Uploaded by Dukotkulangot Mabangis

Computer Networks Project Phase 1

advertisement
Duration: 2 Weeks
Phase 1: Gather information and determine customer requirements (Duration: 2
Weeks)

1.1. Structured Interview
Create a questionnaire for your structured interview to the Laboratory Supervisor
or Technician. This is to gather necessary information for your design of Small
Enterprise building and gather the specific information in each room including the
ff:
- Budget
- Requirements and expectations
- Restrictions
- Future growth
- Applications used
- Hardware resources
- Work patterns
- Number of computers and types of equipment
- Current internet connectivity
- Network infrastructure
- New Services required
1.2.

Site Survey
- Examine the existing locations
- Examine the existing floor plan, if not available, create a plan of “Built as
Plan”.
- Examine the current installed software and hardware resources
- Inventory Sheet of the installed devices includes:
Device name
Date of Purchase
Warranty Information
Location
Brand and Model
Operating System
Logical Addressing Information
Gateway
Method of Connectivity
Virus Checker
Security information
appended information
1
Download