Colliers Project Leaders 23 Beechgrove Lane, Kingston, ON Heating and Cooling RTU Renewal Project No. 1039236-270802 Mechanical and Electrical Specifications Issued for 66% Review 2016-06-21 Project: 8014-053-202 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 Section 00 01 10 TABLE OF CONTENTS Page 1 of 1 SPECIFICATIONS SECTION TITLE NO. OF PAGES DIVISION 01 – GENERAL REQUIREMENTS 01 00 10 General Instructions ........................................................................................... 13 01 91 13 General Commissioning (Cx) Requirements ...................................................... 11 01 91 14 Commissioning - Plan ........................................................................................ 22 01 91 15 Commissioning – Training.................................................................................... 8 DIVISION 23 23 05 00 23 05 93 23 07 13 23 11 23 23 31 13.01 23 74 00 – HEATING, VENTILATING AND AIR CONDITIONING (HVAC) Common Work Results for HVAC ....................................................................... 4 Testing, Adjusting and Balancing for HVAC ......................................................... 5 Duct Insulation ..................................................................................................... 5 Facility Natural Gas Piping ................................................................................... 3 Metal Ducts – Low Pressure to 500 Pa ................................................................ 4 Packaged Outdoor HVAC Equipment .................................................................. 9 DIVISION 25 – INTEGRATED AUTOMATION 25 05 01 EMCS: General Requirements ............................................................................. 9 25 05 02 EMCS: Submittals and Review Process............................................................... 2 25 05 11 EMCS: Start-Up, Verification and Commissioning ................................................ 4 DIVISION 26 - ELECTRICAL 26 05 00 Common Work Results for Electrical .................................................................... 6 26 05 20 Wire and Box Connectors (0-1000V).................................................................... 3 26 05 21 Wires and Cables (0-1000V) ................................................................................3 26 24 16.01 Panelboards Breaker Type .................................................................................. 1 26 27 26 Wiring Devices ..................................................................................................... 1 26 28 23 Disconnect Switches – Fused and Non-Fused ..................................................... 1 END OF SECTION 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 Part 1 General 1.1 GENERAL Section 01 00 10 GENERAL INSTRUCTIONS Page 1 of 13 .1 The Procurement and Contracting Requirements (Division 00) apply to all sections of Divisions 01, 23, 25 and 26. .2 Contractors shall be responsible for fire alarm shut downs and restarts as required by designated fire alarm company for the building. .3 Contractor will be responsible for scanning of concrete floors, walls and underground locates when and if required to complete the project. .4 All work described in these plans and specifications must be performed without any interruption of HVAC systems or their associated controls thereof that may affect the occupants of the facility in any way. 1.2 CODES AND STANDARDS .1 Perform work in accordance with Ontario Building Code of Canada (OBC) 2012 and other applicable code of territorial or local application including amendments up to project tender closing date provided that in case of conflict or discrepancy, more stringent requirements apply. .2 Quality of materials and work must meet or exceed requirements of specified standards, codes and referenced documents. .3 All materials shall be new and work shall conform to the minimum applicable standards of the Canadian General Standards Board, the Canadian Standards Association. 1.3 TAXES .1 1.4 Pay taxes properly levied by law (including Federal, Provincial and Municipal). FEES, PERMITS, AND CERTIFICATES .1 Obtain and pay for building permit, certificates, licenses and other permits as required by municipal, provincial and federal authorities. .2 Provide authorities with plans and information for acceptance certificates. .3 Provide inspection certificates as evidence that Work conforms to requirements of authority having jurisdiction. .4 Submit to Project Manager, copy of application submissions and approval documents received for authority having jurisdiction. 1.5 FIRE SAFETY REQUIREMENTS .1 Comply with the Ontario Building Code of Canada 2012 (OBC) for fire safety in construction and the National Fire Code of Canada 2005 (NFC) for fire prevention, fire-fighting and life safety in building in use. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 .2 Comply with Human Resources Skills Development Canada (HRSDC), Fire Commissioner of Canada (FCC) standards available from Fire Protection Engineering Services, Labour Program, HRSDC or following internet site: http://hrsdc.gc.ca/en/labour/fire_protection/plicies_standards/index.shtml . .1 .2 .3 .4 .3 No. 301: Standard for Construction Operations. No. 302: Standard for Welding and Cutting. No. 374: Fire Protection Standard for General Storage (Indoor and Outdoor). Retain fire safety documents and standards on site. Welding and cutting: .1 .2 .3 .4 .5 .6 .4 Section 01 00 10 GENERAL INSTRUCTIONS Page 2 of 13 At least 48 hours prior to commencing cutting, welding or soldering procedure, provide to Project Manager. .1 Notice of intent, indicating devices affected, time and duration of isolation or bypass. .2 Completed welding permit as defined in FC 302. .3 Return welding permit to Project Manager immediately upon completion of procedures for which permit was issued. Before welding, soldering, grinding and/or cutting work, obtain a permit from Fire Prevention Unit as directed by Project Manager. Store flammable liquids in approved CSA containers inspected by the Fire Prevention Unit. Only use open flame when authorized by Fire Prevention Unit. Provide fire watcher as described in FC 302 when welding or cutting operations are carried out in areas where combustible materials within 10 m may be ignited by conduction or radiation. When work requires interruption of fire alarms or fire suppression, extinguishing or protection systems: .1 Provide watchman service as described in FC 301; In general, watchman service is defined as an individual conversant with Fire Emergency Procedures, performing fire picket duty within an unprotected and unoccupied (no workers) area once per hour. .2 Retain services of manufacturer for fire protection systems on daily basis, to isolate and protect devices relating to: .1 Modification of fire alarms, fire suppression, extinguishing or protection systems; .2 Cutting, welding, soldering or other construction activities which might activate fire protection systems. Immediately upon completion of work, restore fire protection systems to normal operation and verify that devices are fully operational. Inform fire alarm system monitoring agency and local Fire Department immediately prior to isolation and immediately upon restoration of normal operation. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 1.6 Section 01 00 10 GENERAL INSTRUCTIONS Page 3 of 13 FIELD QUALITY CONTROL .1 Carry out Work using qualified licensed workers or apprentices in accordance with Provincial Act respecting manpower vocational training and qualification. .2 Permit employees registered in Provincial apprenticeship program to perform specific tasks only if under direct supervision of qualified licensed workers. .3 Determine permitted activities and tasks by apprentices, based on level of training attended and demonstration of ability to perform specific duties. 1.7 FAMILIARIZATION WITH SITE .1 Contractor may visit site prior to submitting Tender to examine site conditions and assess risks and requirements for completing Work. No allowance is made on account of error or negligence to properly observe and determine existing conditions. .2 Obtain prior permission from Project Manager before carrying out site inspection. 1.8 HAZARDOUS MATERIALS .1 Comply with the requirements of the Workplace Hazardous Materials Information System (WHMIS) regarding use, handling, storage, and disposal of hazardous materials; and regarding labelling and the provision of Material Safety Data Sheets (MSDS) acceptable to Human Resources and Social Development Canada (HRSDC), Labour program. .2 For work in occupied buildings give Project Manager 48 hours notice for work involving designated substances (Ontario Bill 208), hazardous substances (Canada Labour Code Part II Section 10), and before painting, caulking, installing carpet or using adhesives. 1.9 TEMPORARY UTILITIES .1 Existing services required for work, excluding power required for space heating may be used by Contractor without charge. Ensure capacity is adequate prior to imposing additional loads. Connect and disconnect at own expense and responsibility. .2 Notify Project Manager and utility companies of intended interruption of services, obtain requisite permission. .3 Notify Project Manager of each necessary interruption of any mechanical or electrical service throughout course of work, as per the project’s Owner Project Requirements (Section 00 73 10). Minimize duration and frequency of interruptions. Carry out interruptions after normal working hours of occupants. 1.10 REMOVED MATERIALS .1 1.11 Unless otherwise specified, materials for removal become Contractor's property. Remove materials promptly from site. PROTECTION .1 Protect finished work against damage. .2 Protect adjacent work against spread of dust and dirt beyond work areas. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 .3 1.12 Section 01 00 10 GENERAL INSTRUCTIONS Page 4 of 13 Protect operatives and other users of site from hazards. EXAMINATION .1 Examine site and conditions likely to affect work and be familiar and conversant with existing conditions. .2 Provide photographs of surrounding properties, objects and structures liable to be damaged or be subject of subsequent claims. 1.13 USE OF SITE AND FACILITIES .1 1.14 Execute work with least possible interference or disturbance to building operations, occupants, public and normal use of premises. Arrange with Project Manager to facilitate execution of work. Refer to Division 00 for work that must be done during "off hours". SITE STORAGE .1 Do not unreasonably encumber site with materials or equipment. .2 Move stored products or equipment which interfere with operations of other contractors. .3 Obtain and pay for use of additional storage or work areas needed for operations. 1.15 CONCEALMENT .1 1.16 Conceal pipes, ducts and wiring in floor, wall and ceiling construction of finished areas except where indicated. CUT, PATCH AND MAKE GOOD .1 Cut existing surfaces as required to accommodate new work. .2 Remove items shown or specified. .3 Make cuts with clean, true, smooth edges. Make patches inconspicuous in final assembly. .4 Patch and make good surfaces cut, damaged or disturbed, to Project Manager’s approval. Match existing material, colour, finish and texture. Retain and pay for professional subcontractors to carry out this work (ceilings will be affected). .5 Paint as required to match existing colour. .6 Replace all ceiling tiles broken during execution of the work. .7 Install firestops and smoke seals in accordance with ULC-S115, around pipe, ductwork, cables, and other objects penetrating fire separations to provide fire resistance not less than the fire resistance rating of surrounding floor, ceiling, and wall assembly. 1.17 SLEEVES, HANGERS AND INSERTS .1 Co-ordinate setting and packing of sleeves and supply and installation of hangers and inserts. Obtain Consultant's approval before cutting into structure. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 1.18 Section 01 00 10 GENERAL INSTRUCTIONS Page 5 of 13 SCAFFOLDS AND WORK PLATFORMS .1 Design, install, and inspect scaffolds and work platforms required for work in accordance with relevant municipal, provincial and other regulations. .2 Provide design drawings, signed and sealed by qualified Professional Engineer licensed in Province of Ontario. .3 Additions or modifications to scaffolding must be approved in writing by Professional Engineer licensed in Province of Ontario. 1.19 DUST CONTROL .1 Provide temporary dust tight screens or partitions to localize dust generating activities, and for protection of workers, finished areas of work and public. .2 Maintain and relocate protection until such work is complete. .3 Protect furnishings within work area with 0.102 mm thick polyethylene film during construction. Remove film during non-construction hours and leave premises in clean, unencumbered and safe manner for normal daytime function. 1.20 BUILDING SMOKING ENVIRONMENT .1 1.21 Comply with smoking restrictions. WASTE MANAGEMENT .1 Comply with the Environmental Protection Act, Ontario Regulations O.Reg. 102/94 and O. Reg. 103/94 for waste management program on construction and demolition projects. .2 Conduct "waste audit" to determine waste generated during demolition or construction operations, prepare written "waste reduction work plan" and implement procedures to reduce, reuse and recycle materials to the extent possible. .3 Provide source separation program to disassemble and collect in an orderly fashion materials designated for alternative disposal from general waste stream as follows: .1 .2 .3 .4 1.22 Cardboard (corrugated) and paper. Plastic. Steel. Proof that materials have been received at an Approved Waste Processing Site or certified Waste Disposal Site as required. SUBMITTALS .1 Provide submittals in accordance with Division 00. .2 Shop Drawings: .1 .2 Submit for Consultant review, hard copies and electronic copy (*.pdf) of each shop drawing. Review is for sole purpose of ascertaining conformance with general design concept, and does not mean approval of design details inherent in shop drawings, responsibility for which remains with Contractor. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 .3 .4 1.23 Section 01 00 10 GENERAL INSTRUCTIONS Page 6 of 13 Consultant's review does not relieve Contractor of responsibility for errors or omissions in shop drawings or of Contractor's responsibility for meeting requirements of Contract Documents. Do not commence manufacture or order materials before shop drawings are reviewed. DOCUMENTS REQUIRED .1 Maintain at job site, one copy each document as follows: .1 .2 .3 .4 .5 .6 .7 .8 .9 .10 1.24 Contract Drawings. Specifications. Addenda. Reviewed Shop Drawings. List of outstanding shop drawings. Change Orders. Other modifications to Contract. Field Test Reports. Copy of Approved Work Schedule. Other documents as specified. INSPECTION AND TESTING .1 Tests on materials and equipment, as specified within trade sections, is responsibility of Contractor except where specified. .2 Provide necessary instruments, equipment and qualified personnel to perform tests. .3 At completion of tests, turn over two sets of fully documented tests reports to Consultant. .4 Where tests or inspections reveal work not in accordance with Contract, bear cost of tests and additional tests as Project Manager & Consultant requires to verify acceptability of corrected work. .5 Pay costs for uncovering and making good work that is covered before inspection or testing is completed and approved by Consultant. 1.25 MANUFACTURERS INVOLVEMENT .1 Arrange for Manufacturer to submit copies of all production test records for production test required by these specifications prior to shipping. .2 Prior to start-up of equipment or systems, obtain manufacturer’s installation, start-up and operation instructions and review with Project Manager. .3 Use manufacturer’s trained start-up personnel to maintain integrity of warranty. .4 Verify with manufacturer that testing as specified will not void any warranties. .5 Manufacturer’s personnel to be experienced in design, installation and operation of equipment and systems and be able to interpret test results in clear, concise, logical manner. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 .6 1.26 Section 01 00 10 GENERAL INSTRUCTIONS Page 7 of 13 Report in writing to Project Manager any deficiencies or defects noted during performance of services. WORK CO-ORDINATION .1 Co-ordinate work of sub trades. .1 .2 Convene meetings between subcontractors whose work interfaces and ensure awareness of areas and extent of interface required. .1 .3 .2 1.27 Provide each subcontractor with complete plans and specifications for Contract, to assist them in planning and carrying out their respective work. Ensure sub-contractors receive Divisions 00 and 01. Work Co-operation: .1 .4 Designate one person to be responsible for review of contract documents, shop drawings, and planning and managing co-ordination of Work. Ensure co-operation between trades in order to facilitate general progress of Work and avoid situations of spatial interference. Ensure that each trade provides other trades reasonable opportunity for completion of Work to prevent unnecessary delays, cutting, patching and removal or replacement of completed work. Project Manager & Consultant are not responsible for, or accountable for extra costs incurred as a result of Contractor's failure to co-ordinate Work or to resolve disputes between subcontractors. CLEAN UP .1 1.28 Clean up work area as work progresses. At end of each work period and more often if required by Project Manager, remove debris from site, neatly stack material for use, and clean up generally. OPERATIONS AND MAINTENANCE MANUALS .1 Two (2) weeks prior to any scheduled training or substantial performance inspection submit for review to the Project Manager, one (1) hard copy and one electronic copy (*.pdf) of Operations Data and Maintenance Manual, compiled as follows: .1 .2 .3 Must be in a binder labelled on the front cover and on the binder edge with the following information: Building Name and address, project name, project number, completed date (ex. October 2006). Title Page: O&M manual for building name, address, date, and names of the following: Contractor, Consultant, Project Managers and Commissioning Authority. Index: sections as follows: .1 A – CONTRACTUAL AND LEGAL GUIDES: The contractual and legal records shall include: .1 The name and address of the installation; .2 Details of ownership, leases; .3 Details of local and public authority consents; 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 .4 .2 .3 Section 01 00 10 GENERAL INSTRUCTIONS Page 8 of 13 Details of the design teams, consultants, commissioning authorities, installation contractors and associated subcontractors; .5 Dates for the start of the installation, for handover (substantial completion) and for the expiry of the defects liability period; (Warranty) .6 Information of all guarantees affecting components, systems/plant items, together with expiry dates and names, addresses and telephone numbers of relevant contacts. .7 For each item of plant and equipment installed within the building and contained in the list of services covered by the O&M manual, copies of the following documents shall also be provided, where applicable: .1 Test certificates; .2 Manufacturers’ guarantees and warranties; .3 Insurance inspection reports; .4 Safety and fire certificates. .8 A clear statement shall be made in this section concerning those hazards and safety precautions of which the operators and maintainers of the installations need to be made aware. They shall include the following: .1 Any known feature or operational characteristic of the equipment or systems installed which may produce a hazard; .2 Any known hazards against which protection must be provided; .3 Any mandatory requirements relating to safety; .4 Any other safety requirements which should be observed; .5 Any other relevant warnings. B - OVERALL PURPOSE: this section shall provide a general overview of the original design intent. It shall include a summary for each engineering system installed giving: .1 The parameters and conditions within which it has been designed to operate, including known hazards; .2 The type of each service (gas, water, electricity, etc.) required to operate the system; .3 The intended method of control. C – DESCRIPTION: this provides a detailed description of each engineering system installed. It shall include .1 The system type (e.g. cold water supply, chilled water supply); .2 System location and what it serves; .3 What the system depends upon in order to function; 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 .4 .4 .5 .6 .7 .8 Section 01 00 10 GENERAL INSTRUCTIONS Page 9 of 13 Design data, basic design parameters, basic assumptions made during design; .5 Reasons for selecting particular plants; .6 Expected service life (where applicable); .7 Planned operational efficiency; .8 Copy of all reviewed as-built shop drawings; D - EQUIPMENT SCHEDULE: the type, model number and serial number of all component items within the system should be listed, together with the names of their respective manufacturers or suppliers, including copies of CMMS forms for all new equipment. E - PARTS IDENTIFICATION AND RECOMMENDED SPARES: .1 This shall comprise a parts identification list detailing and identifying replaceable assemblies, sub-assemblies and components. It shall include suppliers’ recommendations for both spares and ‘running spares’ (i.e. parts required for scheduled replacement due to wear or deterioration). .2 Items normally held in stock by a supplier, or for which a refurbishment service is available, shall be identified separately. F - COMMISSIONING DATA: the results of all commissioning work and associated tests shall be provided, this shall include: .1 Measured data and Measurement points; .2 Test equipment used; .3 Calibration certificate details; .4 A statement confirms that weather design requirements were achieved. G – OPERATION: instructions must be given for the safe and efficient operation, under both normal and emergency conditions, of each engineering systems installed. These will be in addition to manufactures’ literature for plant items and shall include: .1 A recommended strategy for operation and control; .2 An outline of the general operation mode; .3 Control data (location, effect, object, sequence, limits of capability, modes, set points) .4 Procedure and sequences for start-up, running and shut down, under both normal and emergency conditions; .5 Operating procedure for stand-by plant; .6 Precautions necessary to overcome known hazards; .7 The means by which potentially hazardous plant may be made safe; .8 Target figures for both energy consumption and energy use; .9 Forms for recording plant running hours, energy consumption and the energy costs; H - MAINTENANCE INSTRUCTIONS: the manufacturer’s recommendations and instructions for maintenance must be 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 .9 .10 .11 .12 .13 Section 01 00 10 GENERAL INSTRUCTIONS Page 10 of 13 detailed for each item of plant and equipment installed. Clear distinction shall be made between planned tasks (preventive maintenance) and work done on corrective basis. Instructions shall be given on each of the following, as appropriate: .1 The isolation and return to service of plant and equipment; .2 Adjustments, calibration and testing; .3 Dismantling and assembly; .4 The exchange of components and assemblies; .5 Dealing with hazards which may arise during maintenance; .6 The nature of deterioration and defects to be looked for; .7 Special tools, test equipment and ancillary services. I - MAINTENANCE SCHEDULES: maintenance schedules shall be provided for all preventive maintenance tasks identified in Index-H. These shall be based on both manufacturers’ recommendations and other authoritative sources (e.g. statutory or mandatory requirements) and shall include: .1 Inspections; .2 Examinations and Tests; .3 Adjustments and Calibrations; .4 Lubrication; .5 Periodic overhaul. J - FAULT FINDING: procedure for the logical diagnosis and correction of faults shall be provided for critical components, equipment and systems K – LUBRICATION: a schedule of all plant requiring lubrication shall be provided together with manufacturers’ recommendations on the type of lubricant and the method and frequency of application. Where the type of lubricant is identified by product name, a generic reference (e.g. CSA, ASTM standard) should be given. Information must also be provided on special requirements for the handling and storage of lubricants. L - MODIFICATION INFORMATION: .1 Modifications are authorized changes which may affect the safety, reliability, operation or maintenance of a system or any components. .2 Information on permitted plant or system modifications allowed for by manufacturers or system designers shall be included for each system. Space must be provided in the manual for the recording of all modifications and changes as they occur (this would initially comprise a series of appropriately headed blank pages). M - DISPOSAL INSTRUCTIONS: where relevant, information shall be provided detailing: .1 Any known dangers likely to arise during the disposal of specific items of plant or equipment together with the necessary precautions and safety measures; 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 .2 .14 .15 .16 .17 Section 01 00 10 GENERAL INSTRUCTIONS Page 11 of 13 Methods for safely disposing of or destroying the equipment or any part thereof, including packaging, insulation and fluids; .3 Sources from which further information can be obtained. N - NAMES AND ADDRESSES OF MANUFACTURERS: .1 Details of all manufacturers and suppliers of equipment listed in the manual shall be provided under this heading giving name, address, telephone number, fax number, email and web address. Any additional information likely to help the building operator to make contact with or obtain advice from a manufacturer or supplier shall also be included. .2 Where appropriate, details of local stocking or spare parts, replaceable assemblies or complete units shall also be provided. .3 Details shall be arranged in alphabetical order of manufacturer or supplier name to provide a logical information retrieval procedure. O - INDEX OF PLANS AND DRAWINGS: .1 An index shall be provided of all ‘as built’ drawings supplied during the course of the installation work and on completion, identified by number and title. .2 The index shall also include a schedule of all drawings issued by manufacturers and suppliers during the course of the installation work and on completion e.g. control panel wiring diagrams. P - EMERGENCY INFORMATION: .1 An important feature of any manual is the emergency information. Located, for ease of reference, at the end of the document, this should include names, address, telephone numbers, fax numbers and emails addresses of the appropriate contacts in the event of fire, theft or burglary, and gas, electricity or water failure/leaks. It shall also list those firms or staff to contact in the event of the failure or breakdown of such plant as lifts, boilers, chillers, building automation system and pumps. .2 Where applicable, location of firefighting equipment, hydrants and rising mains shall be described. .3 Special attention shall be given to hazards particular to the building. .4 Depending on client policy, a note of security installations may also be included. Q - MANUFACTURERS LITERATURE: a complete set of all manufacturers’ literature shall be provided for the plant and equipment installed, and assembled for each building services systems. (1 copy of all information including as-built drawings on a CD will be provided.) This literature shall provide the following information: 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 Section 01 00 10 GENERAL INSTRUCTIONS Page 12 of 13 .1 .18 .2 1.29 Manufactures literature and specifications are to be inserted in the close out documents identifying operating and design temperatures, pressures, flow rates, and differentials. .2 The manufacturer and design consultants are to identify in the close out documents all preliminary sequence of operations on major components and equipment. .3 Description of the product purchased; .4 The cost and date of purchase; .5 Performance- behavioral characteristics of the equipment in use; .6 Applications- suitability for use; .7 Operation and maintenance details; .8 Reviewed/as-built shop drawings; .9 Resources of labor, plant, material and space required; .10 Methods of operation and control; .11 Cleaning and maintenance requirements; .12 Protective measures; .13 Labor safety and welfare associated with equipment; .14 Public safety consideration .15 Where this data is not adequately provided in manufacturers’ literature the author of the manual shall augment the literature as necessary. LAST TAB: misc. Following the Project Manager’s review, make modifications as directed by Project Manager and submit five (5) Final copies of the Operations Data and Maintenance Manual. Each final copy to include one (1) hard copy (combined in binder) and one electronic copy (*.pdf) on a CD (or DVD). RECORDS .1 1.30 As work progresses, maintain accurate records to show deviations from contract drawings. Just prior to Project Manager‘s inspection for issuance of Substantial certificate of completion, supply to Project Manager one (1) set of white prints with all deviations neatly inked in. Project Manager will provide two sets of clean white prints for this purpose. GUARANTEES AND WARRANTIES .1 Before completion of work collect manufacturer's guarantees and warranties and deliver to Project Manager. Part 2 Products 2.1 NOT USED .1 Not used. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 Part 3 Execution 3.1 NOT USED .1 Section 01 00 10 GENERAL INSTRUCTIONS Page 13 of 13 Not used. END OF SECTION 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 Part 1 General 1.1 DESCRIPTION Section 01 91 13 COMMISSIONING – GENERAL REQUIREMENTS Page 1 of 11 .1 Related Sections: This section of the Specification forms part of the Contract Documents and shall be read, interpreted and coordinated with all other parts. .2 Commissioning Authority: The mechanical Contractor will be responsible to manage and administrate the commissioning process on this project. .3 Commissioning Definition: Commissioning is a systematic process of ensuring that all building systems perform interactively according to the design intent and the owner’s operational needs. This is achieved by beginning in the design phase and documenting the owner’s project requirements, design intent and continuing through construction, acceptancy and the warranty period with actual verification of performance. The commissioning process shall encompass and coordinate the traditionally separate functions of system documentation, equipment startup, control system calibration, testing and balancing, performance testing and training. Commissioning during the construction phase is intended to achieve the following specific objectives according to the Contract Documents: .1 .2 .3 .4 Verify that applicable equipment and systems are installed according to the manufacturer’s recommendations and to industry accepted minimum standards and that they receive adequate operational checkout by installing contractors. Verify and document proper performance of equipment and systems. Verify that O&M documentation left on site is complete. Verify that the Owner’s operating personnel are adequately trained. The commissioning process does not take away from or reduce the responsibility of the system Consultants or installing contractors to provide a finished and fully functioning product. .4 Abbreviations: The following are common abbreviations used in the Commissioning Specifications and in the Commissioning Plan. Definitions are found in Section 1.6. OWCACxCx PlanPCFT- 1.2 Owner/Owner’s Representative Commissioning Authority Commissioning Commissioning Plan Document Prefunctional Checklist Functional Performance Test PMME MCCC TABEC- Project Manager (of the Owner) Mechanical Engineer Mechanical Contractor Controls Contractor Test and Balance Contractor Electrical Contractor COORDINATION .1 Commissioning Team. The members of the commissioning team consist of the Commissioning Authority (CA), the Project Manager (PM), the designated representative of the owner’s firm (OW), the Mechanical and Electrical Engineers 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 Section 01 91 13 COMMISSIONING – GENERAL REQUIREMENTS Page 2 of 11 (ME) and (EE), the Mechanical Contractor (MC), the Electrical Contractor (EC), the TAB Contractor, the Controls Contractor (CC), any other installing subcontractors (Subs) or suppliers of equipment. The Owner’s building or plant operator/engineer is also a member of the commissioning team. The commissioning team for this project includes the following members: .1 .2 .3 .4 .5 .6 .7 .8 .9 Owner/Owner’s Representative (OW/PM): CBRE/COLLIERS Commissioning Authority (CA): Mechanical Contractor (MC) Mechanical Consultant (ME): BPA General Contractor (GC) Mechanical Contractor (MC) Sheet Metal Contractor Controls Contractor (CC) Testing and Balancing Agency (TAB) Electrical Contractor (EC) .2 Management. The CA directs and coordinates the commissioning activities and the reports to the PM. All members work together to fulfill their contracted responsibilities and meet the objectives of the Contract Documents. .3 Scheduling. The CA will work with the GC according to established protocols to schedule the commissioning activities. The CA will provide sufficient notice to the GC for scheduling commissioning activities. The GC will integrate all commissioning activities into the master schedule. All parties will address scheduling problems and make necessary notifications in a timely manner in order to expedite the commissioning process. The CA will provide the initial schedule of primary commissioning events at the commissioning scoping meeting. The Commissioning Plan - Section 01 91 14 provides the format for this schedule. As construction progresses more detailed schedules are developed by the CA. The Commissioning Plan also provides a format for detailed schedules. 1.3 COMMISSIONING PROCESS .1 Commissioning Plan. The Commissioning Plan - Section 01 91 14 provided as part of the bid documents, is binding on the Contractor. The commissioning plan provides guidance in the execution of the commissioning process. Just after the initial commissioning scoping meeting the CA will update the plan which is then considered the “final” plan, though it will continue to evolve and expand as the project progresses. The Specifications will take precedence over the Commissioning Plan. .2 Commissioning Process. The following narrative provides a brief overview of the typical commissioning tasks during construction and the general order in which they occur. .1 Commissioning during construction begins with a scoping meeting conducted by the CA where the commissioning process is reviewed with the commissioning team members. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 .2 .3 .4 .5 .6 .7 .8 .9 .10 .11 .12 .13 1.4 Section 01 91 13 COMMISSIONING – GENERAL REQUIREMENTS Page 3 of 11 Additional meetings will be required throughout construction, scheduled by the CA with necessary parties attending, to plan, scope, coordinate, schedule future activities and resolve problems. Equipment documentation is submitted to the CA during normal submittals, including detailed start-up procedures. The CA works with the GC, MC, EC and the Subs in updating startup plans and startup documentation formats, including providing the GC, MC, EC and the Subs with pre-functional checklists to be completed, during the startup process. In general, the checkout and performance verification proceeds from simple to complex; from component level to equipment to systems and intersystem levels with prefunctional checklists being completed before functional testing. The GC, MC, EC and the Subs, execute and document the prefunctional checklists and perform startup and initial checkout. The CA documents that the checklists and startup were completed according to the approved plans. This may include the CA witnessing start-up of selected equipment. The CA updates specific equipment and system functional performance test procedures. The GC, MC, EC and the Subs review the procedures. The procedures are executed by the GC, MC, EC and the Subs, under the direction of, and documented by the CA. Items of non-compliance in material, installation or setup are corrected at the GC, MC, EC and the Sub’s expense and the system retested. The ME reviews the O&M documentation for completeness. The CA reviews O&M documentation on the Owner’s behalf and recommends acceptancy or provides additional comments. Commissioning is completed before Substantial Completion. The CA reviews and coordinates the training provided by the GC, MC, EC and the Subs and verifies that is was completed. Deferred testing is conducted, as specified or required. RELATED WORK .1 Specific commissioning requirements are given in the following sections of this specification. All of the following sections apply to the Work of this section. .1 .2 .3 .4 01 91 14 – Commissioning Plan 01 91 15 – Commissioning Training 23 05 93 – Testing, Adjusting and Balancing: Lists special requirements and alerts the TAB contractor of the special requirements of the TAB contractor and TAB system in 01 91 13 and 23 08 00. 25 05 11 – Building Automation System: Lists special requirements and alerts the controls contractor of the special requirements of the control contractor and control system in 01 91 13. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 1.5 Section 01 91 13 COMMISSIONING – GENERAL REQUIREMENTS Page 4 of 11 RESPONSIBILITIES .1 Overview: The responsibilities of various parties in the commissioning process are provided in this section. The contractors shall include the cost of providing their commissioning and testing services. The owner is not paying extra for contractors commissioning services. .2 All Parties .1 .2 .3 .3 Mechanical Consultants .1 .4 Follow the Commissioning Plan. Attend commissioning scoping meeting and additional meetings, as necessary. Warranty Period .1 Coordinate resolution of design non-conformance and design deficiencies identified during warranty-period commissioning. Construction and Substantial Phase .1 Perform normal submittal review, construction observation, asbuilt drawing preparation, etc., as contracted. One site observation should be completed just prior to system startup. .2 Provide any design narrative and sequences documentation requested by the CA. The Consultants shall assist (along with the contractors) in clarifying the operation and control of commissioned equipment in areas where the specifications, control drawings or equipment documentation is not sufficient for writing detailed testing procedures. .3 Attend commissioning scoping meetings and other selected commissioning team meetings. .4 Participate in the resolution of system deficiencies identified during commissioning, according to the contract documents .5 Review and approve the O&M manuals .6 Provide a design overview presentation if requested at one of the training sessions for the Owner’s personnel. .7 Witness testing of selected pieces of equipment and systems. .8 Participate in the resolution of non-compliance, non-conformance and design deficiencies identified during commissioning process. .9 Maintain a master deficiency list. .10 Oversee and approve the training of the Owner’s operating personnel. .11 Preparation of the O&M manuals, review, approval and handover to Owner Commissioning Authority (CA) .1 The CA is not responsible for design concept, design criteria, compliance with codes, design or general construction scheduling, cost estimating, or 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 .2 Section 01 91 13 COMMISSIONING – GENERAL REQUIREMENTS Page 5 of 11 construction management. The CA may assist with problem-solving, nonconformance or deficiencies, but ultimately that responsibility resides with the General Contractor and the A/E. The primary role of the CA is to develop and coordinate the execution of a testing plan, observe and document performance—that systems are functioning in accordance with the documented design intent and in accordance with the Contract Documents. The Contractors will provide all tools or the use of tools to start, check-out and functionally test equipment and systems. Construction and Substantial Phase .1 Coordinates and directs the commissioning activities in a logical, sequential and efficient manner using consistent protocols and forms, centralized documentation, clear and regular communications and consultations with all necessary parties, frequently updated timelines and schedules and technical expertise. .2 Coordinate the commissioning work with the GC, ensure that commissioning activities are being scheduled into the master schedule. .3 Revise, as necessary, Commissioning Plan. .4 Plan and conduct a commissioning scoping meeting and other commissioning meetings. .5 Request and review additional information required to perform commissioning tasks, including O&M materials, contractor start-up and checkout procedures. .6 Before startup, gather and review the current control sequences and interlocks and work with contractors and design engineers until sufficient clarity has been obtained, in writing, to be able to write detailed testing procedures. .7 Review and approve normal Contractor submittals applicable to systems being commissioned for compliance with commissioning needs, concurrent with the ME reviews. .8 Update pre-functional tests and checklists. .9 Develop an enhanced start-up and initial systems checkout plan with Subs. .10 Perform site visits, as necessary, to observe component and system installations. Attends selected planning and job-site meetings to obtain information on construction progress. Review construction meeting minutes for revisions/substitutions relating to the commissioning process. Assist in resolving any discrepancies. .11 Approve prefunctional tests and checklist completion by reviewing prefunctional checklist reports and by selected site observation and spot checking. .12 Approve systems startup by reviewing start-up reports and by selected site observation. .13 Review TAB execution plan. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 .14 .15 .16 .17 .18 .19 .20 .21 .22 Section 01 91 13 COMMISSIONING – GENERAL REQUIREMENTS Page 6 of 11 Oversee sufficient functional testing of the control system and approve it to be used for TAB, before TAB is executed. Approve air and water systems balancing by spot testing, by reviewing completed reports and by selected site observation. With necessary assistance and review from installing contractors, update the functional performance test procedures for equipment and systems. This may include energy management control system trending, stand-alone data logger monitoring or manual functional testing. Submit to GC for review, and for approval if required. Analyze any functional performance trend logs and monitoring data to verify performance. Coordinate, witness and approve manual functional performance tests performed by installing contractors. Coordinate retesting as necessary until satisfactory performance is achieved. Maintain a master deficiency and resolution log and a separate testing record. Provide the GC with written progress reports and test results with recommended actions. Review equipment warranties to ensure that the Owner’s responsibilities are clearly defined. Compile and maintain a commissioning record and building systems book(s). Provide a final commissioning report (as described in this section). 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 .3 .5 .2 Construction and Substantial Phase .1 Review and approve the final Commissioning Plan—Construction Phase. .2 Attend a commissioning scoping meeting and other commissioning team meetings. .3 Perform the normal review of Contractor submittals. .4 When necessary, observe and witness pre-functional checklists, startup and functional testing of selected equipment. .5 Assist the GC in coordinating the training of owner personnel. Warranty Period .1 Assist the CA as necessary in the seasonal or deferred testing and deficiency corrections required by the specifications. Project Manager (PM) .1 .2 1.6 Warranty Period .1 Coordinate and supervise required seasonal or deferred testing and deficiency corrections. .2 Return to the site at 10 months into the 12 month warranty period and review with facility staff the current building operation and the condition of outstanding issues related to the original and seasonal commissioning. Also interview facility staff and identify problems or concerns they have operating the building as originally intended. Make suggestions for improvements and for recording these changes in the O&M manuals. Identify areas that may come under warranty or under the original construction contract. Assist facility staff in developing reports, documents and requests for services to remedy outstanding problems. Owner/Owner’s Representative (OW) .1 .6 Section 01 91 13 COMMISSIONING – GENERAL REQUIREMENTS Page 7 of 11 Construction and Substantial Phase .1 Manage the contract of the A/E and of the GC. .2 Arrange for facility operating and maintenance personnel to attend various field commissioning activities and field training sessions according to the Commissioning Plan. .3 Provide final approval for the completion of the commissioning work. Warranty Period .1 Ensure that any seasonal or deferred testing and any deficiency issues are addressed. DEFINITIONS .1 Substantial Phase - Phase of construction after startup and initial checkout when functional performance tests, O&M documentation review and training occurs. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 Section 01 91 13 COMMISSIONING – GENERAL REQUIREMENTS Page 8 of 11 .2 Approval – Acceptance that a piece of equipment or system has been properly installed and is functioning in the tested modes according to the Contract Documents. .3 Mechanical Consultant (ME) - The prime consultant responsible for mechanical systems design for this project. .4 Basis of Design - The basis of design is the documentation of the primary thought processes and assumptions behind design decisions that were made to meet the design intent. The basis of design describes the systems, components, conditions and methods chosen to meet the intent. Some reiterating of the design intent may be included. .5 Commissioning authority (CA) - An independent agent, not otherwise associated with the A/E team members or the Contractor. The CA directs and coordinates the day-to-day commissioning activities. The CA does not take an oversight role like the GC. The CA is part of the Owner’s team and shall report directly to the OW/PM. .6 Commissioning Plan - An overall plan, developed before or after bidding, that provides the structure, schedule and coordination planning for the commissioning process. .7 Contract Documents - The documents binding on parties involved in the construction of this project (drawings, specifications, change orders, amendments, contracts, Cx Plan, etc.). .8 Contractor - The contractor in general or authorized representative. .9 Control system - The central building energy management control system. .10 Datalogging - Monitoring flows, currents, status, pressures, etc. of equipment using stand-alone dataloggers separate from the control system. .11 Deferred Functional Tests - FTs that are performed later, after substantial completion, due to partial occupancy, equipment, seasonal requirements, design or other site conditions that disallow the test from being performed. .12 Deficiency - A condition in the installation or function of a component, piece of equipment or system that is not in compliance with the Contract Documents (that is, does not perform properly or is not complying with the design intent). .13 Design Intent - A dynamic document that provides the explanation of the ideas, concepts and criteria that are considered to be very important to the owner. It is initially the outcome of the programming and conceptual design phases. .14 Design Narrative or Design Documentation - Sections of either the Design Intent or Basis of Design. .15 Factory Testing - Testing of equipment on-site or at the factory by factory personnel with an Owner’s representative present. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 Section 01 91 13 COMMISSIONING – GENERAL REQUIREMENTS Page 9 of 11 .16 Functional Performance Test (FT) - Test of the dynamic function and operation of equipment and systems using manual (direct observation) or monitoring methods. Functional testing is the dynamic testing of systems (rather than just components) under full operation. Systems are tested under various modes, such as during low cooling or heating loads, high loads, component failures, unoccupied, varying outside air temperatures, fire alarm, power failure, etc. The systems are run through all the control system’s sequences of operation and components are verified to be responding as the sequences state. Traditional air test and balancing (TAB) is not functional testing, in the commissioning sense of the word. TAB’s primary work is setting up the system flows and pressures as specified, while functional testing is verifying that which has already been set up. The commissioning authority develops the functional test procedures in a sequential written form, coordinates, oversees and documents the actual testing, which is usually performed by the installing contractor or vendor. FTs are performed after prefunctional checklists and startup are complete. .17 Indirect Indicators - Indicators of a response or condition, such as a reading from a control system screen reporting a damper to be 100% closed. .18 Manual Test - Using hand-held instruments, immediate control system readouts or direct observation to verify performance (contrasted to analyzing monitored data taken over time to make the “observation”). .19 Monitoring - The recording of parameters (flow, current, status, pressure, etc.) of equipment operation using dataloggers or the trending capabilities of control systems. .20 Non-Compliance - See Deficiency. .21 Non-Conformance - See Deficiency. .22 Over-written Value - Writing over a sensor value in the control system to see the response of a system (e.g., changing the outside air temperature value from 50F to 75F to verify economizer operation). See also “Simulated Signal.” .23 Owner-Contracted Tests - Tests paid for by the Owner outside the GC’s contract and for which the CA does not oversee. These tests will not be repeated during functional tests if properly documented. .24 Phased Commissioning - Commissioning that is completed in phases (by floors, for example) due to the size of the structure or other scheduling issues, in order minimize the total construction time. .25 Prefunctional Checklist (PC) - A list of items to inspect and elementary component tests to conduct to verify proper installation of equipment, provided by the CA to the Sub. Prefunctional checklists are primarily static inspections and procedures to prepare the equipment or system for initial operation (e.g., belt tension, oil levels OK, labels affixed, gages in place, sensors calibrated, etc.). However, some prefunctional checklist items entail simple testing of the function of a component, a piece of equipment or system (such as measuring the voltage imbalance on a three phase pump motor of a chiller system). The word prefunctional refers to before functional testing. Prefunctional checklists augment and are combined with the manufacturer’s start-up checklist. Even without a commissioning process, contractors typically perform some, if not many, of the 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 Section 01 91 13 COMMISSIONING – GENERAL REQUIREMENTS Page 10 of 11 prefunctional checklist items a commissioning authority will recommend. However, few contractors document in writing the execution of these checklist items. Therefore, for most equipment, the contractors execute the checklists on their own. The commissioning authority only requires that the procedures be documented in writing, and does not witness much of the prefunctional checklisting, except for larger or more critical pieces of equipment. .26 Project Manager (PM) - The contracting and managing authority for the owner over the design and/or construction of the project. .27 Sampling. - Functionally testing only a fraction of the total number of identical or near identical pieces of equipment. .28 Seasonal Performance Tests - FT that are deferred until the system(s) will experience conditions closer to their design conditions. .29 Simulated Condition - Condition that is created for the purpose of testing the response of a system (e.g., applying a hair blower to a space sensor to see the response in a VAV box). .30 Simulated Signal - Disconnecting a sensor and using a signal generator to send an amperage, resistance or pressure to the transducer and DDC system to simulate a sensor value. .31 Specifications - The construction specifications of the Contract Documents. .32 Startup - The initial starting or activating of dynamic equipment, including executing prefunctional checklists. .33 Subs - The subcontractors to the GC who provide and install building components and systems. .34 Test Procedures - The step-by-step process which must be executed to fulfill the test requirements. The test procedures are developed by the CA. .35 Test Requirements - Requirements specifying what modes and functions, etc. shall be tested. The test requirements are not the detailed test procedures. The test requirements are specified in the Contract Documents. .36 Trending - Monitoring using the building control system. .37 Vendor - Supplier of equipment. .38 Warranty Period - Warranty period for entire project, including equipment components. Warranty begins at Substantial Completion and extends for at least one year, unless specifically noted otherwise in the Contract Documents and accepted submittals. Part 2 Products 2.1 TEST EQUIPMENT .1 All standard testing equipment required to perform startup and initial checkout and required functional performance testing shall be provided by the Division contractor for the equipment being tested. For example, the mechanical contractor of Division 23 shall ultimately be responsible for all standard testing 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 Section 01 91 13 COMMISSIONING – GENERAL REQUIREMENTS Page 11 of 11 equipment for the HVAC system and controls systems in this Division, except for equipment specific to and used by TAB in their commissioning responsibilities. Two-way radios shall be provided by the control contractor (CC). .2 Special equipment, tools and instruments (only available from vendor, specific to a piece of equipment) required for testing equipment, according to these Contract Documents shall be included in the base bid price to the Contractor and left on site. .3 All testing equipment shall be of sufficient quality and accuracy to test and/or measure system performance with the tolerances specified in the Specifications. If not otherwise noted, the following minimum requirements apply: Temperature sensors and digital thermometers shall have a certified calibration within the past year to an accuracy of 0.5°F and a resolution of + or - 0.1°F. Pressure sensors shall have an accuracy of + or - 2.0% of the value range being measured (not full range of meter) and have been calibrated within the last year. All equipment shall be calibrated according to the manufacturer’s recommended intervals and when dropped or damaged. Calibration tags shall be affixed or certificates readily available. Part 3 Execution 3.1 NOT USED .1 Not used. END OF DOCUMENT 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 Part 1 General 1.1 OBJECTIVE OF COMMISSIONING .1 The following are the objectives of the commissioning process: .1 .2 .3 .4 .2 .2 .3 The Commissioning Plan is the master planning tool relating to commissioning, setting out scope, standards, roles and responsibilities, expectations, deliverables, etc. It provides an overview of commissioning, a general description of all elements that make up the Commissioning Plan, and sets out the process and the methodology for successful commissioning of the above-mentioned project. The Commissioning Plan functions as a management tool, setting out the scope standards of commissioning, roles and responsibilities of each member of the Commissioning Team and deliverables. The Commissioning Plan also functions as a communications tool, addressed to all members of the Commissioning Team and informing each member of the Commissioning Team, in general terms, of their own roles and responsibilities and those of the other members of the Commissioning Team. Production of the Commissioning Plan .1 .4 To provide fully functional facility whose systems, equipment and components have been proven to meet all User's functional requirements before the date of acceptance, and which operate consistently at peak efficiencies and within specified energy budgets under all normal loads. To fully train the Owner O&M personnel in all aspects of all installed systems. To optimize life cycle costs. To complete documentation relating to all installed equipment and systems. Importance of the Commissioning Plan .1 .3 Section 01 91 14 COMMISSIONING – PLAN Page 1 of 22 This Commissioning plan was assembled by the project Commissioning Authority using input from the Commissioning Team members. Revisions to the Commissioning Plan .1 The Commissioning Plan will be reviewed, revised, refined and updated, if required, during construction. Each time it is revised, the revision number and date will also be revised. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 1.2 Section 01 91 14 COMMISSIONING – PLAN Page 2 of 22 ROLES AND RESPONSIBILITIES .1 Commissioning Team: The members of the commissioning team consist of the Commissioning Authority (CA), the Project Manager (PM), the designated representative of the owner’s firm (OW), the Mechanical Engineers (ME), the Mechanical Contractor (MC), the Electrical Contractor (EC), the TAB Contractor, the Controls Contractor (CC), any other installing subcontractors (Subs) or suppliers of equipment. The Owner’s building or plant operator/engineer is also a member of the commissioning team. The commissioning team for this project includes the following members: .1 .2 .3 .4 .5 .6 .7 .8 Owner/Owner’s Representative (OW/PM): CBRE/MHPM Commissioning Authority (CA): CES Engineering Ltd Mechanical Consultant (ME): BPA Mechanical Contractor (MC) Sheet Metal Contractor Controls Contractor (CC) Testing and Balancing Agency (TAB) Electrical Contractor (EC) For detail description about roles and responsibilities of the commissioning team members refer to Section 01 91 13, Paragraph 1.5 – Responsibilities. 1.3 SYSTEMS TO BE COMMISSIONED .1 Equipment and System .1 Mechanical Equipment Packaged Outdoor HVAC Equipment Specified In: 23 74 00 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 .2 Section 01 91 14 COMMISSIONING – PLAN Page 3 of 22 Building Automation System Specified In: Integrated Automation Instrumentation and Terminal Devices 1.4 O&M DOCUMENTATION .1 General Requirements .1 .2 .3 .2 Operation and maintenance manuals shall be prepared as per the format outlined in Infrastructure Ontario 2015 Building Systems Commissioning Guideline, Schedule B: Operating and Maintenance Manuals. CA Review and Approval. Prior to substantial completion, the CA shall review the O&M manuals to verify compliance with the Specifications. The CA will communicate deficiencies in the manuals to the OW, PM or ME, as requested. Upon a successful review of the corrections, the CA recommends approval and acceptance of these sections of the O&M manuals to the OW, PM or ME. The CA also reviews each equipment warranty and verifies that all requirements to keep the warranty valid are clearly stated. This work does not supersede the ME review of the O&M manuals according to the ME contract. Commissioning Record in O&M Manuals. .1 The CA is responsible to compile, organize and index the following commissioning data by equipment into labeled, indexed and tabbed, three-ring binders and deliver it to the OW in the format of a System Manual, to be included with the O&M manuals. The format of the systems manuals shall be: Tab I-1 Commissioning Plan Tab I-2 Final Commissioning Report Tab 01 System Type 1 (Boilers and hot water heating system, humidification, rooftop air handling unit, VAV terminal units, and building automation system etc.) Sub-Tab A Design narrative and criteria, sequences, approvals for Equipment Sub-Tab B Startup plan and report, approvals, corrections, blank prefunctional checklists Colored Separator Sheets—for each equipment type (fans, pumps, chiller, etc.) Sub-Tab C Functional tests (completed), trending and analysis, approvals and corrections, training plan, record and approvals, blank functional test forms and a recommended re-commissioning schedule. Tab 02 System Type 2 repeat as per System 1 .2 Final Report Details. The final commissioning report shall include an executive summary, list of participants and roles, brief building description, overview of commissioning and testing scope and a general 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 Section 01 91 14 COMMISSIONING – PLAN Page 4 of 22 description of testing and verification methods. For each piece of commissioned equipment, the report should contain the disposition of the commissioning authority regarding the adequacy of the equipment, documentation and training meeting the contract documents in the following areas: 1) Equipment meeting the equipment specifications, 2) Equipment installation, 3) Functional performance and efficiency, 4) Equipment documentation and design intent, and 5) Operator training. All outstanding non-compliance items shall be specifically listed. Recommendations for improvement to equipment or operations, future actions, commissioning process changes, etc. shall also be listed. Each non-compliance issue shall be referenced to the specific functional test, inspection, trend log, etc. where the deficiency is documented. The functional performance and efficiency section for each piece of equipment shall include a brief description of the verification method used (manual testing, BAS trend logs, data loggers, etc.) and include observations and conclusions from the testing. .3 Warranties .1 .4 A complete inventory of warranty items will be provided by the Contractor to the Designer who will review same before submission to the Commissioning Authority who, in turn, recommends acceptance by the Project Manager. "As-built" Drawings and Specifications .1 These are generally produced by the contractor from the project record documents maintained on the site and kept up-to-date with all changes as they occur and marked thereon by the Contractor. Accuracy will be verified by the Consultant before preparation of the "As-builts" and by the Commissioning Authority after submission by the Consultant. They shall be completed in time to be used for owner’s training and demonstration sessions. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 1.5 Section 01 91 14 COMMISSIONING – PLAN Page 5 of 22 CMMS INVENTORY PROCESS .1 General .1 .2 The Computerized Maintenance Management System is a database operated by CBRE Ltd Facilities Management that records all life cycle data logged against an item of equipment or system. This is an important feature as it permits the Facilities Management to monitor the device against manufacturers’ service recommendations to determine service and replacement intervals and carry out cost efficiency analysis. The CMMS data will also be loaded into OILC’s Asset Management System to support its asset management responsibilities. Responsibilities .1 .2 .3 .4 Owner Representative provides electronic copies of CMMS forms in editable format. Contractors will be responsible to complete these forms during testing procedures. Contractors commissioning coordinator and the Commissioning Authority shall ensure completion of these documents. These forms will be collected by the Commissioning Authority and handover to the OW. After review and verification by the Commissioning Authority, these forms will be included in the O&M Manual. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 .3 Sample CMMS Form Section 01 91 14 COMMISSIONING – PLAN Page 6 of 22 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 1.6 Section 01 91 14 COMMISSIONING – PLAN Page 7 of 22 TRAINING AND DEMONSTRATION .1 General .1 .2 .3 .4 .2 Training Schedule .1 .3 The commissioning schedule shall indicate in detail how training will be implemented, the duration of each training session, the trainers, trainees, etc. Duration of Training .1 .4 Detailed information regarding contents, duration and instructors for any particular building system is included in Specification Section 01 91 15 – Commissioning –Training. The Training Plans are produced conjointly by the Consultant and the Commissioning Authority to meet project-specific requirements and they include details provided by the Facility Property Manager relating to numbers and prerequisite qualifications and skills of trainees, type of training (i.e. observation, hands-on, classroom), etc. The CA coordinates and schedules, with the MC, the overall training for the commissioned systems. The CA develops criteria for determining that the training was satisfactorily completed, including attending some of the training, etc. The CA recommends approval of the training to the OW and PM using a standard form. The MC also signs the approval form. The Training Plans are included in Specification Section 01 91 15 – Commissioning –Training. Duration of training for each system, instruction aids, etc. depends on systems complexity. The minimum number of hours for training sessions is identified in the commissioning specifications Section 01 91 15 – Commissioning Training. Details of Training .1 See Section 01 19 15 – Commissioning Training. Part 2 Commissioning Process Execution 2.1 MEETINGS .1 Scoping Meeting. Within 90 days of commencement of construction, the CA will schedule, plan and conduct a commissioning scoping meeting with the entire commissioning team in attendance. Meeting minutes will be distributed to all parties by the CA. Information gathered from this meeting will allow the CA to revise the Draft 2 Commissioning Plan to its “final” version, which will also be distributed to all parties. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 .2 2.2 Section 01 91 14 COMMISSIONING – PLAN Page 8 of 22 Miscellaneous Meetings. Other meetings will be planned and conducted by the CA as construction progresses. These meetings will cover coordination, deficiency resolution and planning issues with particular Subs. The CA will plan these meetings and will minimize unnecessary time being spent by Subs. Within final 3 months of construction these meetings may be held as frequently as one per week. REPORTING .1 The CA will provide regular reports to the MC, PM and OW, with increasing frequency as construction and commissioning progresses. Standard forms are provided and referenced in the Commissioning Plan. .2 The CA will regularly communicate with all members of the commissioning team, keeping them apprised of commissioning progress and scheduling changes through memos, progress reports, etc. .3 Testing or review approvals and non-conformance and deficiency reports are made regularly with the review and testing as described in later sections. .4 A final summary report (about four to six pages, not including backup documentation) by the CA will be provided to the MC and PM, focusing on evaluating commissioning process issues and identifying areas where the process could be improved. All acquired documentation, logs, minutes, reports, deficiency lists, communications, findings, unresolved issues, etc., will be compiled in appendices and provided with the summary report. Pre-functional checklists, functional tests and monitoring reports will not be part of the final report, but will be stored in the Commissioning Record in the O&M manuals. 2.3 SUBMITTALS .1 The CA will provide appropriate contractors with a specific request for the type of submittal documentation the CA requires to facilitate the commissioning work. These requests will be integrated into the normal submittal process and protocol of the construction team. At minimum, the request will include the manufacturer and model number, the manufacturer’s printed installation and detailed start-up procedures, full sequences of operation, O&M data, performance data, any performance test procedures, control drawings and details of owner contracted tests. In addition, the installation and checkout materials that are actually shipped inside the equipment and the actual field checkout sheet forms to be used by the factory or field technicians shall be submitted to the Commissioning authority. All documentation requested by the CA will be included by the Subs in their O&M manual contributions. .2 The CA will review and approve submittals related to the commissioned equipment for conformance to the Contract Documents as it relates to the commissioning process, to the functional performance of the equipment and adequacy for developing test procedures. This review is intended primarily to aid in the development of functional testing procedures and only secondarily to verify compliance with equipment specifications. The Commissioning authority will notify the MC, PM or ME as requested, of items missing or areas that are not in conformance with Contract Documents and which requires resubmission. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 Section 01 91 14 COMMISSIONING – PLAN Page 9 of 22 .3 The CA may request additional design narrative from the ME and Controls Contractor, depending on the completeness of the design intent documentation and sequences provided with the Specifications. .4 These submittals to the CA do not constitute compliance for O&M manual documentation. The O&M manuals are the responsibility of the Contractor, though the CA will review and approve them. 2.4 START-UP, PREFUNCTIONAL CHECKLISTS AND INITIAL CHECKOUT .1 Application: The following procedures apply to all equipment to be commissioned, according to Paragraph 1.3, Systems to be Commissioned. Some systems that are not comprised so much of actual dynamic machinery, e.g., electrical system power quality, may have very simplified PCs and startup. .2 General: Pre-functional checklists are important to ensure that the equipment and systems are hooked up and operational. It ensures that functional performance testing (in-depth system checkout) may proceed without unnecessary delays. Each piece of equipment receives full pre-functional checkout. No sampling strategies are used. The pre-functional testing for a given system must be successfully completed prior to formal functional performance testing of equipment or subsystems of the given system. .3 Start-up and Initial Checkout Plan: The CA shall assist the commissioning team members responsible for startup of any equipment in developing detailed start-up plans for all equipment. The primary role of the CA in this process is to ensure that there is written documentation that each of the manufacturer-recommended procedures have been completed. Parties responsible for pre-functional checklists and startup are identified in the commissioning scoping meeting and in the checklist forms. Parties responsible for executing functional performance tests are identified in the testing requirements in Section 2.6 and 2.9. .4 The CA updates the manufacturer’s startup and initial checkout procedures from O&M submittals. .5 The CA marks the applicable areas in the procedures and makes initial and date lines at each procedure or section. .6 The CA transmits these procedures and the original pre-functional checklist procedures to the Contractor as the startup and initial checkout plan. 2.5 SENSOR AND ACTUATOR CALIBRATION .1 General: All field-installed temperature, relative humidity, and pressure sensors and gages, and all actuators (dampers and valves) on all equipment shall be calibrated using the methods described below. Alternate methods may be used, if approved by the Owner before-hand. All test instruments shall have had a certified calibration within the last 12 months. Sensors installed in the unit at the factory with calibration certification provided need not be field calibrated. All procedures used shall be fully documented on the prefunctional checklists or other suitable forms, clearly referencing the procedures followed and written documentation of initial, intermediate and final results. .2 Sensor Calibration Methods 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 .1 .2 .3 2.6 Section 01 91 14 COMMISSIONING – PLAN Page 10 of 22 All Sensors: Verify that all sensor locations are appropriate and away from causes of erratic operation. Verify that sensors with shielded cable, are grounded only at one end. For sensor pairs that are used to determine a temperature or pressure difference, make sure they are reading within 0.2°F of each other for temperature and within a tolerance equal to 2% of the reading, of each other, for pressure. Tolerances for critical applications may be tighter. Sensors Without Transmitters: Standard Application. Make a reading with a calibrated test instrument within 6 inches of the site sensor. Verify that the sensor reading (via the permanent thermostat, gage or building automation system (BAS)) is within the tolerances in the table below of the instrument-measured value. If not, calibrate or replace sensor. Sensors With Transmitters: Standard Application. Calibrate as per manufacturer’s requirements using 3 calibration points. EXECUTION OF PREFUNCTIONAL CHECKLISTS AND STARTUP .1 Four weeks prior to startup, the Subs and vendors schedule startup and checkout with the MC and CA. The performance of the prefunctional checklists, startup and checkout are directed and executed by the Sub or vendor. When checking off pre-functional checklists, signatures may be required of other Subs for verification of completion of their work. .2 The CA shall observe, at minimum, the procedures for each piece of primary equipment, unless there are multiple units, (in which case a sampling strategy may be used as approved by the MC). In no case will the number of units witnessed be less than four on any one building, nor less than 20% of the total number of identical or very similar units. .3 The Subs and vendors shall execute startup and provide the CA with a signed and dated copy of the completed start-up and pre-functional tests and checklists. .4 Only individuals that have direct knowledge and witnessed that a line item task on the pre-functional checklist was actually performed shall initial or check that item off. It is not acceptable for witnessing supervisors to fill out these forms. 2.7 DEFICIENCIES, NON-CONFORMANCE AND APPROVAL IN CHECKLISTS AND STARTUP .1 The Subs shall clearly list any outstanding items of the initial start-up and prefunctional procedures that were not completed successfully, at the bottom of the procedures form or on an attached sheet. The procedures form and any outstanding deficiencies are provided to the CA within two days of test completion. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 Section 01 91 14 COMMISSIONING – PLAN Page 11 of 22 .2 The CA reviews the report and submits either a non-compliance report or an approval form to the Sub or MC and PM. The CA shall work with the Subs and vendors to correct and retest deficiencies or uncompleted items. The CA will involve the MC and others as necessary. The installing Subs or vendors shall correct all areas that are deficient or incomplete in the checklists and tests in a timely manner, and shall notify the CA as soon as outstanding items have been corrected and resubmit an updated start-up report and a Statement of Correction on the original non-compliance report. When satisfactorily completed, the CA recommends approval of the execution of the checklists and startup of each system to the MC and PM using a standard form. .3 Items left incomplete, which later cause deficiencies or delays during functional testing may result in back charges to the responsible party. Refer to Part 2.10 herein for details. .4 When all the above is complete the Functional Performance testing phase can proceed. 2.8 PHASED COMMISSIONING .1 2.9 The project may require startup and initial checkout to be executed in phases. This phasing will be planned and scheduled in a coordination meeting of the CA, MC, TAB and controls contactors. Results will be added to the master and commissioning schedule. FUNCTIONAL PERFORMANCE TESTING This sub-section applies to all commissioning functional testing for all divisions. The general list of equipment to be commissioned is found in Paragraph 1.3. .1 Objectives and Scope. The objective of functional performance testing is to demonstrate that each system is operating according to the documented design intent and Contract Documents. Functional testing facilitates bringing the systems from a state of substantial completion to full dynamic operation. Additionally, during the testing process, areas of deficient performance are identified and corrected, improving the operation and functioning of the systems. In general, each system should be operated through all modes of operation (seasonal, occupied, unoccupied, warm-up, cool-down, part- and full-load) where there is a specified system response. Verifying each sequence in the sequences of operation is required. Proper responses to such modes and conditions as power failure, freeze condition, low pressure, no flow, equipment failure, etc. shall also be tested. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 .2 Section 01 91 14 COMMISSIONING – PLAN Page 12 of 22 Updating Test Procedures. Before test procedures are written, the CA shall obtain all requested documentation and a current list of change orders affecting equipment or systems, including an updated points list, program code, control sequences and parameters. Using the testing parameters, the CA shall update specific test procedures and forms to verify and document proper operation of each piece of equipment and system. Each Sub or vendor responsible to execute a test, shall provide limited assistance to the CA in updating the procedures review (answering questions about equipment, operation, sequences, etc.). Prior to execution, the CA shall provide a copy of the test procedures to the Sub(s) who shall review the tests for feasibility, safety, equipment and warranty protection. The CA may submit the tests to the ME for review, if requested. The CA shall review owner-contracted, factory testing or required owner acceptance tests which the CA is not responsible to oversee, including documentation format, and shall determine what further testing or format changes may be required to comply with the Specifications. Redundancy of testing shall be minimized. The purpose of any given specific test is to verify and document compliance with the stated criteria of acceptance given on the test form. .3 Test Methods. Functional performance testing and verification may be achieved by manual testing (persons manipulate the equipment and observe performance) or by monitoring the performance and analyzing the results using the control system’s trend log capabilities or by stand-alone data loggers. The CA will determine which method is most appropriate for tests that do not have a method specified. .4 Simulated Conditions. Simulating conditions (not by an overwritten value) shall be allowed, though timing the testing to experience actual conditions is encouraged wherever practical. .5 Overwritten Values. Overwriting sensor values to simulate a condition, such as overwriting the outside air temperature reading in a control system to be something other than it really is, shall be allowed, but shall be used with caution and avoided when possible. Such testing methods often can only test a part of a system, as the interactions and responses of other systems will be erroneous or not applicable. Simulating a condition is preferable. e.g., for the above case, by heating the outside air sensor with a hair blower rather than overwriting the value, or by altering the appropriate setpoint to see the desired response. Before simulating conditions or overwriting values, sensors, transducers and devices shall have been calibrated. .6 Simulated Signals. Using a signal generator which creates a simulated signal to test and calibrate transducers and DDC constants is generally recommended over using the sensor to act as the signal generator via simulated conditions or overwritten values. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 Section 01 91 14 COMMISSIONING – PLAN Page 13 of 22 .7 Altering Setpoints. Rather than overwriting sensor values, and when simulating conditions is difficult, altering setpoints to test a sequence is acceptable. For example, to see the AC compressor lockout work at an outside air temperature below 55F, when the outside air temperature is above 55F, temporarily change the lockout setpoint to be 2F above the current outside air temperature. .8 Indirect Indicators. Relying on indirect indicators for responses or performance shall be allowed only after visually and directly verifying and documenting, over the range of the tested parameters, that the indirect readings through the control system represent actual conditions and responses. Much of this verification is completed during prefunctional testing. .9 Setup. Each function and test shall be performed under conditions that simulate actual conditions as close as is practically possible. The Sub executing the test shall provide all necessary materials, system modifications, etc. to produce the necessary flows, pressures, temperatures, etc. necessary to execute the test according to the specified conditions. At completion of the test, the Sub shall return all affected building equipment and systems, due to these temporary modifications, to their pre-test condition. .10 Sampling. Multiple identical pieces of non-life-safety or otherwise non-critical equipment may be functionally tested using a sampling strategy. Significant application differences and significant sequence of operation differences in otherwise identical equipment invalidates their common identity. A small size or capacity difference, alone, does not constitute a difference. It is noted that no sampling by Subs is allowed in pre=functional checklist execution. The facility systems and sampling rate of systems to be commissioned are as follows: System Building Automation System Roof Top Units .11 Rigor 100% Coordination and Scheduling .1 The Subs shall provide 10 business days notice to the CA regarding their completion schedule for the prefunctional checklists and startup of all equipment and systems. The CA will schedule functional tests through the MC and affected Subs. The CA shall direct, witness and document the functional testing of all equipment and systems. The Subs shall execute the tests. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 .2 .3 .4 .12 2.10 Section 01 91 14 COMMISSIONING – PLAN Page 14 of 22 In general, functional testing is conducted after prefunctional testing and startup has been satisfactorily completed. The control system is sufficiently tested and approved by the CA before it is used for TAB or to verify performance of other components or systems. The air balancing and water balancing is completed and debugged before functional testing of air-related or water-related equipment or systems. Testing proceeds from components to subsystems to systems. When the proper performance of all interacting individual systems has been achieved, the interface or coordinated responses between systems is checked. The CA documents the results of the test. Corrections of minor deficiencies identified are made during the tests at the discretion of the CA. The CA records the results of the test on the procedure or test form. Deficiencies or non-conformance issues are noted and reported to the MC and PM. Subs correct deficiencies and notify the CA. The CA schedules retesting through the MC and PM. Decisions regarding deficiencies and corrections are made at as low a level as possible, preferably between CA or MC and the Sub. For areas in dispute, final authority, besides the Owner’s, resides with the ME. The CA recommends acceptance of each test to the MC and PM. The PM gives final approval on each test. The Owner’s facilities operating staff are encouraged to attend and participate in the testing process. The commissioning agent shall ensure the owner is notified at least 5 business days prior to any testing, so that owner has a chance to attend startup and functional testing. Problem Solving. The CA will recommend solutions to problems found, however the burden of responsibility to solve, correct and retest problems is with the contractors, Subs and ME. DOCUMENTATION, NON-CONFORMANCE AND APPROVAL OF TESTS .1 Documentation: The CA shall witness and document the results of all functional performance tests using the specific procedural forms developed for that purpose. Prior to testing, these forms are provided to the PM for review and approval and to the Subs for review. The CA will include the filled out forms in the System Manual. .2 Non-Conformance .1 .2 The CA will record the results of the functional test on the procedure or test form. All deficiencies or non-conformance issues shall be noted and reported to the MC and PM on a standard non-compliance form. Corrections of minor deficiencies identified may be made during the tests at the discretion of the CA. In such cases the deficiency and resolution will be documented on the procedure form. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 .3 .4 .5 .6 .3 Section 01 91 14 COMMISSIONING – PLAN Page 15 of 22 Every effort will be made to expedite the testing process and minimize unnecessary delays, while not compromising the integrity of the procedures. However, the CA will not be pressured into overlooking deficient work or loosening acceptance criteria to satisfy scheduling or cost issues, unless there is an overriding reason to do so at the request of the Owner. As tests progress and a deficiency is identified, the CA discusses the issue with the executing contractor. When there is no dispute on the deficiency and the Sub accepts responsibility to correct it: .1 The CA documents the deficiency and the Sub’s response and intentions and they go on to another test or sequence. After the day’s work, the CA submits the non-compliance reports to the MC and PM for signature, if required. A copy is provided to the Sub and CA. The Sub corrects the deficiency, signs the statement of correction at the bottom of the non-compliance form certifying that the equipment is ready to be retested and sends it back to the CA. .2 The CA reschedules the test and the test is repeated. If there is a dispute about a deficiency, regarding whether it is a deficiency or who is responsible: .1 The deficiency shall be documented on the non-compliance form with the Sub’s response and a copy given to the MC and to the Sub representative assumed to be responsible .2 Resolutions are made at the lowest management level possible. Other parties are brought into the discussions as needed. Final interpretive authority is with the ME. Final acceptance authority is with the Owner. .3 The CA documents the resolution process. .4 Once the interpretation and resolution have been decided, the appropriate party corrects the deficiency, signs the statement of correction on the non-compliance form and provides it to the CA. The CA reschedules the test and the test is repeated until satisfactory performance is achieved Cost of Retesting .1 .2 The cost for the Sub to retest a pre-functional or functional test, if they are responsible for the deficiency, shall be theirs. For a deficiency identified, not related to any pre-functional checklist or start-up fault, the following shall apply: .1 The CA, ME and/or PM will direct the retesting of the equipment once at no “charge” to the contractors for their time. However, the CA’s, ME’s and/or PM’s time for a second retest will be charged to the contractors, who may choose to recover costs from the responsible Sub. .2 The time for the CA, ME and/or PM to direct any retesting required because a specific prefunctional checklist or start-up test item, 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 .3 .4 .5 .4 reported to have been successfully completed, but determined during functional testing to be faulty, will be backcharged to the contractor, who may choose to recover costs from the party responsible for executing the faulty prefunctional test. .3 Refer to the Sampling Section for requirements for testing and retesting identical equipment. The Contractor shall respond in writing to the CA and PM at least as often as commissioning meetings are being scheduled concerning the status of each apparent outstanding discrepancy identified during commissioning. Discussion shall cover explanations of any disagreements and proposals for their resolution. The CA retains the original non-conformance forms until the end of the project. Any required retesting by any contractor shall not be considered a justified reason for a claim of delay or for a time extension by the prime contractor. Failure Due to Manufacturer Defect: If 10%, or three, whichever is greater, of identical pieces (size alone does not constitute a difference) of equipment fail to perform to the Contract Documents (mechanically or substantively) due to manufacturing defect, not allowing it to meet its submitted performance spec, all identical units may be considered unacceptable by the PM. In such case, the Contractor shall provide the Owner with the following: .1 .2 .3 .4 .5 .5 Section 01 91 14 COMMISSIONING – PLAN Page 16 of 22 Within one week of notification from the PM, the Contractor or manufacturer’s representative shall examine all other identical units making a record of the findings. The findings shall be provided to the PM within two weeks of the original notice. Within two weeks of the original notification, the Contractor or manufacturer shall provide a signed and dated, written explanation of the problem, cause of failures, etc. and all proposed solutions which shall include full equipment submittals. The proposed solutions shall not significantly exceed the specification requirements of the original installation. The PM AND THE OWNER will determine whether a replacement of all identical units or a repair is acceptable. Two examples of the proposed solution will be installed by the Contractor will be allowed to test the installations for up to one week, upon which the PM will decide whether to accept the solution. Upon acceptance, the Contractor and/or manufacturer shall replace or repair all identical items, at their expense and extend the warranty accordingly, if the original equipment warranty had begun. The replacement/repair work shall proceed with reasonable speed beginning within one week from when parts can be obtained. Approval: The CA notes each satisfactorily demonstrated function on the test form. Formal approval of the functional test is made later after review by the CA and by the ME, if necessary. The CA recommends acceptance of each test to 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 Section 01 91 14 COMMISSIONING – PLAN Page 17 of 22 the PM using a standard form. The PM gives final approval on each test using the same form, providing a signed copy to the CA and the Contractor. 2.11 POST OCCUPANCY COMMISSIONING .1 Post Occupancy Commissioning during the close out phase of the project begins at substantial performance and may continue through to the end of the contractual warranty/correction period. It is required where additional performance testing is needed because of seasonal changes, or varying building occupancy loads, or occasionally where all parties have agreed that substantial performance can occur before all systems have been constructed. .2 The activities of all participants in the commissioning process throughout the execution phase will generally follow the principles set out in ASHRAE Commissioning Guideline O, other than situation-specific differences for IO projects noted herein. .3 The key steps to achieve this with the participation of a commissioning authority are: .1 .2 .3 .4 .5 .6 .7 .8 .4 Oversight of the commissioning activities by the commissioning authority Witness orderly startup, verification and testing of designated systems for equipment installed during the Post Occupancy Commissioning. Correction of remaining deficiencies, including those identified during commissioning. Coordination and compilation of the commissioning documentation during the fine tuning and performance testing stages, and completion of any outstanding CMMS verification forms. (Schedule D) Completion of any remaining stakeholder training (Schedule G) Submittal of remaining items for the O&M manuals (Schedule B) Completion of instrument 4.1.3 T1 – Post Occupancy Commissioning Verification Form (Schedule F) Update of instrument 3.1.4 T2 – Project Handover Checklist (Schedule H) – Completed earlier in Execution phase Unforeseen Deferred Tests. If any check or test cannot be completed due to the building structure, required occupancy condition or other deficiency, execution of checklists and functional testing may be delayed upon approval of the PM. These tests will be conducted in the same manner as the seasonal tests as soon as possible. Services of necessary parties will be negotiated. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 .5 Section 01 91 14 COMMISSIONING – PLAN Page 18 of 22 Seasonal Testing. During the warranty period, seasonal testing (tests delayed until weather conditions are closer to the system’s design) shall be completed as part of this contract. The CA shall coordinate this activity. Tests will be executed, documented and deficiencies corrected by the appropriate Subs, with facilities staff and the CA witnessing. Any final adjustments to the O&M manuals and asbuilds due to the testing will be made. Part 3 Commissioning Documentation 3.1 COMMISSIONING ACTIVITIES AND RELATED DOCUMENTATION .1 Commissioning will be performed by the specified Commissioning Agencies using procedures identified in the specification documents. .2 Commissioning activities will be witnessed by, and results certified by, the Commissioning Authority and/or Designer. .3 Reported results will be witnessed and certified using approved testing forms. .4 Upon satisfactory completion, the Commissioning Agency performing the tests will prepare the required Commissioning Report, which will be certified by the Commissioning Authority and/or Designer 3.2 COMMISSIONING OF INTEGRATED SYSTEMS AND RELATED DOCUMENTATION .1 Commissioning will be performed by the specified Commissioning Agencies, using procedures developed by the Commissioning Authority. Procedures will be witnessed by Commissioning Authority and documented on approved Report Forms. Upon satisfactory completion, the Commissioning Authority will prepare a Commissioning Report, which will be certified by the Designer. .2 The schedule of integrated systems will be prepared the Commissioning Authority and will identify integrated systems to be commissioned over and above those listed herein: .1 .2 3.3 HVAC and associated systems forming part of integrated HVAC systems DDC Systems COMMISSIONING SPECIFICATIONS .1 Commissioning specifications are included in Section 01 91 13, 01 91 14 and 01 91 15. All commissioning sections under this division refer to the general commissioning practices in an integrated approach for all building systems. .2 All building trades contractors shall refer to these sections for understanding about standards, level of inspections and scope of work with respect to commissioning activities for this project. 3.4 PRE-FUNCTIONAL AND START UP INSTALLATION CHECKLISTS (PFC) .1 Installation checklists shall be used to validate per-start-up and start-up inspection of the building systems. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 Section 01 91 14 COMMISSIONING – PLAN Page 19 of 22 .2 Contractors will be responsible to complete these sheets during testing procedures. These sheets will be used by the Design team and the Commissioning Authority to follow up progress of equipment start up process and to authorize next phase of systems inspection (performance verification). .3 After review and verification by the Commissioning Authority, these report forms will be included in the relevant Commissioning Reports. .4 The sample of Pre Functional and Start up Installation Checklist are included as Appendix to the Commissioning Plan. 3.5 PERFORMANCE VERIFICATION (PV) REPORT FORMS – .1 Performance verification shall be used to validate equipment and systems functionality in line with the design intent. .2 Contractors may use these sheets as an indication about extend of the system inspection with regard to the functional performance and to allow sufficient labor hours for full participation in these testing, The inspection and testing are performed at the system level (Hot water boilers and associated pump systems) rather than the individual equipment. .3 The consultants and/or Commissioning Authority will witness and verify all sequences identified in these check sheets. Contractors will be responsible for presentation of specified systems operation to Consultants and/or Commissioning Authority. .4 After review and verification by the Commissioning Authority, these report forms will be included in the relevant Commissioning Reports. .5 The sample of Performance Verification Checklist are included as Appendix to the Commissioning Plan. 3.6 COMMISSIONING REPORTS .1 The commissioning process generates a number of written work products described in various parts of the Specifications. The following lists all the formal written work products and describes who is responsible to create them. In summary, the written products are: Product Developed By .1 .2 .3 .4 .5 Final commissioning plan Meeting minutes Commissioning schedules Equipment documentation submittals Sequence clarifications .6 .7 .8 .9 .10 Prefunctional checklists Startup and initial checkout plan Startup and initial checkout forms filled out Final TAB report Issues log (deficiencies) CA CA CA with OW Subs Subs and ME as needed CA Subs and CA Subs TAB CA 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 .2 3.7 .11 .12 Commissioning Progress Record Deficiency reports .13 .14 .15 .16 .17 .18 Functional test forms Filled out functional tests O&M manuals Commissioning record book Overall training plan Final commissioning report Section 01 91 14 COMMISSIONING – PLAN Page 20 of 22 CA ME and verified by CA CA CA Subs CA CA and OW CA Certification for payment shall not exceed 90% (NINETY PERCENT) of the value of the total construction cost until commissioning has been satisfactory completed and the preliminary commissioning report, project record drawings and preliminary Maintenance Manuals have been submitted and FULLY ACCEPTED in writing by CA and responsible consultants. IO COMMISSIONING VERIFICATION FORMS .1 The following forms shall be completed throughout commissioning process to confirm compliance to the IO commissioning guideline and to achieve Substantial Performance and later on the final project close out: .1 .2 .3 3.8 Commissioning Verification Form – IO Commissioning Guideline – Schedule E (Completed by Commissioning Authority) Post Occupancy Commissioning Verification Form – IO Commissioning Guideline – Schedule F (Completed by Commissioning Authority) Final Project Handover Checklist - IO Commissioning Guideline – Schedule H (Completed by PM and FM) COMMISSIONING SCHEDULE .1 General .1 The CA will work with the MC and subcontractors to incorporate all commissioning activities into the master construction schedule. All parties will address scheduling problems and make necessary notifications in a timely manner in order to expedite commissioning process. The schedule shall include all necessary time-points and milestones, testing, documentation, training and commissioning activities. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 .2 .3 .2 Section 01 91 14 COMMISSIONING – PLAN Page 21 of 22 The CA will monitor progress of commissioning against this schedule. A separate detailed schedule in day-by-day format will be provided by the Contractor for commissioning of all components, equipment, subsystems, systems and integrated systems. This schedule shall include a detailed training schedule so as to demonstrate that there will be no conflicts with testing. The schedule of commissioning activities will be produced in a bar chart format to a scale that will ensure legibility. This bar chart will show sequences of testing equipment and systems, interrelationship between tests, duration of tests and training periods. The commissioning schedule will include the following milestones (as appropriate): .1 Introductory commissioning meeting chaired by the Commissioning Authority and the Consultants group: 45 days after general contractor award of contract. .2 Commissioning procedures review: contractors’ comments if different from specs documents. - 120 days after general contractor award of contract .3 Commissioning report format: 3 months before start-up of inspection and testing Commissioning Schedule for Mechanical Systems (General Outline) .1 Pre-Functional and Start-up Inspection: .1 Mechanical Pre-functional Inspection .1 Physical installation complete .2 Mountings checks .3 Vibration isolator & seismic restraint installed .4 Piping completed .5 Electrical connection completed .6 Local disconnect switches installed .7 Overload heaters in place and sized correctly .8 Safety controls operational .9 Control system completed (end to end check) .10 Operation verified .2 Electrical Pre-functional Inspection .1 Devices installed per manufacturer’s instructions and specifications .2 Devices installed agree with shop drawings and specifications .3 Verify mounting, location and clearances are per plans and specifications .4 All zone circuits and inputs are correctly wired, circuits labeled .5 Communications interconnection / interface is connected .6 Deficiencies as per attached list 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 Section 01 91 14 COMMISSIONING – PLAN Page 22 of 22 .3 .2 .3 Commissioning Schedule for Integrated Systems (General Outline) .1 .4 Upon completion of individual system tests, tests of the integrated systems shall be performed to verify that all components work together. Commissioning Reports .1 .5 EMCS System .1 Control software installed and commissioned .2 Control graphics installed and commissioned Functional Performance Verification .1 HVAC Systems Performance Verification .1 Demonstration of operation of all systems under all operating conditions and over the full operating range will take place during functional inspection period and will be witnessed by the Owner, Designer and/or Commissioning Authority. This will include simulated opposite-season tests. .2 BAS System Demonstration to Commissioning Agent .3 BAS Systems Acceptance Testing The Commissioning Authority shall indicate submission dates of commissioning reports as milestone dates as part of the commissioning schedule. Training and Demonstration .1 A dedicated time frame shall be allowed for training and demonstration of building systems operation and maintenance to the building operation and maintenance personnel. The commissioning schedule and time frame allowed shall reflect instructions and training tables indicated in Section 01 91 15 Commissioning Training. END OF DOCUMENT 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 Part 1 GENERAL 1.1 DESCRIPTION Section 01 91 15 COMMISSIONING – TRAINING Page 1 of 8 The building systems training for Owners Operating Personnel shall be coordinated by the Commissioning Authority. The training shall include all components as identified in tables below. .1 Training Objectives: Training shall be in sufficient detail and of sufficient duration to meet the following objectives: .1 .2 .3 .4 .5 .6 Safe, reliable and energy-efficient operation of all systems in all normal and all emergency modes and under all conditions. Effective ongoing inspection and measurement of system performance. Proper preventive maintenance, diagnosis and troubleshooting. Service and repair of all systems, equipment and components. Ability to update documentation and input on future building modifications. Ability to operate equipment and systems under emergency conditions without assistance or until appropriate qualified assistance arrives. For training of O & M personnel to be effective, it is to be implemented during the later stages of construction, to allow for familiarization with the facility and the installed systems. .2 Long Term Ongoing Training: “Long-term” ongoing training is not included in commissioning activities. However, training courses and training materials must be designed to permit long term ongoing training well into the future. .3 Co-ordination and Monitoring: The Commissioning Authority shall co-ordinate all participants for training and shall monitor all training. Contractors shall co-ordinate and implement all training. .4 Responsibilities .1 .2 The Commissioning Authority shall: .1 In conjunction with the Owner ensure all designated O & M personnel will be available for training during later stages of construction for purposes of familiarization with the facility and all installed systems, .2 Review the quality of the Contractor’s training and training materials meets all requirements of the project. The Contractor shall have overall responsibility to provide, coordinate, document, record all training including videotaping and shall provide all training materials, training and classroom times. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 .3 .4 .5 Contractor’s personnel, professional trainers, manufacturer’s resources for training purposes and be responsible for: .1 Direct all training .2 Implementation of all training activities .3 Coordination among instructors .4 Quality of training and training materials. Trainees shall include O & M personnel selected for operating and maintaining the project, the Facility Manager, building operators, maintenance staff, security staff, technical specialists (as applicable). Instructors: Instructors shall include the following: .1 .2 .3 .4 .6 Section 01 91 15 COMMISSIONING – TRAINING Page 2 of 8 Consultant and/or Commissioning Authority: To provide instruction on the Design Philosophy, Design Criteria, Design Intent, and description of all systems. Contractor: To provide instruction on the operation of specific systems, equipment or components, including start up, operation, shut down, features of controls, such as reasons for, results of, implications on associated systems of, adjustment of set points of control and limit safety devices. Factory trained and certified manufacturer’s maintenance specialist personnel: to provide instruction on start up, operation, care, maintenance, shut down of equipment for which they have certified installation, started up and carried out PV tests. Professional trainers: Where the Contractor is not deemed to be able to deliver the quality or level or training required. Training Requirements: .1 .2 Organization: Training of O & M personnel shall consist of three main parts: .1 Familiarization sessions organized for all systems during construction and installation stage and equipment commissioning. .2 Hands on training: shall be provided on all systems, components and equipment and explanations of all commissioning procedures shall be given during the commissioning phase. .3 Classroom sessions or onsite training: shall be provided as necessary, with instruction regarding functional requirements, system philosophy, system operation and use of the Building Management Manual and all other commissioning documentation. Content: .1 Training requirements for building systems are included in table format in this appendix and in the relevant commissioning specifications of various divisions. .2 Training shall include: .1 Review of the facility .2 Functional requirements .3 System philosophy – Design Criteria, design Intents, why the system was designed in this way, why certain settings 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 .3 .4 .5 .6 .7 Section 01 91 15 COMMISSIONING – TRAINING Page 3 of 8 are important and should not be changed without proper authority, limitations of each system, including emergency procedures .4 Review of system layout and equipment, components and controls .5 Use the printed installation, operation and maintenance instruction material included in the O&M manuals. .6 Discussion of warranties and guarantees. .7 System operating sequences, including interaction between systems forming part of integrated systems, step by step directions for starting up and shutting down all systems, closing and opening valves, dampers and switches, adjusting control settings, turning motors on and off, emergency procedures .8 Maintenance and servicing of systems, equipment and components .9 Troubleshooting diagnosis – symptoms, signs, causes and corrective measures. For some equipment, this need only be a general knowledge, but should be enough to allow the operator to describe the problem adequately and to take emergency measures until qualified help arrives. .10 Review of O & M documentation Instructional Materials: All instructional material shall be produced in a digital electronic form that will permit future training for replacement O & M personnel to the same degree of detail and depth as supplied by initial training. Training materials shall include at least the following: .1 “As Built” Contract Documents .2 Building Management Manual – containing the Operating Manual and Maintenance Manual. Copies of the Building Management Manual shall be made available to O & M personnel prior to the familiarization sessions for retention throughout the training period for purposes of self study. .3 PV Reports Instructional material shall be supplemented as necessary by: .1 Transparencies for overhead projectors .2 35 mm slide presentations .3 Manufacturers training videos. These should be screened by the Commissioning Authority and reviewed by the Consultant at least six months prior to pre start up inspections before being included as part of the training material. .4 Equipment models Instructors shall be responsible for the content and quality of training materials for all training sessions under their jurisdiction. Training Plan 23 Beechgrove Lane Section 01 91 15 Heating-Cooling RTU Renewal COMMISSIONING – TRAINING Project No. 1039236-270802 Page 4 of 8 .1 A training Plan developed by the Contractor for each discipline based upon project requirements shall be provided within 12 weeks of award of General Contract. .2 Submit the training Plan to the Commissioning Authority for review and comment at least 12 weeks prior to the proposed training dates. Update and resubmit as required. .3 Include an agenda and a course outline summarizing the content and duration of training. .4 Co-ordinate the date(s) of the training session (s) with the Commissioning Authority. Commissioning Authority to organize the location and provide the lists of participants. .5 Prepare a summary of the training sessions. Indicate dates, subject matter, and all personnel present for training. After training, submit the training summary to the Commissioning Authority. .6 Provide one copy of training material per student. .7 Record the time, date and subject matter of training sessions as they occur. Indicate all those who are present at each training session. .8 Delivery of Training .1 Training shall normally be provided during regular working hours prior to take over of the project. .2 Adequate time for training is to be included in Construction and Completion Schedule. .3 Provide four (4) on-site training sessions including classroom and terminal hands on, for personnel designated by the owner/owners service provider prior to and at substantial completion or when system starts affecting conditions in tenant spaces that owner/owners service provider must respond to. .4 Each training session should not be longer than three hours and provided between the hours of 08:30 – 11:30 and 13:00 – 16:00. .5 Training is to be hands on, classroom, oral, written and audio/visual. .6 Train the designated staff of IO and its representative to enable them to do following: .1 Day-to-day Operators: range of 4 to 8 person (2 sessions) .1 Proficiently operate the system .2 Understand control system architecture and configuration .3 Understand DDC system components .4 Understand system operation, including DDC system control and optimizing routines (algorithms) .5 Operate the workstation and peripherals .6 Log on and off the system .7 Access graphics, point reports, and logs 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 .2 .3 Section 01 91 15 COMMISSIONING – TRAINING Page 5 of 8 .8 Adjust and change system set points, time schedules, and holiday schedules .9 Recognize malfunctions of the system by observation of the printed copy and graphical visual signals .10 Understand system drawings and Operation and Maintenance manual .11 Understand the job layout and location of control components .12 Access data from DDC controllers and ASCs .13 Operate portable operator’s terminals Advanced Operator (in addition to above): 2-4 persons (1 session) .1 Make and change graphics on the workstation .2 Create, delete, and modify alarms, including annunciation and routing of these .3 Create, delete, and modify point trend logs and graph or print these both on an ad-hoc basis and at user.4 definable time intervals .5 Create, delete, and modify reports .6 Add, remove, and modify system’s physical points .7 Create, modify, and delete programming .8 Add panels when required .9 Add operator interface stations .10 Create, delete, and modify system displays, both graphical and others .11 Perform DDC system field checkout procedures .12 Perform DDC controller unit operation and maintenance procedures .13 Perform workstation and peripheral operation and maintenance procedures .14 Perform DDC system diagnostic procedures .15 Configure hardware including PC boards, switches, communication, and I/O points .16 Maintain, calibrate, troubleshoot, diagnose, and repair hardware .17 Adjust, calibrate, and replace system components System Managers/Administrator (in addition to above): 2-4 persons (1 session) .1 Maintain software and prepare backups .2 Interface with job-specific, third-party operator software 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 .9 .10 .11 .12 Section 01 91 15 COMMISSIONING – TRAINING Page 6 of 8 .3 Add new users and understand password security procedures Training is to be completed prior to acceptance of facility. Training should include demonstrations by the trained O & M personnel so as to show confidence in, and depth of understanding of, all systems and equipment, and to demonstrate completeness of training. Upon completion of these demonstrations, the contractors responsible for all training shall provide a written report signed by Instructors and witnessed by Consultant and/or Commissioning Authority. This report shall be deposited with the Commissioning Authority. Training Activities: .1 See the following attached building systems activities Training Plan. This is a broad scope outline summary for the Contractors and Commissioning Coordinator information and incorporation into the project training plan. Perth Courthouse Boiler Renewal Project No. 1040809-270728 1.2 Section 01 91 15 COMMISSIONING – TRAINING Page 7 of 8 TRAINING ACTIVITIES - MECHANICAL MECHANICAL (THIS IS BROAD OUTLINE ONLY) This Training Plan forms Part of Section 01 91 15 Systems and Goals Instructor Design Philosophy 1. General overview of design concepts 2. Awareness of interaction of mechanical systems Commissioning Authority (CA) Ventilation System 1. To learn details of all systems installed 2. To develop in depth knowledge of the operation of each system Installing Contractor, Equipment Manufacturer, CA Content (approximately 30% Theory, 70% practical) 1. Explanation of mechanical and related electrical systems, their interaction 2. Site visit in early stages of project 3. Classroom sessions during commissioning stage 1. Explanation of operational concepts of systems and components including VAV boxes and room thermostats. 2. Equipment operation and adjustment 3. Review of O & M Manuals 4. Equipment troubleshooting 5. Observation during construction 6. Site visits, classroom sessions Duration 1 hours 2 hours Instruction Materials and Tools 1. Schematic of layouts & controls 2. Installed system, equipment 3. Design Criteria, Design Intents 1. “ As built” HVAC drawings 2. Systems Operations Manual 3. Maintenance Manual 4. Installed systems, equipment 5. Controls Schematics and Reports 6. Demonstrations Perth Courthouse Boiler Renewal Project No. 1040809-270728 Section 01 91 15 COMMISSIONING – TRAINING Page 8 of 8 MECHANICAL (THIS IS BROAD OUTLINE ONLY) This Training Plan forms Part of Section 01 91 15 Systems and Goals Instructor Rooftop UNits 1. To develop in depth knowledge of the operation of each system Installing Contractor, Equipment Manufacturer, CA BAS, EMCS Control systems for mechanical systems. Building control components. System Installing Contractor, EMCS Trade, CA Content (approximately 30% Theory, 70% practical) 1. Explanation of operational concepts of systems and components 2. Equipment operation and adjustment 3. Review of O & M Manuals 4. Equipment troubleshooting 5. Observation during construction Site visits, classroom sessions 1. Explanation of operational concepts of the building systems and components 2. Use of various cycles and controls 3. Equipment and operation and adjustment 4. Review of O & M Manuals 5. Equipment and system troubleshooting 6. Observation during construction 7. Site visits, classroom sessions END OF DOCUMENT Duration 2 hours Four Sessions of 3 Hours as per Item 1.1.6. Delivery of training Instruction Materials and Tools 1. “ As built” HVAC drawings 2. Systems Operations Manual 3. Maintenance Manual 4. Installed systems, equipment 5. Controls Schematics and Reports 6. Demonstrations 1. “As built” HVAC and control drawings 2. Systems Operations Manual 3. Maintenance Manual 4. Installed systems, equipment 5. Controls Schematics and Reports 6. Demonstrations 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 Section 23 05 00 COMMON WORK RESULTS FOR HVAC Page 1 of 4 Part 1 General 1.1 ACTION AND INFORMATIONAL SUBMITTALS .1 Submit in accordance with Section 01 00 10 – General Procedures. .2 Product Data: .1 .3 Shop Drawings: .1 .2 .3 1.2 Submit manufacturer's instructions, printed product literature and data sheets and include product characteristics, performance criteria, physical size, finish and limitations. Submit drawings stamped and signed by professional engineer registered or licensed in Province of Ontario, Canada. Indicate on drawings: .1 Mounting arrangements. .2 Operating and maintenance clearances. Shop drawings and product data accompanied by: .1 Detailed drawings of bases, supports, and anchor bolts. .2 Acoustical sound power data, where applicable. .3 Points of operation on performance curves. .4 Manufacturer to certify current model production. .5 Certification of compliance to applicable codes. CLOSEOUT SUBMITTALS .1 Submit in accordance with Section 01 00 10 – General Procedures. .2 Operation and Maintenance Data: .1 .2 .3 Operation and maintenance manual approved by, and final copies deposited with, Departmental Representative before final inspection. Operation data to include: .1 Control schematics for systems including environmental controls. .2 Description of systems and their controls. .3 Description of operation of systems at various loads together with reset schedules and seasonal variances. .4 Operation instruction for systems and component. .5 Description of actions to be taken in event of equipment failure. .6 Colour coding chart. Maintenance data to include: .1 Servicing, maintenance, operation and trouble-shooting instructions for each item of equipment. .2 Data to include schedules of tasks, frequency, tools required and task time. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 .4 .5 .6 .7 .8 .9 1.3 Section 23 05 00 COMMON WORK RESULTS FOR HVAC Page 2 of 4 Performance data to include: .1 Equipment manufacturer's performance datasheets with point of operation as left after commissioning is complete. .2 Equipment performance verification test results. .3 Special performance data as specified. .4 Testing, adjusting and balancing reports as specified in Section 23 05 93 - Testing, Adjusting and Balancing for HVAC. Approvals: .1 Submit 2 copies of draft Operation and Maintenance Manual to Departmental Representative for approval. Submission of individual data will not be accepted unless directed by Departmental Representative. .2 Make changes as required and re-submit as directed by Departmental Representative. Additional data: .1 Prepare and insert into operation and maintenance manual additional data when need for it becomes apparent during specified demonstrations and instructions. Site records: .1 Departmental Representative will provide 1 set of reproducible mechanical drawings. Provide sets of white prints as required for each phase of work. Mark changes as work progresses and as changes occur. Include changes to existing mechanical systems, control systems and low voltage control wiring. .2 Transfer information weekly to reproducibles. .3 Use different colour waterproof ink for each service. .4 Make available for reference purposes and inspection. As-built drawings: .1 Prior to start of Testing, Adjusting and Balancing for HVAC, finalize production of as-built drawings. .2 Identify each drawing in lower right hand corner in letters at least 12 mm high as follows: - "AS BUILT DRAWINGS: THIS DRAWING HAS BEEN REVISED TO SHOW MECHANICAL SYSTEMS AS INSTALLED" (Signature of Contractor) (Date). .3 Submit to Departmental Representative for approval and make corrections as directed. .4 Perform testing, adjusting and balancing for HVAC using as-built drawings. .5 Submit completed reproducible as-built drawings with Operating and Maintenance Manuals. Submit copies of as-built drawings for inclusion in final TAB report. MAINTENANCE MATERIAL SUBMITTALS .1 Submit in accordance with Section 01 00 10 – General Instructions. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 .2 Section 23 05 00 COMMON WORK RESULTS FOR HVAC Page 3 of 4 Furnish spare parts as follows: .1 One filter cartridge or set of filter media for each filter or filter bank in addition to final operating set. .3 Provide one set of special tools required to service equipment as recommended by manufacturers. .4 Furnish one commercial quality grease gun, grease and adapters to suit different types of grease and grease fittings. 1.4 DELIVERY, STORAGE AND HANDLING .1 Deliver, store and handle materials in accordance with Section 01 00 10 – General Instructions and with manufacturer's written instructions. .2 Delivery and Acceptance Requirements: deliver materials to site in original factory packaging, labelled with manufacturer's name and address. .3 Storage and Handling Requirements: .1 .2 .3 .4 Store materials in dry location and in accordance with manufacturer's recommendations in clean, dry, well-ventilated area. Store and protect from nicks, scratches, and blemishes. Replace defective or damaged materials with new. Packaging Waste Management: in accordance with Section 01 00 10 – General Instructions. Part 2 Products 2.1 MATERIALS .1 HVAC and R Equipment: .1 Refrigerant: .1 HFC based refrigerant. Part 3 Execution 3.1 PAINTING REPAIRS AND RESTORATION .1 Do painting in accordance with Section 01 00 10 – General Instructions. .2 Prime and touch up marred finished paintwork to match original. .3 Restore to new condition, finishes which have been damaged. 3.2 SYSTEM CLEANING .1 Clean interior and exterior of all systems. Vacuum interior of ductwork and air handling units. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 3.3 Section 23 05 00 COMMON WORK RESULTS FOR HVAC Page 4 of 4 FIELD QUALITY CONTROL .1 Manufacturer's Field Services: .1 .2 3.4 Obtain written report from manufacturer verifying compliance of Work, in handling, installing, applying, protecting and cleaning of product and submit Manufacturer's Field Reports as described in PART 1 - ACTION AND INFORMATIONAL SUBMITTALS. Provide manufacturer's field services consisting of product use recommendations and periodic site visits for inspection of product installation in accordance with manufacturer's instructions. DEMONSTRATION .1 Departmental Representative will use equipment and systems for test purposes prior to acceptance. Supply labour, material, and instruments required for testing. .2 Supply tools, equipment and personnel to demonstrate and instruct operating and maintenance personnel in operating, controlling, adjusting, trouble-shooting and servicing of all systems and equipment during regular work hours, prior to acceptance. .3 Use operation and maintenance manual, as-built drawings, and audio visual aids as part of instruction materials. .4 Instruction duration time requirements as specified in appropriate sections. .5 Departmental Representative will record these demonstrations on video tape for future reference. 3.5 CLEANING .1 Progress Cleaning: clean in accordance with Section 01 00 10 – General Instructions. .1 Leave Work area clean at end of each day. .2 Final Cleaning: upon completion remove surplus materials, rubbish, tools and equipment in accordance with Section 01 00 10 – General Instructions. .3 Waste Management: separate waste materials for recycling in accordance with Section 01 00 10 – General Instructions. .1 3.6 Remove recycling containers and bins from site and dispose of materials at appropriate facility. PROTECTION .1 Protect equipment and systems openings from dirt, dust, and other foreign materials with materials appropriate to system. END OF SECTION 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 Part 1 General 1.1 SUMMARY Section 23 05 93 TESTING, ADJUSTING AND BALANCING FOR HVAC Page 1 of 5 .1 TAB is used throughout this Section to describe the process, methods and requirements of testing, adjusting and balancing for HVAC. .2 TAB means to test, adjust and balance to perform in accordance with requirements of Contract Documents and to do other work as specified in this section. 1.2 QUALIFICATIONS OF TAB PERSONNEL .1 Submit names of personnel to perform TAB to Departmental Representative within 30 days of award of contract. .2 Provide documentation confirming qualifications, successful experience. .3 TAB: performed in accordance with the requirements of standard under which TAB Firm's qualifications are approved: .1 .2 .3 Associated Air Balance Council, (AABC) National Standards for Total System Balance. National Environmental Balancing Bureau (NEBB) TABES, Procedural Standards for Testing, Adjusting, Balancing of Environmental Systems. Sheet Metal and Air Conditioning Contractors' National Association (SMACNA), HVAC TAB HVAC Systems - Testing, Adjusting and Balancing. .4 Recommendations and suggested practices contained in the TAB Standard: mandatory. .5 Use TAB Standard provisions, including checklists, and report forms to satisfy Contract requirements. .6 Use TAB Standard for TAB, including qualifications for TAB Firm and Specialist and calibration of TAB instruments. .7 Where instrument manufacturer calibration recommendations are more stringent than those listed in TAB Standard, use manufacturer's recommendations. .8 TAB Standard quality assurance provisions such as performance guarantees form part of this contract. .1 .2 1.3 For systems or system components not covered in TAB Standard, use TAB procedures developed by TAB Specialist. Where new procedures, and requirements, are applicable to Contract requirements have been published or adopted by body responsible for TAB Standard used (AABC, NEBB, or TABB), requirements and recommendations contained in these procedures and requirements are mandatory. PURPOSE OF TAB .1 Test to verify proper and safe operation, determine actual point of performance, evaluate qualitative and quantitative performance of equipment, systems and controls at design, average and low loads using actual or simulated loads 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 Section 23 05 93 TESTING, ADJUSTING AND BALANCING FOR HVAC Page 2 of 5 .2 Adjust and regulate equipment and systems to meet specified performance requirements and to achieve specified interaction with other related systems under normal and emergency loads and operating conditions. .3 Balance systems and equipment to regulate flow rates to match load requirements over full operating ranges. 1.4 EXCEPTIONS .1 1.5 TAB of systems and equipment regulated by codes, standards to satisfaction of authority having jurisdiction. CO-ORDINATION .1 Schedule time required for TAB (including repairs, re-testing) into project construction and completion schedule to ensure completion before acceptance of project. .2 Do TAB of each system independently and subsequently, where interlocked with other systems, in unison with those systems. 1.6 PRE-TAB REVIEW .1 Review contract documents before project construction is started confirm in writing to Departmental Representative adequacy of provisions for TAB and other aspects of design and installation pertinent to success of TAB. .2 Review specified standards and report to Departmental Representative in writing proposed procedures which vary from standard. .3 During construction, co-ordinate location and installation of TAB devices, equipment, accessories, measurement ports and fittings. 1.7 START-UP .1 Follow start-up procedures as recommended by equipment manufacturer unless specified otherwise. .2 Follow special start-up procedures specified elsewhere in Division 23. 1.8 OPERATION OF SYSTEMS DURING TAB .1 1.9 Operate systems for length of time required for TAB and as required by Departmental Representative for verification of TAB reports. START OF TAB .1 Notify Departmental Representative 7 days prior to start of TAB. .2 Start TAB when building is essentially completed, including: .3 Installation of ceilings, doors, windows, other construction affecting TAB. .4 Application of weatherstripping, sealing, and caulking. .5 Provisions for TAB installed and operational. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 .6 Start-up, verification for proper, normal and safe operation of mechanical and associated electrical and control systems affecting TAB including but not limited to: .1 .2 1.10 Section 23 05 93 TESTING, ADJUSTING AND BALANCING FOR HVAC Page 3 of 5 Proper thermal overload protection in place for electrical equipment. Air systems: .1 Filters in place, clean. .2 Duct systems clean. .3 Fire, smoke, volume control dampers installed and open. .4 Coil fins combed, clean. .5 Access doors, installed, closed. .6 Outlets installed, volume control dampers open. APPLICATION TOLERANCES .1 Do TAB to following tolerances of design values: .1 1.11 HVAC systems: plus 5 %, minus 5 %. ACCURACY TOLERANCES .1 1.12 Measured values accurate to within plus or minus 2 % of actual values. INSTRUMENTS .1 Prior to TAB, submit to Departmental Representative list of instruments used together with serial numbers. .2 Calibrate in accordance with requirements of most stringent of referenced standard for either applicable system or HVAC system. .3 Calibrate within 3 months of TAB. Provide certificate of calibration to Departmental Representative. 1.13 ACTION AND INFORMATIONAL SUBMITTALS .1 Submit, prior to commencement of TAB: .2 Proposed methodology and procedures for performing TAB if different from referenced standard. 1.14 PRELIMINARY TAB REPORT .1 Submit for checking and approval of Departmental Representative, prior to submission of formal TAB report, sample of rough TAB sheets. Include: .1 .2 .3 .4 1.15 Details of instruments used. Details of TAB procedures employed. Calculations procedures. Summaries. TAB REPORT .1 Format in accordance with referenced standard. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 .2 TAB report to show results in SI units and to include: .1 .2 .3 1.16 Section 23 05 93 TESTING, ADJUSTING AND BALANCING FOR HVAC Page 4 of 5 Project record drawings. System schematics. Submit 6 copies of TAB Report to Departmental Representative for verification and approval, in English in D-ring binders, complete with index tabs. VERIFICATION .1 Reported results subject to verification by Departmental Representative .2 Provide personnel and instrumentation to verify up to 30 % of reported results. .3 Number and location of verified results as directed by Departmental Representative .4 Pay costs to repeat TAB as required to satisfaction of Departmental Representative 1.17 SETTINGS .1 After TAB is completed to satisfaction of Departmental Representative, replace drive guards, close access doors, lock devices in set positions, ensure sensors are at required settings. .2 Permanently mark settings to allow restoration at any time during life of facility. Do not eradicate or cover markings. 1.18 COMPLETION OF TAB .1 1.19 TAB considered complete when final TAB Report received and approved by Departmental Representative AIR SYSTEMS .1 Standard: TAB to most stringent of TAB standards of AABC NEBB SMACNA ASHRAE. .2 Do TAB of systems, equipment, components, controls specified Division 23. .3 Qualifications: personnel performing TAB qualified to standards of AABC NEBB. .4 Quality assurance: perform TAB under direction of supervisor qualified to standards of AABC NEBB. .5 Measurements: to include as appropriate for systems, equipment, components, controls: air velocity, static pressure, flow rate, pressure drop (or loss), temperatures (dry bulb, wet bulb, dewpoint), duct cross-sectional area, RPM, electrical power, voltage, noise, vibration. .6 Locations of equipment measurements: to include as appropriate: .1 .2 .7 Inlet and outlet of dampers, filter, coil, humidifier, fan, other equipment causing changes in conditions. At controllers, controlled device. Locations of systems measurements to include as appropriate: main ducts, main branch, sub-branch, run-out (or grille, register or diffuser). 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 Part 2 Products 2.1 NOT USED .1 Not used. Part 3 Execution 3.1 NOT USED .1 Section 23 05 93 TESTING, ADJUSTING AND BALANCING FOR HVAC Page 5 of 5 Not used. END OF SECTION 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 Part 1 General 1.1 REFERENCES .1 Definitions: .1 .2 .2 Section 23 07 13 DUCT INSULATION Page 1 of 5 For purposes of this section: .1 "CONCEALED" - insulated mechanical services and equipment in suspended ceilings and non-accessible chases and furred-in spaces. .2 "EXPOSED" - means "not concealed" as previously defined. .3 Insulation systems - insulation material, fasteners, jackets, and other accessories. TIAC Codes: .1 CRD: Code Round Ductwork, .2 CRF: Code Rectangular Finish. Reference Standards: .1 .2 .3 American Society of Heating, Refrigeration and Air Conditioning Engineers (ASHRAE) .1 ANSI/ASHRAE/IESNA 90.1-13, SI; Energy Standard for Buildings Except Low-Rise Residential Buildings. ASTM International Inc. .1 ASTM B209M-14, Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate (Metric). .2 ASTM C335/C335M-10e1, Standard Test Method for Steady State Heat Transfer Properties of Pipe Insulation. .3 ASTM C411-11, Standard Test Method for Hot-Surface Performance of High-Temperature Thermal Insulation. .4 ASTM C449/C449M-07(R2013), Standard Specification for Mineral Fiber-Hydraulic-Setting Thermal Insulating and Finishing Cement. .5 ASTM C547-12, Standard Specification for Mineral Fiber Pipe Insulation. .6 ASTM C553-11, Standard Specification for Mineral Fiber Blanket Thermal Insulation for Commercial and Industrial Applications. .7 ASTM C612-10, Standard Specification for Mineral Fiber Block and Board Thermal Insulation. .8 ASTM C795-08(R2013), Standard Specification for Thermal Insulation for Use in Contact with Austenitic Stainless Steel. .9 ASTM C921-10(2015), Standard Practice for Determining the Properties of Jacketing Materials for Thermal Insulation. Canadian General Standards Board (CGSB) .1 CGSB 51-GP-52Ma-89, Vapour Barrier, Jacket and Facing Material for Pipe, Duct and Equipment Thermal Insulation. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 .4 .5 .6 .7 1.2 Section 23 07 13 DUCT INSULATION Page 2 of 5 Green Seal Environmental Standards (GSES) .1 Standard GS-36-00, Commercial Adhesives. South Coast Air Quality Management District (SCAQMD), California State .1 SCAQMD Rule 1168-A2005, Adhesive and Sealant Applications. Thermal Insulation Association of Canada (TIAC): National Insulation Standards (2005). Underwriters Laboratories of Canada (ULC) .1 CAN/ULC-S102-10, Method of Test for Surface Burning Characteristics of Building Materials and Assemblies. .2 CAN/ULC-S701-11, Standard for Thermal Insulation, Polystyrene, Boards and Pipe Covering. ACTION AND INFORMATIONAL SUBMITTALS .1 Provide submittals in accordance with Section 01 00 10 – General Instructions. .2 Product Data: .1 .3 Manufacturers' Instructions: .1 1.3 Provide manufacturer's printed product literature and datasheets for duct insulation, and include product characteristics, performance criteria, physical size, finish and limitations. .1 Description of equipment giving manufacturer's name, type, model, year and capacity. .2 Details of operation, servicing and maintenance. .3 Recommended spare parts list. Provide manufacture's written duct insulation jointing recommendations. and special handling criteria, installation sequence, cleaning procedures. QUALITY ASSURANCE .1 Qualifications: .1 1.4 Installer: specialist in performing work of this section, and have at least 3 years successful experience in this size and type of project, qualified to standards of TIAC. DELIVERY, STORAGE AND HANDLING .1 Deliver, store and handle in accordance with Section 01 00 10 – General Instructions. .2 Deliver materials to site in original factory packaging, labelled with manufacturer's name, address and ULC markings. .3 Packaging Waste Management: remove for reuse of pallets crates padding packaging materials in accordance with Section 01 00 10 – General Instructions. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 Part 2 Products 2.1 FIRE AND SMOKE RATING .1 To CAN/ULC-S102: .1 .2 2.2 Section 23 07 13 DUCT INSULATION Page 3 of 5 Maximum flame spread rating: 25. Maximum smoke developed rating: 50. INSULATION .1 Mineral fibre: as specified includes glass fibre, rock wool, slag wool. .2 Thermal conductivity ("k" factor) not to exceed specified values at 24 degrees C mean temperature when tested in accordance with ASTM C335. .3 TIAC Code C-1: Rigid mineral fibre board to ASTM C612, with factory applied vapour retarder jacket to CGSB 51-GP-52Ma (as scheduled in PART 3 of this Section). 2.3 JACKETS .1 Canvas: .1 .2 Lagging adhesive: compatible with insulation. .1 .3 Maximum VOC limit 50 200 250 g/L to SCAQMD Rule 1168 GSES GS36. Aluminum: .1 .2 .3 .4 .5 .6 .7 .8 2.4 220 gm/m² cotton, plain weave, treated with dilute fire retardant lagging adhesive to ASTM C921. To ASTM B209 with moisture barrier as scheduled in PART 3 of this section. Thickness: 0.50 mm sheet. Finish: Corrugated. Jacket banding and mechanical seals: 19 mm wide, 0.5 mm thick stainless steel. .1 Stainless steel: Type: 304. Thickness: 0.50 mm sheet. Finish: Smooth. Jacket banding and mechanical seals: 19 mm wide, 0.5 mm thick stainless steel. ACCESSORIES .1 Vapour retarder lap adhesive: .1 .2 Water based, fire retardant type, compatible with insulation. .1 Maximum VOC limit to SCAQMD Rule 1168. Indoor Vapour Retarder Finish: .1 Vinyl emulsion type acrylic, compatible with insulation. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 Section 23 07 13 DUCT INSULATION Page 4 of 5 .3 Insulating Cement: hydraulic setting on mineral wool, to ASTM C449. .4 ULC Listed Canvas Jacket: .1 .5 220 gm/m² cotton, plain weave, treated with dilute fire retardant lagging adhesive to ASTM C921. Outdoor Vapour Retarder Mastic: .1 .2 Vinyl emulsion type acrylic, compatible with insulation. Reinforcing fabric: Fibrous glass, untreated 305 g/m². .6 Tape: self-adhesive, aluminum, plain reinforced, 50 75 mm wide minimum. .7 Contact adhesive: quick-setting .1 .8 Maximum VOC limit to SCAQMD Rule 1168. Canvas adhesive: washable. .1 Maximum VOC limit to SCAQMD Rule 1168. .9 Tie wire: 1.5 mm stainless steel. .10 Banding: 19 mm wide, 0.5 mm thick stainless steel. .11 Facing: 25 mm stainless galvanized steel hexagonal wire mesh stitched on both faces of insulation. .12 Fasteners: 4 mm diameter pins with 35 mm diameter clips, length to suit thickness of insulation. Part 3 Execution 3.1 APPLICATION .1 3.2 Manufacturer's Instructions: comply with manufacturer's written recommendations, including product technical bulletins, handling, storage and installation instructions, and datasheets. PRE-INSTALLATION REQUIREMENTS .1 Pressure test ductwork systems complete, witness and certify. .2 Ensure surfaces are clean, dry, free from foreign material. 3.3 INSTALLATION .1 Install in accordance with TIAC National Standards. .2 Apply materials in accordance with manufacturers instructions and as indicated. .3 Use 2 layers with staggered joints when required nominal thickness exceeds 75 mm. .4 Fasteners: install at 300 mm on centre in horizontal and vertical directions, minimum 2 rows each side. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 3.4 Section 23 07 13 DUCT INSULATION Page 5 of 5 DUCTWORK INSULATION SCHEDULE .1 Insulation types and thicknesses: conform to following table: Rectangular warm air ducts Round warm air ducts Rectangular ducts outside .2 Vapour Retarder no no special Thickness (mm) 25 25 50 Exposed round ducts 600 mm and larger, smaller sizes where subject to abuse: .1 3.5 TIAC Code C-1 C-1 C-1 Use TIAC code C-1 insulation, scored to suit diameter of duct. .1 Finishes: conform to following table: TIAC Code Rectangular Round Indoor CRF/2 CRD/3 Outdoor, exposed to CRF/3 CRD/4 precipitation CLEANING .1 Clean in accordance with Section 01 00 10 – General Instructions. .1 .2 Remove surplus materials, excess materials, rubbish, tools and equipment. Waste Management: separate waste materials for recycling in accordance with Section 01 00 10 – General Instructions. END OF SECTION 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 Part 1 General 1.1 REFERENCES .1 American Society of Mechanical Engineers (ASME) .1 .2 .3 .4 .2 .2 .3 .4 .2 CAN/CSA B149.1HB-05, Natural Gas and Propane Installation Code Handbook. CAN/CSA B149.2-15, Propane Storage and Handling Code. Health Canada/Workplace Hazardous Materials Information System (WHMIS) .1 1.2 CSA W47.1-09(R2014), Certification of Companies for Fusion Welding of Steel. Canadian Standards Association (CSA)/Canadian Gas Association (CGA) .1 .5 ASTM A47/A47M-99(2014), Standard Specification for Ferritic Malleable Iron Castings. ASTM A53/A53M-12, Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc Coated, Welded and Seamless. ASTM B75/B75M-11, Standard Specification for Seamless Copper Tube Metric. ASTM B837-10, Standard Specification for Seamless Copper Tube for Natural Gas and Liquefied Petroleum (LP) Gas Fuel Distribution Systems. Canadian Standards Association (CSA International) .1 .4 ASME B16.5-2013, Pipe Flanges and Flanged Fittings: 1/2 NPS through NPS 24 Metric/Inch Standard. ASME B16.18-2012, Cast Copper Alloy Solder Joint Pressure Fittings. ASME B16.22-2013, Wrought Copper and Copper Alloy Solder-Joint Pressure Fittings. ASME B18.2.1--2012, Square, Hex, Heavy Hex, and Askew Head Bolts and Hex, Heavy Hex, Hex Flange, Lobed Head, and Lag Screws (Inch Series. American Society for Testing and Materials International (ASTM) .1 .3 Section 23 11 23 FACILITY NATURAL GAS PIPING Page 1 of 3 Material Safety Data Sheets (MSDS). ACTION AND INFORMATIONAL SUBMITTALS .1 Submittals in accordance with Section 01 00 10 – General Instructions. .2 Product Data: .1 .2 .3 Submit manufacturer's printed product literature, specifications and datasheet for piping, fittings and equipment. Indicate on manufacturers catalogue literature following: valves. Test Reports: submit certified test reports from approved independent testing laboratories indicating compliance with specifications for specified performance characteristics and physical properties. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 Section 23 11 23 FACILITY NATURAL GAS PIPING Page 2 of 3 .4 Certificates: submit certificates signed by manufacturer certifying that materials comply with specified performance characteristics and physical properties. .5 Instructions: submit manufacturer's installation instructions. .6 Closeout Submittals: submit maintenance and engineering data for incorporation into manual specified in Section 01 00 10 – General Instructions. 1.3 QUALITY ASSURANCE .1 Health and Safety: .1 1.4 Do construction occupational health and safety in accordance with Section 01 00 10 – General Instructions. DELIVERY, STORAGE AND HANDLING .1 Waste Management and Disposal: .1 .2 .3 .4 Separate waste materials for recycling in accordance with Section 01 00 10 – General Instructions. Remove from site and dispose of packaging materials at appropriate recycling facilities. Collect and separate for disposal paper, plastic, polystyrene and corrugated cardboard packaging material in appropriate on-site bins for recycling. Separate for recycling and place in designated containers Steel, Metal and Plastic. Part 2 Products 2.1 PIPE .1 Steel pipe: to ASTM A53/A53M, Schedule 40, seamless as follows: .1 .2 .2 2.2 NPS 1/2 to 2, screwed. NPS2 1/2 and over, plain end. Copper tube: to ASTM B837. JOINTING MATERIAL .1 Screwed fittings: pulverized lead paste. .2 Welded fittings: to CSA W47.1. .3 Flange gaskets: nonmetallic flat. .4 Brazing: to ASTM B837. 2.3 FITTINGS .1 Steel pipe fittings, screwed, flanged or welded: .1 .2 .3 .4 Malleable iron: screwed, banded, Class 150. Steel pipe flanges and flanged fittings: to ASME B16.5. Welding: butt-welding fittings. Unions: malleable iron, brass to iron, ground seat, to ASTM A47/A47M. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 .5 .6 .2 Bolts and nuts: to ASME B18.2.1. Nipples: schedule 40, to ASTM A53/A53M. Copper pipe fittings, screwed, flanged or soldered: .1 .2 2.4 Section 23 11 23 FACILITY NATURAL GAS PIPING Page 3 of 3 Cast copper fittings: to ASME B16.18. Wrought copper fittings: to ASME B16.22. VALVES .1 Provincial Code approved, lubricated plug ball type. Part 3 Execution 3.1 MANUFACTURER'S INSTRUCTIONS .1 3.2 Compliance: comply with manufacturer's written recommendations or specifications, including product technical bulletins, handling, storage and installation instructions, and datasheet. FIELD QUALITY CONTROL .1 Site Tests/Inspection: .1 .2 3.3 Test system in accordance with CAN/CSA B149.1 and requirements of authorities having jurisdiction. Obtain reports within 3 days of review and submit immediately to Departmental Representative. ADJUSTING .1 Purging: purge after pressure test in accordance with CAN/CSA B149.1. .2 Pre-Start-Up Inspections: .1 .2 3.4 Check vents from regulators, control valves, terminate outside building in approved location, protected against blockage, damage. Check gas trains, entire installation is approved by authority having jurisdiction. CLEANING .1 Cleaning: in accordance with Section 23 08 02 - Cleaning and Start-Up of Mechanical Piping Systems CAN/CSA B149.1, supplemented as specified. .2 Perform cleaning operations as specified in Section 01 00 10 – General Instructions, and in accordance with manufacturer's recommendations. .3 Upon completion and verification of performance of installation, remove surplus materials, excess materials, rubbish, tools and equipment. END OF SECTION 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 Part 1 General 1.1 REFERENCES Section 23 31 13.01 METAL DUCTS - LOW PRESSURE TO 500 PA Page 1 of 4 .1 American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE) .2 ASTM International .1 .2 .3 .3 Green Seal Environmental Standards (GS) .1 .4 .2 .3 SMACNA HVAC Duct Construction Standards - Metal and Flexible, 2005. SMACNA HVAC Air Duct Leakage Test Manual, 2012. IAQ Guideline for Occupied Buildings Under Construction 2007. South Coast Air Quality Management District (SCAQMD), California State, Regulation XI. Source Specific Standards .1 1.2 NFPA 90A-15, Standard for the Installation of Air-Conditioning and Ventilating Systems. NFPA 90B-15, Standard for the Installation of Warm Air Heating and AirConditioning Systems. NFPA 96-14, Standard for Ventilation Control and Fire Protection of Commercial Cooking Operations. Sheet Metal and Air Conditioning Contractors' National Association (SMACNA) .1 .2 .3 .6 GS-36-13, Standard for Adhesives for Commercial Use. National Fire Protection Association (NFPA) .1 .5 ASTM A480/A480M-15, Standard Specification for General Requirements for Flat-Rolled Stainless and Heat-Resisting Steel Plate, Sheet and Strip. ASTM A635/A635M-15, Standard Specification for Steel, Sheet and Strip, Heavy-Thickness Coils, Hot-Rolled, Alloy, Carbon, Structural, HighStrength Low-Alloy, and High-Strength Low-Alloy with Improved Formability, General Requirements for. ASTM A653/A653M-15, Standard Specification for Steel Sheet, Zinc Coated (Galvanized) or Zinc-Iron Alloy Coated (Galvannealed) by the Hot-Dip Process. SCAQMD Rule 1168-A2005, Adhesives and Sealants Applications. ACTION AND INFORMATIONAL SUBMITTALS .1 Submit in accordance with Section 01 00 10 – General Instructions. .2 Product Data: .1 .3 Submit manufacturer's instructions, printed product literature and data sheets for metal ducts and include product characteristics, performance criteria, physical size, finish and limitations. Shop Drawings: .1 Submit drawings stamped and signed by professional engineer registered or licensed in Province of Ontario, Canada. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 .4 Test and Evaluation Reports: .1 1.3 Section 23 31 13.01 METAL DUCTS - LOW PRESSURE TO 500 PA Page 2 of 4 Certification of Ratings: .1 Catalogue or published ratings to be those obtained from tests carried out by manufacturer or independent testing agency signifying adherence to codes and standards. DELIVERY, STORAGE AND HANDLING .1 Deliver, store and handle materials in accordance with Section 01 00 10 – General Instructions and with manufacturer's written instructions. .2 Delivery and Acceptance Requirements: deliver materials to site in original factory packaging, labelled with manufacturer's name and address. .3 Storage and Handling Requirements: .1 Store materials in dry location and in accordance with manufacturer's recommendations in clean, dry, well-ventilated area. Store and protect metal ducts from nicks, scratches, and blemishes. Replace defective or damaged materials with new. .2 .3 .4 Packaging Waste Management: remove for reuse of pallets, crates, padding, packaging materials in accordance with Section 01 00 10 – General Instructions. Part 2 Products 2.1 SEAL CLASSIFICATION .1 Classification as follows: Maximum Pressure Pa 500 250 .2 Seal classification: .1 2.2 SMACNA Seal Class C C Class C: transverse joints and connections made air tight with sealant and tape. Longitudinal seams unsealed. SEALANT .1 Sustainability Characteristics: .1 .2 2.3 Adhesives and sealants: VOC limit maximum to SCAQMD Rule 1168. Sealant: oil resistant, water borne, polymer type flame resistant duct sealant. Temperature range of minus 30 degrees C to plus 93 degrees C. TAPE .1 2.4 Tape: polyvinyl treated, open weave fiberglass tape, 50 mm wide. DUCT LEAKAGE .1 In accordance with SMACNA HVAC Air Duct Leakage Test Manual. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 2.5 Section 23 31 13.01 METAL DUCTS - LOW PRESSURE TO 500 PA Page 3 of 4 FITTINGS .1 Fabrication: to SMACNA. .2 Radiused elbows: .1 .3 Mitred elbows, rectangular: .1 .2 .4 Short radiused elbows. Obstruction deflectors: maintain full cross-sectional area. .1 2.6 Diverging: 20 degrees maximum included angle. Converging: 30 degrees maximum included angle. Offsets: .1 .6 To 400 mm: with single double thickness turning vanes. Over 400 mm: with double thickness turning vanes. Transitions: .1 .2 .5 Rectangular: standard radius. Maximum included angles: as for transitions. FIRE STOPPING .1 Retaining angles around duct, on both sides of fire separation in accordance with Section 01 00 10 – General Instructions. .2 Fire stopping material and installation must not distort duct. 2.7 GALVANIZED STEEL .1 Lock forming quality: to ASTM A653/A653M, Z90 zinc coating. .2 Thickness, fabrication and reinforcement: to SMACNA. .3 Joints: to SMACNA. Part 3 Execution 3.1 EXAMINATION .1 Verification of Conditions: verify that conditions of substrate previously installed under other Sections or Contracts are acceptable for metal duct installation in accordance with manufacturer's written instructions. .1 .2 .3 3.2 Visually inspect substrate in presence of Departmental Representative. Inform Departmental Representative of unacceptable conditions immediately upon discovery. Proceed with installation only after unacceptable conditions have been remedied and after receipt of written approval to proceed from Departmental Representative. GENERAL .1 Do work in accordance with ASHRAE and SMACNA. .2 Install breakaway joints in ductwork on sides of fire separation. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 3.3 Section 23 31 13.01 METAL DUCTS - LOW PRESSURE TO 500 PA Page 4 of 4 SEALING AND TAPING .1 Apply sealant in accordance with SMACNA. .2 Bed tape in sealant and recoat with minimum of 1 coat of sealant to manufacturers recommendations. 3.4 CLEANING .1 Progress Cleaning: clean in accordance with Section 01 00 10 – General Instructions. .1 Leave Work area clean at end of each day. .2 Final Cleaning: upon completion remove surplus materials, rubbish, tools and equipment in accordance with Section 01 00 10 – General Instructions. .3 Waste Management: separate waste materials for recycling in accordance with Section 01 00 10 – General Instructions. .1 Remove recycling containers and bins from site and dispose of materials at appropriate facility. END OF SECTION 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 Part 1 General 1.1 REFERENCES .1 Section 23 74 00 PACKAGED OUTDOOR HVAC EQUIPMENT Page 1 of 9 American National Standards Institute (ANSI)/Air Conditioning and Refrigeration Institute (ARI) .1 .2 ANSI/ARI 210/240-2008, Unitary Air-Conditioning and Air-Source Heat Pump Equipment. ARI 270-95, Sound Rating of Outdoor Unitary Equipment. .2 ANSI/UL 1995 B-2011, Standard for Heating and Cooling Equipment. .3 Canadian Standards Association (CSA International) .1 .2 .4 Health Canada / Workplace Hazardous Materials Information System (WHMIS) .1 .5 Material Safety Data Sheets (MSDS). National Fire Protection Association .1 1.2 CSA B52-13, Mechanical Refrigeration Code. CSA C22.1 HB-05, Canadian Electrical Code Handbook. NFPA 90A-15, Standard for the Installation of Air Conditioning and Ventilating Systems. ACTION AND INFORMATIONAL SUBMITTALS .1 Submittals in accordance with Section 01 00 10 – General Instructions. .2 Product Data: .1 .3 Submit manufacturer's printed product literature, specifications and datasheet for packaged rooftop HVAC units. Shop Drawings: .1 Submit shop drawings to indicate project layout and dimensions; indicate: .1 Equipment, piping, and connections, together with valves, strainers, control assemblies, thermostatic controls, auxiliaries and hardware, and recommended ancillaries which are mounted, wired and piped ready for final connection to building system, its size and recommended bypass connections. .2 Control equipment shipped loose, showing final location in assembly. .3 Dimensions, internal and external construction details, recommended method of installation with proposed structural steel support, mounting curb details, sizes and location of mounting bolt holes; include mass distribution drawings showing point loads. .4 Detailed composite wiring diagrams for control systems showing factory installed wiring and equipment on packaged equipment or required for controlling devices of ancillaries, accessories, controllers. .5 Fan performance curves. .6 Details of vibration isolation. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 .7 .8 Section 23 74 00 PACKAGED OUTDOOR HVAC EQUIPMENT Page 2 of 9 Estimate of sound levels to be expected across individual octave bands in dB referred to A rating. Type of refrigerant used. .4 Test Reports: submit certified test reports from approved independent testing laboratories indicating compliance with specifications for specified performance characteristics and physical properties. .5 Certificates: submit certificates signed by manufacturer certifying that materials comply with specified performance characteristics and physical properties. .6 Instructions: submit manufacturer's installation instructions. .7 Manufacturer's Field Reports: manufacturer's field reports specified. .8 Closeout submittals: submit maintenance and engineering data for incorporation into manual specified in Section 01 00 10 – General Instructions include data as follows: .1 .2 1.3 Indicate: brief description of unit, indexed, with details of function, operation, control, and service for components. Provide for units, manufacturer's name, type, year, number of units, and capacity. DELIVERY, STORAGE AND HANDLING .1 Waste Management and Disposal: .1 .2 .3 .4 .5 .6 1.4 Separate waste materials for recycling in accordance with Section 01 00 10 – General Instructions. Remove from site and dispose of packaging materials at appropriate recycling facilities. Collect and separate for disposal paper, plastic, polystyrene and corrugated cardboard packaging material in appropriate on-site bins for recycling in accordance with Section 01 00 10 – General Instructions. Separate for recycling and place in designated containers Metal and Plastic waste in accordance with Section 01 00 10 – General Instructions. Handle and dispose of hazardous materials in accordance with Regional and Municipal, regulations. Divert unused metal materials from landfill to metal recycling facility as approved by Departmental Representative. WARRANTY .1 Contractor hereby warrants that packaged rooftop HAVC units and refrigeration compressors will function and operate in accordance with CCDC 2 GC 24, but for 60 months. Part 2 Products 2.1 GENERAL .1 Packaged rooftop unit shall include compressor, evaporator coil, filters, supply fan, dampers, air-cooled condenser coils, condenser fan, gas heater, and unit controls. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 Section 23 74 00 PACKAGED OUTDOOR HVAC EQUIPMENT Page 3 of 9 .2 Unit shall be factory assembled and tested including leak testing of the DX coils, pressure testing of the refrigeration circuit, and run testing of the completed unit. Run test report shall be supplied with the unit in the service compartment’s literature pocket. .3 Unit shall have decals and tags to indicate lifting and rigging, service areas and caution areas for safety and to assist service personnel. .4 Unit components shall be labeled, including refrigeration system components and electrical and controls components. .5 Estimated sound power levels (dB) shall be shown on the unit ratings sheet. .6 Installation, Operation and Maintenance manual shall be supplied within the unit. .7 Laminated color-coded wiring diagram shall match factory installed wiring and shall be affixed to the interior of the control compartment’s hinged access door. .8 Unit nameplate shall be provided in two locations on the unit, affixed to the exterior of the unit and affixed to the interior of the control compartment’s hinged access door. 2.2 CONSTRUCTION .1 All cabinet walls, access doors, and roof shall be fabricated of double wall, impact resistant, rigid polyurethane foam panels. .2 Unit insulation shall have a minimum thermal resistance R-value of 13. Foam insulation shall have a minimum density of 2 pounds/cubic foot and shall be tested in accordance with ASTM D-1929 for a minimum flash ignition temperature of 610°F. .3 Unit construction shall be double wall with G90 galvanized steel on both sides and a thermal break. Double wall construction with a thermal break prevents moisture accumulation on the insulation, provides a cleanable interior, prevents heat transfer through the panel, and prevents exterior condensation on the panel. .4 Unit shall be designed to reduce air leakage and infiltration through the cabinet. Cabinet leakage shall not exceed 1% of total airflow when tested at 3 times the minimum external static pressure provided in AHRI Standard 210/240.Panel deflection shall not exceed L/240 ratio at 125% of design static pressure, at a maximum 8 inches of positive or negative static pressure, to reduce air leakage. Deflection shall be measured at the midpoint of the panel height and width. Continuous sealing shall be included between panels and between access doors and openings to reduce air leakage. Piping and electrical conduit through cabinet panels shall include sealing to reduce air leakage. .5 Roof of the air tunnel shall be sloped to provide complete drainage. Cabinet shall have rain break overhangs above access doors. .6 Access to filters, dampers, cooling coil, heater, compressor, and electrical and controls components shall be through hinged access doors with quarter turn, lockable handles. Full length stainless steel piano hinges shall be included on the doors. .7 Exterior paint finish shall be capable of withstanding at least 2,500 hours, with no visible corrosive effects, when tested in a salt spray and fog atmosphere in accordance with ASTM B 117-95 test procedure. .8 Units shall include double sloped 304 stainless steel drain pans. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 Section 23 74 00 PACKAGED OUTDOOR HVAC EQUIPMENT Page 4 of 9 .9 Unit shall be provided with through the base vertical discharge and return air openings. All openings through the unit shall have upturned flanges of at least 1/2 inch around the opening. .10 Unit shall be provided with left side horizontal discharge and return air openings. All openings through the unit shall have upturned flanges of at least 1/2 inch around the opening. .11 Unit shall include lifting lugs on the top of the unit. 2.3 ELECTRICAL .1 Unit shall be provided with factory installed and factory wired, non-fused disconnect switch. .2 Unit shall be provided with phase and brown out protection which shuts down all motors in the unit if the electrical phases are more than 10% out of balance on voltage, the voltage is more than 10% under design voltage or on phase reversal. 2.4 SUPPLY FANS .1 Unit shall include direct drive, unhoused, backward curved, plenum supply fans. .2 Blowers and motors shall be dynamically balanced. .3 Motor shall be inverter rated efficiency ODP with ball bearings rated for 200,000 hours service with external lubrication points. .4 Variable frequency drive shall be factory wired and mounted in the unit. Fan motor shall be inverter rated efficiency. 2.5 COOLING COILS .1 Evaporator Coils shall be designed for use with R-410A refrigerant and constructed of copper tubes with aluminum fins mechanically bonded to the tubes and aluminum end casings. Fin design shall be sine wave rippled. .2 Coils shall be helium hydrogen or helium leak tested. .3 Coils shall be furnished with factory installed thermostatic expansion valves. 2.6 REFRIGERATION SYSTEM .1 Conform to CSA B52 and ANSI/UL 1995 requirements. .2 Unit shall be factory charged with R-410A refrigerant. .3 Compressors shall be scroll type with thermal overload. .4 Compressors shall be mounted in an isolated service compartment which can be accessed without affecting unit operation. Lockable hinged compressor access doors shall be fabricated of double wall, rigid polyurethane foam injected panels to prevent the transmission of noise outside the cabinet. .5 Compressors shall be isolated from the base pan with the compressor manufacturer’s recommended rubber vibration isolators, to reduce any transmission of noise from the compressors into the building area. .6 Each refrigeration circuit shall be equipped with thermostatic expansion valve type refrigerant flow control. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 Section 23 74 00 PACKAGED OUTDOOR HVAC EQUIPMENT Page 5 of 9 .7 Each refrigeration circuit shall be equipped with automatic reset low pressure and manual reset high pressure refrigerant safety controls, Schrader type service fittings on both the high pressure and low pressure sides and a factory installed replaceable core liquid line filter driers. .8 Unit shall include a variable capacity scroll compressor on the refrigeration circuit which shall be capable of modulation from 10-100% of its capacity. 2.7 CONDENSERS .1 Air-Cooled Condenser fans shall be a vertical discharge, axial flow, direct drive fans. .2 Coils shall be designed for use with R-410A refrigerant. .3 Condenser coils shall be multi-pass and fabricated from aluminum microchannel tubes. .4 Coils shall be designed for a minimum of 10°F of refrigerant sub-cooling. .5 Coils shall be hydrogen or helium leak tested. .6 Condenser fans shall be high efficiency electrically commutated motor driven with multiple speeds which are controlled with a fan cycle switch based on head pressure and allow matching condenser airflow with cooling capacity steps. 2.8 GAS HEATING .1 Stainless steel heat exchanger. .2 Gas furnace shall consist of stainless steel heat exchangers with multiple concavities, an induced draft blower and an electronic pressure switch to lockout the gas valve until the combustion chamber is purged and combustion airflow is established. .3 Furnace shall include a gas ignition system consisting of an electronic igniter to a pilot system, which will be continuous when the heater is operating, but will shut off the pilot when heating is not required. .4 Unit shall include a single gas connection and have gas supply piping entrances in the unit base for through-the-curb gas piping and in the outside cabinet wall for across the roof gas piping. .5 Natural gas furnace shall be equipped with modulating gas valves, adjustable speed combustion blowers, stainless steel tubular heat exchangers, and electronic controller. Combustion blowers and gas valves shall be capable of modulation. Electronic controller includes a factory wired, field installed supply air temperature sensor. Sensor shall be field installed in the supply air ductwork. Supply air temperature setpoint shall be adjustable on the electronic controller within the controls compartment. Gas heating assemblies shall be capable of operating at any firing rate between 100% and 30% of their rated capacity. 2.9 FILTERS .1 Unit shall include 4 inch thick, pleated panel filters with an ASHRAE efficiency of 30% and MERV rating of 8, upstream of the cooling coil. .2 Unit shall include a clogged filter switch. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 2.10 Section 23 74 00 PACKAGED OUTDOOR HVAC EQUIPMENT Page 6 of 9 OUTSIDE AIR/ECONOMIZER .1 Unit shall include 0-100% economizer consisting of a motor operated outside air damper and return air damper assembly constructed of extruded aluminum, hollow core, airfoil blades with rubber edge seals and aluminum end seals. Damper blades shall be gear driven and designed to have no more than 15 CFM of leakage per sq. ft. of damper area when subjected to 2 inches w.g. air pressure differential across the damper. Unit shall include outside air opening bird screen, outside air hood with rain lip and barometric relief dampers. .2 Damper assembly shall be controlled by spring return enthalpy activated fully modulating actuator. 2.11 CONTROLS .1 Factory Installed and Factory Provided Unit controller shall be capable of controlling all features and options of the unit. Controller shall be factory installed in the unit controls compartment and factory tested. .2 Controller shall be capable of stand alone operation with unit configuration, setpoint adjustment, sensor status viewing, unit alarm viewing, and occupancy scheduling available. Unit Controller to connect to existing Proprietary BAS system. BAS to allow for unit operation (ON/OFF), monitor Cooling and Heating Status and monitor for alarms. Unit supplier to coordinate requirements of controller with BAS system provider. .3 Controller shall have an onboard clock and calendar functions that allow for occupancy scheduling. .4 Controller shall include non-volatile memory to retain all programmed values without the use of a battery, in the event of a power failure. .5 When unit is operating at a constant air volume, the unit shall modulate cooling with constant airflow to meet space temperature cooling loads. Unit shall modulate heating with constant airflow to meet space temperature heating loads. Modulating heating capacity shall modulate based on supply air temperature. .6 Unit configuration, setpoint adjustment, sensor status viewing, unit alarm viewing, and occupancy scheduling shall be accomplished with a touchscreen controller interface. Part 3 Execution 3.1 MANUFACTURER'S INSTRUCTIONS .1 3.2 Compliance: comply with manufacturer's written recommendations and specifications, including product technical bulletins, handling, storage and installation instructions, and datasheet. INSTALLATION .1 Install as per manufacturers' instructions on roof curb adapters provided by manufacturer. .2 Manufacturer to certify installation, supervise start-up and commission unit. .3 Run drain line from cooling coil condensate drain pan to discharge over roof drain. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 3.3 Section 23 74 00 PACKAGED OUTDOOR HVAC EQUIPMENT Page 7 of 9 FIELD QUALITY CONTROL .1 Manufacturer's Field Services: .1 .2 .3 Have manufacturer of products supplied under this Section review work involved in handling, installation/application, protection and cleaning of its product, and submit written reports, in acceptable format, to verify compliance of work with Contract. Provide manufacturer's field services, consisting of product use recommendations and periodic site visits for inspection of product installation, in accordance with manufacturer's instructions. Schedule site visits to review work at stages listed: .1 After delivery and storage of products, and when preparatory work on which work of this Section depends is complete, but before installation begins. .2 Upon completion of work, after cleaning is carried out. .2 Obtain reports within 3 days of review and submit immediately to Departmental Representative. .3 Performance Verification: .1 Rooftop Air Handling Units: .1 Set zone mixing dampers for full cooling, except that where diversity factor forms part of design set that % of zone dampers to full heating. .2 Set outside air and return air dampers for minimum outside air. .3 Set face and bypass dampers so face dampers are fully open and bypass dampers are fully closed. .4 Check for smooth, vibration less correct rotation of supply fan impeller. .5 Measure supply fan capacity. .6 Adjust impeller speed as necessary and repeat measurement of fan capacity. .7 Measure pressure drop each component of unit. .8 Set outside air and return air dampers for the % of outside air required by design and repeat measurements of fan capacity. .9 Reduce differences between fan capacity at minimum and maximum outside air less than 5%. .10 Set face and bypass dampers to full bypass and repeat measurement of fan capacity. .11 Reduce difference between fan capacity with F BPD fully closed to bypass and fully open to bypass to less than 5%. .12 Reduce difference between fan capacity at full cooling and fan capacity at full heating to less than 5%. .13 OAD: verify for proper stroking, interlock with RAD. .14 Measure DBT, WBT of SA, RA, EA. .15 Measure air cooled condenser discharge DBT. .16 Measure flow rates (minimum and maximum) of SA, RA, EA, relief air. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 Section 23 74 00 PACKAGED OUTDOOR HVAC EQUIPMENT Page 8 of 9 .17 .2 .3 .4 Commissioning Reports: .1 3.4 Simulate maximum cooling load and measure refrigerant hot gas and suction temperatures and pressures. .18 Use smoke test to verify no short-circuiting of EA, relief air to outside air intake or to condenser intake. .19 Simulate maximum heating load and: .1 Verify temperature rise across heat exchanger. .2 Perform flue gas analysis. Adjust for peak efficiency. .3 Verify combustion air flow to heat exchanger. .4 Simulate minimum heating load and repeat measurements. .20 Measure radiated and discharge sound power levels under maximum heating demand and under maximum cooling demand with compressors running. .21 Verify operating control strategies, including: .1 Heat exchanger operating and high limit. .2 Early morning warm-up cycle. .3 Freeze protection. .4 Economizer cycle operation, temperature of change-over. .5 Alarms. .6 Voltage drop across thermostat wiring. .7 Operation of remote panel including pilot lights, failure modes. .22 Set zone mixing dampers for full heating and repeat measurements. .23 Measure leakage past zone mixing dampers by taking temperature measurements. Reduce leakage to less than 5%. .24 Measure return fan capacity. .25 Adjust impeller speed as necessary and repeat measurement of return fan capacity. .26 Check capacity of heating unit. .27 Measure DX refrigeration system performance. .28 Refer to other sections of these specifications for PV procedures for other components. Verify accessibility, serviceability of components including motorized dampers, filters coils, fans, motors, operators, humidifiers, sensors, electrical disconnects. Verify accessibility, clean ability, drainage of drain pans for coils, humidifiers. In accordance with Section 01 91 13 - General Commissioning (Cx) Requirements DEMONSTRATION .1 Training: in accordance with Section 01 91 13 - General Commissioning (Cx) Requirements. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 3.5 Section 23 74 00 PACKAGED OUTDOOR HVAC EQUIPMENT Page 9 of 9 CLEANING .1 Perform cleaning operations as specified in Section 01 00 10 – General Instructions and in accordance with manufacturer's recommendations. .2 On completion and verification of performance of installation, remove surplus materials, excess materials, rubbish, tools and equipment. END OF SECTION 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 Part 1 General 1.1 GENERAL CONDITIONS Section 25 05 01 EMCS: GENERAL REQUIREMENTS Page 1 of 9 .1 The specifications of Division 01 apply to Division 25. .2 All sections of Division 25 are interrelated and complete one another as a whole. .3 All mechanical and electrical drawings apply to Division 25. 1.2 RELATED SECTIONS .1 1.3 All sections of Division 23. SUMMARY .1 The scope of Division 25 consists of installing the new Rooftop Units on the existing Energy Management and Control System (EMCS) for the control, supervision and management of the units. .2 In general terms, the scope of Division 25 includes: .1 .2 .3 1.4 The Connection of the New Rooftop units to the Existing EMCS system as described in Division 23 specifications. Programming of new sequences of operation and graphical user interface associated with new Units. Start-up, verification and commissioning of the Rooftop Unit portion of the Existing EMCS. REFERENCES .1 American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. (ASHRAE). .1 .2 ASHRAE STD 135, BACnet - Data Communication Protocol for Building Automation and Control Network. Institute of Electrical and Electronics Engineers (IEEE)/Standard for Information technology - Telecommunications and information exchange between systems Local and metropolitan area networks - Specific requirements. .1 IEEE 802.3, Part 3: Carrier sense multiple access with collision detection (CSMA/CD) access method and physical layer specifications. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 1.5 ACRONYMS AND ABBREVIATIONS .1 Section 25 05 01 EMCS: GENERAL REQUIREMENTS Page 2 of 9 Acronyms used in Division 25: .1 .2 .3 .4 .5 .6 .7 .8 .9 .10 .11 .12 .13 .14 .15 .16 .17 .18 .19 .20 .21 .22 .23 .24 .25 .26 .27 .28 .29 .30 .31 .32 .33 .34 .35 AEL - Average Effectiveness Level. BACnet - Building Automation and Control Network. BC(s) - Building Controller(s). BTL - BACnet Testing Laboratories. CDL - Control Description Logic. COSV - Change of State or Value. CPU - Central Processing Unit. DDC - Direct Digital Control. DP - Differential Pressure. EMCS - Energy Management and Control System. HMI - Human Machine Interface. HVAC - Heating, Ventilation, Air Conditioning. I/O - Input/Output. LAN - Local Area Network. LCU(s) - Local Control Unit(s). MCU(s) - Master Control Unit(s). NC - Normally Closed. NMC(s) - Network Management Controller(s). NO - Normally Open. OS - Operating System. O&M - Operation and Maintenance. OWS - Operator Work Station. PC - Personal Computer. PDA – Personal Digital Assistant. PI – Proportional and Integral. PID - Proportional, Integral and Derivative. RAM - Random Access Memory. SP - Static Pressure. TCU(s) - Terminal Control Unit(s). ROM - Read Only Memory. USB - Universal Serial Bus. UPS - Uninterruptible Power Supply. VAV - Variable Air Volume. VFD - Variable Frequency Drive. WAN - Wide Area Network. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 1.6 Section 25 05 01 EMCS: GENERAL REQUIREMENTS Page 3 of 9 DEFINITIONS .1 Point: may be logical or physical. .1 .2 .2 Point Object Type: points fall into following object types: .1 .2 .3 .4 .5 1.7 Logical points: values calculated by system such as setpoints, totals, counts, derived corrections and may include, but not limited to result of and statements in CDL's. Physical points: inputs or outputs which have hardware wired to controllers to measure physical properties, to provide status conditions of contacts or relays or to provide interaction with related equipment (system start/stop, modulation control, etc.) AI (analog input). AO (analog output). DI (digital input). DO (digital output). Pulse inputs. SCOPE OF WORK .1 Connect new installed rooftop units to the existing EMCS system. .2 Provide all labour, material, equipment, system connections and software that may or may not be specifically referred to herein or on the drawings, that are required to meet the functional intent of these specifications. .3 In general, the work covered by the sections of Division 25 includes, but is not limited to, the following: .1 .2 .3 .4 The following work does not form part of Division 25: .1 .2 .3 1.8 All electrical, electronic and DDC type controls required for connection of the new Rooftop to the existing system. Complete electrical installation including conduits, cables, junction boxes, etc. required for control systems, automation and the EMCS Supply and installation of all low voltage transformers required for controls and automation systems. Access doors for controls equipment and instrumentation. Supply and installation of balancing dampers and balancing valves. Installation of field devices provided by Division 25 but required to be installed by others. Refer to the item “EQUIPMENT TO PROVIDE TO OTHERS” in this section. SUBMITTALS .1 Make submittals in accordance with Section 25 05 02 – EMCS: Submittals and Review Process. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 .2 Quality Control: .1 .2 1.9 Section 25 05 01 EMCS: GENERAL REQUIREMENTS Page 4 of 9 Unless otherwise noted, provide equipment and material from manufacturer's regular production, CSA and ULC certified, manufactured to standard quoted plus additional specified requirements. Submit proof of compliance to specified standards with shop drawings and product data in accordance with Section 25 05 02 – EMCS: Submittals and Review Process. Label or listing of specified organization is acceptable evidence. QUALITY ASSURANCE .1 The EMCS Provider to comply with the following criteria: .1 .2 .3 .4 .2 Installation: .1 .2 .3 1.10 EMCS Contractor to be regularly engaged in the business of manufacturing and installing DDC-type HVAC controls for over twenty (20) years. Companies pre-qualified by Infrastructure Ontario (IO) for approval prior to bid are: .1 Automated Logic Controls / WebCTRL .2 Delta Controls / enteliWEB .3 Honeywell Controls / EBI .4 Johnson Controls / Metasys .5 Schneider Controls / StruxureWare .6 Siemens Controls / Apogee Maintain a local staff of at least four technicians who factory-trained on the specific products to be used. These personnel are required to provide installation, instruction, routine and emergency service. Contractors shall provide names of qualified individuals and their certifications to be part of submission. Maintain or have direct access to a local supply of essential replacement parts for EMCS components. Maintain an office within 300 km of job site and provide emergency callout service 24 h/day, 365 days/year with a maximum of four-hour response time. Provide details of arrangements. Have factory-trained and experienced personnel to perform the work described in all sections of Division 25. Ensure qualified supervisory personnel continuously direct and monitor Work and attend site meetings. All wiring for electrical work must be completed in accordance with Section 26 05 00 - Common Work Results for Electrical, manufacturer’s recommendations and the Ontario Electrical Safety Authority (ESA). MISCELLANEOUS WORK .1 Provide instructions, monitor work and retain complete responsibility for all field control devices and equipment provided by Division 25, but installed by others (e.g. control valves, thermowells, VFDs, etc.) 23 Beechgrove Lane Section 25 05 01 Heating-Cooling RTU Renewal EMCS: GENERAL REQUIREMENTS Project No. 1039236-270802 Page 5 of 9 .2 Coordinate wiring requirements of systems or equipment provided by others but required to be wired by Division 25. Obtain manufacturer’s recommendations from the system provider. .3 1.11 Coordinate wiring interface of equipment supplied by others. EQUIPMENT TO PROVIDE TO OTHERS .1 Provide to Division 23: .1 .2 .3 1.12 Control valves for heating water network. Thermowells for temperature sensors installed on heating water network. Pressure transmitters for installation on heating water network. EXISTING CONDITIONS - CONTROL COMPONENTS .1 Utilize existing control wiring for field devices (I/O wiring) and controller enclosures. .2 Existing conduits can be re-used to run new wiring, provided that conduits size complies with these specifications and routing applies to new installation. .3 Existing power supplies: .1 .2 It is intended to re-use existing power sources (120V/1/60) for new EMCS components and transformers. However, existing power sources are not currently identified in local distribution panels. Inspect existing circuits used for EMCS and provide a report indicating the following: .1 Number of circuits currently used and their location (room, panel #, circuit #, etc.); .2 Panel information (normal/emergency, rating, total number of circuits, number of spare circuits, etc.) .3 For each circuit: .1 Provide a confirmation circuit is dedicated to the EMCS. .2 Indicate the intended use with new EMCS (e.g. server, 1st floor VAVs, mechanical room 204, etc.) .3 Provide anticipated equipment load. .4 Submit written request for permission to disconnect controls and to obtain equipment downtime before proceeding with Work. .5 Assume responsibility for controls to be incorporated into EMCS after written receipt of approval from Project Manager. .1 .2 .3 Be responsible for items repaired or replaced by Project Manager. Be responsible for repair costs due to negligence or abuse of equipment. Responsibility for existing devices terminates upon final acceptance of applicable portions of EMCS as approved by Project Manager. 23 Beechgrove Lane Section 25 05 01 Heating-Cooling RTU Renewal EMCS: GENERAL REQUIREMENTS Project No. 1039236-270802 Page 6 of 9 .6 Following EMCS installation, remove all controls not re-used or no longer required in the new EMCS arrangement. This work includes all unused control devices, cabinets, conduits, cables, network wiring and pneumatic tubing. Place in approved storage for disposition as directed. 1.13 SWITCHOVER PROCESS .1 All electro-mechanical systems must remain functional during normal operation hours. For that intent, conduct all control panel switchovers outside of normal operation hours. .2 Minimize downtime of electro-mechanical equipment during the switchover process to ensure building ambient conditions are put back to normal conditions before the commencement of normal operating hours. .3 Switchover Planning: .1 .2 1.14 EMCS Contractor to provide a switchover plan for review by the Project Manager and Consultant, including the following: .1 List of switchover activities to be conducted. .2 Actions taken to minimize downtime during switchover and ensure electro-mechanical systems are back in operation for normal occupancy. .3 Schedule of switchover activities and planned switchover date for individual panels. .4 Measures in place to verify controls and EMCS operation following system switchovers and correct any deficiencies causing downtime during normal operating hours. .5 Measures to switchover the Centralized Management System and minimize EMCS downtime for facility operators. All panel switchovers and activities causing equipment downtime must be coordinated with the Project Manager. Obtain permission form Project Manager before proceeding with work causing downtime. ELECTRICAL INSTALLATION .1 Division 25 is responsible for the hiring of a qualified and licensed Electrical contractor for the following work: .1 .2 .3 .4 Complete electrical installation including all conduits, cables, junction box, etc. required for control and automation systems. 120V single phase power source for DDC controls, local monitoring panels, cabinets and transformers provided by this Division. All connections to motor control centers or starters, interlocks for fans, pumps and other control components. Grounding systems required for all systems and devices provided under Division 25, in accordance with manufacturer’s instructions and requirements of Division 26. 23 Beechgrove Lane Section 25 05 01 Heating-Cooling RTU Renewal EMCS: GENERAL REQUIREMENTS Project No. 1039236-270802 Page 7 of 9 .5 Inspection of existing power sources (120V/1/60) intended to be re-used for the new EMCS complete with report, as described in item “EXISTING CONDITIONS - CONTROL COMPONENTS”. .2 Quality Assurance: .1 .2 .3 The electrical contractor providing the electrical installation for Division 25 to be fully competent in the type of work described in these specifications and to be familiar with the electrical and grounding requirements of this type of installation. Provide qualified personnel that have been trained for the installation of electrical systems specific to DDC controls, instrumentation and networking infrastructure. Electrical contractor to hold a valid Master Electrical contractor license as issued by the Province that the work is being constructed. Part 2 Products 2.1 ENERGY MANAGEMENT AND CONTROL SYSTEM (EMCS) .1 The new EMCS Building Controllers and Centralized Management System shall be from the same manufacturer and product line. .2 The EMCS shall have the capability of interfacing with third party control systems including pump packages, air-handling units, energy metering systems and other control systems provided they comply with open protocols such as ASHRAE BACnet, Echelon Lonworks or Modbus. .3 The graphics package of the EMCS Centralized Management System must be based on the Niagara AX standard base library to ensure consistency within IO buildings graphics. 2.2 EMCS - PRIMARY NETWORK .1 EMCS communication at the primary level (Ethernet TCP/IP) will be provided in conformance with: .1 .2 .3 Ethernet standard. TCP/IP protocol suite. ASHRAE BACnet Standard 135-2010, Annex J with support for Internet Protocol (IP) Addressing and common routers. Part 3 Execution 3.1 GENERAL .1 All controls shall be installed and adjusted by specialized technicians, regularly employed by the EMCS manufacturer. All costs related to adjustments form part of this contract. 23 Beechgrove Lane Section 25 05 01 Heating-Cooling RTU Renewal EMCS: GENERAL REQUIREMENTS Project No. 1039236-270802 Page 8 of 9 .2 All controls components must be easily accessible for maintenance. .3 3.2 Install all field devices in control cabinets. MANUFACTURER'S RECOMMENDATIONS .1 3.3 Installation: to manufacturer's recommendations. ELECTRICAL INSTALLATION .1 Complete installation in accordance with Section 26 05 00 - Common Work Results for Electrical and the Ontario Electrical Safety Code. .2 Modify starters to provide for EMCS as indicated on drawings. Refer to electrical control schematics included as part of control design schematics on drawings. Provide wiring schematics including additions, deletions to control circuits. .3 Terminate wires with screw terminal type connectors suitable for wire size, and number of terminations. .4 Provide grounding for controls systems and the EMCS installation in accordance with Division 26. .5 Variable Frequency Drives (VFDs): mounting and 600VAC connections of all VFDs are to be done by Division 26. .6 Wiring: .1 .2 .3 .4 .5 .6 .7 .8 .9 .10 Wiring must be continuous without joints. All wiring shall be run in EMT conduit unless specified otherwise. Maximum conduit fill not to exceed 50%. Use of FT6 plenum-rated cables without conduits is only authorized in accessible ceiling space, for connection of EMCS components (24V power supply, room sensor, control valve, etc.) to an application-specific digital controller (TCU) or local control unit (LCU). When FT6 plenum cables are run without conduits, wiring must follow the building lines and must be attached properly every 1.5 meters using hooks (or Velcro) specifically designed for this purpose. Hooks (or Velcro) must be fixed properly to the building structure and must not be attached to existing building systems such as electrical conduits, ductwork, piping, etc. or their associated hangers. The use of tape or tie-wraps is prohibited. Provide protection against the abrasion of cables when running FT6 plenum-rated cables to sensors or other accessories inside the wall. Communication trunks and power wiring must be run in corridors, away from closed offices. Do not run exposed conduits in normally occupied spaces unless otherwise indicated or unless impossible to do otherwise. Consultant to review before starting Work. Wiring in mechanical rooms, wiring in service rooms and exposed wiring must be in conduit. 23 Beechgrove Lane Section 25 05 01 Heating-Cooling RTU Renewal EMCS: GENERAL REQUIREMENTS Project No. 1039236-270802 Page 9 of 9 .11 Wiring sizes: .1 120 V: #12AWG minimum. .2 24 V: #18AWG minimum. .3 Power loss through conductor shall not exceed 5%. .7 Ethernet Network: .1 .2 .3 3.4 All Ethernet cables, for connection of IP-enabled devices to the EMCS, shall be supplied by Division 25 and certified by a Telecommunications Specialist. Division 25 is responsible for providing the EMT conduit infrastructure that will be used to run Ethernet cables to EMCS and integrated devices. In all cases, coordinate with the Telecommunications Specialist to ensure the conduit infrastructure deployed complies with EIA/TIA standards. PAINTING .1 Clean and touch up marred or scratched surfaces of factory finished equipment to match original finish. .2 Restore to new condition, finished surfaces too extensively damaged to be primed and touched up to make good. .3 Clean and prime exposed hangers, racks, fastenings, and other support components. 3.5 ADDITIONAL BANK OF HOURS .1 Provide a bank of sixty (40) additional hours to perform system refinement, optimization or additional work to the Contract. The bank must remain valid for a period of twenty-four (24) months following the Final Acceptance date. .2 Hours from this bank may also be used for future training purposes. .3 All hours are additional to the work described in Division 25. All hours withdrawn from the bank must be approved and signed by the Owner. END OF SECTION 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 Part 1 General 1.1 RELATED SECTIONS .1 1.2 Section 25 05 02 EMCS: SUBMITTALS AND REVIEW PROCESS Page 1 of 2 Section 25 05 01 - EMCS: General Requirements. SUBMITTALS .1 In addition to submittals required in Division 01, provide all shop drawings and closeout documentation in accordance with the requirements of this section. .2 Shop Drawings: provide an electronic copy of shop drawings in PDF format. .3 Closeout Documents: submit preliminary copy for Consultant’s review. Following the review, make corrections as requested and provide (5) hard copies and (5) “back-up” copy (PDF – multipage format) on DVD of the closeout documents. Closeout documents must also be entered on the facility OWS. 1.3 SHOP DRAWING REVIEW .1 Submit detailed shop drawings before start of installation and include following: .1 .2 1.4 Detailed system architecture showing all points associated with the Rooftop units. Proposed graphic layout and Floor plan layout. CLOSEOUT DOCUMENTATION .1 Submit closeout documentation once system start-up, verification and commissioning has been completed, in accordance with Section 25 05 11 EMCS: Start-up, verification and commissioning. .2 Closeout documents to include final “Operations and Maintenance” manual and all as-built data related to the completed EMCS installation, including: .1 .2 .3 .4 .5 .6 .7 .8 .9 Corrected and updated version of all information requested in the shop drawings reviews, in accordance with the as-built system. All testing and commissioning reports, in accordance with Section 25 05 11 – EMCS: Start-up, verification and commissioning. Copy of all system programs and documentation for their use. Copy of all software programmed including database, graphics, parameters, etc. List of alarm limits programed (high and low for each type). List of points assigned to schedule and event programs. Updated floor plans showing location of new Rooftop Units. Training documentation. Certification and warranty of primary network (Ethernet TCP/IP). 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 1.5 QUALITY ASSURANCE .1 Section 25 05 02 EMCS: SUBMITTALS AND REVIEW PROCESS Page 2 of 2 Preliminary Design Review Meeting: Convene meeting to: .1 .2 .3 Undertake functional review of preliminary design documents, resolve inconsistencies. Resolve conflicts between contract document requirements and actual items. Review "Sequence of Operations". .2 System programmers (EMCS) to attend meeting. .3 Consultant retains right to revise sequence or subsequent CDL prior to software finalization without cost to Owner. Part 2 Products 2.1 NOT USED .1 Not Used. Part 3 Execution 3.1 NOT USED .1 Not Used. END OF SECTION 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 Part 1 General 1.1 DEFINITIONS Section 25 05 11 EMCS: START-UP, VERIFICATION AND COMMISSIONING Page 1 of 4 .1 For additional acronyms and definitions refer to Section 25 05 01 – EMCS: General Requirements. .2 AEL: ratio between total test periods less any system downtime accumulated within that period and test period. .3 Downtime: results whenever EMCS is unable to fulfill required functions due to malfunction of equipment defined under responsibility of EMCS contractor. Downtime is measured by duration, in time, between time that Contractor is notified of failure and time system is restored to proper operating condition. Downtime not to include following: .1 .2 .3 1.2 Outage of main power supply in excess of back-up power sources, provided that: .1 Automatic initiation of back-up was accomplished. .2 Automatic shut-down and re-start of components was as specified. Failure of communications link, provided that: .1 Controller automatically and correctly operated in stand-alone mode. .2 Failure was not due to failure of any specified EMCS equipment. Functional failure resulting from individual sensor inputs or output devices, provided that: .1 System recorded said fault. .2 Equipment defaulted to fail-safe mode. DESIGN REQUIREMENTS .1 Confirm with Consultant that Design Criteria and Design Intents are still applicable. .2 Commissioning personnel to be fully aware of and qualified to interpret Design Criteria and Design Intents. 1.3 SUBMITTALS .1 Final Report: submit report in accordance with Section 25 05 02 – EMCS: Submittals and Review Procedures. .1 Include measurements, final settings and certified test results. .2 Bear signature of commissioning technician and supervisor .3 Report format to be approved by Commissioning Authority before commissioning is started. 23 Beechgrove Lane Heating-Cooling RTU Renewal Section 25 05 11 EMCS: START-UP, VERIFICATION AND COMMISSIONING Project No. 1039236-270802 Page 2 of 4 .4 Revise "as-built" documentation, commissioning reports to reflect changes, adjustments and modifications to EMCS as set during commissioning. .5 1.4 Recommend additional changes and/or modifications deemed advisable in order to improve performance, environmental conditions or energy consumption. COMMISSIONING .1 Carry out commissioning under direction and in presence of Commissioning Authority, in compliance with Section 01 91 13 – Commissioning – General Requirements and additional requirements of this section. .2 Inform, and obtain approval from, Consultant in writing at least 7 days prior to commissioning or each test. Indicate: .1 Location and part of system to be tested or commissioned. .2 Testing/commissioning procedures, anticipated results. .3 Names of testing/commissioning personnel. .3 Correct deficiencies, re-test in presence of Commissioning Authority until satisfactory performance is obtained. .4 Acceptance of tests will not relieve Contractor from responsibility for ensuring that complete systems meet every requirement of Contract. .5 Load system with project software. .6 Perform tests as required. 1.5 COMPLETION OF COMMISSIONING .1 1.6 Commissioning to be considered as satisfactorily completed when objectives of commissioning have been achieved and reviewed by Consultant. ISSUANCE OF FINAL CERTIFICATE OF COMPLETION .1 Final Certificate of Completion will not be issued until receipt of written approval indicating successful completion of specified commissioning activities including receipt of commissioning documentation. Part 2 Products 2.1 EQUIPMENT .1 Provide sufficient instrumentation to verify and commission the installed system. Provide two-way radios. .2 Instrumentation accuracy tolerances: higher order of magnitude than equipment or system being tested. .3 Independent testing laboratory to certify test equipment as accurate to within approved tolerances no more than 2 months prior to tests. .4 Application: to conform to normal industry standards. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 Part 3 Execution 3.1 Section 25 05 11 EMCS: START-UP, VERIFICATION AND COMMISSIONING Page 3 of 4 PROCEDURES .1 Test each system independently. .2 Debug system software. .3 Optimize operation and performance of systems by fine-tuning PID values and modifying CDLs as required. 3.2 FIELD QUALITY CONTROL .1 .2 Completion Testing: .1 General: test after installation of each part of system and after completion of mechanical and electrical hook-ups, to verify correct installation and functioning. .2 Include following activities: Test and calibrate field hardware including stand-alone capability of each controller. .2 Provide point verification list in table format including point identifier, point identifier expansion, point type and address, low and high limits and engineering units. Include space on commissioning technician and Consultant. This document will be used in final start-up testing. Final Start-up Testing: .1 .3 .1 Upon satisfactory completion of tests, perform point-by-point test of entire system under direction of Consultant and provide: .1 Technical personnel capable of re-calibrating field hardware and modifying software. .2 Detailed daily schedule showing items to be tested and personnel available. .3 Commissioning to commence during final start-up testing. .4 O&M personnel to assist in commissioning procedures as part of training. .5 Operate systems as long as necessary to commission entire project. .6 Monitor progress and keep detailed records of activities and results. Final Operational Testing: .1 .2 To demonstrate that EMCS functions in accordance with contract requirements. In accordance with Section 01 91 13 – Commissioning – General Requirements. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 3.3 DEMONSTRATION .1 Section 25 05 11 EMCS: START-UP, VERIFICATION AND COMMISSIONING Page 4 of 4 Demonstrate operation of systems including sequence of operations in regular and emergency modes, under normal and emergency conditions, start-up, shutdown interlocks and lock-outs. END OF SECTION 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 Part 1 General 1.1 RELATED REQUIREMENTS Section 26 05 00 COMMON WORK RESULTS FOR ELECTRICAL Page 1 of 6 .1 All contractual documents. .2 Obtain a copy of pertinent documents, read them attentively and determine requirements based on the scope of work. 1.2 REFERENCES .1 Canadian Standards Association (CSA) .1 .2 .3 1.3 CSA C22.1- 15, Canadian Electrical Code, Part 1 (23rd Edition), Safety Standard for Electrical Installations, Includes Update No. 1 (2015 CAN/CSA-C22.3 No. 1-10 (R2015), Overhead Systems. CSA Z32-09(2014), Electrical Safety and Essential Electrical Systems in Health Care Facilities, includes Update No. 1 (2010), Update No. 2 (2010). SCOPE OF WORK .1 Work Includes: .1 1.4 In general, work consists of the supply of all required materials, workforce, equipment and tools required to complete the electrical installations as described in writing, plans, and specifications. Most notably, work is comprised of: .1 Supply and connection of all AC units .2 AC unit GFI outlets .3 Closed-circuit television (CCTV) system. .4 Night shift system. .5 Connection of electrical hardware. RELATED WORK .1 The following work must be carried out by following the prescribed requirements, and is also included in other sections of the specifications: .1 1.5 Mechanical work associated with the installation of the AC units MATERIALS .1 1.6 Unless stated to the contrary use new materials, without defect, and of the quality required, bearing the appropriate approval labels by CSA, ULC, FM, according to the specifications. DOCUMENTS/SAMPLES TO SUBMIT FOR APPROVAL/INFORMATION .1 Shop Drawings .1 Submit the technical data sheets required in addition to the instructions and the Manufacturer’s documentation. Technical data sheets must indicate product information, nameplate, performance criteria, product dimensions, product limitations. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 .2 .3 .4 1.7 Section 26 05 00 COMMON WORK RESULTS FOR ELECTRICAL Page 2 of 6 Indoor and outdoor disconnect switches GFI outlets and weatherproof enclosure Submit for review fire alarm riser diagram, plan and zoning of building, [under plexiglass] [in glazed frames] at fire alarm control panel and annunciator. WIRING TERMINATIONS .1 2.6 Ensure lugs, terminals, screws used for termination of wiring are suitable for either copper or aluminum conductors. EQUIPMENT IDENTIFICATION .2 Identify electrical equipment with [nameplates] [labels] as follows: .1 .2 Nameplates: [plastic laminate] [lamicoid] [3] mm [thick plastic engraving sheet] [melamine], [black] [matt white finish] face, [black] [white] core, [lettering accurately aligned and engraved into core] [mechanically attached with self-tapping screws]. Sizes as follows: NAMEPLATE SIZES Size 1 10 mm x 50 mm One line Size 2 12 mm x 70 mm One line Size 3 12 mm x 70 mm Two lines Size 4 20 mm x 90 mm One line Size 5 20 mm x 90 mm Two lines Size 6 25 mm x 100 mm One line Size 7 25 mm x 100 mm Two lines 3 mm high letters 5 mm high letters 3 mm high letters 8 mm high letters 5 mm high letters 12 mm high letters 6 mm high letters .3 Labels: embossed plastic labels with [6] mm high letters unless specified otherwise. .4 Wording on [nameplates] [labels] to be approved by Consultant prior to manufacture. .5 Allow for minimum of twenty-five (25) letters per [nameplate] [label]. .6 Nameplates for terminal cabinets and junction boxes to indicate system and/or voltage characteristics. .7 Identify equipment with Size 3 labels engraved "ASSET INVENTORY NO. [_____]" as directed by Consultant. .8 Disconnects, starters and contactors: indicate equipment being controlled and voltage. .9 Terminal cabinets and pull boxes: indicate system and voltage. .10 Transformers: indicate capacity, primary and secondary voltages. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 .11 Devices: .1 .2 .3 .4 .5 1.8 Section 26 05 00 COMMON WORK RESULTS FOR ELECTRICAL Page 3 of 6 Identify all electrical equipment with visible safety labels on the device cover, the door of the device, or on the device frame. Use the same device code as indicated on drawings. Provide a list of all device identification for approval prior to the manufacturing. Assure that all device identifications are affixed to the equipment and that they are in [English] and [French]. List of equipment to identify: .1 AC units .2 GFI receptacles .3 Disconnect switches .4 Electrical panels WIRING IDENTIFICATION .1 Identify wiring with permanent indelible identifying markings, [numbered] [coloured plastic tapes], on both ends of phase conductors of feeders and branch circuit wiring. .2 Maintain phase sequence and colour coding throughout. .3 Phases: .1 .2 .3 .4 Identify with letters of size 5 cm in height, each phase A, B, C, N, on the inside of each transformer entry point, each low-voltage switchboard, and each motor control centre on all live components. Identify components and assigned phases using the colour codes outlined below: Identification 120/208 V 120/240 V 347/600 V Phase A Red Red Red wih stripe Phase B Black Black Black with stripe Phase C Blue --- Blue with stripe Neutral White White White Ground Green Green Green Use yellow coloured wiring for lighting return switches and orange coloured wiring for driver deflecting switches and inverters. Use coloured tape placed at a distance of 150 mm from each end of the conductors to identify drivers. Use coloured tape on each end of the conductors inside junction and pull boxes. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 Part 2 Execution 2.1 EXAMINATION .1 Verification of Conditions: verify that conditions of substrate previously installed under other Sections or Contracts are acceptable for [_____] installation in accordance with manufacturer's written instructions. .1 .2 .3 2.2 Section 26 05 00 COMMON WORK RESULTS FOR ELECTRICAL Page 4 of 6 Visually inspect substrate in presence of Consultant. Inform Consultant of unacceptable conditions immediately upon discovery. Proceed with installation only after unacceptable conditions have been remedied [and after receipt of written approval to proceed from Consultant. INSTALLATION .1 Do complete installation in accordance with CSA C22.1 except where specified otherwise. .2 Do overhead and underground systems in accordance with CAN/CSA-C22.3 no. 1 except where specified otherwise. 2.3 NAMEPLATES AND LABELS .1 2.4 Ensure manufacturer's nameplates, CSA labels and identification nameplates are visible and legible after equipment is installed. CONDUIT AND CABLE INSTALLATION .1 EMT for indoor installation .2 PVC for outdoor installation .1 .2 .3 .4 .5 2.5 Television outlets: [400] mm. Wall mounted speakers: [2300] mm. Clocks: [2300] mm. Doorbell pushbuttons: [1200] mm. Poste d’appel de chevet : 1100 mm Hôpitaux : lampe murale de chevet : 1800 mm LOCATION OF OUTLETS .1 2.6 The exact location of outdoor outlets is 600mm from ground to centerline COORDINATION OF PROTECTIVE DEVICES .1 Ensure circuit protective devices such as overcurrent trips, relays and fuses are installed to required values and settings. .2 Ensure circuit protective devices such as overcurrent trips, relays and fuses match the required capacity values according to their labels. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 2.7 Section 26 05 00 COMMON WORK RESULTS FOR ELECTRICAL Page 5 of 6 FIELD QUALITY CONTROL .1 Load Balance: .1 .2 .3 2.8 Measure phase current to panel boards with normal loads (lighting) operating at time of acceptance; adjust branch circuit connections as required to obtain best balance of current between phases and record changes. Measure phase voltages at loads and adjust transformer taps to within 2% of rated voltage of equipment. Provide upon completion of work, load balance report as directed in PART 1 – "ACTION AND INFORMATIONAL SUBMITTALS", phase and neutral currents on panel boards, dry-core transformers and motor control centres, operating under normal load, as well as hour and date on which each load was measured, and voltage at time of test. PERFORMANCE .1 Electrical contractor to collaborate with other trades in such a way that the performance of equipment can be tested in a timely fashion. .2 Once testing of equipment is complete, devices can be adjusted in such a way to obtain maximum efficiency. .3 General Requirements: .1 .2 .3 .4 .5 .6 .7 .8 .9 .10 .11 All testing must be completed in the presence of the engineer and to their satisfaction. The engineer may require their own testing prior to accepting the results. For temporary testing, obtain written permission to perform the tests. A written warning giving a notice of 48 hours to the engineer is required prior to testing. Provide the necessary devices, equipment, meters, materials, and personnel required for the execution of testing throughout the project until such a time as the engineer accepts the performance. If a piece of equipment or a device does not operate as per the manufacturer’s guarantee or the results of a test do not yield the desired results, the faulty piece of equipment must be replaced without delay and payment shall be deferred until the new piece of equipment is installed and desired operating results are obtained. Prevent dust, dirt, and other foreign materials from penetrating the openings in installations and devices during the testing phase. Provide the engineer with a certificate or a manufacturer’s letter confirming that the power supply to the device has been installed to their satisfaction. Provide written confirmation of the results obtained from testing. Testing trials must be completed and accepted prior to the installation of thermal insulation. Do not hide or recess any outlets, accessories, or devices until testing is complete and results have been accepted. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 .4 Special Requirements: .1 .5 .2 .3 .2 .3 .4 2.9 The owner and engineer reserve the right to examine equipment in use and to assist in the testing to ensure factory device requirements are met. Advice the engineer and owner at least one week in advance with the exact date and time that testing will occur. Provide two certified copies of testing reports to the engineer. This testing will include the verification of: .1 .7 The presence of the electrical contractor may be required for a test conducted by another trade. Factory Testing: .1 .6 Section 26 05 00 COMMON WORK RESULTS FOR ELECTRICAL Page 6 of 6 Integrity of the wire insulation and the voltage between the conductors to the ground. Differences in Voltage between ground and active points. Resistance in the socket. Polarity of the outlets. Include with the submission, the cost associated with the prescribed testing outlined in standard CSA Z32 DEMOLITION .1 Remove and transport off-site all demolished equipment including the following: conduits, boxes, outlets, switches, lighting devices, power distribution devices, auxiliary systems, safety/warning communications systems, and all accessories. .2 Remove wiring and conduits back to the panel. .3 Seal all openings left in accordance with the requirements contained in article "FIREPROOFING". .4 Repair any power circuits, control wiring or communications wiring that may have been damaged during demolition work. 2.10 REMOVAL AND RE-INSTALLATION OF EXISTING EQUIPMENT .1 Remove and install all electrical devices, conduits and required conductors to allow for the completion of architectural, mechanical, and structural work as outlined in the drawings and specifications. Consult the drawings and specifications of other disciplines as required. END OF SECTION 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 Part 1 General 1.1 REFERENCES .1 CSA International .1 .2 .2 1.2 CAN/CSA-C22.2 No.18-98(R2003), Outlet Boxes, Conduit Boxes and Fittings. CAN/CSA-C22.2 No.65-13, Wire Connectors (Tri-National Standard with UL 486A-486B and NMX-J-543-ANCE-03). Electrical and Electronic Manufacturers' Association of Canada (EEMAC) .1 .3 Section 26 05 20 WIRE AND BOX CONNECTORS (0-1000V) Page 1 of 3 EEMAC 1Y-2-1961, Bushing Stud Connectors and Aluminum Adapters (1200 Ampere Maximum Rating). National Electrical Manufacturers Association (NEMA) ACTION AND INFORMATION SUBMITTALS .1 Submit in accordance with Section 01 00 10 – General Instructions. .2 Product Data: .1 1.3 Submit manufacturer's instructions, printed product literature and data sheets for [wire and box connectors] and include product characteristics, performance criteria, physical size, finish and limitations. CLOSEOUT SUBMITTALS .1 Submit in accordance with Section 01 00 10 – General Instructions. .2 Operation and Maintenance Data: submit operation and maintenance data for [wire and box connectors] for incorporation into manual, E&Es. Part 2 Product 2.1 MATERIALS .1 Pressure type wire connectors to: CAN/CSA-C22.2 No.65, with current carrying parts of [copper] [copper alloy] [aluminum] [aluminum alloy] sized to fit [copper] [aluminum] conductors as required. .2 Fixture type splicing connectors to: CAN/CSA-C22.2 No.65] with current carrying parts of [copper] [copper alloy] sized to fit [copper] conductors 10 AWG or less. .3 Bushing stud connectors: to [EEMAC 1Y-2] [NEMA] to consist of: .1 .2 .3 .4 .5 .6 Connector body and stud clamp for [stranded] [round] [copper] [aluminum] [conductors] [tube] [bar]. Clamp for [stranded] [round] copper [conductors] [bar]. Clamp for [stranded aluminum] [ACSR] [conductors] [round aluminum bar]. Stud clamp bolts. Bolts for copper [conductors] [bar]. Bolts for aluminum [conductors] [bar]. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 .7 .4 2.2 Section 26 05 20 WIRE AND BOX CONNECTORS (0-1000V) Page 2 of 3 Sized for [conductors] [tubes] [bars] as indicated. Clamps or connectors for [armoured cable,] [Teck cable] [aluminum sheathed cable,] [mineral insulated cable,] [flexible conduit,] [non-metallic sheathed cable] as required to: CAN/CSA-C22.2 no.18. WIRE CONNECTORS .1 Mechanical connectors for conductor size 8 AWG or less, use Scotchlock Electrical Spring Connectors from 3M or Marette from Thomas & Betts. .2 Mechanical connection for copper-to-copper conductors of size 6 AWG or larger, use type H split bolt connectors from Thomas & Betts. .3 Mechanical connection for copper-to-Nual conductors of size 6 AWG or larger, use type APS split bolt connectors from Thomas & Betts. .4 Mechanical connection for Nual-to-Nual conductors of size 6 AWG or larger, use type HPS split bolt connector from Thomas & Betts. 2.3 TERMINAL BLOCKS .1 All wire connection in junction boxes and panels for fire-alarm, low-voltage lighting control, other low-voltage systems, etc., will be made on terminal blocks in sufficient quantities for each wire connection. .2 Terminal blocks shall be from Wieland brand, model 9700B, 10 A, 300 V, complete with DIN rail, end plates, identification, extremity flanges and jumpers. 2.4 ACCEPTABLE MANUFACTURERS .1 Wire connectors: .1 .2 .3 .2 3M Burndy Thomas & Betts Terminal Blocks: .1 .2 .3 Staffel Weidmüller Wieland Part 3 Execution 3.1 EXAMINATION .1 Verification of Conditions: verify that conditions of substrate previously installed under other Sections or Contracts are acceptable for wire and box connector installation in accordance with manufacturer's written instructions. .1 .2 .3 Visually inspect substrate in presence of Consultant. Inform Consultant of unacceptable conditions immediately upon discovery. Proceed with installation only after unacceptable conditions have been remedied [and after receipt of written approval to proceed from Consultant]. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 3.2 Section 26 05 20 WIRE AND BOX CONNECTORS (0-1000V) Page 3 of 3 INSTALLATION .1 Remove insulation carefully from ends of conductors [cables] and: .1 .2 .3 .4 Apply coat of zinc joint compound on aluminum conductors prior to installation of connectors. Install mechanical pressure type connectors and tighten screws [with appropriate compression tool recommended by manufacturer]. Installation shall meet secureness tests in accordance with CAN/CSA-C22.2 no.65. Install fixture type connectors and tighten to CAN/CSA-C22.2 no.65. Replace insulating cap. Install bushing stud connectors in accordance with [EEMAC 1Y-2] NEMA. END OF SECTION 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 Part 1 General 1.1 REFERENCES .1 Canadian Standards Association (CSA) .1 1.2 Section 26 05 21 WIRES AND CABLES (0-1000V) Page 1 of 3 CAN/CSA-C22.2 No.131-14, Type TECK 90 Cable. PRODUCT DATA .1 Provide product data in accordance with Section 01 00 10 – General Instructions. Part 2 Products 2.1 BUILDING WIRES .1 2.2 Conductors: stranded for 8 AWG and larger. Minimum size: 12 AWG. TECK 90 CABLE .1 Conductors: .1 .2 Grounding conductor: Unless stated otherwise copper only Insulation: .1 .2 Cross-linked polyethylene (RW90 XLPE). Voltage rating: 1 000 V [600 V]. .3 Tape: Mylar .4 Inner jacket: polyvinyl chloride material. .5 Armour: flat, interlocking, aluminum [galvanized steel]. .6 Overall covering: thermoplastic polyvinyl chloride, compliant to applicable Building Code classification for this project. .7 Fastenings: .1 .2 .8 Connectors: .1 .2 .9 Watertight, [explosion-proof] approved for Teck cable. Indoor type teck cable connectors for indoor installation Single conductor cable characteristics: .1 .10 One hole, malleable iron, steel, aluminum, in humid areas, straps to secure surface cables 50 mm and smaller. Two holes steel straps for cables larger than 50 mm. Channel type U supports for two or more cables. Threaded rods: 6 mm diameter to support suspended channels. Concentric ground conductor. Multi-conductor cable characteristics: .1 .2 Class B stranded copper conductors. Class B stranded copper grounding conductor. 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 .3 2.3 Section 26 05 21 WIRES AND CABLES (0-1000V) Page 2 of 3 Filling with non-hygroscopic material. NON-METALLIC SHEATHED CABLE .1 2.4 Non-metallic sheathed, copper ACM alloy cable type: NMD-90, FT-1 approved, for the connection of circuits inside a housing unit. Size as indicated. APPROVED MANUFACTURERS .1 Teck Cables: .1 .2 .3 Alcan (General Cable) Nexans Phillips Part 3 Execution 3.1 FIELD QUALITY CONTROL .1 Perform tests in accordance with Section 26 05 00 – Common Work Results for Electrical. .2 Perform tests using method appropriate to site conditions and to approval of Consultant and local authority having jurisdiction over installation. .3 Perform tests before energizing electrical system. 3.2 GENERAL CABLE INSTALLATION .1 Supply and install wires and cables required for the connection of all electrical equipment and devices to make them fully operational even if the wires or cables are not specifically shown on the drawings. .2 Do not fasten cables using plastic ties. .3 Fasten cables in accordance to the Ontario Electrical Safety Code. .1 .4 Maintain an equal spacing of at least the largest diameter of the cable between each of the cables installed in open air or in the cable racks. Maximum length of voltage drops. Size cables in accordance to table below. APPENDIX II MAXIMUM LENGTH (IN METERS) OF A BRANCHCIRCUIT AT 120 V VERSUS VOLTAGE DROP Rating in Amps (A) Conductor Size AWG 15 20 30 12 20 15 --- 10 30 25 15 8 50 40 25 6 90 65 40 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 Section 26 05 21 WIRES AND CABLES (0-1000V) Page 3 of 3 MAXIMUM LENGTH (IN METERS) OF A BRANCHCIRCUIT AT 120 V VERSUS VOLTAGE DROP Notes : - For non-specified loads, refer to Chapter V – Electrical to Construction Code of Quebec (Quebec Electrical Code (table no. D3). - Distance calculated for copper conductors at a temperature of 60°C. END OF SECTION 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 Part 1 General 1.1 NOT USED .1 Section 26 24 16.01 PANELBOARDS BREAKER TYPE Page 1 of 1 Not used. Part 2 Products 2.1 PANELBOARDS .1 All panels installed in mechanical and electrical rooms are existing. 2.2 BREAKERS .1 2.3 Use breakers approved by the electrical panel’s manufacturer EQUIPMENT IDENTIFICATION .1 Type written updated legend Part 3 Execution 3.1 INSTALLATION .1 Connect loads to circuits. .2 Connect neutral conductors to common neutral bus. END OF SECTION 23 Beechgrove Lane Heating-Cooling RTU Renewal Project No. 1039236-270802 Part 1 General 1.1 NOT USED .1 Not used Part 2 Products 2.1 RECEPTACLES .1 Duplex GFI receptacles, 5-15 CSA Type R, 125 V, 15 A, grounded U socket to conform to CSA C22.2 No. 42. .1 .2 .3 White, brown or grey GFCI Leviton or equivalent Weatherproof box Cooper TP 7010 or equivalent Weatherproof cover, Leviton 5980 ULC transparent cover Part 3 Execution 3.1 EXAMINATION .1 Verification of Conditions: verify that conditions of substrate previously installed under other Sections or Contracts are acceptable for wiring devices installation in accordance with manufacturer’s written instructions. .1 .2 .3 .2 Section 26 27 26 WIRING DEVICES Page 1 of 1 Visually inspect substrate in presence of the Consultant. Inform the Consultant of unacceptable conditions immediately upon discovery. Proceed with installation only after unacceptable conditions have been remedied, and after receipt of written approval to proceed from the Consultant. Receptacles: .1 .2 .3 Install receptacles on the new AC units at 600mm from ground to center of device. Do not block any AC unit access panels Do not mount sideways END OF SECTION 23 Beechgrove Lane Heating-Cooling RTU Renewal Section 26 28 23 DISCONNECT SWITCHES – FUSED AND NON-FUSED Page 1 of 1 Project No. 1039236-270802 Part 1 General 1.1 REFERENCES .1 Canadian Standards Association (CSA) .1 CSA C22.2 No. 39 -13, Fuseholder Assemblies Part 2 Products 2.1 DISCONNECT SWITCHES .1 Mechanically interlocked door to prevent opening when handle in "on" position. .2 Fuse-holders: to CSA C22.2 No. 39, relocatable and suitable without adaptors, for type and size of fuse indicated. .3 Quick-make, quick-break action. .4 ON-OFF switch position indication on switch enclosure cover. .5 Intensive use type, to sudden opening and closing, with or without fuses, as indicated, locked door in the closed position with the possibility of cancellation by qualified personnel, possible lockout by three (3) padlocks, portfolio fuses class J fuses, solid neutral, NEMA -1 housing inside, NEMA -3R and technical rooms sprinklered and NEMA -4X outdoors, model H, series Cutler Hammer or equivalent by Siemens. Part 3 Execution 3.1 EXAMINATION .1 Verification of conditions: verify that conditions of substrate previously installed under other Sections or Contracts are acceptable for disconnect switches - fused and non-fused installation in accordance with manufacturer's written instructions. .1 .2 .3 3.2 Visually inspect substrate in presence of the Consultant. Inform the Consultant of unacceptable conditions immediately upon discovery. Proceed with installation only after unacceptable conditions have been remedied and after receipt of written approval to proceed from the Consultant. INSTALLATION .1 Install disconnect switches complete with fuses if applicable. .2 Do not block any access panels on the new AC units. .3 Fasten outdoor disconnect switches using strut if required to ensure there is no movement. END OF SECTION