BOUSTEAD NAVAL SHIPYARD SDN.BHD PANGKALAN TLDM, 32100 LUMUT PERAK DARUL RIDZUAN ENGINEERING DEPARTMENT ________________________________________________________________________________ KD SRI INDERA SAKTI (PENNANT NO. 1503) DOCKING AND ESSENTIAL DEFECTS (DED) Prepared by: HASSAN, HAMIZAH Date: 24.05.19 Checked by: AZLIN Date: 28.05.19 Approved by: MOHD YUSOF Date: 29.05.19 Client: ROYAL MALAYSIAN NAVY Originator: BOUSTEAD NAVAL SHIPYARD Project: TEST BED FACILITY LOC 34 BOUSTEAD NAVAL SHIPYARD SDN BHD (A member of Boustead Group) Dept. ENGR. Ext. No. 7421 Security Classification: RESTRICTED SCALE (No. 199302-K) PANGKALAN TLDM, 32100 LUMUT PERAK DARUL RIDZUAN Tel: +605 930 7439 Fax: +605 683 5809 NTS Title: FEASIBILITY STUDY AND RECOMMENDATION ON THE TEST BED FACILITY Document No. 900920 – 52000 – P – 0001 Rev 0 P/List N Sheet 1/14 _____________________________________________________________________________ ©All data contained in this document is the exclusive property of BOUSTEAD NAVAL SHIPYARD SDN BHD and shall neither be used nor disclosed without its prior written consent. BOUSTEAD NAVAL SHIPYARD SDN.BHD PANGKALAN TLDM, 32100 LUMUT PERAK DARUL RIDZUAN ENGINEERING DEPARTMENT Project: Document No.: Document Title: Date: TEST BED FACILITY LOC 34 900920 – 52000 – P – 0001 FEASIBILITY STUDY AND RECOMMENDATION ON THE TEST BED FACILITY 5 SEPT 2019 REFERENCES A. B. Finding reports by Loc 13 and Loc 08. Engine Test Bed Inspection Report by PROMAND. INTRODUCTION 1. Engine Test Bed is a facility used to develop, characterize and test engines. It’s allows engine operation regimes and offers measurement of several physical variables associated with the engine operation. 2. BNSY have this facility but due to some constraints it has not been operate for sometimes and last operated in year 2015. There have 3 test bed provided in Loc 34. a. Test Bed No. 1 : Water Brake 12 N 70 F 5200 KW : Water Brake 10 N 48 F 1900 KW b. Test Bed No. 2 : Water Brake 11 N 56 F 3000 KW c. Test Bed No. 3 : Water Brake 5 N 26 F 330 KW d. Test Bed No. 4 : Gearbox Test Bed PROBLEM STATEMENT SYSTEM SPECIFICATION 2 ©All data contained in this document is the exclusive property of BOUSTEAD NAVAL SHIPYARD SDN BHD and shall neither be used nor disclosed without its prior written consent. BOUSTEAD NAVAL SHIPYARD SDN.BHD PANGKALAN TLDM, 32100 LUMUT PERAK DARUL RIDZUAN ENGINEERING DEPARTMENT Project: Document No.: Document Title: Date: TEST BED FACILITY LOC 34 900920 – 52000 – P – 0001 FEASIBILITY STUDY AND RECOMMENDATION ON THE TEST BED FACILITY 5 SEPT 2019 SURVEY FINDINGS 3. All main components were inspected thoroughly with the following observation: a. Preheater. (1) No irregularity, crack, burn mark and significant deterioration sign at electrical components and cables were found as per pic. 1 and 2. (2) Actual preheater condition unknown as the item was not running for few years. (3) The wiring still intact and highly recommend to continuity and insulation check for ensure cable condition. The control panel require servicing and replace all damaged components. Picture 1 Picture 2 b. Air Compressor for Test Bed No. 1. (1) No irregularity, crack, burn mark and significant deterioration sign at electrical components, motor and cables were found as per pic. 3 and 4. 3 ©All data contained in this document is the exclusive property of BOUSTEAD NAVAL SHIPYARD SDN BHD and shall neither be used nor disclosed without its prior written consent. BOUSTEAD NAVAL SHIPYARD SDN.BHD PANGKALAN TLDM, 32100 LUMUT PERAK DARUL RIDZUAN ENGINEERING DEPARTMENT Project: Document No.: Document Title: Date: TEST BED FACILITY LOC 34 900920 – 52000 – P – 0001 FEASIBILITY STUDY AND RECOMMENDATION ON THE TEST BED FACILITY 5 SEPT 2019 (2) The compressor capable to running during survey, however the actual performance not measured. As the system capable to running, it indicates the control panel and motor are functioning well. (3) The wiring was intact and highly recommend doing continuity and insulation testing for ensure cable condition. The control panel and motor require servicing and carry out functional test with associate equipment. (from mizah) Picture 3 Picture 4 c. Deluge Water Pump No. 1 Control Panel. (1) No irregularity, crack, burn mark and significant deterioration sign at electrical components, internal wiring was found as per pic. 5 and 6. The control panel had been renewed by The Yard Service Department. (2) The control panel seen in good condition upon visual checking process. However, the system was not running due to the motor in bad condition. The cables from panel to motors was found out heavily deteriorated cause by wet and salty environment. (3) Recommendation is to service the control panel and carry out functional test upon completion. 4 ©All data contained in this document is the exclusive property of BOUSTEAD NAVAL SHIPYARD SDN BHD and shall neither be used nor disclosed without its prior written consent. BOUSTEAD NAVAL SHIPYARD SDN.BHD PANGKALAN TLDM, 32100 LUMUT PERAK DARUL RIDZUAN ENGINEERING DEPARTMENT Project: Document No.: Document Title: Date: Picture 5 TEST BED FACILITY LOC 34 900920 – 52000 – P – 0001 FEASIBILITY STUDY AND RECOMMENDATION ON THE TEST BED FACILITY 5 SEPT 2019 Picture 6 d. Deluge Water Pump Motor (2 in no). (1) The motors and motor foundation were in heavily corroded condition due to aging, wet and salty environment as per pic. 7,8,9 and 10. The power cables from control panel to motors also affected and need replacement. (2) We recommend both motors, foundations and all cables to be renew. 5 ©All data contained in this document is the exclusive property of BOUSTEAD NAVAL SHIPYARD SDN BHD and shall neither be used nor disclosed without its prior written consent. BOUSTEAD NAVAL SHIPYARD SDN.BHD PANGKALAN TLDM, 32100 LUMUT PERAK DARUL RIDZUAN ENGINEERING DEPARTMENT Project: Document No.: Document Title: Date: TEST BED FACILITY LOC 34 900920 – 52000 – P – 0001 FEASIBILITY STUDY AND RECOMMENDATION ON THE TEST BED FACILITY 5 SEPT 2019 Picture 7 Picture 8 Picture 9 Picture 10 e. Air Compressor for Test Bed No. 2&3. (1) No irregularity, crack, burn mark and significant deterioration sign at electrical components, motor and cables were found as per pic. 11 and 12. (2) The compressor condition unknown as the item was not running for few years. The motor and control panel condition were not tested. (3) The wiring still intact and highly recommend to continuity and insulation testing for ensure cable condition. The control panel and motor are required to be renew. 6 ©All data contained in this document is the exclusive property of BOUSTEAD NAVAL SHIPYARD SDN BHD and shall neither be used nor disclosed without its prior written consent. BOUSTEAD NAVAL SHIPYARD SDN.BHD PANGKALAN TLDM, 32100 LUMUT PERAK DARUL RIDZUAN ENGINEERING DEPARTMENT Picture 11 Project: Document No.: Document Title: Date: TEST BED FACILITY LOC 34 900920 – 52000 – P – 0001 FEASIBILITY STUDY AND RECOMMENDATION ON THE TEST BED FACILITY 5 SEPT 2019 Picture 12 f. Fuel Transfer System from Storage Tank to Header Tank. (1) Fuel transfer system consist of 3 in no of motors, 2 in no of control panels and 2 in no float switches. As per visual inspection on the system, deteriorated sign can be found as per Pic. 13,14,15 and 16. (2) The actual condition of the system was undetermined because the system not functioning. The deteriorated sign at motors were barely sees due to the equipment already being painted. Float switches not functioning and all the cable need replacement. (3) Base on this survey, the recommendation is to renew all the motors, Control Panel, sensors and cables. 7 ©All data contained in this document is the exclusive property of BOUSTEAD NAVAL SHIPYARD SDN BHD and shall neither be used nor disclosed without its prior written consent. BOUSTEAD NAVAL SHIPYARD SDN.BHD PANGKALAN TLDM, 32100 LUMUT PERAK DARUL RIDZUAN ENGINEERING DEPARTMENT Project: Document No.: Document Title: Date: TEST BED FACILITY LOC 34 900920 – 52000 – P – 0001 FEASIBILITY STUDY AND RECOMMENDATION ON THE TEST BED FACILITY 5 SEPT 2019 Picture 13 Picture 14 Picture 15 Picture 16 8 ©All data contained in this document is the exclusive property of BOUSTEAD NAVAL SHIPYARD SDN BHD and shall neither be used nor disclosed without its prior written consent. BOUSTEAD NAVAL SHIPYARD SDN.BHD PANGKALAN TLDM, 32100 LUMUT PERAK DARUL RIDZUAN ENGINEERING DEPARTMENT Project: Document No.: Document Title: Date: TEST BED FACILITY LOC 34 900920 – 52000 – P – 0001 FEASIBILITY STUDY AND RECOMMENDATION ON THE TEST BED FACILITY 5 SEPT 2019 g. Sea Water System at Pump House. (1) Sea water system consist of 2 in no of motors, 1 in nos of control panels. As per visual inspection, no significant defect and deteriorated sign were found on side as per picture 17,18,19 and 20. (2) The actual condition of the system was undetermined because the system not running, and the last service done at 2012 as been told by yard service personal. No actual service record had been seen to prove the service had been done. The deteriorated sign at motors were barely sees due to the equipment already being painted. No burn mark on control panel component. However, the actual condition of components was undetermined. (3) Base on this survey, the recommendation is to service all the motors, and Control Panel. Picture 17 Picture 18 9 ©All data contained in this document is the exclusive property of BOUSTEAD NAVAL SHIPYARD SDN BHD and shall neither be used nor disclosed without its prior written consent. BOUSTEAD NAVAL SHIPYARD SDN.BHD PANGKALAN TLDM, 32100 LUMUT PERAK DARUL RIDZUAN ENGINEERING DEPARTMENT Picture 19 Project: Document No.: Document Title: Date: TEST BED FACILITY LOC 34 900920 – 52000 – P – 0001 FEASIBILITY STUDY AND RECOMMENDATION ON THE TEST BED FACILITY 5 SEPT 2019 Picture 20 RECOMMENDATIONS 4. Based on observation and evident found, our recommendation as below: Bil. 1. 2. 3. 4. 5 6 7 Equipment/System Preheater Recommendation 1.Service control panel and replace defect item. 2.Countinity and insulation check on cable. 3.Upon completion, carry out functional test. Air Compressor for TB 1 1.Service control panel and motor. 2.Countinity and insulation check on cable. 3.Upon completion, carry out functional test. Deluge Water Pump No. 1 1.Service control panel Control Panel 2.Upon completion, carry out functional test Deluge Water Pump Motor 1.Renew motors 2.Renew cables 3.Renew foundation of motor Air Compressor for TB 1.Renew control panel and motor. 2&3 2.Countinity and insulation check on cable. 3.Upon completion, carry out functional test. Fuel Transfer System 1.Renew control panels, motors, sensors and cables. Sea Water System 1.Service control panel and motor. 10 ©All data contained in this document is the exclusive property of BOUSTEAD NAVAL SHIPYARD SDN BHD and shall neither be used nor disclosed without its prior written consent. BOUSTEAD NAVAL SHIPYARD SDN.BHD PANGKALAN TLDM, 32100 LUMUT PERAK DARUL RIDZUAN ENGINEERING DEPARTMENT Project: Document No.: Document Title: Date: TEST BED FACILITY LOC 34 900920 – 52000 – P – 0001 FEASIBILITY STUDY AND RECOMMENDATION ON THE TEST BED FACILITY 5 SEPT 2019 2.Countinity and insulation check on cable. 3.Upon completion, carry out functional test. RISK 5. To refurbish the facilities, there have several issues need to consider: a. Level of operator training and support required for each of the systems. b. Upgradeability of both hardware and software. CONCLUSIONS 11 ©All data contained in this document is the exclusive property of BOUSTEAD NAVAL SHIPYARD SDN BHD and shall neither be used nor disclosed without its prior written consent. BOUSTEAD NAVAL SHIPYARD SDN.BHD PANGKALAN TLDM, 32100 LUMUT PERAK DARUL RIDZUAN ENGINEERING DEPARTMENT Project: Document No.: Document Title: Date: TEST BED FACILITY LOC 34 900920 – 52000 – P – 0001 FEASIBILITY STUDY AND RECOMMENDATION ON THE TEST BED FACILITY 5 SEPT 2019 ____________________________________________________________________________________________ 12 © All data contained in this document is the exclusive property of BOUSTEAD NAVAL SHIPYARD SDN BHD and shall neither be used nor disclosed without its prior written consent. BOUSTEAD NAVAL SHIPYARD SDN.BHD PANGKALAN TLDM, 32100 LUMUT PERAK DARUL RIDZUAN ENGINEERING DEPARTMENT Project: Document No.: Document Title: Date: TEST BED FACILITY LOC 34 900920 – 52000 – P – 0001 FEASIBILITY STUDY AND RECOMMENDATION ON THE TEST BED FACILITY 5 SEPT 2019 ____________________________________________________________________________________________ 13 © All data contained in this document is the exclusive property of BOUSTEAD NAVAL SHIPYARD SDN BHD and shall neither be used nor disclosed without its prior written consent. BOUSTEAD NAVAL SHIPYARD SDN.BHD PANGKALAN TLDM, 32100 LUMUT PERAK DARUL RIDZUAN ENGINEERING DEPARTMENT Project: Document No.: Document Title: Date: TEST BED FACILITY LOC 34 900920 – 52000 – P – 0001 FEASIBILITY STUDY AND RECOMMENDATION ON THE TEST BED FACILITY 5 SEPT 2019 14 ©All data contained in this document is the exclusive property of BOUSTEAD NAVAL SHIPYARD SDN BHD. and shall neither be used nor disclosed without its prior written consent.