Cost Retification

advertisement
Defects Ratification cost
Bulging tiles
Item
Description
Unit
Quantity
Rate(RM)
Amount (RM)
F8
Removes and loosen the tile
Fill in sand and floor patching
compound in any low spot
Retiled and replace damaged
parts
M2
0.36
52.23
52.23
RM
RM
Analysis of Price
RM
A)Removes and loosen the tile
i) Labour Cost Unskilled worker
RM12.70 x 1 hour x 0.36
4.57
B)Fill in sand and floor patching
compound in any low spot
i) Labour Cost Unskilled worker
7.31
RM20.30 x 1 hour x 0.36
C) Retiled and replace damaged parts
i) Ceramic tiles 300mm x 300mm x
8mm
i) Labour
Cost
Unskilled
30.00
worker/8hours x 1 hour
RM82.80 /8 x 1 hour
10.35
40.35
52.23
Dampness
Item
F5
Description
Unit
Quantity
Rate(RM)
Amount (RM)
Remove all debris, install
new sealant, scrap the
affected area, overall size
0.5m length x 0.7m width,
paint the surface using
undercoat and emulsion
paint
m²
0.35
160.51
160.51
Analysis of Price
RM
RM
a) Remove all debris from the area
i) Labour
Cost
Unskilled
worker/8hours x 0.5 hour
RM55/8 x 0.5 hour
3.44
b) Scrap the affected area
i) Labour Cost Unskilled worker
x
0.5hrs x 0.35m²
RM4.30 x 0.5 hours x 0.35m²
0.75
c) Prepare the surface and paint one
layer of undercoat paint on the
surface
i) Material Cost
Nippon Vinilex 5400 Wall Sealer
5L
ii) Labour Cost
105.00
RM
Painter x 1.0hrs x 0.35m²
1.44
106.44
RM4.10 x 1.0hrs x 0.35m²
d) Paint two layer of emulsion paint on
the surface
i) Material Cost
44.00
7 litre Colourland Paint Interior
Colour Lite Emulsion Paint
ii) Labour Cost
Painter x 2.0 hour x 0.35m²
RM8.40 x 2.0 hour x 0.35m²
5.88
49.88
160.51