Standard Operating Procedure United Engineering & Power Services Limited. Title: Operating Procedure of Reverse Osmosis Plant (4 m3/h) Prepared by Checked by Approved by Owner of the SOP : : : : SOP No. Version No. Date Originated Replaces Effective Date Revision Due Page UEPSL/SOP/001 01 N/A 1 of 4 Personal Sign / Date Md. Nazim Uddin Ashik Sr. Executive, Technical services UEPSL, UAEL _____________ Rais Uddin Ahmed Plant Chemist. UEPSL, UMPL ______________ Quazi Raihanur Rahman Plant Manager, UEPSL, UAEL ____________ WTP Distribution list : 1. Head of plant (Master copy) 2. Work bench 3. WTP file 4. Central Archive Prepared by / date: _______________________ Approved by / date: _______________________ United Ashuganj Energy limited Standard Operating Procedure United Engineering & Power Services Limited. Title: Operating Procedure of Reverse Osmosis Plant (4 m3/h) 1. SOP No. Version No. Date Originated Replaces Effective Date Revision Due Page UEPSL/SOP/001 01 N/A 2 of 4 Overview This Standard Operating Procedure SOP describes the procedure to be followed for proper operation of Reverse Osmosis plant used at united Engineering & power service Limited & contact manufacturing sites. 2. Policy/Policy reference In house 2. Purpose and Scope This SOP describes the proper operation for Reverse Osmosis plant at united Ashuganj Engineering limited Plant or manufacturing sites. 4. Responsibilities It is the responsibility of well trained Production Department Personnel & Technical service personnel. 5. Procedure 5.1 . Start Up Check List 5.1.1. 5.1.2. 5.1.3. 5.1.4. 5.1.5. Check the machine for cleanliness & obtain cleaning clearance. First of all, check the machine physically. Check electric connection and mechanical set up. Check Power supply availability. Check all motors & Pumps (Submersible pump 1 & 2, Raw Water pumps, Dosing pumps & High-pressure RO pumps. 5.1.6. Must be confirming the raw water tank level. 5.1.7. Check Sample Line, Valve orientation & dosing lines. 5.1.8. Must be confirming all chemical to be dosing. 5.1.9. Must be concern about last operation pressure of the cartridge filter. 5.1.10. Check all valve connected with RO membrane. 5.1.11. Check & confirm- RO inlet & RO flashing valve open position. Prepared by / date: _______________________ Approved by / date: _______________________ United Ashuganj Energy limited Standard Operating Procedure United Engineering & Power Services Limited. Title: Operating Procedure of Reverse Osmosis Plant (4 m3/h) 5.2. SOP No. Version No. Date Originated Replaces Effective Date Revision Due Page UEPSL/SOP/001 01 N/A 3 of 4 Plant Operation (Production) procedure 5.2.1. 5.2.2. Keep all pre-filter valve at back wash position & start raw water pump. After 10 minutes observing the outlet water transparency, if it is clear then turn the sand filter valve at the flash position. 5.2.3. When again outlet water will be transparent (generally its take 5 minutes) then turn the valve at operation position. 5.2.4. Repeat previous two steps for oxidization filter. 5.2.5. Start the RO high pressure pump & after 2 min then close RO flashing valve. 5.2.6. Control the permit & concentration flow through the respective valves. 5.2.7. Control EDI concentration & dilute flow through respective valves. 5.2.8. Start RO anti scale & pH booster pumps. 5.2.9. Switch on the power connection of EDI display & EDI. 5.2.10. Confirm all pressure gauge shows normal pressure again. 5.3. Plant Operation (Shutdown) procedure 5.3.1. 5.3.2. 5.3.3. 5.3.4. 5.3.5. 5.3.6. To shut down the plant, very first it should be switch off the EDI & EDI display. After stopping EDI then Switch off all chemical dosing pump. Open the Flashing Valve. It should be flash out the water for 2 minutes before shutdown. Then switch off the RO high pressure pump. At the end switch off the Raw water feeding pump. 6. Safety and Precautions 6.1. 6.2. 6.3. 6.4. Machine operation can only be done when precautions are available. Always use Personal protection equipment during machine operation. Eye must be protected at all times during machine operation. Must be ware goggles, gloves & Safety shoes during chemical handling. Prepared by / date: _______________________ Approved by / date: _______________________ United Ashuganj Energy limited Standard Operating Procedure United Engineering & Power Services Limited. Title: Operating Procedure of Reverse Osmosis Plant (4 m3/h) SOP No. Version No. Date Originated Replaces Effective Date Revision Due Page UEPSL/SOP/001 01 N/A 4 of 4 6.5. 6.6. Must stay in safe position during Electrical operation For any troubles/disturbances put off the main switch first and protect the materials. 6.7. 6.8. For any danger, inform the superior & as soon as possible. Assurance weekly, monthly and yearly servicing and maintenance in consultation with Engineering Department. Definition : There is (are) no unique term(s) in this document. Abbreviation : There is (are) no unique term(s) in this document. Reference SL. No. 1. : Operation Manual. In-house Development Version & Issue details Revision/Change in Brief Reason for Change N/A N/A Version 01, UEPSL/SOP/001 Date of Issue: Revision Due: Prepared by / date: _______________________ Approved by / date: _______________________ United Ashuganj Energy limited