Installation Guide - Peter Pepper Products

advertisement
 Peter Pepper Products, Inc. Evolution Installation Instructions A Modular Wall System www.peterpepper.com/evolution 2 Table of Contents Trim Details…………………………………………………………………. 3 Frame Description & Details………………………………………… 4 Evolution Frame Installation Instructions…………………….. 6 Evolution Stud Mounted Tile Installation……………………… 8 Evolution Cleat Mounted Tile Installation…………………….. 9 Shelf & Marker Tray Installation…………………………………… 11 Universal Brackets……………………………………………………….. 12 Monitor Brackets…………………………………………………………. 14 Tile Removal Tool………………………………………………………… 15 www.peterpepper.com/evolution 800 496 0204 3 Trim Details Frames are shipped with trim pieces installed. Remove trim pieces before mounting frames to wall. Pull up on back edge of trim to release from retention clips. Rotate up and slide off frame. Retention Clip Note difference between horizontal and vertical trim pieces. Horizontal trim is not full depth, leaving a gap between trim and wall to allow for cable routing. Vertical trim is full depth, but has knockouts that can be removed to provide additional cable routing. Horizontal
Trim Vertical Trim www.peterpepper.com/evolution Gap for Cable Routing 800 496 0204 Knockout 4 Frame Description & Details Front of Frame Trim Retention Clip Cable Routing Corner Trim Horizontal Rails Corner Trim Retention Screws Trim Mounting Rails Cable Routing Cable Routing Vertical Slots – Used to attach cleat mounted tiles and mounting brackets. Vertical Rails Horizontal Slots – Used to attach shelves, marker tray, coat hook, LED light and mounting brackets. Stud Receiver Hole – Used for attaching stud mounted tiles. Tile Security Holes – Receives tile security screw, locking tile to frame. www.peterpepper.com/evolution 800 496 0204 5 Frame Description & Details (cont.) Back of Frame Frame Mounting Cleats – Used to attach frame to wall. Stud Receiver Auxiliary Frame Mounting Holes Cable Management Notch Indicates Cable Routing Paths www.peterpepper.com/evolution 800 496 0204 Frame Corner with Corner Trim Removed 6 Evolution Frame Installation Instructions Intall hanger rail 72” above floor (to top of rail). This applies to all frame sizes. Align holes in hanger rail with wall studs and intall two screws into each stud. Use screws appropriate for your specific wall construction. Secure rail to maximum numbers of studs available based on the width of the rail. In general, the number of studs available will be equal to the number of panels, i.e. mount to a minimum of three studs for a three panel width frame. Do not fully tighten screws at this time. 1
Hanger Rail Ensure rail is level before installing screws. Hanger Rail 2 Frame Frame Mount frame to hanger rail. Insert cleat on back surface of top horizontal frame rail into hanger rail. Cleat Hanger Rail Ensure cleat is fully seated in hanger rail. www.peterpepper.com/evolution 800 496 0204 7 3 Slide frame to left or right as necessary to align slots in lower rail with studs. Slot 4 Lower Rail Install one screw into each stud. Fully tighten these screws and screws installed in step 1. Frame installation is complete. www.peterpepper.com/evolution 800 496 0204 8 Evolution Stud Mounted Tile Installation The following instructions apply to all stud mounted tiles, including decorative, marker board, tack board, cart holder, clock, lightbox, gaming and iPod tiles. 1 Tile Latch Stud Latch studs must be installed in decorative, marker board, tack board and clock tiles. Studs are pre-­‐installed at the factory for all other tiles. Double width tiles use six studs. 2 To install tiles, aligned latch studs with corresponding holes in frame. Insert studs in holes and press firmly on the face of the tile over each stud to seat the studs in the clips. An audible ‘snap’ will heard when stud is fully engaged. Press firmly on face of tile over studs to fully seat studs in receivers. www.peterpepper.com/evolution Latch Stud 800 496 0204 9 Evolution Cleat Mounted Tile Installation The following instructions apply to all cleat mounted tiles, including med storage, work stations, CPU storage and infection control. 1 Loosen security screws (one on each side). Back completely out, but do not remove. Security Screw www.peterpepper.com/evolution 800 496 0204 Mounting Cleats – Note cleats are staggered vertically to allow side-­‐by-­‐side mounting in frame. Cleats engage in vertical rail slots. 10 2 Align cleats with slots in vertical rails. 3 Insert cleats into vertical rail slots. 4 5
Re-­‐tighten security screws on both Push down on top of tile to engage cleats. Important! sides to lock tile to frame. Cleats shown fully engaged. www.peterpepper.com/evolution 800 496 0204 11 Shelf & Marker Tray Installation The following instructions apply to single wide shelves, double wide shelves and marker trays. Tiles must be in place prior to installing these components. Trim can be installed before or after shelves and marker trays. 1 Flip shelf/marker tray over and pull security clip all the way out. 2 Security Clip Bottom View Align cleats with horizontal slots in rail. Insert cleats and while pushing shelf or marker tray against tiles, slide to the right to engage with slots. Edge of shelf will be aligned with edge of tile when installed properly. 3
Important! Push security clip all the way in to secure the shelf/marker tray to frame. www.peterpepper.com/evolution 800 496 0204 12 Universal Brackets Universal brackets are available with three different sizes of face plates 3-­‐1/2”x 3-­‐1/2”, 6”x 6” and 10”x 10”. All connect to the universal mounting bracket via four keyhole slots. Universal brackets can be mounted anywhere along the perimeter of the frame or within the horizontal or vertical gaps between tiles. 3-­‐1/2”x 3-­‐1/2” 6”x 6” 10”x 10” Perimeter installations require the use of the shim that comes with the universal bracket assembly. The shim mounts using the screws provided, on the side of the bracket that overhangs the trim. The bracket shown below would mount on the left edge. The shim compensates for the height difference between the face of the tile and the face of the trim. www.peterpepper.com/evolution 800 496 0204 Shim 13 Universal Brackets (cont.)
Trim Shim Tile Bracket must be mounted so that the “L” shaped slots are pointed down. Universal brackets attach to the frame in the same manner as cleat mounted tiles. In vertical rails, insert cleats in slots and push down to engage with rail. In horizontal rails, insert cleats in slots and push to the left to engage with rails After installing bracket, tighten set screw to secure to frame. Important! To attach face plate to bracket: 1. Insert four buttons into large portion of “L” shaped slots. 2. Push face plate down until buttons snap into lower leg of “L” slots. 1 2 www.peterpepper.com/evolution 800 496 0204 14 Monitor Brackets Monitor brackets are cleat mounted brackets used in vertical rails only. Shims are provided for perimeter mounted applications (see Universal Bracket section). After installing bracket, tighten set screw to secure to frame. www.peterpepper.com/evolution Important! 800 496 0204 15 Tile Removal Tool The tile removal tool is used to remove stud mounted tiles. Insert tile removal tool into gap between tiles, near corner of tile being removed. Slide flange on tile removal tool under tile. Pull on handle of tile removal tool to dislodge tile from frame. www.peterpepper.com/evolution 800 496 0204 
Download