Instructions: XYZ Corp. Document Review and Comment (DCR) Form Author: Complete items 1 – 6 Reviewer: Review the document applying the criteria specified below, and complete items 7 and 8 Author: If there are comments requiring response, prepare response to each comment on attached page(s); complete item 9, and return to reviewer Reviewer: Review responses to comments. Indicate acceptance or rejection on the DRC and complete item 10. Note: Author and Reviewer are encouraged to discuss comments. If comment(s) cannot be resolved, refer the issue(s) to management Entries must be complete, legible, and in reproducible ink or completed electronically. 1. Document Title: 2. Rev: 3. Document Description Contaminated soil volume determination and methods at MDEQ Facility No. 0000 1 Section 4.0, Figures 5-7 and 13, and accompanying memorandum for a phase II site assessment 4. x • • • • • • Type of Review (check one) Technical (technical adequacy, accuracy, completeness) Are the objectives clearly stated and fulfilled? Is the technical activity clearly described? Are equations/calculations accurate? Does logic lead to reasonable conclusions? Are the results drawn from the data supported by data presented? Data/Tables/Figures: Are they easily understood? Are legends complete? 5. Additional criteria (if applicable): Author: 7. Review Prepared by: 9. QA (compliance and completeness) Are applicable QA requirements adequately cited/incorporated and met Sam Fire 6. 8. • No comments Response to comments prepared by: 10. Response Concurrence Date: Date: Comments Recorded on the following pages Date: Date: 03/03/2020 Page _____ of _______ Document Title Rev. # Reviewer’s Comments Comment# * Location Comment Review Requester’s Response Accept Reject Reviewer’s Response Accept Reject