Uploaded by Shreekanya Baral

FINAL APM PDF

advertisement
LITERATURE STUDY
Sheet
No 1
WHAT IS LAND VALUE CAPTURE ?
Land Value Capture (LVC) is a method of transit finance that recovers land value gains (an unearned
income) enjoyed by transit proximate properties, for transit project funding purposes.
Land Value Determinant
Description
Land use regulation
Government provision of
development rights or buildable
space on land through up zoning
Public investments in social
services and infrastructure
Social services and infrastructure
include: schools, hospitals, transit,
parks, etc.
Private investments on land
improvements
Land owner investments in on-site
construction and land improvements
Population growth and
economic development
Increases in land value as a result of
the growth in population – due to
natural population growth, migration,
and rapid urbanization – and
increases in income levels.
Transport infrastructure projects embrace direct as well as in direct benefits:
❖ The direct user benefits such as reduced travel time, but also indirect benefits
such as land value increase, land use densification etc.
❖ The benefits of transportation investments get capitalized in real estate market
in the short-term while land-use adjustments occur over longer term.
❖ This potential to produce economic benefits has become important in decisionmaking process of the transport investment.
❖ The land value added due to the east west metro corridor can be used to fund
other infrastructure in the city.
Fig 2:Value curve Theory
Source : Capturing the Value of Transit
By United States Department of Transportation
NEED OF THE STUDY
Figure 2 presents an example that illustrates how property values might increase over time as a result of new transit service. The impact of
transit is expected to begin when a new transit project is first announced
❖ This study tries to build a relation among accessibility benefits ,impact on
proximate land use and land value gains.
❖ The value appreciation varies from place to place influenced by various
parameters. The study identifies parameters that influence the scale of
increment in land values and the land value capture model that is most
appropriate for the transit corridor.
❖ Once the Land value capture method is recognized, it can be implemented for
similar areas.
MOST COMMON MODELS USED FOR DETERMINING ESTIMATING TRANSPORTATION-RELATED
BENEFITS AND DISBENEFITS AFFECTING RESIDENTIAL PROPERTY VALUES –
IMPACT ASSESMENT OF METRO CORRIDOR
A CASE STUDY OF EAST WEST METRO CORRIDOR IN KOLKATA
Name: Shreekanya Baral
Reg. No.: 2180400092 Batch: 2017-19
MURP II Year IV Sem,
Dept. of Planning, SPA Vijayawada
Guide:
Mr. Prasanth Vardhan
Seal
& Signature:
RESEARCH DESIGN
IMPACT ASSESMENT OF METRO CORRIDOR ON LAND VALUE PRICING
AIM: To investigate the potential of Value Capture Mechanism and to suggest a suitable model of value capture
for the area of interest which can be used for other similar cases
OBJECTIVES:
• To study the most common practices of land value capture methods used for transit corridors.
• Delineation of the influence area along the east west metro corridor
• To assess land value along the metro corridor at different points of time (i.e. Initial speculation period, Project
formulation, During construction, Post completion).
• To find out the major variables that are affecting property market in the given area
• To arrive at the share of property market value increase due to the transit corridor
• To find the suitable land value capture method
Concept – What is accessibility? , relationship between transport investment and Land value, What is Value
Capture?
Hypothesis - Accessibility improvement leads to gain in the proximate land values.
Relevant theories identified - Land & its prices , Land rent theory , Land rent & land Use , Hedonic pricing ,
Micro economic theories
Sheet
No 2
DATA REQUIREMENTS
❖ selling prices and locations of residential properties
❖ property characteristics that may affect selling prices, such as
lot size, number and size of rooms, and number of
bathrooms
❖ neighbourhood characteristics that may affect selling prices,
such as property taxes, crime rates, and quality of schools
❖ accessibility characteristics that may affect prices, such as
distances to work and availability of public transportation
❖ environmental characteristics that may affect price
FUNCTION OF TIME
Property value from the date of inception of project till now
(2009-2019)
FUNCTION OF DISTANCE
❖ The price of properties within 500 metres of a rail station
❖ The price of properties from 500 metres to 2km of a rail
station
Relevant theories identified
Land & its prices,Land rent theory, Hedonic pricing
Micro economic theories
Secondary Data
Literature Review
1) Metro Rail transit system. Impacts on Land-Use in Bangalore,
India by Sagar Setia
2)Kolkata Metro Rail Corporation. Annual Report 2014-2015
3) Transit Value Capture Finance
A Global Review of Monetary Potential and Performance
4) Capturing the Value of Transit by CTOD
Case Studies – Kolkata
Techniques - Accessibility and Proximity levels , Qualitative analysis , Descriptive statistics , Regression analysis,
Hedonic pricing , GIS mapping techniques
IMPACT ASSESMENT OF METRO CORRIDOR
A CASE STUDY OF EAST WEST METRO CORRIDOR IN KOLKATA
Name: Shreekanya Baral
Reg. No.: 2180400092 Batch: 2017-19
MURP II Year IV Sem,
Dept. of Planning, SPA Vijayawada
Guide:
Mr. Prasanth Vardhan
Seal
& Signature:
CASE STUDY AREA
Sheet
No 3
SCOPE
❖ The land value should been assessed through authorized officials and also by direct interaction with
developers ,real estate agents
❖ Value appreciation can be captured through change in ownership patterns , distance from CBD’s etc
LIMITATIONS
❖ To delineate the area and to limit the study to the delineated area
❖ The scope of study of socio economic, demography of the area is vast and should be narrowed
down.
RELEVANCE OF EAST WEST METRO
Twin cities of Kolkata and Howrah are dependent on each other for various functions such as education,
employment etc.
Kolkata dominates as the commercial and administrative hub while Howrah dominates as the industrial
centre.
There was no continuous connectivity between the twin cities. therefore, the east west metro corridor
plan provides optimum and hassle-free connectivity between the two.
PROPOSED E-W CORRIDOR PROFILE
To operate between Howrah Maidan& Sector V, Salt Lake Route length: 16.6km (10.8km underground
and 5.8 km elevated) Total Stations: 12 (6 underground and 6 elevated)
STUDY AREA STATIONS
Sector V station
REASONS FOR SELECTING THE PARTICULAR STATION
As per the as per VISION 2025 Sector V, Salt Lake has been identified as an industrial growth centre
&IT Hub, to cater to a population of 5 lakhs and provide employment to more than 1.2 lakh. The site is
within 1 km of the of the Sector V Station, Transit Oriented Development zone around it, having
densified development using metro as a catalyst
HOW TO DELINEATE THE AREA
TOD focuses on creation of high density mixed
land use development in the influence zone of
transit stations, i.e. within the walking distance
of (500-800 m) transit station or along the
corridor in case the station spacing is about 1km
STUDY CARRIED OUT FOR THE STATION
There are 3 zones along a transit namely :
❖ Land Value Increment as a Function of Time
Project Inception Stage. Project Formulation Stage, Project
Construction Stage , Post Completion Stage , Full time period
Intense zone – 500m
Standard zone – 1000m
Transition zone – 2000m
❖ Land Values as a Function of Distance from Metro
Fig 2:TOD along Transit Stations
Source : National Transit Oriented Development (TOD) Policy
IMPACT ASSESMENT OF METRO CORRIDOR
A CASE STUDY OF EAST WEST METRO CORRIDOR IN KOLKATA
Name: Shreekanya Baral
Reg. No.: 2180400092 Batch: 2017-19
MURP II Year IV Sem,
Dept. of Planning, SPA Vijayawada
Guide:
Mr. Prasanth Vardhan
Seal
& Signature:
Download