NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Shipping, Road Transport & Highways) Government of India Improvement, Operation and Maintenance, Rehabilitation and Strengthening of Existing 2 lane road and widening to 4-lane divided Highway from Km 265+000 to Km 380+000 (New Km 261+720 to Km 379+878 ) of NH-3 (Dhule-Pimpalgaon) in state of Maharashtra on Build Operate and transfer (BOT) basis MONTHLY O & M INSPECTION REPORT (Completed stretch from Km: 261+720 to Km 379+878) BY INDEPENDENT CONSULTANT for the month of Concessionaire Ircon Soma Tollways Pvt. Ltd Independent Consultant K & J Projects Pvt. Ltd. PIU NHAI NASHIK DHULE-PTMPALGAON (NIl_3) BOT PROJBCT K&J/DP NH n Lt 20 i 6 toqq t, Date:o ril2016 L..'--To, The Project Director, National Highways Authority of India, PlU, Nashik, "Subodh House",S. N o.91 1 12,plot No.4, Off MumbaiAgra Highway Nashik - 422009 lmprovement and Maintenance, Rehabilitation and Strengthening of existing 2 tane road an to 4_lane divided Highway from Km 265+000 to Km 380+ggg e1 NH-3 (Dhule n) in the state of Maharashtra on Build operate and transfer basis - o & M Inspection Report (coD stretch New Km 261+tzo to Km --!Bor) 379+878) for the month of March _ 20116 _ sub: Req. Ref: Clause 19.2, Volume I of Concession Agreement. Dear Sir, As per clause 19.2, Volume I of Concession Agreement, please find o & M Inspection Reporl of lc for the month of March 2016.This is for your kind information please. - With Besi Regards, 6nrscl'"r A.K.Mittal Tea; Leader Dhule Pimpalgaon Section of NH-3. Encl: As above. cc: 1) The coo, rsrpL, Laring Toil praza, Laring, Tar-Dist Dhure for inf & 2) Mr V A' Dange' Executive Director, Road, pune 3) Office Fites. K& - 411007, for perusal n/a. 18, AnjaliApartment, Baner Residency, Baner J?rojects Pvt. Ltd. Plot No. 4, Gajanan Housing Society, GTP Stop, Deopur, Dhule - 424005, Maharashtra (lNDIA) Monthly O & M Inspection Report - March - 2016 Improvement,Operation and Maintenance,Rehabilitation and Strengthening of Existing 2-Lane Road and Widening to 4/6 Lane of Dhule to Pimpalgaon(Km 265 - Km 380) Section of NH-3 on BOT basis. MONTHLY O & M INSPECTION REPORT (MARCH - 2016 ) TABLE OF CONTENTS Description of work Sl.No. Page No. 1 Shoulder, slopes, earthworks 2 Road Maintenance 2 to 4 3 Structure 5 to 7 4 Road Furniture 8 to 14 5 Drainage 15 6 Misc. Maintenance Activities 16 7 Horticulture 17 8 8.1.1 - RHS Enchroachmnet 18 9 8.1.2 - LHS Encroachment 19 10 8.1.3 - Median Encroachment 20 11 Annexures 21 8.1 Annexure -A : Encroachments 22 1 8.2 Annexure -B : Highway Lighting 23 to 24 8.3 Annexure -C : Avenue plants 25 to 26 8.4 Annexure - D : Recovery of Damages 27 to 30 K & J Projects Pvt. Ltd. Monthly O and M Inspection Report - March - 2016 Improvement, Operation and Maintenance, Rehabilitation and Strengthening of existing 2 lane road and widening to 4-lane divided Highway from Km 265+000 to Km 380+000 (New Km 261+720 to Km 379+878 ) of NH-3 (Dhule-Pimpalgaon) in state of Maharashtra on Build Operate and transfer (BOT) basis O & M Inspection Report by IC for the month of March - 2016 1 - Shoulder, slopes, earthworks Sl.No Description of Maintenance work to be done 1 Location in Km Type of Damages noticed Action taken by IC Remarks Notice Issued Defects to be rectified immediately sec 3000 req. Km 285+600 to Km 285+800 LHS Blading/ grading Shoulder and Slope Km 282+220 to Km 282+320 LHS Km 304+500 to Km 305+200 LHS Km 266+600 to 266+700 RHS Km 285+800 to Km 286+000 LHS Reconstruction & regravelling of Slope/ Shoulder Km 296+800 to Km 296+600 RHS Km 311+250 RHS Km 348+600 to Km 348+800 RHS Km 343+810 LHS 2 scouring of soft shoulders,hence stagnation of water during rainy season and to be repaired by exacavation,filling and compaction scouring of soil below the standpost of MBCB needs be Stone pitching damged on to emb. Notice Issued Quadrant pitching on Nashik side is Furnishing & laying turf Km 352+600 LHS damaged and the bed of slab culvert at Km 352+600 LHS is filled with disposed litter and all rubbish, debris etc obstructing the flow of water K & J Projects Pvt. Ltd Notice Issued Defects to be rectified immediately Monthy O and M Inspection Report - March - 2016 Improvement, Operation and Maintenance, Rehabilitation and Strengthening of Existing 2 lane road and widening to 4-lane divided Highway from Km 265+000 to Km 380+000 (New Km 261+720 to Km 379+878 ) of NH-3 (Dhule-Pimpalgaon) in state of Maharashtra on Build Operate and transfer (BOT) basis O & M Inspection Report by IC for the month of March - 2016 2 - Road Maintenance Sl.No. Description of Maintenance work to be done Location in Km Type of Damages Notice Action taken by IC Remarks Vegetation on embankment to be cleared Notice issued Defects to be rectified immediately. Notice issued To be rectified pertaining to Clause 3.3.5 (iv) of Schedule –L, Volume-II of CA and Swachh Bharat Mission of NHAI – Activities in NHAI LHS Km 288+000 to Km 288+200 Km 288+350 to Km 288+500 Km 297+000 to Km 297+000 Km 312+200 to km 312+400 Km 316+000 to Km 317+000 Km 326+000 to Km 327+000 Km 336+600 to Km 336+700 1 Clearance of Embankment Km 337+500 to Km 337+700 Km 352+600 to Km 352+800 RHS Km 338+200 to Km 338+600 Km 349+400 to Km 349+800 Km 360+300 to Km 360+500 Km 361+000 to Km 360+400 Km 363+600 to Km 362+200 Km 375+000 to Km 374+600 LHS Km 290+300 to Km 290+450 2 Cleaning Carriage ways Footpath Cleaning (S/R) Km 282+180 to Km 282+220 Cow dung heap lying along shoulder Km 316+400 Footpath Cleaning Km 321+050 Footpath Cleaning RHS K & J Projects Pvt. Ltd. Km 290+300 to Km 289+800 Service Road Cleaning Km 295+000 Cow dung lying in ROW Km 305+000 to Km 306+000 Garbage lying in ROW Notice issued To be rectified pertaining to Clause 3.3.5 (iv) of Schedule –L, Volume-II of CA and Swachh Bharat Mission of NHAI Monthy O and M Inspection Report - March - 2016 O & M Inspection Report by IC for the month of March - 2016 2 - Road Maintenance Sl.No. Description of Maintenance work to be done Location in Km Type of Damages Notice Action taken by IC Remarks Porous and hungry surface Notice issued Defects shall be rectified immediately by providing two coat surface dressing with 10mm aggregates Sealing Cracks 3 4 a) covered with 6-7mm stone chipping@ 0.1cum/10sgm b) covered with dry coarse sand surface dressing Second coat of surface dressing 5 Sealing to closely spreaded cracks at scatterd locations Treatment of Bleeding 6 a) Providing treatment and repair to potholes potholes depth< b) Deep 7 75mm Bituminous Macadam Dense 8 Bituminous Macadam (Profile corrective course) RHS Km 272+000 to Km 271+000 LHS Km 273+800 to Km 273+900 9 Laying Bituminous concrete Km 274+600 to Km 275+300 Km 280+250 to Km 280+600 Km 315+000 to Km 315+200 Km 333+650 to Km 333+950 700 m length for a width of 3.5m to be rectified 350 m length for a width of 3.5m to be rectified 200 m length for a width of 3.5m to be rectified 300 m length for a width of 3.5m to be rectified 100 m length for a width of 3.5m to be rectified 700 m length for a width of 3.5m to be rectified Km 372+800 to Km 373+000 Km 287+300 to Km 287+850 RHS Km 274+800 to Km 274+500 Km 286+000 to Km 285+850 Km 303+000 to Km 302+800 K & J Projects Pvt. Ltd. Notice issued Km 365+300 to Km 366+000 Km 368+200 to Km 368+900 Laying Bituminous concrete LHS 100 m length for a width of 3.5m to be rectified Km 365+000 to Km 365+100 Km 367+000 to Km 367+100 10 Cracks of moderate severity of width 36mm on microsurfacing done BC surface with surface deformation.To be rectified immediately by milling and filling the millled surface with BC material Cracks of moderate severity of width 36mm on microsurfacing done BC surface with surface deformation.To be rectified immediately by milling and filling the millled surface with BC material 100 m length for a width of 3.5m to be rectified 700 m length for a width of 3.5m to be rectified Notice issued 200 m length for a width of 3.5m to be rectified 550 m length for a width of 3.5m to be rectified RHS Monthy O and M Inspection Report - March - 2016 O & M Inspection Report by IC for the month of March - 2016 2 - Road Maintenance Sl.No. Description of Maintenance work to be done Location in Km Type of Damages Notice Action taken by IC Remarks Km 332+600 to Km 332+000 Km 356+450 to Km 356+400 Km 357+800 to Km 357+200 10 11 12 Km 365+000 to Km 364+800 Km 272+400 to Km 272+300 100 m length for a width of 3.5m to be rectified Km 276+450 to Km 276+350 100 m length for a width of 3.5m to be rectified Km 325+050 to Km 325+250 10 m length for a width of 3.5m to be rectified Single course semi-dense bituminious Using pavingconcrete bitumen as per IS:73 Patching of built up spray grout in layers Slurry seal LHS RHS Km 378+000 to Km 377+000 Km 334+000 to Km 333+000 Km 280+100 to Km 279+650 Km 278+600 to Km 278+000 14 15 Tack coat a) With Bituminous emulsion /cut back of specified grade Premix patching with stone chipping mixed with a) Using straight runbinder. bitumen (3.5 to 4%) compacted b) Patch work using cationic bitumen emulsion RS K & J Projects Pvt. Ltd. LHS Km 339+450 to Km 339+550 20 m length for a width of 2.0 m to be rectified Logitudinal cracks on BC surface.Defects shall be rectified immediately complying to Clause 3004.5 /Clause 516 of MORTH specification. RHS Notice issued Monthy O and M Inspection Report - March - 2016 O & M Inspection Report by IC for the month of March - 2016 2 - Road Maintenance Sl.No. 16 17 18 19 Description of Maintenance work to be done Location in Km Type of Damages Notice Action taken by IC RHS Roughness value exceeds the specification limit. Notice issued Remarks Scarifying existing damaged BC surfaceexisting stone metal Scarifying layers. Missing of distressed road pavement in depth. a) in variable depth up to 50mm in single pass b) for depth 50-100 mm in single pass 100-150 mm in c) for depth single pass sweeping Carriageway Watch and ward on highway MBCB and hand railing c) Anti glare median railling 20 K & J Projects Pvt. Ltd. Road Roughness Km 274+000 to Km 273+300 RHS 1000 m length for a width of 3.5m to be rectified Monthly O and M Inspection Report - March - 2016 Improvement, Operation and maintenance, Rehabilitation and Strengthening of existing 2 lane road and widening to 4-lane divided Highway from Km 265+000 to Km 380+000 (New Km 261+720 to 379+878 ) of NH-3 (Dhule-Pimpalgaon) in state of Maharashtra on Build Operate and transfer (BOT) basis O & M Inspection Report by IC for the month of Monthy O and M Inspection Report - March - 2016 3 - Structure Sl. No Description of Maintenance work to be done 1 Cleaning the upstream/downstream sides of C.D.works. a) Minor Bridge Location in Km / Structure ID Km 379+800 RHS Type of Damages noticed Action taken by IC Remarks. Notice issued To be rectified immediately Box culvert cleaning required Km 277+241 LHS 2 Replacing damaged/broken railing 3 Repair stone/brick masonry 4 pointing to existing pointing works 5 Cement plaster & repair 6 Painting exposed concrete/mansonry portion of bridge /CD works a) Dry distemper of approved brand or lime b) Enamel paint of approved brand 7 Sealing of cracks by injection through nipples a) Cement Grout b) Epoxy Resign Grout i) 25mm ii) 40mm iii) 50mm K & J Projects Pvt. Ltd. 8 Repair to foundation 9 Applying epoxy mortar treatment over leached combed and pilled concrete Km 296+270 to Km 296+550 LHS Km 308+650 to Km 308+810 LHS Km 311+800 to Km 311+810 RCC parapet damaged Monthly O and M Inspection Report - March - 2016 O & M Inspection Report by IC for the month of Monthy O and M Inspection Report - March - 2016 3 - Structure Sl. No Description of Maintenance work to be done Location in Km / Structure ID Km 273+250 10 Periodic maintenance of expansion joint Km 292+600 Km 273+250 11 Dismantling/breaking of damaged cement concrete floor 12 Maintenance to all type of bearings 13 14 15 K & J Projects Pvt. Ltd. Providing and fixing weep holes 75 mm dia in walls Providing and laying required dia RCC hume pipe Survey for Monitoring the Settlement LHS Type of Damages noticed Metal strip broken, cracking of concrete Metal strip broken,cracking of concrete,knocking sound,loss of sealing compound RHS Metal strip broken Action taken by IC Remarks. Notice issued To be rectified immediately Monthly O and M Inspection Report - March - 2016 Improvement, Operation and maintenance, Rehabilitation and Strengthening of existing 2 lane road and widening to 4-lane divided Highway from Km265+000 to Km 380+000 (New Km 261+720 to Km 379+878 ) of NH-3 (DhulePimpalgaon) in state of Maharashtra on Build Operate and transfer (BOT) basis O & M Inspection Report by IC for the month of March - 2016 4 - Road Furniture Sl. No. Description of Maintenance work to be done Location in Km Type of Damages noticed Action taken by IC Remarks Notice issued To be rectified immediately as per Clause 3.4.2.13 (ii) & (iii) Schedule L of Volume-II of Concession Agreement Maintenance of road signs LHS Km 337+700 RHS Devgaon village 1 K & J Projects Pvt. Ltd. a) Road sign board mounted on single post End Board Damaged Village name boards missing.To be replaced Missing Two Way Hazard Marker at Bus Bay Locations LHS Km 261+800 Dhule city bus bay Km 282+180 Purmepada Bus bay island separator Km 321+050 Mungse Bus bay island separator Km 341+100 Chinchve Bus bay island separator Km 365+820 Bus bay island separator Km 378+100 Shirwade Vani Bus bay island separator RHS Km 261+820 Dhule city bus bay Km 280+180 Arvee Bus bay island separator Km 282+300 Purmepada Bus bay island separator Missing Two Way Hazard Marker at start of Service Road LHS Km 261+780 dhule city Km 262+120 On Separator of service road Km 289+780 On Separator of service road Km 295+600 On Separator of service road RHS Km 290+750 On Separator of service road Km 280+650 On Separator of service road Km 279+080 On Separator of service road Missing Object Marker in Median Opening Km 294+800 Missing Object Marker Km 296+550 Missing Object Marker Km 359+000 Missing Object Marker Km 373+530 Missing Object Marker Km 375+950 Missing Object Marker Missing Hazard Marker before MBCB LHS Km 282+900 before MBCB Km 287+850 before MBCB Km 292+600 before MBCB Km 295+600 before MBCB Km 301+580 before MBCB Km 308+500 before MBCB Km 311+350 before MBCB Km 342+800 before MBCB Km 347+250 before MBCB Monthly O and M Inspection Report - March - 2016 O & M Inspection Report by IC for the month of March - 2016 4 - Road Furniture Sl. No. 1 Description of Maintenance work to be done a) Road sign board mounted on single post b) Road sign board mounted on double post c) Road stud K & J Projects Pvt. Ltd. Location in Km Type of Damages noticed Km 357+500 Km 370+800 RHS Km 292+900 Km 287+600 Km 284+550 Km 283+100 Km 281+100 Km 279+500 Km 277+980 Km 277+670 Km 275+300 Km 273+930 Km 271+180 Km 270+900 Median Km 296+600 Km 273+220 Hazard Marker erected after MBCB LHS Chevron board in MEDIAN Km 273+400 to Km 273+600 Km 282+500 to Km 282+700 Km 292+800 to Km 293+000 Km 262+810 (median) Km 304+180 (median) Km 314+850 (median) before MBCB before MBCB Km 269+190 to Km 269+210 Km 277+090 to Km 277+110 Km 281+490 to Km 281+510 Km 282+190 to Km 282+210 Km 286+555 to Km 286+575 Km 294+766 to Km 294+800 Km 296+000 to Km 296+025 Km 297+417 to km 297+446 Km 301+142 to Km 301+166 Km 303+745 to Km 303+791 Km 316+238 to Km 316+257 Km 324+055 to Km 324+070 Km 325+770 to Km 325+790 Km 330+055 to Km 330+085 Km 330+360 to Km 330+380 Km 330+650 to Km 330+670 Km 332+550 to Km 332+570 Km 334+100 to Km 334+120 Km 339+400 to Km 339+420 Action taken by IC Remarks Notice issued To be rectified immediately as per Clause 3.4.2.13 (ii) & (iii) Schedule L of Volume-II of Concession Agreement before MBCB before MBCB before MBCB Defects to be rectified immediately Monthly O and M Inspection Report - March - 2016 O & M Inspection Report by IC for the month of March - 2016 4 - Road Furniture Sl. No. Description of Maintenance work to be done 2 Replacing/Installing Delineators 3 Reflective stickers on MBCB crash barrier Location in Km Km 341+030 to Km 341+050 Km 342+125 to Km 342+145 Km 343+080 to Km 343+095 Km 346+650 to Km 346+670 Km 348+950 to Km 349+000 Km 352+600 to Km 352+620 Km 352+990 to Km 353+010 Km 354+005 to Km 354+035 Km 354+560 to Km 354+580 Km 356+500 to Km 356+932 Km 357+635 to Km 357+655 Km 361+365 to Km 361+385 Km 362+820 to Km 363+855 Km 363+925 to Km 363+950 Km 364+400 to Km 364+420 Km 365+760 to Km 365+780 Km 370+250 to Km 370+280 Km 373+500 to Km 373+520 Km 375+920 to Km 375+940 Km 378+230 to km 378+250 Type of Damages noticed Action taken by IC Remarks Delineators provided on Dhule & Nashik side are blackened/ missing/damaged needs cleaning/ replacement/repairs respectively. Notice issued Defects to be rectified as per Clause 3.4.2.13 (ii) & (iii) Schedule L of CA,Vol-II HM stone damaged/missing/cleaning required Notice issued To be rectified as and when necessary as per Clause 3.3.5 (vii) Sch L of Vol-II of CA Fixing of distance measurement stone 4 a) Hectometer stone K & J Projects Pvt. Ltd. LHS Km 299+800 (Missing) Km 302+200/800 (Missing) Km 304+600/800 (Missing) Km 306+200/400 (Missing) Km 307+400/600/800 (Missing) Km 311+200/800 Km 317+800 Km 318+400 Km 320+400/800 Km 323+200 (Paint Feded) Km 325+200 (Paint Feded) Km 328+800 (Paint Feded) Km 329+400 (Paint Feded) Km 335+600 (Damaged) Km 337+400/600/800 (Missing) Km 339+400 (Distrub) Km 347+600 (Not Deginated) Km 350+200 (Missing) Km 351+200 Km 354+800 (Damaged) Km 357+600/800 Km 362+200 Km 363+200/400 (Not Painted) Km 367+600 ( Damaged) RHS Km 285+200 Km 292+800 Km 311+600 Km 317+800 (Not Designated) Km 319+200 not painted Km 320+200/600 (not designated) Km 321+400 (Not Deginated) Km 321+800 ( Damaged) Monthly O and M Inspection Report - March - 2016 O & M Inspection Report by IC for the month of March - 2016 4 - Road Furniture Sl. No. 4 5 Description of Maintenance work to be done b) Kilometer stone Boundary stone Painting two coat on old surface a) Hectometer stone 6 b) Kilometer stone c) 5th kilometer stone d) Boundary stone K & J Projects Pvt. Ltd. Location in Km Km 322+800 (Not Designated) Km 327+200/400 ( Not Deginated) Km 334+400 (Paint Feded) Km 334+400 (Not Deginated) Km 337+200 ( Distrub) Km 338+200 (Hectometer Stone) Km 344+200 (Not Deginated) Km 343+200 Km 346+400 (Not Painted) Km 348+600 (Damaged) Km 359+400,600 (Damaged) Km 363+400 (Damaged) Km 371+800/600/400 ( Missing) LHS Km 301+000 Km 336+000 Km 358+000 Km 359+000 Km 360+000 Km 370+000 Km 372+000 RHS Km 295+000 Km 343+000 Km 348+000 Km 355+000 Km 368+000 Km 372+000 Km 375+000 Type of Damages noticed Action taken by IC Remarks Notice issued Defects shall be rectified as and when necessary as per Clause 3.3.5 (vii) Sch L of Vol-II of CA Km stone missing Km stone damaged Km stone damaged Km stone damaged Km stone damaged Km stone damaged Km stone painting faded Km stone painting faded Km stone painting faded Km stone damaged Km stone damaged Monthly O and M Inspection Report - March - 2016 O & M Inspection Report by IC for the month of March - 2016 4 - Road Furniture Sl. No. 7 8 8 K & J Projects Pvt. Ltd. Description of Maintenance work to be done Painting faded surface of kerb a) Damages of kerb stone b) Unauthorized Median break Location in Km LHS Km 273+000 to Km 274+000 Km 297+000 to Km 303+000 Km 305+000 to Km 306+500 Km 308+000 to Km 310+000 Km 315+000 to Km 317+000 Km 342+000 to Km 343+000 Km 344+000 to Km 346+000 Km 346+500 to Km 346+700 Km 347+300 to Km 348+000 Km 349+000 to Km 350+000 Km 350+600 to Km 351+000 RHS Km 352+600 to Km 352+200 Km 346+400 to Km 346+150 Km 346+000 to Km 345+300 Km 344+200 to Km 344+000 Km 343+800 to Km 341+900 Km 341+600 to Km 341+080 Km 340+800 to Km 340+000 Km 337+700 to Km 337+600 Km 327+800 to Km 326+400 Km 305+000 to Km 302+000 Km 276+000 to Km 274+000 Km 274+000 to Km 261+720 LHS Km 262+750 Km 266+630 Km 277+650 Km 280+200 Km 310+520 Km 313+550 Km 357+630 RHS Km 351+050 Service Road RHS Km 262+374 to Km 262+386 Km 262+403 to Km 262+418 Km 265+442 to Km 265+468 Service Road LHS Km 266+840 to Km 266+848 Km 266+867 to Km 266+905 MCW Km 266+660 Km 269+900 Km 278+110 Type of Damages noticed Action taken by IC Remarks Median kerb faded/blackened -needs repainting. Notice issued Defects shall be rectified immediately Notice issued Defects shall be rectified immediately Notice issued Defects shall be rectified immediately Notice issued Concessionaire is requested to furnish a list of unauthorized median opening to Police Authorities and close the median opening with the help of Police Authorities as discussed in the meeting of Road Safety Committee Dtd 09.01.2015 Island Kerb Damaged Bell Mouth Damaged Median Bell Mouth Island Kerb Damaged Median opening Bell Mouth damaged Separator Bell Mouth damaged Median opening Bell Mouth dmaged Renuka Devi Island Kerb Damaged Unauthorised median breaks to be closed Monthly O and M Inspection Report - March - 2016 O & M Inspection Report by IC for the month of March - 2016 4 - Road Furniture Sl. No. 9 Description of Maintenance work to be done Raised pavement marker 10 Removal of encroachment of ROW 11 Removal of unauthorized approaches 12 Location in Km Km 279+500 Km 280+110 Km 283+180 Km 284+710 Km 286+310 Km 290+600 Km 291+760 Km 293+360 Km 296+860 LHS Km 343+800 to Km 344+000 Km 345+000 to Km 345+500 Km 348+900 to Km 349+180 RHS Km 344+600 to Km 345+200 Km 335+600 to Km 336+000 As per annexure A (enclosed) LHS Km 270+650 Km 270+700 RHS Km 270+730 Km 290+180 LHS Km 310+350 Km 316+200 Km 316+800 Km 319+500 RHS Km 319+630 Rumbler Strip Km 294+810 RHS K & J Projects Pvt. Ltd. Type of Damages noticed Center Line Faded Center + Inner line Faded Center + Shoulder Edge line Faded Action taken by IC Notice issued Remarks Defects to be rectified as per Clause 3.4.2.13 (vi) Schedule L of CA,Vol-II Shoulder Edge line Faded Shoulder Edge line Faded Encraochment to be removed Warning sign board not provided Needs to be provided for warning of the presence of the speed breakers to the drivers cat-eyes not provided .Needs to be provided to enhance cat-eyes not provided .Needs to be provided to enhance night visibility. the Rumble strip provided at Devarpada village is of more height than the IRC specification causing heavy jerks while passing over the strips. This is dangerous from safety point of view and needs to be rectified as per the IRC specification by reducing the height. Notice issued To be rectified as per the order of the Bombay High Court for direction with Speed Breakers Monthly O and M Inspection Report - March - 2016 Improvement, Operation and Maintenance, Rehabilitation and Strengthening of existing 2 lane road and widening to 4-lane divided Highway from Km 265+000 to Km 380+000 (New Km: 261+720 to Km 379+878 ) of NH-3 (Dhule-Pimpalgaon) in state of Maharashtra on Build Operate and transfer (BOT) basis O & M Inspection Report by IC for the month of March - 2016 5 - Drainage Sl.N o. Description of Maintenance work to be done Location in Km Km 281+600 to Km 281+700 LHS 1 2 Cleaning road side unlined drains Cleaning road side lined drains Km 303+600 to Km 304+400 LHS Km 304+950 to Km 305+350 LHS Km 347+000 to Km 348+000 LHS Km 349+000 to Km 349+500 LHS Km 351+400 BHS Type of Damage noticed Action taken by IC Remarks. Notice issued To be rectified immediately Notice issued To be rectified immediately Cleaning of chute drain on embankment portion required side drain choked up,filled with soil LHS Km 283+600 to Km 283+400 Km 337+500 to Km 337+600 Median cross drain cleaning Km 354+100 to Km 354+500 Km 266+400 LHS Km 313+800 Km 354+050 service road 01Nos Km 353+600 service road 01Nos RHS Km 315+230 service road 01 Nos RHS Km 314+675 service road 01 Nos RHS Km 314+550 service road 01 Nos RHS Km 314+500 service road 01 Nos RHS Km 314+450 service road 01 Nos RHS K & J Projects Pvt. Ltd. Drain Cover Damage(S/R) Drain Cover Damage & Cleaning (S/R) Drain Cover Damage(S/R) Drain Cover Damage(S/R) RCC Drain Cover Missing to be provided Monthly O and M Inspection Report - March - 2016 Improvement, Operation and Maintenance, Rehabilitation and Strengthening of Existing 2 lane road and widening to 4-lane divided Highway from Km. 265+000 to Km. 380+000 (New Km: 261+720 to Km 379+878 ) of NH-3 (Dhule-Pimpalgaon) in the state of Maharashtra on Build Operate and transfer (BOT) basis O & M Inspection Report by IC for the month of March - 2016 Misc. Maintenance Activities Sl. No Description of Maintenance work to be done Location in Km Km 341+000 LHS Km 365+800 LHS Km 351+200 LHS 1 Bus shelter Km 261+900 RHS Km 316+410 RHS Km 337+900 RHS Km 351+120 RHS Km 353+800 RHS Km 289+700 RHS Km 316+400 to Km 316+500 RHS (Tehare) 2 Street light 3 Guard stone 5 Erection of non standard signages 5 Erection of non standard signages Action taken by IC Remarks Notice Issued Defect to be rectified immediately Notice Issued Defect to be rectified immediately Notice Issued These locations are replaced with Object Marker in lieu of Hazard Marker; previously it was Hazard marker. To be rectified Notice Issued These locations are replaced with Object Marker in lieu of Hazard Marker; previously it was Hazard marker. To be rectified immediately as per IRC-79 Busshelter damaged Vegetation and human excreta on the Busbay footpath to be cleaned Separate sheet enclosed Annx- B Km 269+300 LHS Km 344+100 to Km 344+600 LHS Km 344+800 to Km 345+400 LHS LHS Km 286+300 Km 287+810 Km 290+870 Km 291+500 Km 291+830 RHS Km 273+350 Km 288+660 Km 296+700 Median Km 263+630 Km 263+940 Km 273+130 Km 277+225 Km 288+020 K & J Projects Pvt. Ltd. Type of Damages noticed LHS Guard stone missing/damaged at the start of MBCB at the start of MBCB at the start of MBCB at the start of MBCB at the start of MBCB at the start of MBCB at the start of MBCB at the start of MBCB median wall of minor bridge median wall of minor bridge median wall of minor bridge median wall of minor bridge median wall of minor bridge Monthly O and M Inspection Report - March - 2016 Improvement, Operation and maintenance, Rehabilitation and Strengthening of existing 2 lane road and widening to 4-lane divided Highway from Km 265+000 to Km 380+000 (New Km 261+720 to Km 379+878 ) of NH3 (Dhule-Pimpalgaon) in state of Maharashtra on Build Operate and transfer (BOT) basis O & M Inspection Report by IC for the month of March - 2016 7 - Horticulture Sl. No 1 2. A Description of Maintenance work to Location in Km be done Separate sheet enclosed Annx C Avenue Plantation Km 264+350 to Km 264+400 Km 268+800 to Km 269+220 Km 275+000 to Km 275+400 Km 279+600 to Km 279+660 Km 297+000 to Km 298+000 Km 300+200 to Km 301+500 Km 336+800 to Km 336+500 Km 338+600 to Km 339+800 Km 339+200 to Km 341+100 Km 347+700 to Km 347+800 Km 354+000 to Km 354+080 Km 358+950 to Km 359+050 Km 364+600 to Km 364+700 Km 365+300 to Km 365+400 Km 365+900 to Km 366+000 Median Plantation Km 371+470 to Km 371+600 Km 375+800 to Km 375+950 Km 377+750 to Km 377+900 Km 379+150 to Km 379+200 Km 379+600 to Km 379+800 Km 285+950 to Km 286+150 Km 331+200 to Km 331+400 Km 349+450 to Km 349+650 Km 350+100 to Km 351+000 Km 355+000 to Km 356+000 Km 355+200 to Km 355+600 Km 364+600 to Km 369+800 Km 369+800 to Km 364+900 Km 378+050 to Km 377+900 Km 378+300 to Km 378+600 Km 350+500 to Km 351+100 K & J Projects Pvt. Ltd. Type of Damages noticed Action taken by IC Remarks Missing median plants to be replanted Notice issued To be rectified immediately as per IRC :SP:21 Pruning in Median Monthly O and M Inspection Report - March - 2016 Improvement, Operation and maintenance, Rehabilitation and Strengthening of existing 2 lane road and widening to 4-lane divided Highway from Km 265+000 to Km 380+000 (New Km 261+720 to Km 379+878 ) of NH-3 (Dhule-Pimpalgaon) in state of Maharashtra on Build Operate and transfer (BOT) basis Details of Encroachment (RHS) Sl. No 1 Chainge (Km) Description of Encroachment Encroachment Length x Width Nature of Hoardings and other Unauthorised Boards Temporary Remarks Permanent Navkar Ford has created an encroachment inside ROW by Km 265+000 RHS of 100mm thick concreting upto the existing RCC drain as a service road 30m length Permanent parking place for vehicles 2 Km 296+100 Sai car dhaba - double post mounted board 3 Km 317+650 Compound wall 4 Km 335+800 Hotel Moonlight -double post mounted board Permanent 5 Km 356+400 Hotel Navrang - double post mounted board Permanent K & J Projects Pvt. Ltd. Permanent 7m length Permanent Not acceptable pertaining to Clause 5.0 of Schedule –L, Volume-II of Concession Agreement Monthly O and M Inspection Report - March - 2016 Improvement, Operation and maintenance, Rehabilitation and Strengthening of existing 2 lane road and widening to 4-lane divided Highway from Km 265+000 to Km 380+000 (New Km 261+720 to Km 379+878 ) of NH-3 (Dhule-Pimpalgaon) in state of Maharashtra on Build Operate and Transfer (BOT) basis Details of Encroachment (LHS) Sl. No Chainge (Km) Description of Encroachment Encroachment Length x Width Nature of Hoardings and other Unauthorised Boards Temporary 1 2 3 4 5 Km 325+800 Hotel Fountain - Double post mounted board Km 282+350 to Km 282+420 Km 282+650 to Km Unauthorized erection of cement concrete post for fencing inside ROW 282+700 Km 282+730 to Km 282+780 Km 335+200 Shubh Mangal Lawns Double Post K & J Projects Pvt. Ltd. Remarks Permanent 1.25m x 1.25m Permanent 70m length Permanent 50m length Permanent 50m length Permanent To be rectified pertaining to Clause 5.0 (a), Schedule -L of Volume -II of Concession agreement 1.25 x 1.25m Permanent Monthly O and M Inspection Report - March - 2016 Improvement, Operation and maintenance, Rehabilitation and Strengthening of existing 2 lane road and widening to 4-lane divided Highway from Km 265+000 to Km 380+000 (New Km 261+720 to Km 379+878 ) of NH-3 (Dhule-Pimpalgaon) in state of Maharashtra on Build Operate and transfer (BOT) basis Details of Encroachment (Median) Nature of Hoardings and Sl. No NIL Chainge (Km) NIL K & J Projects Pvt. Ltd. Description of Encroachment NIL Encroachment other Unauthorised Boards Length x Width NIL Temporary Permanent NIL NIL Remarks NIL Monthly O and M Inspection Report – March - 2016 Improvement, Operation & Maintenance, Rehabilitation and Strengthening of existing 2-lane road and widening carriageway to 4-lane divided dual carriageway configuration of Dhule to Pimpalgaon (Km 265 to Km 380) section of NH-3 on BOT basis MONTHLY O & M INSPECTION REPORT (March - 2016) 8. Annexures 8.1. Annexure - A: Encroachments 8.2. Annexure - B: Highway Lighting 8.3. Annexure - C: Status of Avenue plants 8.4. Annexure - D: Recovery of Damages K&J Projects Pvt. Ltd. Page 20 Monthly O and M Inspection Report – March - 2016 Improvement, Operation & Maintenance, Rehabilitation and Strengthening of existing 2-lane road and widening carriageway to 4-lane divided dual carriageway configuration of Dhule to Pimpalgaon (Km 265 to Km 380) section of NH-3 on BOT basis MONTHLY O & M INSPECTION REPORT (March - 2016) 8.1. Annexure - A Encroachments K&J Projects Pvt. Ltd. Page 21 Monthly O and M Inspection Report – March - 2016 Improvement, Operation & Maintenance, Rehabilitation and Strengthening of existing 2-lane road and widening carriageway to 4-lane divided dual carriageway configuration of Dhule to Pimpalgaon (Km 265 to Km 380) section of NH-3 on BOT basis MONTHLY O & M INSPECTION REPORT (March - 2016) 8.2. Annexure - B Highway Lighting K&J Projects Pvt. Ltd. Page 22 Monthly O and M Inspection Report - March - 2016 Improvement, Operation and Maintenance, Rehabilitation and Strengthening of Existing 2 lane road and widening to 4lane divided highway from Km 265+000 to Km 380+000 of NH-3 (Dhule – Pimpalgaon) in the state of Maharashtra on Build Operate and Transfer (BOT) basis Annexure -B HIGHWAY LIGHTING S. No Description of Maintenance work to Name of Town/Village be done At Umrane village (without transformer). 1 From To 336+113 At Sangvi village. 339+400 339+800 At Chandwad village. 353+800 354+600 At Sogras village (without transformer). At Wadali-Bhoi village. At Chandanpuri (Malegaon) At Umrane village (without transformer). 363+800 368+500 369+150 313+120 315+410 336+113 At Sangvi village. At Rahud village. 339+400 346+700 339+800 347+400 At Chandwad village. 353+800 354+600 356+400 357+100 At Chandwad Toll Plaza. At Sogras village (without transformer). 363+800 At Wadali-Bhoi village. 368+500 369+150 At Zodge village. At Sayane village. At Chandanpuri (Malegaon) 289+640 303+420 290+780 304+510 313+120 315+410 At Umrane village (without transformer). 336+113 At Sogras village (without transformer). 363+800 At Wadali-Bhoi village. 368+500 369+150 At Arvi village. At Sayane village. At Chandanpuri (Malegaon) 277+890 303+420 280+800 304+510 313+120 315+410 At Umrane village (without transformer). At Chandwad village. At Sogras village (without transformer). K & J Projects Pvt. Ltd. Location in Km 336+113 353+800 354+600 363+800 At Wadali-Bhoi village. 368+500 369+150 At Arvi village. At Zodge village. At Sayane village. At Chandanpuri (Malegaon) At Umrane village (without transformer). 277+890 289+640 303+420 280+800 290+780 304+510 313+120 315+410 336+113 Types of Damage Notice Remarks Monthly O and M Inspection Report - March - 2016 S. No Description of Maintenance work to Name of Town/Village be done At Rahud village. At Chandwad village. At Sogras village (without transformer). 6 Testing & Replacing From To 346+700 347+400 353+800 354+600 368+500 369+150 At Dhule Urban Area. 262+000 267+140 At Umrane village (without transformer). 336+113 At Sogras village (without transformer). 363+800 At Wadali-Bhoi village. 368+500 369+150 At Arvi village. At Sayane village. At Chandanpuri (Malegaon) At Umrane village (without transformer). 277+890 303+420 280+800 304+510 313+120 315+410 At Wadali-Bhoi village. Types of Damage Notice Remarks Testing to be done at these locations (after verifying the status of lights at the above mentioned locations ion item no.1) and replacement; if any Cleaning,washing and realignment of luminaries to be carried out immediately 363+800 At Wadali-Bhoi village. At Sogras village (without transformer). K & J Projects Pvt. Ltd. Location in Km 336+113 363+800 368+500 369+150 At Umrane village (without transformer). 336+113 At Sogras village (without transformer). 363+800 Monthly O and M Inspection Report – March - 2016 Improvement, Operation & Maintenance, Rehabilitation and Strengthening of existing 2-lane road and widening carriageway to 4-lane divided dual carriageway configuration of Dhule to Pimpalgaon (Km 265 to Km 380) section of NH-3 on BOT basis MONTHLY O & M INSPECTION REPORT (March - 2016) 8.3. Annexure - C Status of Avenue plants K&J Projects Pvt. Ltd. Page 25 Monthly O and M Inspection Report – March - 2016 8.3.1 - Status of Avenue Plantation along Project Highway As per monitoring of IE, in1st fortnight i.e. from 01.03.2016 to 15.03.2016, the status of Plantation is as under Name of the PIU Name of the project 1 2 Mechanism of plantations Number of Plants proposed to be planted No of plants planted so far 3 4 5 Survival percentage If not completed, tentative date of completion Action taken against any default 6 7 8 Km 261+720 to Completed Km 379+878 Nashik Both side of Concessionaire 34200 42331 81.31 Project As per N.A environmental clearance Highway The dead trees in 1st fortnight are 36 no. The total no’s of trees surviving on Dt. 15.03.2016 is 34423 and as no of trees surviving is more than required as per environmental clearance thus no action proposed. In median, as on 15.03.2016, the total no. of dead trees are 133 nos. and thus the balance trees are 1,34,455 - which is more than required and thus no action proposed. As per monitoring of IE, in 2nd fortnight i.e. from 16.03.2016 to 31.03.2016, the status of Plantation is as under Name of the PIU Name of the project 1 2 Mechanism of plantations Number of Plants proposed to be planted No of plants planted so far 3 4 5 Survival percentage If not completed, tentative date of completion Action taken against any default 6 7 8 Km 261+720 to Completed Km 379+878 Nashik Both side of Project Highway Concessionaire 34200 42331 81.02 As per environmental N.A clearance The dead trees in 2nd fortnight are 127 no. The total no’s of trees surviving on Dt. 31.03.2016 is 34294 and as no of trees surviving is more than required as per environmental clearance thus no action proposed. In median, as on 31.03.2016, the total no. of dead trees are 133 nos. and thus the balance trees are 1,34,455 - which is more than required and thus no action proposed. K&J Projects Pvt. Ltd. Page 26 Monthly O and M Inspection Report – March - 2016 Improvement, Operation & Maintenance, Rehabilitation and Strengthening of existing 2-lane road and widening carriageway to 4-lane divided dual carriageway configuration of Dhule to Pimpalgaon (Km 265 to Km 380) section of NH-3 on BOT basis MONTHLY O & M INSPECTION REPORT (March - 2016) 8.4. Annexure - D Recovery of Damages K&J Projects Pvt. Ltd. Page 27 Monthly O & M Inspection Report – March - 2016 8.4 - RECOVERY OF DAMAGES TILL MARCH - 2016 8.4.1 – DETAILS OF IMPOSITION OF RECOVERIES Sr. no. 1 2 3 4 Rate of recovery per day (in Rs.) 34,463.00 95,721.00 1,15,361.00 72,416.00 K&J Projects Pvt. Ltd. Total items NHAI Ltr. no. Period for rectification given by NHAI 01.10.2013 1.Cracks on BC surface, 2.Longitudinal cracks, 3.Roughness value exceeding limit 3000mm /km, 4.severe alligator cracking, 5.Depressed soft shoulder 5 no.s NHAI/PIU/NSK/ DP/2013/3002 dated 23.10.2013 7days 01.03.2014 1.Cracks on BC surface, 2.Longitudinal cracks 3.Roughness exceeding limit 3000mm/km 4.Severe alligator cracking, 5.Depressed soft shoulder, 6.Rutting, 7.Unauthorizedmedian opening 8.painting faded kerb, 9.BI test 10.damaged expansion joint, 11. Highway lighting. 11 no.s NHAI/PIU/NSK/ DP/2014/1048 dated 01.05.2014 7days 06.05.2014 1.Cracks on BC surface, 2.Longitudinal cracks, 3.Roughness value exceeding limit 3000mm /km, 4.severe alligator cracking, 5.Depressed soft shoulder, 6.Rutting, 7.Unauthorized median opening, 8.Painting faded kerb, 9.BI test, 10.damaged expansion joint, 11.Highway lighting, 12. Avenue plantation. 12 no.s NHAI/PIU/NSK/ DP/2014/1085 dated 08.05.2014 7days 15.07.2014 1.Cracks on BC surface, 2.Longitudinal cracks, 3.Roughness value exceeding limit 3000mm /km, 4.Severe alligator cracking, 5.Rutting, 6.Unauthorized median opening, 7.Painting faded kerb, 8.Damaged expansion joint, 9. Avenue plantation. 9 no.s NHAI/PIU/NSK/ DP/2014/1877 dated 01.08.2014 7days Date of effect Items Page 28 Monthly O & M Inspection Report – March - 2016 Sr. no. 5 Rate of recovery per day (in Rs.) 52,510.00 6 25.09.2014 28,249.00 7 Date of effect 01.01.2015 3,17,870.00 26.10.2014 Items 1.Cracks on BC surface, 2.Longitudinal cracks, 3.Roughness value exceeding limit 3000mm /km, 4.Severe alligator cracking, 5.Rutting, 6.Unauthorized median opening, 7.Painting faded kerb, 8.Damaged expansion joint, 1.Cracks on BC surface, 2.Longitudinal cracks, 3.Roughness value exceeding limit 3000mm /km, 4.Severe alligator cracking, 5.Rutting, 6.Unauthorized median opening, 7.Painting faded kerb, 8.Damaged expansion joint, Total items NHAI Ltr. no. Period for rectification given by NHAI 8 no.s NHAI/PIU/NSK/ DP/2014/2580 dated 30.10.2014 7days 8 no.s PD,NHAI NHAI/PIU/NSK/ DP/2015/421 dated 11.02.2015 7days PD,NHAI NHAI/PIU/NSK/ DP/2015/502 dated 20.02.2015 - - Periodic Maintenance 8.4.2 - STATUS RECOVERY OF DAMAGES Sr. no. Period Rate of recovery Amount of recovery 1 01.04.2010 to 24.03.2011 Rs.10,000/- per day 35,80,000/- 2 25.03.2011 to 30.09.2011 Rs.77,605/- per day 1,47,44,950/ - 3 01.10.2011 to 30.04.2012 Rs.77,605/- per day 1,65,29,865/ - 4 01.05.2012 to 07.08.2012 Rs.10,000/- per day 9,90,000/- 5 08.08.2012 to 30.09.2013 Rs.10,000/- per day 41,90,000/- 6 01.10.2013 to 28.02.2014 Rs.34,463/- per day 52,03,913/- K&J Projects Pvt. Ltd. Remarks Recovered from grants payable for 4th year of Concession period To be recovered from grants payable for 5th year of Concession period To be recovered from grants payable for 7th year of Concession period Page 29 Monthly O & M Inspection Report – March - 2016 7 01.03.2014 to 05.05.2014 Rs.95,721/- per day 6,31,7586 8 06.05.2014 to 14.07.2014 Rs.1,15,361/-per day 80,75,270 9 15.07.2014 to 24.09.2014 Rs.72,416/- per day 51,41,536 10 25.09.2014 to 31.12.2014 Rs.52,510/- per day 51,45,980 11 1.01.2015 to 31.03.2015 Rs.28,249/- per day 25,42,410 12 1.04.2015 to 31.05.2015 Rs.28,249/- per day 17,23,189 13 26.10.2014 to 31.03.2015 3,17,870/-per day 4,99,05,590 14 1.04.2015 to 31.05.2015 3,17,870/- per day 1,93,90,070 15 1.06.2015 to 30.08.2015 3,17,870/-per day 2,92,44,040 16 01.06.2015 to 30.08.2015 28,249/-per day 25,98,908 17 01.09.2015 to 30.09.2015 3,17,870/-per day 98,53,970 18 01.09.2015 to 30.09.2015 28,249/-per day K&J Projects Pvt. Ltd. To be recovered from grants payable for 8th year of Concession period To be recovered from grants payable 8,75,719 Page 30