sky@dgzhongzhi.com
ISO 9001
Test Machine Manufacture
Ⅰ.Caution Matters
marks for Safety:
In the manual, the below marks on safety and caution and warning when use the machine, please take a high
importance on them to avoid the accident and danger!Please keep in mind!
Danger:
!
It means that the operator maybe get hurt if don’t obey the instruction.
Warning:
!
It means that the machine maybe get damaged if don’t obey the instruction.
Caution:

It means that the testing result and quality maybe get affected.
Below marks on the machine means Caution, Warning.
!

Warning
Danger voltage
Earth grounding
protection
It means the occasions that needs to obey to the manual.
It means high voltage is dangerous.
It means the earth grounding terminal of the machine.
Dongguan Zhongzhi Testing Instruments Co.,Ltd
http://www.dgzhongzhi.com
3
TEL:0769-89369332 FAX:0769-88808258
E-mail:sky@dgzhongzhi.com
ISO 9001
Test Machine Manufacture
Ⅱ.Overview
Application
This series of mechanical vibration test machine is combined with vibration platform, vibration table,
and control cabinet ,it is designed in humanized controlled idea , beautiful appearance, smooth lines.The use
of the machine is simple and convenient without special foundation when installation;
This series of machines are widely used in electronics, components, mechanical and electrical products,
instruments and meters, communication, automobile, motorcycle, household appliances and other industrial
products for the vibration of the quality system certification and inspection.They are used for founding early
failure, and analog assessment of actual working condition and structure strength test. The series of products
also can be applied to various products of scientific research and production line of resistance vibration test.It
is provide a powerful guarantee for you to optimize the quality of the products.
This series of machines are meet with GB,UL,IEC standards for low frequency vibration test;
Specifications
Model
CZ-100A
Test loading
100 kg
Frequency range
10-55 Hz
Sweep frequency range
10-55 Hz
Amplitude
1.5mm p-p
Vibration direction
vertical
Vibration waveform
Sine wave
Test mode
Working size of platform
fixed frequency, sweep frequency(logarithmic frequency
sweep,linear sweep)
650*600 mm(W*D)
Size of the machine
650*600*680 mm(W*D*H)
Size of control cabinet
400*300*880 mm(W*D*H)
Power/voltage
Dongguan Zhongzhi Testing Instruments Co.,Ltd
http://www.dgzhongzhi.com
AC220V ±10%, 5A, 50Hz ±2%
4
TEL:0769-89369332 FAX:0769-88808258
E-mail:sky@dgzhongzhi.com
ISO 9001
Test Machine Manufacture
Ⅲ.Out Appearance&Control Panel Introduction
Whole machine out appearance instruction
4
1
5
2
3
1.
2.
3.
4.
5.
vibration platform
transportation handle
vibration body
operation panel( see operation panel manual)
control cabinet
Warning:
!
When move it, must use transportation handle(see 2 in above picture), don’t add
force to the platform in case of damage the machine;
When move the machine, don’t let the machine dump in case of hurting people or
damage the machine
Dongguan Zhongzhi Testing Instruments Co.,Ltd
http://www.dgzhongzhi.com
5
TEL:0769-89369332 FAX:0769-88808258
E-mail:sky@dgzhongzhi.com
ISO 9001
Test Machine Manufacture
Control panel
1. Emergency stop switch
If under the emergency condition, push this button can stop the machine;
2. Power switch
after connected with cable, turn it on, the machine gets power and starts to work;
3. Data transferring port
Can be connected with U disk, download test data
4. Vibration controller
deal with the related setting and operation for vibration test, see details in instruction;
Dongguan Zhongzhi Testing Instruments Co.,Ltd
http://www.dgzhongzhi.com
6
TEL:0769-89369332 FAX:0769-88808258
E-mail:sky@dgzhongzhi.com
ISO 9001
Test Machine Manufacture
IV.Installation Method
4.1.Installation and positioning: This machine don’t need special basic infrastructure, only need to be fixed
on the firm flat cement floor or firm horizontal table ;
Notice:the floor or the table must be in horizontal level and stable and firm;
must keep the test platform is in horizontal level;
4.2.Power information:please equip connect with the right power as the nameplate showed;
Notice: please check the power capacity, try to avoid using one power source for
several machines in case of reduction voltage affects the machine even worse to accident
shutdown;
Danger
!
Input voltage error should keep within ± 10%, make sure the machine is right well earth
grounding, in case of electric leakage lead to hurt ;
4.3.Connect with wire: connect the related wires rightly and firmly as the mark showed;
4.4. Running environmental requirement: room temperature condition;
4.5. Fix the test sample: the test sample must be fixed by grips or use the equipped fixed rope and tieback
positioned tightly on the working platform, put the center of the test sample on the center of the
working platform when fixing it;
Before the machine starts working after power connected, please take notice to the
below matters:
check whether the power switch is turned off or not;
check whether the sample is fixed well or not;
check the output line of control cabinet is connected well or not, the control cabinet
wires is connected well;
turn on the power check indicate light is on the site of “on”;
Dongguan Zhongzhi Testing Instruments Co.,Ltd
http://www.dgzhongzhi.com
7
TEL:0769-89369332 FAX:0769-88808258
E-mail:sky@dgzhongzhi.com
ISO 9001
V.Operation Steps
Test Machine Manufacture
Major function:fixed frequency testing and sweep frequency testing two working
modes;(sweep frequency test include:logarithmic frequency sweep,linear sweep)
vertical vibration direction;
Fixed frequency test: set the needed frequency points up to the testing requirement, keep
on fixed frequency vibration test on the set point when the testing
starts;
5.1. Fixed frequency test:
Turn on the power switch, the vibration controller will display the starting screen, wait for
a while, it will automatically jumped to the fixed frequency test screen
Fixed frequency test screen
menu:click it to switch over to menu screen
curve:click it to switch over to curve screen
Dongguan Zhongzhi Testing Instruments Co.,Ltd
http://www.dgzhongzhi.com
8
TEL:0769-89369332 FAX:0769-88808258
E-mail:sky@dgzhongzhi.com
ISO 9001
Test Machine Manufacture
status display frame:display current running status
set time:click set frame, input the needed test time, unit is “S”
run time:display current tested time, unit is “S”
zero:click it to clear the running time to zero
Notice: To prevent wrong operation, the buttons need to be long pressed one second;
this button can’t be operated under the running condition;
set freq:input the test needed frequency in set frame, unit is Hz
out freq:display the vibration table current working frequency, unit is Hz
vertical:click it if displays in green color, the vibration table will switch over to vertical vibration status,
press it again it will display in red, then the vibration table switch over to the horizontal vibration status;
Notice: A type machine without horizontal vibration function, so this key can’t be operated
start:press it will appear a drip ring, the controller will go to a calculation status, after delayed for several
seconds, it will display in green, the vibration table starts working, status frame also displays in working
status
Notice:after clicked the start key, the controller need different calculation times up to different test
methods, start testing after calculation finished;
If it doesn’t start at once after you clicked “start”, it is normal phenomenon, if over 10 seconds or longer
time, it still do not work, then it has the problem ;
stop:click it the test will stop; out frequency will drop to 0 Hz, running time also will stop;
Notice:It is need to wait for over five seconds to restart the testing after stop.
After set the related set freq and set time ,then click start to test,when the set time is reached, the testing
will stop automatically and record the tested time;
Dongguan Zhongzhi Testing Instruments Co.,Ltd
http://www.dgzhongzhi.com
9
TEL:0769-89369332 FAX:0769-88808258
E-mail:sky@dgzhongzhi.com
ISO 9001
Test Machine Manufacture
test screen,switch over to menu screen after clicked “menu”
Menu screen
Dongguan Zhongzhi Testing Instruments Co.,Ltd
http://www.dgzhongzhi.com
10
TEL:0769-89369332 FAX:0769-88808258
E-mail:sky@dgzhongzhi.com
ISO 9001
Test Machine Manufacture
Manufacturer data screen
Menu or test screen,switch over to curve screen after clicked “curve”
Curve screen
menu:click it to switch over to menu screen
curve:click it to back to the previous screen;
out freq:display the current working frequency of the vibration table, unit is Hz
view freq:click curve, the black mark line will display in the graph, the remark line frequency is view
frequency, unit is Hz
Save data:before testing, connect the USB with the data transmission interface, click this button after
Dongguan Zhongzhi Testing Instruments Co.,Ltd
http://www.dgzhongzhi.com
11
TEL:0769-89369332 FAX:0769-88808258
E-mail:sky@dgzhongzhi.com
ISO 9001
Test Machine Manufacture
finished test, save the data to USB in recognized format;
If the USB doesn’t connect before test, the data can’t be transferred out;
If data transferred function isn’t selected to equip for this machine, this button without effect;
curve clear:click it, clear the test process curve to zero
controller will clear all the curve to zero automatically before test, after finished test,it will
automatically stop record curve
5.2. linear sweep test:
linear sweep:according to the set lower limit and upper limit frequency range and the set of frequency
sweep speed, automatic do reciprocating frequency point scanning;
end frequency:the lowest frequency point when automatic sweep frequency
start frequency:the highest frequency point when automatic sweep frequency
sweep frequency speed: the increasing or decreasing speed rate when automatic sweep
frequency
Menu screen, click linear sweep, and enter to linear sweep screen
Dongguan Zhongzhi Testing Instruments Co.,Ltd
http://www.dgzhongzhi.com
12
TEL:0769-89369332 FAX:0769-88808258
E-mail:sky@dgzhongzhi.com
ISO 9001
Test Machine Manufacture
Linear sweep test screen
set time:click set frame, input the needed test time, unit is “S”
run time:display current tested time, unit is “S”
zero:click it to clear the running time to zero
Notice: To prevent wrong operation, the buttons need to be long pressed one second;this button
can’t be operated under the running condition;
set cycle:click the set frame site, input the needed test cycles, the set cycle and run time could be set at the
same time, it will stop test at the fastest reached set value;
run cycle:display current tested cycle
zero:click it, the run cycle will be cleared to zero
Notice: To prevent wrong operation, the buttons need to be long pressed one second;this button
can’t be operated under the running condition;
end freq:click the set frame place, input the needed lower limit frequency, unit is Hz
Dongguan Zhongzhi Testing Instruments Co.,Ltd
http://www.dgzhongzhi.com
13
TEL:0769-89369332 FAX:0769-88808258
E-mail:sky@dgzhongzhi.com
ISO 9001
Test Machine Manufacture
start freq:click the set frame place, input the needed upper limit frequency, unit is Hz
sweep spd:click the set frame place, input the needed sweep frequency speed, unit is Hz/s
out freq:display the current working frequency of the vibration table, unit is Hz
vertical:click it if displays in green color, the vibration table will switch over to vertical vibration status,
press it again it will display in red, then the vibration table switch over to the horizontal vibration status;
Notice: A type machine without horizontal vibration function, so this key can’t be operated
start:press it will appear a drip ring, the controller will go to a calculation status, after delayed for several
seconds, it will display in green, the vibration table starts working, status frame also displays in
working status
Notice:after clicked the start key, the controller need different calculation times up to different test
methods, start testing after calculation finished;
If it doesn’t start at once after you clicked “start”, it is normal phenomenon, if over 10 seconds or
longer time, it still do not work, then it has the problem ;
stop:click it the test will stop; out frequency will drop to 0 Hz, running time also will stop;
Notice:It is need to wait for over five seconds to restart the testing after stop.
After the related test requirements are set, then can click start to test, when the set time and set cycle are
reached, it will stop test and record the test time and test cycle automatically;
5.3.logarithmic frequency sweep test:
logarithmic frequency sweep:according to the set lower limit and upper limit frequency
range and the set of frequency sweep speed, automatic do reciprocating
frequency point scanning;
end frequency:the lowest frequency point when automatic sweep frequency
start frequency:the highest frequency point when automatic sweep frequency
sweep frequency speed: the increasing or decreasing speed rate when automatic sweep
frequency
Dongguan Zhongzhi Testing Instruments Co.,Ltd
http://www.dgzhongzhi.com
14
TEL:0769-89369332 FAX:0769-88808258
E-mail:sky@dgzhongzhi.com
ISO 9001
Test Machine Manufacture
Menu screen, click logarithmic frequency sweep, switch over to its test screen
logarithmic frequency sweep test screen
set time:click set frame, input the needed test time, unit is “S”
run time:display current tested time, unit is “S”
zero:click it to clear the running time to zero
Notice: To prevent wrong operation, the buttons need to be long pressed one second;this button
can’t be operated under the running condition;
set cycle:click the set frame site, input the needed test cycles, the set cycle and run time could be set at the
same time, it will stop test at the fastest reached set value;
run cycle:display current tested cycle
zero:click it, the run cycle will be cleared to zero
Notice: To prevent wrong operation, the buttons need to be long pressed one second;this button
can’t be operated under the running condition;
end freq:click the set frame place, input the needed lower limit frequency, unit is Hz
start freq:click the set frame place, input the needed upper limit frequency, unit is Hz
15
Dongguan Zhongzhi Testing Instruments Co.,Ltd
TEL:0769-89369332 FAX:0769-88808258
http://www.dgzhongzhi.com
E-mail:sky@dgzhongzhi.com
ISO 9001
Test Machine Manufacture
sweep spd:click the set frame place, input the needed sweep frequency speed, unit is oct/min
out freq:display the current working frequency of the vibration table, unit is Hz
vertical:click it if displays in green color, the vibration table will switch over to vertical vibration status,
press it again it will display in red, then the vibration table switch over to the horizontal vibration
status;
Notice: A type machine without horizontal vibration function, so this key can’t be operated
start:press it will appear a drip ring, the controller will go to a calculation status, after delayed for several
seconds, it will display in green, the vibration table starts working, status frame also displays in
working status
Notice:after clicked the start key, the controller need different calculation times up to different test
methods, start testing after calculation finished;
If it doesn’t start at once after you clicked “start”, it is normal phenomenon, if over 10 seconds or
longer time, it still do not work, then it has the problem ;
stop:click it the test will stop; out frequency will drop to 0 Hz, running time also will stop;
Notice:It is need to wait for over five seconds to restart the testing after stop.
After the related test requirements are set, then can click start to test, when the set time and set cycle are
reached, it will stop test and record the test time and test cycle automatically;
5.4. Test example:
5.4.1. fixed frequency test, vertical, frequency 20Hz, time 30 mins
operation method instruction:
1. switch over to fixed frequency
screen
2. click set frame of set time , input 1800 S
(30*60)
3. click set frame of set freq , input 20 Hz
4. click start , after the controller finished the calculation, will starts test;
5. when the set time reached, it stops test automatically;
5.4.2. sweep frequency test, vertical,10Hz-55Hz-10Hz、1 cycle/min, test time 2 hours
Dongguan Zhongzhi Testing Instruments Co.,Ltd
http://www.dgzhongzhi.com
16
TEL:0769-89369332 FAX:0769-88808258
E-mail:sky@dgzhongzhi.com
ISO 9001
Test Machine Manufacture
operation method instruction:
6. switch over to linear sweep
screen
1. click set frame of end freq ,input 10 Hz
2. click set frame of start freq ,input 55 Hz
3. click set frame of sweep spd ,input 1.5 Hz/S ((55-10)*2/60 )
4. click set frame of set time ,input 7200 S
(2*60*60)
5. click set frame of set cycle ,input 999999
6. click start , after the controller finished the calculation, will starts test;
7. when the set time reached, it stops test automatically;
5.4.3. sweep frequency test,vertical,10Hz-55Hz-10Hz,1oct/min, test 2 cycles
operation method instruction:
1. click set frame of end freq ,input 10 Hz
2. click set frame of start freq ,input 55 Hz
3. click set frame of sweep spd ,input 1 oct/min
4. click set frame of set time ,input 7200 S
(2*60*60)
5. click set frame of set cycle ,input 999999
6. click set frame of set cycle ,input 2
7. click start , after the controller finished the calculation, will starts test;
8. when the set time reached, it stops test automatically;
VI.Regular Maintenance Method
1. Keep the out shell of the machine clean, clean the dirty always.
2. The plating part please use oil or rust-proof oil to wipe in order to prevent rust and keep light.
3. Check the vibration table and motor fixed screws regularly , tighten it always;
4. The control cabinet and vibration table are forbidden to get wet or water in case of damage to the
electronic components.
VII.Simple Fault Diagnosis Table
Dongguan Zhongzhi Testing Instruments Co.,Ltd
http://www.dgzhongzhi.com
17
TEL:0769-89369332 FAX:0769-88808258
E-mail:sky@dgzhongzhi.com
ISO 9001
1
no power, the
power indicate
light doesn’t light
up
can’t start the test
1 doesn’t connect with power
2 fuse protector is damaged
3 power switch problem
the fuse burned
for many times,
can’t use any
more
1 input power and voltage
abnormal
2 motor problem
1 ask electrician to check, recover normal
power supply or add voltage stabilizer
2 motor is damaged, repair or change it, or
contact with us
large running
noise
large electrostatic
on the surface of
the table
1 motor abnormal
1 motor is damaged, repair or change it, or
contact with us
1 connect with earth grounding wire
2 reconnect with earth grounding wire
2
3
4
5
Test Machine Manufacture
1 set time doesn’t reach on
2 set time doesn’t set
3 run cycle reached
4 set cycle doesn’t set
5 emergency stop switch is turned
on
6 emergency stop switch is
damaged
7 power and voltage are input
abnormal, driver self-protection
1 earth grounding wire isn’t
connected
2 earth grounding resistance is too
large
Dongguan Zhongzhi Testing Instruments Co.,Ltd
http://www.dgzhongzhi.com
18
1 connect with power
2 change fuse protector (change after
checked the problem)
3 change the power switch
1 clear run time
2 set test time
3 clear run cycle
4 set test cycle
5 rotary to right of emergency stop switch
6 change emergency switch
7 ask electrician to check, recover normal
power supply or add voltage stabilizer
TEL:0769-89369332 FAX:0769-88808258
E-mail:sky@dgzhongzhi.com
Download