Quality Assurance Agreement with Production Material Suppliers , Advanced Product Quality Planning Product Development Process (PDP) / APQP Suppliers Customer project gates Definition phase Prototype phase Optimisation phase Production prelaunch phase Ramp-up phase 1. Customer order 2. Customer specifications 3. Craftsmanship (appearance) 4. Design FMEA 5. Design Review 6. Design Verification Plan - DVP 7. Subcontractor quality planning 8. Equipment, tools and inspection equipment 9. Prototype Control Plan 10. Production/inspection of prototype parts 11. Drawings and specifications 12. Manufacturing feasibility assessment 13. Process flow chart and volume production layout 14. Process FMEA 15. Inspection equipment capability 16. Pre-Launch Control Plan 17. Process instructions 18. Packaging and Logistics Concept 19. Production Trial Run 20. Volume Production Control Plan 21. Preliminary Process Capability Study 22. Technical tests on volume production parts 23. Volume production sampling S 296001-1 Appendix 1 Page 1 of 1 Issue: 2015-04-22