Health and Safety Induction – Part B (Tir Mostyn Wind Farm)
Latest update: 15/07/2019, issue 2
To meet the Health and Safety requirements to work on any wind site operated by BayWa r.e. Operation
Services Ltd, it is necessary that all contractors go through this Online Induction process upon their first arrival
to site and prior to any tasks commencing.
This is Part B of the Online Induction process which provides information on the site specifics for
Tir Mostyn Wind Farm.
Depending on your work activity, you will also need to
•
complete Part A (all wind sites),
•
provide work-related certificates,
•
complete a questionnaire at the end of this Online Induction session.
Health and Safety Induction - Part B
Tir Mostyn Wind Farm
Page 1
Site description
Tir Mostyn Wind Farm
B4501, Cerrig Road, Nantyglyn, Denbghshire, LL16 5RN
•
Capacity: 21.25 MW
•
Turbines: 25x Gamesa G52-850 0.85MW
•
Hub Height: 55m
•
Operational: September 2009
•
Owner: Tir Mostyn & Foel Goch Ltd
•
Operator: BayWa r.e. Operation Services Ltd
•
Turbine O&M: Vestas
•
HV Operator: East Solutions
Health and Safety Induction - Part B
Tir Mostyn Wind Farm
Page 2
Project location
Muster point: At the site main entrance.
First aid kit, eye wash, fire extinguishers and spill kit: At the substation.
Health and Safety Induction - Part B
Tir Mostyn Wind Farm
Page 3
Key contacts - Accident and Emergency
Emergency Number - 999
•
Glan Clwyn Hospital, Rhuddlan Road, Bodelwyddan, Rhy
LL18 5UJ
•
Approximately 33 minutes (15.6 miles)
Control Room - 0044 (0)1908 229980
BayWa r.e. Operation Services GmbH
Please make sure you have additionally saved the contact details of
the site / project manager and deputy for Tir Mostyn Wind Farm.
Health and Safety Induction - Part B
Tir Mostyn Wind Farm
Page 4
Site specific hazards
•
Working Farm
The wind farm is sited on a working farm, please take extra caution
when on site to avoid the livestock. Ensure that you clean your boots
thoroughly before entering the substation or turbines.
•
Public Roads
The access gates near turbines 2 and 1 and site C, all open out onto a
public single track road. When using these gates please ensure that
vehicles are parked safely as to not block the road, gates are secured,
and extra care is taken when using the gates to watch for other road
users.
•
Cattle Grids
Cattle grids on site have no pedestrian access, please ensure that extra
care is taken when crossing them to open and close gates, especially in
wet and slippery conditions.
Health and Safety Induction - Part B
Tir Mostyn Wind Farm
Page 5
Site specific hazards
•
Mains Fed Water
The water at the substation is mains fed and is suitable for drinking,
the system is tested annually for suitability.
•
Overhead Lines
There are overhead lines crossing the internal roads at just beyond
the main entrance, persons responsible for the operation of any high
vehicles or equipment must take care to ensure that there is
adequate clearance before attempting to pass under them.
Health and Safety Induction - Part B
Tir Mostyn Wind Farm
Page 6
Health and Safety Induction – Part B (Tir Mostyn Wind Farm)
Document signoff (Issue 1)
Name
Role
Date
James Higgins
Author
10/07/2019
Reggie Perrin
Reviewer
11/07/2019
Document change record
Name
Version
Date
Change details
Marina Bauer
Issue 2
15/07/2019
- BayWa r.e. logo update
- Label description on page 3 (project location)
Health and Safety Induction - Part B
Tir Mostyn Wind Farm
Page 7