1 13 90 DEGREE STD. HOOK, TYP. 1' - 0" 12" STRUCTURAL SLAB, SEE PLANS FOR REINF. BEAM OR SLAB DEPTH HOOK ALL VERT. BARS INTO SLAB LAP STRUCTURAL SLAB, SEE FRAMING PLANS 24 BAR DIAMETER TOP OF SLAB . . 3 SPA. @ 3" 3 4 BARS LOWER REINFORCEMENT IT IS A VIOLATION OF LAW FOR ANY PERSON TO ALTER THESE DOCUMENTS IN ANY WAY UNLESS ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER OR LICENSED ARCHITECT. 8 BARS 12 BARS 16 BARS TYPICAL CONCRETE COLUMN SECTIONS * CONSECUTIVE CROSSTIES ENGAGING THE SAME LONGITUDINAL BAR HAVE THEIR 90-DEG HOOK ON OPPOSITE SIDES OF COLUMN 3 SEE PLAN VERTICAL COLUMN REINF. SEE SCHEDULE 1101 King Street | Suite 400 | Alexandria, Virginia 22314−2944 | 703.518.8500 * ALTERNATE LAP LOCATION 180° SEE NOTE 8 3" = 1' 0 * TYPICAL CONCRETE COLUMN SECTIONS 3/4" = 1'-0" TIES SETS, SEE COLUMN NOTES MAINTAIN ALIGNMENT OF BARS AT SPLICE SHEAR WALL REINFORCING, SEE SHEAR WALL ELEVATIONS STRUCTURAL SLAB OR BEAM, SEE FRAMING PLANS BEAM OR SLAB DEPTH 3 3" POINT OF VERTICAL BEND SQUARE COLUMNS RECTANGULAR COLUMNS SHEAR WALL, SEE ELEVATION FOR REINF. DOWELS, SEE COLUMN SCHEDULE BAR ABOVE LAP SPLICE TYP. BENT BARS WITH MAX. SLOPE 1:6, TYP. #5 "U" BARS @ 12" O.C. NOTE: MECHANICAL SPLICES SHALL BE USED WHERE COLUMN MARKED * STRUCTURAL SLAB, SEE PLANS FOR REINF. TOP OF SLAB 4 TYPICAL COLUMN REINF. SPLICE DETAIL SEE PLAN CLASS 'B' LAP SPLICE 1 1/2" = 1' 0 1 SEE PLAN 3/4" = 1'-0" SEE NOTE 8 . . 3 SPA. @ 3" 1 COLUMN, SEE SCHEDULE FOR SIZE AND REINF. HOOK HORIZ. BARS INTO COLUMN TIE SPACING 6 SEE PLAN SEE PLAN TYPICAL SHEAR WALL CORNER DETAIL 3/4" = 1'-0" SEE PLAN 1" = 1' 0 6 8-#9 VERT. AT EACH WALL INTERESECTION LAP SPLICE SHEAR WALL REINFORCING, SEE SHEAR WALL ELEVATIONS 3 SHEAR WALL, SEE ELEVATION FOR REINF. TIES SETS, SEE COLUMN NOTES #5 "U" BARS @ 12" O.C. PREMOLDED JOINT FILLER, TYP. DOWELS TO MATCH VERT. COLUMN REINF. WITH STD. 90 DEGREE HOOKS 5 TOP OF SLAB 8-#9 VERT. AT EACH WALL END 3/4" = 1'-0" 1' - 2" SLAB ON GRADE, SEE FOUNDATION PLANS PREMOLDED JOINT FILLER ALL AROUND COLUMN LAP SPLICE DOWELS TO MATCH VERT. WALL REINFORCEMENT TOP OF FTG. SEE PLAN LAP SPLICE DOWELS TO MATCH VERT. WALL REINF. STRUCTURAL SLAB, SEE PLANS FOR REINF. 8 01-FIRST FLOOR EL. 0" SHEAR WALL #19 END DETAIL 3/4" = 1'-0" 3" 1' - 0" TOP OF FTG. TOP REINFORCING, SEE FOOTING SCHEDULE 4-#5 CONT., EXTEND EMBEDMENT DEPTH INTO COLUMN FOOTINGS OR USE DOWELS PER 3/S-302 3" 3" 1/2" = 1' 0 1 SEE FOOTING SCHEDULE 3" LAP SPLICE SHEAR WALL REINFORCING, SEE SHEAR WALL ELEVATIONS SEE SCHEDULE CLASS 'B' LAP SPLICE AT COLUMNS ADJ. TO SHEAR WALLS 3 6 30 BAR DIAMETERS, UNO. 3/4" = 1' 0 1 01-FIRST FLOOR EL. 0" SHEAR WALL, SEE ELEVATION FOR REINF. TYPICAL SHEAR WALL / COLUMN DETAIL 6 1' - 7" 10" 7 1' - 7" SHEAR WALL AT FIRST FLOOR 6 3/4" = 1'-0" 3' - 0" 6.5 7 8' - 2" 11' - 8" 3' - 0" #4 @ 12" 3" FOOTING REINFORCING, SEE FOOTING SCHEDULE TYPICAL CONCRETE COLUMN AND FOOTING DETAIL 3/4" = 1'-0" TYPICAL SECTION THRU SHEAR WALL 3/4" = 1'-0" #10 @ 6 TOP #3 @ 12" FOR #3 @ 12" FOR #3 @ 16" FOR #3 @ 16" FOR #4 @ 18" FOR #4 @ 18" FOR #6 VERTICAL BARS #7 VERTICAL BARS #8 VERTICAL BARS #9 VERTICAL BARS #10 VERTICAL BARS #11 VERTICAL BARS 2#4X4'-0" CENTERED IN SLAB 3 TIE SET SPACING SHALL EQUAL THE SMALLER OF THE LEAST COLUMN DIMENSION OR THE SPACING SHOWN ABOVE #9 @ 12 BOT 8. COLUMN TIES SETS SHALL BE AS FOLLOWS: 0" 5. PROVIDE CLASS 'B' LAP SPLICES FOR SHEAR WALLS AND COLUMNS MONOLITHIC WITH SHEAR WALLS INCLUDING LAP SPLICE AT TOP OF FOOTING. #9 @ 12 BOT #9 @ 12 BOT 7. COLUMN TIES SHALL BE LOCATED VERTICALLY NOT MORE THAN 3 INCHES BELOW HORIZONTAL REINFORCEMENT IN BEAM OR SLAB. WHERE BEAMS FRAME FROM FOUR DIRECTIONS INTO A COLUMN, TIES MAY BE TERMINATED NOT MORE THAN 3 INCHES BELOW LOWEST REINFORCEMENT OF SHALLOWEST BEAM. 2' 4. VERTICAL COLUMN BARS SHALL BE EQUALLY SPACED ON EACH FACE, EXCEPT WHERE REQUIRED TO BE ADJUSTED SO AS NOT TO INTERFERE WITH INTERSECTING BEAM REINFORCING. VERTICAL COLUMN BARS MAY BE MOVED WITHING THE SPACING LIMITATIONS OF ACI 315-80 (REV. 1986) IN ORDER TO ACCOMODATED INTERSECTING BEAM REINFORCING. #9 @ 12 BOT #10 @ 6 TOP 2. FOR COLUMN SIZE DIMENSIONS, THE FIRST NUMBER IN THE SCHEDULE INDICATES DIMENSION IN THE NORTH-SOUTH DIRECTION. 6. ALL COLUMN TIES SHALL BE AS SHOWN AND SHALL HAVE STANDARD 135 DEGREE HOOKS. COLUMN TIE ARRANGEMENTS NOT SHOWN SHALL CONFORM TO STANDARD ACI 315-80 (REV. 1986) WITH STANDARD 135 DEGREE HOOK. 20' - 8" 1. ALL COLUMNS SHALL BE CENTERED ON COLUMN GRIDS UNLESS OTHERWISE NOTED OR SHOWN. 4' - 0" D CONCRETE COLUMN NOTES 3. WHERE BARS OF DIFFERENT SIZES ARE TO BE LAP SPLICED, THE SPLICE LENGTH SHALL BE AS REQUIRED FOR THE SMALLER BAR. SEE SCHEDULE, SHEET S-302. 6 2 CJ 12 3/8" = 1' 0 1 1 4' - 0" 3 SEE FOOTING SCHEDULE 1 3'-6" THICK JOB NO. ADDENDUM #02 ISSUE FOR BID 05/07/10 04/09/10 SHEET NO REVISION DATE DWN. APP'D. 1 6'-0" x 6'-0" x 1'-8" 7'-0" x 7'-0" x 2'-0" 9'-0" x 9'-0" x 3'-0" 10'-0" x 10'-0" x 3'-0" 20'-0" x 20'-0" x 4'-0" 32'-0" x 24'-0" x 4'-0" 32'-0" x 32'-0" x 4'-0" SEE DETAIL 10/S-203 F-9 14'-0" x 10'-0" x 2'-0" REMARKS CJ 6-#6 E.W. BOTTOM 6-#7 E.W. BOTTOM 7-#8 E.W. BOTTOM 9-#8 E.W. BOTTOM #9 @ 12" E.W., T & B #9 @ 12" E.W., T & B #9 @ 12" E.W., T & B CJ UNDER CONTRACT WITH C COL, SEE SCHEDULE 42" THICK UNITED STATES DEPARTMENT OF ENERGY 1' - 0" F-1 F-2 F-3 F-4 F-5 F-6 F-7 F-8 #9 @ 12 T&B NOTE: SEE SHEET S-301 FOR TYP CJ REQUIREMENTS 5' - 0" 9-#8 L.W., 13-#8 S.W. BOT / 9-#6 L.W., 13-#8 S.W. TOP 6' - 0" 2" ISO GAP . TO ADJ FTG 12 MARK FOOTING SCHEDULE FOOTING SIZE (L x W x T) REINFORCING 3" CJ 24 PREMOLDED JOINT FILLER ALL AROUND COLUMN 0" 1/4" = 1' 0 1 2' 3" PLANT ENGINEERING DIVISION UPTON, NEW YORK 11973 JOB TITLE DWG. TITLE COLUMN AND SHEAR WALL DETAILS INTERDISCIPLINARY SCIENCE BUILDING ILR,GPP,LNI, HEM DATE ACCT. NO. SHEET OF JOB NO. DWG. NO. 1/8" = 1' 0 1 3 6 04/09/10 NOTE: COORDINATE WITH ELECTRICAL DRAWINGS FOR INSTALLATION OF GROUNDING ELECTRODE SYSTEM IN FOOTINGS. 9 CONTRACTION / CONSTRUCTION JOINT DETAIL @ COLUMN. 3/4" = 1'-0" 10 FOOTING F-8 PLAN DETAIL 1/4" = 1'-0" SCALE DWN. BY As indicated ESHQ RISK LEVEL REV'D BY MM APP'D. BY Approver FILENAME: 079872 S-203 \\alxsrv5\projects\200321\079872\RVT\079872S-CENTRAL.rvt 5/7/2010 4:15:03 PM RAW 079872 BLDG. NO. S-203 QA