MORNING MEETING MONDAY 17TH OF DECEMBER 2018 SAFETY MOMENT BOAT TRANSFER/LANDING STEEL HAWK ENGINEERING SDN BHD 2 Correct Usage of Rope Swings SAFETY MOMENT Every year injuries to employees occur while being transported to and from an oil platform. A great number of these accidents happen during the transfer to or from the platform, and on or off the crew boat. In most cases, transfer is done by the use of the rope swing. Here are some safety tips to remember when using the rope swing. Boat to Platform • Do not swing with extra weight or materials. Pass your baggage/items over first. If the material is heavy or bulky, do not try to pass it over. Use the crane. • The procedure is reversed when swinging from fixed platform to the moving vessel. During this procedure, start the swing as the boat is beginning to rise from the bottom of the wave. • Just as the boat dips down from the highest point of the wave, swing to the platform by pushing off the boat with your feet. Do NOT jump or step. • Time your swing so your feet can land on the boat deck as it completes its rise. • Do not let the rope get between your legs as it might interfere with your landing. INTERNATIONAL ASSOCIATION OF DRILLING CONTRACTORS Platform to Boat • If your timing is off and you miss the boat, do not let go of the rope. Continue your swing and you will automatically swing back to the catwalk. • Once you land, establish your timing and try again. 3 SAFETY MOMENT Take Your Time! • If you feel you cannot transfer safely, DON’T! • Remember, you can’t do your work if you don’t get to and from your job safely. INTERNATIONAL ASSOCIATION OF DRILLING CONTRACTORS 4 LAST WEEK HIGHLIGHTS HSE Audit for both CI and Pig trap contract Non-intrusive Magnetic Pig Signaller demo at Tukau STEEL HAWK ENGINEERING SDN BHD 5 LAST WEEK HIGHLIGHTS HSE AUDIT CD52 Bandit At Site Demo • Conducted by PCSB on 11th Dec 2018 • On site demonstration of the non-intrusive pig signaller • To assess SHESB readiness and compliant towards contract agreement • Was done onboard Tukau A and B with live pigging ops • Both yard and documentations were assess with the respective personnel STEEL HAWK ENGINEERING SDN BHD • To assess the suitability of using the non-intrusive pig signaller – first trial run in PCSB-SKO 6 HSE AUDIT • Reward, internal audit, inhouse training. • Refresher training for all personnel on basic policies • Improved safety awareness program • Contractor evaluation and selection criteria • HSE equipment and controls to be improved • Complete internal HSE and Work documentations STEEL HAWK ENGINEERING SDN BHD 7 CD52 BANDIT AT SITE DEMO • Introduction and familiarization of the non-intrusive pig signaller to the operations team at Tukau platform • Set-up and rig-up signallers at both launcher and receiver • Monitor pig passage time as operational pigging was underway. • Demob signallers and tools to shore. • Spacing Concerns • Timing of units to be exact – better synchronization/communications STEEL HAWK ENGINEERING SDN BHD 8 THIS WEEK PLANS • Documentations for past pig trap inspections • Workpack preparation for door and barrel changeout • HSE Audit close out • Holidays and January manpower planning STEEL HAWK ENGINEERING SDN BHD 9 OPERATIONS MOMENT: PIG TRAP DIMENSIONS STEEL HAWK ENGINEERING SDN BHD 10 PIG TRAP TAG NUMBER • Tag number of valves and accessories to be noted clearly OPERATIONS FEEDBACK • To get feedback on pig trap operational condition • If unable to identify – note so STEEL HAWK ENGINEERING SDN BHD 11 Thank You, Work Safe AOB 12