Uploaded by Moriyasu Nguyen

180801-BPF-HSLS-100DD-REV00

advertisement
CÔNG TY TNHH DỊCH VỤ CÁP TREO BÀ NÀ
APOLLO CO ... LTD
HỒ SƠ THIẾT KẾ KỸ THUẬT
HẠNG MỤC: CẢNH QUAN
BEER FESTIVAL PLAZA
ADDITIONAL ARCHITECTURE - RETAIL PLAZA
100% DETAIL DESIGN HARDSCAPE & LANDSCAPE
REVISION 00
ĐƠN VỊ TƯ VẤN
CT TNHH DỰ ÁN DDP
ĐÀ NẴNG01/08/2018
LẦN PHÁT HÀNH - 00
1438.2
KE
1437.9
KE
KE
INDEXSHEET
ET
1438.2
KE
1438.2
HS-000
COVERSHEET
HS-001
INDEXSHEET
HS-002
HARDSCAPE PAVING REFERENCE IMAGES
HS-003
PAVING & TYPE MASTER SCHEDULE
HS-004
PLANTING REFERENCE IMAGES - LANDSCAPE SCHEDULE
HS-005
SITE FURNITURE REFERENCE IMAGES
HS-100
MASTER PLAN
HS-101
GF LEVEL +1445.4 - LAYOUT PLAN
HS-102
GF LEVEL +1445.4 - PERSPECTIVE
HS-103
MEZ F LEVEL +1448.9 - LAYOUT PLAN
HS-110
SETTING OUT PLAN
HS-111
SETTINGOUT PLAN - ENLARGED 1
HS-112
SETTINGOUT PLAN - ENLARGED 2
HS-150
PAVING LAYOUT PLAN
HS-160
LANDSCAPE LAYOUT PLAN
HS-200
WATER FEATURE - ELEVATION 1
HS-201
WATER FEATURE - ELEVATION 2
HS-210
WATER FEATURE - SECTION
HS-300
POND 1 - DETAIL
HS-301
POND 2 - DETAIL
HS-302
POND 2 - DETAIL
HS-303
FOUNTAIN 1 - DETAIL
HS-304
FOUNTAIN 1 - DETAIL
HS-305
FOUNTAIN 2 - DETAIL
HS-310
TERRACE LANDSCAPE - DETAIL
HS-311
TERRACE LANDSCAPE - SECTION A
HS-312
TERRACE LANDSCAPE - SECTION B
HS-400
TYP. STAIR 01
HS-401
TYP. STAIR 01 - DETAIL
HS-410
STAIR 02 - PLANS
HS-411
STAIR 02 - SECTION
HS-420
STAIR 03
HS-430
TYP.STAIR 04, RAILING, DETAILS
HS-440
RAMP 01 - DETAIL
HS-450
RAMP 02 - DETAIL
HS-460
RAMP 03
HS-500
TOILET LAYOUT PLAN
HS-501
TOILET - FINISHING FLOOR
HS-502
TOILET - CEILING PLAN
HS-503
TOILET - SECTION 1, 2
HS-504
TOILET - SECTION 3, 4
HS-550
KIOSK LOCATION
HS-551
TYP. KIOSK LAYOUT PLANS
HS-552
KIOSK SECTION
HS-560
TYP CONSTRUCTION DETAIL
HS-561
DOOR & ARCHWAY SHEDULE
Grand total: 46
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
Current Revision
Date
01/08/2018
01/08/2018
01/08/2018
01/08/2018
01/08/2018
01/08/2018
01/08/2018
01/08/2018
01/08/2018
01/08/2018
01/08/2018
01/08/2018
01/08/2018
01/08/2018
01/08/2018
01/08/2018
01/08/2018
01/08/2018
01/08/2018
01/08/2018
01/08/2018
01/08/2018
01/08/2018
01/08/2018
01/08/2018
01/08/2018
01/08/2018
01/08/2018
01/08/2018
01/08/2018
01/08/2018
01/08/2018
01/08/2018
01/08/2018
01/08/2018
01/08/2018
01/08/2018
01/08/2018
01/08/2018
01/08/2018
01/08/2018
01/08/2018
01/08/2018
01/08/2018
01/08/2018
01/08/2018
Current Revision
Description
100%DD
100%DD
100%DD
100%DD
100%DD
100%DD
100%DD
100%DD
100%DD
100%DD
100%DD
100%DD
100%DD
100%DD
100%DD
100%DD
100%DD
100%DD
100%DD
100%DD
100%DD
100%DD
100%DD
100%DD
100%DD
100%DD
100%DD
100%DD
100%DD
100%DD
100%DD
100%DD
100%DD
100%DD
100%DD
100%DD
100%DD
100%DD
100%DD
100%DD
100%DD
100%DD
100%DD
100%DD
100%DD
100%DD
SHEET GROUP
00.WATER FEATURE
00.WATER FEATURE
00.WATER FEATURE
00.WATER FEATURE
00.WATER FEATURE
00.WATER FEATURE
00.WATER FEATURE
00.WATER FEATURE
00.WATER FEATURE
00.WATER FEATURE
00.WATER FEATURE
00.WATER FEATURE
00.WATER FEATURE
00.WATER FEATURE
00.WATER FEATURE
00.WATER FEATURE
00.WATER FEATURE
00.WATER FEATURE
00.WATER FEATURE
00.WATER FEATURE
00.WATER FEATURE
00.WATER FEATURE
00.WATER FEATURE
00.WATER FEATURE
00.WATER FEATURE
00.WATER FEATURE
00.WATER FEATURE
00.WATER FEATURE
00.WATER FEATURE
00.WATER FEATURE
00.WATER FEATURE
00.WATER FEATURE
00.WATER FEATURE
00.WATER FEATURE
00.WATER FEATURE
00.WATER FEATURE
00.WATER FEATURE
00.WATER FEATURE
00.WATER FEATURE
00.WATER FEATURE
00.WATER FEATURE
00.WATER FEATURE
00.WATER FEATURE
00.WATER FEATURE
00.WATER FEATURE
00.WATER FEATURE
DESIGN BOUNDARY
ISSUED FOR
REFERENCE
PRELIMINARY
TENDER
UP
APPROVAL
+1
44
4 .5
00
1444.55
DESIGN BOUNDARY
2%
Sheet Name
KE
CONSTRUCTION
1454.44
1454.2
i=
Sheet
Number
Current
Revision
Issued To
+144
4 .850
UP
AS-BUILT
+144
5 .120
LỐ
IV
ÀO
W
C
REVISION SCHEDULE
Rev_Num
ber
Rev. Date
00
01/08/2018
1
Rev. Description
100%DD
SITE LOCATION
SCALE: 1 : 1000
INVESTOR
CÔNG TY TNHH DỊCH VỤ
CÁP TREO BÀ NÀ
PROJECT'S NAME:
BEER FESTIVAL PLAZA
CONCEPT DESIGNED:
HARDSCAPE-LANDSCAPE:
ADD: 5th FLOOR,130-132 BACH DANG St. HAI CHAU Dist.,DA NANG City
Tel
: 0511 3849598
Email :info@ddpprojects.com
DESIGNED BY:
Philip Hocking
DRAWN BY:
Trinh Pham
CHECKED BY:
Philip Hocking
DRAWING'S NAME:
INDEXSHEET
Scale:
1 : 1000
Date:
01/08/2018
Drawing No:
BFP-HS-001
Revision:
00
PAVING REFERENCES
ISSUED FOR
REFERENCE
PRELIMINARY
TENDER
APPROVAL
CONSTRUCTION
AS-BUILT
REV ISI ON SCHEDULE
Rev_Num
ber
Rev. Date
00
01/08/2018
Rev. Description
100%DD
INVESTOR
CÔNG TY TNHH DỊCH VỤ
CÁP TREO BÀ NÀ
PROJECT'S NAME:
BEER FESTIVAL PLAZA
CONCEPT DESIGNED:
HARDSCAPE-LANDSCAPE:
ADD: 5th FLOOR,130-132 BACH DANG St. HAI CHAU Dist.,DA NANG City
Tel
: 0511 3849598
Email :info@ddpprojects.c om
DESIGNED BY:
Philip Hocking
DRAW N BY:
Trinh Pham
CHECKED BY:
Philip Hocking
DRAWING'S NAME:
HARDSCAPE PAVING
REFERENCE IMAGES
Date:
Scale:
01/08/2018
Drawing No:
BFP-HS-002
Revision:
00
100X200
100X200
100X200
200X200
100X200
100X200
200X200
100X200
200X200
100X200
100X200
100X200
100X200
100X200
100X200
100X200
200X200
100X200
100X200
100X200
100X200
100X200
100X200
100X200
100X200
100X200
200X200
100X200
100X200
200X200
100X200
100X200
100X200
100X200
100X200
200X200
100X200
100X200
100X200
100X200
200X200
100X200
100X200
ISSUED FOR
100X200
HARDSCAPE PAVING PATTERN - N2
HARDSCAPE PAVING PATTERN - N1
REFERENCE
HARDSCAPE PAVING PATTERN - N3
SLATE STONE 100 X200- THK 30mm
SLATE STONE THK 30mm
SAND STONE 70X200 THK 30mm
PRELIMINARY
TENDER
APPROVAL
CONSTRUCTION
AS-BUILT
400X600
REV ISI ON SCHEDULE
400X600
STEP TILE
(330 X L)
Rev_Num
ber
Rev. Date
00
01/08/2018
BORDER TILE
200X600
200X600
Rev. Description
100%DD
LOẠI BODER RỘNG 40
BORDER TILE
LOẠI BODER RỘNG 20
HARDSCAPE PAVING PATTERN - N4
STEP TILE
(330 X L)
HARDSCAPE PAVING PATTERN - N5
HARDSCAPE PAVING PATTERN - N6
SLATE STONE THK 50mm
CUBIC BAZAN STONE 100X100 THK 50mm
SLATE STONE THK 30mm
PAVING FINISH SCHEDULE
Pattern paving
code
N1
N2
Pattern
code
Colour
Description
SLATE STONE
Size
(mm)
MIX DARK-LIGHTGREY,YELLOW
THICK 30
(100X100,100X200,200X200)
YELLOW
(100X200X30)
Remark
INVESTOR
CÔNG TY TNHH DỊCH VỤ
CÁP TREO BÀ NÀ
PROJECT'S NAME:
BEER FESTIVAL PLAZA
GRANITE STONE
CONCEPT DESIGNED:
N3
GRANITE STONE
YELLOW
(50X200X30)
BAZAN STONE BOLDER
DARK GREY
THICK 30
BAZAN SLATE STONE
DARK GREY
THICK 50
HARDSCAPE-LANDSCAPE:
N4
HARDSCAPE PAVING - N9
MOSAIC THK 20mm
N5
ADD: 5th FLOOR,130-132 BACH DANG St. HAI CHAU Dist.,DA NANG City
Tel
: 0511 3849598
Email :info@ddpprojects.c om
DESIGNED BY:
N6
CUBIC BAZAN STONE
MIX GREY, BLACK
100x100X50
MIX GREY,WHITE
(100X100X50)
Philip Hocking
DRAWN BY:
Trinh Pham
N7
BAZAN CUBIC STONE BOLDER
CHECKED BY:
Philip Hocking
DRAWING'S NAME:
N8
N9
CAPPING STONE
THK 100mm
SLATE STONE
DARK YELLOW
MOSAIC
MIX GREY, WHITE
THICK 50
THICK 20
PAVING & TYPE MASTER
SCHEDULE
Scale:
As
indicated
Date:
01/08/2018
Drawing No:
BFP-HS-003
Revision:
00
NOTE:
- THIS PLANTING IS ONLY AN
INDICATION
OF LOOK & FEEL
- A-PROFESSIONAL IN THE FIELD
TO
SUGGEST THE PLANT TYPE
- DDP CARIES NO RESPONSIBILITY
ISSUED FOR
REFERENCE
PRELIMINARY
TENDER
APPROVAL
CONSTRUCTION
AS-BUILT
REV ISI ON SCHEDULE
Rev_Num
ber
Rev. Date
00
01/08/2018
Rev. Description
100%DD
INVESTOR
CÔNG TY TNHH DỊCH VỤ
CÁP TREO BÀ NÀ
PROJECT'S NAME:
BEER FESTIVAL PLAZA
REF. IMAGE - SHRUBS
LANDSCAPE SCHEDULE
CONCEPT DESIGNED:
SYMBOL
BOTANICAL NAME
CLEAR TRK.HT
(MM)
PLANTING
DISTANCE
QUANTITY
TREES
HARDSCAPE-LANDSCAPE:
CEDAR TREE
Tr
(H=4000-15000)
BY CLIENT
11
SHRUBS
FERN TREE
sh
CYPERUS INVOLUCRATUS
FICUS PUMILA
ADD: 5th FLOOR,130-132 BACH DANG St. HAI CHAU Dist.,DA NANG City
H= 400-900
H= 700-1500
CLIMB ON W ALL
BY CLIENT
AREA ON
PLANDING
Tel
: 0511 3849598
Email :info@ddpprojects.c om
DESIGNED B Y:
Philip Hocking
DRAW N BY:
HEDGE
Trinh Pham
CHECKED BY:
Philip Hocking
REF. IMAGE -TREE
R
ROSE
NL
EXISTING NATURAL LANDSCAPE
Gr
GRASS
H= 400-600
BY CLIENT
DRAWING'S NAME:
PLANTING REFERENCE
IMAGES - LANDSCAPE
SCHEDULE
BY CLIENT
1 : 50
Scale:
Date:
01/08/2018
Drawing No:
BFP-HS-004
Revision:
00
WATER FEATURE
SHADING
ISSUED FOR
REFERENCE
PRELIMINARY
TENDER
APPROVAL
CONSTRUCTION
AS-BUILT
REVISION SCHEDULE
BENCH
KIOSKS
Rev_Num
ber
Rev. Date
00
01/08/2018
Rev. Description
100%DD
INVESTOR
CÔNG TY TNHH DỊCH VỤ
CÁP TREO BÀ NÀ
PROJECT'S NAME:
BEER FESTIVAL PLAZA
CONCEPT DESIGNED:
LAMP POST
TRASH BIN
STATUES
HARDSCAPE-LANDSCAPE:
ADD: 5th FLOOR,130-132 BACH DANG St. HAI CHAU Dist.,DA NANG City
Tel
: 0511 3849598
Email :info@ddpprojects.com
DESIGNED BY:
Philip Hocking
DRAW N BY:
Trinh Pham
CHECKED BY:
Philip Hocking
DRAWING'S NAME:
SITE FURNITURE
REFERENCE IMAGES
Date:
Scale:
01/08/2018
Drawing No:
BFP-HS-005
Revision:
00
UPDATE FOLLOW TO PMU
P24
16
P25
ROAD TO BE DESIGNED BY OTHER
3
14
2
8.
3
14
FFL
P26
2
8.
1--HS-103
K1
+1444.900
P19
P23
FFL
K2
+1447.200
P27
P20
P21
J
FFL
+1444.900
K3
VOID
FFL
+1445.350
FFL
P29
I'
+1444.500
P28
P22
I
P30
ISSUED FOR
EXISTING MOUNTAIN
REFERENCE
H
PRELIMINARY
TENDER
G1
APPROVAL
G
.2
54
14
P9
CONSTRUCTION
P15
AS-BUILT
KIOSK
P16
KIOSK
P2
P5
F
P6
E
FFL
BEER FESTIVAL BUILDING
REVISION SCHEDULE
Rev_Num
ber
Rev. Date
00
01/08/2018
Rev. Description
100%DD
WATER P38
FEATURE
+1452.300
D
FFL
UP
P4
+1459.800
P3
P13
P7
KIOSK
KIOSK
P1
P17
P14
B
P18
A
P12
CÔNG TY TNHH DỊCH VỤ
CÁP TREO BÀ NÀ
P11
EXISTING ROAD
INVESTOR
A'
P10
PROJECT'S NAME:
BEER FESTIVAL PLAZA
EXISTING TREES
CONCEPT DESIGNED:
BOUNDARY OF MORIN PLAZA FLOOR
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
15'
HARDSCAPE-LANDSCAPE:
ADD: 5th FLOOR,130-132 BACH DANG St. HAI CHAU Dist.,DA NANG City
Tel
: 0511 3849598
Email :info@ddpprojects.com
DESIGNED BY:
COORDINATES
Mark
X
COORDINATES
Y
Mark
X
COORDINATES
Y
Mark
X
Y
Mark
X
Philip Hocking
LEGEND:
COORDINATES
DRAWN BY:
Y
NATURAL LANDSCAPE
1
MASTER PLAN
SCALE:1 : 400
P1
P2
P3
P4
P5
P6
P7
P8
P9
P10
1783978
1795095
1795093
1788576
1788578
1793695
1793693
1798784
1798797
1804182
507383
521937
509947
511348
520538
520537
511347
503506
528401
495108
P11
P12
P13
P14
P15
P16
P17
P18
P19
P20
1812621
1813976
1819016
1816335
1816339
1819018
1816336
1816001
1804459
1812051
494911
500564
508573
503988
528003
523384
508473
499870
548272
544751
P21
P22
P23
P24
P25
P26
P27
P28
P29
P30
1818924
1797625
1796327
1794725
1791040
1783374
1785062
1816653
1802205
1803899
544737
540749
548528
553280
552050
549491
544431
535789
538373
536495
P31
P32
P33
P34
P35
P36
P37
P38
1797131
1805649
1817845
1822445
1809580
1801749
1791836
1805011
537127
542239
542237
537650
551004
552973
549665
515990
WATER
Trinh Pham
CHECKED BY:
Philip Hocking
DRAWING'S NAME:
LANDSCAPE
MASTER PLAN
TREE
As
indicated
Scale:
SHRUBS FOR WATER FEATURE
Date:
01/08/2018
Drawing No:
BFP-HS-100
Revision:
00
K3
K2
K1
RAMP 2
FOUNTAIN
12
DIS.TOILET
(7 m²)
D01
HS-450
HS-500
W1
5
.5
44
14
MOUNTAIN RETAINING WALL
1
PUBLIC TOILET
R = 205
0
E
AP
MALE TOILET
(30 m²)
W4
REFERENCE
W2
W5
GAS STORE
(31 m²)
D01
FFL
D01
+1444.900
W5
PRELIMINARY
+1446.100
D01
TENDER
APPROVAL
5°
UP
FFL
UP
+1445.000
CONSTRUCTION
AS-BUILT
15
REV ISI ON SCHEDULE
W3
FFL
13
HS-420
W5
LANDSCAPE
AR 1
1
STAIR 3
HOUSE KEEPING
(4 m²)
+1444.500
D01
FEMALE TOILET
(27 m²)
FFL
5°
+1446.080
RAMP 1
HS-201
1
Rev_Num
ber
Rev. Date
00
01/08/2018
5610
LANDSCAPE
4 98 0
ISSUED FOR
15'
W5
SC
ND
FFL
+1444.500
LA
R
=1
FFL
0
75
6740
STAIR 2
8
.9
51
14
2
1
HS-410
Rev. Description
100%DD
1600
23940
HS-440
UP
14
5000
16
LANDSCAPE
FFL
+1444.950
13
INVESTOR
BEER FESTIVAL BUILDING
5000
CÔNG TY TNHH DỊCH VỤ
CÁP TREO BÀ NÀ
PROJECT'S NAME:
BEER FESTIVAL PLAZA
UP
12
CONCEPT DESIGNED:
FFL
FFL
+1445.350
+1444.900
UP
UPDATE FOLLOW TO PMU
HARDSCAPE-LANDSCAPE:
7200
5000
2000
3000
5000
K
5000
5000
5000
5000
42200
ADD: 5th FLOOR,130-132 BACH DANG St. HAI CHAU Dist.,DA NANG City
J
I'
I
H
G1
G
F
E
D
C
B
Tel
: 0511 3849598
Email :info@ddpprojects.c om
DESIGNED B Y:
Philip Hocking
DRAW N BY:
Trinh Pham
CHECKED BY:
Philip Hocking
DRAWING'S NAME:
1
GF LEVEL +1445.4 LAYOUT PLAN
GF LEVEL +1445.4 - LAYOUT PLAN
SCALE: 1 : 200
1 : 200
Scale:
Date:
01/08/2018
Drawing No:
BFP-HS-101
Revision:
00
STAIR TO WATER TANK
STORE
ISSUED FOR
REFERENCE
PRELIMINARY
TENDER
APPROVAL
CONSTRUCTION
AS-BUILT
REV ISI ON SCHEDULE
FFL
+1446.080
Rev_Num
ber
Rev. Date
00
01/08/2018
PUBLIC TOILET
Rev. Description
100%DD
BEER FESTIVAL BUILDING
FFL
+1445.000
5°
INVESTOR
CÔNG TY TNHH DỊCH VỤ
CÁP TREO BÀ NÀ
5°
PROJECT'S NAME:
BEER FESTIVAL PLAZA
CONCEPT DESIGNED:
FFL
+1444.500
ARCHITECTURE:
ADD: 5th FLOOR,130-132 BACH DANG St. HAI CHAU Dist.,DA NANG City
Tel
: 0511 3849598
Email :info@ddpprojects.c om
DESIGNED B Y:
Philip Hocking
DRAW N BY:
Ngoc Trai Tran
CHECKED BY:
Philip Hocking
DRAWING'S NAME:
1
GF LEVEL +1445.4 PERSPECTIVE
GF LEVEL +1445.4 - PERSPECTIVE
SCALE:
Date:
Scale:
01/08/2018
Drawing No:
BFP-HS-102
Revision:
00
K3
K2
1
K1
HS-210
8
.9
51
14
15060
7470
STAIR 2
5
.5
44
14
HS-410
230 2000
W1
ISSUED FOR
2630
4790
230
REFERENCE
170
22
1
.7
44
14
.2
54
14
MOUNTAIN RETAINING WALL
15'
PRELIMINARY
TENDER
WATER TANK
(27 m²)
500
500
?
D01
33
STAIR 3
AS-BUILT
1710
PUMP ROOM
(94 m²)
HS-420
REV ISI ON SCHEDULE
160
+1448.900
CONSTRUCTION
230
W2
FFL
APPROVAL
6740
?
?
4480
?
15
W3
W2
LADER
BALUSTRADE
+1448.800
7200
FFL
W3
Rev_Num
ber
Rev. Date
00
01/08/2018
Rev. Description
100%DD
18940
M2
BALUSTRADE
16
58
2.
4
14
UP
FFL
5000
14
+1448.850
INVESTOR
CÔNG TY TNHH DỊCH VỤ
CÁP TREO BÀ NÀ
6
+
1
.
4
5 7
=
=
H
m
H
m
0
0
9
9
+
+
1
1
u
u
u
4 8
5
4
p
p
p
5 8
rm
1
f5
9
8
3
4
4
+
2
u
+
+
1
1
1
5
6
. +
p
4 o
4 6
13
PROJECT'S NAME:
BEER FESTIVAL PLAZA
5700
1500
5000
2000
3000
5000
5000
5000
5000
5000
5000
CONCEPT DESIGNED:
47200
J
I'
I
H
G1
G
F
E
D
C
B
A
HARDSCAPE-LANDSCAPE:
ADD: 5th FLOOR,130-132 BACH DANG St. HAI CHAU Dist.,DA NANG City
Tel
: 0511 3849598
Email :info@ddpprojects.c om
DESIGNED B Y:
Philip Hocking
DRAW N BY:
Trinh Pham
CHECKED BY:
Philip Hocking
DRAWING'S NAME:
1
MEZ F LEVEL +1448.9 - LAYOUT PLAN
SCALE: 1 : 200
MEZ F LEVEL +1448.9 LAYOUT PLAN
1 : 200
Scale:
Date:
01/08/2018
Drawing No:
BFP-HS-103
Revision:
00
1
TERRACE STEPS DETAIL
HS-310
1
2
HS-400
TYP. STAIR 1
POND 1
WALKWAY
(REFER TO WALKWAY PAKAGE DWGS)
1
TYP. STAIR 1
HS-300
1
HS-400
EXISTING MOUNTAIN
MOUNTAIN RETAINING WALL
5000
3
1
14950
HS-460
12
5000
RAMP 3
FFL
+1459.800
00
63
FOUNTAIN 2
HS-305
i=2%
6600
00
40
i=4
BOUNDARY OF MORIN
PLAZA FLOOR
.
ISSUED FOR
REFERENCE
%
PRELIMINARY
i=2%
FFL
TENDER
WATER FEATURE
.
46
2
0
150
.
FFL
+1457.907
+1457.907
APPROVAL
4000
00
50
CONSTRUCTION
AS-BUILT
0
90
i=2%
REV ISI ON SCHEDULE
F
L
+
1
4
3
7
.0
9257413068, 8732106459,
G
IU
N
IN
L
E
L
K
D
L
P
V
S
A
A
H
P
T
R
E
Y
P
C
D E
W
Y
IC
U
F
W
F
B A
R
R
P
E
+
S
F
+
U
F
B
N
F
1
O
1
G
U
T
R
A
E
4
R
O
I4
D
5
'E
A S
I(N
3
2
O
.8
L
L A
L
0
0
3 A
2.9
uW A
uU O
5
2
N
918427365y0xâN
a,T
l,caK
l&
S
yxâR
D
N 0319287654N
Y
K
6D
342910857G
A
G
R
T
E
M
P
IL
C
O
D G
T
N
M
E
F
E
N
F
G
1
D
IốtN
L
E
B
U
'gW
G
P
U
T
N
O
4
S
G
F
A
IE
M
S
D
5
T
A
S
)
3
X
O
X K
R
.D
L
P
0
L
+
1
+
1
4
4
9
5
5
8 A
2
2
.3
.3
0
0 B
4321O
, P
C
K
D
N
,tF
C
2076IN
L
Y A
V
U E
n+
ớ
T
O
R W
5319247086aohnồbD
4710653928ư
Z
L
T
E 20H
P
L
G
E
F
T
IS
E
W
èkđá 1
5
O
X
U
T
R A
G
IN A
D
U
L
+
4
8
.0 A
O
D
4U
358R
S
C
N
19W
P O
7936821504N
S T
A
IR
12
4000
R =2
070
yxđ
â
yh
xđ
á
tè
á
yxn
è
kư
kb
h
ậ
à
c â
ờ â
n
g
tb
h
ka
ê
ầ
ta
u
.
l4
c è
1
n
g
b
y5 0
ậ
9
c ô
.u
0
0.9541a
n
g
4970
.
Rev_Num
ber
Rev. Date
00
01/08/2018
HS-411
0
FFL
+1455.144
FFL
Rev. Description
100%DD
+1455.144
15'
0
35 4
i=2%
.
00
39
R = 2670
4 00 0
10
24
15
6 00 0
FFL
INVESTOR
+1452.300
CÔNG TY TNHH DỊCH VỤ
CÁP TREO BÀ NÀ
EXISTING TREE
PROJECT'S NAME:
BEER FESTIVAL PLAZA
VOID
CONCEPT DESIGNED:
POND 2
1
12
BOUNDARY OF BEER PLAZA FLOOR
HS-301
HS-210
HARDSCAPE-LANDSCAPE:
5700
1500
1710
1980
2160
640 1080
1620
820
19980
5000
5000
2000
49200
ADD: 5th FLOOR,130-132 BACH DANG St. HAI CHAU Dist.,DA NANG City
Tel
J
I'
I
H
G1
F
E
D
C
B
A
A'
: 0511 3849598
Email :info@ddpprojects.com
DESIGNED BY:
Philip Hocking
DRAWN BY:
Trinh Pham
LEGEND:
CHECKED BY:
Philip Hocking
SHRUBS
HARDSCAPE
1
WATER
NATURAL LANDSCAPE
WATER FEATURE -LEVEL LAYOUT PLAN
SCALE: 1 : 200
DRAWING'S NAME:
LEVEL 1452.300 - LAYOUT
PLAN
Scale:
RETAINING WALL
LANDSCAPE
As
indicated
Date:
01/08/2018
Drawing No:
BFP-HS-104
Revision:
00
MOUNTAIN RETAINING WALL
EXISTING MOUNTAIN
F
R
1
TYP. STAIR 1
= 5370
12
1
2
HS-112
HS-400
HS-111
5000
14950
FFL
P21
1710
00
63
1980
2800
1080
1620
5000
P13
3230
P33
P15
i=2%
3660
+1459.800
P16
820
7000
P14
POND 1
P18
P17
.
150
5000
3300
+1457.907
FFL
WATER FEATURE
FFL
FFL
E
.
AS-BUILT
REV ISI ON SCHEDULE
FFL
17040
4000
0
07
FFL
P38
+1455.144
FFL
Rev_Num
ber
Rev. Date
00
01/08/2018
+1455.144
6810
R
0
33 9
15'
i=2%
.
=
40
79
1
R = 81
00
39
=3
18
0
0
4 00 0
NATURAL LANDSCAPE
P31
2040
2450
60
22
R
P22
P9
P8
15
P23
6 00 0
P2
R = 5280
INVESTOR
FFL
+1452.300
CÔNG TY TNHH DỊCH VỤ
CÁP TREO BÀ NÀ
P7
EXISTING TREE
R = 37
80
P37
5 00 0
16
P6
P3
P24
P25
PROJECT'S NAME:
BEER FESTIVAL PLAZA
VOID
14
P5
CONCEPT DESIGNED:
P4
HARDSCAPE-LANDSCAPE:
85
1.
4
14
1
Rev. Description
100%DD
P10
LA
POND 2
8 50
5 01 0
+1453.000
E
P32
ND
SC
AP
5010
CA
P
i=2%
ND
S
0
67
P36
APPROVAL
+1455.200
CONSTRUCTION
0
R = 327
R = 1740
TENDER
LA
=2
P19
+1456.000
+1457.907
4500
=2
REFERENCE
PRELIMINARY
FFL
.2
54
14
R
R
ISSUED FOR
P11
4000
P35
2500
P12
2340
46
2
.
2500
00
25
00
50
0
00
25
i=2%
LANDSCAPE
.
LANDSCAPE
LANDSCAPE
%
i=4
LANDSCAPE
00
40
LANDSCAPE
6600
MORIN PLAZA FLOOR
J
K3
I
I'
1
F
K2
SETTING OUT LAYOUT
D
C
B
A
A'
HS-210
ADD: 5th FLOOR,130-132 BACH DANG St. HAI CHAU Dist.,DA NANG City
SCALE: 1 : 200
Tel
: 0511 3849598
Email :info@ddpprojects.com
DESIGNED BY:
Philip Hocking
COORDINA TES
Mark
P1
P2
P3
P4
P5
P6
P7
P8
P9
P10
X
1783978
1795095
1795093
1788576
1788578
1793695
1793693
1798784
1798797
1804182
COORDINA TES
Y
507383
521937
509947
511348
520538
520537
511347
503506
528401
495108
Mark
P11
P12
P13
P14
P15
P16
P17
P18
P19
P20
X
1812621
1813976
1819016
1816335
1816339
1819018
1816336
1816001
1804459
1812051
COORDINA TES
Y
494911
500564
508573
503988
528003
523384
508473
499870
548272
544751
Mark
P21
P22
P23
P24
P25
P26
P27
P28
P29
P30
X
1818924
1797625
1796327
1794725
1791040
1783374
1785062
1816653
1802205
1803899
COORDINA TES
Y
544737
540749
548528
553280
552050
549491
544431
535789
538373
536495
Mark
P31
P32
P33
P34
P35
P36
P37
P38
X
1797131
1805649
1817845
1822445
1809580
1801749
1791836
1805011
DRAWN BY:
Y
537127
542239
542237
537650
551004
552973
549665
515990
Trinh Pham
CHECKED BY:
Philip Hocking
LEGEND:
DRAWING'S NAME:
SHRUBS
WATER
HARDSCAPE
LANDSCAPE
SETTING OUT PLAN
Scale:
EXISTING NATURAL LANDSCAPE
As
indicated
Date:
01/08/2018
Drawing No:
BFP-HS-110
Revision:
00
MOUNTAIN RETAINING WALL
EXISTING MOUNTAIN
6160
P21
10100
5000
1160
00
63
1790
210
1780
260
1900
640
1080
210
1410
110 660 60
P33
P15
.
K3
i=2%
P20
FFL
+1444.900
.
0
2500
3760
REFERENCE
PRELIMINARY
TENDER
5000
APPROVAL
CONSTRUCTION
8
.0
55
4
1
1050
FFL +1444.700
P32
0
0
R = 267
16250
2100
4000
32
70
=
Rev. Description
100%DD
70
R
Rev_Num
ber
Rev. Date
00
01/08/2018
11
2 07
174
0
200
REV ISI ON SCHEDULE
.2
54
4
1
0
60
R=
R=
70
0
342
0
90
.
5000
5010
11
00
25
i=2%
AS-BUILT
4780
P35
+1448.600 FFL
4000
00
50
1170
00
25
46
2
3730
2500
ISSUED FOR
2100
%
FFL +1456.300
i=4
.
FFL +1456.000
FFL
+1444.500
00
40
1170
FFL +1455.000
6750
1810
i=2%
330
P28
70
24
P19
P30
15'
INVESTOR
16
R=
CÔNG TY TNHH DỊCH VỤ
CÁP TREO BÀ NÀ
30
PROJECT'S NAME:
BEER FESTIVAL PLAZA
11 7
0
=5
00
=4
00
83 0
CONCEPT DESIGNED:
R=
R
R
00
39
R=
40 0
=3
R
18
52 8 0 = 3 7
80 0
R
23
R
=3
00
4 00 0
5 01 0
P29
30 0
8 50
.
4420
0
35 4
P36
i=2%
11
70
FFL
R=
500
P9
HARDSCAPE-LANDSCAPE:
P22
+1444.900
P31
60
22
15
4 61 0
P23
ADD: 5th FLOOR,130-132 BACH DANG St. HAI CHAU Dist.,DA NANG City
Tel
: 0511 3849598
Email :info@ddpprojects.com
DESIGNED BY:
Philip Hocking
DRAWN BY:
P24
Trinh Pham
CHECKED BY:
Philip Hocking
DRAWING'S NAME:
SETTINGOUT PLAN ENLARGED 1
VOID
1
SETTINGOUT PLAN - ENLARGED 1
SCALE: 1 : 100
1 : 100
Scale:
J
K1
I'
I
K2
H
G1
G
Date:
01/08/2018
Drawing No:
BFP-HS-111
Revision:
00
2170
5000
+1459.800
2190
230 90
P16
5000
3620
6980
P13
3000
3230
230
FFL
5000
+144
230
P14
POND 1
P18
900
900
FFL +1456.300
600
P17
ISSUED FOR
REFERENCE
P12
900
PRELIMINARY
TENDER
P11
FFL +1456.000
FFL +1453.000
2520
AS-BUILT
REV ISI ON SCHEDULE
Rev_Num
ber
Rev. Date
00
01/08/2018
34 2
0
Rev. Description
100%DD
640
11
70
900
900
900
900
FFL +1453.600
900
10140
WATER FEATURE
CONSTRUCTION
FFL +1455.000
2340
APPROVAL
P38
INVESTOR
32
70
15'
6530
15'
PROJECT'S NAME:
BEER FESTIVAL PLAZA
7 94
R=
7
11
0
6860
CÔNG TY TNHH DỊCH VỤ
CÁP TREO BÀ NÀ
P10
POND 2
0
CONCEPT DESIGNED:
R = 8270
0
352
330
HARDSCAPE-LANDSCAPE:
P8
ADD: 5th FLOOR,130-132 BACH DANG St. HAI CHAU Dist.,DA NANG City
2050
Tel
FFL
: 0511 3849598
Email :info@ddpprojects.com
DESIGNED BY:
+1452.300
Philip Hocking
DRAWN BY:
15
Trinh Pham
CHECKED BY:
2050
10970
1980
Philip Hocking
12000
DRAWING'S NAME:
F
1
SETTINGOUT PLAN - ENLARGED 2
SCALE: 1 : 100
E
D
C
B
A
A'
SETTINGOUT PLAN ENLARGED 2
1 : 100
Scale:
Date:
01/08/2018
Drawing No:
BFP-HS-112
Revision:
00
EXISTING MOUNTAIN
N1
MOUNTAIN RETAINING WALL
N4
N4
FFL
+1459.800
POND 1
N4
i=2%
.
.
LANDSCAPE
i=2%
LANDSCAPE
N6
LANDSCAPE
LANDSCAPE
%
LANDSCAPE
i=4
.
LANDSCAPE
MORIN PLAZA FLOOR
N5
ISSUED FOR
REFERENCE
PRELIMINARY
N5
STEPS WATER
TENDER
N8
CA
P
E
APPROVAL
.
N8
N8
LA
.2
54
14
LANDSCAPE
CONSTRUCTION
ND
S
i=2%
AS-BUILT
N5
ND
SC
AP
E
REV ISI ON SCHEDULE
N5
Rev_Num
ber
Rev. Date
00
01/08/2018
LA
N9
15'
i=2%
.
Rev. Description
100%DD
POND 2
N6
LANDSCAPE
UP
FFL
15
UP
+1444.900
FFL
+1452.300
N1
N2
N5
INVESTOR
LANDSCAPE
CÔNG TY TNHH DỊCH VỤ
CÁP TREO BÀ NÀ
EXISTING ROAD
LANDSCAPE
PROJECT'S NAME:
16
BEER FESTIVAL PLAZA
K3
J
I'
I
G
D
F
C
B
A
A'
K2
CONCEPT DESIGNED:
PAVING FINISH SCHEDULE
Pattern paving
code
N1
N2
Pattern
code
Description
SLATE STONE
Colour
Size
(mm)
MIX DARK-LIGHTGREY,YELLOW
THICK 30
(100X100,100X200,200X200)
YELLOW
(100X200X30)
Remark
HARDSCAPE-LANDSCAPE:
ADD: 5th FLOOR,130-132 BACH DANG St. HAI CHAU Dist.,DA NANG City
GRANITE STONE
NON - SLIP
Tel
: 0511 3849598
Email :info@ddpprojects.com
DESIGNED B Y:
Philip Hocking
N4
BAZAN STONE BOLDER
DARK GREY
300 x L -THICK 30
DRAW N BY:
Trinh Pham
N5
N8
BAZAN SLATE STONE
DARK GREY
THICK 50
SLATE STONE
DARK YELLOW
THICK 50
CHECKED BY:
Philip Hocking
DRAWING'S NAME:
PAVING LAYOUT PLAN
N9
1
MOSAIC
MIX: GREY, WHITE
PAVING LAYOUT - PLAN
SCALE: 1 : 200
THICK 20
Scale:
As
indicated
Date:
01/08/2018
Drawing No:
NOTE: N3,N6,N7 TO BE USED FOR BEER PLAZA PAVING - MAIN PAKAPAGE
BFP-HS-150
Revision:
00
i=4
EXISTING MOUNTAIN
Gr
MOUNTAIN RETAINING WALL
G
FFL
+1459.800
POND 1
i=2%
.
SH
%
SH
ISSUED FOR
SH
Tr
FFL
.
+1444.500
Gr
.
Gr
R
Tr
PRELIMINARY
TENDER
R
STEPS WATER
Gr
SH
SH
APPROVAL
AS-BUILT
SH
SH
SH
.
REFERENCE
Gr
SH
i=2%
Gr
CONSTRUCTION
SH
Tr
Tr
SH
i=2%
REV ISI ON SCHEDULE
Tr
70
20
+1444.900
Gr
SH
Tr
Rev_Num
ber
00
R
R
Tr
Rev. Date
01/08/2018
Rev. Description
100%DD
Tr
Tr
?
Gr
NL
SH
POND 2
.
=
FFL
Tr
Tr
Sh
Gr
Tr
Gr
Sh
Gr
SH
15'
i=2%
R
1
U
U
P
P
P
U
R
T
S
N
LIC
ILD
V
A
R
E
R
D
Y
W
E
O
K
E
Y
WR
E
(F
R
O A
L&
E
W
N
E
G A
N
S
F
G
P
'K
F
L+1437.0 U
T
+143.9052N
O A
A
O
U
T A
D
S
Y B
K
A
D
U
N
P
P
T
IO
E
N
T
IN
E
X
B
F
G
IW
D
A
R
S
R
G
IC
IN P
O
M
N
C
B
F
G
G
R
S
L
E
T
O
S
WG
)
LK
F
+F
E
+F
D
B U
LH
L D
D
LG
1M
+M
1453.908 A
452.830 A
1A
452.30Y A
LT
U E
O
R D
IN
G
T
IP
E
èkX
IN
S
LO
R
W
đá U
E
G
T
IT
E
P
H
X
R
Z
LD
U
W
S
R
O
U
15F
T
D A
' A
L+48.0 A
V A
S
C
P
E E
G
A
S T
IR
N
N
C
D
D
C
D
4 N
2
2 K
3
3
OK
1
O
1
0
2
3
4
5
6
7
8
9
â
yxđ
á
è
kh
tN
y1
x4
n
b
h
ư
ậ
à
cờ n
1
4
2
9
3
5
7
N
t8
ư
0
2
5
6
C
ố
3
g
ớ â
n
g
0
h
to
è
k,a
b
.
ê
ầ
l4
u
cậ 5
u
y 0
8
1
4
9
5
3
1
3
5
6
9
7
2
4
1
8
9
2
1
4
3
0
7
6
,a
â
yx,a
8
2
9
ồ
0
ctl.u 5
7
3 ô
3
5
0
1
4
9
1
1
2
7
g
,
0
6
7
,. 8
6
2
9
4
8
5
2
â
yx,a
ln
u 0
SH
Sh
Tr
SH
Sh
Tr
FFL
+1452.300
15
INVESTOR
CÔNG TY TNHH DỊCH VỤ
CÁP TREO BÀ NÀ
Gr
FFL
+1452.300
PROJECT'S NAME:
EXISTING ROAD
BEER FESTIVAL PLAZA
Sh
G
I'
K2
I
F
D
C
B
A
A'
CONCEPT DESIGNED:
K3
HARDSCAPE-LANDSCAPE:
ADD: 5th FLOOR,130-132 BACH DANG St. HAI CHAU Dist.,DA NANG City
Tel
: 0511 3849598
Email :info@ddpprojects.com
DESIGNED B Y:
Philip Hocking
LEGEND :
DRAW N BY:
GRASS
Gr
Trinh Pham
CHECKED BY:
TREE
Tr
EXISTING NATURAL LANDSCAPE
NL
Philip Hocking
DRAW ING'S NAME:
ROSE
R
SHRUBS
sh
LANDSCAPE LAYOUT
PLAN
Scale:
LANDSCAPE LAYOUT PLAN
As
indicated
Date:
01/08/2018
Drawing No:
SCALE: 1 : 200
BFP-HS-160
Revision:
00
WATER FEATURE
STATUE
BALUSTRADE
ROSE STEPS PLANTERBOX
+1459.980
900
FFL
ISSUED FOR
Morin Plaza
+1460.000
REFERENCE
PRELIMINARY
3100
3100
TENDER
M2
APPROVAL
CONSTRUCTION
M2
M2
M2
GRASS
Rev_Num
ber
Rev. Date
00
01/08/2018
Rev. Description
100%DD
M2
M2
M2
M2
+1452.300
600
GRASS
M2
M2
900
GRASS
390
GRASS
FFL
N4
850
5000
14910
5000
850
4200
210
2200
700
GRASS
REV ISI ON SCHEDULE
700
M2
M2
800
800
M2
M2
700
8400
700
AS-BUILT
First Floor
+1452.400
2000
INVESTOR
C
B
A
CÔNG TY TNHH DỊCH VỤ
CÁP TREO BÀ NÀ
A'
PROJECT'S NAME:
BEER FESTIVAL PLAZA
CONCEPT DESIGNED:
HARDSCAPE-LANDSCAPE:
ADD: 5th FLOOR,130-132 BACH DANG St. HAI CHAU Dist.,DA NANG City
Tel
: 0511 3849598
Email :info@ddpprojects.com
DESIGNED B Y:
Philip Hocking
DRAW N BY:
Trinh Pham
INTERIOR WALL FINISHING
WALL WATER FEATURE MATERIAL
WALL WATER FEATURE MATERIAL
CHECKED BY:
Philip Hocking
DRAWING'S NAME:
WATER FEATURE ELEVATION 1
1
WATER FEATURE - ELEVATION 1
1 : 100
Scale:
SCALE: 1 : 100
M1 - WHITE PAINTED PLASTER WALL
M2 - BRICK FINISHED WITH THEMING
M3-BRICK FINISHED WITH THEMING
MATERIAL - REFER TO TM01
Date:
01/08/2018
Drawing No:
BFP-HS-200
Revision:
00
1000
FFL
Morin Plaza
+1460.000
+1459.800
ISSUED FOR
3400
REFERENCE
PRELIMINARY
M2
TENDER
APPROVAL
M2
1400
7600
CONSTRUCTION
AS-BUILT
M2
REV ISI ON SCHEDULE
GRASS
Rev. Description
100%DD
GRASS
FFL
3400
Fisrt Floor.
+1452.300
EXISTING MOUNTAIN
400
2800
Rev_Num
ber
Rev. Date
00
01/08/2018
M3
M2
M2
+1452.300
First Floor
+1452.400
6740
Mezzanine Floor
+1448.900
760
7900
INVESTOR
CÔNG TY TNHH DỊCH VỤ
CÁP TREO BÀ NÀ
PROJECT'S NAME:
GRASS
BEER FESTIVAL PLAZA
2940
SHRUBS
400
CONCEPT DESIGNED:
M3
FFL
SHRUBS
SHRUBS
FFL
+1444.500
Ground Floor
+1445.000
HARDSCAPE-LANDSCAPE:
+1444.500
ADD: 5th FLOOR,130-132 BACH DANG St. HAI CHAU Dist.,DA NANG City
310
7700
1390
700
2420
2080
5250
Tel
: 0511 3849598
Email :info@ddpprojects.com
DESIGNED B Y:
Philip Hocking
15'
15
DRAW N BY:
Trinh Pham
INTERIOR WALL FINISHING
WALL WATER FEATURE MATERIAL
WALL WATER FEATURE MATERIAL
CHECKED BY:
Philip Hocking
DRAWING'S NAME:
1
WATER FEATURE ELEVATION 2
WATER FEATURE - ELEVATION 3
SCALE: 1 : 100
1 : 100
Scale:
M1 - WHITE PAINTED PLASTER WALL
M2 - BRICK FINISHED WITH THEMING
M3-BRICK FINISHED WITH THEMING
MATERIAL - REFER TO TM01
Date:
01/08/2018
Drawing No:
BFP-HS-201
Revision:
00
+1458.800
FFL
EXPANSION JOINT
F3
390
380
M3
900 200
+1457.504
FFL
Morin Plaza
+1460.000
520
F2
ISSUED FOR
1040
REFERENCE
+1455.144
PRELIMINARY
170
FFL
520
TENDER
1040
APPROVAL
CONSTRUCTION
520
AS-BUILT
520
FFL
Rev_Num
ber
Rev. Date
00
01/08/2018
+1452.300
1690
220
REV ISI ON SCHEDULE
TREVI FOUNTAIN ROME
Rev. Description
100%DD
M2
Fisrt Floor.
+1452.300
1870
LADER
F2
220
First Floor
+1452.400
4480
170
M3
3400
W1
600
F3
700
15000
M2
M3
M3
WATER TANK
2000
D01
INVESTOR
F2
+1448.900
FFL
Mezzanine Floor
+1448.900
CÔNG TY TNHH DỊCH VỤ
CÁP TREO BÀ NÀ
PROJECT'S NAME:
3900
BEER FESTIVAL PLAZA
WC - BOH
CONCEPT DESIGNED:
F1
RAMP
1600
100
1370
FFL
230
3270
Ground Floor
+1445.000
+1445.000
HARDSCAPE-LANDSCAPE:
170
6740
ADD: 5th FLOOR,130-132 BACH DANG St. HAI CHAU Dist.,DA NANG City
15
15'
Tel
: 0511 3849598
Email :info@ddpprojects.c om
DESIGNED B Y:
Philip Hocking
DRAW N BY:
INTERIOR WALL FINISHING
WALL WATER FEATURE MATERIAL
WALL WATER FEATURE MATERIAL
Trinh Pham
CHECKED BY:
Philip Hocking
DRAWING'S NAME:
WATER FEATURE SECTION
1
SECTION 3 WATER FEATURE
SCALE: 1 : 100
M1 - W HITE PAINTED PLASTER WALL
M2 - BRICK FINISHED W ITH THEMING
M3-BRICK FINISHED W ITH THEMING
MATERIAL - REFER TO TM01
1 : 100
Scale:
Date:
01/08/2018
Drawing No:
BFP-HS-210
Revision:
00
500
4500
500
+1
DL
2250
4500
2250
+1459.800
230
FFL
500
1458.800
WL
1459.800
14350
1580
350
350
350
350
1770
7EQ= 3500
1140
ISSUED FOR
350
350
2770
7EQ= 3500
350
REFERENCE
PRELIMINARY
TENDER
200 350
230
APPROVAL
CONSTRUCTION
AS-BUILT
230
14350
100
230
14810
FOUNTAIN SYSTEM WITH LED LIGHT
( REFER TO FOUNTAIN SYSTEM DWG)
HS-300
1
REVISION SCHEDULE
90
A
Rev_Num
ber
Rev. Date
00
01/08/2018
C
Rev. Description
100%DD
POND 1 - DETAIL
SCALE: 1 : 50
5000
5000
200
2500
FFL
2500
+1460.700
Morin Plaza
+1460.000
900
INVESTOR
FFL
FFL
+1459.800
CÔNG TY TNHH DỊCH VỤ
CÁP TREO BÀ NÀ
+1459.807
PROJECT'S NAME:
BEER FESTIVAL PLAZA
330
14350
320
CONCEPT DESIGNED:
F
E
C
FOUNTAIN ATTACHMENT WITH LED
( REFER TO FOUNTAIN SYSTEM DWG)
HARDSCAPE-LANDSCAPE:
FFL
200
FINE SUCTION FILTER
+1460.700
ADD: 5th FLOOR,130-132 BACH DANG St. HAI CHAU Dist.,DA NANG City
Tel
M3
SCALE: 1 : 50
1100
900
: 0511 3849598
Email :info@ddpprojects.com
DESIGNED BY:
Philip Hocking
+1459.800
+1459.800
20
WL
Morin Plaza
+1460.000
FFL
DRAWN BY:
Trinh Pham
CHECKED BY:
WATER
950
3
M3
POND 1 - ELEVATION
970
1120
3230
1440
3000
FFL
1380
WATER
M3
Philip Hocking
DRAWING'S NAME:
FFL
+1458.800
POND 1 - DETAIL
1 : 50
Scale:
A
POND 1 - SECTION A
SCALE: 1 : 50
230
2770
3230
Date:
01/08/2018
230
Drawing No:
BFP-HS-300
Revision:
00
1
HS-302
4190
240
15'
ISSUED FOR
REFERENCE
6230
500
PRELIMINARY
TENDER
APPROVAL
CONSTRUCTION
AS-BUILT
330
REV ISI ON SCHEDULE
1720
Rev_Num
ber
Rev. Date
00
01/08/2018
Rev. Description
100%DD
CAPPING STONE
THICK 100MM
1452.800
FFL
1452.300
330
WL
15
330
1720
10890
1720
330
INVESTOR
14990
F
E
1
D
HS-303
CÔNG TY TNHH DỊCH VỤ
CÁP TREO BÀ NÀ
C
2
HS-302
PROJECT'S NAME:
2
1
POND 2 - DETAIL
BEER FESTIVAL PLAZA
HS-301
SCALE: 1 : 50
CONCEPT DESIGNED:
HARDSCAPE-LANDSCAPE:
650
CAPPING STONE
THICK 100MM
1350
FFL
+1453.000
ADD: 5th FLOOR,130-132 BACH DANG St. HAI CHAU Dist.,DA NANG City
700
Tel
M2
FFL
Fisrt Floor.
+1452.300
: 0511 3849598
Email :info@ddpprojects.c om
DESIGNED BY:
FFL
+1452.300
+1452.300
Philip Hocking
DRAW N BY:
Trinh Pham
1720
10890
CHECKED BY:
1720
Philip Hocking
15000
DRAWING'S NAME:
F
2
E
D
C
POND 2 - DETAIL
POND 2 - ELEVATION
Scale:
SCALE: 1 : 50
Drawing No:
1 : 50
BFP-HS-301
Date:
01/08/2018
Revision:
00
FOUNTAIN ATTACHMENT WITH LED
( REFER TO FOUNTAIN SYSTEM DWG)
2300
CAPPING STONE
THICK 100MM
2390
100
FINE SUCTION FILTER
WL
REFERENCE
+1452.800
PRELIMINARY
600
700
100
ISSUED FOR
FFL
Fisrt +1452.300
Floor.
TENDER
FFL
+1452.300
APPROVAL
+1452.300
CONSTRUCTION
AS-BUILT
REV ISI ON SCHEDULE
240
Rev_Num
ber
Rev. Date
00
01/08/2018
Rev. Description
100%DD
LEGEND:
15
1
15'
M4
GRAY PAINT
POND 2 - SECTION A
SCALE: 1 : 50
FINISHED BY CONCRETE THEMING
GREY PAINT
M4
CONCRETE SLAB
INVESTOR
CÔNG TY TNHH DỊCH VỤ
CÁP TREO BÀ NÀ
20
30
110 20 90
80
10
BEER FESTIVAL PLAZA
1270
1540
800
1540
CONCEPT DESIGNED:
1110
590
A
PROJECT'S NAME:
130 30 150
60
MOUDLING DECORATE
HARDSCAPE-LANDSCAPE:
M4
HS-302
30
20
90 20 110
ADD: 5th FLOOR,130-132 BACH DANG St. HAI CHAU Dist.,DA NANG City
590
Fisrt Floor.
+1452.300
130
130
570
130
Trinh Pham
CHECKED BY:
90 50
130
820
50
BASE OF STATUE
SCALE: 1 : 20
3
BASE OF STATUE - ELEVATION
SCALE: 1 : 20
Philip Hocking
DRAW ING'S NAME:
1090
2
Email :info@ddpprojects.c om
DRAW N BY:
Fisrt Floor.
+1452.300
1110
: 0511 3849598
Philip Hocking
190
20
30
110 20 80
40 150 40 130
30
20
90 20 110
Tel
DESIGNED BY:
A
POND 2 - DETAIL
BASE OF STATUE - SECTION A
SCALE: 1 : 20
As
indicated
Scale:
Date:
01/08/2018
Drawing No:
BFP-HS-302
Revision:
00
ISSUED FOR
A
--HS-304
REFERENCE
PRELIMINARY
300
TENDER
APPROVAL
CONSTRUCTION
300
AS-BUILT
00
REV ISI ON SCHEDULE
R = 400
80 80
80
300
320
R=
7 00
Rev. Description
100%DD
2000
R=
320
R
=
10
Rev_Num
ber
Rev. Date
00
01/08/2018
INVESTOR
300
CÔNG TY TNHH DỊCH VỤ
CÁP TREO BÀ NÀ
PROJECT'S NAME:
BEER FESTIVAL PLAZA
CONCEPT DESIGNED:
300
300
320
80 80
320
300
300
2000
HARDSCAPE-LANDSCAPE:
ADD: 5th FLOOR,130-132 BACH DANG St. HAI CHAU Dist.,DA NANG City
Tel
: 0511 3849598
Email :info@ddpprojects.c om
DESIGNED BY:
Philip Hocking
DRAW N BY:
1
FOUNTAIN 1 - LAYOUT PLAN
SCALE: 1 : 20
FOUNTAIN 1 - PERSPECTIVE
Trinh Pham
CHECKED BY:
Philip Hocking
DRAW ING'S NAME:
FOUNTAIN 1 - DETAIL
1 : 20
Scale:
Date:
01/08/2018
Drawing No:
BFP-HS-303
Revision:
00
DECORATIVE PIPE
50
190
ISSUED FOR
210
210
320
230
210
190
30
30
40
50
190
190
PRELIMINARY
MEMBRANE W ATER PROOFING
70 50
TENDER
APPROVAL
130
530
130
370
30
REFERENCE
50
AS-BUILT
310
310
310
CONSTRUCTION
120 40 100
160
MOUDLING
( REFER TO THEMING FOR DETAILS)
30 40
Rev_Num
ber
Rev. Date
00
01/08/2018
Rev. Description
100%DD
370
10
100
780
40
70
70
40
420
100
350
100
REV ISI ON SCHEDULE
540
290
THE BASE SOILD BRICK
( REFER TO ENG'S FOR DETAILS)
INVESTOR
200
CÔNG TY TNHH DỊCH VỤ
CÁP TREO BÀ NÀ
100
70 100
PROJECT'S NAME:
190
260
BEER FESTIVAL PLAZA
CONCEPT DESIGNED:
240
HARDSCAPE-LANDSCAPE:
260
260
190
230
280
PROPOSED PUMP LOCATION
( REFER TO MEP DWGS)
WATER SUPPLY PIPE
ADD: 5th FLOOR,130-132 BACH DANG St. HAI CHAU Dist.,DA NANG City
Tel
: 0511 3849598
Email :info@ddpprojects.c om
DESIGNED BY:
Philip Hocking
230
370
600
370
230
600
600
DRAW N BY:
Trinh Pham
600
1190
CHECKED BY:
Philip Hocking
DRAWING'S NAME:
1
FOUNTAIN 1 - SECTION A
SCALE: 1 : 20
2
FOUNTAIN 1 - ELEVATION
FOUNTAIN 1 - DETAIL
SCALE: 1 : 20
1 : 20
Scale:
Date:
01/08/2018
Drawing No:
BFP-HS-304
Revision:
00
190 20
410
A-
190
300
50
210
---
2200
120 40 100
990
REFERENCE
PRELIMINARY
100
R = 400
ISSUED FOR
TENDER
320
10
80
80 80
R=
7 00
2000
R=
320
R
=
10
310
00
300
130
700
370
APPROVAL
CONSTRUCTION
300
260
110
300
AS-BUILT
550
300
300
320
80 80
320
300
300
2
2000
REV ISI ON SCHEDULE
Rev_Num
ber
Rev. Date
00
01/08/2018
Rev. Description
100%DD
550
1100
FOUNTAIN 2 - ELEVATION
SCALE: 1 : 20
DECORATIVE PIPE
40
30
FOUNTAIN 2 - LAYOUT PLAN
INVESTOR
190
SCALE: 1 : 20
90
CÔNG TY TNHH DỊCH VỤ
CÁP TREO BÀ NÀ
230
320
30
PROJECT'S NAME:
BEER FESTIVAL PLAZA
190
50
530
MEMBRANE WATER PROOFING
70 50
310
130
CONCEPT DESIGNED:
100
HARDSCAPE-LANDSCAPE:
MOUDLING - FINISHED BY GREY PAINT
( REFER TO THEMING FOR DETAILS)
160
2200
30 40
100
ADD: 5th FLOOR,130-132 BACH DANG St. HAI CHAU Dist.,DA NANG City
780
Tel
: 0511 3849598
Email :info@ddpprojects.c om
DESIGNED BY:
Philip Hocking
380
DRAW N BY:
Trinh Pham
110
CHECKED BY:
250
1
50
3
SCALE: 1 : 20
Philip Hocking
PROPOSED PUMP LOCATION
( REFER TO MEP DWGS)
DRAWING'S NAME:
FOUNTAIN 2 - DETAIL
THE BASE SOILD BRICK
( REFER TO ENG'S FOR DETAILS)
550
FOUNTAIN 2 - SECTION A
WATER SUPPLY PIPE
550
1100
1 : 20
Scale:
Date:
01/08/2018
Drawing No:
BFP-HS-305
Revision:
00
FFL
1710
FFL
+1448.600
210
1770
210
FFL
+1455.000
1950
640
FFL
+1456.000
1080
210
1410
A
A
HS-311
HS-311
+1456.300
FINISHED BY BRICK
REFER TO M2 MATERIAL
FINISHED BY BRICK
REFER TO M2 MATERIAL
860
1180
1170
330
1170
1180
200
MOUNTAIN
RETAINING WALL
780
100
200
980
100
2
A
160
200
3780
HS-310
HS-311
700
540
600
610
7680
1000
ISSUED FOR
REFERENCE
PRELIMINARY
TENDER
2100
APPROVAL
200
APE
LANDSC
E
SCAP
LAND
E
SCAP
LAND
APE
LANDSC
G1
CONSTRUCTION
AS-BUILT
GRASS
REV ISI ON SCHEDULE
4780
Rev. Description
100%DD
700
PE
1390
A
DSC
PE
CA
DS
LA N
L AN
3
2
TYP.PLANTER BOX
TYP. PLANTER BOX - ELEVATION
SCALE: 1 : 25
SCALE: 1 : 25
2100
2420
PE
CA
DS
LA N
PE
CA
DS
LA N
Rev_Num
ber
Rev. Date
00
01/08/2018
INVESTOR
15'
2080
CÔNG TY TNHH DỊCH VỤ
CÁP TREO BÀ NÀ
PROJECT'S NAME:
1170
1180
200
580
200
4420
1810
100
100
BEER FESTIVAL PLAZA
CAPPING STONE
THICK 100MM
CONCEPT DESIGNED:
P
FINISHED BY BRICK
REFER TO M3 MATERIAL
FFL
STAIR 2
( REFER TO HS-410)
I
HARDSCAPE-LANDSCAPE:
+1452.300
PRECAST CONCRETE
H
G
ADD: 5th FLOOR,130-132 BACH DANG St. HAI CHAU Dist.,DA NANG City
GRASS
Tel
: 0511 3849598
Email :info@ddpprojects.c om
DESIGNED BY:
B
Philip Hocking
HS-312
DRAW N BY:
100
Trinh Pham
P
1
TERRACE LANDSCAPE - DETAIL
SCALE: 1 : 100
CHECKED BY:
Philip Hocking
GRASS
GROWING MEDIUM
ROOT BARIER
DRAINAGE
WATERPROOF MEMBRANE
WATERPROOF PLASTER
DRAWING'S NAME:
150
620
150
TERRACE LANDSCAPE DETAIL
As
indicated
Scale:
CONCRETE SLAB
CRUSH STONE
4
TYP. PLANTER BOX - SECTION A
SCALE: 1 : 25
Date:
01/08/2018
Drawing No:
BFP-HS-310
Revision:
00
W
W ATER
FINISHED BY BRICK STONE
M3
CEMENT RENDER
WATERPROOF MEMBRANE
WATERPROOF PLASTER
CONCRETE SLAB
PLANTER BOX
RETAINING WALL
PLANTER BOX
REFER TO HS-310 DWG
1060
Morin Plaza
+1460.000
STAIR 4
ISSUED FOR
FFL
+1458.598
REFERENCE
1000
2240
4610
PRELIMINARY
TENDER
APPROVAL
CONSTRUCTION
AS-BUILT
1500
GRASS
GRASS
REV ISI ON SCHEDULE
Rev_Num
ber
Rev. Date
00
01/08/2018
2800
GROUND EARTH
First Floor
+1452.400
400
Fisrt Floor.
+1452.300
Rev. Description
100%DD
3200
GRASS
3800
2500
PLANTER BOX
REFER TO HS-310 DWG
900
INVESTOR
GRASS
400
CÔNG TY TNHH DỊCH VỤ
CÁP TREO BÀ NÀ
Mezzanine Floor
+1448.900
PROJECT'S NAME:
BEER FESTIVAL PLAZA
.
.
CONCEPT DESIGNED:
3700
MOUNTAIN RETAINING WALL
( REFER TO ENG DRAWING FOR DETAILS)
3300
EXISTING MOUNTAIN
400
SHRUB
3000
2000
5000
1500
+1444.500
FFL
Ground Floor
+1445.000
HARDSCAPE-LANDSCAPE:
ADD: 5th FLOOR,130-132 BACH DANG St. HAI CHAU Dist.,DA NANG City
Tel
11500
: 0511 3849598
Email :info@ddpprojects.c om
DESIGNED BY:
Philip Hocking
G
G1
H
I
I'
DRAW N BY:
Trinh Pham
CHECKED BY:
Philip Hocking
DRAWING'S NAME:
TERRACE LANDSCAPE SECTION A
A
TERRACE LANDSCAPE - SECTION A
Scale:
SCALE: 1 : 100
Drawing No:
1 : 100
BFP-HS-311
Date:
01/08/2018
Revision:
00
FFL
+1457.827
1
HS-312
+1455.064
ISSUED FOR
REFERENCE
7500
9EQ= 2700
170
FFL
6EQ= 1800
200
Morin Plaza
+1460.000
PRELIMINARY
60
TENDER
APPROVAL
9EQ= 2700
CONSTRUCTION
EXISTING MOUNTAIN
60
First
Floor
Fisrt
Floor.
+1452.400
+1452.300
330 430
5EQ= 2580
5
740
8EQ= 4150
00
2100
630
2100
8EQ= 4000
13110
AS-BUILT
REV ISI ON SCHEDULE
FFL
+1452.300
Rev_Num
ber
Rev. Date
00
01/08/2018
Rev. Description
100%DD
420
4370
15'
B
TERRACE STEPS - SECTION B
SCALE: 1 : 100
INVESTOR
CÔNG TY TNHH DỊCH VỤ
CÁP TREO BÀ NÀ
520
520
PROJECT'S NAME:
BEER FESTIVAL PLAZA
300
CRUSH STONE
300
GROUND EARTH
900
300
CONCEPT DESIGNED:
CONCRETE SLAB
REFER TO CONSTRUCTION DWG
HARDSCAPE-LANDSCAPE:
ADD: 5th FLOOR,130-132 BACH DANG St. HAI CHAU Dist.,DA NANG City
Tel
: 0511 3849598
Email :info@ddpprojects.c om
100
DESIGNED BY:
Philip Hocking
DRAW N BY:
Trinh Pham
100
420
100
1040
420
100
CHECKED BY:
Philip Hocking
DRAWING'S NAME:
TERRACE LANDSCAPE SECTION B
1
TERRACE STEPS - DETAIL 1
Scale:
SCALE: 1 : 20
Drawing No:
As
indicated
BFP-HS-312
Date:
01/08/2018
Revision:
00
1
850
B
G
5
14
1
5000
44
4.
5
4
3
5
7
9
11
13
15
17
19
HS-312
2
4.
21
23
25
27
29
31
33
N5
UP
35
37
39
41
43
N5
UP
UP
FFL+1455.164
FFL+1457.927
FFL+1459.800
A1
HS-400
ISSUED FOR
F
i=2%
REFERENCE
PRELIMINARY
i=2%
TENDER
APPROVAL
15@300= 4500
2400
15@300= 4500
2350
CONSTRUCTION
11@300= 3300
17050
AS-BUILT
REV ISI ON SCHEDULE
1
3
5
HS-401
2
HS-401
Rev_Num
ber
Rev. Date
00
01/08/2018
TYP. STAIR 01
SCALE: 1 : 100
-
4
6
---
HS-401
FFL
FFL
Rev. Description
100%DD
+1459.800
+1457.927
11EQ= 2090
Morin Plaza
+1460.000
FFL
INVESTOR
+1455.164
PROJECT'S NAME:
7600
16EQ= 2760
CÔNG TY TNHH DỊCH VỤ
CÁP TREO BÀ NÀ
BEER FESTIVAL PLAZA
16EQ= 2740
CONCEPT DESIGNED:
HARDSCAPE-LANDSCAPE:
First Floor
+1452.400
Fisrt Floor.
+1452.300
15EQ= 4500
2110
2400
2430
2300
15EQ= 4500
2310
2340
2310
2290
ADD: 5th FLOOR,130-132 BACH DANG St. HAI CHAU Dist.,DA NANG City
10EQ= 3000
1690
Tel
: 0511 3849598
Email :info@ddpprojects.c om
DESIGNED BY:
1690
Philip Hocking
16740
DRAWN BY:
Trinh Pham
15'
CHECKED BY:
Philip Hocking
1
STAIR 01 - SECTION A
SCALE: 1 : 100
DRAWING'S NAME:
LEGEND:
TYP. STAIR 01
N5
BAZAN SLATE STONE
As
indicated
Scale:
Date:
01/08/2018
Drawing No:
BFP-HS-400
Revision:
00
FINISHED BY
M3 MATERIAL
1100
FINISHED BY
M3 MATERIAL
FINISHED BY N5 PATTERN
Morin Plaza
+1460.000
400
500
F
F
ISSUED FOR
REFERENCE
50
400
50
3530
11EQ= 2070
SOILD BRICK
120
PRELIMINARY
240
TENDER
50
400
50
APPROVAL
400
CONSTRUCTION
500
AS-BUILT
110
600
110
4870
REV ISI ON SCHEDULE
150
3
TYP. BASE OF STATUE - PLAN
SCALE: 1 : 25
5
TYP. BASE OF STATUE - SECTION A
Rev_Num
ber
Rev. Date
00
01/08/2018
Rev. Description
100%DD
SCALE: 1 : 25
G
1
STAIR 01 - SECTION B
F
SCALE: 1 : 50
500
50
320
50
400
50
280
SOILD BRICK
50
?
M3
20
INVESTOR
CÔNG TY TNHH DỊCH VỤ
CÁP TREO BÀ NÀ
100
20
50
200 50
20
400
500
STONE CAPPING ( 500x500x50)
170
150
PROJECT'S NAME:
FINISHED BT SLATE STONE - 20MM
THICKNESS -YELLOW COLOUR
5
-
BEER FESTIVAL PLAZA
1350
1050
1100
1350
---
CONCRETE LAB REFER TO
STRUCTURE DRAWING
CONCEPT DESIGNED:
150
HARDSCAPE-LANDSCAPE:
2
TYP. WATER FEATURE STEP - DETAIL
SCALE: 1 : 10
ADD: 5th FLOOR,130-132 BACH DANG St. HAI CHAU Dist.,DA NANG City
6-
Tel
---
: 0511 3849598
Email :info@ddpprojects.c om
DESIGNED B Y:
Philip Hocking
LEGEND:
WALL WATER FEATURE MATERIAL
4
TYP. BASE OF STATUE - ELEVATION
SCALE: 1 : 25
6
TYP. BASE OF STATUE - SECTION B
SCALE: 1 : 25
DRAW N BY:
Trinh Pham
CHECKED BY:
Philip Hocking
DRAW ING'S NAME:
TYP. STAIR 01 - DETAIL
As
indicated
Scale:
M3-BRICK FINISHED WITH THEMING
MATERIAL - REFER TO TM01
Date:
01/08/2018
Drawing No:
BFP-HS-401
Revision:
00
4000
5120
14@280= 3920
280@10= 2800
1200
1
1200
1
HS-411
1200
N5
N5
1200
HS-411
UP
1
3
5
7
9
11
13
15
27
29
31
33
13
ISSUED FOR
15
FFL+1450.681
2540
+1448.900
140
2540
FFL +1447.038
140
REFERENCE
FFL
PRELIMINARY
TENDER
N1
23
21
19
17
25
23
21
19
17
APPROVAL
FFL
1200
1200
25
CONSTRUCTION
AS-BUILT
+1444.500
REV ISI ON SCHEDULE
10@280= 2800
Rev_Num
ber
Rev. Date
00
01/08/2018
1200
280@9= 2520
1200
4000
Rev. Description
100%DD
3720
1
STAIR 02 - GROUND FLOOR
2
SCALE: 1 : 50
1. STAIR 02 - MEZ FLOOR
SCALE: 1 : 50
3720
280@9= 2520
1200
INVESTOR
CÔNG TY TNHH DỊCH VỤ
CÁP TREO BÀ NÀ
1
PROJECT'S NAME:
29
+1452.300
47
45
43
33
35
41
37
N5
FFL
+1450.681
BEER FESTIVAL PLAZA
CONCEPT DESIGNED:
39
1200
FFL
31
2540
N1
140
1200
HS-411
HARDSCAPE-LANDSCAPE:
ADD: 5th FLOOR,130-132 BACH DANG St. HAI CHAU Dist.,DA NANG City
Tel
: 0511 3849598
Email :info@ddpprojects.c om
DESIGNED BY:
280@9= 2520
1220
3740
3
1. STAIR 02- FIRST FLOOR
SCALE: 1 : 50
Philip Hocking
DRAWN BY:
PAVING FINISH SCHEDULE
Pattern paving
code
N1
Pattern
code
Trinh Pham
Description
SLATE STONE
Colour
MIX DARK-LIGHTGREY,YELLOW
Size
(mm)
THICK 30
(100X100,100X200,200X200)
CHECKED BY:
Philip Hocking
DRAWING'S NAME:
STAIR 02 - PLANS
N5
BAZAN STONE
DARK GREY
THICK 50
1 : 50
Scale:
Date:
01/08/2018
Drawing No:
BFP-HS-410
Revision:
00
+1452.300
ISSUED FOR
1100
FFL
REFERENCE
FFL
+1450.681
PRELIMINARY
Fisrt Floor.
+1452.300
TENDER
10EQ= 1620
APPROVAL
4
HS-430
CONSTRUCTION
AS-BUILT
REV ISI ON SCHEDULE
7
Rev_Num
ber
Rev. Date
00
01/08/2018
Rev. Description
100%DD
8900
11EQ= 1780
3400
HS-430
Mezzanine Floor
+1448.900
11EQ= 1860
+1447.038
1240
FFL
5
INVESTOR
CÔNG TY TNHH DỊCH VỤ
CÁP TREO BÀ NÀ
HS-430
PROJECT'S NAME:
3900
BEER FESTIVAL PLAZA
CONCEPT DESIGNED:
+1444.500
15EQ= 2540
FFL
1270
ADD: 5th FLOOR,130-132 BACH DANG St. HAI CHAU Dist.,DA NANG City
500
Ground Floor
+1445.000
HARDSCAPE-LANDSCAPE:
Tel
: 0511 3849598
Email :info@ddpprojects.c om
DESIGNED BY:
Philip Hocking
DRAWN BY:
Trinh Pham
CHECKED BY:
Philip Hocking
DRAWING'S NAME:
1
STAIR 02 - SECTION
SCALE: 1 : 50
2
STAIR 02 - 3D
STAIR 02 - SECTION
SCALE:
1 : 50
Scale:
Date:
01/08/2018
Drawing No:
BFP-HS-411
Revision:
00
WATER TANK
FFL
FFL
+1447.500
STEEL LADDER
+1447.500
W1
80
+1446.100
15
13
+1448.900
11
9
2
HS-420
1
3
5
7
15
13
11
9
D01
800
2
FFL
7
80
5
ISSUED FOR
800
FFL
3
1680
1
1680
UP
800
800
D01
HS-420
REFERENCE
PRELIMINARY
15
TENDER
15
APPROVAL
CONSTRUCTION
2030
2030
7@180= 1960
7@180= 1960
790
AS-BUILT
790
4790
4790
REV ISI ON SCHEDULE
D
STAIR 03 - GROUND FLOOR
3
SCALE: 1 : 50
C
Rev_Num
ber
Rev. Date
00
01/08/2018
Rev. Description
100%DD
STAIR 03 - MEZ FLOOR
SCALE: 1 : 50
1100
1
D
C
3
HS-430
+1448.900
8EQ= 1400
1100
+1446.100
CÔNG TY TNHH DỊCH VỤ
CÁP TREO BÀ NÀ
BEER FESTIVAL PLAZA
CONCEPT DESIGNED:
HARDSCAPE-LANDSCAPE:
180
FFL
INVESTOR
PROJECT'S NAME:
2800
FFL
+1447.500
1100
FFL
8EQ= 1400
150
Mezzanine Floor
+1448.900
ADD: 5th FLOOR,130-132 BACH DANG St. HAI CHAU Dist.,DA NANG City
Tel
: 0511 3849598
Email :info@ddpprojects.c om
DESIGNED BY:
Philip Hocking
1960
780
DRAWN BY:
Trinh Pham
2740
CHECKED BY:
Philip Hocking
C
DRAWING'S NAME:
STAIR 03
2
STAIR 03 - SECTION
SCALE: 1 : 50
1 : 50
Scale:
Date:
01/08/2018
Drawing No:
BFP-HS-420
Revision:
00
.BAZAN STONE.
SOILD BRICK
170
160
150
UP
20
20
+1444.900
180
FFL
+1447.200
4750
FFL
ISSUED FOR
REFERENCE
N5
2
PRELIMINARY
HS-430
CONCRETE LAB REFER TO
STRUCTURE DRAWING
300
13
11
9
7
5
3
1
TENDER
20 20
260
20
20
260
APPROVAL
300
CONSTRUCTION
AS-BUILT
3
STAIR 03 - DETAIL
5
SCALE: 1 : 10
STAIR 02 - DETAIL 02
REV ISI ON SCHEDULE
SCALE: 1 : 10
Rev_Num
ber
Rev. Date
00
01/08/2018
BAZAN STONE
13@300= 3900
50
Rev. Description
100%DD
SOILD BRICK
3950
FFL
.
+1447.200
.
140
SCALE: 1 : 50
160
20
TYP. STAIR 04
160
1100
140
20
1
INVESTOR
CÔNG TY TNHH DỊCH VỤ
CÁP TREO BÀ NÀ
PROJECT'S NAME:
CONCRETE LAB THICK 100
REFER TO STRUCTURE DRAWING
3400
BEER FESTIVAL PLAZA
FFL
HS-430
+1444.900
20
260
20 20
300
13EQ= 2300
6
20
280
320
CONCEPT DESIGNED:
4
STAIR 02 - DETAIL 01
6
SCALE: 1 : 10
STAIR 04 - DETAIL
SCALE: 1 : 10
40
HARDSCAPE-LANDSCAPE:
Ground Floor
+1445.000
STEEL CYLINDER RAILING
R=20
ADD: 5th FLOOR,130-132 BACH DANG St. HAI CHAU Dist.,DA NANG City
13@300= 3900
960
1100
Tel
: 0511 3849598
Email :info@ddpprojects.c om
DESIGNED BY:
VERTICAL STEEL BOX 25x25
Philip Hocking
DRAWN BY:
STAIR 04 - SECTION
30
SCALE: 1 : 50
Mezzanine Floor
+1448.900
LEGEND:
HORIZONE STEEL CYLINDER
R=15
100 100 100 100 100 100 100 100 100 100 100
N5
Trinh Pham
CHECKED BY:
70
2
WROUGHT IRON BALUSTRADE
(REFER TO ID DRAWINGS FOR BALUSTRADE PROFILE)
Philip Hocking
DRAWING'S NAME:
TYP.STAIR 04, RAILING,
DETAILS
BAZAN STONE
As
indicated
Scale:
7
TYP RAILING STEEL DETAIL
SCALE: 1 : 25
Date:
01/08/2018
Drawing No:
BFP-HS-430
Revision:
00
i=2%
280
FFL
+1446.080
6870
6580
+1444.500
5°
2
ISSUED FOR
HS-440
REFERENCE
PRELIMINARY
1430
6870
N6
FFL
5160
290
15
TENDER
APPROVAL
14
CONSTRUCTION
AS-BUILT
REV ISI ON SCHEDULE
210
3000
5000
5000
4900
5000
100 190
Rev_Num
ber
Rev. Date
00
01/08/2018
18110
G1
1
G
F
E
Rev. Description
100%DD
D
RAMP 01
SCALE: 1 : 100
DRAINAGE
INVESTOR
CÔNG TY TNHH DỊCH VỤ
CÁP TREO BÀ NÀ
R
HS-560
---
PROJECT'S NAME:
DRAINAGE
N6
FFL
+1446.080
BEER FESTIVAL PLAZA
FFL
+1444.500
5°
CONCEPT DESIGNED:
HARDSCAPE-LANDSCAPE:
500
110
18600
3000
5000
5000
5000
600
ADD: 5th FLOOR,130-132 BACH DANG St. HAI CHAU Dist.,DA NANG City
4400
Tel
: 0511 3849598
Email :info@ddpprojects.c om
DESIGNED BY:
G1
G
F
E
D
Philip Hocking
C
DRAWN BY:
Trinh Pham
CHECKED BY:
Philip Hocking
DRAW ING'S NAME:
2
RAMP 01 - SECTION
LEGEND:
RAMP 01 - DETAIL
SCALE: 1 : 100
N6
CUBIC BAZAN STONE
As
indicated
Scale:
Date:
01/08/2018
Drawing No:
BFP-HS-440
Revision:
00
METAL GRATE
ISSUED FOR
REFERENCE
N6
FFL
N6
PRELIMINARY
+1445.000
1970
UP
2
TENDER
APPROVAL
HS-450
5°
FFL
N6
CONSTRUCTION
+1444.500
AS-BUILT
REV ISI ON SCHEDULE
300
1
Rev_Num
ber
Rev. Date
00
01/08/2018
6580
Rev. Description
100%DD
RAMP 02 - PLAN
SCALE: 1 : 50
INVESTOR
CÔNG TY TNHH DỊCH VỤ
CÁP TREO BÀ NÀ
PROJECT'S NAME:
FFL
R-
FFL
+1444.500
+1445.000
BEER FESTIVAL PLAZA
N6
5°
270
100 170
HS-560
---
Ground Floor
+1445.000
CONCEPT DESIGNED:
HARDSCAPE-LANDSCAPE:
300
6580
ADD: 5th FLOOR,130-132 BACH DANG St. HAI CHAU Dist.,DA NANG City
Tel
: 0511 3849598
Email :info@ddpprojects.c om
DESIGNED BY:
2
RAMP 02 - SECTION
Philip Hocking
SCALE: 1 : 50
DRAWN BY:
Trinh Pham
CHECKED BY:
Philip Hocking
LEGEND:
DRAW ING'S NAME:
RAMP 02 - DETAIL
N6
CUBIC BAZAN STONE
1 : 50
Scale:
Date:
01/08/2018
Drawing No:
BFP-HS-450
Revision:
00
+1
44
4.5
00
7050
ISSUED FOR
REFERENCE
PRELIMINARY
TENDER
FFL +1444.900
APPROVAL
N6
4700
CONSTRUCTION
UP
AS-BUILT
2
HS-460
REV ISI ON SCHEDULE
Rev_Num
ber
Rev. Date
00
01/08/2018
FFL +1444.500
Rev. Description
100%DD
2350
1
METAL GRATE
RAMP 03
INVESTOR
CÔNG TY TNHH DỊCH VỤ
CÁP TREO BÀ NÀ
SCALE: 1 : 50
PROJECT'S NAME:
BEER FESTIVAL PLAZA
CONCEPT DESIGNED:
FFL +1444.900
R
1
HS-560
HARDSCAPE-LANDSCAPE:
FFL +1444.500
Ground Floor
+1445.000
400
ADD: 5th FLOOR,130-132 BACH DANG St. HAI CHAU Dist.,DA NANG City
Tel
: 0511 3849598
Email :info@ddpprojects.c om
DESIGNED BY:
Philip Hocking
DRAWN BY:
Trinh Pham
4100
500
CHECKED BY:
Philip Hocking
4600
DRAW ING'S NAME:
LEGEND:
RAMP 03
N6
2
CUBIC BAZAN STONE
RAMP 03 - SECTION
Scale:
SCALE: 1 : 50
Drawing No:
1 : 50
BFP-HS-460
Date:
01/08/2018
Revision:
00
15000
5000
5000
3200
1870
100
5080
1860
100
1150
100
550
800
4700
800
800
650
150
4760
15'
i=2
%
270
170
3100
5000
DIS.TOILET
(7 m²)
i=2
%
%
ISSUED FOR
A
1770
2080
1860
1000
i=2
REFERENCE
HS-503
PRELIMINARY
B
780
+1445.000
100
11
1370
160
1000
CONSTRUCTION
50
AS-BUILT
1500
230
FFL
5°
+1445.000
380
1000
670
200
Rev_Num
ber
Rev. Date
00
01/08/2018
6740
2220
REV ISI ON SCHEDULE
2090
2
APPROVAL
MALE TOILET
(30 m²)
100
HS-450
TENDER
HS-503
3500
2°
FFL
Rev. Description
100%DD
1000
2910
1500
100
HOUSE KEEPING
(4 m²)
LANDSCAPE
C
%
i=2
%
i=2
INVESTOR
1410
2290
FEMALE TOILET
(27 m²)
CÔNG TY TNHH DỊCH VỤ
CÁP TREO BÀ NÀ
HS-504
170
170
PROJECT'S NAME:
BEER FESTIVAL PLAZA
15
CONCEPT DESIGNED:
E
D
HS-504
2890
100
2020
100
1140
3540
170
420
900
900
HS-504
900
900
900
HARDSCAPE-LANDSCAPE:
F
E
D
G
ADD: 5th FLOOR,130-132 BACH DANG St. HAI CHAU Dist.,DA NANG City
Tel
: 0511 3849598
Email :info@ddpprojects.c om
DESIGNED BY:
Philip Hocking
DRAWN BY:
Trinh Pham
CHECKED BY:
Philip Hocking
DRAW ING'S NAME:
TOILET LAYOUT PLAN
1
TOILET - BOH LAYOUT PLAN
Scale:
SCALE: 1 : 50
Drawing No:
1 : 50
BFP-HS-500
Date:
01/08/2018
Revision:
00
15000
5000
5000
3200
1870
5000
1330
8600
W1
170
270
DIS.TOILET
(7 m²)
1000
i=2%
W4
2080
W5
i=2
%
i=2
%
A
HS-503
W5
3270
W4
B
780
+1445.000
ISSUED FOR
REFERENCE
11
2°
FFL
15'
MALE TOILET
(30 m²)
TENDER
100
MF1
PRELIMINARY
HS-503
APPROVAL
MF1
CONSTRUCTION
160
1000
50
AS-BUILT
100
W4
230
W2
N6
FFL
6410
REV ISI ON SCHEDULE
2090
2220
W2
Rev_Num
ber
Rev. Date
00
01/08/2018
+1445.000
Rev. Description
100%DD
W4
W4
2910
W4
2290
FEMALE TOILET
(27 m²)
HOUSE KEEPING
(4 m²)
W4
W4
MF1
i=2
%
%
i= 2
C
INVESTOR
CÔNG TY TNHH DỊCH VỤ
CÁP TREO BÀ NÀ
170
170
170
HS-504
15
PROJECT'S NAME:
BEER FESTIVAL PLAZA
W3
W3
E
D
HS-504
70
2890
100
2950
2020
100
1140
CONCEPT DESIGNED:
HS-504
3540
170
2200
420
4580
9850
HARDSCAPE-LANDSCAPE:
F
G
E
D
ADD: 5th FLOOR,130-132 BACH DANG St. HAI CHAU Dist.,DA NANG City
Tel
: 0511 3849598
Email :info@ddpprojects.c om
DESIGNED BY:
Philip Hocking
DRAWN BY:
FINISHING FLOOR LEGEND
Trinh Pham
CHECKED BY:
Philip Hocking
MF1-NONSLIDE CERAMIC TILE 600X600
DRAWING'S NAME:
TOILET - FINISHING
FLOOR
1
TOILET - FINISHING FLOOR PLAN
CUBIC BAZAN STONE 100X100X50
As
indicated
Scale:
SCALE: 1 : 50
FINISHED FLOOR MATERIAL TO BE REFER BY ID PACKAGE
Date:
01/08/2018
Drawing No:
BFP-HS-501
Revision:
00
G
E
F
D
E
D
HS-504
HS-504
15000
3100
100
1860
100
9770
80
W1
170
15'
A
DIS.TOILET
(7 m²)
HS-503
W5
W5
W4
CH +2700
B
ISSUED FOR
3270
W4
HS-503
MALE TOILET
(30 m²)
REFERENCE
CM
PRELIMINARY
CH +2700
TENDER
APPROVAL
W2
CM
CONSTRUCTION
AS-BUILT
230
W2
W4
W4
6740
W4
REV ISI ON SCHEDULE
Rev_Num
ber
Rev. Date
00
01/08/2018
W4
Rev. Description
100%DD
2910
CM
W4
W4
C
HS-504
HOUSE KEEPING
(4 m²)
FEMALE TOILET
(27 m²)
W4
CH +2700
CH +2700
170
INVESTOR
CÔNG TY TNHH DỊCH VỤ
CÁP TREO BÀ NÀ
15
PROJECT'S NAME:
W3
BEER FESTIVAL PLAZA
CONCEPT DESIGNED:
D
G
F
E
HARDSCAPE-LANDSCAPE:
ADD: 5th FLOOR,130-132 BACH DANG St. HAI CHAU Dist.,DA NANG City
Tel
: 0511 3849598
Email :info@ddpprojects.c om
DESIGNED BY:
Philip Hocking
DRAWN BY:
Trinh Pham
CHECKED BY:
LEGEND:
Philip Hocking
DRAW ING'S NAME:
CM
PLUSH PLASTER BOARD CEILING
TOILET - CEILING PLAN
1
GROUND FLOOR - TOILET CEILING PLAN
SCALE: 1 : 50
EXPOSED STRUCTORT RENDER FINISH
1 : 50
Scale:
Date:
01/08/2018
Drawing No:
BFP-HS-502
Revision:
00
TYPICAL FINISH PLASTERBOARD CEILING
( REFER TO CEILING DETAIL DESIGN HS-560 DW G)
2700
2700
MW 3
M3 1
MW
ISSUED FOR
REFERENCE
PRELIMINARY
TENDER
FFL
FFL
+1445.000
+1445.000
MF1
APPROVAL
Ground Floor
+1445.000
CONSTRUCTION
AS-BUILT
?
U
CP
70
3040
100
1860
100
4700
390
10240
G
REV ISI ON SCHEDULE
4680
230
Rev_Num
ber
Rev. Date
00
01/08/2018
4910
Rev. Description
100%DD
F
E
A
TOILET - SECTION A
SCALE: 1 : 50
TYPICAL FINISH PLASTERBOARD CEILING
( REFER TO CEILING DETAIL DESIGN HS-560 DWG)
600
INVESTOR
CÔNG TY TNHH DỊCH VỤ
CÁP TREO BÀ NÀ
MW1
MW4
MW4
PROJECT'S NAME:
MW4
MW3
MW3
MR
MR
2700
MR
M3
MW1
MR
MW3
CONCEPT DESIGNED:
230
MW3
MW3
BEER FESTIVAL PLAZA
D01
BS
BS
BS
D01
BS
?
MW2
FFL
80
?
CP
?
CP
?
CP
900
900
900
?
CP
?
CP
1800
WD1
420
650
WD1
800
WD1
800
HARDSCAPE-LANDSCAPE:
400
150
800
?
350
1950
700
1950
MW4
+1445.000
Ground Floor
+1445.000
ADD: 5th FLOOR,130-132 BACH DANG St. HAI CHAU Dist.,DA NANG City
WD1
800
Tel
550
1250
100
1860
100
2490
550
70
15000
D
: 0511 3849598
Email :info@ddpprojects.c om
DESIGNED B Y:
Philip Hocking
E
F
DRAW N BY:
G
Trinh Pham
BATHROOM ACCESORIES
BATHROOM MATERIAL
CODE
B
TOILET - SECTION B
MW 1
CERAMIC TILES 300X600
MW4
MIRROR
MW2
GRANITE STONE
MF1
NONSLIDE CERAMIC TILES 300X300
MW3
PARTITION LAMINATE
FINISHED BY COLOR TIMBER
WD1
TIMBER FRAME ANTIQUE PU PAINT
FINISH
SCALE: 1 : 50
DESCRIPTION
CODE
CHECKED BY:
DESCRIPTION
Philip Hocking
DRAWING'S NAME:
BS
BASIN
TR
TOWEL RACK
FD
FLOOR DRAIN
U
UNIRAL
CP
CLOSET PAN
P
PLASTIC PARTITION
SR
SPRAY
MR
MIRROR
Scale:
PH
PAPER HOLDER
HD
HAND DRYER
Drawing No:
TOILET - SECTION 1, 2
As
indicated
BFP-HS-503
Date:
01/08/2018
Revision:
00
600
TYPICAL FINISH PLASTERBOARD CEILING
( REFER TO CEILING DETAIL DESIGN HS-560 DWG)
MW1
MR
MR
MR
MW4
MR
MW3
BS
BS
BS
MW3
MW3
MW3
ISSUED FOR
230
MW3
2700
MW4
1950
MW4
700
MW4
BS
REFERENCE
800
?
150
FFL
+1445.000
WD1
100
2020
100
PRELIMINARY
1240
550
WD1
WD1
800
TENDER
Ground Floor
+1445.000
APPROVAL
CONSTRUCTION
WD1
800
800
480
590
900
900
900
900
900
AS-BUILT
80
12050
REV ISI ON SCHEDULE
F
C
E
D
Rev_Num
ber
Rev. Date
00
01/08/2018
TOILET - SECTION C
Rev. Description
100%DD
SCALE: 1 : 50
TYPICAL FINISH PLASTERBOARD CEILING
( REFER TO CEILING DETAIL DESIGN HS-560 DWG)
TYPICAL FINISH PLASTERBOARD CEILING
( REFER TO CEILING DETAIL DESIGN HS-560 DWG)
?
600
?
MW1
1410
1500
?
CP
230
1500
1310
460
1400
1950
400
2700
BEER FESTIVAL PLAZA
800
170
Ground Floor
+1445.000
+1445.000
HARDSCAPE-LANDSCAPE:
?
U
170
CONCEPT DESIGNED:
FFL
WD1
460
1310
1500
6740
15
PROJECT'S NAME:
M2
?
U
PH
CÔNG TY TNHH DỊCH VỤ
CÁP TREO BÀ NÀ
BS
BS
150
+1445.000
MW4
MW4
300 200
400
300 200
170
?CP
400
150
FFL
PH
MW3
400
MW3
1950
MW3
INVESTOR
2700
1400
M2
MW1
WD1
230
1530
1380
170
6740
15'
15'
15
ADD: 5th FLOOR,130-132 BACH DANG St. HAI CHAU Dist.,DA NANG City
Tel
: 0511 3849598
Email :info@ddpprojects.c om
DESIGNED B Y:
D
TOILET - SECTION D
E
SCALE: 1 : 50
Philip Hocking
TOILET - SECTION E
DRAW N BY:
SCALE: 1 : 50
Trinh Pham
CHECKED BY:
BATHROOM ACCESORIES
CODE
DESCRIPTION
CODE
Philip Hocking
BATHROOM MATERIAL
DESCRIPTION
BS
BASIN
TR
TOWEL RACK
FD
FLOOR DRAIN
U
UNIRAL
CP
CLOSET PAN
P
PLASTIC PARTITION
SR
SPRAY
MR
MIRROR
PH
PAPER HOLDER
HD
HAND DRYER
DRAWING'S NAME:
MW1
CERAMIC TILES 300X600
MW4
MW2
GRANITE STONE
MF1
MIRROR
TOILET - SECTION 3, 4
NONSLIDE CERAMIC TILES 300X300
As
indicated
Scale:
MW3
PARTITION LAMINATE
FINISHED BY COLOR TIMBER
WD1
TIMBER FRAME ANTIQUE PU PAINT
FINISH
Date:
01/08/2018
Drawing No:
BFP-HS-504
Revision:
00
I'
I
H
ISSUED FOR
REFERENCE
G1
PRELIMINARY
TENDER
6000
1800
6000
1750
APPROVAL
G
CONSTRUCTION
4300
AS-BUILT
REVISION SCHEDULE
KIOSK
KIOSK
F
FFL
Rev_Num
ber
Rev. Date
00
01/08/2018
Rev. Description
100%DD
+1452.300
BEER FESTIVAL PLAZA
E
FFL
+1452.300
D
INVESTOR
CÔNG TY TNHH DỊCH VỤ
CÁP TREO BÀ NÀ
6000
1800
6000
PROJECT'S NAME:
1750
BEER FESTIVAL PLAZA
C
CONCEPT DESIGNED:
KIOSK
4300
KIOSK
HARDSCAPE-LANDSCAPE:
B
ADD: 5th FLOOR,130-132 BACH DANG St. HAI CHAU Dist.,DA NANG City
Tel
: 0511 3849598
Email :info@ddpprojects.com
DESIGNED BY:
6000
1800
6000
640
Philip Hocking
14200
DRAWN BY:
28630
Trinh Pham
CHECKED BY:
Philip Hocking
1
2
3
4
5
6
7
DRAWING'S NAME:
KIOSK LOCATION
1
KIOSK LOCATION
Scale:
SCALE: 1 : 200
Drawing No:
1 : 200
BFP-HS-550
Date:
01/08/2018
Revision:
00
100
1200
100
2070
100
1200
100
230
FLANGE PLATE
370x370x10
70
150
150
230
200
5470
70
TIMBER ROOF
4970
5370
FARBRIC
AWNING
4440
130
1500
1120
130
1500
4440
4440
1120
SERVICE DESK
ISSUED FOR
REFERENCE
130
130
PRELIMINARY
TENDER
APPROVAL
1120
1050
CONSTRUCTION
AS-BUILT
SERVICE DESK
230
100
1200
100
2070
100
1200
100
230
70
STEEL COLUMN, PAINTING FACE TIMBER
1990
5470
320
TIMBER DECK
1
TYP. KIOSK PLAN
Rev_Num
ber
Rev. Date
00
01/08/2018
Rev. Description
100%DD
1990
4300
2
HS-552
SCALE: 1 : 50
MOULDING - MAKE BY PLASTER
30MM THICKNESS TIMBER PAINT
FINISHED
TYP. KIOSK - SITE
SCALE: 1 : 50
990
210
800
4
470
70
200
150
230
REVISION SCHEDULE
TIMBER DECK
TIMBER DECK
INVESTOR
BEER FESTIVAL PLAZA
CONCEPT DESIGNED:
150
170
810
6030
100
MOULDING - MAKE BY PLASTER
30 MM THICKNESS
.
TIMBER PAINT FINISHED
6030
TIMBER ROOF
MOULDING - MAKE BY
PLASTER 30MM
THICKNESS TIMBER
PAINT FISNISHED
PROJECT'S NAME:
900
2630
CÔNG TY TNHH DỊCH VỤ
CÁP TREO BÀ NÀ
1400
770
HARDSCAPE-LANDSCAPE:
660
ADD: 5th FLOOR,130-132 BACH DANG St. HAI CHAU Dist.,DA NANG City
Tel
: 0511 3849598
Email :info@ddpprojects.com
DESIGNED BY:
Philip Hocking
1000
900
DRAWN BY:
TIMBER DECK
Trinh Pham
CHECKED BY:
250
1300
100
2070
100
Philip Hocking
Fisrt Floor.
+1452.300
100
Fisrt Floor.
+1452.300
150
1550
1130
130
1500
130
1120
150
DRAWING'S NAME:
TYP. KIOSK LAYOUT
PLANS
4300
2
KIOSK - ELEVATION 1
SCALE: 1 : 50
3
KIOSK - ELEVATION 2
1 : 50
Scale:
Date:
01/08/2018
Drawing No:
SCALE: 1 : 50
BFP-HS-551
Revision:
00
680
470
120
210
100
890
TIMBER DECK
2610
800
3500
100
TIMBER ROOF
100
MOULDING - MAKE BY
PLAYSTER 30MM
THICKNESS TIMBER PAINT
FINISHED
STEEL GABLE STRUCS
FABRIC AWNING
6030
6030
6030
840
ISSUED FOR
FABRIC AWNING
REFERENCE
100
100
190
PRELIMINARY
TENDER
APPROVAL
1430
1430
CONSTRUCTION
AS-BUILT
STEEL COLUMN
150
1130
130 250
1000
250 130
1120
Rev. Description
100%DD
Fisrt Floor.
+1452.300
100
Fisrt Floor.
+1452.300
Rev_Num
ber
Rev. Date
00
01/08/2018
900
100
TIMBER SLAT
100 100
TIMBER SLAT
SERVICE DESK
700
2430
REV ISI ON SCHEDULE
1270
150
130
1500
130
1270
4300
4300
F
F
INVESTOR
1
KIOSK - ELEVATION 3
SCALE: 1 : 50
2
CÔNG TY TNHH DỊCH VỤ
CÁP TREO BÀ NÀ
KIOSK - SECTION A
SCALE: 1 : 50
PROJECT'S NAME:
BEER FESTIVAL PLAZA
CONCEPT DESIGNED:
HARDSCAPE-LANDSCAPE:
ADD: 5th FLOOR,130-132 BACH DANG St. HAI CHAU Dist.,DA NANG City
Tel
: 0511 3849598
Email :info@ddpprojects.c om
DESIGNED B Y:
Philip Hocking
DRAW N BY:
Trinh Pham
CHECKED BY:
Philip Hocking
DRAWING'S NAME:
KIOSK SECTION
3
KIOSK - 3D.
SCALE:
1 : 50
Scale:
Date:
01/08/2018
Drawing No:
BFP-HS-552
Revision:
00
CONCRETE SLAB/BEAM
PER
STRUCTURAL DRAWINGS
GROUTED AND
RENDERED
ON EACH SIDE
330
15
100
100
100
15
GROUTED AND
RENDERED
ON EACH SIDE
100
FFL
VARIOUS
100
15
INTERIOR
100
CONCRETE SLAB PER
STRUCTURAL
DRAWINGS
EXTERIOR
100
INTERIOR
230
15
EXTERIOR
CONCRETE SLAB/BEAM
PER
STRUCTURAL DRAWINGS
INTERIOR
OVERALL
THICKNESS
OVERALL
THICKNESS
INTERIOR
OVERALL
THICKNESS
F1
PAVING FINISHING MATERIAL
CEMENT RENDER (SLOPED 2%)
WATER FROOP LAYER
CONCRETE SLAB THICK 100MM
CRUSH STONE
NATURAL GROUND
GROUTED AND RENDERED
ON EACH SIDE
CAVITY
DOUBLE WIDTH STANDARD
BRICK WALL
DOUBLE WIDTH STANDARD
BRICK WALL
CONCRETE SLAB PER
STRUCTURAL
DRAWINGS
CONCRETE SLAB PER
STRUCTURAL
DRAWINGS
F2
CEMENT RENDER
PAVING TILES
WATER FROOP LAYER
CONCRETE SLAB
CEMENT RENDER
300
W4
VARIES
APPROVAL
CONSTRUCTION
AS-BUILT
GROUTED AND RENDERED
ON EACH SIDE
8
REV ISI ON SCHEDULE
TYPICAL FLOOR DETAIL - INDOOR FLOOR
Rev_Num
ber
Rev. Date
00
01/08/2018
SIKA WATER PROOF
MEMBRANE
F3
PAVING TILES
CEMENT RENDER (SLOPED 2%)
CONCRETE SLAB
CEMENT RENDER
SELECTED WALL
FINISH
CONCRETE COLUMN PER
STRUCTURAL DRAWINGS
SIKA WATER PROOF
MEMBRANE
FFL
DOUBLE WIDTH
STANDARD BRICK WALL
CONCRETE FOUNDATION PER
STRUCTURAL DRAWINGS
Rev. Description
100%DD
VARIOUS
100 40
10
CAST-IN-PLACE
CONCRETE WALL
INTERIOR
EXTERIOR
INTERIOR
CONCRETE SLAB/BEAM
PER STRUCTURAL DRAWINGS
EXTERIOR
CAST-IN-PLACE
CONCRETE WALL
PRELIMINARY
FFL
WALL TYPE 7
100mm INTERIOR SINGLE WIDTH BRICK WALL
200
CONCRETE SLAB/BEAM
PER STRUCTURAL DRAWINGS
REFERENCE
TENDER
WALL TYPE 1
330mm DOUBLE WIDTH BRICK
WALL WITH CAVITY
W3
ISSUED FOR
VARIOUS
100 40
10
WALL TYPE 9
230mm DOUBLE WIDTH
CONCRETE SLAB PER
STRUCTURAL DRAWINGS
CAVITY
W2
TYPICAL FLOOR DETAIL - TOILET FLOOR
SINGLE W IDTH STANDARD
BRICK WALL
CONCRETE FOUNDATION PER
STRUCTURAL DRAWINGS
INVESTOR
NOTE: REFER TO PARTITION
LAYOUT PLAN FOR WALL LOCATION
W1
WALL TYPE 3
CAST-IN-PLACE CONCRETE
RETAINING WALL
W5
VARIES
8
TYPICAL FLOOR DETAIL - OUTDOOR FLOOR
CÔNG TY TNHH DỊCH VỤ
CÁP TREO BÀ NÀ
TYPICAL WALL AND COLUMN
CONECTION
WALL TYPE 3'
CAST-IN-PLACE CONCRETE
PROJECT'S NAME:
BEER FESTIVAL PLAZA
TYPICAL CONCRETE BEAM
TYPICAL CONCRETE BEAM
TYPICAL FLOOR/ROOF SLAB
TYPICAL FLOOR/ROOF SLAB
CONCEPT DESIGNED:
RUNNER CHANNEL
@ 500mm O.C.
FRAME BY WOOD 30X60MM
FINISHED BY STONE
CEMENT RENDER
CONCRETE SLAB
400
NATURAL GROUND
200
RAMP
Tel
TYPICAL WALL, SEE WALL TYPES
GYPSUM BOARD CEILING,
SEE
REFLECTED CEILING PLANS
TYPICAL WALL, SEE WALL TYPES
HARD CEILING DETAILS
10
CEILING DETAILS
Email :info@ddpprojects.c om
DRAW N BY:
Trinh Pham
CHECKED BY:
CEMENT RENDER SLOPE TO DRAIN
WATER PROOFING SIKA
CASTING IN PLACE CONCRETE GUTTER
LEAN CONCRETE
CRUSH STONE
R
9
: 0511 3849598
DESIGNED B Y:
Philip Hocking
GYPSUM BOARD
10mm SHADOWLINE
STOPPING ANGLE
HARDSCAPE-LANDSCAPE:
ADD: 5th FLOOR,130-132 BACH DANG St. HAI CHAU Dist.,DA NANG City
FRAME BY WOOD 15X30MM
HAT CHANNELS @ 500mm
O.C.TIED TO RUNNER CHANNEL
METAL
i= 11%
480
STEEL ANGLE AT
RUNNER CHANNEL
REFER TO RCP FOR ACTUAL HEIGHT
AS PER MANUFACTURE
SPECIFICATION
REFER TO RCP FOR ACTUAL HEIGHT
ANCHOR FOR WIRE HANGERS
Philip Hocking
DRAWING'S NAME:
TYP CONSTRUCTION
DETAIL
DRAINAGE FOR RAMP DETAIL
As
indicated
Scale:
Date:
01/08/2018
Drawing No:
BFP-HS-560
Revision:
00
50
50
400
0
22
220
2 20
1300
R = 1400
22
0
22
0
2200
2150
0
230
450
22
EX
2200
IN
220
FFL
50
50
40 380
INTERIOR
REFERENCE
5000
4019030
PRELIMINARY
5230
900
600
50
ISSUED FOR
5000
900
1000
5230
50
230
220
2 20
TENDER
APPROVAL
600
CONSTRUCTION
AS-BUILT
4019030
EXTERIOR
REV ISI ON SCHEDULE
IN
EX
TYPE
D01
PROFILE SPECS
SOLID TIMBER
GLAZING'S SPECS
FIRE GLASS
SIZE(STRUCTURE)
1000 X 2100
OPERATION
SWING OUT
LOCATION
PUBLIC TOILET , GAS STORE
440 4019030
600
Rev_Num
ber
Rev. Date
00
01/08/2018
Rev. Description
100%DD
FFL
230
3000
230
3460
330
NOTE
COUNT
INVESTOR
7
CÔNG TY TNHH DỊCH VỤ
CÁP TREO BÀ NÀ
INTERIOR
PROJECT'S NAME:
600
50
500
230
3000
50
FIX
50
600
500
50
BEER FESTIVAL PLAZA
50
1900
230
CONCEPT DESIGNED:
EXTERIOR
3460
50
IN
2000
EX
HARDSCAPE-LANDSCAPE:
INTERIOR
ADD: 5th FLOOR,130-132 BACH DANG St. HAI CHAU Dist.,DA NANG City
Tel
50
1900
50
: 0511 3849598
Email :info@ddpprojects.c om
DESIGNED B Y:
EXTERIOR
Philip Hocking
TYPE
W1
TYPE
PROFILE SPECS
SOLID TIMBER
PROFILE SPECS
GLAZING'S SPECS
FIRE GLASS
GLAZING'S SPECS
SIZE(STRUCTURE)
600 X 2000
SIZE(STRUCTURE)
OPERATION
FIX
OPERATION
LOCATION
WATER TANK
LOCATION
AR1
DRAW N BY:
Trinh Pham
CHECKED BY:
Philip Hocking
3000 X 5000
DRAWING'S NAME:
DOOR & ARCHWAY
SHEDULE
ON ROAD
1 : 50
Scale:
NOTE
COUNT
NOTE
1
COUNT
Date:
01/08/2018
Drawing No:
1
BFP-HS-561
Revision:
00
Download