TECHNICAL OFFER FOR
WHRB 2 X 9.35 TPH , 68 KG/CM2(G), 495± 5 °C TEMPERATURE
M/S. MARUTHI ISPAT & ENERGY PVT LTD.
MANTRALAYAM, ANDHRA PRADESH
RIBO Industries Private Limited
Juman Centre, Promenade Road, Cantonment,
Tiruchirappalli – 620 001.
Tamil Nadu, India.
Ph: 944 214 2112 | www.ribo.in
RIBO INDUSTRIES PVT LTD
PROJECT : M/s. MARUTHI ISPAT & ENERGY (P) LTD
BOILER : WHRB – 2 X 9.35 TPH, 68 KG/CM2(G),
495±5 ˚C
REF: No.
19B-455
Date /REV
11.03.2020/ NIL
Page No.
1 of 39
Date:
11.03.2020
Offer No: RIBO / OFF / 368 / 2019-20
M/s. MARUTI ISPAT & ENERGY (P) LTD
Kind atten:
Sub : Technical offer for the supply & Execution of Two no. 9.35 TPH, (FWT
126°C), 68 kg/cm2(g) pressure, 495± 5 °C superheated steam
temperature, Single Drum , WHRB boiler and its auxiliaries– Reg.,
****************
With reference to the above subject, we are pleased to submit herewith our Technical
Offer
for
the
Design,
Engineering,
and
Manufacturing,
supply,
Erection
&
Commissioning of Two no. 9.35 TPH, (FWT 126 ° C), 68 kg/cm2 (g) pressure, 495± 5
°C superheated steam temperature, Single-Drum type, WHRB boiler and its auxiliaries
for your kind perusal.
For Specific design consideration, Design basis, Technical specifications, Scope chart,
Terminal Points and Vendor list, please refer the enclosed offer.
We trust the above is in-line with your requirement and in the meantime should you
need any further clarifications please feel free to contact us.
Thanking you and assuring you of our best attention at all times.
Yours faithfully,
For
M/s RIBO INDUSTRIES PVT LTD
[B. SARAVANA KUMAR]
VICE PRESIDENT – MARKETING
RIBO INDUSTRIES PVT LTD
PROJECT : M/s. MARUTHI ISPAT & ENERGY (P) LTD
BOILER : WHRB – 2 X 9.35 TPH, 68 KG/CM2(G),
495±5 ˚C
REF: No.
19B-455
Date /REV
11.03.2020/ NIL
Page No.
2 of 39
LIST OF ANNEXURES
SL. NO.
ANNEXURE NO.
DESCRIPTION
1.
ANNEXURE – I
PROJECT DETAILS
2.
ANNEXURE – II
HIGHLIGHTS
3.
ANNEXURE – III
DESIGN BASIS
4.
ANNEXURE – IV
TECHNICAL DATA SHEET
5.
ANNEXURE – V
SCOPE CHART
6.
ANNEXURE –VI
TERMINAL POINTS
7.
ANNEXURE –VII
DRAWING LIST
8.
ANNEXURE –VIII
EXCLUSIONS
9.
ANNEXURE –IX
VENDOR LIST
RIBO INDUSTRIES PVT LTD
PROJECT : M/s. MARUTHI ISPAT & ENERGY (P) LTD
BOILER : WHRB – 2 X 9.35 TPH, 68 KG/CM2(G),
495±5 ˚C
REF: No.
19B-455
Date /REV
11.03.2020/ NIL
Page No.
3 of 39
ANNEXURE – I
PROJECT DETAILS
S.NO
DETAILS
DESCRIPTION
M/S Maruthi Ispat & Energy Steel (P)
Ltd.
M/S Maruthi Ispat & Energy Steel (P)
Ltd.
1.
Purchaser Name
2.
Plant Name
3.
Contact Details
Customer to confirm
4.
Latitude & Longitude
Customer to confirm
5.
Altitude above MSL ( meters)
321 (Customer to confirm)
6.
Temperature
Ambient
Temperature
performance guarantee
Ambient
Temperature
electrical/ inst. design
Relative Humidity (RH %)
7.
50 °C
60 % (Assumed)
As per IS875: 2000
39 m/sec
Seismic Data
Zone As per IS 1893 ( Part I )2002
9.
for
40 °C (Assumed)
Wind Data
Maximum wind velocity (m/sec)
8.
for
Zone - II
Electrical
Design Electrical Ambient
temperature
50 °C
AC Power supply ( LT )
415V±10%, 50Hz±5% (Combined
Variation +/-10%)
AC Control Supply
230V AC
For Field instruments
24V DC
RIBO INDUSTRIES PVT LTD
PROJECT : M/s. MARUTHI ISPAT & ENERGY (P) LTD
BOILER : WHRB – 2 X 9.35 TPH, 68 KG/CM2(G),
495±5 ˚C
REF: No.
19B-455
Date /REV
11.03.2020/ NIL
Page No.
4 of 39
ANNEXURE – II
HIGHLIGHTS
We have offered for the supply of two no of 9.35 TPH, 68 kg/cm2(g)
Pressure, 495 ± 5 °C SH steam temperature WHRB Boiler.( For Gas Flow of
24000 Nm^3 /hr at 900 °C at the inlet of Radiant Chamber).
01.
The offered WHRB’S are of single drum, water tube natural circulation type and
designed to recover heat energy available in the sponge iron rotary kiln exhaust
gas.
02.
We have designed the WHRB considering the normal gas flow parameters as
furnished below and cooling the gas temperature upto 160°C at the outlet of
economizer and considering the feed water temperature of 126°C at the inlet of
economizer as per the data provided. Considering the same we can generate
the steam quantity to 9350 Kg/hr at 68 kg/cm2(g) pressure and 495±5°C SH
temperature from WHRB at MSSV outlet. Kindly note that the steam generation
indicated by us is gross steam generation.
Exhaust gas flow
Nm3/hr
: 24,000
Exhaust gas temperature at the
Deg.C
: 900
Exhaust gas analysis
(% by vol)
CO2
: 14.00
H2O
: 12.00
SO2
: NIL
O2
: 03.00
N2
: 71.10
Gas density (calculated)
kg/Nm3
: 1.303
The performance of WHRB will vary if there is any change in the above
parameters.
RIBO INDUSTRIES PVT LTD
PROJECT : M/s. MARUTHI ISPAT & ENERGY (P) LTD
BOILER : WHRB – 2 X 9.35 TPH, 68 KG/CM2(G),
495±5 ˚C
03.
REF: No.
19B-455
Date /REV
11.03.2020/ NIL
Page No.
5 of 39
We have considered the hot gas ducting from the kiln as per the following table.
Boiler No.
Tapping at
Elevation
Distance from kiln end column
center line to Boiler front column
WHRB
ABC outlet
25.48 m
4m
Request you conform the Elevation of the tapping point at ABC outlet.
04.
We have not considered the hot gas ducting from ABC outlet to radiant chamber
inlet. The same will be in Ms Maruthi Ispat & Energy (P) Ltd scope.
05.
We have not considered Deaerator & storage tank, LP Dosing and Boiler feed
pump in our scope. Our scope starts from the inlet of the Feed Control Station.
06.
We have provided retractable type soot blowers in superheater sections and
fixed type rotary soot blowers in evaporator and economizer sections.
The
steam for soot blower will be taken from the Primary superheater outlet header
for a short while. The necessary piping, valves and PRV are considered in our
scope of supply.
07.
We request you to provide civil column and operating floor at the elevation of
5.00 mtr, which is in Ms Maruthi Ispat & Energy (P) Ltd scope. Steel structures
above the concrete floor will be in our scope. We have not considered the civil
works in our scope. The loading data will be given for the equipment supplied
by RIBO.
08.
09.
We have considered the following in our proposed offer,

Basic Boiler ( Refer Annexure – V- SCOPE CHART )

Field Instruments

Instrument & signal cables upto JB, including JB
We have not considered the following items in our scope.
 Ash Handling System
 Hot gas ducting
 ESP
RIBO INDUSTRIES PVT LTD
PROJECT : M/s. MARUTHI ISPAT & ENERGY (P) LTD
BOILER : WHRB – 2 X 9.35 TPH, 68 KG/CM2(G),
495±5 ˚C
REF: No.
19B-455
Date /REV
11.03.2020/ NIL
Page No.
6 of 39
 ID Fan
 Chimney
 Boiler MCC
 Power Cables and control cables From MCC to individual equipments
 Instrument & signal cables (from J.B to DCS)
 DCS
 Earthing
 Boiler Lighting
 Lightning system
10.
Our boiler needs DM water for Hydrotest as per the feed water quality
requirement furnished vide Annexure-III. Hence customer has to provide the
same for Hydro testing of the boiler.
11.
Kindly note that, we will supply the items / equipments as per the scope chart
which we have furnished vide Annexure-V. However any additional items which
are not specifically mentioned can be supplied at an additional cost.
12.
The Design parameters furnished along with this offer are predictions only. It is
also liable for change during project execution without affecting the boiler’s
major parameters.
RIBO INDUSTRIES PVT LTD
PROJECT : M/s. MARUTHI ISPAT & ENERGY (P) LTD
BOILER : WHRB – 2 X 9.35 TPH, 68 KG/CM2(G),
495±5 ˚C
ANNEXURE – III
SL.No
REF: No.
19B-455
Date /REV
11.03.2020/ NIL
Page No.
7 of 39
DESIGN BASIS
Description
Unit
Remarks
1.
GAS PARAMETERS
a.
Type of gas
b.
Exhaust gas flow
Nm3/hr
24,000
c.
Exhaust gas temperature
°C
900
d.
Gas density
Kg/Nm3
1.303
2.
GAS COMPOSITION (% BY VOL)
a.
CO2
%
14.00
b.
H2O
%
12.00
c.
O2
%
03.00
d.
N2
%
71.10
e.
SO2
%
NIL
3.
DUST CONCENTRATION
gm/Nm3
20
4.
BOILER PARAMETERS
a.
SH steam Flow at Stop valve
Kg/hr
9,350
b.
SH steam pressure at Stop
valve
Kg/cm2
c.
Feed water temperature at
Economiser Inlet
°C
126
d.
Exhaust gas outlet temp
°C
160
e.
No.of Boilers
Sponge iron rotary kiln exhaust
(g)
68
Two
RIBO INDUSTRIES PVT LTD
PROJECT : M/s. MARUTHI ISPAT & ENERGY (P) LTD
BOILER : WHRB – 2 X 9.35 TPH, 68 KG/CM2(G),
495±5 ˚C
REF: No.
19B-455
Date /REV
11.03.2020/ NIL
Page No.
8 of 39
RECOMMENDED FEED WATER LIMITS
The following recommendations hold good for water tube boilers with drum pressure
from 61-100 Bar (a) where high purity feed water is available by the use of
demineralizer. It is recommended that demineralizer shall only be used for all chemical
recovery boilers irrespective of drum pressures.
DESCRIPTION
Hardness
61 – 100
Nil
pH at 25 Deg.C (Copper alloy pre-Boiler system)
8.8 – 9.2
pH at 25 Deg.C (Copper free pre-Boiler system)
9.0 – 9.4
Oxygen (max.)(ppm)
0.007
Total iron (max.)(ppm)
0.01
Total copper
0.01
(max.)(ppm)
Total Silica (max.)(ppm)
0.02
Specific electrical conductivity at 25 Deg.C
measured after cation exchanger in H+ form and
after CO2 removal (max.) (µ s/cm)
0.5
Hydrazine residual (ppm)
0.01 – 0.02
Permanganate (max.) (ppm)
Nil
Total CO2
Nil
Oil
Not allowed
REMARKS
RIBO INDUSTRIES PVT LTD
PROJECT : M/s. MARUTHI ISPAT & ENERGY (P) LTD
BOILER : WHRB – 2 X 9.35 TPH, 68 KG/CM2(G),
495±5 ˚C
REF: No.
19B-455
Date /REV
11.03.2020/ NIL
Page No.
9 of 39
RECOMMENDED BOILER WATER LIMITS
DESCRIPTION
pH at 25 Deg.C
Phosphate residual (max.)(ppm)
61 – 100
9.8 – 10.2
15 – 25
Total dissolved solids (max.)(ppm)
Not more than 100
Specific electrical conductivity at 25 Deg.C
(max.)( µ s/cm)
Not more than 200
Silica (max.)(ppm)
REMARKS
Less than 0.02
Note:
1.
All the measurements of feed water shall be made at outlet economiser inlet.
2.
Oxygen can also be additionally measured at deaerator outlet to determine the
quantity of Na2So3 dozing.
3.
The recommended pH in feed water can be obtained by dozing ammonia
morpholine or any volatile amine. The concentration of volatile chemical in the
feed water should not exceed 1 ppm (expressed as ammonia).
4.
If the pH of boiler water falls below the recommended range, it will considerably
increase silica carryover in steam and hence suitable lower silica level should be
maintained in boiler water to maintain less than 0.02 ppm in steam leaving the
drum.
5.
The phosphate and pH are recommended in accordance with co-ordinated
phosphate curve to prevent presence of free hydroxide in boiler water. If the
recommended pH is consistently obtained phosphate residual can be maintained
near lower limits.
6.
Water levels in drum should be maintained within limits during all operational
modes, start-up, load fluctuation and normal operation.
7.
The alignment of drum internal should be checked and ensured to be in order at
least once every year.
8.
It is needless to emphasize that correct sampling accurate measurements with
the use of reliable instruments at adequate intervals and proper logging of
reading go a long way in ensuring trouble free operation of boilers.
RIBO INDUSTRIES PVT LTD
PROJECT : M/s. MARUTHI ISPAT & ENERGY (P) LTD
BOILER : WHRB – 2 X 9.35 TPH, 68 KG/CM2(G),
495±5 ˚C
ANNEXURE – IV
SL.No
REF: No.
19B-455
Date /REV
11.03.2020/ NIL
Page No.
10 of 39
TECHNICAL DATA SHEET
Description
Unit
Remarks
1.0
AVAILABLE DATA
a
Heat Source
2.0
FLUEGAS DATA
a
Quantity
b
Temperature
3.0
General
a.
Type of Boiler
Single-Drum, Water tube &
Vertical type
b.
Type of circulation
Natural Circulation
c.
Type of support
Bottom supported
d.
No. of Boilers
Two
e.
Boiler design code
IBR 1950 with its latest
amendments
4.0
Boiler Predicted Performance
a.
Boiler Capacity (MCR)
b.
Steam temperature at super
heater outlet
Steam pressure at super
heater outlet
c.
Exhaust flue gas from Sponge iron
rotary kiln.
Nm3/hr
ºC
kg/hr
24,000
900
9,350
ºC
495
Kg/cm2
(g)
68
d.
Feed water temperature at
Economiser inlet
°C
126
e.
Flue gas temperature at the
exit of economiser
°C
160
Note:
The steam quantity furnished above is considering the exhaust gas
parameters (gas flow and gas temperature) and exhaust gas composition
furnished vide point no.1 & 2 in Annexure – III at the inlet of screen and
considering the feed water temperature as 126 Deg.C at the inlet of
Economiser as per the data provided. The performance of WHRB will vary if
there is any change in the above parameters
RIBO INDUSTRIES PVT LTD
PROJECT : M/s. MARUTHI ISPAT & ENERGY (P) LTD
BOILER : WHRB – 2 X 9.35 TPH, 68 KG/CM2(G),
495±5 ˚C
SL.No
Description
REF: No.
19B-455
Date /REV
11.03.2020/ NIL
Page No.
11 of 39
Unit
Remarks
5.0
Flue Gas Temperature
a.
Radiant section
900
b.
Inlet of Screen section
730 – 750
c.
Inlet of Superheater
700 – 720
d.
Inlet of Evaporator
490 – 510
e.
Inlet of Economiser
320 – 340
f.
Outlet of Economiser
160
6.0
Water Temperature
a.
Economiser inlet
126
b.
Economiser outlet
250 – 260
7.0
Steam Temperature
a.
Super heater inlet
288
b.
Final Super heater outlet
495
8.0
Flue Gas Velocities
ºC
ºC
ºC
m/s
a.
Screen
7–8
b.
Superheater
9 -10
c.
Evaporator
6.0 – 8.0
d.
Economiser
8.0 – 10.0
9.0
Water Velocities
a.
Economiser
0.8 – 1.0
b.
Feed water line
1.5 – 3.0
10.0
Steam velocities
a.
Primary superheater
8– 11
b.
Secondary Superheater
11 – 14
c.
Main steam line
40 – 60
m/s
m/s
RIBO INDUSTRIES PVT LTD
PROJECT : M/s. MARUTHI ISPAT & ENERGY (P) LTD
BOILER : WHRB – 2 X 9.35 TPH, 68 KG/CM2(G),
495±5 ˚C
SL.No
Description
19B-455
Date /REV
11.03.2020/ NIL
Page No.
12 of 39
Unit
Remarks
Kg/cm2(g)
11.0
Steam Pressure Profile
a.
At main steam stop valve
68
b.
Superheater safety valve set
pressure
Pressure drop across Primary
Superheater
73
c.
REF: No.
4
d.
Pressure drop across
Secondary Superheater
e.
Drum Safety valve I set
pressure
77
f.
Drum Safety valve II set
pressure
78
g.
Drum Design Pressure
78
12.0
Draft Losses
a.
Hot gas ducting
10
b.
Radiant chamber
10
c.
Superheater
10
d.
Evaporator
30
e.
Economiser
70
f.
Connecting ductings within our
Terminal points
25
g.
Total gas side pressure drop
155
13.0
Boiler Construction Details
13.1
Drums
a.
Internal diameter
mm
1220
b.
Drum shell plate thickness
mm
As per IBR
c.
Drum shell material
SA 516 Gr. 70
d.
Type of drum support
Bottom Supported
e.
Drum Design code
IBR 1950 with its latest
amendments
mmWC
:
25 (Assumed)
STEAM DRUM
RIBO INDUSTRIES PVT LTD
PROJECT : M/s. MARUTHI ISPAT & ENERGY (P) LTD
BOILER : WHRB – 2 X 9.35 TPH, 68 KG/CM2(G),
495±5 ˚C
SL.No
REF: No.
19B-455
Date /REV
11.03.2020/ NIL
Page No.
13 of 39
Description
Unit
Remarks
f.
No. of Direct level gauges on
drum
nos.
2
g.
No./Type of safety valve on
the drum
nos.
2/Spring loaded mechanical type
h.
Type of Separator provided
13.2
Radiant Chamber
a.
Type of tube construction
b.
Tube size (OD x T)
c.
Tube material
SA 210 Gr. A1
d.
Header Material
SA 106 Gr. B
e.
Fin material and thickness
IS 2062 & 5 mm.
13.3
Superheater
Primary
Secondary
a.
Type of flow
Counter
Counter
b.
Arrangement
Inline
Inline
c.
Location
Convection
Convection
d.
Tube size (OD x T)
38.1 x 4.06
38.1 x 4.5
e.
Tube material
SA 210 Gr. A1
/ SA 213 T11
SA 213 T11/T22
f.
Inlet Header material
SA 106 Gr. B
(Inlet &Outlet)
SA 106 Gr. B
(inlet)/SA 335
P11 (Outlet)
13.4
De-Superheater
a.
Type
b.
Number off
c.
Location
In between Primary and
Secondary superheater.
d.
Material of pipe
SA 106 Gr B
Cyclone separator with screen
dryers
Fin Welded membrane wall
construction
mmxmm
mmxmm
51 x 4.06
Inter stage, spray type, fixed
nozzle
nos.
One
RIBO INDUSTRIES PVT LTD
PROJECT : M/s. MARUTHI ISPAT & ENERGY (P) LTD
BOILER : WHRB – 2 X 9.35 TPH, 68 KG/CM2(G),
495±5 ˚C
SL.No
Description
REF: No.
19B-455
Date /REV
11.03.2020/ NIL
Page No.
14 of 39
Unit
Remarks
13.5
Evaporator
a.
Type of Economiser
b.
Location
c.
Arrangement
d.
Tube size (OD x T)
e.
Tube material
SA 210 Gr. A1
f.
Header material
SA 106 Gr. B
13.6
Economiser
a.
Type of Economiser
Horizontal, drainable
b.
Location
Downstream of Evaporator
c.
Arrangement
Inline
d.
Tube size (OD x T)
e.
Tube material
SA 210 Gr. A1
f.
Header material
SA 106 Gr. B
g.
Casing material
IS 2062
h.
Type of flow
Counter
13.7
Safety Valves
SV-I
SV-II
SV-III
a.
Location
Steam
Drum
Steam
Drum
Main
Steam
Line
b.
Number provided
1
1
1
c.
Type
14.0
Soot Blowing Equipment
a.
Type
Long
retractable
Fixed rotary
b.
Location
At SH zone
At Evaporator &
Economiser zone
c.
Type of Operation
Motorised
Motorised
Inclined bare tubes in line
Assembly
Downstream of Primary
superheater
Inline
mmxmm
mmxmm
44.5 x 4.06
38.1 x 3.66
Spring loaded mechanical safety
valve
RIBO INDUSTRIES PVT LTD
PROJECT : M/s. MARUTHI ISPAT & ENERGY (P) LTD
BOILER : WHRB – 2 X 9.35 TPH, 68 KG/CM2(G),
495±5 ˚C
SL.No
Description
Unit
REF: No.
19B-455
Date /REV
11.03.2020/ NIL
Page No.
15 of 39
Remarks
15.0
Insulation
a.
Insulation Material
b.
Cladding finish
16.0
CHEMICAL DOSING
SYSTEM
a.
Type of system
b.
Tank Capacity
c.
Tank Material
d.
Tank Size
e.
Type of stirrer
Motorised stirrer
f.
Type of pump
Reciprocating pump
g.
No. Of pumps
2 (1W + IS)
h.
Capacity of the pump
i.
Head developed by pump
j.
Motor rating
k.
Chemical to be dosed
l.
Piping material
17.0
Sample Cooler
a.
Type
Shell & coil type
b.
Sampling point
Feed water, Sat. steam, SH
steam, Blowdown water
18.0
Blow down tank
a.
Quantity
b.
Type
Steel Plates cylindrical
c.
Material specification
SA 515 GR 70
Light Resin Bonded mineral wool
Aluminum cladding of 24 SWG thk
HP DOSING
Mixing cum metering
Litres
400
SS
mm
800 x 1000
lit/h
18
Kg/cm2
95
KW
0.37
Trisodium phosphate
SS
Nos.
One no.of continuous and
intermittent blow down
Note :
The technical /equipments information indicated are predictions only and it is liable
for change during detail engineering stage without major change in boiler specified
parameters.
RIBO INDUSTRIES PVT LTD
PROJECT : M/s. MARUTHI ISPAT & ENERGY (P) LTD
BOILER : WHRB – 2 X 9.35 TPH, 68 KG/CM2(G),
495±5 ˚C
REF: No.
19B-455
Date /REV
11.03.2020/ NIL
Page No.
16 of 39
ANNEXURE – V
RIBO
CUST
N.A
N.R
SL.NO
SCOPE CHART
: RIBO INDUSTRIES LIMITED
: M/s. MARUTHI ISPAT & ENERGY (P) LTD
: NOT APPLICABLE
: NOT REQUIRED
DESCRIPTION
ENGG
SUPPLY
FABRIC
ATION
ERECT
ION
COMMISS
IONING
RIBO
RIBO
RIBO
RIBO
RIBO
1.0
STEAM DRUM
1.1
Fully welded steam
drum with internals,
manholes and
necessary nozzle
connections for
mounting valves &
fittings
2.0
WATER WALL
2.1
Water
cooled
membrane enclosure
with
headers
&
necessary
connections
like
drains
RIBO
RIBO
RIBO
RIBO
RIBO
2.2
Ash hopper at the
bottom of water wall
RIBO
RIBO
RIBO
RIBO
RIBO
3.0
SUPERHEATER
3.1
PRIMARY SUPER-HEATER
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
3.1.1
3.1.2
3.2
3.2.1
3.2.2
Superheater tube
assemblies with inlet
and outlet headers
Superheater
coil
supports
SECONDARY SUPER-HEATER
Superheater
tube
assemblies with inlet
and outlet headers
Superheater
coil
supports
RIBO
RIBO
REMARKS
RIBO INDUSTRIES PVT LTD
PROJECT : M/s. MARUTHI ISPAT & ENERGY (P) LTD
BOILER : WHRB – 2 X 9.35 TPH, 68 KG/CM2(G),
495±5 ˚C
SL.NO
3.3
3.3.1
3.3.2
3.3.3
3.3.4
3.3.5
4.0
4.1
4.2
4.3
5.0
5.1
5.2
5.3
DESCRIPTION
REF: No.
19B-455
Date /REV
11.03.2020/ NIL
Page No.
17 of 39
ENGG
SUPPLY
FABRIC
ATION
ERECT
ION
COMMISS
IONING
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
REMARKS
SUPERHEATER LINK
Drum to primary
superheater inlet
header
Primary superheater
outlet
header
to
desuperheater inlet
Desuperheater outlet
to
secondary
superheater
inlet
header
Desuperheater with
spray nozzles and
internals
Steam piping from
final
SH
outlet
header
to
main
steam stop valve
EVAPORATOR
Evaporator
tube
assembly with inlet
and outlet headers
Casing with stiffeners
and access door for
evaporator
Evaporator
coil
supports
ECONOMISER
Economiser
tube
assemblies with inlet
/ outlet headers
Economiser coils
supports
Access
door,
economizer
casing
with stiffeners & ash
hoppers
with
isolation gate
Max.of 10
m
RIBO INDUSTRIES PVT LTD
PROJECT : M/s. MARUTHI ISPAT & ENERGY (P) LTD
BOILER : WHRB – 2 X 9.35 TPH, 68 KG/CM2(G),
495±5 ˚C
SL.NO
DESCRIPTION
REF: No.
19B-455
Date /REV
11.03.2020/ NIL
Page No.
18 of 39
ENGG
SUPPLY
FABRIC
ATION
ERECT
ION
COMMISS
IONING
6.0
DOWNCOMERS
RIBO
RIBO
RIBO
RIBO
RIBO
7.0
RISERS
RIBO
RIBO
RIBO
RIBO
RIBO
8.0
INTEGRAL PIPING
8.1
WATER PIPING
8.1.1
From
economizer
outlet to steam drum
inlet
RIBO
RIBO
RIBO
RIBO
RIBO
8.1.2
Pipe supports
RIBO
RIBO
RIBO
RIBO
RIBO
8.2
External piping
8.2.1
Steam piping
beyond MSSV
CUST
CUST
CUST
CUST
CUST
Feed water control
station
outlet
to
economizer inlet
RIBO
RIBO
RIBO
RIBO
RIBO
From
upstream
of
feed
control
station
to
DeSH
spray water control
station and spray
water control station
to desuperheater
RIBO
RIBO
RIBO
RIBO
RIBO
Pipe supports
RIBO
RIBO
RIBO
RIBO
RIBO
8.2.2
8.2.3
8.2.4
8.3
COOLING WATER PIPING
8.3.1
Piping between
cooling water pump
outlet and one point
near boiler island
CUST
CUST
CUST
CUST
CUST
8.3.2
Piping between one
point near boiler
island and individual
equipments
RIBO
RIBO
RIBO
RIBO
RIBO
REMARKS
For piping
supplied
by RIBO
For piping
supplied
by RIBO
RIBO INDUSTRIES PVT LTD
PROJECT : M/s. MARUTHI ISPAT & ENERGY (P) LTD
BOILER : WHRB – 2 X 9.35 TPH, 68 KG/CM2(G),
495±5 ˚C
SL.NO
DESCRIPTION
ENGG
REF: No.
19B-455
Date /REV
11.03.2020/ NIL
Page No.
19 of 39
SUPPLY
FABRIC
ATION
ERECT
ION
COMMISS
IONING
8.4
BLOWDOWN / DRAIN
8.4.1
Blowdown piping
from steam drum
upto blow down
valve
RIBO
RIBO
RIBO
RIBO
RIBO
8.4.2
Pipe line from blow
down valve outlet
upto blowdown tank
RIBO
RIBO
RIBO
RIBO
RIBO
8.4.3
Drain
piping from
individual
drain
points to common
header
RIBO
RIBO
RIBO
RIBO
RIBO
8.4.4
Common
header
RIBO
RIBO
RIBO
RIBO
RIBO
8.4.5
Piping from common
drain
header
to
blowdown tank
RIBO
RIBO
RIBO
RIBO
RIBO
8.4.6
Piping
blowdown
outlet to
trench
CUST
CUST
CUST
CUST
CUST
8.4.7
Supports
for
Blowdown, drain &
vent piping
RIBO
RIBO
RIBO
RIBO
RIBO
8.4.8
Common Blowdown
tank for Intermediate
& Continuous blow
down
RIBO
RIBO
RIBO
RIBO
RIBO
8.5
VENT
8.5.1
From
individual
vent connections on
steam drum, main
steam line
RIBO
RIBO
RIBO
RIBO
RIBO
8.5.2
Safety valve exhaust
upto safe elevation
RIBO
RIBO
RIBO
RIBO
RIBO
drain
from
tank
nearest
REMARKS
RIBO INDUSTRIES PVT LTD
PROJECT : M/s. MARUTHI ISPAT & ENERGY (P) LTD
BOILER : WHRB – 2 X 9.35 TPH, 68 KG/CM2(G),
495±5 ˚C
SL.NO
9.0
9.1
9.2
9.3
9.4
9.5
9.6
9.7
10.0
10.1
10.2
10.3
10.4
10.5
10.6
DESCRIPTION
REF: No.
19B-455
Date /REV
11.03.2020/ NIL
Page No.
20 of 39
ENGG
SUPPLY
FABRIC
ATION
ERECT
ION
COMMISS
IONING
CUST
CUST
CUST
CUST
CUST
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
CUST
CUST
CUST
CUST
CUST
CUST
CUST
CUST
CUST
CUST
REMARKS
GAS DUCTING
Hot gas ducting from
ABC outlet to radiant
chamber inlet
Hot gas expansion
joint
at
radiant
chamber inlet
From boiler second
pass to third pass
From
economizer
outlet to expansion
joint at ESP inlet
From ESP expansion
joint outlet to ID fan
From ID fan outlet to
chimney
Associated metallic
expansion joints for
gas ducting upto
outlet of economizer
except
ESP
expansion joints
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
CUST
CUST
CUST
CUST
CUST
CUST
CUST
CUST
CUST
CUST
CUST
CUST
CUST
CUST
CUST
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
Within our
boiler
Terminal
points
SUPPORTING STRUCTURE
Supporting structure
for
boiler
and
economizer
from
operating floor
Operating Platform
(RCC)
Staircases,
ladders
upto operating floor
Handrails
operating floor
for
Platform
above
operating floor
Staircases,
ladders
above operating floor
RCC
by
customer
RCC by
customer
RIBO INDUSTRIES PVT LTD
PROJECT : M/s. MARUTHI ISPAT & ENERGY (P) LTD
BOILER : WHRB – 2 X 9.35 TPH, 68 KG/CM2(G),
495±5 ˚C
REF: No.
19B-455
Date /REV
11.03.2020/ NIL
Page No.
21 of 39
DESCRIPTION
ENGG
SUPPLY
FABRIC
ATION
ERECT
ION
COMMISS
IONING
10.7
Foundation bolts for
RIBO
supplied
equipments
RIBO
RIBO
RIBO
RIBO
RIBO
10.8
Roof truss & side
cladding upto drum
operating floor
RIBO
RIBO
RIBO
RIBO
RIBO
10.9
Insert plate for Boiler
supports
RIBO
CUST
CUST
CUST
CUST
10.10
Complete
supports
ducting
SL.NO
REMARKS
RIBO
RIBO
RIBO
RIBO
RIBO
Only
for
ducting
Supplied
by RIBO
10.11
Approach
platform
from boiler to turbine
hall
CUST
CUST
CUST
CUST
CUST
If required
10.12
Buckstay assemblies
for furnace
RIBO
RIBO
RIBO
RIBO
RIBO
11.0
VALVES & MOUNTINGS
11.1
BOILER FEED WATER CONTROL STATION
11.1.1
1X100% Feed water
control valve
RIBO
RIBO
RIBO
RIBO
RIBO
11.1.2
Manual bypass valve
for FCV
RIBO
RIBO
RIBO
RIBO
RIBO
11.1.3
Manual
Isolation
Valve at downstream
& upstream side of
1X100% FCV
RIBO
RIBO
RIBO
RIBO
RIBO
11.1.4
All isolation, drain &
root valves
RIBO
RIBO
RIBO
RIBO
RIBO
11.1.5
Orifice plate for feed
flow measurement
RIBO
RIBO
RIBO
RIBO
RIBO
11.2
DE-SUPERHEATER SPRAY WATER CONTROL STATION
11.2.1
1X100%
control valve
steel
for
Spray
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO INDUSTRIES PVT LTD
PROJECT : M/s. MARUTHI ISPAT & ENERGY (P) LTD
BOILER : WHRB – 2 X 9.35 TPH, 68 KG/CM2(G),
495±5 ˚C
REF: No.
19B-455
Date /REV
11.03.2020/ NIL
Page No.
22 of 39
SL.NO
DESCRIPTION
ENGG
SUPPLY
FABRIC
ATION
ERECT
ION
COMMISS
IONING
11.2.2
Manual bypass valve
for 1X100% SCV
RIBO
RIBO
RIBO
RIBO
RIBO
11.2.3
Manual iso. Valve at
downstream
&
upstream of 1X100%
SCV
RIBO
RIBO
RIBO
RIBO
RIBO
11.3
STEAM DRUM
11.3.1
Water level gauges
RIBO
RIBO
RIBO
RIBO
RIBO
11.3.2
Spring
mechanical
valve
RIBO
RIBO
RIBO
RIBO
RIBO
11.3.3
All isolation, drain &
root valves
RIBO
RIBO
RIBO
RIBO
RIBO
11.4
MAIN STEAM LINE upto MSSV
11.4.1
Motorised
main
steam stop valve
with
motorized
integral bypass valve
RIBO
RIBO
RIBO
RIBO
RIBO
11.4.2
Motorized
vent valve
RIBO
RIBO
RIBO
RIBO
RIBO
11.4.3
Isolation
&
root
valves for drain
RIBO
RIBO
RIBO
RIBO
RIBO
11.4.4
Spring
mechanical
valve
RIBO
RIBO
RIBO
RIBO
RIBO
11.4.5
Non return valve
RIBO
RIBO
RIBO
RIBO
RIBO
11.4.6
Silencer on SH safety
valve & start-up vent
RIBO
RIBO
RIBO
RIBO
RIBO
11.4.7
Flow nozzle in steam
line
loaded
safety
startup
loaded
safety
RIBO
RIBO
RIBO
RIBO
RIBO
REMARKS
Transpare
nt type
Individual
supply by
RIBO
Individual
supply by
RIBO
RIBO INDUSTRIES PVT LTD
PROJECT : M/s. MARUTHI ISPAT & ENERGY (P) LTD
BOILER : WHRB – 2 X 9.35 TPH, 68 KG/CM2(G),
495±5 ˚C
REF: No.
19B-455
Date /REV
11.03.2020/ NIL
Page No.
23 of 39
SL.NO
DESCRIPTION
ENGG
SUPPLY
FABRIC
ATION
ERECT
ION
COMMISS
IONING
11.4.8
All isolation, drain &
root valves
RIBO
RIBO
RIBO
RIBO
RIBO
11.5
OTHER SECTIONS
11.5.1
All IBR valves in
steam line, feed line
and spray line
RIBO
RIBO
RIBO
RIBO
RIBO
11.5.2
All isolation, drain &
root valves
RIBO
RIBO
RIBO
RIBO
RIBO
12.0
SOOT BLOWERS
12.1
Retractable
and
rotary soot blowers
RIBO
RIBO
RIBO
RIBO
RIBO
12.2
Drive
motors
(Geared Motor)
RIBO
RIBO
RIBO
RIBO
RIBO
12.3
Steam piping for soot
blower from PSH
Outlet to soot blower
RIBO
RIBO
RIBO
RIBO
RIBO
12.4
Pressure Reducing
Control valve Station
RIBO
RIBO
RIBO
RIBO
RIBO
13
INSTRUMENTATION AND CONTROL
13.1
Thermocouples
13.1.1
Water temperature
a.
Outlet of Economiser
13.1.2
Fluegas temperature
a.
RIBO
RIBO
RIBO
RIBO
RIBO
WHRB chamber inlet
RIBO
RIBO
RIBO
RIBO
RIBO
b.
Secondary
Superheater inlet
RIBO
RIBO
RIBO
RIBO
RIBO
c.
Primary Superheater
outlet
RIBO
RIBO
RIBO
RIBO
RIBO
d.
Evaporator - II outlet
RIBO
RIBO
RIBO
RIBO
RIBO
e.
Economiser - outlet
RIBO
RIBO
RIBO
RIBO
RIBO
REMARKS
RIBO INDUSTRIES PVT LTD
PROJECT : M/s. MARUTHI ISPAT & ENERGY (P) LTD
BOILER : WHRB – 2 X 9.35 TPH, 68 KG/CM2(G),
495±5 ˚C
SL.NO
DESCRIPTION
REF: No.
19B-455
Date /REV
11.03.2020/ NIL
Page No.
24 of 39
ENGG
SUPPLY
FABRIC
ATION
ERECT
ION
COMMISS
IONING
RIBO
RIBO
RIBO
RIBO
RIBO
f.
ESP outlet
13.1.3
Steam temperature
a.
Desuperheater inlet
RIBO
RIBO
RIBO
RIBO
RIBO
b.
Desuperheater outlet
RIBO
RIBO
RIBO
RIBO
RIBO
c.
Main steam line
RIBO
RIBO
RIBO
RIBO
RIBO
13.1.4
Pressure gauges
a.
Local Pressure gauge
& remote pressure
gauge at feed line
before FCV
RIBO
RIBO
RIBO
RIBO
RIBO
b.
Local Pressure gauge
feed line after FCV
RIBO
RIBO
RIBO
RIBO
RIBO
c.
Local Pressure gauge
Economiser
outlet
header
RIBO
RIBO
RIBO
RIBO
RIBO
d.
Local Pressure gauge
& remote pressure
gauge at steam drum
RIBO
RIBO
RIBO
RIBO
RIBO
e.
Local Pressure gauge
TCV outlet
RIBO
RIBO
RIBO
RIBO
RIBO
f.
Local Pressure gauge
& remote pressure
gauge at main steam
line
RIBO
RIBO
RIBO
RIBO
RIBO
g.
Local pressure gauge
at soot blowing
RIBO
RIBO
RIBO
RIBO
RIBO
13.1.5
Draught gauges to measure
a.
WHRB chamber inlet
RIBO
RIBO
RIBO
RIBO
RIBO
b.
Primary Superheater
outlet
RIBO
RIBO
RIBO
RIBO
RIBO
c.
Evaporator-II outlet
RIBO
RIBO
RIBO
RIBO
RIBO
REMARKS
RIBO INDUSTRIES PVT LTD
PROJECT : M/s. MARUTHI ISPAT & ENERGY (P) LTD
BOILER : WHRB – 2 X 9.35 TPH, 68 KG/CM2(G),
495±5 ˚C
REF: No.
19B-455
Date /REV
11.03.2020/ NIL
Page No.
25 of 39
DESCRIPTION
ENGG
SUPPLY
FABRIC
ATION
ERECT
ION
COMMISS
IONING
d.
Economiser outlet
RIBO
RIBO
RIBO
RIBO
RIBO
e.
ESP outlet
RIBO
RIBO
RIBO
RIBO
RIBO
13.2
FIELD INSTRUMENTS REQUIRED FOR CONTROL SYSTEM
13.2.1
Three element drum level control consists of
a.
Two no. drum level
transmitter
RIBO
RIBO
RIBO
RIBO
RIBO
b.
One
no.
drum
pressure transmitter
RIBO
RIBO
RIBO
RIBO
RIBO
c.
One no. steam flow
transmitter
RIBO
RIBO
RIBO
RIBO
RIBO
d.
One no. main steam
pressure transmitter
RIBO
RIBO
RIBO
RIBO
RIBO
e.
One no. feed flow
transmitter
RIBO
RIBO
RIBO
RIBO
RIBO
f.
I/P converter
RIBO
RIBO
RIBO
RIBO
RIBO
13.2.2
Steam temperature control consists of
SL.NO
a.
b.
c.
One
no.
thermocouple at de
super heater outlet
One no of main
steam
line
temperature
transmitter
One
no.
I/P
converter
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
13.2.3
Furnace draught control consists of
a.
One no. draught
transmitter at
Radiant chamber
inlet
RIBO
RIBO
RIBO
RIBO
RIBO
b.
One no. draught
transmitter at ID Fan
inlet
RIBO
RIBO
RIBO
RIBO
RIBO
REMARKS
RIBO INDUSTRIES PVT LTD
PROJECT : M/s. MARUTHI ISPAT & ENERGY (P) LTD
BOILER : WHRB – 2 X 9.35 TPH, 68 KG/CM2(G),
495±5 ˚C
SL.NO
DESCRIPTION
ENGG
SUPPLY
REF: No.
19B-455
Date /REV
11.03.2020/ NIL
Page No.
26 of 39
FABRIC
ATION
ERECT
ION
COMMISS
IONING
13.2.4
Soot blower pressure control
a.
One no. Pressure
transmitter
RIBO
RIBO
RIBO
RIBO
RIBO
b.
I/P convertor
RIBO
RIBO
RIBO
RIBO
RIBO
13.2.5
Instrument air piping
from source
to
terminal point
CUST
CUST
CUST
CUST
CUST
13.2.6
Instrument air piping
from
boiler
terminal point to
individual
consuming point
RIBO
RIBO
RIBO
RIBO
RIBO
13.2.7
Compensating
cables,
impulse
piping,
instrument
cables and signal
cables from field
instruments
to
junction box
RIBO
RIBO
RIBO
RIBO
RIBO
13.2.8
Cables
beyond
junction box
CUST
CUST
CUST
CUST
CUST
13.2.9
Junction boxes for
the
instruments
supplied by RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
13.2.1
0
DCS/SCADA/PLC
CUST
CUST
CUST
CUST
CUST
14.0
SAMPLE COOLERS
14.1
Feed line
RIBO
RIBO
RIBO
RIBO
RIBO
14.2
Boiler
water
RIBO
RIBO
RIBO
RIBO
RIBO
14.3
Saturated steam
RIBO
RIBO
RIBO
RIBO
RIBO
14.4
SH steam
RIBO
RIBO
RIBO
RIBO
RIBO
blow
down
REMARKS
RIBO INDUSTRIES PVT LTD
PROJECT : M/s. MARUTHI ISPAT & ENERGY (P) LTD
BOILER : WHRB – 2 X 9.35 TPH, 68 KG/CM2(G),
495±5 ˚C
SL.NO
DESCRIPTION
REF: No.
19B-455
Date /REV
11.03.2020/ NIL
Page No.
27 of 39
ENGG
SUPPLY
FABRIC
ATION
ERECT
ION
COMMISS
IONING
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
RIBO
14.5
Sample
Assembly
Cooler
14.6
Necessary
and fittings
Valves
14.7
Cooling water piping
from one point to
individual consuming
points
15.0
ELECTRICALS
15.1
Motor for ID fan
CUST
CUST
CUST
CUST
CUST
15.2
415 V LTMCC for
boiler and its
auxiliaries (Non draw
out type)
CUST
CUST
CUST
CUST
CUST
15.3
Inter
power
cables
CUST
CUST
CUST
CUST
CUST
RIBO
RIBO
RIBO
RIBO
RIBO
15.4
Local push button
stations
for
the
motors supplied by
RIBO
15.5
Above ground level
earthing
CUST
CUST
CUST
CUST
CUST
15.6
Incoming
cables
from
purchaser
power source to MCC
cum
instrument
panel
CUST
CUST
CUST
CUST
CUST
15.7
Earthing pit ,
Subearth mat & main
earth mat
CUST
CUST
CUST
CUST
CUST
15.8
Lightning protection
and Lightings for
boiler area
CUST
CUST
CUST
CUST
CUST
connecting
and control
REMARKS
RIBO INDUSTRIES PVT LTD
PROJECT : M/s. MARUTHI ISPAT & ENERGY (P) LTD
BOILER : WHRB – 2 X 9.35 TPH, 68 KG/CM2(G),
495±5 ˚C
REF: No.
19B-455
Date /REV
11.03.2020/ NIL
Page No.
28 of 39
DESCRIPTION
ENGG
SUPPLY
FABRIC
ATION
ERECT
ION
COMMISS
IONING
15.9
All HT & LT cables,
its cable trays & its
supports.
CUST
CUST
CUST
CUST
CUST
15.10
Air conditioning
system
CUST
CUST
CUST
CUST
CUST
16.0
REFRACTORY
16.1
Refractory and
refractory holding
materials for water
wall bottom portions
RIBO
RIBO
RIBO
RIBO
RIBO
16.2
Refractory
&
refractory
holding
materials for Hot gas
ducting
CUST
CUST
CUST
CUST
CUST
17.0
INSULATION AND
CLADDING
(24
SWG Plain aluminium
cladding)
18.0
SPARES & TOOLS
18.1
Special Tools and
Tackles
18.2
Two years O & M
spares
SL.NO
18.3
Commissioning
spares
19.0
HP DOSING SYSTEM
RIBO
RIBO
RIBO
RIBO
RIBO
N.A
N.A
N.A
N.A
N.A
CUST
CUST
CUST
CUST
CUST
RIBO
RIBO
RIBO
RIBO
RIBO
19.1
High pressure dosing
system
(Chemical
Trisodium
phosphate)
RIBO
RIBO
RIBO
RIBO
RIBO
19.2
HP dosing tank with
agitator
RIBO
RIBO
RIBO
RIBO
RIBO
REMARKS
For items
supplied
by RIBO
Will
taken
back
RIBO
be
by
RIBO INDUSTRIES PVT LTD
PROJECT : M/s. MARUTHI ISPAT & ENERGY (P) LTD
BOILER : WHRB – 2 X 9.35 TPH, 68 KG/CM2(G),
495±5 ˚C
SL.NO
DESCRIPTION
REF: No.
19B-455
Date /REV
11.03.2020/ NIL
Page No.
29 of 39
ENGG
SUPPLY
FABRIC
ATION
ERECT
ION
COMMISS
IONING
19.3
Dosing pumps
RIBO
RIBO
RIBO
RIBO
RIBO
19.4
Dosing pump motor
RIBO
RIBO
RIBO
RIBO
RIBO
19.5
Associated
piping,
Valves, mountings,
fittings
within
system
RIBO
RIBO
RIBO
RIBO
RIBO
19.6
Base frame
RIBO
RIBO
RIBO
RIBO
RIBO
19.7
Level gauge
RIBO
RIBO
RIBO
RIBO
RIBO
19.8
Pressure gauge
RIBO
RIBO
RIBO
RIBO
RIBO
19.9
Foundation
&Supports
RIBO
RIBO
RIBO
RIBO
RIBO
19.10
HP dosing pumping
unit to inlet of HP
dosing connection of
feed line.
RIBO
RIBO
RIBO
RIBO
RIBO
20.0
ASH
HANDLING
SYSTEM
CUST
CUST
CUST
CUST
CUST
21.0
CHIMNEY OF
MILD STEEL (or)
RCC CHIMNEY
CUST
CUST
CUST
CUST
CUST
22.0
DUST
COLLECTION
SYSTEM (ESP)
CUST
CUST
CUST
CUST
CUST
23.0
PAINTING
23.1
Primer painting for
supplied components
RIBO
RIBO
-
RIBO
RIBO
23.2
Final painting for
supplied components
CUST
CUST
CUST
CUST
CUST
24.0
CIVIL WORKS
24.1
Loading data for
equipment under
RIBO scope
RIBO
CUST
CUST
CUST
CUST
bolts
REMARKS
RIBO INDUSTRIES PVT LTD
PROJECT : M/s. MARUTHI ISPAT & ENERGY (P) LTD
BOILER : WHRB – 2 X 9.35 TPH, 68 KG/CM2(G),
495±5 ˚C
SL.NO
24.2
24.3
24.4
24.5
DESCRIPTION
Any
modification/
dismantling
revamping existing
system/building/
equipments/structure
/piping/existing ABC
/existing duct work
refractory
modification in ABC
Grouting
material
(packing plate &
shims)
Grouting
for
equipments
and
boiler
structural
column steel
Rain gutters and
drain piping for boiler
hopper, roof and side
cladding
REF: No.
19B-455
Date /REV
11.03.2020/ NIL
Page No.
30 of 39
ENGG
SUPPLY
FABRIC
ATION
ERECT
ION
COMMISS
IONING
CUST
CUST
CUST
CUST
CUST
CUST
CUST
CUST
CUST
CUST
CUST
CUST
CUST
CUST
CUST
CUST
CUST
CUST
CUST
CUST
25.0
UTILITIES
25.1
Initial fill of
lubricants
RIBO
RIBO
RIBO
RIBO
RIBO
25.2
Chemicals
&
Temporary
piping
for alkali boilout
RIBO
CUST
CUST
CUST
CUST
25.3
Target
plate and
temporary piping for
hydro test
RIBO
CUST
CUST
CUST
CUST
26.0
GENERAL
26.1
Fire fighting system
CUST
CUST
CUST
CUST
CUST
26.2
Packing & forwarding
RIBO
RIBO
RIBO
RIBO
RIBO
26.3
Steam blowing
CUST
CUST
CUST
CUST
CUST
REMARKS
RIBO
supplied
items
RIBO INDUSTRIES PVT LTD
PROJECT : M/s. MARUTHI ISPAT & ENERGY (P) LTD
BOILER : WHRB – 2 X 9.35 TPH, 68 KG/CM2(G),
495±5 ˚C
SL.NO
DESCRIPTION
26.4
Pump required
Hydrotest
26.5
Boiler
pump
SL.NO
initial
for
fill-up
REF: No.
19B-455
Date /REV
11.03.2020/ NIL
Page No.
31 of 39
ENGG
SUPPLY
FABRIC
ATION
ERECT
ION
COMMISS
IONING
CUST
CUST
CUST
CUST
CUST
CUST
CUST
CUST
CUST
CUST
DESCRIPTION
31.0
FACILITIES
31.1
Providing Erection tools, tackles,
hoists, derricks, slings, scaffolding,
rigging tools, welding sets,
instruments, appliances,
consumables required for unloading,
storing, erection, inspection, testing
and commissioning to accomplish the
work.
RESPONSIBILITIES
REMARKS
REMARKS
RIBO
31.2
IBR approval at site and boiler
registration formalities
31.3
Pre-commissioning check, mass
flushing alkali boil out, steam
blowing, trial run of all equipment
calibration of instrument & control
etc.
RIBO
31.4
Performance test
RIBO
31.5
Training for customer personal after
commissioning
RIBO
31.6
Emergency / first aid medical
facilities to RIBO staff and erection
crew and insurance
CUST
31.7
Transportation & Transit insurance
CUST
CUST
Necessary
technical assist by
RIBO
1 week
RIBO INDUSTRIES PVT LTD
PROJECT : M/s. MARUTHI ISPAT & ENERGY (P) LTD
BOILER : WHRB – 2 X 9.35 TPH, 68 KG/CM2(G),
495±5 ˚C
31.8
Site storage insurance
CUST
31.9
Boiler Registration formalities
CUST
31.10
Lighting facilities at erection site,
Security for RIBO supplied items
CUST
31.11
Supply of construction power and
water at free of cost
CUST
31.12
Drainage and sanitary works
CUST
31.13
CEIG, Pollution & factory approval
CUST
31.14
Construction of site office and store
room and Site storage insurance
CUST
31.15
O&M staff for boiler startup,
commissioning & operation
CUST
REF: No.
19B-455
Date /REV
11.03.2020/ NIL
Page No.
32 of 39
RIBO INDUSTRIES PVT LTD
PROJECT : M/s. MARUTHI ISPAT & ENERGY (P) LTD
BOILER : WHRB – 2 X 9.35 TPH, 68 KG/CM2(G),
495±5 ˚C
ANNEXURE – VI
SL. NO.
DESCRIPTION
REF: No.
19B-455
Date /REV
11.03.2020/ NIL
Page No.
33 of 39
TERMINAL POINTS
TERMINAL POINTS
1.
Main Steam
Outlet of MSSV
2.
Feed Water
Inlet of Feed control station,
3.
Flue Gases
Inlet of Radiant Chamber
to Inlet to ESP
4.
Drum Vents
1m above roof
5.
Safety Valve & Startup Vent
1m above roof through
silencer
6.
HP Drains
To Blow-down tank though
Header
7.
Other Drains
In Drain trench
8.
Ash
To equipment hopper outlet
flanges
9.
Trapped Drains
Pipe Drain pot
10.
Instrument Air
One point in Boiler Area
11.
Service Air
One point in Boiler Area
12.
Service Water
One point in Boiler Area
13.
H.P. Dosing
Drum Inlet
14.
Make-up Water
Inlet of HP Dosing Dilution
Tank
15.
Instrument & Signal
Cabling
Outlet of JBs
16.
LT power
At the inlet of LT motor
REMARKS
Flow Nozzle &
NRV shall be
supplied in loose
RIBO INDUSTRIES PVT LTD
PROJECT : M/s. MARUTHI ISPAT & ENERGY (P) LTD
BOILER : WHRB – 2 X 9.35 TPH, 68 KG/CM2(G),
495±5 ˚C
ANNEXURE – VII
S.NO.
DESCRIPTION
REF: No.
19B-455
Date /REV
11.03.2020/ NIL
Page No.
34 of 39
DRAWING LIST
DRAWING NO.
1
General Arrangement Elevation
19B-455-GA- ELEVATION-001
2
General Arrangement - Plan
19B-455-GA- PLAN - 002
3
Key Plan Layout
19B-455-KEYPLAN-003
4
P&ID For Boiler System
19B-455 - PIBS - 004
RIBO INDUSTRIES PVT LTD
PROJECT : M/s. MARUTHI ISPAT & ENERGY (P) LTD
BOILER : WHRB – 2 X 9.35 TPH, 68 KG/CM2(G),
495±5 ˚C
ANNEXURE – VIII
REF: No.
19B-455
Date /REV
11.03.2020/ NIL
Page No.
35 of 39
EXCLUSIONS
The following are excluded from our scope of supply:
CIVIL
1. Boiler foundation & design, Boiler building, all civil works, insert plates,
cable trenches, inplant drains. However, RIBO shall submit the civil loading
data as required for all equipments in scope.
2. RCC supporting structure upto operating floor and operating floor
3. Staircase, ladders upto operating floor and handrails for operating floor
4. Approach platform between boiler & turbine hall if required.
5. Supporting structure to place the deaerator at elevated level.
6. Final grouting materials and grouting for equipment.
7. Boiler MCC and ESP MCC control room
8. Construction of site office and store room
9. Storage space and access road
10. Effluent Disposal & Treatment, if any.
11. Drainage & Sanitary Works.
12. Site leveling & grading, soil investigation.
13. Rain gutter and drain piping for boiler roof.
14. Supporting structure upto bearing level of ESP
WATER
1. Water treatment plant. DM plant, DM water tank.
2. Transfer Pumps.
3. Water for construction, testing and commissioning
4. Cooling water piping up to one point in boiler house
5. DM water piping up to inlet of Dosing tank
6. Condensate piping up to boiler battery limit
7. Feed water piping up to deaerator level control station from DM Plant
8. Boiler initial filling line with pumps.
9. Deaerator & Storage tank
10. Boiler feed water pumps
11. Feed water piping upto inlet of Feed control station
12. Deaerator over flow piping
13. Blowdown piping beyond battery limit
14. Any other water piping beyond battery limits apart from the above
RIBO INDUSTRIES PVT LTD
PROJECT : M/s. MARUTHI ISPAT & ENERGY (P) LTD
BOILER : WHRB – 2 X 9.35 TPH, 68 KG/CM2(G),
495±5 ˚C
REF: No.
19B-455
Date /REV
11.03.2020/ NIL
Page No.
36 of 39
STEAM
1. Any other steam piping not covered under RIBO’S scope of supply
2. Pipe racks/Gantry supports for steam and feed piping
3. Any other motorized valves except as mentioned in offer
4. Steam piping beyond MSSV.
FLUE GAS PATH
1.
2.
3.
4.
5.
6.
7.
Hot gas ducting upto radiant chamber inlet.
Dampers except, if any, listed in scope of supply.
ESP
ID Fan
Ducting from ESP outlet to chimney
Chimney & Aviation lights
Chimney on line flue gas monitoring system for SOX, NOX and SPM.
ELECTRICAL
1. All power and auxiliary transformers & Power
2. MCC Panel.
3. Plant DC and UPS system
4. Emergency power for lighting and start-up
5. Earthing of all equipment.
6. Power & Control Cables.
7. VFD Panels.
8. Plant DC and UPS system.
9. Below Ground Earthing System.
10. Lightning
11. HT & LT switch board
12. All HT & LT cables, its cable trays & its supports if any.
13. Lightning protection.
14. Earthing for boiler& ESP
15. Lightning protection for boiler house with vertical down conductor, earth
electrode and connection to earth pit.
16. Electric power for erection and site fabrication at free of cost
17. CEIG, pollution and factory approval
INSTRUMENTATION
1. All instruments except as mentioned in offer
2. Inlet , outlet racks
3. Control room instrumentation
RIBO INDUSTRIES PVT LTD
PROJECT : M/s. MARUTHI ISPAT & ENERGY (P) LTD
BOILER : WHRB – 2 X 9.35 TPH, 68 KG/CM2(G),
495±5 ˚C
4.
5.
6.
7.
8.
9.
REF: No.
19B-455
Date /REV
11.03.2020/ NIL
Page No.
37 of 39
Instrument air compressors for boiler
DCS / PLC / SCADA
UPS for DCS / PLC /SCADA
Instrumental air piping from source to boiler first column
Analyzer for water and steam (SWAS) and O2 analyzer, if required
Cables beyond junction boxes.
UTILITIES
1.
2.
3.
4.
5.
Operation and maintenance staff for boiler startup,
Operation and maintenance spares
Chemical and lubricant(Other than first fill of lubricants)
Acid cleaning if required
Target plates & steam blowing
OTHERS
1.
2.
3.
4.
5.
6.
Fire fighting system.
Air conditioning.
Elevators & sky climbers.
Communication system.
Statutory fees for IBR.
Clearances for pollution, electrical inspectorate, factory inspectorate unless
mentioned in the scope.
7. Unloading at site before arrival of RIBO crew.
8. Emergency/first aid medical facilities for erection crew.
9. Security for RIBO supplied items.
10. Lighting facilities at erection site.
11. Boiler registration formalities.
12. Site storage insurance.
Note: Any other scope not specifically mentioned in our scope of supply.
RIBO INDUSTRIES PVT LTD
PROJECT : M/s. MARUTHI ISPAT & ENERGY (P) LTD
BOILER : WHRB – 2 X 9.35 TPH, 68 KG/CM2(G),
495±5 ˚C
REF: No.
19B-455
Date /REV
11.03.2020/ NIL
Page No.
38 of 39
ANNEXURE – IX
S.NO
VENDOR LIST
DESCRIPTION
A
MECHANICAL
1.
DIRECT WATER LEVEL GAUGE
VENDOR
- TUBULAR
LEVCON / CHEMTROL / WJNETA /
ASIAN / RK DUTT
2.
FEED PUMPS
KSB / SULZER / FLOWSERVE
3.
FANS
RIBO
4.
FABRIC EXPANSION JOINT
RIBO
5.
STEAM TRAPS
J.N. MARSHALL
6.
REFRACTORY & INSULATING
BRICKS
R.V REFRACTORY / TATA
REFRACTORIES / DALMIA / CASTWELL
INSULATION
- CERAMIC BLANKETS
7.
- LRB
- ALUMINIUM CLADDING
B
LLOYDS INSULATION / ORIENT
CERWOOL
ROCKWOOL INDUSTRIES / ROCKWOOL
INDIA PVT LTD
INDALCO / HINDALCO
VALVES
MIL CONTROLS / IL / RK CONTROLS /
KOSO FLUID CONTROLS / SAMSON
CONTROLS / MASCOT / FORBES
MARSHAL
TYCO SANMAR / FAIGNER LESSER /
DARLING MUESCO
1.
CONTROL VALVES
2.
SAFETY VALVE FOR BOILER
3.
NON-IBR VALVES
FLUID LINE/ KSB / L&T / ARUNA
4.
BALL VALVES
INTERVALVE
5.
IBR VALVES (MANUAL)
KSB / L& T / ARUNA
6.
SS VALVES
BDK
7.
MANUAL BLOW DOWN VALVE
LEVCON
C
ELECTRICAL
1.
LT MOTOR
ABB / SIEMENS / CROMPTON GREAVES
/ BHARAT BIJILEE / MARATHON
RIBO INDUSTRIES PVT LTD
PROJECT : M/s. MARUTHI ISPAT & ENERGY (P) LTD
BOILER : WHRB – 2 X 9.35 TPH, 68 KG/CM2(G),
495±5 ˚C
S.NO
DESCRIPTION
REF: No.
19B-455
Date /REV
11.03.2020/ NIL
Page No.
39 of 39
VENDOR
2.
MCC CUM INSTRUMENT PANEL
RIBO
3.
ACTUATORS
ROTARK / AUMA
4.
LOCAL PUSH BUTTON STATIONS
FCG DAMAN / BALIGA / GOVAN
SWITCH GEAR COMPONENTS
- FUSE
- SWITCHES
- SWITCH/FUSE UNIT
5.
- THERMAL OVERLOAD RELAY
- CONTACTORS
L& T / SIEMENS / ABB / SCHNEIDER /
C&S
- SELECTOR SWITCH
- MCCB
- TIMER
6.
MCB
MDS / SIEMENS / INDOKOPP
D
OTHERS
1.
ORIFICE PLATES
RIBO
2.
METALLIC BELLOWS
RIBO
Download