Project: ai BANK EL Haram ARCHITECTURE WORKS Item No. Description RAISED FLOORS 7.9. Section -1-: GENERAL REQUIREMENTS: Supplying and installing 600X600x40mm raised floor calcium sulphate tiles produced by "MERO", or similar for the IT room, with total height including pedestals from 100mm to 400mm made of high density and high performance chipboard core 38-40mm thickness, 4 sides banding in PVC/ABS trim protection, galvanized steel sheet base. Complete work including all accessories, stringer is connected to pedestal head with screws, gluing the pedestal to the RC slab using approved epoxy clue, surface preparation, painting the room floor using antistatic paint material to be approved by the Consultant. 7.10. 7.11.1 7.11.2 Quantity m2 12 ml 80 m2 90 m2 15 Rate EGP. Amount EGP. PVC Skirting Supplying and installing approved PVC skirting 700mm height to match with the above Raised floor,Vinel tiles. Complete work including cutting, placing, proper fixation to the walls using approved bonding material, neat joining with the Raised floor, ...etc.material to be approved by the Consultant. 7.11. Unit CARPET TILES Supplying and installing Environmental Friendly carpet tiles 500 *500 MM for customer service and manger room from(Milliken) code (FXN44-47 Mocha) Antibacterial with approval color as per the Code ,. Completed work including cutting, placing,using approved gluing material,…etc. which should making necessary opening for floor boxes whenever requested or directed by the Engineer,Different samples must be submitted for review and approval prior of starting the delivery and installation works. All specified as per Square Meter DITTO as above but for premier room from(Milliken) code (FXA169-05-27 Boom) All specified as per Square Meter 16 Project: ai BANK EL Haram ARCHITECTURE WORKS Item No. Description 7.12. CARPET Skirting Section -1-: GENERAL REQUIREMENTS: Supplying and installing approved PVC skirting Covered with Carpet 50mm height to match with the above Carpet tiles. Complete work including cutting, placing, proper fixation to the walls using approved bonding material, neat joining with the Raised floor, ...etc.material to be approved by the Consultant. 7.13. Unit Quantity ml 25 m2 5 m2 160 Rate EGP. Amount EGP. INTERLOCK SIDEWALK PAVE Supplying & installing for outside sidwalk (street side) heavy duty interlock pre-cast concrete pave 80mm thick red & grey colour shape as per approved sample produced by "EUROPEAN", "TECHNOC-CRETE" or similar. The interlock shall be laid on lean concrete bed 150mm thickness class (fcu 250kg/cm2) on well compacted 50mm clean sand bed complete works including lean concrete layer, sand bed, leveling alignment, filling the joints, ....etc. Data sheets, and various samples must be submitted for review and approval prior of commencing the Works. All specified as per Square Meter Section 8:- CLADDING & WALL TILING WORKS 8.1. DRY WALL PARTITION Supplying and erecting dry wall partitions produced by "KNAUF", "LAFARGE" or approved similar 100mm thick. full height extending from floor slab to the underside of the above floor slab for various rooms complete as shown on relevant drawing and in the hereinafter specifications: 1). Made of fire rated (90 min) gypsum boards F(DF) face panels 12mm thick with acoustic insulation- high density rock wool 100kg/m3 - to fill completely the space between the gypsum boards. Joints between boards shall be completely concealed in order after being painted to visually appear as a solid masonry wall. 2). The panels shall be fastened to the studs by means of hardened steel clips with prongs embedded into the panel long edges and screwed on the studs; clips shall be fixed to the adjacent panel and slid between the first panel and the stud structure clips shall be placed at a distance not exceeding 400mm. 3). The boards must provide - at least - one hour fire rating. 4). The partitions should not expose any screws on panels. 5). The scope of work includes providing the necessary stiffening of substructure for the cable routing and the hanging of the boards, providing the necessary opening and box -outs for electrical fittings (lighting and power switches) 6). Complete sound insulation by using foam tapes to seal all the penetrations to maintain the sound integrity. 7). Workshop drawings and a proto-type sample of a dry wall panel including its fixation accessories must be submitted for review and approval prior of commencing the Works. All specified as per Square Meter 17