Fakhreddine.Zahi.Senior.Mech.Eng

advertisement
Fakhreddine Zahi.
Mob: (+974) 66 72 08 22
E-Mail: [email protected]/[email protected]
Marital status: Single. Nationality: Tunisian.
Date and place of birth: 06/19/1983 at Bizerte.
Location : Doha. Qatar
TITLE
MEP Senior Engineer
UPDA certified
QCDD approved
Work visa transferable
Keywords
Method of statement, T&C, ITP, IRE, MAR, NCR. As built DWG, VO, BOQ, MTO, delivery log. Smoke exhaust ducting system,
HVAC, air conditioning, AHU, FCU, steam generation, condensate loop, strainer, water cooled chiller, air cooled chiller;
VRV, calculations, as built plan,3-way valve, air vent, plumbing, manifold, PPR; cPVC, PEX, PEHD, PVC, copper tubing; PVR,
PER, firefighting, water pumping. Water treatment, reverse osmosis, NPSH, compressed air, price negotiation, delivery
planning, deadlines, ducting systems, engine-driven pumps, jockey pump, galvanized duct; insulation thickness, stainless
steel, steel pipe, steam generator, boiler room. condensate loop, strainer, check valve, deluge cabinet, testing, precommissioning, commissioning. Pressure reducing metering station. Piping installation. Gas pressure regulation. NG
filtering and metering. Fire hose, fire dumper, sprinkler, ATEX environment, F 400,
Used Standards
ASHRAE, NFPA, SMACNA.ANSI.ASME.API
Core Qualifications
-Excellent knowledge of plumbing, electrical and mechanical systems.
-Exceptional breadth of experience in HVAC system construction and design.
-Strong proficiency in architectural and engineering drawing interpretation.
-Outstanding design skills for HVAC control and electrical power systems.
-Superior abilities in HVAC equipment design.
-Sound ability to work on multiple projects independently.
-Steam facilities controller and supervisor.
-Good knowledge of firefighting techniques.
-Very good command over fire detecting and protection system.
-Extensive knowledge of chemicals and hazardous products.
-Knowledge of fire alarms.
Software
-Autocad.
-Autocad MEP
-Autofluid
Experience
May 2017 to present.
Company: NAFFCO
Job title: Project Manager
Location : Qatar.
References:
A)-Project: Qatar rail
-Main contractor: ALYSJ JV/Q-rail
-scope of work: GSS( gas suppression system)
-stations: RAS ABOU ABOUD. SOUK WAKEF.BIN MAHMOUD.NATIONAL Museum.
-value: 11 million.
B)-Project: Kahrama substations.
-Main Contractor: NCC/Kahrama
-Scope of work: FM200.Deluge System. Sprinklers.
-substations: BAA1.BAA2. BAA3.BAA4. BAA5.
-value: 15 million.
C) project: JW MARRIOTT Hotel.
-Main contractor: HARINSA/DHC
-Scope of work: firefighting.
-value: 20 million.
D)project: AL Mirqab Tower
-Client: SHELL QATAR
-scope: fire fighting and fire alarm facility renovation.
-Value: 4.2 Million
Job summary
-Managing & Co-ordinating all activities of a Project/site(s) such as technical and contractual correspondence, plan,
implementation of method, schedule of work etc, with various parties involved, from the installation up to completion.
- Drawing guidelines and plans for project engineers, site engineers and supervisors for their routine activities and
ensuring that it is attained.
- Manages overall project planning, examines implementation with subordinates and submits weekly progress reports
to the Dept.Manager/Projects & Operation Manager.
- Ensures that all resources like manpower, machineries, materials and equipments are made available for undisturbed
site activities and are allocated wisely.
- Oversee the quality & quantity of work and subordinates’ productivity, attend progress meetings with client and
inform the project status to the management periodically.
- Conducts weekly meetings with Contractors, subcontractors to discuss and resolve project issues & obstacles and
resolves site problems and technical oversight of subordinates.
- Reviews and approves employee’s evaluations and initiates position changes, identifies training needs and instigate
training processes.
- Supervise technical aspects and ensure it’s implemented correctly.
- Check & recommend interim payments submitted by various contractors
- Prepare and make sure timely submission of project wise time sheet as per the prescribed standard of the Company.
- Ensuring that the equipments & instruments used for site and day-to-day temporary activities are of high quality and
complies with company, industry and government authority standards.
- Ensures that the handing over formalities of projects is done after final verification and are in accordance with
company policy.
- Reporting system as per project and company requirement to be followed.
- Other duties and responsibilities as assigned by the management with respect to the concerned Department.
November 2013 to April 2017
Company: SOMAIS
Job title: Project Manager (Head of MEP department)
Job summary
-Conducted cost-benefit analyses for the proposed installation of MEP systems at large industrial facilities.
-Developed design and bidding specification for MEP projects.
-Completed acceptance testing and approval of industrial MEP project installations for large industrial facilities in order
to save on insurance costs with a favorable amortization of project funding.
-To ensure that all the MEP systems are installed properly and are in good working conditions.
-Update with the MEP policies of the company.
-To ensure that all the construction and safety policies are being followed.
-Handling the team of 2 sub engineers and 6 supervisors.
-Organizing training program for the staff and the new joiner.
-Responsible for checking that all the hazardous chemicals are disposed out of the company after processing.
-Making the plans in emergency case to make sure for their implementation.
-To ensure that all the staffs are wearing fire protection aids.
-Suggesting higher management in case of any change in the processing of chemicals or equipment from the safety
point of view.
-Excellent and Competent in directions for Electrical/ Mechanical principles and techniques in Construction, installation,
support, documentation and testing activities.
- To ensure compliance with specifications, codes and customer requirements.
-Able to handle team professionally for the success of the project flow.
-Working on fire regarding complaints and for their solutions.
July 2010 to August 2013
Company: SEVAC
Job title: MEP engineer.
Job summary
-Cost estimation engineer,
-Planning elaboration,
-Project controller and inspector,
-Technical documentation,
-Daily reporting, weekly reporting.
-Pipe schedule selection
-Pipe support detail & standard single pipe line hanger
- Detail of sprinkler zone control unit
- Firefighting control alarm valve set detail.
-Water tank sizing.
-NFPA/ASHRAE/SMACNA standard conformity controller,
-Project budget elaboration,
-Price negotiation with supplier,
-Lowest bidder selection and material technical conformity supervisor.
-Delivery planner.
-FF CAD elaboration (pump room, isometric and schematic diagram, piping system layout,
Education
Bachelor degree in mechanical engineering 2010
Languages skills
French. English. Arabic.
Download
Related flashcards
Create Flashcards