CHAPTER 2 2.1 Weekly Progress Report 2.1.1 Week 1 Table 1: Week 1 Daily Activities (April 23 – 27, 2018) Date Day No. of Working Hours 04-23-18 Mon 8 04-24-18 Tue 8 Apparatus/ Glasswares Used Le Chatelier flask, funnel, beaker, sample container, spatula, thermometer Tasks Density measurement of Portland cement Analytical balance, spatula, sample container, beaker Le Chatelier flask, funnel, beaker, sample container, spatula, thermometer Weighing of sample cement for MgO analysis Density measurement of Portland cement Hot plate, beaker, glass rod, crucible cover, wash bottle, dropper, funnel, rubber policeman, watch glass MgO analysis in cement Preparation of ammonium nitrate and ammonium oxalate solution 04-25-18 Wed 8 Oven, Furnace, crucible Continuation of MgO analysis in cement Analytical balance, spatula, sample container, beaker Weighing of sample cement for IR/SO3 analysis Hot plate, beaker, glass rod, crucible cover, wash bottle, dropper, funnel, rubber policeman, watch glass IR/SO3 analysis in cement Preparation of barium chloride solution Continuation of IR/SO3 analysis in cement 04-26-18 Thurs 8 Oven, furnace, crucible 04-27-18 Fri 8 Analytical balance, spatula, erlenmeyer flask Weighing of sample steel Hot plate, beaker, glass rod, crucible cover, wash bottle, dropper, funnel, rubber policeman, watch glass, spatula, pipette Phosphorus analysis in steel Preparation of KNO3 solution