TBEA Energy (India) Pvt. Ltd. Calculation Grounding calculation (as per IEEE 80) Project Mehnakhera , REC‐221 Customer HVPNL Scenario Date Design &Engineering, EPC 23/11/2018 Checked BMS Rev 1 VSG Approved Input parameters Calculation 40000 A 1 S 3 Symmetrical fault current in substation for conductor sizing Duration of shock for determining allowable body current Surface gravel layer resistivity 4 Surface gravel layer thickness 0.1 m 5 Soil resistivity 50 Ω‐m 6 Depth of burial of earth material 0.6 m 7 Number of rods in switchyard 219 8 Length of ground rod at each location 3 m 9 Maximum length in X – direction 289.737 m 10 Maximum length in Y – direction 187.158 m 11 40 12 13 Diameter of conductor / equivalent diameter in case of flat conductor Body weight Enter value of k according to the weight of person 50 0.116 14 Enter resistance of the body of person 1000 1 2 3000 Ω‐m mm Ω Ampacity calculation 1 Type of conductor Steel‐1020 2 Reference temperature for material constants 20 ° 3 0.0016 ° 4 Thermal coefficient of resistivity at reference temperature Fusing temperature of conductor 1510 ° 5 Ambient temperature 50 ° Page 1 of 6 ∝ TBEA Energy (India) Pvt. Ltd. Calculation Grounding calculation (as per IEEE 80) Project Mehnakhera , REC‐221 Customer HVPNL Scenario Date Design &Engineering, EPC 6 23/11/2018 Checked BMS 1 ∝ Rev 1 VSG Approved 605 ° 7 Resistivity of conductor at reference temperature 15.9 µΩ ‐ m 8 Thermal capacity per unit volume 3.28 9 Time duration for sizing the earth mat conductor 1 S 10 Current for sizing of earth mat conductor 40 kA 11 Soil resistivity for corrosion allowance 50 Ohm ‐ m ∗ ° Grid configuration 1 Grid shape Rectangle 2 Maximum length in X – direction 289.737 m 3 Maximum length in Y – direction 187.158 m 4 Spacing between parallel conductors 30 m 5 Number of conductor along the length wise 15 6 Number of conductor along the width wise 10 7 Number of electrodes 219 8 Length of individual electrode 3 m 9 Total length 6361.74 m 10 Total area of earth mat 54226.6 m 11 Total length of grid conductor 5704.74 m 12 Periphery length of the earthing equivalent area 953.79 m 13 Total ground rods length 657 m Page 2 of 6 TBEA Energy (India) Pvt. Ltd. Calculation Grounding calculation (as per IEEE 80) Project Mehnakhera , REC‐221 Customer HVPNL Scenario Date Design &Engineering, EPC Checked 23/11/2018 BMS Rev 1 VSG Approved Output Symmetrical with rod ‐ Database 1 Ampacity calculation 1 ∗ ∗ ∗ ∝ ∗ 2 325.1200 ln Check the size of the selected conductor whether it is sufficient or not ∗ 4 20.35106006 mm dmin with corrosion dmin 2*corrosion allowance 24.99906006 mm Minimum cross section required with corrosion allowance 490.588108 Cross section of selected conductor 1256 In case of conductor to be laid in soil having soil resistivity from 25 to 100 Ω‐m – 91.5 mils 2.324 mm Reference : Design of steel Earthing Grids in India, IEEE transactions on Power Apparatus and Systems, Vol. PAS‐98 No. 6 Nov./Dec 1979, pp 2126‐2134 3 The reduction factor de – rating factor Cs Page 3 of 6 Calculation Grounding calculation (as per IEEE 80) Project Mehnakhera , REC‐221 Customer HVPNL Scenario TBEA Energy (India) Pvt. Ltd. Date Design &Engineering, EPC Checked 2 ∗ Rev 1 VSG Approved 0.694828 0.09 Tolerable touch and step voltage 1.5 ∗ 6 ∗ 5 BMS 0.09 ∗ 1 1 4 23/11/2018 ∗ ∗ 478.7 V 1566.8 V 0.103336 Ω Grid configuration ∗ Split Factor 1 1 √20 ∗ ∗ 1 1 1 ∗ Sf 0.6 Symmetrical grid current Ref. IEEE 80 clause no. 15.1.6 Ig Sf * If 0.6 * 40000 24000 Decremental Factor Ref. IEEE 80 clause no. 15.1.4 & 15.10 Df 1 Corrective projection factor Cp Cp IG 1 Df * Cp * Ig 24000 Page 4 of 6 A TBEA Energy (India) Pvt. Ltd. Calculation Grounding calculation (as per IEEE 80) Project Mehnakhera , REC‐221 Customer HVPNL Scenario Date Design &Engineering, EPC 23/11/2018 Checked BMS Rev 1 VSG Approved Maximum Ground Potential Rise Ref. IEEE 80 clause no. 3.14 & 8.1.1 GPR Ig * Rg GPR 2480.072 Tolerable Touch Voltage GPR for switchyard is exceeding tolerable touch voltage. Hence, further check for attainable Touch/Mesh voltage and Step voltage shall be carried out. 6 Calculation of attainable step and touch voltage ∗ ∗ ∗ 12.10477 1 1 2 ∗ 1 1 2 ∗ ∗ ln 0.644 1.264911 0 16 ∗ ∗ 8 ∗ 2 ∗ ∗ ln 4 ∗ 8 ∗ 2 ∗ 1.22 ∗ 0.963963 2.435505 0.148 ∗ 1.55 1 ∗ 6730.061 m 418.6119 V Attainable Mesh/Touch Voltage ∗ ∗ ∗ Page 5 of 6 TBEA Energy (India) Pvt. Ltd. Calculation Grounding calculation (as per IEEE 80) Project Mehnakhera , REC‐221 Customer HVPNL Scenario Date Design &Engineering, EPC 1 ∗ 1 2 ∗ 0.75 ∗ 23/11/2018 Checked 1 BMS 1 ∗ 1 Approved 0.5 Rev 1 VSG 0.307846 0.85 ∗ 4837.005 m 186.0061 V Attainable Step Voltage ∗ 7 ∗ ∗ Safety check Attainable voltage V Tolerable voltage V Touch voltage 418.6119 478.7 Step voltage 186.0061 1566.8 Conclusion The attainable touch and step potentials are lower than tolerable values with considerable amount of difference, hence the design is valid and the proposed Grid Configuration can be used for Earthing in switchyard. Page 6 of 6