Amata B Grimm Power Rayong 5 Maintenance Inspection Form Applied to : Thermography Inspection for Exhaust Gas Turbine 52 Maintenance Type : Predictive Maintenance Site : Amata B Grimm Power Rayong 5 System : Gas Turbine Emissivity : 0.95 Distance: 10.0 m. Atmospheic temp. : 33.0'C 3-Dec-2018 Date: Point 4 Location: Gas Turbine 52 Sub-System : Exhaust Gas Turbine Refl. Temp. : 20'C 100% Load Condition: FLIR T530 Camera model: 2:35 PM Time: SIDE VIEW Point 1 Point 2 Point 5 Point 3 EXTENSION VIEW Point 2 : 354.4 C 1 2 3 4 5 6 7 8 Trend of Temperature Date Exhaust side view Date Point 2 : 354.4 C 400.0 350.0 300.0 250.0 Temp 'C Point SIDE VIEW Temperature 'C Date Date Date Date 25-Aug-18 16-Oct-18 19-Nov-18 3-Dec-18 171.4 179.8 183.6 180.8 350.3 354.4 147.5 145.6 165.8 156.0 141.5 142.0 252.9 107.2 80.3 79.9 200.0 150.0 100.0 50.0 0.0 25-Aug-18 Point 1 16-Oct-18 Point 2 Remark : Found the joint of expansion joints of GT#52 shows that hotspot temperature 354.4 'c at point 2 Note : External surface expension temperature < 200 'C Checked By : Approved by : Date Inspect : Date Inspect : Point 3 19-Nov-18 Point 4 3-Dec-18