Practice Problems: Chapter 12, Inventory Management Problem 1: ABC Analysis Stock Number Annual $ Volume Percent of Annual $ Volume J24 12,500 46.2 R26 9,000 33.3 L02 3,200 11.8 M12 1,550 5.8 P33 620 2.3 T72 65 0.2 S67 53 0.2 Q47 32 0.1 V20 30 0.1 = 100.0 What are the appropriate ABC groups of inventory items? Problem 2: A firm has 1,000 “A” items (which it counts every week, i.e., 5 days), 4,000 “B” items (counted every 40 days), and 8,000 “C” items (counted every 100 days). How many items should be counted per day? Problem 3: Assume you have a product with the following parameters: Demand 360 Holding cost per year $1.00 per unit Order cos t: $100 per order What is the EOQ? Problem 4: Given the data from Problem 3, and assuming a 300-day work year; how many orders should be processed per year? What is the expected time between orders? Problem 5: What is the total cost for the inventory policy used in Problem 3? Problem 6: Assume that the demand was actually higher than estimated (i.e., 500 units instead of 360 units). What will be the actual annual total cost? Problem 7: If demand for an item is 3 units per day, and delivery lead-time is 15 days, what should we use for a re-order point? Problem 8: Assume that our firm produces type C fire extinguishers. We make 30,000 of these fire extinguishers per year. Each extinguisher requires one handle (assume a 300 day work year for daily usage rate purposes). Assume an annual carrying cost of $1.50 per handle; production setup cost of $150, and a daily production rate of 300. What is the optimal production order quantity? Problem 9: We need 1,000 electric drills per year. The ordering cost for these is $100 per order and the carrying cost is assumed to be 40% of the per unit cost. In orders of less than 120, drills cost $78; for orders of 120 or more, the cost drops to $50 per unit. Should we take advantage of the quantity discount? Problem 10: Litely Corp sells 1,350 of its special decorator light switch per year, and places orders for 300 of these switches at a time. Assuming no safety stocks, Litely estimates a 50% chance of no shortages in each cycle, and the probability of shortages of 5, 10, and 15 units as 0.2, 0.15, and 0.15 respectively. The carrying cost per unit per year is calculated as $5 and the stockout cost is estimated at $6 ($3 lost profit per switch and another $3 lost in goodwill, or future sales loss). What level of safety stock should Litely use for this product? (Consider safety stock of 0, 5, 10, and 15 units) Problem 11: Presume that Litely carries a modern white kitchen ceiling lamp that is quite popular. The anticipated demand during lead time can be approximated by a normal curve having a mean of 180 units and a standard deviation of 40 units. What safety stock should Litely carry to achieve a 95% service level? ANSWERS Problem 1: ABC Groups Class Items Annual Volume Percent of $ Volume A J24, R26 21,500 79.5 B L02, M12 4,750 17.6 C P33, T72, S67, Q47, V20 800 2.9 = 100.0 Problem 2: Item Class Quantity Policy Number of Items to Count Per Day A 1,000 Every 5 days 1000/5 = 200/day B 4,000 Every days 40 4000/40=100/day C 8,000 Every days 100 8000/100=80/day Total items to count: 380/day Problem 3: EOQ 2 * Demand * Order cost Holding cost 2 * 360 * 100 72000 268 items 1 Problem 4: N Demand 360 134 . orders per year Q 268 T Working days 300 / 134 . 224 days between orders Expected number of orders Problem 5: TC Demand * Order Cost (Quantity of Items)*(Holding Cost ) 360 * 100 268 * 1 134 134 $268 Q 2 268 2 Problem 6: TC Demand * Order Cost (Quantity of Items)*(Holding Cost ) 500 * 100 268 * 1 186.57 134 $320.57 Q 2 268 2 Note that while demand was underestimated by nearly 50%, annual cost increases by only 20% (320 / 268 120 . ) an illustration of the degree to which the EOQ model is relatively insensitive to small errors in estimation of demand. Problem 7: ROP Demand during lead - time 3 *15 45 units Problem 8: Q*p 2 * Demand * Order Cost Daily Usage Rate Holding Cost 1 Daily Pr oduction Rate F G H IJ K (2)(30,000)(150) 3000 units 100 150 . 1 300 F IJ G H K Problem 9: Q*p ($78) (2)(1000)(100) 80 units (0.4)(78) Q*p ($50) (2)(1000)(100) 100 units 120 to take advantage of quantity discount. (0.4)(50) Ordering 100 units at $50 per unit is not possible; the discount does not apply until 120 the order equals 120 units. Therefore, we need to compare the total costs for the two alternatives. Total cos t Demand * Cost Demand * Order Cost (Quantity of Items) * ( Holding cos t ) Q 2 Total cos t ($78) (1000)(78) (1000)(100) (80)(0.4)(78) $80,498 80 2 Total cos t ($50) (1000)(50) (1000)(100) (120)(0.4)(50) $52,033 120 2 Therefore, we should order 120 each time at a unit cost of $50 and a total cost of $52,033. Problem 10: Safety stock 0 units: Carrying cost equals zero. Stockout cos ts (Stockout cos t * possible units of shortage * probability of shortage * number of orders per year ) S0 6* 5* 0.2 * 1350 1350 1350 6* 10* 015 . * 6* 15* 015 . * $128.25 300 300 300 Safety stock 5 units: Carrying cos t $5 per unit * 5 units $25 . * Stockout cost: S5 6* 5* 015 1350 1350 6* 10* 015 . * $60.75 300 300 Total cos t carrying cos t stockout cos t $25 $60.75 $85.75 Safety stock 10 units: Carrying cos t 10 * 5 $50.00 . * Stockout cost: S10 6* 5* 015 1350 $20.25 300 Total cos t carrying cos t plus stockout cos t $50.00 $20.25 $70.25 Safety stock 15: Carrying cos t 15* 5 $75.00 Stockout cos ts 0 (there is no shortage if 15 units are maintained) Total cos t carrying cos t stockout cos t $75.00 $0 $75.00 Therefore: Minimum cost comes from carrying a 10-unit safety stock. Problem 11: To find the safety stock for a 95% service level it is necessary to calculate the 95th percentile on the normal curve. Using the standard Normal table from the text, we find the Z value for 0.95 is 1.65 standard units. The safety stock is then given by: (165 . * 40) 180 66 180 246 Ceiling Lamps