the 69 kV transformer switches and jumpers that connect to the 69

advertisement
Operating Companies of the
American Electric Power System
FERC Electric Tariff, Third Revised Volume No. 6
Service Agreement No. 623
Original Sheet No. 190
the Eagle Lake Substation including all facilities within it, except for those
facilities owned by LCRA
the 69 kV transformer switches and jumpers that connect to the 69 kV bus
conductors inside the Eagle Lake Substation
any under-built distribution voltage circuits attached to the 69 kV transmission
lines that terminate into the station
7.
Facility Operation and Maintenance Responsibilities of the Parties:
•
•
AEP will control and operate the following equipment until LCRA takes over
operational control:
o 69 kV circuit breaker 7640, associated switches 7639, 7641, 7642, and
associated 69 kV transmission line to Altair
o 69 kV circuit breaker 7650, associated switches 7649, 7651, and associated 69
kV transmission line to El Campo via Matthews, etc.
AEP controls and operates all other equipment in the station including the
following:
o 69 kV switches 1127 and 8603
•
o all distribution equipment in the station
Each Party maintains the facilities it owns that are provided for in this Facility
Schedule. Maintenance of the facilities, including circuit breaker relays, that are
owned by one Party that protect the facilities owned by the other Party, will be
subject to review and approval by the other Party.
Cost Responsibilities of the Parties:
9.
•
Each Party will be fully responsible for the costs and liabilities related to the
facilities it owns.
•
Each Party will be responsible for all costs it incurs in connection with the
establishment and maintenance of the Point of Interconnection in accordance with
this Facility Schedule.
Other Terms and Conditions: None
Issued By: J. Craig Baker, Senior VP
Regulatory Services
Issued On: November 26, 2008
Effective Date: November 1, 2008
100
Service Agreement No. 623
Original Sheet No. 191
Operating Companies of the
American Electric Power System
FERC Electric Tariff, Third Revised Volume No. 6
TO AE,TAIR
I?#A PMKM TAP, ETC,
TO
EE. CAM
1 "0
7649
7639
PT
3
P1 8187'
6167
yST^
' , ' 642
7640
11M.
P1 ^-i
61$$
7r^
1765t
7641
^
LCRl'i
.... _.. ,-.... ._.,..
.^. ...^_ .._^ ._ ^.....,
8603 ^ .^. AEP
^ ^ 't ^27 _
S1dH3-1A
65E
^^r
^.2 (3) A^ 10 TRANS.
b9 f fi:?KV
#T t^.k. 3v Imat3S_^
69/123C4+
51;`iv3
7^03 KVA
1628
6284 ^Q7;
T
T
9NV
4
fi
^
^..
zzss
^
^ 3t f
321
Na
^ 9455
1^2M4
9€54
^ 319
^^^
^^
9457
id;4.
VCR
435 f N
VW
#^3
123
CA
^.
M K1At
24M KWR
^n=
WEST M
. ,ST Ct *
T£' ^ ff'NTfi'AL C,00PANY
LAKE St.,.: 5N 7"10M NO. 2
etc
^.c.
^
T
.. .. _
^^dSE
M
^ 330
^ 320
Df
8876
W77^4
057
615B
TO
PT
PT
TO
APP_
6j-^,
DA7F: I
Effective Date: November 1, 2008
Issued By: J. Craig Baker, Senior VP
Regulatory Services
Issued On: November 26, 2008
101
Operating Companies of the
American Electric Power System
Service Agreement No. 623
Original Sheet No. 192
FERC Electric Tariff, Third Revised Volume No. 6
FACILITY SCHEDULE NO. 60
Name:
2.
Lakeside Pump
Location:
The Lakeside Pump Substation is located 1.9 miles south of the town of
Eagle Lake, Texas, 3/10 mile east of FM 102 in Colorado of the County. The Point of
Interconnection is located where the AEP jumper from the 69 kV transformer switch
connects to the 69 kV tap transmission line.
Delivery Voltage:
69 kV
4.
Normal Operation of Interconnection:
Closed
5.
One-Line Diagram Attached:
Yes
6.
Facility Ownership Responsibilities of the Parties:
LCRA owns the following facilities:
the following transmission lines comprised of structures, easements, conductors,
insulators, and connecting hardware:
o Eagle Lake to Matthews 69 kV transmission line
transmission line dead-end insulator strings and termination hardware
transmission line tap from the station to the 69 kV Eagle Lake - Matthews line
AEP owns the following facilities:
the Lakeside Pump Substation including all facilities within it
the 69 kV transmission tap line surge arresters
any under-built distribution voltage circuits attached to the 69 kV transmission
lines that terminate into the station
7.
Facility Operation and Maintenance Responsibilities of the Parties:
AEP will control and operate the following equipment until LCRA takes over
operational control:
o 69 kV transmission tap line from the Eagle Lake to Matthews 69 kV line to
the Lakeside Pump Substation
AEP controls and operates all other equipment in the station including the
following:
o 69 kV switch 197
o all distribution equipment in the station
Each Party maintains the facilities it owns that are provided for in this Facility
Schedule. Maintenance of the facilities, including circuit breaker relays, that are
Issued By: J. Craig Baker, Senior VP
Regulatory Services
Issued On: November 26, 2008
Effective Date: November 1, 2008
102
Service Agreement No. 623
Original Sheet No. 193
Operating Companies of the
American Electric Power System
FERC Electric Tariff, Third Revised Volume No. 6
owned by one Party that protect the facilities owned by the other Party, will be
subject to review and approval by the other Party.
Cost Responsibilities of the Parties:
8.
Each Party will be fully responsible for the costs and liabilities related to the
facilities it owns.
Each Party will be responsible for all costs it incurs in connection with the
establishment and maintenance of the Point of Interconnection in accordance with
this Facility Schedule.
9.
Other Terms and Conditions: None
Effective Date: November 1, 2008
Issued By: J. Craig Baker, Senior VP
Regulatory Services
Issued On: November 26, 2008
103
Operating Companies of the
American Electric Power System
FERC Electric Tariff, Third Revised Volume No. 6
^l,
- ^, r, r .^..,^.»-
Service Agreement No. 623
Original Sheet No. 194
. . . ....,
f9K'J
,.v,.
'M
.._...
,
.
ta"
2 SK3w
LCRA
^ .^. ^._, ^...,. .,.^
AEP
5M
(3) F6Yt 10 WAxf&
z 3M xva
23T ti:
P:aat
P{.,; IS t'£,"1Ti;,91.
Issued By: J. Craig Baker, Senior VP
Regulatory Services
Issued On: November 26, 2008
Effective Date: November 1, 2008
104
Service Agreement No. 623
Original Sheet No. 195
Operating Companies of the
American Electric Power System
FERC Electric Tariff, Third Revised Volume No. 6
FACILITY SCHEDULE NO. 61
Name:
2.
Matthews
The Matthews Substation is located 2/10 mile south of the town of
Location:
Matthews, Texas, on FM 102 in Colorado County. The Point of Interconnection is
located where the jumper connectors from the 69 kV transformer switch connect to the
69 kV bus.
Delivery Voltage:
4.
69 kV
Normal Operation of Interconnection:
Closed
One-Line Diagram Attached:
Yes
Facility Ownership Responsibilities of the Parties:
LCRA owns the following facilities:
•
•
•
•
•
the following transmission lines comprised of structures, easements, conductors,
insulators, and connecting hardware:
o Matthews to Eagle Lake 69 kV transmission line
o Matthews to Garwood City 69 kV transmission line
transmission line dead-end insulator strings and termination hardware
69 kV transmission line switches 1783 and 1754
69 kV buses, both 69 kV high bus and 69 kV low bus, including conductors,
jumpers between buses, insulators and termination hardware
jumpers from switches 1783 and 1754 to the lines and to the 69 kV bus
AEP owns the following facilities:
•
•
•
the Matthews Substation including all facilities within it, except for those
facilities owned by LCRA
the 69 kV transformer switch and jumper that connect to the 69 kV bus
conductors inside the Matthews Substation
any under-built distribution voltage circuits attached to the 69 kV transmission
lines that terminate into the station
Facility Operation and Maintenance Responsibilities of the Parties:
AEP will control and operate the following equipment until LCRA takes over
operational control:
o 69 kV switch 1783 and associated 69 kV transmission line to Eagle Lake via
Lakeside Pump
Effective Date: November 1, 2008
Issued By: J. Craig Baker, Senior VP
Regulatory Services
Issued On: November 26, 2008
105
Operating Companies of the
American Electric Power System
FERC Electric Tariff, Third Revised Volume No. 6
Service Agreement No. 623
Original Sheet No. 196
o 69 kV switch 1754 and associated 69 kV transmission line to Garwood City
via Lone Star Tap
AEP controls and operates all other equipment in the station including the
following:
o 69 kV switch 6687
o all distribution equipment in the station
Each Party maintains the facilities it owns that are provided for in this Facility
Schedule. Maintenance of the facilities, including circuit breaker relays, that are
owned by one Party that protect the facilities owned by the other Party, will be
subject to review and approval by the other Party.
8.
9.
Cost Responsibilities of the Parties:
•
Each Party will be fully responsible for the costs and liabilities related to the
facilities it owns.
•
Each Party will be responsible for all costs it incurs in connection with the
establishment and maintenance of the Point of Interconnection in accordance with
this Facility Schedule.
Other Terms and Conditions:
None
Issued By: J. Craig Baker, Senior VP
Regulatory Services
Issued On: November 26, 2008
Effective Date: November 1, 2008
106
Service Agreement No. 623
Original Sheet No. 197
Operating Companies of the
American Electric Power System
FERC Electric Tariff, Third Revised Volume No. 6
TO
f14^1.E fA1
YA
t:Ai^ESa7c
?3
ukr^ t3^
4tA
LONESs.M TAP
^^
^ - _ `Z+,..,....^...
i !54
1783
.^® .
^ ^. ^ ^. ,,.^ . .....
^, ..... ._..
LCRA
_^ .....
--AEP "i8:7
(3) 546D-9J:
em
(3) +N;H,. t2 -:"-^M$.
ss/, ^w
^ 5Qp0 x -.'A
G.E.
L
560 KVA
I21t^'
^
^dT&t
7187
^ 1741
Fl;Q.
3 f'ts
El 1740
7188
Sg
t739
OF€ORt#
r=
T"1 r a ^ CENTRAL CUAlPANY
^
..^ .--...,®... ^..^,
. _.-,...,.
^
Z
_.
,,..µ,...
V
2
Effective Date: November 1, 2008
Issued By: J. Craig Baker, Senior VP
Regulatory Services
Issued On: November 26, 2008
107
Service Agreement No. 623
Original Sheet No. 198
Operating Companies of the
American Electric Power System
FERC Electric Tariff, Third Revised Volume No. 6
FACILITY SCHEDULE NO. 62
1.
Name:
2.
Location:
The Garwood Lone Star Substation (a.k.a. Lone Star Cement) is located
off of FM 2614 between the towns of Garwood and Matthews, Texas in Colorado
County. The Point of Interconnection is located where the AEP jumper from the 69 kV
transformer switch connects to the 69 kV tap transmission line.
3.
Delivery Voltage:
4.
Normal Operation of Interconnection:
Closed
5.
One-Line Diagram Attached:
Yes
6.
Facility Ownership Responsibilities of the Parties:
Garwood Lone Star
69 kV
LCRA owns the following facilities
• the following transmission lines comprised of structures, easements, conductors,
insulators, and connecting hardware:
o Garwood City to Matthews 69 kV transmission line
•
transmission line dead-end insulator strings and termination hardware
• transmission tap line from the station to the Garwood City to Matthews 69 kV
transmission line, and associated 69 kV line switches 1947 and 1953
AEP owns the following facilities:
• the Garwood Lone Star Substation including all facilities within it
• the 69 kV transmission tap line surge arresters
• any under-built distribution voltage circuits attached to the 69 kV transmission
lines that terminate into the station
7.
Facility Operation and Maintenance Responsibilities of the Parties:
•
•
AEP will control and operate the following equipment until LCRA takes over
operational control:
o 69 kV switch 1947 and associated 69 kV transmission line to Matthews,
o 69 kV switch 1953 and associated 69 kV transmission line to Garwood City,
o 69 kV transmission tap line from the Garwood City to Matthews 69 kV line to
the Lone Star station.
AEP controls and operates all other equipment in the station including the
following:
o 69 kV switch 285
Issued By: J. Craig Baker, Senior VP
Regulatory Services
Issued On: November 26, 2008
Effective Date: November 1, 2008
108
Service Agreement No. 623
Original Sheet No. 199
Operating Companies of the
American Electric Power System
FERC Electric Tariff, Third Revised Volume No. 6
•
o all distribution equipment in the station
Each Party maintains the facilities it owns that are provided for in this Facility
Schedule. Maintenance of the facilities, including circuit breaker relays, that are
owned by one Party that protect the facilities owned by the other Party, will be
subject to review and approval by the other Party.
Cost Responsibilities of the Parties:
Each Party will be fully responsible for the costs and liabilities related to the
facilities it owns.
Each Party will be responsible for all costs it incurs in connection with the
establishment and maintenance of the Point of Interconnection in accordance with
this Facility Schedule.
9.
Other Terms and Conditions:
None
Effective Date: November 1, 2008
Issued By: J. Craig Baker, Senior VP
Regulatory Services
Issued On: November 26, 2008
109
Operating Companies of the
American Electric Power System
FERC Electric Tariff, Third Revised Volume No. 6
Service Agreement No. 623
Original Sheet No. 200
TO
GARWOUD
9KV
1953
1947
TG
MaTiHEWS
1/0 AGSR
1/0 ACSR 6/9
4.1 MILES
285
(3) SMD-40A
65E
1
(3) VdEST, 10 TRANS.
59/22KV
r
500 KVA
^ 228
233
10.
G.E.
../ ^ 500 KVA
Si
iSU
940
94+7
T
T
12KV
8596
8593
NO.
D85-'5
/ 8^P-4
CEMENT PLANT
i•"
GARWC^^D LONES^`,^ R NO. 30 70
DRFT.RLC
ENG.
APR
DATE: 1116106
Issued By: J. Craig Baker, Senior VP
Regulatory Services
Issued On: November 26, 2008
DWG.
R
Effective Date: November 1, 2008
110
Service Agreement No. 623
Original Sheet No. 201
Operating Companies of the
American Electric Power System
FERC Electric Tariff, Third Revised Volume No. 6
FACILITY SCHEDULE NO. 63
Garwood City
l.
Name:
2.
The Garwood City Substation is located southeast of Garwood, Texas on
Location:
Mansfield Road in Colorado County. The Point of Interconnection is located at the top
connectors on the jumpers that connect the 69 kV high bus to the 69 kV low bus.
3.
Delivery Voltage:
4.
Normal Operation of Interconnection:
Closed
5.
One-Line Diagram Attached:
Yes
6.
Facility Ownership Responsibilities of the Parties:
69 kV
LCRA owns the following facilities:
• the following transmission lines comprised of structures, easements, conductors,
insulators, and connecting hardware:
o Garwood City to Matthews 69 kV transmission line
o Garwood City to El Campo 69 kV transmission line
• transmission line dead-end insulator strings and termination hardware
• 69 kV transmission line switches 848 and 856
• 69 kV high bus, including conductors, insulators and termination hardware
• jumpers from the 69 kV transmission line switches 856 and 848 to the lines and to
the high bus
• 1 - 69 kV line potential transformer and foundation
AEP owns the following facilities:
• the Garwood City Substation including all facilities within it, except for those
facilities owned by LCRA
the
69 kV low bus and jumpers to high bus inside the Garwood City Substation
•
• any under-built distribution voltage circuits attached to the 69 kV transmission
lines that terminate into the station
7.
Facility Operation and Maintenance Responsibilities of the Parties:
•
•
AEP will control and operate the following equipment until LCRA takes over
operational control:
o 69 kV switch 848 and associated 69 kV transmission line to Lone Star tap
o 69 kV switch 856 and associated 69 kV transmission line to El Campo
AEP controls and operates all other equipment in the station including the
Effective Date: November 1, 2008
Issued By: J. Craig Baker, Senior VP
Regulatory Services
Issued On: November 26, 2008
ill
Operating Companies of the
American Electric Power System
FERC Electric Tariff, Third Revised Volume No. 6
Service Agreement No. 623
Original Sheet No. 202
following:
o 69 kV switch 867
o all distribution equipment in the station
Each Party maintains the facilities it owns that are provided for in this Facility
Schedule. Maintenance of the facilities, including circuit breaker relays, that are
owned by one Party that protect the facilities owned by the other Party, will be
subject to review and approval by the other Party.
Cost Responsibilities of the Parties:
•
•
Each Party will be fully responsible for the costs and liabilities related to the
facilities it owns.
Each Party will be responsible for all costs it incurs in connection with the
establishment and maintenance of the Point of Interconnection in accordance with
this Facility Schedule.
9.
Other Terms and Conditions:
None
Issued By: J. Craig Baker, Senior VP
Regulatory Services
Effective Date: November 1, 2008
Issued On: November 26, 2008
112
Service Agreement No. 623
Original Sheet No. 203
Operating Companies of the
American Electric Power System
FERC Electric Tariff, Third Revised Volume No. 6
TO
EL. GAMPCS
TO
9fdN rAR LW
848
...._ ....^ ...... .....^ .-.,^,
E9KY
856
LCRA
® AEP
AUTO SECT.
PT ^ _j ^\867
(3) SMO-iA
6:sE
(3) PENN. rm TRANS.
59/, 2"
4.5 intbA
r
854
AC.
1044
5,OKVn
3 P3s
^^ a ° 3 635II ^
zrtY
iy 2ss1
257>
2572
N.D.
^ 2574
/250
^ 2562
AIb.
E] 25613
2559
Wok
TEXAS '_`ArTRAL COdfl'AW
^ ^D c/r}° f
-- 69/I 2k V
yo. ^^
DATE: rr16106
.306950 1
1E
^
Effective Date: November 1, 2008
Issued By: J. Craig Baker, Senior VP
Regulatory Services
Issued On: November 26, 2008
113
Operating Companies of the
American Electric Power System
Service Agreement No. 623
Original Sheet No. 204
FERC Electric Tariff, Third Revised Volume No. 6
FACILITY SCHEDULE NO. 64
El Campo
Name:
2.
Location:
The El Campo Substation is located at 506 Marion Street in El Campo,
Texas in Wharton County. There are two Points of Interconnection at the El Campo
Substation. One is at the termination of the 69 kV transmission line from the Garwood
City Substation and the other is at the termination of the 69 kV transmission line from the
Altair Switching Station. Both Points of Interconnection are located at the point where
the jumper conductors from the station equipment physically contact the connectors on
the 69 kV transmission line conductors.
Delivery Voltage:
69 kV
4.
Normal Operation of Interconnection:
Closed
5.
One-Line Diagram Attached:
Yes
6.
Facility Ownership Responsibilities of the Parties:
AEP owns the following facilities:
• the El Camp Substation including all the facilities within it
• jumper conductors from the station facilities to the Point(s) of Interconnection
• deadend structures that terminate all transmission lines into the station
• any under-built distribution voltage circuits attached to the 69 kV transmission
lines that terminate into the station
LCRA owns the following facilities:
the following transmission lines comprised of structures, easements, conductors,
insulators, and connecting hardware:
o
o
El Campo to Garwood City 69 kV transmission line
El Campo to Altair 69 kV transmission line
insulators and hardware on the deadend structures that terminate the 69 kV
transmission line from the Garwood City Substation
insulators and hardware on the deadend structures that terminate the 69 kV
transmission line from the Altair Switching Station
7.
Facility Operation and Maintenance Responsibilities of the Parties:
•
•
AEP controls and operates the El Campo Station, including all facilities within it
AEP controls and operates all transmission lines that terminate into the station
except for the 69 kV lines from the Eagle Lake and Altair substations
Issued By: J. Craig Baker, Senior VP
Regulatory Services
Issued On: November 26, 2008
Effective Date: November 1, 2008
114
Service Agreement No. 623
Original Sheet No. 205
Operating Companies of the
American Electric Power System
FERC Electric Tariff, Third Revised Volume No. 6
•
•
8.
9.
AEP will control and operate the following equipment until LCRA takes over
operational control:
o 69 kV transmission line to Eagle Lake, via Garwood
o 69 kV transmission line to Altair
Each Party maintains the facilities it owns that are provided for in this Facility
Schedule. Maintenance of the facilities, including circuit breaker relays, that are
owned by one Party that protect the facilities owned by the other Party, will be
subject to review and approval by the other Party.
Cost Responsibilities of the Parties:
•
Each Party will be fully responsible for the costs and liabilities related to the
facilities it owns.
•
Each Party will be responsible for all costs it incurs in connection with the
establishment and maintenance of the Point of Interconnection in accordance with
this Facility Schedule.
Other Terms and Conditions:
None
Effective Date: November 1, 2008
Issued By: J. Craig Baker, Senior VP
Regulatory Services
Issued On: November 26, 2008
115
Operating Companies of the
American Electric Power System
Service Agreement No. 623
Original Sheet No. 206
FERC Electric Tariff, Third Revised Volume No. 6
L ^
4:
N
„
^ ^
[[[
j}
(
s^-
R
^......o*
,r,
a
YJY
+^f
O^
W
e.a
F
^
q.
..
i
m
..............__. .._...._....-__ .3
IR
•"'i^
LC b
A! A
,,. __ .
yp^
®
^u^.
-y+,y•
.
v. ^
^
R^^
^.^
rf ry
T,
AEP
q• rd
'^`^
^^
g..
^
Qf
Cl
^
/
-
rt
A
^
^.
Tu.4S GFi4'7/,'4C Cu"m'1Nr
^ ....
^z
LD^ ^rs
)25
APP,
^^TE: 31-Tr,^'cr5
Issued By: J. Craig Baker, Senior VP
Regulatory Services
Issued On: November 26, 2008
Effective Date: November 1, 2008
116
Service Agreement No. 623
Original Sheet No. 207
Operating Companies of the
American Electric Power System
FERC Electric Tariff, Third Revised Volume No. 6
FACILITY SCHEDULE NO. 65
B&B Gravel
1.
Name:
2.
The B&B Gravel Substation is located at 6747 State Hwy 71, Garwood,
Location:
Texas in Colorado County. The Point of Interconnection is located where the top
connectors on the AEP transformer switch connects to the LCRA 69 kV jumpers.
3.
Delivery Voltage:
4.
Normal Operation of Interconnection:
Closed
5.
One-Line Diagram Attached:
Yes
6.
Facility Ownership Responsibilities of the Parties:
69 kV
LCRA owns the following facilities:
• the following transmission lines comprised of structures, easements, conductors,
insulators, and connecting hardware:
o B&B Gravel to Altair 69 kV transmission line
o B&B Gravel to Garwood Pump 69 kV transmission line
• transmission line wood H-frame structure, including equipment mounting
crossanns for 69 kV line switch 3897
• transmission line dead-end insulator string and termination hardware
• 69 kV sectionalizing switch 3897
• jumpers from switch 3897 to the 69 kV line and to switch 3927
AEP owns the following facilities:
• the B&B Gravel Substation including all facilities within it
• the following equipment on the H-frame structure owned by LCRA:
o 69 kV switch 3927 and associated mounting hardware
o 69 kV arresters and associated mounting hardware
o 69 kV fuses and associated mounting hardware
• any under-built distribution voltage circuits attached to the 69 kV transmission
lines that terminate into the station
7.
Facility Operation and Maintenance Responsibilities of the Parties:
•
AEP will control and operate the following equipment until LCRA takes over
operational control:
o 69 kV switch 3897 and associated 69 kV transmission line to Altair and
Garwood Pump
Effective Date: November 1, 2008
Issued By: J. Craig Baker, Senior VP
Regulatory Services
Issued On: November 26, 2008
117
Service Agreement No. 623
Original Sheet No. 208
Operating Companies of the
American Electric Power System
FERC Electric Tariff, Third Revised Volume No. 6
•
•
8.
o 69 kV switch 3927
o all distribution equipment in the station
Each Party maintains the facilities it owns that are provided for in this Facility
Schedule. Maintenance of the facilities, including circuit breaker relays, that are
owned by one Party that protect the facilities owned by the other Party, will be
subject to review and approval by the other Party.
Cost Responsibilities of the Parties:
•
•
9.
AEP controls and operates all other equipment in the station including the
following:
Each Party will be fully responsible for the costs and liabilities related to the
facilities it owns.
Each Party will be responsible for all costs it incurs in connection with the
establishment and maintenance of the Point of Interconnection in accordance with
this Facility Schedule.
Other Terms and Conditions: None
Issued By: J. Craig Baker, Senior VP
Regulatory Services
Issued On: November 26, 2008
Effective Date: November 1, 2008
118
Service Agreement No. 623
Original Sheet No. 209
Operating Companies of the
American Electric Power System
FERC Electric Tariff, Third Revised Volume No. 6
ALTAR
.....
-^ ^twOon
213 mi.
Pump
307
^. ,. .......
- 3927
LCRA
AEP
(3) 3N WD-1A
(3) Ata']tdE'C lo
0JIZ 1(Y
45M 1NA
3997 ^
N10. .fi^,..
1fTs°1-£TiT.3$
AC.
5M KYA
SU
TO 12KV
RECLOSER ON
DIST- FEEDER
T£,45 CENTRAL C'Ct)-rPANY
19 &
L1Rf"T_RLC
EKG.
APP,^
-°^DATE: W4516t Dwc-
Effective Date: November 1, 2008
Issued By: J. Craig Baker, Senior VP
Regulatory Services
Issued On: November 26, 2008
119
Service Agreement No. 623
Original Sheet No. 210
Operating Companies of the
American Electric Power System
FERC Electric Tariff, Third Revised Volume No. 6
FACILITY SCHEDULE NO. 66
Garwood Pump
Name:
2.
Location:
The Garwood Pump Substation is located north of Garwood, Texas in
Colorado County. (From Garwood, travel north 4.9 miles on Highway 71, turn east at
canal and follow the gravel road 1.7 miles.) The Point of Interconnection is located at the
termination of the 69 kV transmission line continuing from the B&B Gravel Substation
where the AEP jumper conductors from the Garwood Pump Substation equipment
physically contact the connectors on the 69 kV transmission line conductors.
Delivery Voltage:
4.
6.
69 kV
Normal Operation of Interconnection:
Closed
One-Line Diagram Attached:
Yes
Facility Ownership Responsibilities of the Parties:
LCRA owns the following facilities:
the following transmission lines comprised of structures, easements, conductors,
insulators, and connecting hardware:
o Garwood Pump to B&B Gravel 69 kV transmission line
insulators and hardware on the structures that terminate the 69 kV transmission
line onto the station structure
AEP owns the following facilities:
the Garwood Pump Substation including all facilities within it
any under-built distribution voltage circuits attached to the 69 kV transmission
lines that terminate into the station
7.
Facility Operation and Maintenance Responsibilities of the Parties:
AEP will control and operate the following equipment until LCRA takes over
operational control:
o 69 kV transmission line from the station to B&B Gravel station.
AEP controls and operates all other equipment in the station including the
following:
o 69 kV switch 618
o all distribution equipment in the station
Issued By: J. Craig Baker, Senior VP
Regulatory Services
Issued On: November 26, 2008
Effective Date: November 1, 2008
120
Service Agreement No. 623
Original Sheet No. 211
Operating Companies of the
American Electric Power System
FERC Electric Tariff, Third Revised Volume No. 6
•
Each Party maintains the facilities it owns that are provided for in this Facility
Schedule. Maintenance of the facilities, including circuit breaker relays, that are
owned by one Party that protect the facilities owned by the other Party, will be
subject to review and approval by the other Party
Cost Responsibilities of the Parties:
Each Party will be fully responsible for the costs and liabilities related to the
facilities it owns.
Each Party will be responsible for all costs it incurs in connection with the
establishment and maintenance of the Point of Interconnection in accordance with
this Facility Schedule.
9.
Other Terms and Conditions:
None
Effective Date: November 1, 2008
Issued By: J. Craig Baker, Senior VP
Regulatory Services
Issued On: November 26, 2008
121
Service Agreement No. 623
Original Sheet No. 212
Operating Companies of the
American Electric Power System
FERC Electric Tariff, Third Revised Volume No. 6
AEP
^^---
LCRA
TO ALT, P.
VA a LL
2 s3 :^.
(^) 9,T-- k ^
{^3 MOL. ^ - .
so-^^
^
23ciM
M+= C?'fr?'R.Al. C'09PAVY
r..
.
^,
D7 ,^
=ERG-
^,-
,
Issued By: J. Craig Baker, Senior VP
Regulatory Services
Issued On: November 26, 2008
Effective Date: November 1, 2008
122
Service Agreement No. 623
Original Sheet No. 213
Operating Companies of the
American Electric Power System
FERC Electric Tariff, Third Revised Volume No. 6
FACILITY SCHEDULE NO. 67
Name:
Ideal Cement
2.
The Ideal Cement Substation, a.k.a. Garwood Ideal Substation, is located
Location:
north of Garwood, Texas in Colorado County. (From Garwood, go north 4.1 miles on
Highway 71, turn west, travel 1.7 miles, turn left and travel 2.1 miles.) The Point of
Interconnection is located where the AEP jumper conductors from the Ideal Cement
Substation equipment physically contact the connectors on the 69 kV transmission line.
3.
Delivery Voltage:
4.
Normal Operation of Interconnection:
Closed
One-Line Diagram Attached:
Yes
6.
69 kV
Facility Ownership Responsibilities of the Parties:
LCRA owns the following facilities:
the following transmission lines comprised of structures, easements, conductors,
insulators, and connecting hardware:
o Altair to Garwood Relief Pump 69 kV transmission line
insulators and hardware on the deadend structures that terminate the 69 kV line
onto the station structure
AEP owns the following facilities:
• the Ideal Cement Substation including all facilities within it
any under-built distribution voltage circuits attached to the 69 kV transmission
lines that terminate into the station
Facility Operation and Maintenance Responsibilities of the Parties:
AEP will control and operate the following equipment until LCRA takes over
operational control:
o 69 kV transmission line from the station to Altair
AEP controls and operates all other equipment in the station including the
following:
o 69 kV switch 1137
o all distribution equipment in the station
Effective Date: November 1, 2008
issued By: J. Craig Baker, Senior VP
Regulatory Services
Issued On: November 26, 2008
123
Operating Companies of the
American Electric Power System
FERC Electric Tariff, Third Revised Volume No. 6
Service Agreement No. 623
Original Sheet No. 214
Each Party maintains the facilities it owns that are provided for in this Facility
Schedule. Maintenance of the facilities, including circuit breaker relays, that are
owned by one Party that protect the facilities owned by the other Party, will be
subject to review and approval by the other Party.
Cost Responsibilities of the Parties:
9.
•
Each Party will be fully responsible for the costs and liabilities related to the
facilities it owns.
•
Each Party will be responsible for all costs it incurs in connection with the
establishment and maintenance of the Point of Interconnection in accordance with
this Facility Schedule.
Other Terms and Conditions: None
Issued By: J. Craig Baker, Senior VP
Regulatory Services
Issued On: November 26, 2008
Effective Date: November 1, 2008
124
Service Agreement No. 623
Original Sheet No. 215
Operating Companies of the
American Electric Power System
FERC Electric Tariff, Third Revised Volume No. 6
TO
ALTAR
^
TO
CAAW=
v
s^s8 m.
RMWr
0.64 rni.
TO
TEXAS
INDUSTRIES
O.(34 ma.
To
a & @ GRfi1EL. &
GAf7YX7f>k'S PUMP
.^^ ...w
Q.^3 cr^
..,;ur: ^ ^.. ..^. ,..,...
s ^...^..
-Jill
LCRA
® ^..--'; ,,,.,....
AEP
1137
(1) 38 G-30A
(2) 50E Si.f©-1A
(5) AR--- To TRANS,
69j2.3 KV
:i(ka0 KVA
uL
^("'
t 1134
1056 1a
3 Ph
SU
(
^'y 360 KVA
4,1 3SV
o .. /
TO
CEMENT PLW
TEXAC CENTRAL CVaMP.4N!'
:,7 i-AL C=^^ENT SUR,
ETT_ r-L._
Ew.^^
h,J P.
DATE,
°
Effective Date: November 1, 2008
Issued By: J. Craig Baker, Senior VP
Regulatory Services
Issued On: November 26, 2008
125
Operating Companies of the
American Electric Power System
FERC Electric Tariff, Third Revised Volume No. 6
Service Agreement No. 623
Original Sheet No. 216
FACILITY SCHEDULE NO. 68
1.
Name:
2.
Location:
The Garwood Relief Substation is located north of Garwood, Texas in
Colorado County. (From Garwood travel north 4.2 miles on Highway 71, turn west,
travel 1.7 miles, turn right on gravel road and travel 1.3 miles.) The Point of
Garwood Relief
Interconnection is located at the termination of the 69 kV line that is tapped off of the
Altair Switching Station to Garwood Pump Station 69 kV transmission line where the
jumper conductors from the station equipment physically contact the connectors on the
69 kV transmission line conductors.
Delivery Voltage:
69 kV
4.
Normal Operation of Interconnection:
Closed
5.
One-Line Diagram Attached:
Yes
6.
Facility Ownership Responsibilities of the Parties:
LCRA owns the following facilities:
• the following transmission lines comprised of structures, easements, conductors,
insulators, and connecting hardware:
o Garwood Relief to Altair 69 kV transmission line
• insulators and hardware on the deadend structures that terminate the 69 kV
transmission tap line into the station
AEP owns the following facilities:
•
7.
the Garwood Relief Substation including all facilities within it
any under-built distribution voltage circuits attached to the 69 kV transmission
lines that terminate into the station
Facility Operation and Maintenance Responsibilities of the Parties:
•
•
AEP will control and operate the following equipment until LCRA takes over
operational control:
o 69 kV transmission tap line from the station to Altair
AEP controls and operates all other equipment in the station including the
following:
o
•
69 kV switch 108
o all distribution equipment in the station
Each Party maintains the facilities it owns that are provided for in this Facility
Issued By: J_ Craig Baker, Senior VP
Regulatory Services
Issued On: November 26, 2008
Effective Date: November 1, 2008
126
Service Agreement No. 623
Original Sheet No. 217
Operating Companies of the
American Electric Power System
FERC Electric Tariff, Third Revised Volume No. 6
Schedule. Maintenance of the facilities, including circuit breaker relays, that are
owned by one Party that protect the facilities owned by the other Party, will be
subject to review and approval by the other Party.
8.
Cost Responsibilities of the Parties:
Each Party will be fully responsible for the costs and liabilities related to the
facilities it owns.
Each Party will be responsible for all costs it incurs in connection with the
establishment and maintenance of the Point of Interconnection in accordance with
this Facility Schedule.
Other Terms and Conditions: None
Effective Date: November 1, 2008
Issued By: J. Craig Baker, Senior VP
Regulatory Services
Issued On: November 26, 2008
127
Operating Companies of the
American Electric Power System
FERC Electric Tariff, Third Revised Volume No. 6
Service Agreement No. 623
Original Sheet No. 218
(3) KEARNEY
20A
(3) PAC,R. 19 TRANS.
tiN/SPARE
69/2.3KV
60D KVA
SU ^.
6903
23DW
RELIEF
GARWOOD ' . i-^ sus. #30il - 6.9,,^'`.^. 4fCV
DRFr.RCe
Fvu.
AM
DATE: 1117106 1 D o:303 15001
Issued By: J. Craig Baker, Senior VP
Regulatory Services
Issued On: November 26, 2008
7V 2
Effective Date: November 1, 2008
128
ENCLOSURE2
129
Operating Companies of the
American Electric Power System
FERC Electric Tariff, Third Revised Volume No. 6
Service Agreement No. 341
First Revised Sheet No. 28
Supersedes Original Sheet No. 28
FACILITY SCHEDULE NO. 17
(TERMINATED)
1.
Name: Pioneer (TXI) Substation
2.
Facility Location:
At the existing Texas Industries (TXI) Substation located
approximately 6.2 miles north of Garwood, approximately 2 miles west of the intersection of
State Highway 71 and County Road 111 across from the TXI Plant.
Issued By: J. Craig Baker, Senior VP
Regulatory Services
Issued On: November 26, 2008
Effective Date: November 1, 2008
130
Service Agreement No. 341
First Revised Sheet No. 29
Supersedes Original Sheet No. 29
Operating Companies of the
American Electric Power System
FERC Electric Tariff, Third Revised Volume No. 6
RESERVED SHEET
Effective Date: November 1, 2008
Issued By: J. Craig Baker, Senior VP
Regulatory Services
Issued On: November 26, 2008
131
Operating Companies of the
American Electric Power System
FERC Electric Tariff, Third Revised Volume No. 6
Service Agreement No. 341
First Revised Sheet No. 30
Supersedes Original Sheet No. 30
RESERVED SHEET
Issued By: J. Craig Baker, Senior VP
Regulatory Services
Issued On: November 26, 2008
Effective Date: November 1, 2008
132
ENCLOSURE 3
133
Operating Companies of the
American Electric Power System
FERC Electric Tariff, Third Revised Volume No. 6
First Revised Sheet No. 1
Cancels FERC Service Agreement No. 404
Notice of Cancellation
Issued By: J. Craig Baker, Senior VP
Regulatory Services
Issued On: November 26, 2008
Effective Date: October 28, 2008
134