CADANGAN PEMBANGUNAN PANGSAPURI PERKHIDMATAN DI ATAS LOT 161544, JALAN BATU NILAM 16, BANDAR BUKIT TINGGI, DAERAH KLANG, SELANGOR DARUL EHSAN UNTUK TETUAN GEMILANG WARAS SDN. BHD. TOWER CRANE FOUNDATION SUPPORT DESIGN CRANE MODEL : QTZ5522 (2.0m MAST) MAXIMUM FREE STANDING 41.1m TC 2 (GRIDLINE 12-13/A-B ) AKUAN: I hereby certify that these works have been designed by me in accordance with sound engineering practice and that i take full responsibility for the design and proper performance of the same. MAIN CONTRACTOR: ENG HAN ENGINEERING SDN. BHD. PREPARED BY: TOWER CRANE INSTALLER: IR NG KIM AIK TECHKON MACHINERY 38-1, JALAN 6/38D, TAMAN SRI SINAR, SEGAMBUT, 51200 KUALA LUMPUR TEL: 03 6275 6552 FAX: 03-6275 9552 PS/EHE/2015/APR/01/B 26/Jun/2015 REV-02 PROJECT CADANGAN PEMBANGUNAN PANGSAPURI PERKHIDMATAN DI ATAS LOT 161544, JALAN BATU NILAM 16, BANDAR BUKIT TINGGI, DAERAH KLANG, SELANGOR DARUL EHSAN UNTUK TETUAN GEMILANG WARAS SDN. BHD. DESIGN ASSUMPTION 1./ THE TOWER CRANE IS DESIGNED FOR THE MAXIMUM FREE STANDING HEIGHT AS STATED. 2./ FOR HEIGHT EXCEEDING THE FREE STANDING HEIGHT, TIE AT INTERMEDIATE LEVEL SHALL BE PROVIDED. 3./ THE TOWER CRANE WAS FITTED ON THE NEW FOUNDATION PILECAP. 4./ DESIGN CALCULATIONS ARE BASED ON TORQUE MOMENT AND REACTION FORCES PROVIDED BY THE CRANE'S MANUFACTURER. 5./ THE TOWER CRANE FOUNDATION SUPPORT BASE SHALL KEPT FREE FROM WATER/ MUD AND BARRICAEDED ALL AROUND FOR SITE SAFETY. 6./ NO EXCAVATION SHALL BE ALLOWED NEAR THE TOWER CRANE FOUNDATION. 7./ THE TOWER CRANE IS CATEGORISED AS TEMPORARY STRUCTURE AND IS THE SOLE RESPONSIBILITY OF BUIDLING CONTRACTOR ONLY. 8./ CONTRACTOR SHALL REPORT CHANGES ON SETTING OUT AND MATERIALS ON SITE TO TOWER CRANE DESIGN & SUBMISSION ENGINEER BEFORE COMMENCEMENT OF WORKS. 9./ TOWER CRANE COMPONENTS AND ITS FIXING PART ARE THE PROPIETARY SYSTEM OF THE MANUFACTURER AND HENCE NOT COVER UNDER THIS REPORT. PROJECT CADANGAN PEMBANGUNAN PANGSAPURI PERKHIDMATAN DI ATAS LOT 161544, JALAN BATU NILAM 16, BANDAR BUKIT TINGGI, DAERAH KLANG, SELANGOR DARUL EHSAN UNTUK TETUAN GEMILANG WARAS SDN. BHD. INTRODUCTION Design check of tower crane support foundation. CRANE TYPE/ MODEL MANUFACTURER'S ORIGIN = CHINA CRANE MODEL = QTZ5522 MAX. JIB LENGTH (TO MANUFACTURER'S RECOMMENDATION AS FINAL) = 55 m MAX. FREE STANDING HEIGHT UNDER HOOK = 41.1 m MAST WIDTH, B = 2.0 m DESIGN PARAMETER (BASED ON RECOMMENDATION BY CRANE MANUFACTURER) SELF-WEIGHT OF TOWER CRANE AT BASE LEVEL, MAX = = 753 kN 75.3 TONNES MOMENT OF TOWER CRANE AT BASE LEVEL, Mc MAX. = 2838 kNm HORIZONTAL FORCE OF TOWER CRANE AT BASE LEVEL, H MAX = 129 kN PROJECT CADANGAN PEMBANGUNAN PANGSAPURI PERKHIDMATAN DI ATAS LOT 161544, JALAN BATU NILAM 16, BANDAR BUKIT TINGGI, DAERAH KLANG, SELANGOR DARUL EHSAN UNTUK TETUAN GEMILANG WARAS SDN. BHD. MANUFACTURER'S PROVIDED MOMENT AND SHEAR FORCES PROJECT CADANGAN PEMBANGUNAN PANGSAPURI PERKHIDMATAN DI ATAS LOT 161544, JALAN BATU NILAM 16, BANDAR BUKIT TINGGI, DAERAH KLANG, SELANGOR DARUL EHSAN UNTUK TETUAN GEMILANG WARAS SDN. BHD. PILECAP WIDTH (SQUARE) PILECAP EDGE TO PILES CENTER PILECAP DEPTH PILECAP SELFWEIGHT PILE TO PILE CENTER SPACING EFFECTIVE SPACING DIAGONAL PILE LENGTH DIAGONAL PILE LENGTH/2, y TOWER CRANE MOMENT, Mc ADDITIONAL MOMENT TOWER CRANE WEIGTH, Nc = = = = = = = = = = = 1 m m m KN m m m m KNm KNm KN PILE = 3 2 P2 P1 4 B 5 6 P3 *ASSUME PILES AT 4 CORNERS OF THE PILECAP, P1->P4 5.50 0.475 1.80 1307 4.55 4.55 6.435 3.217 2838 232.2 753 P4 7 8 B VERTICAL FORCES, Pmax/ min. = Nc/n + or - Mc*y/Ixy Nc + PILECAP n Mc+ADD. y y1 Ixy Ixy1 LOADCASE 1 2 3 4 5 6 7 8 = = = = = = = P1 852 178 992 38 852 178 515 515 Total vertical load Number of PILE POINT Total moment Diagonal distance from centre 90 deg. Distance from centre Second moment of area, y Second moment of area, y1 VERTICAL FORCES (KN) P2 P3 178 852 852 178 515 515 515 515 852 178 178 852 992 38 38 992 PILES CHK. PRECAST R.C. CONCRETE PILES ASSUMED PILES WORKING LOAD (PILE TO SET) EACH CORNER REQUIRED PILES NOS., MINIMUM P4 178 852 38 992 178 852 515 515 = = = = = = = CHK 2060 2060 2060 2060 2060 2060 2060 2060 2060 4 3070.2 3.217 2.275 20.7 10.4 KN KNm m m m4 m4 WORKING LOAD Max +ve = 992 KN Max -ve = 38 KN +VE = COMPRESSION -VE = UPLIFT/ TENSION = = = = 500 1200 120 1 mm DIA. KN/ PILE TONNES NOS AT EACH CORNER 500 mm DIA. PROJECT CADANGAN PEMBANGUNAN PANGSAPURI PERKHIDMATAN DI ATAS LOT 161544, JALAN BATU NILAM 16, BANDAR BUKIT TINGGI, DAERAH KLANG, SELANGOR DARUL EHSAN UNTUK TETUAN GEMILANG WARAS SDN. BHD. PILECAP DESIGN (BS8110) 475 4550 475 28T25 475 h 4550 y 5500 b 475 x 28T25 av *SHAPE FOR ILLUSTRATION 5500 1. MAST size : b= 2000 mm h= 2000 mm 2. Pile size/diameter, hp = 500 mm 3. Pilecap thickness = 1800 mm Effective depth of cap,d = 1687.5 mm 4. Spacing factor of pile, x = 9.1 Pile spacing, s 4550.0 mm 5. Pile capacity, 1200.0 KN 6. Max. deviation of pile = 75.0 mm BENDING REINFORCEMENT (in x and y -Direction) Concrete grade, fcu = 30 N/mm2 Steel grade, fy = 460 N/mm2 Maximum moment, M = 4860.00 KNm K= 0.0103 z=d{0.5+[0.25-(K/0.9)]^0.5} = 1603.13 mm As required = M/(0.87fyz) = 7575.16 mm2 As minimum = 0.13%Ac = 12870.0 mm2 Diameter of rebar used = 25 mm Min nos. of rebar required = 27 As provided = < 0.95d 1667.88 mm 0.95d = 1603.13 mm ~ Governed Nos. of rebar provided = ~ Provide 28T25 13744.47 mm2 % rebar provided = z original = Bar spacing = 28 173.2 mm > Asreq, OK 0.14 %Ac > 0.13% and < 4.0%, OK SHEAR CHECKING (in x and y -Direction) Shear force, V = 3600.0 KN Actual shear stress, v = 0.388 N/mm2 Critical shear stress, vc based on Table 3.9 of BS8110 : Pt 1 vc = av = 100As/bd = 0.148 original 400/d = 0.237 400/d = 1.000 0.355 N/mm2 1125.0 mm Allowable shear stress,vc modified = av < 2d, OK 1.066 N/mm2 2d = 3375.0 mm v < vc, OK PUNCHING SHEAR AROUND PILE 0.8*Fcu^0.5 = Smallest perimeter, Uo, to be 20% inside the pile = 1200 mm Max design shear stress = 1.78 N/mm2 < 4.38 4.38 N/mm2 OK BAR ANCHORAGE LENGTH (BS 8110) (i) x and y -Direction a/d = 0.667 Bond factor, BF = 1.333 ~ Full truss action Permissible anchorage bond stress, fba = 0.5(fcu)^0.5 = 3.98 N/mm2 2.739 N/mm2 fba = 3.98 N/mm2 Anchorage bond length required, L = (Dia. of bar* 0.87*BF* Asreq)/(4*fba*Asprov) L= 785.6 mm Permissible bearing strength, fr = (2*fcu)/{1 + 2(dia/spacing of bar)} fr = 46.56 N/mm2 Internal radius of bend, r = {(Pi*dia*0.87*fy*BF*Asreq)/(4*fr*Asprov)}*(length of bar after start of bend/L) r= 190.36 mm Effective anchorage bend of hook = 300.0 mm Start of anchorage to the edge of pilcap = (Pi*dia*0.87*fy*BF*Asreq)/(4*fr*Asprov) = 12*dia = 300.0 mm 4*r = 761.4 mm 475.0 mm 210.72 centre of pile 475.0 mm 275.97 mm (start of anchorage) 473 -18.65 mm r 190.36 mm 25 mm 300.0 mm 209.6 190.36 Cut section details * ALLOW MIN. 1200mm BEND UP LENGTH ATTACHEMENT : FOUNDATION DRAWING 26/6/2015 0 9 0 . 26/6/2015