HSE Action Plan for Working at Height
No.
Recommendation
Finding
Action
Responsible
Person(s)
Status
Completion
date
DESIGN CHANGE:
1
Change management under
No changes in CDM and related
Construction Design Management construction activity
(CDM) relating to construction
sequence.
No further action required unless
there is any new changes on design
108/Upper Tier – Duct Removal GNL
Revised method statement for the Catwalk Cable Tray iinstallation –
change of work, change of
Somi Qatar
sequence,
METHOD STATEMENT REVIEW
2
PERMIT TO WORK
3
Review the application of permit
and Approving Authority
MEP Support &
Plaza Area
Other area comply with WAH
Permit
Log book
1
CM/HSEM
TBA
TBA
RISK ASSESSMENT METHOD
STATEMENT (RAMS) BRIEFING
4
Briefing conducted as per RAMS
Review RAMS and conduct
briefing to all
PRE TASK BRIEFING
5
Conducted on daily basis before
start of activity
To conduct the Pre Task briefing
at the exact work location
COMMUNICATION BARRIERS
comply
6
Multiple language
Awareness training
SAFE SYSTEM OF WORK
7
Work technique
Sequence of work
Authorized Personnel
Sufficient
SIGNAGES
2
8
Adequate signage
Proper signage
SUPERVISION
9
Competency of supervision
Enough supervision
(Number of supervisor/foreman)
FALL PROTECTION SYSTEM AVAILABLE
Current implementation at site following the types of fall protection used:
Primary Protection: Scaffold platform, Guardrails system, Working Platform, Mobile Elevated Working Platform (MEWP), Scissor Lift,
Man lift.
Secondary Protection: Personnel Fall Arrest System such as Lifeline, Full body harness, Fall Restrainer, Retractable life line, Ropes
and strap, anchorage point.
WORK AT HEIGHT PERMIT REGISTER / LOG
3
All activity which required to be performed at height, PTW for Working at Height will be issued and approved. Before issuance of Permit,
all personnel shall be trained for WAH. Permit register or Log shall be maintained at all times. Validity of permit subject to criticality of the
activity/work perform.