Surveyor: Name Matric Muhammmad Raihan Bin Mohd Razlan 2018265016 Nurul Aqilah Binti Zulkarnain 2017655194 Nik NurAzlin Binti R Azmi 2017861722 Khairul Azhar Bin Khalid 2018265214 Muhammad Eilman Arief Bin Rosli 2017639342 Syaza Binti Sanai Dundang 2017741911 PROPERTY INFORMATION • The Building was A 1 ½ storey Bungalow House located in Seremban,Negeri Sembilan. • Name Of Owner : Azami Bin Mohamad • Age Of Building : Approximately 5 Years • Lot Size : 60’ X 80’ No Element Component 1. Structure Reinforced concrete formwork 2. Walls Concrete wall / Masonry wall 3. Roof Concrete roof tiles / Concrete roof slab 4. Ceiling Plaster ceiling / Scheme coat to soffits of concrete slab 5. Windows Aluminium casement Top hung window / fixed glass 6. Door Main entrance (Aluminium Frame Panel Double Door), Bedrooms (Aluminium Frame Panel Door), Bathrooms (Aluminium Frame Flush PVC Door), Store (Aluminium Frame Louvers Door), Balcony (Aluminium Frame Glass Sliding Door) 7. Lockset Quality locket 8. Floor finishes Living, Dining room, Family hall, Bedroom, Bathroom and Kitchen, Car porch, Balcony 9. Wall finishes Kitchen, Bathroom and others 10. Paint Quality Paint 11. Sanitary Install Quality Sanitary Fitting , Sitting water closet -5 Nos, Hand basin -6 Nos, Shower -5 Nos, Kitchen sink -1 No 12. Electric Installation Lighting point (33 Nos), Wall Lighting Point (2 Nos), 13 Amp switch socket outlet (22 Nos), 15 Amp switch socket outlet (8 Nos), Ceiling fan point (8 Nos), Water heater point (5 Nos), Astro point (2 Nos), Door bell point (1 No), Auto gate point (1 No), Gate light point (2 Nos), Telephone (2 Nos) 13. Fencing Front and side: Concrete low wall Rear: Concrete low wall Main gate: Mild steel swing gate 14. Driveway Ceramic tiles BUILDING VIEW Right view Left view FABRIC AND COMPONENT • Staircase Width 1120mm Steps 170mm Riser 170mm Landing 1120mm Handrail Aluminium wall mounted handrail • Window ITEM MATERIAL Aluminium Casement Window Aluminium, Glass, Grill (2 panel) (1200mm x 2100mm) Aluminium Casement Window Aluminium, Glass, Grill (3 panel) (1800mm x 2100mm) Aluminium Top Hung Window (1 panel) Aluminium, Glass, Grill (600mm x 600mm) Aluminium Casement Corner Window Aluminium, Glass, Grill (1200mm x 2100mm) Aluminium Top Hung Window (2 panel) Aluminium, Glass, Grill (1200mm x 600mm) • FLOOR Details Dimension Location Living hall, Dining, Decorative, Lily White 600mm x 600mm Family Hall, Bedrooms and Kitchen Plain, Dark Grey 300mm x 300mm Bathroom 4 Plain, white 300mm x 300mm Bathroom 1,2,3 and 5 Decorative, Orange 600mm x 300mm Apron and Balcony 600mmx600mm Decorative Lily 600mmx300mm Decorative Orange • DOOR DESCRIPTION CONDITION Aluminium Frame Panel Double Door Good Aluminium Frame Flush PVC Door Good Aluminium Frame Glass Patio Sliding Good Door Aluminium Frame Louvered Door Good Aluminium Frame Panel Single Door Good Aluminium frame flush PVC Door Aluminium frame panel single door SERVICES • Water Supply The building is equipped with water supply from Syarikat Air Negeri Sembilan (SAINS). • Sanitary System No Types of Sanitary Quantity 1 Water Closet 5 2 Hand Basin 6 3 Kitchen Sink 1 4 Shower 5 Electricity Supply • The electrical services are supplied by Tenaga Nasional Berhad (TNB) Electrical Installation Quantity Details Lighting point 33 Fluorescent, LED Wall Lighting Point 2 LED 13 Amp switch socket outlet 22 - 15 Amp switch socket outlet 8 Not in used Ceiling Fan 8 5 blades, remote controlled Water Heater Point 5 Not in used ASTRO Point 2 1 not in used Door Bell Point 1 - Auto Gate Point 1 Not in used Gate Light Point 2 LED Bulb Telephone Point 2 Not in used Defect Diagnosis: 1. 2. 3. Interior window condensation Dampness under the window frame spread to the nearest wall. The diagonal and horizontal crack can be seen and there were horizontal voids under the window frame Prognosis: 1. 2. The level of condensation will increase Mould and algae will growth Remedies: 1. 2. Apply water proofing solution and cement wash with admixture of adhesive gum applied on one or more coat Remove the plaster either from external or internal, then replaced with new mortar of rich proportion with admixture of water proofing compound. Defect Diagnosis: 1. 2. Dampness on water proof membrane Water ponding on the surface and the presence of mould Prognosis: 1. 2. Increase in mould growth as the water keep stuck on the surface and not drained properly Will cause moisture problem to the ceiling below the flat roof area Remedies: 1. 2. 3. Use a stiff brush to remove as much of the mould as possible. Wash the surface with 1:3 ratio of bleach solution and water and brush it off. Apply a coat of stain-blocking primer to the slab Defect Diagnosis: 1. 2. Bulging of tiles Poor installation of floor finishes Prognosis: 1. 2. 3. Allow cracks to the tiles Allow more moisture to reach or any debris or insects hideout Safety hazard that can make people trip Remedies: 1. 2. 3. 4. Removes and loosen the tile Fill in sand and floor patching compound in any low spot Retiled and replace damaged parts Follow manufacturer’s instructions when laying down new subfloor Defect Diagnosis: 1. Vertical/hairline crack in 1.2 m Prognosis: 1. 2. Increasing length and width of crack Potential of structural problem Remedies: 1. 2. 3. 4. 5. Cover the crack with either mesh joint tape or joint compound Followed by thin layer joint and compound Allow to dry, apply second coat of joint compound Allow to dry overnight, lightly sand until smooth Paint the wall Defect Analysis • the highest percentage of defect detected is crack which was located mostly at both interior and exterior wall and also fencing wall. • Although it has a high count, the condition of each crack was still at minor stage. • serious crack which left without being taken any action can lead to other defect such as moisture penetration • third defect which contributed 8% flaws in the building is blistering and peeling of paint on the wall. • The other defects such as stain mark, faded paint, missing component and rusting that being recorded were mostly at low quantity in 4%. Element Analysis • Windows and external wall element was sharing the same percentage of defect number with 13%. • floor finishes should be bedded with tiles adhesive to avoid hollowness. • The average finding of elements analysis were ceiling, floor, door, roof and drain with a range of 4% to 8% fair share. Category Of Cause Analysis • Major factor of defect is workmanship that would cause other problem arise such as dampness and tiles bulging. Causes Analysis 35% 31% 28% 30% 22% 25% 20% 15% 10% 7% 7% 4% 5% 0% n Co r st or W vir En o sa ge -u M en nm an n io i sh an km m na nc te ain M t uc t p e at Hu l ria e n sig De • Second major defect is environment and construction material that lead such as mould and blistering of paint mostly affected the wall. • Environment factor could be the results of defective external element of the property due to extreme weather of rain and humid temperature. Defects Rectification Cost Bulging tiles Item F8 Description - - Removes and loosen the tile Fill in sand and floor patching compound in any low spot Retiled and replace damaged parts Unit Quantity Rate(RM) Amount (RM) m2 0.36 52.23 52.23 Analysis of Price RM RM RM A)Removes and loosen the tile i) Labour Cost Unskilled worker RM12.70 x 1 hour x 0.36 4.57 B)Fill in sand and floor patching compound in any low spot i) Labour Cost Unskilled worker 7.31 RM20.30 x 1 hour x 0.36 C) Retiled and replace damaged parts i) Ceramic tiles 300mm x 300mm x 8mm i) Labour Cost Unskilled worker/8hours x 1 30.00 hour RM82.80 /8 x 1 hour 10.35 40.35 52.23 2) Dampness Item F5 Description Unit Quantity Rate(RM) Amount (RM) Remove all debris, install new sealant, scrap the affected area, overall size 0.5m length x 0.7m width, paint the surface using undercoat and emulsion paint m² 0.35 160.51 160.51 Analysis of Price a) Remove all debris from the area i) Labour Cost Unskilled worker/8hours x 0.5 hour RM55/8 x 0.5 hour a) Scrap the affected area i) Labour Cost Unskilled worker x 0.5hrs x 0.35m² RM4.30 x 0.5 hours x 0.35m² RM RM 3.44 0.75 RM Analysis of Price a) RM RM RM Prepare the surface and paint one layer of undercoat paint on the surface i) Material Cost Nippon Vinilex 5400 Wall Sealer 5L i) 105.00 Labour Cost Painter x 1.0hrs x 0.35m² 1.44 106.44 RM4.10 x 1.0hrs x 0.35m² a) Paint two layer of emulsion paint on the surface i) Material Cost 7 litre Colourland Paint Interior Colour Lite 44.00 Emulsion Paint i) Labour Cost Painter x 2.0 hour x 0.35m² RM8.40 x 2.0 hour x 0.35m² 5.88 49.88 160.51 Conclusion & Recommendation • The most major defect found in this building is crack but it only consists of jointing and hairline crack which is not a severe defect. • Mostly defect in this building was detected at wall element which are peeling of paint, blistering and hairline crack • this building can properly function and safe to its occupant, a remedial work must be carried quickly to prevent defect like bulging tiles and jointing crack that cause harm to other people and damaging the building. • owner to take the actions to the higher percentage of defect which is cracks, dampness and blistering DEFECT INDICATION PLAN