Assessment 4001 Student workbook 3 of 3 Unit code: CPCCBC4001A 1.1 To comply with organisational policies and procedures you are required to submit all relevant documents for construction submissions. Explain why each document is needed in relation to the reason shown. Document type Plans and specifications Structural engineering reports -inclusive of all design principles, inclusive structural actions and performance Manufactures guidelines - Certificate of conformity WHS legislation Australian standards Basix Youssef bader Compliance reason There are two reasons or stages - For development consent - For reviews and further update revisions Statutory bodies (such as councils and principle certifiers) may from time to time require engineering reports. Such bodies should specify the type of engineer that they require the reports from. The tangenal benefit of engaging an engineer is only realised if he or she is on the national engineers register, in which care they must declare how much professional indemnity insurance they have. For further proof that the supplied material and goods meets the required specifications and standards. You have absolute liability for everyone working on site, walking by the site, or even breaking in the site. Australian standards don’t mean anything unless they are listed in the NCC (has no legal standing). Basix is a requirement under state legislation. Assessment 4001 Student workbook 3 of 3 Unit code: CPCCBC4001A 1.2 You are required to prepare an email to submit to the certifier- MYBUILD certifiers, bill build- answering correspondence received today with all documentation required for the compliance submission of the trapezoidal roof system (refer workbook 2 Q1.2) You must ensure the language is appropriate to the email respondent. This activity is written/ nonverbal communication email that allows you to introduce yourself and notes the documents required to be supplied (note: you do not need to supply these documents, just note that they are required) you should prepare the email and submit for marking. From: Bader, Youssef Baderconstruction@gmail.com Sent: 25th of April 2019, 10.49pm To: MYBUIILD certifiers (bill build) Subject: response for trapezoidal roof system compliance Dear, Mr Bill Further to you correspondence dated 25th of April 2019 the documentation that you request shall be provided by the 27th of April in two days’ time. If you have any further questions or require further documentation, please do not hesitate to ask. Yours sincerely, Youssef Bader Licence number: 234657C Tel: 02 9367 4539. Fax (02) 9345 5698 Head office: 78 bonds rd., PO box 7609 Belmore NSW,2192 Baderconstructions@gmail.com.au ABN: 56 902 305 618 1.3 list two questions that you would ask verbally to the certifier (refer Q1.2) that would confirm requirements for compliance and how would you share this information to staff for correct installation? Youssef bader Assessment 4001 Student workbook 3 of 3 Unit code: CPCCBC4001A Questions that you can ask are Do you have your registration number? Can you put your instruction in writing? By having a tool box talk and explaining to staff verbally and giving out written instruction for each individual person. Youssef bader