تخطيط وضبط واإلنتاج HOME WORK عبدالرضا حبيب خليفة الصقر 439231293 Routing Information (all times in hours) Product/part Lot size Work center Operation Setup/hours SU hrs per uni X Y C D E E 40 60 120 90 70 70 100 100 200 300 200 300 1 of 1 1 of 1 1 of 1 1 of 1 1 of 2 2 of 2 0.8 1 1.2 2.2 1.8 1 0.02 0.016 0.01 0.029 0.025 0.014 Work center 100 200 X 1.02 0.61 300 totall (0.924)3= 2.772 4.402 WEEK X Y 1 50 15 WEEK WC100 Y 1.416 (0.61)2 +0.725 = 1.945 1.514 4.875 2 40 20 1 (1.02X50)+(1.146 X15)= 3 45 18 2 3 69.12 71.388 63.3 62.46 141.1 6 151.99 2 72.24 WC200 (0.61X50)+(1.645X15)= 59.675 WC300 (2.772X50)+(1.514X15)= 161.31 Run Time per unit 1 1.4 0.6 0.9 0.7 1.5 Total hrs per uni 1.02 1.416 0.61 0.924 0.725 1.514