Uploaded by mohamad kasyfi samsuddin

3. Report Engine Test Bed LOC 34(electrical part)

advertisement
BOUSTEAD NAVAL SHIPYARD SDN.BHD
PANGKALAN TLDM, 32100 LUMUT
PERAK DARUL RIDZUAN
ENGINEERING DEPARTMENT
________________________________________________________________________________
KD SRI INDERA SAKTI
(PENNANT NO. 1503)
DOCKING AND ESSENTIAL DEFECTS (DED)
Prepared by:
HASSAN, HAMIZAH
Date:
24.05.19
Checked by:
AZLIN
Date:
28.05.19
Approved by:
MOHD YUSOF
Date:
29.05.19
Client:
ROYAL MALAYSIAN NAVY
Originator:
BOUSTEAD NAVAL SHIPYARD
Project: TEST BED FACILITY LOC 34
BOUSTEAD NAVAL SHIPYARD SDN BHD
(A member of Boustead Group)
Dept. ENGR.
Ext. No.
7421
Security Classification:
RESTRICTED
SCALE
(No. 199302-K)
PANGKALAN TLDM, 32100 LUMUT
PERAK DARUL RIDZUAN
Tel: +605 930 7439 Fax: +605 683 5809
NTS
Title: FEASIBILITY STUDY AND RECOMMENDATION ON
THE TEST BED FACILITY
Document No.
900920 – 52000 – P – 0001
Rev
0
P/List
N
Sheet
1/14
_____________________________________________________________________________
©All data contained in this document is the exclusive property of BOUSTEAD NAVAL SHIPYARD SDN BHD and shall neither be used nor disclosed without
its prior written consent.
BOUSTEAD NAVAL SHIPYARD SDN.BHD
PANGKALAN TLDM, 32100 LUMUT
PERAK DARUL RIDZUAN
ENGINEERING DEPARTMENT
Project:
Document No.:
Document Title:
Date:
TEST BED FACILITY LOC 34
900920 – 52000 – P – 0001
FEASIBILITY STUDY AND RECOMMENDATION ON
THE TEST BED FACILITY
5 SEPT 2019
REFERENCES
A.
B.
Finding reports by Loc 13 and Loc 08.
Engine Test Bed Inspection Report by PROMAND.
INTRODUCTION
1.
Engine Test Bed is a facility used to develop, characterize and test engines. It’s
allows engine operation regimes and offers measurement of several physical variables
associated with the engine operation.
2.
BNSY have this facility but due to some constraints it has not been operate for
sometimes and last operated in year 2015. There have 3 test bed provided in Loc 34.
a.
Test Bed No. 1
: Water Brake 12 N 70 F 5200 KW
: Water Brake 10 N 48 F 1900 KW
b.
Test Bed No. 2
: Water Brake 11 N 56 F 3000 KW
c.
Test Bed No. 3
: Water Brake 5 N 26 F 330 KW
d.
Test Bed No. 4
: Gearbox Test Bed
PROBLEM STATEMENT
SYSTEM SPECIFICATION
2
©All data contained in this document is the exclusive property of BOUSTEAD NAVAL SHIPYARD SDN BHD and shall neither be used nor
disclosed without its prior written consent.
BOUSTEAD NAVAL SHIPYARD SDN.BHD
PANGKALAN TLDM, 32100 LUMUT
PERAK DARUL RIDZUAN
ENGINEERING DEPARTMENT
Project:
Document No.:
Document Title:
Date:
TEST BED FACILITY LOC 34
900920 – 52000 – P – 0001
FEASIBILITY STUDY AND RECOMMENDATION ON
THE TEST BED FACILITY
5 SEPT 2019
SURVEY FINDINGS
3. All main components were inspected thoroughly with the following observation:
a. Preheater.
(1) No irregularity, crack, burn mark and significant deterioration sign at
electrical components and cables were found as per pic. 1 and 2.
(2) Actual preheater condition unknown as the item was not running for
few years.
(3) The wiring still intact and highly recommend to continuity and insulation
check for ensure cable condition. The control panel require servicing
and replace all damaged components.
Picture 1
Picture 2
b. Air Compressor for Test Bed No. 1.
(1) No irregularity, crack, burn mark and significant deterioration sign at
electrical components, motor and cables were found as per pic. 3 and
4.
3
©All data contained in this document is the exclusive property of BOUSTEAD NAVAL SHIPYARD SDN BHD and shall neither be used nor
disclosed without its prior written consent.
BOUSTEAD NAVAL SHIPYARD SDN.BHD
PANGKALAN TLDM, 32100 LUMUT
PERAK DARUL RIDZUAN
ENGINEERING DEPARTMENT
Project:
Document No.:
Document Title:
Date:
TEST BED FACILITY LOC 34
900920 – 52000 – P – 0001
FEASIBILITY STUDY AND RECOMMENDATION ON
THE TEST BED FACILITY
5 SEPT 2019
(2) The compressor capable to running during survey, however the actual
performance not measured. As the system capable to running, it
indicates the control panel and motor are functioning well.
(3) The wiring was intact and highly recommend doing continuity and
insulation testing for ensure cable condition. The control panel and
motor require servicing and carry out functional test with associate
equipment.
(from mizah)
Picture 3
Picture 4
c. Deluge Water Pump No. 1 Control Panel.
(1) No irregularity, crack, burn mark and significant deterioration sign at
electrical components, internal wiring was found as per pic. 5 and 6.
The control panel had been renewed by The Yard Service Department.
(2) The control panel seen in good condition upon visual checking process.
However, the system was not running due to the motor in bad
condition. The cables from panel to motors was found out heavily
deteriorated cause by wet and salty environment.
(3) Recommendation is to service the control panel and carry out
functional test upon completion.
4
©All data contained in this document is the exclusive property of BOUSTEAD NAVAL SHIPYARD SDN BHD and shall neither be used nor
disclosed without its prior written consent.
BOUSTEAD NAVAL SHIPYARD SDN.BHD
PANGKALAN TLDM, 32100 LUMUT
PERAK DARUL RIDZUAN
ENGINEERING DEPARTMENT
Project:
Document No.:
Document Title:
Date:
Picture 5
TEST BED FACILITY LOC 34
900920 – 52000 – P – 0001
FEASIBILITY STUDY AND RECOMMENDATION ON
THE TEST BED FACILITY
5 SEPT 2019
Picture 6
d. Deluge Water Pump Motor (2 in no).
(1) The motors and motor foundation were in heavily corroded condition
due to aging, wet and salty environment as per pic. 7,8,9 and 10. The
power cables from control panel to motors also affected and need
replacement.
(2) We recommend both motors, foundations and all cables to be renew.
5
©All data contained in this document is the exclusive property of BOUSTEAD NAVAL SHIPYARD SDN BHD and shall neither be used nor
disclosed without its prior written consent.
BOUSTEAD NAVAL SHIPYARD SDN.BHD
PANGKALAN TLDM, 32100 LUMUT
PERAK DARUL RIDZUAN
ENGINEERING DEPARTMENT
Project:
Document No.:
Document Title:
Date:
TEST BED FACILITY LOC 34
900920 – 52000 – P – 0001
FEASIBILITY STUDY AND RECOMMENDATION ON
THE TEST BED FACILITY
5 SEPT 2019
Picture 7
Picture 8
Picture 9
Picture 10
e. Air Compressor for Test Bed No. 2&3.
(1) No irregularity, crack, burn mark and significant deterioration sign at
electrical components, motor and cables were found as per pic. 11 and
12.
(2) The compressor condition unknown as the item was not running for few
years. The motor and control panel condition were not tested.
(3) The wiring still intact and highly recommend to continuity and insulation
testing for ensure cable condition. The control panel and motor are
required to be renew.
6
©All data contained in this document is the exclusive property of BOUSTEAD NAVAL SHIPYARD SDN BHD and shall neither be used nor
disclosed without its prior written consent.
BOUSTEAD NAVAL SHIPYARD SDN.BHD
PANGKALAN TLDM, 32100 LUMUT
PERAK DARUL RIDZUAN
ENGINEERING DEPARTMENT
Picture 11
Project:
Document No.:
Document Title:
Date:
TEST BED FACILITY LOC 34
900920 – 52000 – P – 0001
FEASIBILITY STUDY AND RECOMMENDATION ON
THE TEST BED FACILITY
5 SEPT 2019
Picture 12
f. Fuel Transfer System from Storage Tank to Header Tank.
(1) Fuel transfer system consist of 3 in no of motors, 2 in no of control
panels and 2 in no float switches. As per visual inspection on the
system, deteriorated sign can be found as per Pic. 13,14,15 and 16.
(2) The actual condition of the system was undetermined because the
system not functioning. The deteriorated sign at motors were barely
sees due to the equipment already being painted. Float switches not
functioning and all the cable need replacement.
(3) Base on this survey, the recommendation is to renew all the motors,
Control Panel, sensors and cables.
7
©All data contained in this document is the exclusive property of BOUSTEAD NAVAL SHIPYARD SDN BHD and shall neither be used nor
disclosed without its prior written consent.
BOUSTEAD NAVAL SHIPYARD SDN.BHD
PANGKALAN TLDM, 32100 LUMUT
PERAK DARUL RIDZUAN
ENGINEERING DEPARTMENT
Project:
Document No.:
Document Title:
Date:
TEST BED FACILITY LOC 34
900920 – 52000 – P – 0001
FEASIBILITY STUDY AND RECOMMENDATION ON
THE TEST BED FACILITY
5 SEPT 2019
Picture 13
Picture 14
Picture 15
Picture 16
8
©All data contained in this document is the exclusive property of BOUSTEAD NAVAL SHIPYARD SDN BHD and shall neither be used nor
disclosed without its prior written consent.
BOUSTEAD NAVAL SHIPYARD SDN.BHD
PANGKALAN TLDM, 32100 LUMUT
PERAK DARUL RIDZUAN
ENGINEERING DEPARTMENT
Project:
Document No.:
Document Title:
Date:
TEST BED FACILITY LOC 34
900920 – 52000 – P – 0001
FEASIBILITY STUDY AND RECOMMENDATION ON
THE TEST BED FACILITY
5 SEPT 2019
g. Sea Water System at Pump House.
(1) Sea water system consist of 2 in no of motors, 1 in nos of control
panels. As per visual inspection, no significant defect and deteriorated
sign were found on side as per picture 17,18,19 and 20.
(2) The actual condition of the system was undetermined because the
system not running, and the last service done at 2012 as been told by
yard service personal. No actual service record had been seen to prove
the service had been done. The deteriorated sign at motors were
barely sees due to the equipment already being painted. No burn mark
on control panel component. However, the actual condition of
components was undetermined.
(3) Base on this survey, the recommendation is to service all the motors,
and Control Panel.
Picture 17
Picture 18
9
©All data contained in this document is the exclusive property of BOUSTEAD NAVAL SHIPYARD SDN BHD and shall neither be used nor
disclosed without its prior written consent.
BOUSTEAD NAVAL SHIPYARD SDN.BHD
PANGKALAN TLDM, 32100 LUMUT
PERAK DARUL RIDZUAN
ENGINEERING DEPARTMENT
Picture 19
Project:
Document No.:
Document Title:
Date:
TEST BED FACILITY LOC 34
900920 – 52000 – P – 0001
FEASIBILITY STUDY AND RECOMMENDATION ON
THE TEST BED FACILITY
5 SEPT 2019
Picture 20
RECOMMENDATIONS
4. Based on observation and evident found, our recommendation as below: Bil.
1.
2.
3.
4.
5
6
7
Equipment/System
Preheater
Recommendation
1.Service control panel and replace defect item.
2.Countinity and insulation check on cable.
3.Upon completion, carry out functional test.
Air Compressor for TB 1
1.Service control panel and motor.
2.Countinity and insulation check on cable.
3.Upon completion, carry out functional test.
Deluge Water Pump No. 1 1.Service control panel
Control Panel
2.Upon completion, carry out functional test
Deluge Water Pump Motor 1.Renew motors
2.Renew cables
3.Renew foundation of motor
Air Compressor for TB 1.Renew control panel and motor.
2&3
2.Countinity and insulation check on cable.
3.Upon completion, carry out functional test.
Fuel Transfer System
1.Renew control panels, motors, sensors and
cables.
Sea Water System
1.Service control panel and motor.
10
©All data contained in this document is the exclusive property of BOUSTEAD NAVAL SHIPYARD SDN BHD and shall neither be used nor
disclosed without its prior written consent.
BOUSTEAD NAVAL SHIPYARD SDN.BHD
PANGKALAN TLDM, 32100 LUMUT
PERAK DARUL RIDZUAN
ENGINEERING DEPARTMENT
Project:
Document No.:
Document Title:
Date:
TEST BED FACILITY LOC 34
900920 – 52000 – P – 0001
FEASIBILITY STUDY AND RECOMMENDATION ON
THE TEST BED FACILITY
5 SEPT 2019
2.Countinity and insulation check on cable.
3.Upon completion, carry out functional test.
RISK
5.
To refurbish the facilities, there have several issues need to consider:
a.
Level of operator training and support required for each of the systems.
b.
Upgradeability of both hardware and software.
CONCLUSIONS
11
©All data contained in this document is the exclusive property of BOUSTEAD NAVAL SHIPYARD SDN BHD and shall neither be used nor
disclosed without its prior written consent.
BOUSTEAD NAVAL SHIPYARD SDN.BHD
PANGKALAN TLDM, 32100 LUMUT
PERAK DARUL RIDZUAN
ENGINEERING DEPARTMENT
Project:
Document No.:
Document Title:
Date:
TEST BED FACILITY LOC 34
900920 – 52000 – P – 0001
FEASIBILITY STUDY AND RECOMMENDATION ON
THE TEST BED FACILITY
5 SEPT 2019
____________________________________________________________________________________________
12
© All data contained in this document is the exclusive property of BOUSTEAD NAVAL SHIPYARD SDN BHD and shall neither be used nor disclosed without its prior written consent.
BOUSTEAD NAVAL SHIPYARD SDN.BHD
PANGKALAN TLDM, 32100 LUMUT
PERAK DARUL RIDZUAN
ENGINEERING DEPARTMENT
Project:
Document No.:
Document Title:
Date:
TEST BED FACILITY LOC 34
900920 – 52000 – P – 0001
FEASIBILITY STUDY AND RECOMMENDATION ON
THE TEST BED FACILITY
5 SEPT 2019
____________________________________________________________________________________________
13
© All data contained in this document is the exclusive property of BOUSTEAD NAVAL SHIPYARD SDN BHD and shall neither be used nor disclosed without its prior written consent.
BOUSTEAD NAVAL SHIPYARD SDN.BHD
PANGKALAN TLDM, 32100 LUMUT
PERAK DARUL RIDZUAN
ENGINEERING DEPARTMENT
Project:
Document No.:
Document Title:
Date:
TEST BED FACILITY LOC 34
900920 – 52000 – P – 0001
FEASIBILITY STUDY AND RECOMMENDATION ON
THE TEST BED FACILITY
5 SEPT 2019
14
©All data contained in this document is the exclusive property of BOUSTEAD NAVAL SHIPYARD SDN BHD. and shall neither be used nor
disclosed without its prior written consent.
Download