Algebra 1 Polynomial Project DUE DATE: Wednesday, May 8th, 2019 DOUBLE GRADE – PROJECT & TEST Answers must have supporting work on a separate sheet(s) of paper. Sloppy work will not be graded. NO WORK = NO CREDIT!! NOTE: All dimensions are in feet, indicate appropriate units on the answer sheet. Step 1. Expressing perimeters as polynomial expressions On a separate sheet of paper work each of the questions below. • Your work must be clearly numbered, labeled and neat. Answers must be in simplified form. All answers are polynomial expressions. 1) 2) 3) 4) Find the perimeter of each room. Record your answers on the answer sheet. Find the perimeter of the Master Bedroom and the Master Closet. Find the perimeter of the Bedroom, Closet, and Bathroom. Find the perimeter of the whole house. • Step 2. Calculating perimeters • • On a separate sheet of paper work each of the questions below. Your work must be clearly numbered, labeled and neat. 5) The perimeter of the kitchen and the perimeter of the dining room are exactly the same. Write an equation to represent that the perimeters are equal. 6) Solve the equation you wrote in #5 for x. 7) Substitute the value you found for x to find the perimeter of each room. Record your answer on the answer sheet. 8) Substitute the value you found for x to find the perimeter of the whole house. Step 3. Expressing areas as polynomial expressions On a separate sheet of paper work each of the questions below. • • Your work must be clearly numbered, labeled and neat. Answers must be in simplified form. All answers are polynomial expressions. 9) Find the area of each room. Record your answers on the answer sheet. Step 4. Calculating areas • • On a separate sheet of paper work each of the questions below. Your work must be clearly numbered, labeled and neat. 10) Using the same x-value you solved for from the perimeter, find the areas of each room. Record your answer on the answer sheet. Step 5. Application Problems • • On a separate sheet of paper work each of the questions below. Your work must be clearly numbered, labeled and neat. 11) You want to put carpet in the Master Bedroom, the Master Closet, the Bedroom, the Closet, and the Living Room. You checked with various stores and found that the best deal was given by a company who will charge you $3.95 per square foot (this includes carpet pad and labor). Calculate the total cost for carpeting these rooms. 12) You want to put vinyl flooring in the Bathroom. You checked with various stores and found that the best deal was given by a company who will charge you $3.50 per square foot (labor included). Calculate the total cost for the vinyl flooring. 13) You want to put hardwood flooring in the Hallway. You checked with various stores and found that the best deal was given by a company who will charge you $4.99 per square foot plus $325 for labor. Calculate the total cost for the hardwood flooring. 14) You want to put ceramic tile flooring in your Kitchen and Dining Room. You checked with various stores and found that the best deal was given by a company who will charge you $2.95 per square foot plus $375 for labor. Calculate the total cost for the ceramic tile flooring. Name: ________________________________ Period: __________ Polynomial Project Answer Sheet All answers must be recorded in the spaces provided, including the units. All work must be attached and numbered/labeled appropriately. Step 1: Expressing perimeters as polynomial expressions Room Living Room Perimeter Expressions 1a) Perimeter Calculations 7a) Closet 1b) 7b) Bedroom 1c) 7c) Bathroom 1d) 7d) Master Bedroom 1e) 7e) Master closet 1f) 7f) Kitchen 1g) 7g) Dining Room 1h) 7h) Hallway 1i) 7i) Master Bedroom and Master Closet Bedroom, Closet, and Bathroom Whole House 2) 3) 4) 8) Step 2: Calculating Perimeters 5) Equation:__________________________________________________ 6) Solution to equation from #5: x = _________________ Steps 3 & 4: Expressing areas as polynomial expressions & Calculating areas Room Living Room Area Expressions 9a) Area Calculations 10a) Closet 9b) 10b) Bedroom 9c) 10c) Bathroom 9d) 10d) Master Bedroom 9e) 10e) Master closet 9f) 10f) Kitchen 9g) 10g) Dining Room 9h) 10h) Hallway 9i) 10i) Step 5: Application Problems 11) Total cost for carpeting: __________________________________________________ 12) Total cost for vinyl flooring: _______________________________________________ 13) Total cost for hardwood flooring: __________________________________________ 14) Total cost for ceramic tile flooring: _________________________________________ 𝟐𝟐𝒙𝒙𝟐𝟐 − 𝟔𝟔 𝟐𝟐𝟐𝟐 − 𝟏𝟏 𝒙𝒙𝟐𝟐 − 𝟏𝟏 𝒙𝒙𝟐𝟐 − 𝟓𝟓 𝟓𝟓𝟓𝟓 − 𝟑𝟑 𝒙𝒙 − 𝟏𝟏 𝒙𝒙 + 𝟑𝟑 𝟓𝟓𝟓𝟓 − 𝟖𝟖 𝒙𝒙𝟐𝟐 − 𝟓𝟓 Not drawn to scale