E-Sharp Solar Solution Pvt. Ltd. # 178, Functional Industrial Estate Patpar Ganj, DELHI-110092 www.esharp.in, sales@esharp.in 1.0 SPECIFICATIONS OF MAJOR COMPONENTS OF THE SYSTEM 1.1 SPV ARRAY The SPV array of 5 KWp capacities shall consist of 20 modules of 250Wp wired in 5 series, 4 Parallel configurations. The modules shall be fixed on corrosion resistant MS structures. The SPV module has suitable number of crystalline silicon solar E-Sharp’s connected in series and hermetically sealed with high transmission toughened glass on top and suitable lamination material on back using state-of-the-art technology. The laminates are framed using anodized aluminum channels. A terminal block is fixed on the frames for taking the electrical output. The SPV array shall be grouted on support structure on the Ground or Roof as per availability of space. 1.2 SUPPORT STRUCTURES The modules will be mounted on support structures fabricated from drawn steel. The structure will be hot dip galvanized to make them non-corrosive and long lasting. Each structure will carry 5 modules to form a panel and will be capable of withstanding a horizontal wind speed of 150 KMPH after grouting and installation. 1.3 CABLING & JUNCTION BOXES As mentioned earlier 20 modules will be arranged in 4 panels of 5 modules each. 5 modules of a panel will be mounted on a structure and connected together in series in the daisy chain manner. The two ends of the seriesconnected modules will be brought to the panel junction box (PJB) mounted on the panel structure. Series blocking diode will be located in the panel junction box and the panel output will be taken to Main junction box (MJB) where outputs of all the panels will be brought for paralleling. The output from the MJB and taken to the inverter through charge controller for conversion into 230V, 1 phase AC. The Batteries, Charge Controller and Inverter shall be placed inside a weather-proof location provided by the Buyer. Nominal array voltage will be 120 V DC. 1.4 POWER CONDITIONING UNIT The Single phase Power Conditioning Unit (PCU) provides Single -phase AC power to the specified loads. The Power Conditioning unit mainly comprises of PWM Solar Charge Controller and a single phase inverter. The PWM Charger is microprocessor based system designed to provide the necessary protection and maximize the power from the 5 KWp SPV array to charge the 300 AH battery bank. The charge controller is equipped with necessary software that allows precise charging of the battery bank. E-Sharp Solar Solution Pvt. Ltd. # 178, Functional Industrial Estate Patpar Ganj, DELHI-110092 www.esharp.in, sales@esharp.in The high efficiency inverter converts the DC power available from the Array/Battery back into 1 phase AC, by incorporating IGBT devices for power conversion. When the solar power is available, the control attempts to maintain zero current from the battery, thus transferring as much as solar current to load as possible. During this time the battery voltage is monitored continuously. When the solar energy is not available (due to insufficient sunlight) the system enables the battery to deliver the current through inverter to meet the demand. The microprocessor controlled inverter incorporates Pulse Width Modulation (PWM) technology and incorporates all the desired safety features. Important features/protections in the PCU: PWM Solar Charger LCD Display gives all necessary information. Automatic fault conditions reset for all parameters like voltage, frequency and/or black out. MOV type surge arrestors on AC & DC terminals for over voltage protection from lightening induced surges. PCU operation from -5° to 55° C, Over load capacity (for 30 sec.) shall be 150% of continuous rating. Since the PCU is to be used in solar photovoltaic energy system, it shall have high operational efficiency. The idling current at no load shall not exceed two percent of the full load current. Common Technical Specifications: Type high Output Voltage Waveform Output Frequency Continuous Rating Nominal DC Input Total harmonic Distortion Operating temp. range Inverter Efficiency : : : : : : : : : Self commuted, current regulated, frequency, IGBT based 1Φ, 230 VAC (±10%) Pure Sine-wave 50 Hz ± 3 Hz 10KVA 120 VDC < 5% 5° to 50° C >90% E-Sharp Solar Solution Pvt. Ltd. # 178, Functional Industrial Estate Patpar Ganj, DELHI-110092 www.esharp.in, sales@esharp.in 1.5 Sealed Maintenance Free Battery Bank The 120 Volts, 300AH battery bank in the offered SPV systems is maintenance free type and work on oxygen recombination principle. The oxygen gas generated at the positive plate, is transported in the gas phase through a highly absorbent and porous glass mat separator to the negative plate. The micro porous glass separator is not completely saturated with electrolyte and the void space thus available allows an unimpeded access of oxygen to the negative plate. The oxygen gas gets reduced at the negative late surface, thereby effectively suppressing the evolution of hydrogen. Consequently, batteries cells do not lose any water under normal operation and therefore, no topping-up is required. 1.6 Technical Specifications The technical specifications of the recommended SPV Plant are as follows: General Application Hrs. of operation As Above Load Details As Above Load Details System voltage 120 V DC SPV Module (Quantity 100 nos.) SPV Array Power (Total 5 KWp) Module type Crystalline silicon Module power 250Wp (Nominal) Configuration of Array 5(Series) x 4(Parallel) Battery Battery type Maintenance fee Lead Acid Battery voltage 120 V Battery capacity @ C/10 300 AH No. of Battery Banks Charge controller Rating Mounting No. of Charge Controllers Inverter Rating Mounting No. of Inverters Enclosures Other accessories Cables Module mounting frame 1 set 120V, 5KW Pulse Width Modulated Inside Control Room, Floor/Wall Mounted 1 120 V ,5 KVA DSP Pure Sine-wave Hybrid Inside Control Room, Floor/Wall Mounted 1 Indoor BIS Copper Conductors Galvanized MS frame E-Sharp Solar Solution Pvt. Ltd. # 178, Functional Industrial Estate Patpar Ganj, DELHI-110092 www.esharp.in, sales@esharp.in DATA SHEET SOLAR PV MODULES SOLAR PV MODULE ELECTRICAL PARAMETERS Maximum Power Rating (Wp) 250 Minimum Power Rating (Wp) 248 Rated Current Im (Amps) 6.97 Rated Voltage Vm (Volts) 35.82 Short Circuit Current Isc (Amps) 7.38 Open Circuit Voltage Voc (Volts) 72 PHYSICAL PARAMETERS No. of Cells 72 Dimensions (approx.) 1961(L) X982(W)x36(T) Weight (Kg) 20.60 ENVIRONMENTAL RATINGS Nominal Operating Cell Temp.(C) 492 Max. Allowed Module Temp.(C) -40 to + 85 Max. Allowed System Voltage(V) 1000 RH at 85C 85 Temp. Coefficient of Isc +0.0004/K Temp. Coefficient of Voc -0.0034/K Thanks and Regards E-SHARP SOLAR SOLUTION PVT.LTD. #178, F.I.E., Patparganj, DELHI-110092 M : +91-9582949130 Email: sales@esharp.in Url: http://www.esharp.in http://www.indiamart.com/esharp E-Sharp Solar Solution Pvt. Ltd. # 178, Functional Industrial Estate Patpar Ganj, DELHI-110092 www.esharp.in, sales@esharp.in BATTERY BANK SEALED MAINTENANCE-FREE (VRLA) BATTRY Electrical Nominal Capacity 300 AH @ 27 C Total No. of Cells per Battery bank 72 Float Voltage 2.25±0.01 VPC @ 27 C Boost Voltage 2.30±0.01 VPC @ 27 C ENVIRONMENTAL SPECIFICATIONS Operating Temperature S. No. 1 -20 C to +55C System Unit Price (INR) Supply of Stand Alone Solar Power Plant 5 kWp with 5 KVA Inverter 6,25,000.00 (Rupees Six Lacs Twenty five Thousands only) PWM Charge Controller Inverter LOADS HYBRID POWER CONDITIONING UNIT SPV ARRAY (5 KWp) AC MAINS (Optional) BATTERY BANK (120V, 300AH) E-Sharp Solar Solution Pvt. Ltd. # 178, Functional Industrial Estate Patpar Ganj, DELHI-110092 www.esharp.in, sales@esharp.in TERMS AND CONDITIONS FOR SUPPLY: 1. Prices: FOR our works, DELHI, India 2. Installation & commissioning: Extra @ Rs. 5000.00. 3. Taxes and Duty: Excise Duty-NIL and VAT-Extra @ 5% VAT. 4. Transportation Charges : Extra at actual. 5. Delivery Lead Time: dispatch will be affected with 2 to 3 weeks from date of receipt of your technically and commercially clear purchase order with advance. 6. Payments: 75% advance with confirmed PO, 25% on inspection of material at our works. 7. Validity: offer is valid for three weeks. 8. Modifications: any modifications in Systems specifications and operations will change system configuration and offer price and shall be charged at mutually agreed price. 9. Warranty: our standard warranty against any manufacturing defects /poor workmanship is valid for 15 months from the date of supply or 12 months from the date of installation, whichever is earlier. 10. Force Majeure: standard force majeure conditions apply for this offer and resultant order.