HY-8 Analysis Results Crossing Summary Table Culvert Crossing: Culvert Analysis Headwater Elevation (ft) Total Discharge (cfs) Culvert 1 Discharge (cfs) Roadway Discharge (cfs) Iterations 316.80 317.58 317.97 318.28 318.54 318.77 318.98 319.17 319.36 319.53 319.69 320.50 0.00 3.70 7.40 11.10 14.80 18.50 22.20 25.90 29.60 33.30 37.00 58.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1 1 1 1 1 1 1 1 1 1 1 Overtopping 0.00 3.70 7.40 11.10 14.80 18.50 22.20 25.90 29.60 33.30 37.00 58.81