DIV 02 | Demo & Abatement - Gama CSI
Subcontractor: Gama Contracting Servicing Inc.
SOW:
 Floor abatement during Night and weekend work shifts (Remove and dispose of the
following asbestos containing materials (ACM). Refer to drawings noted above for location of
phases)
DIV 05 | Handrail – TBD
Subcontractor: TBD
SOW: Per Change Order 0102
 Remove existing handrail and replace with new stainless steel round handrail 34" height.
 Patch and repair wall as required where exist.
DIV 09 | Painting - Q&I Construction
Subcontractor: Q & I Construction
SOW: Per plan
 New Painting including wall, interior doors/frame, ceiling grid, ceiling grille @Rooms 201,
202, 202A, 251, 270, 280, 215, 216, 222, 224, 226, 232 and 122, and Corridors CO0208,
CO0203, CO0207, CO0205, CO0202, CO0206, CO0101, CO0102, and CO0103, Rooms 206,
207, 208, 210, 211, 212, 213, and 118, and Corridor CO0210)
 Repair the water damage spots @ outside door 247 and Room 116
 Remove Paint and from North and Portion of East Wall @ Room 215
 Remove Paint from North Brick wall @ Room 216
 Remove Paint from East Wall @ Room 118
 Repair on existing X-Ray area @ Room 215, 118, and 122
 Provide Masonry pre-wash and Masonry restorative cleaner @ Room 201
 Paint Aluminum Storefront Window @ Room 201
DIV 09 | Flooring - RFC Flooring
Subcontractor: RFC Flooring
SOW:
 Supply and install new carpeting and wallbase @Rooms 201, 202, 202A, 251, 270, 280, 215,
216, 222, 224, 226, 232 and 122, and Corridors CO0208, CO0203, CO0207, CO0205, CO0202,
CO0206, CO0101, CO0102, and CO0103, Rooms 206, 207, 208, 210, 211, 212, 213, and 118,
and Corridor CO0210)
 Supply and install one stair case and one landing with rolled carpet via glue down installation
with no new 10” skirts.
 Supply the VI Strips at Stair area (per RFI#7 response)
 Supply and install 156 lf Reducers at doorways as needed (Color tbd)
 Supply and install manufacture recommended adhesives as needed.
DIV 09 | Ceiling Tile – TBD
Subcontractor: T-Wall Enterprises or Q&I (TBD)
SOW: Per Plan
 Replacement of Ceiling Tile @ Room 118, 122, 206-208, 210-212, 215, CO0205, CO0202,
CO0210, CO0101, CO0102, and CO0103.
 Materials will be provided by Exbon