OPERATIONS MANAGEMENT EMBA Batch 17, Singapore BILL OF MATERIALS STANDARD FORMAT OF BOM SECTION PART NO. & LEVEL PART DESCRIPTION NO. OF UNITS UNIT COST ($) TOTAL COST ($) EXAMPLE: BILL OF MATERIALS FOR EXTERNAL MODEM MODEL 157845 (Presented in ascending order of levels) Assembly Level 3 2 1 Component Microchip Wiring harness Mother board On-off switch Indicator lights set Plug sockets set Plastic casing Fastening screws No. of units 1 1 1 Estimated cost ($) 15.00 4.50 7.50 1 1 1 1 4 Total 0.35 0.10 0.40 1.75 0.20 29.80 1 EXERCISE ON BILL OF MATERIALS The Parts List for assembling an electric golf cart is shown below. PARTS LIST: ONE UNIT OF ELECTRIC GOLF CART ASSEMBLY/ SUB-ASSEMBLY/ UNITS UNIT COST SUB-ASSEMBLY COMPONENT ($) Electric golf cart a) Top assembly 1 b) Base assembly 1 Top assembly a) Supports b) Cover 4 1 14 36 Base assembly a) Motor b) Body c) Seats 1 1 2 140 a) Frame b) Controls c) Wheels 1 1 4 65 28 8 Body 18 REQUIRED OF YOU: 1 Construct a level-wise product structure tree showing the assembly sequence of the electric golf cart. Include unique reference codes for each block in the tree. 2 Prepare the Bill of Materials with a cost attached to each entry. 3 What is the Bill of Materials cost? 2