Hazard Identification, Risk Assessment & Determining Control (HIRAC) BS OHSAS 18001:2007 HIRAC What is Hazard? What is risk? Source Situation Likelihood of occurrence of hazardous event Act Risk Harm or ill health What is Ill Health? ill health Adverse physical Severity of injury / ill health Adverse mental condition HIRAC Why HIRAC ? Legal Factor Human Factor Save Life Act / Rule Financial Factor Cost Reduction Minimize risk of life Minimize Injury Penalty Stack holder Contract Condition Staff moral Productivity HIRAC Provide appropriate controls ALL PURPOSE Activities Sub activities Process Task Risk level likelihood Associated consequences identify OH&S hazards PERFORMED AT Head Office Regional Office Workshop Projects Assessing Risk What is a risk assessment? “Process of evaluating the risk arising from a hazard (s), taking into account the adequacy of any existing controls, and deciding whether or not the risk(s) is acceptable”. Why risk assessment required? You Risk Assessmen t Requireme nt Business Other Assessing Risk Factors to be considered while assessing risk: People Equipment Factors Process activity Location Assessing Risk Probability Low Low Assessing Risk Probability Low Medium Assessing Risk Probability Low Medium High Assessing Risk Probability Assessing Risk Severity High Medium Low Assessing Risk Assessing Risk RISK 5 15 25 Assessing Risk Evaluate the Risk / Risk assessment Matrix Probability: 5 5 15 25 5 – Certain Increasing Probability 3 – Likely 3 3 9 15 1 1 3 5 1 – Unlikely Severity: 5 – Catastrophic 1 Increasing Severity 3 5 3 – Major 1 – Minor Assessing Risk RISK PRIORITY CHART - Severity Occupational Safety Hazard (Severity) Severity of risk Description Minimal •First aid injury •Injury (absence less than 48 hrs) •Resume work immediately after FA or within 48 hrs; •Minor delay to resume operation. •Cost of property damage within INR 50,000/- Major/Serious •Lost time injury (absence more than 48 hrs), •Temporary/permane nt disablement •Resume work after 48 hours •Temporary/permanent disablement of body organ •Suspension of operation for few hours •Property damage cost between INR 50000/- to INR/- 10,00,000/ Catastrophic Fatalities or Collapsing of structure •Loss of life; total failure of machinery or catastrophic damages (structural damages etc) •Undefined Suspension of operation . •Damage above INR 10,00,000/- Occupational Health Hazard (Severity) Severity factor Severity of risk Description Severity factor 1 Minimal •Medical aid illness •ill health less than 48hrs •Resume work immediately after FA •Resume work within 48 hrs 1 3 Major/Serious •ill health •Absence more than 48hrs or disabling illness •Resume work after 48 hrs •Disabling illness resulting into disablement of body organ. 3 5 Catastrophic •Death due to Occupational diseases Death due to Occupational diseases 5 Assessing Risk RISK PRIORITY CHART - Probability Probability ( Occupational Safety and health Hazard) Probability factor Probability of risk Description Unlikely Never known to have happened in GIL or other industry 1 Likely Known to have happened more than once in GIL projects 3 Certain Sure to happen or happens regularly at the project 5 Assessing Risk RISK LEVEL INDEX AND ACTION Risk Score (Range) 1 to 3 5 to 9 Above 9 Risk Level Action Low A risk identified as low may be considered as acceptable and further reduction may not be necessary. However, if the risk can be resolved quickly and efficiently, control measures should be implemented and recorded. Medium A risk requires a planned approach to controlling the hazard and applies temporary measure if required. Actions taken must be documented on the risk assessment form including date for completion. High A risk requires immediate action to control the hazard as detailed in the hierarchy of control. Actions taken must be documented on the risk assessment form including date for completion. Controlling Risk 5 5 15 25 How do you reduce risk? Reduce Probability 3 Reduce Severity Reduce both 3 9 15 1 1 3 5 1 3 5 • • • Increasing Probability If you want to reduce the risk, you’ll need to: Increasing Severity Controlling Risk Level To decide on the risk control there is a hierarchy of risk control i.e. 1. Eliminate hazard E.g. eliminating the need to work in a confined space. 2. Substitution E.g. using a hydraulic machine in wet condition instead of electrical power driven machine to avoid shock hazards. 3. Engineering control E.g. installing guarding on equipment or operating machinery remotely 4. Administrative controls 5. PPE E.g. displaying warning signs or providing safety training E.g. using respiratory protection to minimize exposure to inhalation of silica dust, fine particles, cement dust etc. Controlling Risk level Increasing Probability Example - 1 5 5 15 25 3 3 9 15 1 1 3 5 1 3 5 Increasing Severity Controlling Risk level Increasing Probability Example - 2 5 5 15 25 3 3 9 15 1 1 3 5 1 3 5 Increasing Severity Controlling Risk Risks must be reduced so far as is reasonably practicable Hazards Under age workers Damaged grinding wheel Non usages of PPE’s Untrained workers No wheel guard Unprotected & improper storing of cylinders Wet Floor No plug top Unguarded tools Consequences Legal Violation results work stop / penalty Personnel Injury result to cut injury / breathing problem Hit injury to personnel results LTA Braking of wheel causing injury to personnel Personnel injury while performing job Body trap may result into major injury Electrocution Slipping of personnel result major injury / electrocution Contact of human body results cut / crush injury Control Measures Control Measures Deploy worker those have completed 18 year Use of proper grinding wheel (size) Conduct trade test before selection / deployment Use trolley, proper cable routing, secure in vertical position Sign Board, Housekeeping Mandatory Use of quality PPE’s Provide Wheel guard as per manufacturer recommendation Provide Plug top , check periodically Review of Risk Assessment •Amendment of any legislation •At least once in six months. •New type of job •Changing in existing process/activity •Modification in site layout •Current SOP / Method statement Changed •New safety equipment / equipment deputed •After any incident / accident investigation •As a result of safety audit, safety inspection etc HIRAC Documents DETAIL PROCESS • Procedure of HIRAC - GIL-ORGN-MGM-D-022 • Format of HIRAC - GIL-ORGN-MGM-F-022 • Sample HIRAC register – Batching Plant