Quarterly Performance 4th Quarter Report Quarterly PriorityReport Group–Performance Report2009/10 - (date of report) Quarterly Priority Group Performance Report - (date of report) Resources Independent and Healthy Lives Jobs and Enterprise 1 Contents Chapter Page Introduction - Resources 2 External Inspections & Assessment 3 Recent Achievements 6 Priorities for 2010/2011 9 Performance against targets 10 1 Introduction Background Purpose of this performance pack 1 Although the Resources Theme is not a Local Strategic Partnership Theme, it is a key theme for the Council, and is therefore included in quarterly performance reports for the Council. 3 This performance pack sets out progress in delivering the Resources Theme Plan, and so provide the means for appropriate challenge and support to make sure we deliver our vision. 2 The Resources Theme Plan sets out: 4 The information covered in this pack covers: • • • What the Council wants to achieve with regard to its use of Resources The key actions we plan to take to deliver those aims and objectives The performance measures and targets we will use to assess our progress for the Resources Theme 5 2 • Recent achievements • Overviews of our progress against performance targets and planned actions • Information about areas where our performance is currently not on target, or performance is not as good as last year • Details of Milestones due in the Quarter but not achieved at the time of this report. Details of progress with LAA Targets would usually be included in the Theme Performance Packs, however, for this particular Theme there are no relevant LAA targets. External Inspections & Assessments Comprehensive Area Assessment 2009 The following summary statement was included for the South Tyneside Council Organisational Assessment 2009: “Overall, the Council performs well in managing its performance and scores 3 out of 4. Council services generally deliver planned outcomes and are making noticeable improvements for the people of South Tyneside. Resident satisfaction is improving in most areas and where action is needed it is being taken. But in some important services the Council needs to improve. The Council is good at managing its money and other resources and scores 3 out of 4. The Council has continued to deliver improvements in areas that are priorities for residents. For example, by significantly reducing crime and anti-social behaviour in known hot spots, attracting new businesses to the area and providing cultural and other activities for the benefit of the whole community. Last year the borough received its best GCSE and A-Level results, reducing the attainment gap between this area and the national average; this year's results suggest further improvement. And the physical regeneration of the borough can be seen through new schools, new houses and plans for major undeveloped sites. However, in some important areas, such as adult social care, housing, health and education the Council needs to improve. The Care Quality Commission (CQC) rated the Council's safeguarding of vulnerable adults as just adequate. There are still many Council houses that do not meet the decent homes standard, but performance is improving. The health and well-being of adults and young people is improving but at a slower rate than most of the Country. There are some inequalities in the achievement of some primary-aged pupils, particularly those who have special educational needs and those from some ethnic minority backgrounds. Prospects for dealing with most of these issues are good, but CQC rated the Council's prospects for improvement in adult social care as uncertain. The Council has a clear, long-term and ambitious vision of what it wants to achieve for the people of South Tyneside. It was recognised nationally for the way it works with partner organisations and involves local people in its decision-making processes. The Council has translated its vision into priorities and targets that reflect the needs of the various local communities, as well as identifying other opportunities for new and innovative developments. Continued 3 External Inspections & Assessments The Council has the leadership, capacity and capability needed to deliver its objectives. Political and managerial leadership is strong. Councillors work well with Council officers and there is a shared wish to do well for the good of the area. Elected members received national Beacon Status for their role as community champions. The Council is recruiting a new Chief Executive. The outgoing Chief Executive played a major role in turning South Tyneside Council from a troubled authority in 2002 into the Municipal Journal's best achieving council of 2008. The Council's abilities do not rely on one person, but there have also been changes in senior officer posts in the last few years. It will be important for the Council to have stability at senior management levels, as they deal with various complex issues. The political leadership and senior management team remain fully focused on the borough's priorities. Elected members, Council officers and the Local Strategic Partnership (LSP) are confident about the prospects for continued improvement under a new Chief Executive. The Council is aware of the resources it needs to deliver its plans for the area and regularly reviews these to ensure they are targeted where they are most needed. There are clear links between the Council's Medium-Term Financial Plan and its key objectives and priorities.” Source: South Tyneside Area Assessment (Summary Version), 9th Dec 2009 4 External Inspections & Assessments South Tyneside Council Organisational Assessment: Managing performance 3 out of 4 Use of resources 3 out of 4 Managing finances 3 out of 4 Governing the business 3 out of 4 Managing resources 2 out of 4 Conclusion: Overall, South Tyneside Council performs well, scoring 3 out of 4 overall., with an unqualified Value for Money opinion from external auditors 5 Key Achievements Key achievements during 2009/10: Good Use of Resources – The Council was awarded a score of 3 out of 4 for Use of Resources for 2009 by PriceWaterhouse Coopers (on behalf of the Audit Commission), which is an achievement in view the more stringent requirements introduced this year. New Procurement Process - The Council’s new procurement process went live on 8 September 2009. The Corporate Procurement Service put the new process in place to help centralise all spend across the council and partnership and give visibility and control what is being spent. It is important that the Council understands where it’s money is spent so that savings can be made to address other priorities. Contact Centre success - The Customer Contact Centre received Contact Centre Association (CCA) accreditation, which means that standards have remained at a consistently high standard. The assessor reviewed eight areas including customer focus, employee focus and contact centre performance, as well as technology and security. Advisers and managers were interviewed as part of the intensive and wide-ranging review. Award for the Public Service campaign - The joint Tyne and Wear public services communications campaign was awarded the Partnership Excellence award at the Chartered Institute of Public Relations Local Public Services Excellence Awards. The campaign involved the five Tyne and Wear local authorities, Northumbria Police, Tyne and Wear Fire and Rescue Service, PCTs South and North of the Tyne and Nexus pooling resources, including funding and staff to develop the campaign. Creation of HR and Payroll Service Centre – The Council’s new Operational Processing Team was launched on 1st September 2009. Government Connect Accreditation - Government Connect is a pan-government programme providing an accredited and secure network between central government and every local authority in England and Wales. BT South Tyneside has been working with the Government Connect Team to configure local services to use the GCSX infrastructure. South Tyneside received accreditation for this in September 2009. Retaining Investors In People Award - The Council successfully retained its Investors in People accreditation. The assessors found that excellence; integrity and valuing people are understood and used on a day-to-day basis across the Council. The Council's 6 Key Achievements comprehensive plans were highlighted as being well linked at all levels and contributing to the Council's overall plan 'Performing Together'. Workplace Learning Partnership - The Council signed up to a formal agreement with the four main trade unions representing the majority of the workforce in a groundbreaking partnership on learning in the workplace. The trade unions and the Council are committed to working together to promote and support lifelong learning and ensure equal access to learning opportunities. The aim of the partnership is to encourage and develop a positive learning culture throughout the Council across all skill levels and to build upon the Government's current learning initiatives to improve skills in the workforce. Housing Benefits Team win award - After applying for an international ‘prestigious ideas’ award, South Tyneside’s Housing Benefits Team was the only team in the UK to get through to the semi-finals. The BT Challenge Cup semi-finals took place at Leeds Royal Armouries in October 2009 where the team won the ‘people’s choice’ award. Local Area Agreement Reward - South Tyneside received a £4.27 million 'reward package' from the Government for the progress it has made on targets to improve the quality of life for local people. The money will be spread over two years (first payment received) and allocated to the Council and its partners the Police and South of Tyne and Wear Primary Care Trust who have worked together to deliver the Local Area Agreement (LAA) priority targets. The Council led on 9 of the 11 targets ranging from improving health and educational attainments to reducing litter. These were set three years ago when the Council and the Government signed the agreement, which was specifically designed to deliver locally agreed service improvements with clearly laid out targets. South Tyneside Homes Wins Award For Staff Health - South Tyneside Homes secured a prestigious regional award for improving the health of its staff. It achieved bronze in the North East's Better Health at Work Initiative. The accolade marks the successful first stage of recognition as a major employer that is taking positive steps to improve the health, safety and wellbeing of its workforce. Council’s Website Wins a National Award - The Council’s website has again attained the highest possible four star ranking in a prestigious annual survey of the UK’s 424 local authority websites. It’s the second year running that South Tyneside has been rated so highly in the survey conducted by the Society of IT Managers (SOCITM). Only three Councils have achieved this. Their report “Better Connected 2010” is the definitive assessment by which Council’s can judge website performance and is the authorities source of benchmarking progress in website development. South Tyneside Council is one of only 11 local authorities to have received the top rating this year. 7 Key Achievements The Council’s website was also named as a finalist in the prestigious e-Government National Awards 2009 for excellence in increasing usage of its website for waste and recycling information and online services. The website was also shortlisted for an award in the "Local e-Government Excellence: Take-up and Usage Growth" category for shifting waste and recycling transactions to the web through effective marketing. Improved satisfaction levels – The Council carried out a satisfaction survey in 2009, and the results were encouraging. Areas relevant to this theme showing the most significant improvement are shown below: Questions 2008 Score 2009 Score Value for money 36% 52% +16% Satisfaction with council 50% 64% +14% Informed about decision-making 37% 46% +9% Local public services promoting the interests of local residents 44% 53% +9% Local public services act on the concerns of residents 51% 58% +7% 8 Change Priorities for 2010/2011 Identified priorities for further improvement, included as “Must Shifts” in 2010-2013 strategic plans: • Maintain and improve services in new and innovative ways with less resources • Managing the council workforce through the changing economic climate • Reduce the cost of running council buildings while ensuring that our buildings meet our operational needs 9 Performance Against Targets Overall performance against targets 6 The Resources Theme Plan includes a range of performance measures and related targets that will allow us to monitor our progress. Many of these measures are collected annually or less frequently. 7 75% of performance indicator targets were met, and 69% of PIs improved (9 of the 13 PIs). Further details are given on subsequent pages. 8 There were 76 milestones relevant to the Resources Theme that were due to be achieved in the year, and 82% of these have been completed. 10 Performance Against Targets Measures where we are Currently Underperforming The table below shows PIs where we are currently under performing, based on a comparison of the year end estimate (as at the end of the year, unless otherwise stated), with the target and last year’s performance. PI Ref PI Description 2008/09 Performance (unless otherwise stated) 2009/10 Performance Year-End Estimate 2009/10 Target On Target? 97.36% 97.58% 98.00% No BV10 % of Non Domestic Rates collected (high is good) BV12 Proportion of working days/shifts lost to sickness absence (low is good) 9.12 days 9.15 days 9.00 days No BV14 Percentage of employees retiring early (low is good) 0.65% 0.82% 0.65% No BV17a The percentage of local authority employees from minority ethnic communities (low is good) Percentage of planning applications determined in line with the target of NI 157A 60% of planning applications in 13 weeks (low is good) Perf. Trend Context Slight improvement on 2008/09, but missed the target by only 0.42% The average increase in sickness person has only risen by 0.02 days. 1.72% 1.96% 2.00% No The Council’s jobs bulletin is sent out to many local BME groups to try to encourage applications, however, due to the low level of recruitment recently, not many jobs have been advertised externally. 92.31% 88.24% 60.00% Yes Full year averages not yet available 11 Performance Against Targets PI Ref PI Description Percentage of planning applications determined in line with the target of NI 157B 65% of minor planning applications in 8 weeks (low is good) 2008/09 Performance (unless otherwise stated) 88.46% 2009/10 Performance Year-End Estimate 2009/10 Target On Target? 82.39% 65.00% Yes 12 Perf. Trend Context Full year averages not yet available Performance Against Targets Details of Milestones Due in the Quarter but Not Yet Achieved See attached. 13 Jobs and Enterprise Theme Plan Actions Not Achieved only All Partners Report PRIORITY THEME: E - Jobs and Enterprise Full Year 2009-2010 Action Milestone Reference Description Risk Key Type Ref Responsibility Description Target Date Achieved Date Notes AIM: E1 - Increasing employment, reducing unemployment and worklessness PRIORITY OBJECTIVE: E1/1 - Increasing the employment rate Secure Local Labour Agreements for new developments PT/E1/1/1 C South Tyneside Council / Regeneration and Resources / Housing Strategy and Regulatory Services / Planning / Area Planning Job opportunities for local people through labour agreements for all Regeneration Schemes promoted 31/03/2010 Shared With South Tyneside Council / Regeneration and Resources / Housing Strategy and Regulatory Services / Transport Futures Shared With South Tyneside Council / Regeneration and Resources / Housing Strategy and Regulatory Services / Housing Futures Key: High Risk Position as at 02/07/2010 15:53 Page 1 Jobs and Enterprise Theme Plan Actions Not Achieved only All Partners Report PRIORITY THEME: E - Jobs and Enterprise Full Year 2009-2010 Action Milestone Reference Description Risk Key Type Ref Responsibility Description Target Date Achieved Date Notes AIM: E1 - Increasing employment, reducing unemployment and worklessness OBJECTIVE: E1/2 - Reducing the gaps in employment and benefit claimant rates between the worst performing neighbourhoods and national average [A Top Ten Priority] Maximise employment opportunities for residents in East Shields Key: High Risk PT/E1/2/1 A South Tyneside Council / Neighbourhood Services / Adult Social Care Employment opportunities identified at Bramble Court Extra Care Sheltered Housing scheme 31/03/2010 PROGRESS NOTE: To be transferred to 2010/11. New date of 31.05.10 Position as at 02/07/2010 15:53 Page 2 Jobs and Enterprise Theme Plan Actions Not Achieved only All Partners Report PRIORITY THEME: E - Jobs and Enterprise Full Year 2009-2010 Action Milestone Reference Description Risk Key Type Ref Responsibility Description Target Date Achieved Date Notes AIM: E3 - Promoting the growth and sustainability of businesses PRIORITY OBJECTIVE: E3/1 - Increasing the number of business start up and survivals and people who are self employed Provide community based PT/E3/1/1 Enterprise Coaches to promote self-employment, social enterprise and increase business creation B C D Key: High Risk South Tyneside Council / Regeneration and Resources / Enterprise and Regeneration / Business Development South Tyneside Council / Regeneration and Resources / Enterprise and Regeneration / Business Development South Tyneside Council / Regeneration and Resources / Enterprise and Regeneration / Business Development 1200 residents engaged in intensive one-to-one pre-start coaching – performance monitored quarterly 31/03/2010 PROGRESS NOTE: Quarters 1 to 3: 214 residents engaged in intensive one-to-one pre-start coaching (3 hours or more), 549 initial engagements in total. Quarter 4 information available June 2010. 450 residents referred on to Business Link North East services – performance monitored quarterly 31/03/2010 PROGRESS NOTE: Quarters 1-3: 13 residents referred on to Business Link North East services. Quarter 4 information available June 2010. 150 business start-ups assisted 31/03/2010 by Enterprise Coaches – performance monitored quarterly PROGRESS NOTE: Quarters 1-3: 13 business start-ups assisted by Enterprise Coaches. Quarter 4 information available June 2010. Position as at 02/07/2010 15:53 Page 3 Jobs and Enterprise Theme Plan Actions Not Achieved only All Partners Report PRIORITY THEME: E - Jobs and Enterprise Full Year 2009-2010 Action Milestone Reference Description Risk Key Type Ref Responsibility Description Target Date Achieved Date Notes AIM: E3 - Promoting the growth and sustainability of businesses PRIORITY OBJECTIVE: E3/1 - Increasing the number of business start up and survivals and people who are self employed Provide financial assistance to promote business start-up and expansion PT/E3/1/2 A B Provide individuals and TP/E3/1/4 new businesses with relevant and guidance in accessible locations across the Borough (Business Matters outlets) B South Tyneside Council / Regeneration and Resources / Enterprise and Regeneration / Business Development South Tyneside Council / Regeneration and Resources / Enterprise and Regeneration / Business Development 150 new businesses supported 31/03/2010 with financial assistance (<12 months) PROGRESS NOTE: 90 new businesses supported with financial assisance in 2009/10 200 new jobs created (forecast over 2 years) 31/03/2010 PROGRESS NOTE: 128.5 new jobs created (forecast over 2 years) in 2009/10 South Tyneside Council / Regeneration and Resources / Enterprise and Regeneration / Business Development 750 individuals engaged with regards to becoming self-employed or setting up a business 31/03/2010 PROGRESS NOTE: 579 enquiries via Business Matters outlets / telephone / website weeks commencing 5th October 09 to 29th March 10. 1363 enquiries in total 2009/10 Shared With South Tyneside College Key: High Risk Position as at 02/07/2010 15:53 Page 4 Jobs and Enterprise Theme Plan Actions Not Achieved only All Partners Report PRIORITY THEME: E - Jobs and Enterprise Full Year 2009-2010 Action Milestone Reference Description Risk Key Type Ref Responsibility Description Target Date Achieved Date Notes AIM: E3 - Promoting the growth and sustainability of businesses PRIORITY OBJECTIVE: E3/1 - Increasing the number of business start up and survivals and people who are self employed Implement the agreed pilot TP/E3/1/5 project, focusing on the issues relating to shared CRM access. This will examine the full range of options for information sharing and identify how issues should be resolved. This work will involve other partners, where appropr A Business Enterprise North East Vision and objectives agreed 31/03/2010 PROGRESS NOTE: Pilot project for the shared CRM Business and Enterprise North East have produced a business case and we are looking to share the two systems when costings have been agreed with the IT consultants can begin work B Business Enterprise North East Full implementation underway 31/03/2010 PROGRESS NOTE: Pilot project for the shared CRM Business and Enterprise North East have produced a business case and we are looking to share the two systems when costings have been agreed with the IT consultants can begin work OBJECTIVE: E3/2 - Encouraging and developing the growth, productivity and sustainability of our businesses Improve the performance and productivity of businesses by providing expertise to help them realise their full potential (including general mentoring and procurement support to enable more of our local businesses to become tender ready and access more publ Key: High Risk TP/E3/2/4 B South Tyneside Council / Regeneration and Resources / Enterprise and Regeneration / Business Development Further 214 business growth projects commenced 31/03/2010 PROGRESS NOTE: Quarter 1-3: 111 businesses assisted (Management Timeshare, Business Development Grant, Bid Box, Manufacturing Forum, Business Forum). Quarter 4 information available May 2010. Shared With Business Enterprise North East Position as at 02/07/2010 15:53 Page 5 Jobs and Enterprise Theme Plan Actions Not Achieved only All Partners Report PRIORITY THEME: E - Jobs and Enterprise Full Year 2009-2010 Action Milestone Reference Description Risk Key Type Ref Responsibility Description Target Date Achieved Date Notes AIM: E3 - Promoting the growth and sustainability of businesses OBJECTIVE: E3/2 - Encouraging and developing the growth, productivity and sustainability of our businesses Carry out Strategic Account TP/E3/2/6 Management (SAM) Programme in partnership with Tyne and Wear Development Company and One North East Key: High Risk A South Tyneside Council / Regeneration and Resources / Enterprise and Regeneration / Business Development 25 businesses visited 31/03/2010 PROGRESS NOTE: Estimate currently being reviewed. Position as at 02/07/2010 15:53 Page 6 Jobs and Enterprise Theme Plan Actions All Partners Report Not Achieved only PRIORITY THEME: E - Jobs and Enterprise Post EoY 2009-2010 Action Milestone Reference Description Risk Key Type Ref Responsibility Description Target Date Achieved Date Notes AIM: E1 - Increasing employment, reducing unemployment and worklessness PRIORITY OBJECTIVE: E1/1 - Increasing the employment rate Develop the Green Business Park at Jarrow Riverside Key: High Risk PT/E1/1/5 B South Tyneside Council / Regeneration and Resources / Enterprise and Regeneration / Regeneration Reclamation commenced 31/03/2012 PROGRESS NOTE: Site has now been assembled and scheme has been designed. Due to defferal of external funding, the commencement of reclamation works is to be delayed until 31/2/2012. Position as at 02/07/2010 16:05 Page 1