Colliers Project Leaders 23 Beechgrove Lane, Kingston, ON

advertisement
Colliers Project Leaders
23 Beechgrove Lane, Kingston, ON
Heating and Cooling RTU Renewal
Project No. 1039236-270802
Mechanical and Electrical
Specifications
Issued for 66% Review
2016-06-21
Project: 8014-053-202
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
Section 00 01 10
TABLE OF CONTENTS
Page 1 of 1
SPECIFICATIONS
SECTION
TITLE
NO. OF PAGES
DIVISION 01 – GENERAL REQUIREMENTS
01 00 10
General Instructions ........................................................................................... 13
01 91 13
General Commissioning (Cx) Requirements ...................................................... 11
01 91 14
Commissioning - Plan ........................................................................................ 22
01 91 15
Commissioning – Training.................................................................................... 8
DIVISION 23
23 05 00
23 05 93
23 07 13
23 11 23
23 31 13.01
23 74 00
– HEATING, VENTILATING AND AIR CONDITIONING (HVAC)
Common Work Results for HVAC ....................................................................... 4
Testing, Adjusting and Balancing for HVAC ......................................................... 5
Duct Insulation ..................................................................................................... 5
Facility Natural Gas Piping ................................................................................... 3
Metal Ducts – Low Pressure to 500 Pa ................................................................ 4
Packaged Outdoor HVAC Equipment .................................................................. 9
DIVISION 25 – INTEGRATED AUTOMATION
25 05 01
EMCS: General Requirements ............................................................................. 9
25 05 02
EMCS: Submittals and Review Process............................................................... 2
25 05 11
EMCS: Start-Up, Verification and Commissioning ................................................ 4
DIVISION 26 - ELECTRICAL
26 05 00
Common Work Results for Electrical .................................................................... 6
26 05 20
Wire and Box Connectors (0-1000V).................................................................... 3
26 05 21
Wires and Cables (0-1000V) ................................................................................3
26 24 16.01 Panelboards Breaker Type .................................................................................. 1
26 27 26
Wiring Devices ..................................................................................................... 1
26 28 23
Disconnect Switches – Fused and Non-Fused ..................................................... 1
END OF SECTION
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
Part 1
General
1.1
GENERAL
Section 01 00 10
GENERAL INSTRUCTIONS
Page 1 of 13
.1
The Procurement and Contracting Requirements (Division 00) apply to all
sections of Divisions 01, 23, 25 and 26.
.2
Contractors shall be responsible for fire alarm shut downs and restarts as
required by designated fire alarm company for the building.
.3
Contractor will be responsible for scanning of concrete floors, walls and
underground locates when and if required to complete the project.
.4
All work described in these plans and specifications must be performed without
any interruption of HVAC systems or their associated controls thereof that may
affect the occupants of the facility in any way.
1.2
CODES AND STANDARDS
.1
Perform work in accordance with Ontario Building Code of Canada (OBC) 2012
and other applicable code of territorial or local application including amendments
up to project tender closing date provided that in case of conflict or discrepancy,
more stringent requirements apply.
.2
Quality of materials and work must meet or exceed requirements of specified
standards, codes and referenced documents.
.3
All materials shall be new and work shall conform to the minimum applicable
standards of the Canadian General Standards Board, the Canadian Standards
Association.
1.3
TAXES
.1
1.4
Pay taxes properly levied by law (including Federal, Provincial and Municipal).
FEES, PERMITS, AND CERTIFICATES
.1
Obtain and pay for building permit, certificates, licenses and other permits as
required by municipal, provincial and federal authorities.
.2
Provide authorities with plans and information for acceptance certificates.
.3
Provide inspection certificates as evidence that Work conforms to requirements
of authority having jurisdiction.
.4
Submit to Project Manager, copy of application submissions and approval
documents received for authority having jurisdiction.
1.5
FIRE SAFETY REQUIREMENTS
.1
Comply with the Ontario Building Code of Canada 2012 (OBC) for fire safety in
construction and the National Fire Code of Canada 2005 (NFC) for fire
prevention, fire-fighting and life safety in building in use.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
.2
Comply with Human Resources Skills Development Canada (HRSDC), Fire
Commissioner of Canada (FCC) standards available from Fire Protection
Engineering Services, Labour Program, HRSDC or following internet site:
http://hrsdc.gc.ca/en/labour/fire_protection/plicies_standards/index.shtml .
.1
.2
.3
.4
.3
No. 301: Standard for Construction Operations.
No. 302: Standard for Welding and Cutting.
No. 374: Fire Protection Standard for General Storage (Indoor and
Outdoor).
Retain fire safety documents and standards on site.
Welding and cutting:
.1
.2
.3
.4
.5
.6
.4
Section 01 00 10
GENERAL INSTRUCTIONS
Page 2 of 13
At least 48 hours prior to commencing cutting, welding or soldering
procedure, provide to Project Manager.
.1
Notice of intent, indicating devices affected, time and duration of
isolation or bypass.
.2
Completed welding permit as defined in FC 302.
.3
Return welding permit to Project Manager immediately upon
completion of procedures for which permit was issued.
Before welding, soldering, grinding and/or cutting work, obtain a permit
from Fire Prevention Unit as directed by Project Manager.
Store flammable liquids in approved CSA containers inspected by the Fire
Prevention Unit. Only use open flame when authorized by Fire Prevention
Unit.
Provide fire watcher as described in FC 302 when welding or cutting
operations are carried out in areas where combustible materials within 10
m may be ignited by conduction or radiation.
When work requires interruption of fire alarms or fire suppression,
extinguishing or protection systems:
.1
Provide watchman service as described in FC 301; In general,
watchman service is defined as an individual conversant with Fire
Emergency Procedures, performing fire picket duty within an
unprotected and unoccupied (no workers) area once per hour.
.2
Retain services of manufacturer for fire protection systems on
daily basis, to isolate and protect devices relating to:
.1
Modification of fire alarms, fire suppression, extinguishing
or protection systems;
.2
Cutting, welding, soldering or other construction activities
which might activate fire protection systems.
Immediately upon completion of work, restore fire protection systems to
normal operation and verify that devices are fully operational.
Inform fire alarm system monitoring agency and local Fire Department
immediately prior to isolation and immediately upon restoration of normal
operation.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
1.6
Section 01 00 10
GENERAL INSTRUCTIONS
Page 3 of 13
FIELD QUALITY CONTROL
.1
Carry out Work using qualified licensed workers or apprentices in accordance
with Provincial Act respecting manpower vocational training and qualification.
.2
Permit employees registered in Provincial apprenticeship program to perform
specific tasks only if under direct supervision of qualified licensed workers.
.3
Determine permitted activities and tasks by apprentices, based on level of
training attended and demonstration of ability to perform specific duties.
1.7
FAMILIARIZATION WITH SITE
.1
Contractor may visit site prior to submitting Tender to examine site conditions
and assess risks and requirements for completing Work. No allowance is made
on account of error or negligence to properly observe and determine existing
conditions.
.2
Obtain prior permission from Project Manager before carrying out site inspection.
1.8
HAZARDOUS MATERIALS
.1
Comply with the requirements of the Workplace Hazardous Materials Information
System (WHMIS) regarding use, handling, storage, and disposal of hazardous
materials; and regarding labelling and the provision of Material Safety Data
Sheets (MSDS) acceptable to Human Resources and Social Development
Canada (HRSDC), Labour program.
.2
For work in occupied buildings give Project Manager 48 hours notice for work
involving designated substances (Ontario Bill 208), hazardous substances
(Canada Labour Code Part II Section 10), and before painting, caulking, installing
carpet or using adhesives.
1.9
TEMPORARY UTILITIES
.1
Existing services required for work, excluding power required for space heating
may be used by Contractor without charge. Ensure capacity is adequate prior to
imposing additional loads. Connect and disconnect at own expense and
responsibility.
.2
Notify Project Manager and utility companies of intended interruption of services,
obtain requisite permission.
.3
Notify Project Manager of each necessary interruption of any mechanical or
electrical service throughout course of work, as per the project’s Owner Project
Requirements (Section 00 73 10). Minimize duration and frequency of
interruptions. Carry out interruptions after normal working hours of occupants.
1.10
REMOVED MATERIALS
.1
1.11
Unless otherwise specified, materials for removal become Contractor's property.
Remove materials promptly from site.
PROTECTION
.1
Protect finished work against damage.
.2
Protect adjacent work against spread of dust and dirt beyond work areas.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
.3
1.12
Section 01 00 10
GENERAL INSTRUCTIONS
Page 4 of 13
Protect operatives and other users of site from hazards.
EXAMINATION
.1
Examine site and conditions likely to affect work and be familiar and conversant
with existing conditions.
.2
Provide photographs of surrounding properties, objects and structures liable to
be damaged or be subject of subsequent claims.
1.13
USE OF SITE AND FACILITIES
.1
1.14
Execute work with least possible interference or disturbance to building
operations, occupants, public and normal use of premises. Arrange with Project
Manager to facilitate execution of work. Refer to Division 00 for work that must be
done during "off hours".
SITE STORAGE
.1
Do not unreasonably encumber site with materials or equipment.
.2
Move stored products or equipment which interfere with operations of other
contractors.
.3
Obtain and pay for use of additional storage or work areas needed for
operations.
1.15
CONCEALMENT
.1
1.16
Conceal pipes, ducts and wiring in floor, wall and ceiling construction of finished
areas except where indicated.
CUT, PATCH AND MAKE GOOD
.1
Cut existing surfaces as required to accommodate new work.
.2
Remove items shown or specified.
.3
Make cuts with clean, true, smooth edges. Make patches inconspicuous in final
assembly.
.4
Patch and make good surfaces cut, damaged or disturbed, to Project Manager’s
approval. Match existing material, colour, finish and texture. Retain and pay for
professional subcontractors to carry out this work (ceilings will be affected).
.5
Paint as required to match existing colour.
.6
Replace all ceiling tiles broken during execution of the work.
.7
Install firestops and smoke seals in accordance with ULC-S115, around pipe,
ductwork, cables, and other objects penetrating fire separations to provide fire
resistance not less than the fire resistance rating of surrounding floor, ceiling, and
wall assembly.
1.17
SLEEVES, HANGERS AND INSERTS
.1
Co-ordinate setting and packing of sleeves and supply and installation of hangers
and inserts. Obtain Consultant's approval before cutting into structure.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
1.18
Section 01 00 10
GENERAL INSTRUCTIONS
Page 5 of 13
SCAFFOLDS AND WORK PLATFORMS
.1
Design, install, and inspect scaffolds and work platforms required for work in
accordance with relevant municipal, provincial and other regulations.
.2
Provide design drawings, signed and sealed by qualified Professional Engineer
licensed in Province of Ontario.
.3
Additions or modifications to scaffolding must be approved in writing by
Professional Engineer licensed in Province of Ontario.
1.19
DUST CONTROL
.1
Provide temporary dust tight screens or partitions to localize dust generating
activities, and for protection of workers, finished areas of work and public.
.2
Maintain and relocate protection until such work is complete.
.3
Protect furnishings within work area with 0.102 mm thick polyethylene film during
construction. Remove film during non-construction hours and leave premises in
clean, unencumbered and safe manner for normal daytime function.
1.20
BUILDING SMOKING ENVIRONMENT
.1
1.21
Comply with smoking restrictions.
WASTE MANAGEMENT
.1
Comply with the Environmental Protection Act, Ontario Regulations O.Reg.
102/94 and O. Reg. 103/94 for waste management program on construction and
demolition projects.
.2
Conduct "waste audit" to determine waste generated during demolition or
construction operations, prepare written "waste reduction work plan" and
implement procedures to reduce, reuse and recycle materials to the extent
possible.
.3
Provide source separation program to disassemble and collect in an orderly
fashion materials designated for alternative disposal from general waste stream
as follows:
.1
.2
.3
.4
1.22
Cardboard (corrugated) and paper.
Plastic.
Steel.
Proof that materials have been received at an Approved Waste Processing Site
or certified Waste Disposal Site as required.
SUBMITTALS
.1
Provide submittals in accordance with Division 00.
.2
Shop Drawings:
.1
.2
Submit for Consultant review, hard copies and electronic copy (*.pdf) of
each shop drawing.
Review is for sole purpose of ascertaining conformance with general
design concept, and does not mean approval of design details inherent in
shop drawings, responsibility for which remains with Contractor.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
.3
.4
1.23
Section 01 00 10
GENERAL INSTRUCTIONS
Page 6 of 13
Consultant's review does not relieve Contractor of responsibility for errors
or omissions in shop drawings or of Contractor's responsibility for meeting
requirements of Contract Documents.
Do not commence manufacture or order materials before shop drawings
are reviewed.
DOCUMENTS REQUIRED
.1
Maintain at job site, one copy each document as follows:
.1
.2
.3
.4
.5
.6
.7
.8
.9
.10
1.24
Contract Drawings.
Specifications.
Addenda.
Reviewed Shop Drawings.
List of outstanding shop drawings.
Change Orders.
Other modifications to Contract.
Field Test Reports.
Copy of Approved Work Schedule.
Other documents as specified.
INSPECTION AND TESTING
.1
Tests on materials and equipment, as specified within trade sections, is
responsibility of Contractor except where specified.
.2
Provide necessary instruments, equipment and qualified personnel to perform
tests.
.3
At completion of tests, turn over two sets of fully documented tests reports to
Consultant.
.4
Where tests or inspections reveal work not in accordance with Contract, bear
cost of tests and additional tests as Project Manager & Consultant requires to
verify acceptability of corrected work.
.5
Pay costs for uncovering and making good work that is covered before inspection
or testing is completed and approved by Consultant.
1.25
MANUFACTURERS INVOLVEMENT
.1
Arrange for Manufacturer to submit copies of all production test records for
production test required by these specifications prior to shipping.
.2
Prior to start-up of equipment or systems, obtain manufacturer’s installation,
start-up and operation instructions and review with Project Manager.
.3
Use manufacturer’s trained start-up personnel to maintain integrity of warranty.
.4
Verify with manufacturer that testing as specified will not void any warranties.
.5
Manufacturer’s personnel to be experienced in design, installation and operation
of equipment and systems and be able to interpret test results in clear, concise,
logical manner.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
.6
1.26
Section 01 00 10
GENERAL INSTRUCTIONS
Page 7 of 13
Report in writing to Project Manager any deficiencies or defects noted during
performance of services.
WORK CO-ORDINATION
.1
Co-ordinate work of sub trades.
.1
.2
Convene meetings between subcontractors whose work interfaces and ensure
awareness of areas and extent of interface required.
.1
.3
.2
1.27
Provide each subcontractor with complete plans and specifications for
Contract, to assist them in planning and carrying out their respective
work. Ensure sub-contractors receive Divisions 00 and 01.
Work Co-operation:
.1
.4
Designate one person to be responsible for review of contract documents,
shop drawings, and planning and managing co-ordination of Work.
Ensure co-operation between trades in order to facilitate general progress
of Work and avoid situations of spatial interference.
Ensure that each trade provides other trades reasonable opportunity for
completion of Work to prevent unnecessary delays, cutting, patching and
removal or replacement of completed work.
Project Manager & Consultant are not responsible for, or accountable for extra
costs incurred as a result of Contractor's failure to co-ordinate Work or to resolve
disputes between subcontractors.
CLEAN UP
.1
1.28
Clean up work area as work progresses. At end of each work period and more
often if required by Project Manager, remove debris from site, neatly stack
material for use, and clean up generally.
OPERATIONS AND MAINTENANCE MANUALS
.1
Two (2) weeks prior to any scheduled training or substantial performance
inspection submit for review to the Project Manager, one (1) hard copy and one
electronic copy (*.pdf) of Operations Data and Maintenance Manual, compiled as
follows:
.1
.2
.3
Must be in a binder labelled on the front cover and on the binder edge
with the following information: Building Name and address, project name,
project number, completed date (ex. October 2006).
Title Page: O&M manual for building name, address, date, and names of
the following: Contractor, Consultant, Project Managers and
Commissioning Authority.
Index: sections as follows:
.1
A – CONTRACTUAL AND LEGAL GUIDES: The contractual and
legal records shall include:
.1
The name and address of the installation;
.2
Details of ownership, leases;
.3
Details of local and public authority consents;
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
.4
.2
.3
Section 01 00 10
GENERAL INSTRUCTIONS
Page 8 of 13
Details of the design teams, consultants, commissioning
authorities, installation contractors and associated
subcontractors;
.5
Dates for the start of the installation, for handover
(substantial completion) and for the expiry of the defects
liability period; (Warranty)
.6
Information of all guarantees affecting components,
systems/plant items, together with expiry dates and
names, addresses and telephone numbers of relevant
contacts.
.7
For each item of plant and equipment installed within the
building and contained in the list of services covered by the
O&M manual, copies of the following documents shall also
be provided, where applicable:
.1
Test certificates;
.2
Manufacturers’ guarantees and warranties;
.3
Insurance inspection reports;
.4
Safety and fire certificates.
.8
A clear statement shall be made in this section concerning
those hazards and safety precautions of which the
operators and maintainers of the installations need to be
made aware. They shall include the following:
.1
Any known feature or operational characteristic of
the equipment or systems installed which may
produce a hazard;
.2
Any known hazards against which protection must
be provided;
.3
Any mandatory requirements relating to safety;
.4
Any other safety requirements which should be
observed;
.5
Any other relevant warnings.
B - OVERALL PURPOSE: this section shall provide a general
overview of the original design intent. It shall include a summary
for each engineering system installed giving:
.1
The parameters and conditions within which it has been
designed to operate, including known hazards;
.2
The type of each service (gas, water, electricity, etc.)
required to operate the system;
.3
The intended method of control.
C – DESCRIPTION: this provides a detailed description of each
engineering system installed. It shall include
.1
The system type (e.g. cold water supply, chilled water
supply);
.2
System location and what it serves;
.3
What the system depends upon in order to function;
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
.4
.4
.5
.6
.7
.8
Section 01 00 10
GENERAL INSTRUCTIONS
Page 9 of 13
Design data, basic design parameters, basic assumptions
made during design;
.5
Reasons for selecting particular plants;
.6
Expected service life (where applicable);
.7
Planned operational efficiency;
.8
Copy of all reviewed as-built shop drawings;
D - EQUIPMENT SCHEDULE: the type, model number and serial
number of all component items within the system should be listed,
together with the names of their respective manufacturers or
suppliers, including copies of CMMS forms for all new equipment.
E - PARTS IDENTIFICATION AND RECOMMENDED SPARES:
.1
This shall comprise a parts identification list detailing and
identifying replaceable assemblies, sub-assemblies and
components. It shall include suppliers’ recommendations
for both spares and ‘running spares’ (i.e. parts required for
scheduled replacement due to wear or deterioration).
.2
Items normally held in stock by a supplier, or for which a
refurbishment service is available, shall be identified
separately.
F - COMMISSIONING DATA: the results of all commissioning
work and associated tests shall be provided, this shall include:
.1
Measured data and Measurement points;
.2
Test equipment used;
.3
Calibration certificate details;
.4
A statement confirms that weather design requirements
were achieved.
G – OPERATION: instructions must be given for the safe and
efficient operation, under both normal and emergency conditions,
of each engineering systems installed. These will be in addition to
manufactures’ literature for plant items and shall include:
.1
A recommended strategy for operation and control;
.2
An outline of the general operation mode;
.3
Control data (location, effect, object, sequence, limits of
capability, modes, set points)
.4
Procedure and sequences for start-up, running and shut
down, under both normal and emergency conditions;
.5
Operating procedure for stand-by plant;
.6
Precautions necessary to overcome known hazards;
.7
The means by which potentially hazardous plant may be
made safe;
.8
Target figures for both energy consumption and energy
use;
.9
Forms for recording plant running hours, energy
consumption and the energy costs;
H - MAINTENANCE INSTRUCTIONS: the manufacturer’s
recommendations and instructions for maintenance must be
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
.9
.10
.11
.12
.13
Section 01 00 10
GENERAL INSTRUCTIONS
Page 10 of 13
detailed for each item of plant and equipment installed. Clear
distinction shall be made between planned tasks (preventive
maintenance) and work done on corrective basis. Instructions
shall be given on each of the following, as appropriate:
.1
The isolation and return to service of plant and equipment;
.2
Adjustments, calibration and testing;
.3
Dismantling and assembly;
.4
The exchange of components and assemblies;
.5
Dealing with hazards which may arise during maintenance;
.6
The nature of deterioration and defects to be looked for;
.7
Special tools, test equipment and ancillary services.
I - MAINTENANCE SCHEDULES: maintenance schedules shall
be provided for all preventive maintenance tasks identified in
Index-H. These shall be based on both manufacturers’
recommendations and other authoritative sources (e.g. statutory
or mandatory requirements) and shall include:
.1
Inspections;
.2
Examinations and Tests;
.3
Adjustments and Calibrations;
.4
Lubrication;
.5
Periodic overhaul.
J - FAULT FINDING: procedure for the logical diagnosis and
correction of faults shall be provided for critical components,
equipment and systems
K – LUBRICATION: a schedule of all plant requiring lubrication
shall be provided together with manufacturers’ recommendations
on the type of lubricant and the method and frequency of
application. Where the type of lubricant is identified by product
name, a generic reference (e.g. CSA, ASTM standard) should be
given. Information must also be provided on special requirements
for the handling and storage of lubricants.
L - MODIFICATION INFORMATION:
.1
Modifications are authorized changes which may affect the
safety, reliability, operation or maintenance of a system or
any components.
.2
Information on permitted plant or system modifications
allowed for by manufacturers or system designers shall be
included for each system. Space must be provided in the
manual for the recording of all modifications and changes
as they occur (this would initially comprise a series of
appropriately headed blank pages).
M - DISPOSAL INSTRUCTIONS: where relevant, information shall
be provided detailing:
.1
Any known dangers likely to arise during the disposal of
specific items of plant or equipment together with the
necessary precautions and safety measures;
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
.2
.14
.15
.16
.17
Section 01 00 10
GENERAL INSTRUCTIONS
Page 11 of 13
Methods for safely disposing of or destroying the
equipment or any part thereof, including packaging,
insulation and fluids;
.3
Sources from which further information can be obtained.
N - NAMES AND ADDRESSES OF MANUFACTURERS:
.1
Details of all manufacturers and suppliers of equipment
listed in the manual shall be provided under this heading
giving name, address, telephone number, fax number,
email and web address. Any additional information likely to
help the building operator to make contact with or obtain
advice from a manufacturer or supplier shall also be
included.
.2
Where appropriate, details of local stocking or spare parts,
replaceable assemblies or complete units shall also be
provided.
.3
Details shall be arranged in alphabetical order of
manufacturer or supplier name to provide a logical
information retrieval procedure.
O - INDEX OF PLANS AND DRAWINGS:
.1
An index shall be provided of all ‘as built’ drawings
supplied during the course of the installation work and on
completion, identified by number and title.
.2
The index shall also include a schedule of all drawings
issued by manufacturers and suppliers during the course
of the installation work and on completion e.g. control
panel wiring diagrams.
P - EMERGENCY INFORMATION:
.1
An important feature of any manual is the emergency
information. Located, for ease of reference, at the end of
the document, this should include names, address,
telephone numbers, fax numbers and emails addresses of
the appropriate contacts in the event of fire, theft or
burglary, and gas, electricity or water failure/leaks. It shall
also list those firms or staff to contact in the event of the
failure or breakdown of such plant as lifts, boilers, chillers,
building automation system and pumps.
.2
Where applicable, location of firefighting equipment,
hydrants and rising mains shall be described.
.3
Special attention shall be given to hazards particular to the
building.
.4
Depending on client policy, a note of security installations
may also be included.
Q - MANUFACTURERS LITERATURE: a complete set of all
manufacturers’ literature shall be provided for the plant and
equipment installed, and assembled for each building services
systems. (1 copy of all information including as-built drawings on a
CD will be provided.) This literature shall provide the following
information:
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
Section 01 00 10
GENERAL INSTRUCTIONS
Page 12 of 13
.1
.18
.2
1.29
Manufactures literature and specifications are to be
inserted in the close out documents identifying operating
and design temperatures, pressures, flow rates, and
differentials.
.2
The manufacturer and design consultants are to identify in
the close out documents all preliminary sequence of
operations on major components and equipment.
.3
Description of the product purchased;
.4
The cost and date of purchase;
.5
Performance- behavioral characteristics of the equipment
in use;
.6
Applications- suitability for use;
.7
Operation and maintenance details;
.8
Reviewed/as-built shop drawings;
.9
Resources of labor, plant, material and space required;
.10
Methods of operation and control;
.11
Cleaning and maintenance requirements;
.12
Protective measures;
.13
Labor safety and welfare associated with equipment;
.14
Public safety consideration
.15
Where this data is not adequately provided in
manufacturers’ literature the author of the manual shall
augment the literature as necessary.
LAST TAB: misc.
Following the Project Manager’s review, make modifications as directed by
Project Manager and submit five (5) Final copies of the Operations Data and
Maintenance Manual. Each final copy to include one (1) hard copy (combined in
binder) and one electronic copy (*.pdf) on a CD (or DVD).
RECORDS
.1
1.30
As work progresses, maintain accurate records to show deviations from contract
drawings. Just prior to Project Manager‘s inspection for issuance of Substantial
certificate of completion, supply to Project Manager one (1) set of white prints
with all deviations neatly inked in. Project Manager will provide two sets of clean
white prints for this purpose.
GUARANTEES AND WARRANTIES
.1
Before completion of work collect manufacturer's guarantees and warranties and
deliver to Project Manager.
Part 2
Products
2.1
NOT USED
.1
Not used.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
Part 3
Execution
3.1
NOT USED
.1
Section 01 00 10
GENERAL INSTRUCTIONS
Page 13 of 13
Not used.
END OF SECTION
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
Part 1
General
1.1
DESCRIPTION
Section 01 91 13
COMMISSIONING – GENERAL REQUIREMENTS
Page 1 of 11
.1
Related Sections: This section of the Specification forms part of the Contract
Documents and shall be read, interpreted and coordinated with all other parts.
.2
Commissioning Authority: The mechanical Contractor will be responsible to
manage and administrate the commissioning process on this project.
.3
Commissioning Definition: Commissioning is a systematic process of ensuring
that all building systems perform interactively according to the design intent and
the owner’s operational needs. This is achieved by beginning in the design
phase and documenting the owner’s project requirements, design intent and
continuing through construction, acceptancy and the warranty period with actual
verification of performance. The commissioning process shall encompass and
coordinate the traditionally separate functions of system documentation,
equipment startup, control system calibration, testing and balancing,
performance testing and training.
Commissioning during the construction phase is intended to achieve the
following specific objectives according to the Contract Documents:
.1
.2
.3
.4
Verify that applicable equipment and systems are installed according to
the manufacturer’s recommendations and to industry accepted minimum
standards and that they receive adequate operational checkout by
installing contractors.
Verify and document proper performance of equipment and systems.
Verify that O&M documentation left on site is complete.
Verify that the Owner’s operating personnel are adequately trained.
The commissioning process does not take away from or reduce the responsibility
of the system Consultants or installing contractors to provide a finished and fully
functioning product.
.4
Abbreviations: The following are common abbreviations used in the
Commissioning Specifications and in the Commissioning Plan. Definitions are
found in Section 1.6.
OWCACxCx PlanPCFT-
1.2
Owner/Owner’s Representative
Commissioning Authority
Commissioning
Commissioning Plan Document
Prefunctional Checklist
Functional Performance Test
PMME
MCCC
TABEC-
Project Manager (of the Owner)
Mechanical Engineer
Mechanical Contractor
Controls Contractor
Test and Balance Contractor
Electrical Contractor
COORDINATION
.1
Commissioning Team. The members of the commissioning team consist of the
Commissioning Authority (CA), the Project Manager (PM), the designated
representative of the owner’s firm (OW), the Mechanical and Electrical Engineers
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
Section 01 91 13
COMMISSIONING – GENERAL REQUIREMENTS
Page 2 of 11
(ME) and (EE), the Mechanical Contractor (MC), the Electrical Contractor (EC),
the TAB Contractor, the Controls Contractor (CC), any other installing
subcontractors (Subs) or suppliers of equipment. The Owner’s building or plant
operator/engineer is also a member of the commissioning team. The
commissioning team for this project includes the following members:
.1
.2
.3
.4
.5
.6
.7
.8
.9
Owner/Owner’s Representative (OW/PM): CBRE/COLLIERS
Commissioning Authority (CA): Mechanical Contractor (MC)
Mechanical Consultant (ME): BPA
General Contractor (GC)
Mechanical Contractor (MC)
Sheet Metal Contractor
Controls Contractor (CC)
Testing and Balancing Agency (TAB)
Electrical Contractor (EC)
.2
Management. The CA directs and coordinates the commissioning activities and
the reports to the PM. All members work together to fulfill their contracted
responsibilities and meet the objectives of the Contract Documents.
.3
Scheduling. The CA will work with the GC according to established protocols to
schedule the commissioning activities. The CA will provide sufficient notice to
the GC for scheduling commissioning activities. The GC will integrate all
commissioning activities into the master schedule. All parties will address
scheduling problems and make necessary notifications in a timely manner in
order to expedite the commissioning process.
The CA will provide the initial schedule of primary commissioning events at the
commissioning scoping meeting. The Commissioning Plan - Section 01 91 14
provides the format for this schedule. As construction progresses more detailed
schedules are developed by the CA. The Commissioning Plan also provides a
format for detailed schedules.
1.3
COMMISSIONING PROCESS
.1
Commissioning Plan. The Commissioning Plan - Section 01 91 14 provided as
part of the bid documents, is binding on the Contractor. The commissioning plan
provides guidance in the execution of the commissioning process. Just after the
initial commissioning scoping meeting the CA will update the plan which is then
considered the “final” plan, though it will continue to evolve and expand as the
project progresses. The Specifications will take precedence over the
Commissioning Plan.
.2
Commissioning Process. The following narrative provides a brief overview of the
typical commissioning tasks during construction and the general order in which
they occur.
.1
Commissioning during construction begins with a scoping meeting
conducted by the CA where the commissioning process is reviewed with
the commissioning team members.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
.2
.3
.4
.5
.6
.7
.8
.9
.10
.11
.12
.13
1.4
Section 01 91 13
COMMISSIONING – GENERAL REQUIREMENTS
Page 3 of 11
Additional meetings will be required throughout construction, scheduled
by the CA with necessary parties attending, to plan, scope, coordinate,
schedule future activities and resolve problems.
Equipment documentation is submitted to the CA during normal
submittals, including detailed start-up procedures.
The CA works with the GC, MC, EC and the Subs in updating startup
plans and startup documentation formats, including providing the GC,
MC, EC and the Subs with pre-functional checklists to be completed,
during the startup process.
In general, the checkout and performance verification proceeds from
simple to complex; from component level to equipment to systems and
intersystem levels with prefunctional checklists being completed before
functional testing.
The GC, MC, EC and the Subs, execute and document the prefunctional
checklists and perform startup and initial checkout. The CA documents
that the checklists and startup were completed according to the approved
plans. This may include the CA witnessing start-up of selected
equipment.
The CA updates specific equipment and system functional performance
test procedures. The GC, MC, EC and the Subs review the procedures.
The procedures are executed by the GC, MC, EC and the Subs, under
the direction of, and documented by the CA.
Items of non-compliance in material, installation or setup are corrected at
the GC, MC, EC and the Sub’s expense and the system retested.
The ME reviews the O&M documentation for completeness. The CA
reviews O&M documentation on the Owner’s behalf and recommends
acceptancy or provides additional comments.
Commissioning is completed before Substantial Completion.
The CA reviews and coordinates the training provided by the GC, MC, EC
and the Subs and verifies that is was completed.
Deferred testing is conducted, as specified or required.
RELATED WORK
.1
Specific commissioning requirements are given in the following sections of this
specification. All of the following sections apply to the Work of this section.
.1
.2
.3
.4
01 91 14 – Commissioning Plan
01 91 15 – Commissioning Training
23 05 93 – Testing, Adjusting and Balancing: Lists special requirements
and alerts the TAB contractor of the special requirements of the TAB
contractor and TAB system in 01 91 13 and 23 08 00.
25 05 11 – Building Automation System: Lists special requirements and
alerts the controls contractor of the special requirements of the control
contractor and control system in 01 91 13.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
1.5
Section 01 91 13
COMMISSIONING – GENERAL REQUIREMENTS
Page 4 of 11
RESPONSIBILITIES
.1
Overview: The responsibilities of various parties in the commissioning process
are provided in this section.
The contractors shall include the cost of providing their commissioning and
testing services. The owner is not paying extra for contractors commissioning
services.
.2
All Parties
.1
.2
.3
.3
Mechanical Consultants
.1
.4
Follow the Commissioning Plan.
Attend commissioning scoping meeting and additional meetings, as
necessary.
Warranty Period
.1
Coordinate resolution of design non-conformance and design
deficiencies identified during warranty-period commissioning.
Construction and Substantial Phase
.1
Perform normal submittal review, construction observation, asbuilt drawing preparation, etc., as contracted. One site observation
should be completed just prior to system startup.
.2
Provide any design narrative and sequences documentation
requested by the CA. The Consultants shall assist (along with the
contractors) in clarifying the operation and control of
commissioned equipment in areas where the specifications,
control drawings or equipment documentation is not sufficient for
writing detailed testing procedures.
.3
Attend commissioning scoping meetings and other selected
commissioning team meetings.
.4
Participate in the resolution of system deficiencies identified
during commissioning, according to the contract documents
.5
Review and approve the O&M manuals
.6
Provide a design overview presentation if requested at one of the
training sessions for the Owner’s personnel.
.7
Witness testing of selected pieces of equipment and systems.
.8
Participate in the resolution of non-compliance, non-conformance
and design deficiencies identified during commissioning process.
.9
Maintain a master deficiency list.
.10
Oversee and approve the training of the Owner’s operating
personnel.
.11
Preparation of the O&M manuals, review, approval and handover
to Owner
Commissioning Authority (CA)
.1
The CA is not responsible for design concept, design criteria, compliance
with codes, design or general construction scheduling, cost estimating, or
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
.2
Section 01 91 13
COMMISSIONING – GENERAL REQUIREMENTS
Page 5 of 11
construction management. The CA may assist with problem-solving, nonconformance or deficiencies, but ultimately that responsibility resides with
the General Contractor and the A/E. The primary role of the CA is to
develop and coordinate the execution of a testing plan, observe and
document performance—that systems are functioning in accordance with
the documented design intent and in accordance with the Contract
Documents. The Contractors will provide all tools or the use of tools to
start, check-out and functionally test equipment and systems.
Construction and Substantial Phase
.1
Coordinates and directs the commissioning activities in a logical,
sequential and efficient manner using consistent protocols and
forms, centralized documentation, clear and regular
communications and consultations with all necessary parties,
frequently updated timelines and schedules and technical
expertise.
.2
Coordinate the commissioning work with the GC, ensure that
commissioning activities are being scheduled into the master
schedule.
.3
Revise, as necessary, Commissioning Plan.
.4
Plan and conduct a commissioning scoping meeting and other
commissioning meetings.
.5
Request and review additional information required to perform
commissioning tasks, including O&M materials, contractor start-up
and checkout procedures.
.6
Before startup, gather and review the current control sequences
and interlocks and work with contractors and design engineers
until sufficient clarity has been obtained, in writing, to be able to
write detailed testing procedures.
.7
Review and approve normal Contractor submittals applicable to
systems being commissioned for compliance with commissioning
needs, concurrent with the ME reviews.
.8
Update pre-functional tests and checklists.
.9
Develop an enhanced start-up and initial systems checkout plan
with Subs.
.10
Perform site visits, as necessary, to observe component and
system installations. Attends selected planning and job-site
meetings to obtain information on construction progress. Review
construction meeting minutes for revisions/substitutions relating to
the commissioning process. Assist in resolving any
discrepancies.
.11
Approve prefunctional tests and checklist completion by reviewing
prefunctional checklist reports and by selected site observation
and spot checking.
.12
Approve systems startup by reviewing start-up reports and by
selected site observation.
.13
Review TAB execution plan.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
.14
.15
.16
.17
.18
.19
.20
.21
.22
Section 01 91 13
COMMISSIONING – GENERAL REQUIREMENTS
Page 6 of 11
Oversee sufficient functional testing of the control system and
approve it to be used for TAB, before TAB is executed.
Approve air and water systems balancing by spot testing, by
reviewing completed reports and by selected site observation.
With necessary assistance and review from installing contractors,
update the functional performance test procedures for equipment
and systems. This may include energy management control
system trending, stand-alone data logger monitoring or manual
functional testing. Submit to GC for review, and for approval if
required.
Analyze any functional performance trend logs and monitoring
data to verify performance.
Coordinate, witness and approve manual functional performance
tests performed by installing contractors. Coordinate retesting as
necessary until satisfactory performance is achieved.
Maintain a master deficiency and resolution log and a separate
testing record. Provide the GC with written progress reports and
test results with recommended actions.
Review equipment warranties to ensure that the Owner’s
responsibilities are clearly defined.
Compile and maintain a commissioning record and building
systems book(s).
Provide a final commissioning report (as described in this section).
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
.3
.5
.2
Construction and Substantial Phase
.1
Review and approve the final Commissioning Plan—Construction
Phase.
.2
Attend a commissioning scoping meeting and other
commissioning team meetings.
.3
Perform the normal review of Contractor submittals.
.4
When necessary, observe and witness pre-functional checklists,
startup and functional testing of selected equipment.
.5
Assist the GC in coordinating the training of owner personnel.
Warranty Period
.1
Assist the CA as necessary in the seasonal or deferred testing
and deficiency corrections required by the specifications.
Project Manager (PM)
.1
.2
1.6
Warranty Period
.1
Coordinate and supervise required seasonal or deferred testing
and deficiency corrections.
.2
Return to the site at 10 months into the 12 month warranty period
and review with facility staff the current building operation and the
condition of outstanding issues related to the original and
seasonal commissioning. Also interview facility staff and identify
problems or concerns they have operating the building as
originally intended. Make suggestions for improvements and for
recording these changes in the O&M manuals. Identify areas that
may come under warranty or under the original construction
contract. Assist facility staff in developing reports, documents and
requests for services to remedy outstanding problems.
Owner/Owner’s Representative (OW)
.1
.6
Section 01 91 13
COMMISSIONING – GENERAL REQUIREMENTS
Page 7 of 11
Construction and Substantial Phase
.1
Manage the contract of the A/E and of the GC.
.2
Arrange for facility operating and maintenance personnel to attend
various field commissioning activities and field training sessions
according to the Commissioning Plan.
.3
Provide final approval for the completion of the commissioning
work.
Warranty Period
.1
Ensure that any seasonal or deferred testing and any deficiency
issues are addressed.
DEFINITIONS
.1
Substantial Phase - Phase of construction after startup and initial checkout when
functional performance tests, O&M documentation review and training occurs.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
Section 01 91 13
COMMISSIONING – GENERAL REQUIREMENTS
Page 8 of 11
.2
Approval – Acceptance that a piece of equipment or system has been properly
installed and is functioning in the tested modes according to the Contract
Documents.
.3
Mechanical Consultant (ME) - The prime consultant responsible for mechanical
systems design for this project.
.4
Basis of Design - The basis of design is the documentation of the primary
thought processes and assumptions behind design decisions that were made to
meet the design intent. The basis of design describes the systems, components,
conditions and methods chosen to meet the intent. Some reiterating of the design
intent may be included.
.5
Commissioning authority (CA) - An independent agent, not otherwise associated
with the A/E team members or the Contractor. The CA directs and coordinates
the day-to-day commissioning activities. The CA does not take an oversight role
like the GC. The CA is part of the Owner’s team and shall report directly to the
OW/PM.
.6
Commissioning Plan - An overall plan, developed before or after bidding, that
provides the structure, schedule and coordination planning for the commissioning
process.
.7
Contract Documents - The documents binding on parties involved in the
construction of this project (drawings, specifications, change orders,
amendments, contracts, Cx Plan, etc.).
.8
Contractor - The contractor in general or authorized representative.
.9
Control system - The central building energy management control system.
.10
Datalogging - Monitoring flows, currents, status, pressures, etc. of equipment
using stand-alone dataloggers separate from the control system.
.11
Deferred Functional Tests - FTs that are performed later, after substantial
completion, due to partial occupancy, equipment, seasonal requirements, design
or other site conditions that disallow the test from being performed.
.12
Deficiency - A condition in the installation or function of a component, piece of
equipment or system that is not in compliance with the Contract Documents (that
is, does not perform properly or is not complying with the design intent).
.13
Design Intent - A dynamic document that provides the explanation of the ideas,
concepts and criteria that are considered to be very important to the owner. It is
initially the outcome of the programming and conceptual design phases.
.14
Design Narrative or Design Documentation - Sections of either the Design Intent
or Basis of Design.
.15
Factory Testing - Testing of equipment on-site or at the factory by factory
personnel with an Owner’s representative present.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
Section 01 91 13
COMMISSIONING – GENERAL REQUIREMENTS
Page 9 of 11
.16
Functional Performance Test (FT) - Test of the dynamic function and operation of
equipment and systems using manual (direct observation) or monitoring
methods. Functional testing is the dynamic testing of systems (rather than just
components) under full operation. Systems are tested under various modes,
such as during low cooling or heating loads, high loads, component failures,
unoccupied, varying outside air temperatures, fire alarm, power failure, etc. The
systems are run through all the control system’s sequences of operation and
components are verified to be responding as the sequences state. Traditional air
test and balancing (TAB) is not functional testing, in the commissioning sense of
the word. TAB’s primary work is setting up the system flows and pressures as
specified, while functional testing is verifying that which has already been set up.
The commissioning authority develops the functional test procedures in a
sequential written form, coordinates, oversees and documents the actual testing,
which is usually performed by the installing contractor or vendor. FTs are
performed after prefunctional checklists and startup are complete.
.17
Indirect Indicators - Indicators of a response or condition, such as a reading from
a control system screen reporting a damper to be 100% closed.
.18
Manual Test - Using hand-held instruments, immediate control system readouts
or direct observation to verify performance (contrasted to analyzing monitored
data taken over time to make the “observation”).
.19
Monitoring - The recording of parameters (flow, current, status, pressure, etc.) of
equipment operation using dataloggers or the trending capabilities of control
systems.
.20
Non-Compliance - See Deficiency.
.21
Non-Conformance - See Deficiency.
.22
Over-written Value - Writing over a sensor value in the control system to see the
response of a system (e.g., changing the outside air temperature value from 50F
to 75F to verify economizer operation). See also “Simulated Signal.”
.23
Owner-Contracted Tests - Tests paid for by the Owner outside the GC’s contract
and for which the CA does not oversee. These tests will not be repeated during
functional tests if properly documented.
.24
Phased Commissioning - Commissioning that is completed in phases (by floors,
for example) due to the size of the structure or other scheduling issues, in order
minimize the total construction time.
.25
Prefunctional Checklist (PC) - A list of items to inspect and elementary
component tests to conduct to verify proper installation of equipment, provided by
the CA to the Sub. Prefunctional checklists are primarily static inspections and
procedures to prepare the equipment or system for initial operation (e.g., belt
tension, oil levels OK, labels affixed, gages in place, sensors calibrated, etc.).
However, some prefunctional checklist items entail simple testing of the function
of a component, a piece of equipment or system (such as measuring the voltage
imbalance on a three phase pump motor of a chiller system). The word
prefunctional refers to before functional testing. Prefunctional checklists augment
and are combined with the manufacturer’s start-up checklist. Even without a
commissioning process, contractors typically perform some, if not many, of the
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
Section 01 91 13
COMMISSIONING – GENERAL REQUIREMENTS
Page 10 of 11
prefunctional checklist items a commissioning authority will recommend.
However, few contractors document in writing the execution of these checklist
items. Therefore, for most equipment, the contractors execute the checklists on
their own. The commissioning authority only requires that the procedures be
documented in writing, and does not witness much of the prefunctional
checklisting, except for larger or more critical pieces of equipment.
.26
Project Manager (PM) - The contracting and managing authority for the owner
over the design and/or construction of the project.
.27
Sampling. - Functionally testing only a fraction of the total number of identical or
near identical pieces of equipment.
.28
Seasonal Performance Tests - FT that are deferred until the system(s) will
experience conditions closer to their design conditions.
.29
Simulated Condition - Condition that is created for the purpose of testing the
response of a system (e.g., applying a hair blower to a space sensor to see the
response in a VAV box).
.30
Simulated Signal - Disconnecting a sensor and using a signal generator to send
an amperage, resistance or pressure to the transducer and DDC system to
simulate a sensor value.
.31
Specifications - The construction specifications of the Contract Documents.
.32
Startup - The initial starting or activating of dynamic equipment, including
executing prefunctional checklists.
.33
Subs - The subcontractors to the GC who provide and install building
components and systems.
.34
Test Procedures - The step-by-step process which must be executed to fulfill the
test requirements. The test procedures are developed by the CA.
.35
Test Requirements - Requirements specifying what modes and functions, etc.
shall be tested. The test requirements are not the detailed test procedures. The
test requirements are specified in the Contract Documents.
.36
Trending - Monitoring using the building control system.
.37
Vendor - Supplier of equipment.
.38
Warranty Period - Warranty period for entire project, including equipment
components. Warranty begins at Substantial Completion and extends for at least
one year, unless specifically noted otherwise in the Contract Documents and
accepted submittals.
Part 2
Products
2.1
TEST EQUIPMENT
.1
All standard testing equipment required to perform startup and initial checkout
and required functional performance testing shall be provided by the Division
contractor for the equipment being tested. For example, the mechanical
contractor of Division 23 shall ultimately be responsible for all standard testing
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
Section 01 91 13
COMMISSIONING – GENERAL REQUIREMENTS
Page 11 of 11
equipment for the HVAC system and controls systems in this Division, except for
equipment specific to and used by TAB in their commissioning responsibilities.
Two-way radios shall be provided by the control contractor (CC).
.2
Special equipment, tools and instruments (only available from vendor, specific to
a piece of equipment) required for testing equipment, according to these Contract
Documents shall be included in the base bid price to the Contractor and left on
site.
.3
All testing equipment shall be of sufficient quality and accuracy to test and/or
measure system performance with the tolerances specified in the Specifications.
If not otherwise noted, the following minimum requirements apply: Temperature
sensors and digital thermometers shall have a certified calibration within the past
year to an accuracy of 0.5°F and a resolution of + or - 0.1°F. Pressure sensors
shall have an accuracy of + or - 2.0% of the value range being measured (not full
range of meter) and have been calibrated within the last year. All equipment
shall be calibrated according to the manufacturer’s recommended intervals and
when dropped or damaged. Calibration tags shall be affixed or certificates
readily available.
Part 3
Execution
3.1
NOT USED
.1
Not used.
END OF DOCUMENT
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
Part 1
General
1.1
OBJECTIVE OF COMMISSIONING
.1
The following are the objectives of the commissioning process:
.1
.2
.3
.4
.2
.2
.3
The Commissioning Plan is the master planning tool relating to
commissioning, setting out scope, standards, roles and responsibilities,
expectations, deliverables, etc. It provides an overview of commissioning,
a general description of all elements that make up the Commissioning
Plan, and sets out the process and the methodology for successful
commissioning of the above-mentioned project.
The Commissioning Plan functions as a management tool, setting out
the scope standards of commissioning, roles and responsibilities of each
member of the Commissioning Team and deliverables.
The Commissioning Plan also functions as a communications tool,
addressed to all members of the Commissioning Team and informing
each member of the Commissioning Team, in general terms, of their own
roles and responsibilities and those of the other members of the
Commissioning Team.
Production of the Commissioning Plan
.1
.4
To provide fully functional facility whose systems, equipment and
components have been proven to meet all User's functional requirements
before the date of acceptance, and which operate consistently at peak
efficiencies and within specified energy budgets under all normal loads.
To fully train the Owner O&M personnel in all aspects of all installed
systems.
To optimize life cycle costs.
To complete documentation relating to all installed equipment and
systems.
Importance of the Commissioning Plan
.1
.3
Section 01 91 14
COMMISSIONING – PLAN
Page 1 of 22
This Commissioning plan was assembled by the project Commissioning
Authority using input from the Commissioning Team members.
Revisions to the Commissioning Plan
.1
The Commissioning Plan will be reviewed, revised, refined and updated,
if required, during construction. Each time it is revised, the revision
number and date will also be revised.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
1.2
Section 01 91 14
COMMISSIONING – PLAN
Page 2 of 22
ROLES AND RESPONSIBILITIES
.1
Commissioning Team: The members of the commissioning team consist of the
Commissioning Authority (CA), the Project Manager (PM), the designated
representative of the owner’s firm (OW), the Mechanical Engineers (ME), the
Mechanical Contractor (MC), the Electrical Contractor (EC), the TAB Contractor,
the Controls Contractor (CC), any other installing subcontractors (Subs) or
suppliers of equipment. The Owner’s building or plant operator/engineer is also
a member of the commissioning team. The commissioning team for this project
includes the following members:
.1
.2
.3
.4
.5
.6
.7
.8
Owner/Owner’s Representative (OW/PM): CBRE/MHPM
Commissioning Authority (CA): CES Engineering Ltd
Mechanical Consultant (ME): BPA
Mechanical Contractor (MC)
Sheet Metal Contractor
Controls Contractor (CC)
Testing and Balancing Agency (TAB)
Electrical Contractor (EC)
For detail description about roles and responsibilities of the commissioning team
members refer to Section 01 91 13, Paragraph 1.5 – Responsibilities.
1.3
SYSTEMS TO BE COMMISSIONED
.1
Equipment and System
.1
Mechanical Equipment
Packaged Outdoor HVAC Equipment
Specified In:
23 74 00
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
.2
Section 01 91 14
COMMISSIONING – PLAN
Page 3 of 22
Building Automation System
Specified In:
Integrated Automation Instrumentation and
Terminal Devices
1.4
O&M DOCUMENTATION
.1
General Requirements
.1
.2
.3
.2
Operation and maintenance manuals shall be prepared as per the format
outlined in Infrastructure Ontario 2015 Building Systems Commissioning
Guideline, Schedule B: Operating and Maintenance Manuals.
CA Review and Approval. Prior to substantial completion, the CA shall
review the O&M manuals to verify compliance with the Specifications.
The CA will communicate deficiencies in the manuals to the OW, PM or
ME, as requested. Upon a successful review of the corrections, the CA
recommends approval and acceptance of these sections of the O&M
manuals to the OW, PM or ME. The CA also reviews each equipment
warranty and verifies that all requirements to keep the warranty valid are
clearly stated.
This work does not supersede the ME review of the O&M manuals
according to the ME contract.
Commissioning Record in O&M Manuals.
.1
The CA is responsible to compile, organize and index the following
commissioning data by equipment into labeled, indexed and tabbed,
three-ring binders and deliver it to the OW in the format of a System
Manual, to be included with the O&M manuals. The format of the
systems manuals shall be:
Tab I-1 Commissioning Plan
Tab I-2 Final Commissioning Report
Tab 01 System Type 1 (Boilers and hot water heating system, humidification,
rooftop air handling unit, VAV terminal units, and building automation system
etc.)
Sub-Tab A
Design narrative and criteria, sequences, approvals for
Equipment
Sub-Tab B
Startup plan and report, approvals, corrections, blank
prefunctional checklists
Colored Separator Sheets—for each equipment type (fans, pumps,
chiller, etc.)
Sub-Tab C
Functional tests (completed), trending and analysis,
approvals and corrections, training plan, record and approvals, blank
functional test forms and a recommended re-commissioning schedule.
Tab 02 System Type 2 repeat as per System 1
.2
Final Report Details. The final commissioning report shall include an
executive summary, list of participants and roles, brief building
description, overview of commissioning and testing scope and a general
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
Section 01 91 14
COMMISSIONING – PLAN
Page 4 of 22
description of testing and verification methods. For each piece of
commissioned equipment, the report should contain the disposition of the
commissioning authority regarding the adequacy of the equipment,
documentation and training meeting the contract documents in the
following areas: 1) Equipment meeting the equipment specifications, 2)
Equipment installation, 3) Functional performance and efficiency, 4)
Equipment documentation and design intent, and 5) Operator training. All
outstanding non-compliance items shall be specifically listed.
Recommendations for improvement to equipment or operations, future
actions, commissioning process changes, etc. shall also be listed. Each
non-compliance issue shall be referenced to the specific functional test,
inspection, trend log, etc. where the deficiency is documented. The
functional performance and efficiency section for each piece of equipment
shall include a brief description of the verification method used (manual
testing, BAS trend logs, data loggers, etc.) and include observations and
conclusions from the testing.
.3
Warranties
.1
.4
A complete inventory of warranty items will be provided by the Contractor
to the Designer who will review same before submission to the
Commissioning Authority who, in turn, recommends acceptance by the
Project Manager.
"As-built" Drawings and Specifications
.1
These are generally produced by the contractor from the project record
documents maintained on the site and kept up-to-date with all changes as
they occur and marked thereon by the Contractor. Accuracy will be
verified by the Consultant before preparation of the "As-builts" and by the
Commissioning Authority after submission by the Consultant. They shall
be completed in time to be used for owner’s training and demonstration
sessions.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
1.5
Section 01 91 14
COMMISSIONING – PLAN
Page 5 of 22
CMMS INVENTORY PROCESS
.1
General
.1
.2
The Computerized Maintenance Management System is a database
operated by CBRE Ltd Facilities Management that records all life cycle
data logged against an item of equipment or system. This is an important
feature as it permits the Facilities Management to monitor the device
against manufacturers’ service recommendations to determine service
and replacement intervals and carry out cost efficiency analysis. The
CMMS data will also be loaded into OILC’s Asset Management System to
support its asset management responsibilities.
Responsibilities
.1
.2
.3
.4
Owner Representative provides electronic copies of CMMS forms in
editable format.
Contractors will be responsible to complete these forms during testing
procedures. Contractors commissioning coordinator and the
Commissioning Authority shall ensure completion of these documents.
These forms will be collected by the Commissioning Authority and
handover to the OW.
After review and verification by the Commissioning Authority, these forms
will be included in the O&M Manual.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
.3
Sample CMMS Form
Section 01 91 14
COMMISSIONING – PLAN
Page 6 of 22
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
1.6
Section 01 91 14
COMMISSIONING – PLAN
Page 7 of 22
TRAINING AND DEMONSTRATION
.1
General
.1
.2
.3
.4
.2
Training Schedule
.1
.3
The commissioning schedule shall indicate in detail how training will be
implemented, the duration of each training session, the trainers, trainees,
etc.
Duration of Training
.1
.4
Detailed information regarding contents, duration and instructors for any
particular building system is included in Specification Section 01 91 15 –
Commissioning –Training.
The Training Plans are produced conjointly by the Consultant and the
Commissioning Authority to meet project-specific requirements and they
include details provided by the Facility Property Manager relating to
numbers and prerequisite qualifications and skills of trainees, type of
training (i.e. observation, hands-on, classroom), etc.
The CA coordinates and schedules, with the MC, the overall training for
the commissioned systems. The CA develops criteria for determining that
the training was satisfactorily completed, including attending some of the
training, etc. The CA recommends approval of the training to the OW and
PM using a standard form. The MC also signs the approval form.
The Training Plans are included in Specification Section 01 91 15 –
Commissioning –Training.
Duration of training for each system, instruction aids, etc. depends on
systems complexity. The minimum number of hours for training sessions
is identified in the commissioning specifications Section 01 91 15 –
Commissioning Training.
Details of Training
.1
See Section 01 19 15 – Commissioning Training.
Part 2
Commissioning Process Execution
2.1
MEETINGS
.1
Scoping Meeting. Within 90 days of commencement of construction, the CA will
schedule, plan and conduct a commissioning scoping meeting with the entire
commissioning team in attendance. Meeting minutes will be distributed to all
parties by the CA. Information gathered from this meeting will allow the CA to
revise the Draft 2 Commissioning Plan to its “final” version, which will also be
distributed to all parties.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
.2
2.2
Section 01 91 14
COMMISSIONING – PLAN
Page 8 of 22
Miscellaneous Meetings. Other meetings will be planned and conducted by the
CA as construction progresses. These meetings will cover coordination,
deficiency resolution and planning issues with particular Subs. The CA will plan
these meetings and will minimize unnecessary time being spent by Subs. Within
final 3 months of construction these meetings may be held as frequently as one
per week.
REPORTING
.1
The CA will provide regular reports to the MC, PM and OW, with increasing
frequency as construction and commissioning progresses. Standard forms are
provided and referenced in the Commissioning Plan.
.2
The CA will regularly communicate with all members of the commissioning team,
keeping them apprised of commissioning progress and scheduling changes
through memos, progress reports, etc.
.3
Testing or review approvals and non-conformance and deficiency reports are
made regularly with the review and testing as described in later sections.
.4
A final summary report (about four to six pages, not including backup
documentation) by the CA will be provided to the MC and PM, focusing on
evaluating commissioning process issues and identifying areas where the
process could be improved. All acquired documentation, logs, minutes, reports,
deficiency lists, communications, findings, unresolved issues, etc., will be
compiled in appendices and provided with the summary report. Pre-functional
checklists, functional tests and monitoring reports will not be part of the final
report, but will be stored in the Commissioning Record in the O&M manuals.
2.3
SUBMITTALS
.1
The CA will provide appropriate contractors with a specific request for the type of
submittal documentation the CA requires to facilitate the commissioning work.
These requests will be integrated into the normal submittal process and protocol
of the construction team. At minimum, the request will include the manufacturer
and model number, the manufacturer’s printed installation and detailed start-up
procedures, full sequences of operation, O&M data, performance data, any
performance test procedures, control drawings and details of owner contracted
tests. In addition, the installation and checkout materials that are actually shipped
inside the equipment and the actual field checkout sheet forms to be used by the
factory or field technicians shall be submitted to the Commissioning authority. All
documentation requested by the CA will be included by the Subs in their O&M
manual contributions.
.2
The CA will review and approve submittals related to the commissioned
equipment for conformance to the Contract Documents as it relates to the
commissioning process, to the functional performance of the equipment and
adequacy for developing test procedures. This review is intended primarily to aid
in the development of functional testing procedures and only secondarily to verify
compliance with equipment specifications. The Commissioning authority will
notify the MC, PM or ME as requested, of items missing or areas that are not in
conformance with Contract Documents and which requires resubmission.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
Section 01 91 14
COMMISSIONING – PLAN
Page 9 of 22
.3
The CA may request additional design narrative from the ME and Controls
Contractor, depending on the completeness of the design intent documentation
and sequences provided with the Specifications.
.4
These submittals to the CA do not constitute compliance for O&M manual
documentation. The O&M manuals are the responsibility of the Contractor,
though the CA will review and approve them.
2.4
START-UP, PREFUNCTIONAL CHECKLISTS AND INITIAL CHECKOUT
.1
Application: The following procedures apply to all equipment to be
commissioned, according to Paragraph 1.3, Systems to be Commissioned.
Some systems that are not comprised so much of actual dynamic machinery,
e.g., electrical system power quality, may have very simplified PCs and startup.
.2
General: Pre-functional checklists are important to ensure that the equipment
and systems are hooked up and operational. It ensures that functional
performance testing (in-depth system checkout) may proceed without
unnecessary delays. Each piece of equipment receives full pre-functional
checkout. No sampling strategies are used. The pre-functional testing for a
given system must be successfully completed prior to formal functional
performance testing of equipment or subsystems of the given system.
.3
Start-up and Initial Checkout Plan: The CA shall assist the commissioning team
members responsible for startup of any equipment in developing detailed start-up
plans for all equipment. The primary role of the CA in this process is to ensure
that there is written documentation that each of the manufacturer-recommended
procedures have been completed. Parties responsible for pre-functional
checklists and startup are identified in the commissioning scoping meeting and in
the checklist forms. Parties responsible for executing functional performance
tests are identified in the testing requirements in Section 2.6 and 2.9.
.4
The CA updates the manufacturer’s startup and initial checkout procedures from
O&M submittals.
.5
The CA marks the applicable areas in the procedures and makes initial and date
lines at each procedure or section.
.6
The CA transmits these procedures and the original pre-functional checklist
procedures to the Contractor as the startup and initial checkout plan.
2.5
SENSOR AND ACTUATOR CALIBRATION
.1
General: All field-installed temperature, relative humidity, and pressure sensors
and gages, and all actuators (dampers and valves) on all equipment shall be
calibrated using the methods described below. Alternate methods may be used,
if approved by the Owner before-hand. All test instruments shall have had a
certified calibration within the last 12 months. Sensors installed in the unit at the
factory with calibration certification provided need not be field calibrated.
All procedures used shall be fully documented on the prefunctional checklists or
other suitable forms, clearly referencing the procedures followed and written
documentation of initial, intermediate and final results.
.2
Sensor Calibration Methods
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
.1
.2
.3
2.6
Section 01 91 14
COMMISSIONING – PLAN
Page 10 of 22
All Sensors: Verify that all sensor locations are appropriate and away
from causes of erratic operation. Verify that sensors with shielded cable,
are grounded only at one end. For sensor pairs that are used to
determine a temperature or pressure difference, make sure they are
reading within 0.2°F of each other for temperature and within a tolerance
equal to 2% of the reading, of each other, for pressure. Tolerances for
critical applications may be tighter.
Sensors Without Transmitters: Standard Application. Make a reading
with a calibrated test instrument within 6 inches of the site sensor. Verify
that the sensor reading (via the permanent thermostat, gage or building
automation system (BAS)) is within the tolerances in the table below of
the instrument-measured value. If not, calibrate or replace sensor.
Sensors With Transmitters: Standard Application. Calibrate as per
manufacturer’s requirements using 3 calibration points.
EXECUTION OF PREFUNCTIONAL CHECKLISTS AND STARTUP
.1
Four weeks prior to startup, the Subs and vendors schedule startup and
checkout with the MC and CA. The performance of the prefunctional checklists,
startup and checkout are directed and executed by the Sub or vendor. When
checking off pre-functional checklists, signatures may be required of other Subs
for verification of completion of their work.
.2
The CA shall observe, at minimum, the procedures for each piece of primary
equipment, unless there are multiple units, (in which case a sampling strategy
may be used as approved by the MC). In no case will the number of units
witnessed be less than four on any one building, nor less than 20% of the total
number of identical or very similar units.
.3
The Subs and vendors shall execute startup and provide the CA with a signed
and dated copy of the completed start-up and pre-functional tests and checklists.
.4
Only individuals that have direct knowledge and witnessed that a line item task
on the pre-functional checklist was actually performed shall initial or check that
item off. It is not acceptable for witnessing supervisors to fill out these forms.
2.7
DEFICIENCIES, NON-CONFORMANCE AND APPROVAL IN CHECKLISTS
AND STARTUP
.1
The Subs shall clearly list any outstanding items of the initial start-up and
prefunctional procedures that were not completed successfully, at the bottom of
the procedures form or on an attached sheet. The procedures form and any
outstanding deficiencies are provided to the CA within two days of test
completion.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
Section 01 91 14
COMMISSIONING – PLAN
Page 11 of 22
.2
The CA reviews the report and submits either a non-compliance report or an
approval form to the Sub or MC and PM. The CA shall work with the Subs and
vendors to correct and retest deficiencies or uncompleted items. The CA will
involve the MC and others as necessary. The installing Subs or vendors shall
correct all areas that are deficient or incomplete in the checklists and tests in a
timely manner, and shall notify the CA as soon as outstanding items have been
corrected and resubmit an updated start-up report and a Statement of Correction
on the original non-compliance report. When satisfactorily completed, the CA
recommends approval of the execution of the checklists and startup of each
system to the MC and PM using a standard form.
.3
Items left incomplete, which later cause deficiencies or delays during functional
testing may result in back charges to the responsible party. Refer to Part 2.10
herein for details.
.4
When all the above is complete the Functional Performance testing phase can
proceed.
2.8
PHASED COMMISSIONING
.1
2.9
The project may require startup and initial checkout to be executed in phases.
This phasing will be planned and scheduled in a coordination meeting of the CA,
MC, TAB and controls contactors. Results will be added to the master and
commissioning schedule.
FUNCTIONAL PERFORMANCE TESTING
This sub-section applies to all commissioning functional testing for all divisions.
The general list of equipment to be commissioned is found in Paragraph 1.3.
.1
Objectives and Scope. The objective of functional performance testing is to
demonstrate that each system is operating according to the documented design
intent and Contract Documents. Functional testing facilitates bringing the
systems from a state of substantial completion to full dynamic operation.
Additionally, during the testing process, areas of deficient performance are
identified and corrected, improving the operation and functioning of the systems.
In general, each system should be operated through all modes of operation
(seasonal, occupied, unoccupied, warm-up, cool-down, part- and full-load) where
there is a specified system response. Verifying each sequence in the sequences
of operation is required. Proper responses to such modes and conditions as
power failure, freeze condition, low pressure, no flow, equipment failure, etc.
shall also be tested.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
.2
Section 01 91 14
COMMISSIONING – PLAN
Page 12 of 22
Updating Test Procedures. Before test procedures are written, the CA shall
obtain all requested documentation and a current list of change orders affecting
equipment or systems, including an updated points list, program code, control
sequences and parameters. Using the testing parameters, the CA shall update
specific test procedures and forms to verify and document proper operation of
each piece of equipment and system. Each Sub or vendor responsible to
execute a test, shall provide limited assistance to the CA in updating the
procedures review (answering questions about equipment, operation,
sequences, etc.). Prior to execution, the CA shall provide a copy of the test
procedures to the Sub(s) who shall review the tests for feasibility, safety,
equipment and warranty protection. The CA may submit the tests to the ME for
review, if requested.
The CA shall review owner-contracted, factory testing or required owner
acceptance tests which the CA is not responsible to oversee, including
documentation format, and shall determine what further testing or format
changes may be required to comply with the Specifications. Redundancy of
testing shall be minimized.
The purpose of any given specific test is to verify and document compliance with
the stated criteria of acceptance given on the test form.
.3
Test Methods. Functional performance testing and verification may be achieved
by manual testing (persons manipulate the equipment and observe performance)
or by monitoring the performance and analyzing the results using the control
system’s trend log capabilities or by stand-alone data loggers. The CA will
determine which method is most appropriate for tests that do not have a method
specified.
.4
Simulated Conditions. Simulating conditions (not by an overwritten value) shall
be allowed, though timing the testing to experience actual conditions is
encouraged wherever practical.
.5
Overwritten Values. Overwriting sensor values to simulate a condition, such as
overwriting the outside air temperature reading in a control system to be
something other than it really is, shall be allowed, but shall be used with caution
and avoided when possible. Such testing methods often can only test a part of a
system, as the interactions and responses of other systems will be erroneous or
not applicable. Simulating a condition is preferable. e.g., for the above case, by
heating the outside air sensor with a hair blower rather than overwriting the
value, or by altering the appropriate setpoint to see the desired response. Before
simulating conditions or overwriting values, sensors, transducers and devices
shall have been calibrated.
.6
Simulated Signals. Using a signal generator which creates a simulated signal to
test and calibrate transducers and DDC constants is generally recommended
over using the sensor to act as the signal generator via simulated conditions or
overwritten values.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
Section 01 91 14
COMMISSIONING – PLAN
Page 13 of 22
.7
Altering Setpoints. Rather than overwriting sensor values, and when simulating
conditions is difficult, altering setpoints to test a sequence is acceptable. For
example, to see the AC compressor lockout work at an outside air temperature
below 55F, when the outside air temperature is above 55F, temporarily change
the lockout setpoint to be 2F above the current outside air temperature.
.8
Indirect Indicators. Relying on indirect indicators for responses or performance
shall be allowed only after visually and directly verifying and documenting, over
the range of the tested parameters, that the indirect readings through the control
system represent actual conditions and responses. Much of this verification is
completed during prefunctional testing.
.9
Setup. Each function and test shall be performed under conditions that simulate
actual conditions as close as is practically possible. The Sub executing the test
shall provide all necessary materials, system modifications, etc. to produce the
necessary flows, pressures, temperatures, etc. necessary to execute the test
according to the specified conditions. At completion of the test, the Sub shall
return all affected building equipment and systems, due to these temporary
modifications, to their pre-test condition.
.10
Sampling. Multiple identical pieces of non-life-safety or otherwise non-critical
equipment may be functionally tested using a sampling strategy. Significant
application differences and significant sequence of operation differences in
otherwise identical equipment invalidates their common identity. A small size or
capacity difference, alone, does not constitute a difference. It is noted that no
sampling by Subs is allowed in pre=functional checklist execution.
The facility systems and sampling rate of systems to be commissioned are as
follows:
System
Building Automation System
Roof Top Units
.11
Rigor
100%
Coordination and Scheduling
.1
The Subs shall provide 10 business days notice to the CA regarding their
completion schedule for the prefunctional checklists and startup of all
equipment and systems. The CA will schedule functional tests through
the MC and affected Subs. The CA shall direct, witness and document
the functional testing of all equipment and systems. The Subs shall
execute the tests.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
.2
.3
.4
.12
2.10
Section 01 91 14
COMMISSIONING – PLAN
Page 14 of 22
In general, functional testing is conducted after prefunctional testing and
startup has been satisfactorily completed. The control system is
sufficiently tested and approved by the CA before it is used for TAB or to
verify performance of other components or systems. The air balancing
and water balancing is completed and debugged before functional testing
of air-related or water-related equipment or systems. Testing proceeds
from components to subsystems to systems. When the proper
performance of all interacting individual systems has been achieved, the
interface or coordinated responses between systems is checked.
The CA documents the results of the test. Corrections of minor
deficiencies identified are made during the tests at the discretion of the
CA. The CA records the results of the test on the procedure or test form.
Deficiencies or non-conformance issues are noted and reported to the
MC and PM. Subs correct deficiencies and notify the CA. The CA
schedules retesting through the MC and PM. Decisions regarding
deficiencies and corrections are made at as low a level as possible,
preferably between CA or MC and the Sub. For areas in dispute, final
authority, besides the Owner’s, resides with the ME. The CA
recommends acceptance of each test to the MC and PM. The PM gives
final approval on each test.
The Owner’s facilities operating staff are encouraged to attend and
participate in the testing process. The commissioning agent shall ensure
the owner is notified at least 5 business days prior to any testing, so that
owner has a chance to attend startup and functional testing.
Problem Solving. The CA will recommend solutions to problems found, however
the burden of responsibility to solve, correct and retest problems is with the
contractors, Subs and ME.
DOCUMENTATION, NON-CONFORMANCE AND APPROVAL OF TESTS
.1
Documentation: The CA shall witness and document the results of all functional
performance tests using the specific procedural forms developed for that
purpose. Prior to testing, these forms are provided to the PM for review and
approval and to the Subs for review. The CA will include the filled out forms in
the System Manual.
.2
Non-Conformance
.1
.2
The CA will record the results of the functional test on the procedure or
test form. All deficiencies or non-conformance issues shall be noted and
reported to the MC and PM on a standard non-compliance form.
Corrections of minor deficiencies identified may be made during the tests
at the discretion of the CA. In such cases the deficiency and resolution
will be documented on the procedure form.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
.3
.4
.5
.6
.3
Section 01 91 14
COMMISSIONING – PLAN
Page 15 of 22
Every effort will be made to expedite the testing process and minimize
unnecessary delays, while not compromising the integrity of the
procedures. However, the CA will not be pressured into overlooking
deficient work or loosening acceptance criteria to satisfy scheduling or
cost issues, unless there is an overriding reason to do so at the request of
the Owner.
As tests progress and a deficiency is identified, the CA discusses the
issue with the executing contractor.
When there is no dispute on the deficiency and the Sub accepts
responsibility to correct it:
.1
The CA documents the deficiency and the Sub’s response and
intentions and they go on to another test or sequence. After the
day’s work, the CA submits the non-compliance reports to the MC
and PM for signature, if required. A copy is provided to the Sub
and CA. The Sub corrects the deficiency, signs the statement of
correction at the bottom of the non-compliance form certifying that
the equipment is ready to be retested and sends it back to the CA.
.2
The CA reschedules the test and the test is repeated.
If there is a dispute about a deficiency, regarding whether it is a
deficiency or who is responsible:
.1
The deficiency shall be documented on the non-compliance form
with the Sub’s response and a copy given to the MC and to the
Sub representative assumed to be responsible
.2
Resolutions are made at the lowest management level possible.
Other parties are brought into the discussions as needed. Final
interpretive authority is with the ME. Final acceptance authority is
with the Owner.
.3
The CA documents the resolution process.
.4
Once the interpretation and resolution have been decided, the
appropriate party corrects the deficiency, signs the statement of
correction on the non-compliance form and provides it to the CA.
The CA reschedules the test and the test is repeated until
satisfactory performance is achieved
Cost of Retesting
.1
.2
The cost for the Sub to retest a pre-functional or functional test, if they are
responsible for the deficiency, shall be theirs.
For a deficiency identified, not related to any pre-functional checklist or
start-up fault, the following shall apply:
.1
The CA, ME and/or PM will direct the retesting of the equipment
once at no “charge” to the contractors for their time. However, the
CA’s, ME’s and/or PM’s time for a second retest will be charged to
the contractors, who may choose to recover costs from the
responsible Sub.
.2
The time for the CA, ME and/or PM to direct any retesting required
because a specific prefunctional checklist or start-up test item,
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
.3
.4
.5
.4
reported to have been successfully completed, but determined
during functional testing to be faulty, will be backcharged to the
contractor, who may choose to recover costs from the party
responsible for executing the faulty prefunctional test.
.3
Refer to the Sampling Section for requirements for testing and
retesting identical equipment.
The Contractor shall respond in writing to the CA and PM at least as often
as commissioning meetings are being scheduled concerning the status of
each apparent outstanding discrepancy identified during commissioning.
Discussion shall cover explanations of any disagreements and proposals
for their resolution.
The CA retains the original non-conformance forms until the end of the
project.
Any required retesting by any contractor shall not be considered a
justified reason for a claim of delay or for a time extension by the prime
contractor.
Failure Due to Manufacturer Defect: If 10%, or three, whichever is greater, of
identical pieces (size alone does not constitute a difference) of equipment fail to
perform to the Contract Documents (mechanically or substantively) due to
manufacturing defect, not allowing it to meet its submitted performance spec, all
identical units may be considered unacceptable by the PM. In such case, the
Contractor shall provide the Owner with the following:
.1
.2
.3
.4
.5
.5
Section 01 91 14
COMMISSIONING – PLAN
Page 16 of 22
Within one week of notification from the PM, the Contractor or
manufacturer’s representative shall examine all other identical units
making a record of the findings. The findings shall be provided to the PM
within two weeks of the original notice.
Within two weeks of the original notification, the Contractor or
manufacturer shall provide a signed and dated, written explanation of the
problem, cause of failures, etc. and all proposed solutions which shall
include full equipment submittals. The proposed solutions shall not
significantly exceed the specification requirements of the original
installation.
The PM AND THE OWNER will determine whether a replacement of all
identical units or a repair is acceptable.
Two examples of the proposed solution will be installed by the Contractor
will be allowed to test the installations for up to one week, upon which the
PM will decide whether to accept the solution.
Upon acceptance, the Contractor and/or manufacturer shall replace or
repair all identical items, at their expense and extend the warranty
accordingly, if the original equipment warranty had begun. The
replacement/repair work shall proceed with reasonable speed beginning
within one week from when parts can be obtained.
Approval: The CA notes each satisfactorily demonstrated function on the test
form. Formal approval of the functional test is made later after review by the CA
and by the ME, if necessary. The CA recommends acceptance of each test to
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
Section 01 91 14
COMMISSIONING – PLAN
Page 17 of 22
the PM using a standard form. The PM gives final approval on each test using
the same form, providing a signed copy to the CA and the Contractor.
2.11
POST OCCUPANCY COMMISSIONING
.1
Post Occupancy Commissioning during the close out phase of the project begins
at substantial performance and may continue through to the end of the
contractual warranty/correction period. It is required where additional
performance testing is needed because of seasonal changes, or varying building
occupancy loads, or occasionally where all parties have agreed that substantial
performance can occur before all systems have been constructed.
.2
The activities of all participants in the commissioning process throughout the
execution phase will generally follow the principles set out in ASHRAE
Commissioning Guideline O, other than situation-specific differences for IO
projects noted herein.
.3
The key steps to achieve this with the participation of a commissioning authority
are:
.1
.2
.3
.4
.5
.6
.7
.8
.4
Oversight of the commissioning activities by the commissioning authority
Witness orderly startup, verification and testing of designated systems for
equipment installed during the Post Occupancy Commissioning.
Correction of remaining deficiencies, including those identified during
commissioning.
Coordination and compilation of the commissioning documentation during
the fine tuning and performance testing stages, and completion of any
outstanding CMMS verification forms. (Schedule D)
Completion of any remaining stakeholder training (Schedule G)
Submittal of remaining items for the O&M manuals (Schedule B)
Completion of instrument 4.1.3 T1 – Post Occupancy Commissioning
Verification Form (Schedule F)
Update of instrument 3.1.4 T2 – Project Handover Checklist (Schedule H)
– Completed earlier in Execution phase
Unforeseen Deferred Tests. If any check or test cannot be completed due to the
building structure, required occupancy condition or other deficiency, execution of
checklists and functional testing may be delayed upon approval of the PM.
These tests will be conducted in the same manner as the seasonal tests as soon
as possible. Services of necessary parties will be negotiated.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
.5
Section 01 91 14
COMMISSIONING – PLAN
Page 18 of 22
Seasonal Testing. During the warranty period, seasonal testing (tests delayed
until weather conditions are closer to the system’s design) shall be completed as
part of this contract. The CA shall coordinate this activity. Tests will be executed,
documented and deficiencies corrected by the appropriate Subs, with facilities
staff and the CA witnessing. Any final adjustments to the O&M manuals and asbuilds due to the testing will be made.
Part 3
Commissioning Documentation
3.1
COMMISSIONING ACTIVITIES AND RELATED DOCUMENTATION
.1
Commissioning will be performed by the specified Commissioning Agencies
using procedures identified in the specification documents.
.2
Commissioning activities will be witnessed by, and results certified by, the
Commissioning Authority and/or Designer.
.3
Reported results will be witnessed and certified using approved testing forms.
.4
Upon satisfactory completion, the Commissioning Agency performing the tests
will prepare the required Commissioning Report, which will be certified by the
Commissioning Authority and/or Designer
3.2
COMMISSIONING OF INTEGRATED SYSTEMS AND RELATED
DOCUMENTATION
.1
Commissioning will be performed by the specified Commissioning Agencies,
using procedures developed by the Commissioning Authority. Procedures will be
witnessed by Commissioning Authority and documented on approved Report
Forms. Upon satisfactory completion, the Commissioning Authority will prepare a
Commissioning Report, which will be certified by the Designer.
.2
The schedule of integrated systems will be prepared the Commissioning
Authority and will identify integrated systems to be commissioned over and
above those listed herein:
.1
.2
3.3
HVAC and associated systems forming part of integrated HVAC systems
DDC Systems
COMMISSIONING SPECIFICATIONS
.1
Commissioning specifications are included in Section 01 91 13, 01 91 14 and 01
91 15. All commissioning sections under this division refer to the general
commissioning practices in an integrated approach for all building systems.
.2
All building trades contractors shall refer to these sections for understanding
about standards, level of inspections and scope of work with respect to
commissioning activities for this project.
3.4
PRE-FUNCTIONAL AND START UP INSTALLATION CHECKLISTS (PFC)
.1
Installation checklists shall be used to validate per-start-up and start-up
inspection of the building systems.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
Section 01 91 14
COMMISSIONING – PLAN
Page 19 of 22
.2
Contractors will be responsible to complete these sheets during testing
procedures. These sheets will be used by the Design team and the
Commissioning Authority to follow up progress of equipment start up process and
to authorize next phase of systems inspection (performance verification).
.3
After review and verification by the Commissioning Authority, these report forms
will be included in the relevant Commissioning Reports.
.4
The sample of Pre Functional and Start up Installation Checklist are included as
Appendix to the Commissioning Plan.
3.5
PERFORMANCE VERIFICATION (PV) REPORT FORMS –
.1
Performance verification shall be used to validate equipment and systems
functionality in line with the design intent.
.2
Contractors may use these sheets as an indication about extend of the system
inspection with regard to the functional performance and to allow sufficient labor
hours for full participation in these testing, The inspection and testing are
performed at the system level (Hot water boilers and associated pump systems)
rather than the individual equipment.
.3
The consultants and/or Commissioning Authority will witness and verify all
sequences identified in these check sheets. Contractors will be responsible for
presentation of specified systems operation to Consultants and/or
Commissioning Authority.
.4
After review and verification by the Commissioning Authority, these report forms
will be included in the relevant Commissioning Reports.
.5
The sample of Performance Verification Checklist are included as Appendix to
the Commissioning Plan.
3.6
COMMISSIONING REPORTS
.1
The commissioning process generates a number of written work products
described in various parts of the Specifications. The following lists all the formal
written work products and describes who is responsible to create them. In
summary, the written products are:
Product
Developed By
.1
.2
.3
.4
.5
Final commissioning plan
Meeting minutes
Commissioning schedules
Equipment documentation submittals
Sequence clarifications
.6
.7
.8
.9
.10
Prefunctional checklists
Startup and initial checkout plan
Startup and initial checkout forms filled out
Final TAB report
Issues log (deficiencies)
CA
CA
CA with OW
Subs
Subs and ME as
needed
CA
Subs and CA
Subs
TAB
CA
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
.2
3.7
.11
.12
Commissioning Progress Record
Deficiency reports
.13
.14
.15
.16
.17
.18
Functional test forms
Filled out functional tests
O&M manuals
Commissioning record book
Overall training plan
Final commissioning report
Section 01 91 14
COMMISSIONING – PLAN
Page 20 of 22
CA
ME and verified by
CA
CA
CA
Subs
CA
CA and OW
CA
Certification for payment shall not exceed 90% (NINETY PERCENT) of the value
of the total construction cost until commissioning has been satisfactory
completed and the preliminary commissioning report, project record drawings
and preliminary Maintenance Manuals have been submitted and FULLY
ACCEPTED in writing by CA and responsible consultants.
IO COMMISSIONING VERIFICATION FORMS
.1
The following forms shall be completed throughout commissioning process to
confirm compliance to the IO commissioning guideline and to achieve Substantial
Performance and later on the final project close out:
.1
.2
.3
3.8
Commissioning Verification Form – IO Commissioning Guideline –
Schedule E (Completed by Commissioning Authority)
Post Occupancy Commissioning Verification Form – IO Commissioning
Guideline – Schedule F (Completed by Commissioning Authority)
Final Project Handover Checklist - IO Commissioning Guideline –
Schedule H (Completed by PM and FM)
COMMISSIONING SCHEDULE
.1
General
.1
The CA will work with the MC and subcontractors to incorporate all
commissioning activities into the master construction schedule. All
parties will address scheduling problems and make necessary
notifications in a timely manner in order to expedite commissioning
process. The schedule shall include all necessary time-points and
milestones, testing, documentation, training and commissioning activities.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
.2
.3
.2
Section 01 91 14
COMMISSIONING – PLAN
Page 21 of 22
The CA will monitor progress of commissioning against this schedule. A
separate detailed schedule in day-by-day format will be provided by the
Contractor for commissioning of all components, equipment, subsystems,
systems and integrated systems. This schedule shall include a detailed
training schedule so as to demonstrate that there will be no conflicts with
testing. The schedule of commissioning activities will be produced in a
bar chart format to a scale that will ensure legibility. This bar chart will
show sequences of testing equipment and systems, interrelationship
between tests, duration of tests and training periods.
The commissioning schedule will include the following milestones (as
appropriate):
.1
Introductory commissioning meeting chaired by the
Commissioning Authority and the Consultants group: 45 days after
general contractor award of contract.
.2
Commissioning procedures review: contractors’ comments if
different from specs documents. - 120 days after general
contractor award of contract
.3
Commissioning report format: 3 months before start-up of
inspection and testing
Commissioning Schedule for Mechanical Systems (General Outline)
.1
Pre-Functional and Start-up Inspection:
.1
Mechanical Pre-functional Inspection
.1
Physical installation complete
.2
Mountings checks
.3
Vibration isolator & seismic restraint installed
.4
Piping completed
.5
Electrical connection completed
.6
Local disconnect switches installed
.7
Overload heaters in place and sized correctly
.8
Safety controls operational
.9
Control system completed (end to end check)
.10
Operation verified
.2
Electrical Pre-functional Inspection
.1
Devices installed per manufacturer’s instructions and
specifications
.2
Devices installed agree with shop drawings and
specifications
.3
Verify mounting, location and clearances are per plans and
specifications
.4
All zone circuits and inputs are correctly wired, circuits
labeled
.5
Communications interconnection / interface is connected
.6
Deficiencies as per attached list
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
Section 01 91 14
COMMISSIONING – PLAN
Page 22 of 22
.3
.2
.3
Commissioning Schedule for Integrated Systems (General Outline)
.1
.4
Upon completion of individual system tests, tests of the integrated
systems shall be performed to verify that all components work together.
Commissioning Reports
.1
.5
EMCS System
.1
Control software installed and commissioned
.2
Control graphics installed and commissioned
Functional Performance Verification
.1
HVAC Systems Performance Verification
.1
Demonstration of operation of all systems under all
operating conditions and over the full operating range will
take place during functional inspection period and will be
witnessed by the Owner, Designer and/or Commissioning
Authority. This will include simulated opposite-season
tests.
.2
BAS System Demonstration to Commissioning Agent
.3
BAS Systems Acceptance Testing
The Commissioning Authority shall indicate submission dates of
commissioning reports as milestone dates as part of the commissioning
schedule.
Training and Demonstration
.1
A dedicated time frame shall be allowed for training and demonstration of
building systems operation and maintenance to the building operation and
maintenance personnel. The commissioning schedule and time frame
allowed shall reflect instructions and training tables indicated in Section
01 91 15 Commissioning Training.
END OF DOCUMENT
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
Part 1
GENERAL
1.1
DESCRIPTION
Section 01 91 15
COMMISSIONING – TRAINING
Page 1 of 8
The building systems training for Owners Operating Personnel shall be
coordinated by the Commissioning Authority. The training shall include all
components as identified in tables below.
.1
Training Objectives: Training shall be in sufficient detail and of sufficient duration
to meet the following objectives:
.1
.2
.3
.4
.5
.6
Safe, reliable and energy-efficient operation of all systems in all normal and
all emergency modes and under all conditions.
Effective ongoing inspection and measurement of system performance.
Proper preventive maintenance, diagnosis and troubleshooting.
Service and repair of all systems, equipment and components.
Ability to update documentation and input on future building modifications.
Ability to operate equipment and systems under emergency conditions
without assistance or until appropriate qualified assistance arrives.
For training of O & M personnel to be effective, it is to be implemented during the
later stages of construction, to allow for familiarization with the facility and the
installed systems.
.2
Long Term Ongoing Training: “Long-term” ongoing training is not included in
commissioning activities. However, training courses and training materials must
be designed to permit long term ongoing training well into the future.
.3
Co-ordination and Monitoring: The Commissioning Authority shall co-ordinate all
participants for training and shall monitor all training. Contractors shall co-ordinate
and implement all training.
.4
Responsibilities
.1
.2
The Commissioning Authority shall:
.1
In conjunction with the Owner ensure all designated O & M
personnel will be available for training during later stages of
construction for purposes of familiarization with the facility and all
installed systems,
.2
Review the quality of the Contractor’s training and training materials
meets all requirements of the project.
The Contractor shall have overall responsibility to provide, coordinate,
document, record all training including videotaping and shall provide all
training materials, training and classroom times.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
.3
.4
.5
Contractor’s personnel, professional trainers, manufacturer’s resources for
training purposes and be responsible for:
.1
Direct all training
.2
Implementation of all training activities
.3
Coordination among instructors
.4
Quality of training and training materials.
Trainees shall include O & M personnel selected for operating and
maintaining the project, the Facility Manager, building operators,
maintenance staff, security staff, technical specialists (as applicable).
Instructors: Instructors shall include the following:
.1
.2
.3
.4
.6
Section 01 91 15
COMMISSIONING – TRAINING
Page 2 of 8
Consultant and/or Commissioning Authority: To provide instruction on the
Design Philosophy, Design Criteria, Design Intent, and description of all
systems.
Contractor: To provide instruction on the operation of specific systems,
equipment or components, including start up, operation, shut down,
features of controls, such as reasons for, results of, implications on
associated systems of, adjustment of set points of control and limit safety
devices.
Factory trained and certified manufacturer’s maintenance specialist
personnel: to provide instruction on start up, operation, care, maintenance,
shut down of equipment for which they have certified installation, started up
and carried out PV tests.
Professional trainers: Where the Contractor is not deemed to be able to
deliver the quality or level or training required.
Training Requirements:
.1
.2
Organization: Training of O & M personnel shall consist of three main parts:
.1
Familiarization sessions organized for all systems during
construction and installation stage and equipment commissioning.
.2
Hands on training: shall be provided on all systems, components
and equipment and explanations of all commissioning procedures
shall be given during the commissioning phase.
.3
Classroom sessions or onsite training: shall be provided as
necessary, with instruction regarding functional requirements,
system philosophy, system operation and use of the Building
Management Manual and all other commissioning documentation.
Content:
.1
Training requirements for building systems are included in table
format in this appendix and in the relevant commissioning
specifications of various divisions.
.2
Training shall include:
.1
Review of the facility
.2
Functional requirements
.3
System philosophy – Design Criteria, design Intents, why
the system was designed in this way, why certain settings
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
.3
.4
.5
.6
.7
Section 01 91 15
COMMISSIONING – TRAINING
Page 3 of 8
are important and should not be changed without proper
authority, limitations of each system, including emergency
procedures
.4
Review of system layout and equipment, components and
controls
.5
Use the printed installation, operation and maintenance
instruction material included in the O&M manuals.
.6
Discussion of warranties and guarantees.
.7
System operating sequences, including interaction between
systems forming part of integrated systems, step by step
directions for starting up and shutting down all systems,
closing and opening valves, dampers and switches,
adjusting control settings, turning motors on and off,
emergency procedures
.8
Maintenance and servicing of systems, equipment and
components
.9
Troubleshooting diagnosis – symptoms, signs, causes and
corrective measures. For some equipment, this need only
be a general knowledge, but should be enough to allow the
operator to describe the problem adequately and to take
emergency measures until qualified help arrives.
.10
Review of O & M documentation
Instructional Materials: All instructional material shall be produced in a
digital electronic form that will permit future training for replacement O & M
personnel to the same degree of detail and depth as supplied by initial
training.
Training materials shall include at least the following:
.1
“As Built” Contract Documents
.2
Building Management Manual – containing the Operating Manual
and Maintenance Manual. Copies of the Building Management
Manual shall be made available to O & M personnel prior to the
familiarization sessions for retention throughout the training period
for purposes of self study.
.3
PV Reports
Instructional material shall be supplemented as necessary by:
.1
Transparencies for overhead projectors
.2
35 mm slide presentations
.3
Manufacturers training videos. These should be screened by the
Commissioning Authority and reviewed by the Consultant at least
six months prior to pre start up inspections before being included as
part of the training material.
.4
Equipment models
Instructors shall be responsible for the content and quality of training
materials for all training sessions under their jurisdiction.
Training Plan
23 Beechgrove Lane
Section 01 91 15
Heating-Cooling RTU Renewal
COMMISSIONING – TRAINING
Project No. 1039236-270802
Page 4 of 8
.1
A training Plan developed by the Contractor for each discipline
based upon project requirements shall be provided within 12 weeks
of award of General Contract.
.2
Submit the training Plan to the Commissioning Authority for review
and comment at least 12 weeks prior to the proposed training
dates. Update and resubmit as required.
.3
Include an agenda and a course outline summarizing the content
and duration of training.
.4
Co-ordinate the date(s) of the training session (s) with the
Commissioning Authority. Commissioning Authority to organize the
location and provide the lists of participants.
.5
Prepare a summary of the training sessions. Indicate dates, subject
matter, and all personnel present for training. After training, submit
the training summary to the Commissioning Authority.
.6
Provide one copy of training material per student.
.7
Record the time, date and subject matter of training sessions as
they occur. Indicate all those who are present at each training
session.
.8
Delivery of Training
.1
Training shall normally be provided during regular working hours
prior to take over of the project.
.2
Adequate time for training is to be included in Construction and
Completion Schedule.
.3
Provide four (4) on-site training sessions including classroom and
terminal hands on, for personnel designated by the owner/owners
service provider prior to and at substantial completion or when
system starts affecting conditions in tenant spaces that
owner/owners service provider must respond to.
.4
Each training session should not be longer than three hours and
provided between the hours of 08:30 – 11:30 and 13:00 – 16:00.
.5
Training is to be hands on, classroom, oral, written and
audio/visual.
.6
Train the designated staff of IO and its representative to enable
them to do following:
.1
Day-to-day Operators: range of 4 to 8 person (2 sessions)
.1
Proficiently operate the system
.2
Understand control system architecture and
configuration
.3
Understand DDC system components
.4
Understand system operation, including DDC
system control and optimizing routines (algorithms)
.5
Operate the workstation and peripherals
.6
Log on and off the system
.7
Access graphics, point reports, and logs
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
.2
.3
Section 01 91 15
COMMISSIONING – TRAINING
Page 5 of 8
.8
Adjust and change system set points, time
schedules, and holiday schedules
.9
Recognize malfunctions of the system by
observation of the printed copy and graphical visual
signals
.10
Understand system drawings and Operation and
Maintenance manual
.11
Understand the job layout and location of control
components
.12
Access data from DDC controllers and ASCs
.13
Operate portable operator’s terminals
Advanced Operator (in addition to above): 2-4 persons (1
session)
.1
Make and change graphics on the workstation
.2
Create, delete, and modify alarms, including
annunciation and routing of these
.3
Create, delete, and modify point trend logs and
graph or print these both on an ad-hoc basis and at
user.4
definable time intervals
.5
Create, delete, and modify reports
.6
Add, remove, and modify system’s physical points
.7
Create, modify, and delete programming
.8
Add panels when required
.9
Add operator interface stations
.10
Create, delete, and modify system displays, both
graphical and others
.11
Perform DDC system field checkout procedures
.12
Perform DDC controller unit operation and
maintenance procedures
.13
Perform workstation and peripheral operation and
maintenance procedures
.14
Perform DDC system diagnostic procedures
.15
Configure hardware including PC boards, switches,
communication, and I/O points
.16
Maintain, calibrate, troubleshoot, diagnose, and
repair hardware
.17
Adjust, calibrate, and replace system components
System Managers/Administrator (in addition to above): 2-4
persons (1 session)
.1
Maintain software and prepare backups
.2
Interface with job-specific, third-party operator
software
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
.9
.10
.11
.12
Section 01 91 15
COMMISSIONING – TRAINING
Page 6 of 8
.3
Add new users and understand password security
procedures
Training is to be completed prior to acceptance of facility.
Training should include demonstrations by the trained O & M personnel so
as to show confidence in, and depth of understanding of, all systems and
equipment, and to demonstrate completeness of training.
Upon completion of these demonstrations, the contractors responsible for
all training shall provide a written report signed by Instructors and
witnessed by Consultant and/or Commissioning Authority. This report shall
be deposited with the Commissioning Authority.
Training Activities:
.1
See the following attached building systems activities Training
Plan. This is a broad scope outline summary for the Contractors
and Commissioning Coordinator information and incorporation into
the project training plan.
Perth Courthouse
Boiler Renewal
Project No. 1040809-270728
1.2
Section 01 91 15
COMMISSIONING – TRAINING
Page 7 of 8
TRAINING ACTIVITIES - MECHANICAL
MECHANICAL (THIS IS BROAD OUTLINE ONLY)
This Training Plan forms Part of Section 01 91 15
Systems and Goals
Instructor
Design Philosophy
1. General overview of design concepts
2. Awareness of interaction of
mechanical systems
Commissioning
Authority (CA)
Ventilation System
1. To learn details of all systems installed
2. To develop in depth knowledge of the
operation of each system
Installing
Contractor,
Equipment
Manufacturer,
CA
Content (approximately 30% Theory,
70% practical)
1. Explanation of mechanical and related
electrical systems, their interaction
2. Site visit in early stages of project
3. Classroom sessions during
commissioning stage
1. Explanation of operational concepts of
systems and components including
VAV boxes and room thermostats.
2. Equipment operation and adjustment
3. Review of O & M Manuals
4. Equipment troubleshooting
5. Observation during construction
6. Site visits, classroom sessions
Duration
1 hours
2 hours
Instruction Materials
and Tools
1. Schematic of
layouts & controls
2. Installed system,
equipment
3. Design Criteria,
Design Intents
1. “ As built” HVAC
drawings
2. Systems
Operations Manual
3. Maintenance
Manual
4. Installed systems,
equipment
5. Controls
Schematics and
Reports
6. Demonstrations
Perth Courthouse
Boiler Renewal
Project No. 1040809-270728
Section 01 91 15
COMMISSIONING – TRAINING
Page 8 of 8
MECHANICAL (THIS IS BROAD OUTLINE ONLY)
This Training Plan forms Part of Section 01 91 15
Systems and Goals
Instructor
Rooftop UNits
1. To develop in depth knowledge of the
operation of each system
Installing
Contractor,
Equipment
Manufacturer,
CA
BAS, EMCS
Control systems for mechanical systems.
Building control components.
System
Installing
Contractor,
EMCS Trade,
CA
Content (approximately 30% Theory,
70% practical)
1. Explanation of operational concepts of
systems and components
2. Equipment operation and adjustment
3. Review of O & M Manuals
4. Equipment troubleshooting
5. Observation during construction
Site visits, classroom sessions
1. Explanation of operational concepts of
the building systems and components
2. Use of various cycles and controls
3. Equipment and operation and
adjustment
4. Review of O & M Manuals
5. Equipment and system troubleshooting
6. Observation during construction
7. Site visits, classroom sessions
END OF DOCUMENT
Duration
2 hours
Four
Sessions
of 3 Hours
as per
Item
1.1.6.
Delivery
of training
Instruction Materials
and Tools
1. “ As built” HVAC
drawings
2. Systems
Operations Manual
3. Maintenance
Manual
4. Installed systems,
equipment
5. Controls
Schematics and
Reports
6. Demonstrations
1. “As built” HVAC and
control drawings
2. Systems Operations
Manual
3. Maintenance
Manual
4. Installed systems,
equipment
5. Controls
Schematics and
Reports
6. Demonstrations
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
Section 23 05 00
COMMON WORK RESULTS FOR HVAC
Page 1 of 4
Part 1
General
1.1
ACTION AND INFORMATIONAL SUBMITTALS
.1
Submit in accordance with Section 01 00 10 – General Procedures.
.2
Product Data:
.1
.3
Shop Drawings:
.1
.2
.3
1.2
Submit manufacturer's instructions, printed product literature and data
sheets and include product characteristics, performance criteria, physical
size, finish and limitations.
Submit drawings stamped and signed by professional engineer registered
or licensed in Province of Ontario, Canada.
Indicate on drawings:
.1
Mounting arrangements.
.2
Operating and maintenance clearances.
Shop drawings and product data accompanied by:
.1
Detailed drawings of bases, supports, and anchor bolts.
.2
Acoustical sound power data, where applicable.
.3
Points of operation on performance curves.
.4
Manufacturer to certify current model production.
.5
Certification of compliance to applicable codes.
CLOSEOUT SUBMITTALS
.1
Submit in accordance with Section 01 00 10 – General Procedures.
.2
Operation and Maintenance Data:
.1
.2
.3
Operation and maintenance manual approved by, and final copies
deposited with, Departmental Representative before final inspection.
Operation data to include:
.1
Control schematics for systems including environmental controls.
.2
Description of systems and their controls.
.3
Description of operation of systems at various loads together with
reset schedules and seasonal variances.
.4
Operation instruction for systems and component.
.5
Description of actions to be taken in event of equipment failure.
.6
Colour coding chart.
Maintenance data to include:
.1
Servicing, maintenance, operation and trouble-shooting
instructions for each item of equipment.
.2
Data to include schedules of tasks, frequency, tools required and
task time.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
.4
.5
.6
.7
.8
.9
1.3
Section 23 05 00
COMMON WORK RESULTS FOR HVAC
Page 2 of 4
Performance data to include:
.1
Equipment manufacturer's performance datasheets with point of
operation as left after commissioning is complete.
.2
Equipment performance verification test results.
.3
Special performance data as specified.
.4
Testing, adjusting and balancing reports as specified in Section
23 05 93 - Testing, Adjusting and Balancing for HVAC.
Approvals:
.1
Submit 2 copies of draft Operation and Maintenance Manual to
Departmental Representative for approval. Submission of
individual data will not be accepted unless directed by
Departmental Representative.
.2
Make changes as required and re-submit as directed by
Departmental Representative.
Additional data:
.1
Prepare and insert into operation and maintenance manual
additional data when need for it becomes apparent during
specified demonstrations and instructions.
Site records:
.1
Departmental Representative will provide 1 set of reproducible
mechanical drawings. Provide sets of white prints as required for
each phase of work. Mark changes as work progresses and as
changes occur. Include changes to existing mechanical systems,
control systems and low voltage control wiring.
.2
Transfer information weekly to reproducibles.
.3
Use different colour waterproof ink for each service.
.4
Make available for reference purposes and inspection.
As-built drawings:
.1
Prior to start of Testing, Adjusting and Balancing for HVAC,
finalize production of as-built drawings.
.2
Identify each drawing in lower right hand corner in letters at least
12 mm high as follows: - "AS BUILT DRAWINGS: THIS
DRAWING HAS BEEN REVISED TO SHOW MECHANICAL
SYSTEMS AS INSTALLED" (Signature of Contractor) (Date).
.3
Submit to Departmental Representative for approval and make
corrections as directed.
.4
Perform testing, adjusting and balancing for HVAC using as-built
drawings.
.5
Submit completed reproducible as-built drawings with Operating
and Maintenance Manuals.
Submit copies of as-built drawings for inclusion in final TAB report.
MAINTENANCE MATERIAL SUBMITTALS
.1
Submit in accordance with Section 01 00 10 – General Instructions.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
.2
Section 23 05 00
COMMON WORK RESULTS FOR HVAC
Page 3 of 4
Furnish spare parts as follows:
.1
One filter cartridge or set of filter media for each filter or filter bank in
addition to final operating set.
.3
Provide one set of special tools required to service equipment as recommended
by manufacturers.
.4
Furnish one commercial quality grease gun, grease and adapters to suit different
types of grease and grease fittings.
1.4
DELIVERY, STORAGE AND HANDLING
.1
Deliver, store and handle materials in accordance with Section 01 00 10 –
General Instructions and with manufacturer's written instructions.
.2
Delivery and Acceptance Requirements: deliver materials to site in original
factory packaging, labelled with manufacturer's name and address.
.3
Storage and Handling Requirements:
.1
.2
.3
.4
Store materials in dry location and in accordance with manufacturer's
recommendations in clean, dry, well-ventilated area.
Store and protect from nicks, scratches, and blemishes.
Replace defective or damaged materials with new.
Packaging Waste Management: in accordance with Section 01 00 10 – General
Instructions.
Part 2
Products
2.1
MATERIALS
.1
HVAC and R Equipment:
.1
Refrigerant:
.1
HFC based refrigerant.
Part 3
Execution
3.1
PAINTING REPAIRS AND RESTORATION
.1
Do painting in accordance with Section 01 00 10 – General Instructions.
.2
Prime and touch up marred finished paintwork to match original.
.3
Restore to new condition, finishes which have been damaged.
3.2
SYSTEM CLEANING
.1
Clean interior and exterior of all systems. Vacuum interior of ductwork and air
handling units.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
3.3
Section 23 05 00
COMMON WORK RESULTS FOR HVAC
Page 4 of 4
FIELD QUALITY CONTROL
.1
Manufacturer's Field Services:
.1
.2
3.4
Obtain written report from manufacturer verifying compliance of Work, in
handling, installing, applying, protecting and cleaning of product and
submit Manufacturer's Field Reports as described in PART 1 - ACTION
AND INFORMATIONAL SUBMITTALS.
Provide manufacturer's field services consisting of product use
recommendations and periodic site visits for inspection of product
installation in accordance with manufacturer's instructions.
DEMONSTRATION
.1
Departmental Representative will use equipment and systems for test purposes
prior to acceptance. Supply labour, material, and instruments required for testing.
.2
Supply tools, equipment and personnel to demonstrate and instruct operating
and maintenance personnel in operating, controlling, adjusting, trouble-shooting
and servicing of all systems and equipment during regular work hours, prior to
acceptance.
.3
Use operation and maintenance manual, as-built drawings, and audio visual aids
as part of instruction materials.
.4
Instruction duration time requirements as specified in appropriate sections.
.5
Departmental Representative will record these demonstrations on video tape for
future reference.
3.5
CLEANING
.1
Progress Cleaning: clean in accordance with Section 01 00 10 – General
Instructions.
.1
Leave Work area clean at end of each day.
.2
Final Cleaning: upon completion remove surplus materials, rubbish, tools and
equipment in accordance with Section 01 00 10 – General Instructions.
.3
Waste Management: separate waste materials for recycling in accordance with
Section 01 00 10 – General Instructions.
.1
3.6
Remove recycling containers and bins from site and dispose of materials
at appropriate facility.
PROTECTION
.1
Protect equipment and systems openings from dirt, dust, and other foreign
materials with materials appropriate to system.
END OF SECTION
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
Part 1
General
1.1
SUMMARY
Section 23 05 93
TESTING, ADJUSTING AND BALANCING FOR HVAC
Page 1 of 5
.1
TAB is used throughout this Section to describe the process, methods and
requirements of testing, adjusting and balancing for HVAC.
.2
TAB means to test, adjust and balance to perform in accordance with
requirements of Contract Documents and to do other work as specified in this
section.
1.2
QUALIFICATIONS OF TAB PERSONNEL
.1
Submit names of personnel to perform TAB to Departmental Representative
within 30 days of award of contract.
.2
Provide documentation confirming qualifications, successful experience.
.3
TAB: performed in accordance with the requirements of standard under which
TAB Firm's qualifications are approved:
.1
.2
.3
Associated Air Balance Council, (AABC) National Standards for Total
System Balance.
National Environmental Balancing Bureau (NEBB) TABES, Procedural
Standards for Testing, Adjusting, Balancing of Environmental Systems.
Sheet Metal and Air Conditioning Contractors' National Association
(SMACNA), HVAC TAB HVAC Systems - Testing, Adjusting and
Balancing.
.4
Recommendations and suggested practices contained in the TAB Standard:
mandatory.
.5
Use TAB Standard provisions, including checklists, and report forms to satisfy
Contract requirements.
.6
Use TAB Standard for TAB, including qualifications for TAB Firm and Specialist
and calibration of TAB instruments.
.7
Where instrument manufacturer calibration recommendations are more stringent
than those listed in TAB Standard, use manufacturer's recommendations.
.8
TAB Standard quality assurance provisions such as performance guarantees
form part of this contract.
.1
.2
1.3
For systems or system components not covered in TAB Standard, use
TAB procedures developed by TAB Specialist.
Where new procedures, and requirements, are applicable to Contract
requirements have been published or adopted by body responsible for
TAB Standard used (AABC, NEBB, or TABB), requirements and
recommendations contained in these procedures and requirements are
mandatory.
PURPOSE OF TAB
.1
Test to verify proper and safe operation, determine actual point of performance,
evaluate qualitative and quantitative performance of equipment, systems and
controls at design, average and low loads using actual or simulated loads
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
Section 23 05 93
TESTING, ADJUSTING AND BALANCING FOR HVAC
Page 2 of 5
.2
Adjust and regulate equipment and systems to meet specified performance
requirements and to achieve specified interaction with other related systems
under normal and emergency loads and operating conditions.
.3
Balance systems and equipment to regulate flow rates to match load
requirements over full operating ranges.
1.4
EXCEPTIONS
.1
1.5
TAB of systems and equipment regulated by codes, standards to satisfaction of
authority having jurisdiction.
CO-ORDINATION
.1
Schedule time required for TAB (including repairs, re-testing) into project
construction and completion schedule to ensure completion before acceptance of
project.
.2
Do TAB of each system independently and subsequently, where interlocked with
other systems, in unison with those systems.
1.6
PRE-TAB REVIEW
.1
Review contract documents before project construction is started confirm in
writing to Departmental Representative adequacy of provisions for TAB and other
aspects of design and installation pertinent to success of TAB.
.2
Review specified standards and report to Departmental Representative in writing
proposed procedures which vary from standard.
.3
During construction, co-ordinate location and installation of TAB devices,
equipment, accessories, measurement ports and fittings.
1.7
START-UP
.1
Follow start-up procedures as recommended by equipment manufacturer unless
specified otherwise.
.2
Follow special start-up procedures specified elsewhere in Division 23.
1.8
OPERATION OF SYSTEMS DURING TAB
.1
1.9
Operate systems for length of time required for TAB and as required by
Departmental Representative for verification of TAB reports.
START OF TAB
.1
Notify Departmental Representative 7 days prior to start of TAB.
.2
Start TAB when building is essentially completed, including:
.3
Installation of ceilings, doors, windows, other construction affecting TAB.
.4
Application of weatherstripping, sealing, and caulking.
.5
Provisions for TAB installed and operational.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
.6
Start-up, verification for proper, normal and safe operation of mechanical and
associated electrical and control systems affecting TAB including but not limited
to:
.1
.2
1.10
Section 23 05 93
TESTING, ADJUSTING AND BALANCING FOR HVAC
Page 3 of 5
Proper thermal overload protection in place for electrical equipment.
Air systems:
.1
Filters in place, clean.
.2
Duct systems clean.
.3
Fire, smoke, volume control dampers installed and open.
.4
Coil fins combed, clean.
.5
Access doors, installed, closed.
.6
Outlets installed, volume control dampers open.
APPLICATION TOLERANCES
.1
Do TAB to following tolerances of design values:
.1
1.11
HVAC systems: plus 5 %, minus 5 %.
ACCURACY TOLERANCES
.1
1.12
Measured values accurate to within plus or minus 2 % of actual values.
INSTRUMENTS
.1
Prior to TAB, submit to Departmental Representative list of instruments used
together with serial numbers.
.2
Calibrate in accordance with requirements of most stringent of referenced
standard for either applicable system or HVAC system.
.3
Calibrate within 3 months of TAB. Provide certificate of calibration to
Departmental Representative.
1.13
ACTION AND INFORMATIONAL SUBMITTALS
.1
Submit, prior to commencement of TAB:
.2
Proposed methodology and procedures for performing TAB if different from
referenced standard.
1.14
PRELIMINARY TAB REPORT
.1
Submit for checking and approval of Departmental Representative, prior to
submission of formal TAB report, sample of rough TAB sheets. Include:
.1
.2
.3
.4
1.15
Details of instruments used.
Details of TAB procedures employed.
Calculations procedures.
Summaries.
TAB REPORT
.1
Format in accordance with referenced standard.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
.2
TAB report to show results in SI units and to include:
.1
.2
.3
1.16
Section 23 05 93
TESTING, ADJUSTING AND BALANCING FOR HVAC
Page 4 of 5
Project record drawings.
System schematics.
Submit 6 copies of TAB Report to Departmental Representative for verification
and approval, in English in D-ring binders, complete with index tabs.
VERIFICATION
.1
Reported results subject to verification by Departmental Representative
.2
Provide personnel and instrumentation to verify up to 30 % of reported results.
.3
Number and location of verified results as directed by Departmental
Representative
.4
Pay costs to repeat TAB as required to satisfaction of Departmental
Representative
1.17
SETTINGS
.1
After TAB is completed to satisfaction of Departmental Representative, replace
drive guards, close access doors, lock devices in set positions, ensure sensors
are at required settings.
.2
Permanently mark settings to allow restoration at any time during life of facility.
Do not eradicate or cover markings.
1.18
COMPLETION OF TAB
.1
1.19
TAB considered complete when final TAB Report received and approved by
Departmental Representative
AIR SYSTEMS
.1
Standard: TAB to most stringent of TAB standards of AABC NEBB SMACNA
ASHRAE.
.2
Do TAB of systems, equipment, components, controls specified Division 23.
.3
Qualifications: personnel performing TAB qualified to standards of AABC NEBB.
.4
Quality assurance: perform TAB under direction of supervisor qualified to
standards of AABC NEBB.
.5
Measurements: to include as appropriate for systems, equipment, components,
controls: air velocity, static pressure, flow rate, pressure drop (or loss),
temperatures (dry bulb, wet bulb, dewpoint), duct cross-sectional area, RPM,
electrical power, voltage, noise, vibration.
.6
Locations of equipment measurements: to include as appropriate:
.1
.2
.7
Inlet and outlet of dampers, filter, coil, humidifier, fan, other equipment
causing changes in conditions.
At controllers, controlled device.
Locations of systems measurements to include as appropriate: main ducts, main
branch, sub-branch, run-out (or grille, register or diffuser).
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
Part 2
Products
2.1
NOT USED
.1
Not used.
Part 3
Execution
3.1
NOT USED
.1
Section 23 05 93
TESTING, ADJUSTING AND BALANCING FOR HVAC
Page 5 of 5
Not used.
END OF SECTION
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
Part 1
General
1.1
REFERENCES
.1
Definitions:
.1
.2
.2
Section 23 07 13
DUCT INSULATION
Page 1 of 5
For purposes of this section:
.1
"CONCEALED" - insulated mechanical services and equipment in
suspended ceilings and non-accessible chases and furred-in
spaces.
.2
"EXPOSED" - means "not concealed" as previously defined.
.3
Insulation systems - insulation material, fasteners, jackets, and
other accessories.
TIAC Codes:
.1
CRD: Code Round Ductwork,
.2
CRF: Code Rectangular Finish.
Reference Standards:
.1
.2
.3
American Society of Heating, Refrigeration and Air Conditioning
Engineers (ASHRAE)
.1
ANSI/ASHRAE/IESNA 90.1-13, SI; Energy Standard for Buildings
Except Low-Rise Residential Buildings.
ASTM International Inc.
.1
ASTM B209M-14, Standard Specification for Aluminum and
Aluminum-Alloy Sheet and Plate (Metric).
.2
ASTM C335/C335M-10e1, Standard Test Method for Steady State
Heat Transfer Properties of Pipe Insulation.
.3
ASTM C411-11, Standard Test Method for Hot-Surface
Performance of High-Temperature Thermal Insulation.
.4
ASTM C449/C449M-07(R2013), Standard Specification for
Mineral Fiber-Hydraulic-Setting Thermal Insulating and Finishing
Cement.
.5
ASTM C547-12, Standard Specification for Mineral Fiber Pipe
Insulation.
.6
ASTM C553-11, Standard Specification for Mineral Fiber Blanket
Thermal Insulation for Commercial and Industrial Applications.
.7
ASTM C612-10, Standard Specification for Mineral Fiber Block
and Board Thermal Insulation.
.8
ASTM C795-08(R2013), Standard Specification for Thermal
Insulation for Use in Contact with Austenitic Stainless Steel.
.9
ASTM C921-10(2015), Standard Practice for Determining the
Properties of Jacketing Materials for Thermal Insulation.
Canadian General Standards Board (CGSB)
.1
CGSB 51-GP-52Ma-89, Vapour Barrier, Jacket and Facing
Material for Pipe, Duct and Equipment Thermal Insulation.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
.4
.5
.6
.7
1.2
Section 23 07 13
DUCT INSULATION
Page 2 of 5
Green Seal Environmental Standards (GSES)
.1
Standard GS-36-00, Commercial Adhesives.
South Coast Air Quality Management District (SCAQMD), California State
.1
SCAQMD Rule 1168-A2005, Adhesive and Sealant Applications.
Thermal Insulation Association of Canada (TIAC): National Insulation
Standards (2005).
Underwriters Laboratories of Canada (ULC)
.1
CAN/ULC-S102-10, Method of Test for Surface Burning
Characteristics of Building Materials and Assemblies.
.2
CAN/ULC-S701-11, Standard for Thermal Insulation, Polystyrene,
Boards and Pipe Covering.
ACTION AND INFORMATIONAL SUBMITTALS
.1
Provide submittals in accordance with Section 01 00 10 – General Instructions.
.2
Product Data:
.1
.3
Manufacturers' Instructions:
.1
1.3
Provide manufacturer's printed product literature and datasheets for duct
insulation, and include product characteristics, performance criteria,
physical size, finish and limitations.
.1
Description of equipment giving manufacturer's name, type,
model, year and capacity.
.2
Details of operation, servicing and maintenance.
.3
Recommended spare parts list.
Provide manufacture's written duct insulation jointing recommendations.
and special handling criteria, installation sequence, cleaning procedures.
QUALITY ASSURANCE
.1
Qualifications:
.1
1.4
Installer: specialist in performing work of this section, and have at least 3
years successful experience in this size and type of project, qualified to
standards of TIAC.
DELIVERY, STORAGE AND HANDLING
.1
Deliver, store and handle in accordance with Section 01 00 10 – General
Instructions.
.2
Deliver materials to site in original factory packaging, labelled with manufacturer's
name, address and ULC markings.
.3
Packaging Waste Management: remove for reuse of pallets crates padding
packaging materials in accordance with Section 01 00 10 – General Instructions.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
Part 2
Products
2.1
FIRE AND SMOKE RATING
.1
To CAN/ULC-S102:
.1
.2
2.2
Section 23 07 13
DUCT INSULATION
Page 3 of 5
Maximum flame spread rating: 25.
Maximum smoke developed rating: 50.
INSULATION
.1
Mineral fibre: as specified includes glass fibre, rock wool, slag wool.
.2
Thermal conductivity ("k" factor) not to exceed specified values at 24 degrees C
mean temperature when tested in accordance with ASTM C335.
.3
TIAC Code C-1: Rigid mineral fibre board to ASTM C612, with factory applied
vapour retarder jacket to CGSB 51-GP-52Ma (as scheduled in PART 3 of this
Section).
2.3
JACKETS
.1
Canvas:
.1
.2
Lagging adhesive: compatible with insulation.
.1
.3
Maximum VOC limit 50 200 250 g/L to SCAQMD Rule 1168 GSES GS36.
Aluminum:
.1
.2
.3
.4
.5
.6
.7
.8
2.4
220 gm/m² cotton, plain weave, treated with dilute fire retardant lagging
adhesive to ASTM C921.
To ASTM B209 with moisture barrier as scheduled in PART 3 of this
section.
Thickness: 0.50 mm sheet.
Finish: Corrugated.
Jacket banding and mechanical seals: 19 mm wide, 0.5 mm thick
stainless steel.
.1
Stainless steel:
Type: 304.
Thickness: 0.50 mm sheet.
Finish: Smooth.
Jacket banding and mechanical seals: 19 mm wide, 0.5 mm thick
stainless steel.
ACCESSORIES
.1
Vapour retarder lap adhesive:
.1
.2
Water based, fire retardant type, compatible with insulation.
.1
Maximum VOC limit to SCAQMD Rule 1168.
Indoor Vapour Retarder Finish:
.1
Vinyl emulsion type acrylic, compatible with insulation.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
Section 23 07 13
DUCT INSULATION
Page 4 of 5
.3
Insulating Cement: hydraulic setting on mineral wool, to ASTM C449.
.4
ULC Listed Canvas Jacket:
.1
.5
220 gm/m² cotton, plain weave, treated with dilute fire retardant lagging
adhesive to ASTM C921.
Outdoor Vapour Retarder Mastic:
.1
.2
Vinyl emulsion type acrylic, compatible with insulation.
Reinforcing fabric: Fibrous glass, untreated 305 g/m².
.6
Tape: self-adhesive, aluminum, plain reinforced, 50 75 mm wide minimum.
.7
Contact adhesive: quick-setting
.1
.8
Maximum VOC limit to SCAQMD Rule 1168.
Canvas adhesive: washable.
.1
Maximum VOC limit to SCAQMD Rule 1168.
.9
Tie wire: 1.5 mm stainless steel.
.10
Banding: 19 mm wide, 0.5 mm thick stainless steel.
.11
Facing: 25 mm stainless galvanized steel hexagonal wire mesh stitched on both
faces of insulation.
.12
Fasteners: 4 mm diameter pins with 35 mm diameter clips, length to suit
thickness of insulation.
Part 3
Execution
3.1
APPLICATION
.1
3.2
Manufacturer's Instructions: comply with manufacturer's written
recommendations, including product technical bulletins, handling, storage and
installation instructions, and datasheets.
PRE-INSTALLATION REQUIREMENTS
.1
Pressure test ductwork systems complete, witness and certify.
.2
Ensure surfaces are clean, dry, free from foreign material.
3.3
INSTALLATION
.1
Install in accordance with TIAC National Standards.
.2
Apply materials in accordance with manufacturers instructions and as indicated.
.3
Use 2 layers with staggered joints when required nominal thickness exceeds 75
mm.
.4
Fasteners: install at 300 mm on centre in horizontal and vertical directions,
minimum 2 rows each side.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
3.4
Section 23 07 13
DUCT INSULATION
Page 5 of 5
DUCTWORK INSULATION SCHEDULE
.1
Insulation types and thicknesses: conform to following table:
Rectangular warm air ducts
Round warm air ducts
Rectangular ducts outside
.2
Vapour Retarder
no
no
special
Thickness (mm)
25
25
50
Exposed round ducts 600 mm and larger, smaller sizes where subject to abuse:
.1
3.5
TIAC Code
C-1
C-1
C-1
Use TIAC code C-1 insulation, scored to suit diameter of duct.
.1
Finishes: conform to following table:
TIAC Code
Rectangular
Round
Indoor
CRF/2
CRD/3
Outdoor, exposed to
CRF/3
CRD/4
precipitation
CLEANING
.1
Clean in accordance with Section 01 00 10 – General Instructions.
.1
.2
Remove surplus materials, excess materials, rubbish, tools and
equipment.
Waste Management: separate waste materials for recycling in accordance with
Section 01 00 10 – General Instructions.
END OF SECTION
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
Part 1
General
1.1
REFERENCES
.1
American Society of Mechanical Engineers (ASME)
.1
.2
.3
.4
.2
.2
.3
.4
.2
CAN/CSA B149.1HB-05, Natural Gas and Propane Installation Code
Handbook.
CAN/CSA B149.2-15, Propane Storage and Handling Code.
Health Canada/Workplace Hazardous Materials Information System (WHMIS)
.1
1.2
CSA W47.1-09(R2014), Certification of Companies for Fusion Welding of
Steel.
Canadian Standards Association (CSA)/Canadian Gas Association (CGA)
.1
.5
ASTM A47/A47M-99(2014), Standard Specification for Ferritic Malleable
Iron Castings.
ASTM A53/A53M-12, Standard Specification for Pipe, Steel, Black and
Hot-Dipped, Zinc Coated, Welded and Seamless.
ASTM B75/B75M-11, Standard Specification for Seamless Copper Tube
Metric.
ASTM B837-10, Standard Specification for Seamless Copper Tube for
Natural Gas and Liquefied Petroleum (LP) Gas Fuel Distribution Systems.
Canadian Standards Association (CSA International)
.1
.4
ASME B16.5-2013, Pipe Flanges and Flanged Fittings: 1/2 NPS through
NPS 24 Metric/Inch Standard.
ASME B16.18-2012, Cast Copper Alloy Solder Joint Pressure Fittings.
ASME B16.22-2013, Wrought Copper and Copper Alloy Solder-Joint
Pressure Fittings.
ASME B18.2.1--2012, Square, Hex, Heavy Hex, and Askew Head Bolts
and Hex, Heavy Hex, Hex Flange, Lobed Head, and Lag Screws (Inch
Series.
American Society for Testing and Materials International (ASTM)
.1
.3
Section 23 11 23
FACILITY NATURAL GAS PIPING
Page 1 of 3
Material Safety Data Sheets (MSDS).
ACTION AND INFORMATIONAL SUBMITTALS
.1
Submittals in accordance with Section 01 00 10 – General Instructions.
.2
Product Data:
.1
.2
.3
Submit manufacturer's printed product literature, specifications and
datasheet for piping, fittings and equipment.
Indicate on manufacturers catalogue literature following: valves.
Test Reports: submit certified test reports from approved independent testing
laboratories indicating compliance with specifications for specified performance
characteristics and physical properties.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
Section 23 11 23
FACILITY NATURAL GAS PIPING
Page 2 of 3
.4
Certificates: submit certificates signed by manufacturer certifying that materials
comply with specified performance characteristics and physical properties.
.5
Instructions: submit manufacturer's installation instructions.
.6
Closeout Submittals: submit maintenance and engineering data for incorporation
into manual specified in Section 01 00 10 – General Instructions.
1.3
QUALITY ASSURANCE
.1
Health and Safety:
.1
1.4
Do construction occupational health and safety in accordance with
Section 01 00 10 – General Instructions.
DELIVERY, STORAGE AND HANDLING
.1
Waste Management and Disposal:
.1
.2
.3
.4
Separate waste materials for recycling in accordance with Section
01 00 10 – General Instructions.
Remove from site and dispose of packaging materials at appropriate
recycling facilities.
Collect and separate for disposal paper, plastic, polystyrene and
corrugated cardboard packaging material in appropriate on-site bins for
recycling.
Separate for recycling and place in designated containers Steel, Metal
and Plastic.
Part 2
Products
2.1
PIPE
.1
Steel pipe: to ASTM A53/A53M, Schedule 40, seamless as follows:
.1
.2
.2
2.2
NPS 1/2 to 2, screwed.
NPS2 1/2 and over, plain end.
Copper tube: to ASTM B837.
JOINTING MATERIAL
.1
Screwed fittings: pulverized lead paste.
.2
Welded fittings: to CSA W47.1.
.3
Flange gaskets: nonmetallic flat.
.4
Brazing: to ASTM B837.
2.3
FITTINGS
.1
Steel pipe fittings, screwed, flanged or welded:
.1
.2
.3
.4
Malleable iron: screwed, banded, Class 150.
Steel pipe flanges and flanged fittings: to ASME B16.5.
Welding: butt-welding fittings.
Unions: malleable iron, brass to iron, ground seat, to ASTM A47/A47M.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
.5
.6
.2
Bolts and nuts: to ASME B18.2.1.
Nipples: schedule 40, to ASTM A53/A53M.
Copper pipe fittings, screwed, flanged or soldered:
.1
.2
2.4
Section 23 11 23
FACILITY NATURAL GAS PIPING
Page 3 of 3
Cast copper fittings: to ASME B16.18.
Wrought copper fittings: to ASME B16.22.
VALVES
.1
Provincial Code approved, lubricated plug ball type.
Part 3
Execution
3.1
MANUFACTURER'S INSTRUCTIONS
.1
3.2
Compliance: comply with manufacturer's written recommendations or
specifications, including product technical bulletins, handling, storage and
installation instructions, and datasheet.
FIELD QUALITY CONTROL
.1
Site Tests/Inspection:
.1
.2
3.3
Test system in accordance with CAN/CSA B149.1 and requirements of
authorities having jurisdiction.
Obtain reports within 3 days of review and submit immediately to Departmental
Representative.
ADJUSTING
.1
Purging: purge after pressure test in accordance with CAN/CSA B149.1.
.2
Pre-Start-Up Inspections:
.1
.2
3.4
Check vents from regulators, control valves, terminate outside building in
approved location, protected against blockage, damage.
Check gas trains, entire installation is approved by authority having
jurisdiction.
CLEANING
.1
Cleaning: in accordance with Section 23 08 02 - Cleaning and Start-Up of
Mechanical Piping Systems CAN/CSA B149.1, supplemented as specified.
.2
Perform cleaning operations as specified in Section 01 00 10 – General
Instructions, and in accordance with manufacturer's recommendations.
.3
Upon completion and verification of performance of installation, remove surplus
materials, excess materials, rubbish, tools and equipment.
END OF SECTION
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
Part 1
General
1.1
REFERENCES
Section 23 31 13.01
METAL DUCTS - LOW PRESSURE TO 500 PA
Page 1 of 4
.1
American Society of Heating, Refrigerating and Air-Conditioning Engineers
(ASHRAE)
.2
ASTM International
.1
.2
.3
.3
Green Seal Environmental Standards (GS)
.1
.4
.2
.3
SMACNA HVAC Duct Construction Standards - Metal and Flexible, 2005.
SMACNA HVAC Air Duct Leakage Test Manual, 2012.
IAQ Guideline for Occupied Buildings Under Construction 2007.
South Coast Air Quality Management District (SCAQMD), California State,
Regulation XI. Source Specific Standards
.1
1.2
NFPA 90A-15, Standard for the Installation of Air-Conditioning and
Ventilating Systems.
NFPA 90B-15, Standard for the Installation of Warm Air Heating and AirConditioning Systems.
NFPA 96-14, Standard for Ventilation Control and Fire Protection of
Commercial Cooking Operations.
Sheet Metal and Air Conditioning Contractors' National Association (SMACNA)
.1
.2
.3
.6
GS-36-13, Standard for Adhesives for Commercial Use.
National Fire Protection Association (NFPA)
.1
.5
ASTM A480/A480M-15, Standard Specification for General Requirements
for Flat-Rolled Stainless and Heat-Resisting Steel Plate, Sheet and Strip.
ASTM A635/A635M-15, Standard Specification for Steel, Sheet and Strip,
Heavy-Thickness Coils, Hot-Rolled, Alloy, Carbon, Structural, HighStrength Low-Alloy, and High-Strength Low-Alloy with Improved
Formability, General Requirements for.
ASTM A653/A653M-15, Standard Specification for Steel Sheet, Zinc
Coated (Galvanized) or Zinc-Iron Alloy Coated (Galvannealed) by the
Hot-Dip Process.
SCAQMD Rule 1168-A2005, Adhesives and Sealants Applications.
ACTION AND INFORMATIONAL SUBMITTALS
.1
Submit in accordance with Section 01 00 10 – General Instructions.
.2
Product Data:
.1
.3
Submit manufacturer's instructions, printed product literature and data
sheets for metal ducts and include product characteristics, performance
criteria, physical size, finish and limitations.
Shop Drawings:
.1
Submit drawings stamped and signed by professional engineer registered
or licensed in Province of Ontario, Canada.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
.4
Test and Evaluation Reports:
.1
1.3
Section 23 31 13.01
METAL DUCTS - LOW PRESSURE TO 500 PA
Page 2 of 4
Certification of Ratings:
.1
Catalogue or published ratings to be those obtained from tests
carried out by manufacturer or independent testing agency
signifying adherence to codes and standards.
DELIVERY, STORAGE AND HANDLING
.1
Deliver, store and handle materials in accordance with Section 01 00 10 –
General Instructions and with manufacturer's written instructions.
.2
Delivery and Acceptance Requirements: deliver materials to site in original
factory packaging, labelled with manufacturer's name and address.
.3
Storage and Handling Requirements:
.1
Store materials in dry location and in accordance with manufacturer's
recommendations in clean, dry, well-ventilated area.
Store and protect metal ducts from nicks, scratches, and blemishes.
Replace defective or damaged materials with new.
.2
.3
.4
Packaging Waste Management: remove for reuse of pallets, crates, padding,
packaging materials in accordance with Section 01 00 10 – General Instructions.
Part 2
Products
2.1
SEAL CLASSIFICATION
.1
Classification as follows:
Maximum Pressure Pa
500
250
.2
Seal classification:
.1
2.2
SMACNA Seal Class
C
C
Class C: transverse joints and connections made air tight with sealant
and tape. Longitudinal seams unsealed.
SEALANT
.1
Sustainability Characteristics:
.1
.2
2.3
Adhesives and sealants: VOC limit maximum to SCAQMD Rule 1168.
Sealant: oil resistant, water borne, polymer type flame resistant duct sealant.
Temperature range of minus 30 degrees C to plus 93 degrees C.
TAPE
.1
2.4
Tape: polyvinyl treated, open weave fiberglass tape, 50 mm wide.
DUCT LEAKAGE
.1
In accordance with SMACNA HVAC Air Duct Leakage Test Manual.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
2.5
Section 23 31 13.01
METAL DUCTS - LOW PRESSURE TO 500 PA
Page 3 of 4
FITTINGS
.1
Fabrication: to SMACNA.
.2
Radiused elbows:
.1
.3
Mitred elbows, rectangular:
.1
.2
.4
Short radiused elbows.
Obstruction deflectors: maintain full cross-sectional area.
.1
2.6
Diverging: 20 degrees maximum included angle.
Converging: 30 degrees maximum included angle.
Offsets:
.1
.6
To 400 mm: with single double thickness turning vanes.
Over 400 mm: with double thickness turning vanes.
Transitions:
.1
.2
.5
Rectangular: standard radius.
Maximum included angles: as for transitions.
FIRE STOPPING
.1
Retaining angles around duct, on both sides of fire separation in accordance with
Section 01 00 10 – General Instructions.
.2
Fire stopping material and installation must not distort duct.
2.7
GALVANIZED STEEL
.1
Lock forming quality: to ASTM A653/A653M, Z90 zinc coating.
.2
Thickness, fabrication and reinforcement: to SMACNA.
.3
Joints: to SMACNA.
Part 3
Execution
3.1
EXAMINATION
.1
Verification of Conditions: verify that conditions of substrate previously installed
under other Sections or Contracts are acceptable for metal duct installation in
accordance with manufacturer's written instructions.
.1
.2
.3
3.2
Visually inspect substrate in presence of Departmental Representative.
Inform Departmental Representative of unacceptable conditions
immediately upon discovery.
Proceed with installation only after unacceptable conditions have been
remedied and after receipt of written approval to proceed from
Departmental Representative.
GENERAL
.1
Do work in accordance with ASHRAE and SMACNA.
.2
Install breakaway joints in ductwork on sides of fire separation.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
3.3
Section 23 31 13.01
METAL DUCTS - LOW PRESSURE TO 500 PA
Page 4 of 4
SEALING AND TAPING
.1
Apply sealant in accordance with SMACNA.
.2
Bed tape in sealant and recoat with minimum of 1 coat of sealant to
manufacturers recommendations.
3.4
CLEANING
.1
Progress Cleaning: clean in accordance with Section 01 00 10 – General
Instructions.
.1
Leave Work area clean at end of each day.
.2
Final Cleaning: upon completion remove surplus materials, rubbish, tools and
equipment in accordance with Section 01 00 10 – General Instructions.
.3
Waste Management: separate waste materials for recycling in accordance with
Section 01 00 10 – General Instructions.
.1
Remove recycling containers and bins from site and dispose of materials
at appropriate facility.
END OF SECTION
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
Part 1
General
1.1
REFERENCES
.1
Section 23 74 00
PACKAGED OUTDOOR HVAC EQUIPMENT
Page 1 of 9
American National Standards Institute (ANSI)/Air Conditioning and Refrigeration
Institute (ARI)
.1
.2
ANSI/ARI 210/240-2008, Unitary Air-Conditioning and Air-Source Heat
Pump Equipment.
ARI 270-95, Sound Rating of Outdoor Unitary Equipment.
.2
ANSI/UL 1995 B-2011, Standard for Heating and Cooling Equipment.
.3
Canadian Standards Association (CSA International)
.1
.2
.4
Health Canada / Workplace Hazardous Materials Information System (WHMIS)
.1
.5
Material Safety Data Sheets (MSDS).
National Fire Protection Association
.1
1.2
CSA B52-13, Mechanical Refrigeration Code.
CSA C22.1 HB-05, Canadian Electrical Code Handbook.
NFPA 90A-15, Standard for the Installation of Air Conditioning and
Ventilating Systems.
ACTION AND INFORMATIONAL SUBMITTALS
.1
Submittals in accordance with Section 01 00 10 – General Instructions.
.2
Product Data:
.1
.3
Submit manufacturer's printed product literature, specifications and
datasheet for packaged rooftop HVAC units.
Shop Drawings:
.1
Submit shop drawings to indicate project layout and dimensions; indicate:
.1
Equipment, piping, and connections, together with valves,
strainers, control assemblies, thermostatic controls, auxiliaries and
hardware, and recommended ancillaries which are mounted,
wired and piped ready for final connection to building system, its
size and recommended bypass connections.
.2
Control equipment shipped loose, showing final location in
assembly.
.3
Dimensions, internal and external construction details,
recommended method of installation with proposed structural steel
support, mounting curb details, sizes and location of mounting bolt
holes; include mass distribution drawings showing point loads.
.4
Detailed composite wiring diagrams for control systems showing
factory installed wiring and equipment on packaged equipment or
required for controlling devices of ancillaries, accessories,
controllers.
.5
Fan performance curves.
.6
Details of vibration isolation.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
.7
.8
Section 23 74 00
PACKAGED OUTDOOR HVAC EQUIPMENT
Page 2 of 9
Estimate of sound levels to be expected across individual octave
bands in dB referred to A rating.
Type of refrigerant used.
.4
Test Reports: submit certified test reports from approved independent testing
laboratories indicating compliance with specifications for specified performance
characteristics and physical properties.
.5
Certificates: submit certificates signed by manufacturer certifying that materials
comply with specified performance characteristics and physical properties.
.6
Instructions: submit manufacturer's installation instructions.
.7
Manufacturer's Field Reports: manufacturer's field reports specified.
.8
Closeout submittals: submit maintenance and engineering data for incorporation
into manual specified in Section 01 00 10 – General Instructions include data as
follows:
.1
.2
1.3
Indicate: brief description of unit, indexed, with details of function,
operation, control, and service for components.
Provide for units, manufacturer's name, type, year, number of units, and
capacity.
DELIVERY, STORAGE AND HANDLING
.1
Waste Management and Disposal:
.1
.2
.3
.4
.5
.6
1.4
Separate waste materials for recycling in accordance with Section 01 00
10 – General Instructions.
Remove from site and dispose of packaging materials at appropriate
recycling facilities.
Collect and separate for disposal paper, plastic, polystyrene and
corrugated cardboard packaging material in appropriate on-site bins for
recycling in accordance with Section 01 00 10 – General Instructions.
Separate for recycling and place in designated containers Metal and
Plastic waste in accordance with Section 01 00 10 – General Instructions.
Handle and dispose of hazardous materials in accordance with Regional
and Municipal, regulations.
Divert unused metal materials from landfill to metal recycling facility as
approved by Departmental Representative.
WARRANTY
.1
Contractor hereby warrants that packaged rooftop HAVC units and refrigeration
compressors will function and operate in accordance with CCDC 2 GC 24, but for
60 months.
Part 2
Products
2.1
GENERAL
.1
Packaged rooftop unit shall include compressor, evaporator coil, filters, supply
fan, dampers, air-cooled condenser coils, condenser fan, gas heater, and unit
controls.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
Section 23 74 00
PACKAGED OUTDOOR HVAC EQUIPMENT
Page 3 of 9
.2
Unit shall be factory assembled and tested including leak testing of the DX coils,
pressure testing of the refrigeration circuit, and run testing of the completed unit.
Run test report shall be supplied with the unit in the service compartment’s
literature pocket.
.3
Unit shall have decals and tags to indicate lifting and rigging, service areas and
caution areas for safety and to assist service personnel.
.4
Unit components shall be labeled, including refrigeration system components and
electrical and controls components.
.5
Estimated sound power levels (dB) shall be shown on the unit ratings sheet.
.6
Installation, Operation and Maintenance manual shall be supplied within the unit.
.7
Laminated color-coded wiring diagram shall match factory installed wiring and
shall be affixed to the interior of the control compartment’s hinged access door.
.8
Unit nameplate shall be provided in two locations on the unit, affixed to the
exterior of the unit and affixed to the interior of the control compartment’s hinged
access door.
2.2
CONSTRUCTION
.1
All cabinet walls, access doors, and roof shall be fabricated of double wall,
impact resistant, rigid polyurethane foam panels.
.2
Unit insulation shall have a minimum thermal resistance R-value of 13. Foam
insulation shall have a minimum density of 2 pounds/cubic foot and shall be
tested in accordance with ASTM D-1929 for a minimum flash ignition
temperature of 610°F.
.3
Unit construction shall be double wall with G90 galvanized steel on both sides
and a thermal break. Double wall construction with a thermal break prevents
moisture accumulation on the insulation, provides a cleanable interior, prevents
heat transfer through the panel, and prevents exterior condensation on the panel.
.4
Unit shall be designed to reduce air leakage and infiltration through the cabinet.
Cabinet leakage shall not exceed 1% of total airflow when tested at 3 times the
minimum external static pressure provided in AHRI Standard 210/240.Panel
deflection shall not exceed L/240 ratio at 125% of design static pressure, at a
maximum 8 inches of positive or negative static pressure, to reduce air leakage.
Deflection shall be measured at the midpoint of the panel height and width.
Continuous sealing shall be included between panels and between access doors
and openings to reduce air leakage. Piping and electrical conduit through cabinet
panels shall include sealing to reduce air leakage.
.5
Roof of the air tunnel shall be sloped to provide complete drainage. Cabinet shall
have rain break overhangs above access doors.
.6
Access to filters, dampers, cooling coil, heater, compressor, and electrical and
controls components shall be through hinged access doors with quarter turn,
lockable handles. Full length stainless steel piano hinges shall be included on the
doors.
.7
Exterior paint finish shall be capable of withstanding at least 2,500 hours, with no
visible corrosive effects, when tested in a salt spray and fog atmosphere in
accordance with ASTM B 117-95 test procedure.
.8
Units shall include double sloped 304 stainless steel drain pans.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
Section 23 74 00
PACKAGED OUTDOOR HVAC EQUIPMENT
Page 4 of 9
.9
Unit shall be provided with through the base vertical discharge and return air
openings. All openings through the unit shall have upturned flanges of at least
1/2 inch around the opening.
.10
Unit shall be provided with left side horizontal discharge and return air openings.
All openings through the unit shall have upturned flanges of at least 1/2 inch
around the opening.
.11
Unit shall include lifting lugs on the top of the unit.
2.3
ELECTRICAL
.1
Unit shall be provided with factory installed and factory wired, non-fused
disconnect switch.
.2
Unit shall be provided with phase and brown out protection which shuts down all
motors in the unit if the electrical phases are more than 10% out of balance on
voltage, the voltage is more than 10% under design voltage or on phase reversal.
2.4
SUPPLY FANS
.1
Unit shall include direct drive, unhoused, backward curved, plenum supply fans.
.2
Blowers and motors shall be dynamically balanced.
.3
Motor shall be inverter rated efficiency ODP with ball bearings rated for 200,000
hours service with external lubrication points.
.4
Variable frequency drive shall be factory wired and mounted in the unit. Fan
motor shall be inverter rated efficiency.
2.5
COOLING COILS
.1
Evaporator Coils shall be designed for use with R-410A refrigerant and
constructed of copper tubes with aluminum fins mechanically bonded to the
tubes and aluminum end casings. Fin design shall be sine wave rippled.
.2
Coils shall be helium hydrogen or helium leak tested.
.3
Coils shall be furnished with factory installed thermostatic expansion valves.
2.6
REFRIGERATION SYSTEM
.1
Conform to CSA B52 and ANSI/UL 1995 requirements.
.2
Unit shall be factory charged with R-410A refrigerant.
.3
Compressors shall be scroll type with thermal overload.
.4
Compressors shall be mounted in an isolated service compartment which can be
accessed without affecting unit operation. Lockable hinged compressor access
doors shall be fabricated of double wall, rigid polyurethane foam injected panels
to prevent the transmission of noise outside the cabinet.
.5
Compressors shall be isolated from the base pan with the compressor
manufacturer’s recommended rubber vibration isolators, to reduce any
transmission of noise from the compressors into the building area.
.6
Each refrigeration circuit shall be equipped with thermostatic expansion valve
type refrigerant flow control.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
Section 23 74 00
PACKAGED OUTDOOR HVAC EQUIPMENT
Page 5 of 9
.7
Each refrigeration circuit shall be equipped with automatic reset low pressure and
manual reset high pressure refrigerant safety controls, Schrader type service
fittings on both the high pressure and low pressure sides and a factory installed
replaceable core liquid line filter driers.
.8
Unit shall include a variable capacity scroll compressor on the refrigeration circuit
which shall be capable of modulation from 10-100% of its capacity.
2.7
CONDENSERS
.1
Air-Cooled Condenser fans shall be a vertical discharge, axial flow, direct drive
fans.
.2
Coils shall be designed for use with R-410A refrigerant.
.3
Condenser coils shall be multi-pass and fabricated from aluminum microchannel
tubes.
.4
Coils shall be designed for a minimum of 10°F of refrigerant sub-cooling.
.5
Coils shall be hydrogen or helium leak tested.
.6
Condenser fans shall be high efficiency electrically commutated motor driven
with multiple speeds which are controlled with a fan cycle switch based on head
pressure and allow matching condenser airflow with cooling capacity steps.
2.8
GAS HEATING
.1
Stainless steel heat exchanger.
.2
Gas furnace shall consist of stainless steel heat exchangers with multiple
concavities, an induced draft blower and an electronic pressure switch to lockout
the gas valve until the combustion chamber is purged and combustion airflow is
established.
.3
Furnace shall include a gas ignition system consisting of an electronic igniter to a
pilot system, which will be continuous when the heater is operating, but will shut
off the pilot when heating is not required.
.4
Unit shall include a single gas connection and have gas supply piping entrances
in the unit base for through-the-curb gas piping and in the outside cabinet wall for
across the roof gas piping.
.5
Natural gas furnace shall be equipped with modulating gas valves, adjustable
speed combustion blowers, stainless steel tubular heat exchangers, and
electronic controller. Combustion blowers and gas valves shall be capable of
modulation. Electronic controller includes a factory wired, field installed supply air
temperature sensor. Sensor shall be field installed in the supply air ductwork.
Supply air temperature setpoint shall be adjustable on the electronic controller
within the controls compartment. Gas heating assemblies shall be capable of
operating at any firing rate between 100% and 30% of their rated capacity.
2.9
FILTERS
.1
Unit shall include 4 inch thick, pleated panel filters with an ASHRAE efficiency of
30% and MERV rating of 8, upstream of the cooling coil.
.2
Unit shall include a clogged filter switch.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
2.10
Section 23 74 00
PACKAGED OUTDOOR HVAC EQUIPMENT
Page 6 of 9
OUTSIDE AIR/ECONOMIZER
.1
Unit shall include 0-100% economizer consisting of a motor operated outside air
damper and return air damper assembly constructed of extruded aluminum,
hollow core, airfoil blades with rubber edge seals and aluminum end seals.
Damper blades shall be gear driven and designed to have no more than 15 CFM
of leakage per sq. ft. of damper area when subjected to 2 inches w.g. air
pressure differential across the damper. Unit shall include outside air opening
bird screen, outside air hood with rain lip and barometric relief dampers.
.2
Damper assembly shall be controlled by spring return enthalpy activated fully
modulating actuator.
2.11
CONTROLS
.1
Factory Installed and Factory Provided Unit controller shall be capable of
controlling all features and options of the unit. Controller shall be factory installed
in the unit controls compartment and factory tested.
.2
Controller shall be capable of stand alone operation with unit configuration,
setpoint adjustment, sensor status viewing, unit alarm viewing, and occupancy
scheduling available. Unit Controller to connect to existing Proprietary BAS
system. BAS to allow for unit operation (ON/OFF), monitor Cooling and Heating
Status and monitor for alarms. Unit supplier to coordinate requirements of
controller with BAS system provider.
.3
Controller shall have an onboard clock and calendar functions that allow for
occupancy scheduling.
.4
Controller shall include non-volatile memory to retain all programmed values
without the use of a battery, in the event of a power failure.
.5
When unit is operating at a constant air volume, the unit shall modulate cooling
with constant airflow to meet space temperature cooling loads. Unit shall
modulate heating with constant airflow to meet space temperature heating loads.
Modulating heating capacity shall modulate based on supply air temperature.
.6
Unit configuration, setpoint adjustment, sensor status viewing, unit alarm viewing,
and occupancy scheduling shall be accomplished with a touchscreen controller
interface.
Part 3
Execution
3.1
MANUFACTURER'S INSTRUCTIONS
.1
3.2
Compliance: comply with manufacturer's written recommendations and
specifications, including product technical bulletins, handling, storage and
installation instructions, and datasheet.
INSTALLATION
.1
Install as per manufacturers' instructions on roof curb adapters provided by
manufacturer.
.2
Manufacturer to certify installation, supervise start-up and commission unit.
.3
Run drain line from cooling coil condensate drain pan to discharge over roof
drain.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
3.3
Section 23 74 00
PACKAGED OUTDOOR HVAC EQUIPMENT
Page 7 of 9
FIELD QUALITY CONTROL
.1
Manufacturer's Field Services:
.1
.2
.3
Have manufacturer of products supplied under this Section review work
involved in handling, installation/application, protection and cleaning of its
product, and submit written reports, in acceptable format, to verify
compliance of work with Contract.
Provide manufacturer's field services, consisting of product use
recommendations and periodic site visits for inspection of product
installation, in accordance with manufacturer's instructions.
Schedule site visits to review work at stages listed:
.1
After delivery and storage of products, and when preparatory work
on which work of this Section depends is complete, but before
installation begins.
.2
Upon completion of work, after cleaning is carried out.
.2
Obtain reports within 3 days of review and submit immediately to Departmental
Representative.
.3
Performance Verification:
.1
Rooftop Air Handling Units:
.1
Set zone mixing dampers for full cooling, except that where
diversity factor forms part of design set that % of zone dampers to
full heating.
.2
Set outside air and return air dampers for minimum outside air.
.3
Set face and bypass dampers so face dampers are fully open and
bypass dampers are fully closed.
.4
Check for smooth, vibration less correct rotation of supply fan
impeller.
.5
Measure supply fan capacity.
.6
Adjust impeller speed as necessary and repeat measurement of
fan capacity.
.7
Measure pressure drop each component of unit.
.8
Set outside air and return air dampers for the % of outside air
required by design and repeat measurements of fan capacity.
.9
Reduce differences between fan capacity at minimum and
maximum outside air less than 5%.
.10
Set face and bypass dampers to full bypass and repeat
measurement of fan capacity.
.11
Reduce difference between fan capacity with F BPD fully closed to
bypass and fully open to bypass to less than 5%.
.12
Reduce difference between fan capacity at full cooling and fan
capacity at full heating to less than 5%.
.13
OAD: verify for proper stroking, interlock with RAD.
.14
Measure DBT, WBT of SA, RA, EA.
.15
Measure air cooled condenser discharge DBT.
.16
Measure flow rates (minimum and maximum) of SA, RA, EA, relief
air.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
Section 23 74 00
PACKAGED OUTDOOR HVAC EQUIPMENT
Page 8 of 9
.17
.2
.3
.4
Commissioning Reports:
.1
3.4
Simulate maximum cooling load and measure refrigerant hot gas
and suction temperatures and pressures.
.18
Use smoke test to verify no short-circuiting of EA, relief air to
outside air intake or to condenser intake.
.19
Simulate maximum heating load and:
.1
Verify temperature rise across heat exchanger.
.2
Perform flue gas analysis. Adjust for peak efficiency.
.3
Verify combustion air flow to heat exchanger.
.4
Simulate minimum heating load and repeat measurements.
.20
Measure radiated and discharge sound power levels under
maximum heating demand and under maximum cooling demand
with compressors running.
.21
Verify operating control strategies, including:
.1
Heat exchanger operating and high limit.
.2
Early morning warm-up cycle.
.3
Freeze protection.
.4
Economizer cycle operation, temperature of change-over.
.5
Alarms.
.6
Voltage drop across thermostat wiring.
.7
Operation of remote panel including pilot lights, failure
modes.
.22
Set zone mixing dampers for full heating and repeat
measurements.
.23
Measure leakage past zone mixing dampers by taking
temperature measurements. Reduce leakage to less than 5%.
.24
Measure return fan capacity.
.25
Adjust impeller speed as necessary and repeat measurement of
return fan capacity.
.26
Check capacity of heating unit.
.27
Measure DX refrigeration system performance.
.28
Refer to other sections of these specifications for PV procedures
for other components.
Verify accessibility, serviceability of components including motorized
dampers, filters coils, fans, motors, operators, humidifiers, sensors,
electrical disconnects.
Verify accessibility, clean ability, drainage of drain pans for coils,
humidifiers.
In accordance with Section 01 91 13 - General Commissioning (Cx)
Requirements
DEMONSTRATION
.1
Training: in accordance with Section 01 91 13 - General Commissioning (Cx)
Requirements.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
3.5
Section 23 74 00
PACKAGED OUTDOOR HVAC EQUIPMENT
Page 9 of 9
CLEANING
.1
Perform cleaning operations as specified in Section 01 00 10 – General
Instructions and in accordance with manufacturer's recommendations.
.2
On completion and verification of performance of installation, remove surplus
materials, excess materials, rubbish, tools and equipment.
END OF SECTION
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
Part 1
General
1.1
GENERAL CONDITIONS
Section 25 05 01
EMCS: GENERAL REQUIREMENTS
Page 1 of 9
.1
The specifications of Division 01 apply to Division 25.
.2
All sections of Division 25 are interrelated and complete one another as a whole.
.3
All mechanical and electrical drawings apply to Division 25.
1.2
RELATED SECTIONS
.1
1.3
All sections of Division 23.
SUMMARY
.1
The scope of Division 25 consists of installing the new Rooftop Units on the
existing Energy Management and Control System (EMCS) for the control,
supervision and management of the units.
.2
In general terms, the scope of Division 25 includes:
.1
.2
.3
1.4
The Connection of the New Rooftop units to the Existing EMCS system
as described in Division 23 specifications.
Programming of new sequences of operation and graphical user interface
associated with new Units.
Start-up, verification and commissioning of the Rooftop Unit portion of
the Existing EMCS.
REFERENCES
.1
American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.
(ASHRAE).
.1
.2
ASHRAE STD 135, BACnet - Data Communication Protocol for Building
Automation and Control Network.
Institute of Electrical and Electronics Engineers (IEEE)/Standard for Information
technology - Telecommunications and information exchange between systems Local and metropolitan area networks - Specific requirements.
.1
IEEE 802.3, Part 3: Carrier sense multiple access with collision detection
(CSMA/CD) access method and physical layer specifications.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
1.5
ACRONYMS AND ABBREVIATIONS
.1
Section 25 05 01
EMCS: GENERAL REQUIREMENTS
Page 2 of 9
Acronyms used in Division 25:
.1
.2
.3
.4
.5
.6
.7
.8
.9
.10
.11
.12
.13
.14
.15
.16
.17
.18
.19
.20
.21
.22
.23
.24
.25
.26
.27
.28
.29
.30
.31
.32
.33
.34
.35
AEL - Average Effectiveness Level.
BACnet - Building Automation and Control Network.
BC(s) - Building Controller(s).
BTL - BACnet Testing Laboratories.
CDL - Control Description Logic.
COSV - Change of State or Value.
CPU - Central Processing Unit.
DDC - Direct Digital Control.
DP - Differential Pressure.
EMCS - Energy Management and Control System.
HMI - Human Machine Interface.
HVAC - Heating, Ventilation, Air Conditioning.
I/O - Input/Output.
LAN - Local Area Network.
LCU(s) - Local Control Unit(s).
MCU(s) - Master Control Unit(s).
NC - Normally Closed.
NMC(s) - Network Management Controller(s).
NO - Normally Open.
OS - Operating System.
O&M - Operation and Maintenance.
OWS - Operator Work Station.
PC - Personal Computer.
PDA – Personal Digital Assistant.
PI – Proportional and Integral.
PID - Proportional, Integral and Derivative.
RAM - Random Access Memory.
SP - Static Pressure.
TCU(s) - Terminal Control Unit(s).
ROM - Read Only Memory.
USB - Universal Serial Bus.
UPS - Uninterruptible Power Supply.
VAV - Variable Air Volume.
VFD - Variable Frequency Drive.
WAN - Wide Area Network.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
1.6
Section 25 05 01
EMCS: GENERAL REQUIREMENTS
Page 3 of 9
DEFINITIONS
.1
Point: may be logical or physical.
.1
.2
.2
Point Object Type: points fall into following object types:
.1
.2
.3
.4
.5
1.7
Logical points: values calculated by system such as setpoints, totals,
counts, derived corrections and may include, but not limited to result of
and statements in CDL's.
Physical points: inputs or outputs which have hardware wired to
controllers to measure physical properties, to provide status conditions of
contacts or relays or to provide interaction with related equipment (system
start/stop, modulation control, etc.)
AI (analog input).
AO (analog output).
DI (digital input).
DO (digital output).
Pulse inputs.
SCOPE OF WORK
.1
Connect new installed rooftop units to the existing EMCS system.
.2
Provide all labour, material, equipment, system connections and software that
may or may not be specifically referred to herein or on the drawings, that are
required to meet the functional intent of these specifications.
.3
In general, the work covered by the sections of Division 25 includes, but is not
limited to, the following:
.1
.2
.3
.4
The following work does not form part of Division 25:
.1
.2
.3
1.8
All electrical, electronic and DDC type controls required for connection of
the new Rooftop to the existing system.
Complete electrical installation including conduits, cables, junction boxes,
etc. required for control systems, automation and the EMCS
Supply and installation of all low voltage transformers required for
controls and automation systems.
Access doors for controls equipment and instrumentation.
Supply and installation of balancing dampers and balancing valves.
Installation of field devices provided by Division 25 but required to be
installed by others. Refer to the item “EQUIPMENT TO PROVIDE TO
OTHERS” in this section.
SUBMITTALS
.1
Make submittals in accordance with Section 25 05 02 – EMCS: Submittals and
Review Process.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
.2
Quality Control:
.1
.2
1.9
Section 25 05 01
EMCS: GENERAL REQUIREMENTS
Page 4 of 9
Unless otherwise noted, provide equipment and material from
manufacturer's regular production, CSA and ULC certified, manufactured
to standard quoted plus additional specified requirements.
Submit proof of compliance to specified standards with shop drawings
and product data in accordance with Section 25 05 02 – EMCS:
Submittals and Review Process. Label or listing of specified organization
is acceptable evidence.
QUALITY ASSURANCE
.1
The EMCS Provider to comply with the following criteria:
.1
.2
.3
.4
.2
Installation:
.1
.2
.3
1.10
EMCS Contractor to be regularly engaged in the business of
manufacturing and installing DDC-type HVAC controls for over twenty
(20) years. Companies pre-qualified by Infrastructure Ontario (IO) for
approval prior to bid are:
.1
Automated Logic Controls / WebCTRL
.2
Delta Controls / enteliWEB
.3
Honeywell Controls / EBI
.4
Johnson Controls / Metasys
.5
Schneider Controls / StruxureWare
.6
Siemens Controls / Apogee
Maintain a local staff of at least four technicians who factory-trained on
the specific products to be used. These personnel are required to provide
installation, instruction, routine and emergency service. Contractors shall
provide names of qualified individuals and their certifications to be part of
submission.
Maintain or have direct access to a local supply of essential replacement
parts for EMCS components.
Maintain an office within 300 km of job site and provide emergency callout
service 24 h/day, 365 days/year with a maximum of four-hour response
time. Provide details of arrangements.
Have factory-trained and experienced personnel to perform the work
described in all sections of Division 25.
Ensure qualified supervisory personnel continuously direct and monitor
Work and attend site meetings.
All wiring for electrical work must be completed in accordance with Section
26 05 00 - Common Work Results for Electrical, manufacturer’s
recommendations and the Ontario Electrical Safety Authority (ESA).
MISCELLANEOUS WORK
.1
Provide instructions, monitor work and retain complete responsibility for all field
control devices and equipment provided by Division 25, but installed by others
(e.g. control valves, thermowells, VFDs, etc.)
23 Beechgrove Lane
Section 25 05 01
Heating-Cooling RTU Renewal
EMCS: GENERAL REQUIREMENTS
Project No. 1039236-270802
Page 5 of 9
.2
Coordinate wiring requirements of systems or equipment provided by others but
required to be wired by Division 25. Obtain manufacturer’s recommendations
from the system provider.
.3
1.11
Coordinate wiring interface of equipment supplied by others.
EQUIPMENT TO PROVIDE TO OTHERS
.1
Provide to Division 23:
.1
.2
.3
1.12
Control valves for heating water network.
Thermowells for temperature sensors installed on heating water network.
Pressure transmitters for installation on heating water network.
EXISTING CONDITIONS - CONTROL COMPONENTS
.1
Utilize existing control wiring for field devices (I/O wiring) and controller
enclosures.
.2
Existing conduits can be re-used to run new wiring, provided that conduits size
complies with these specifications and routing applies to new installation.
.3
Existing power supplies:
.1
.2
It is intended to re-use existing power sources (120V/1/60) for new EMCS
components and transformers. However, existing power sources are not
currently identified in local distribution panels.
Inspect existing circuits used for EMCS and provide a report indicating
the following:
.1
Number of circuits currently used and their location (room, panel
#, circuit #, etc.);
.2
Panel information (normal/emergency, rating, total number of
circuits, number of spare circuits, etc.)
.3
For each circuit:
.1
Provide a confirmation circuit is dedicated to the EMCS.
.2
Indicate the intended use with new EMCS (e.g. server, 1st
floor VAVs, mechanical room 204, etc.)
.3
Provide anticipated equipment load.
.4
Submit written request for permission to disconnect controls and to obtain
equipment downtime before proceeding with Work.
.5
Assume responsibility for controls to be incorporated into EMCS after written
receipt of approval from Project Manager.
.1
.2
.3
Be responsible for items repaired or replaced by Project Manager.
Be responsible for repair costs due to negligence or abuse of equipment.
Responsibility for existing devices terminates upon final acceptance of
applicable portions of EMCS as approved by Project Manager.
23 Beechgrove Lane
Section 25 05 01
Heating-Cooling RTU Renewal
EMCS: GENERAL REQUIREMENTS
Project No. 1039236-270802
Page 6 of 9
.6
Following EMCS installation, remove all controls not re-used or no longer
required in the new EMCS arrangement. This work includes all unused control
devices, cabinets, conduits, cables, network wiring and pneumatic tubing. Place
in approved storage for disposition as directed.
1.13
SWITCHOVER PROCESS
.1
All electro-mechanical systems must remain functional during normal operation
hours. For that intent, conduct all control panel switchovers outside of normal
operation hours.
.2
Minimize downtime of electro-mechanical equipment during the switchover
process to ensure building ambient conditions are put back to normal conditions
before the commencement of normal operating hours.
.3
Switchover Planning:
.1
.2
1.14
EMCS Contractor to provide a switchover plan for review by the Project
Manager and Consultant, including the following:
.1
List of switchover activities to be conducted.
.2
Actions taken to minimize downtime during switchover and ensure
electro-mechanical systems are back in operation for normal
occupancy.
.3
Schedule of switchover activities and planned switchover date for
individual panels.
.4
Measures in place to verify controls and EMCS operation following
system switchovers and correct any deficiencies causing
downtime during normal operating hours.
.5
Measures to switchover the Centralized Management System and
minimize EMCS downtime for facility operators.
All panel switchovers and activities causing equipment downtime must be
coordinated with the Project Manager. Obtain permission form Project
Manager before proceeding with work causing downtime.
ELECTRICAL INSTALLATION
.1
Division 25 is responsible for the hiring of a qualified and licensed Electrical
contractor for the following work:
.1
.2
.3
.4
Complete electrical installation including all conduits, cables, junction box,
etc. required for control and automation systems.
120V single phase power source for DDC controls, local monitoring
panels, cabinets and transformers provided by this Division.
All connections to motor control centers or starters, interlocks for fans,
pumps and other control components.
Grounding systems required for all systems and devices provided under
Division 25, in accordance with manufacturer’s instructions and
requirements of Division 26.
23 Beechgrove Lane
Section 25 05 01
Heating-Cooling RTU Renewal
EMCS: GENERAL REQUIREMENTS
Project No. 1039236-270802
Page 7 of 9
.5
Inspection of existing power sources (120V/1/60) intended to be re-used
for the new EMCS complete with report, as described in item “EXISTING
CONDITIONS - CONTROL COMPONENTS”.
.2
Quality Assurance:
.1
.2
.3
The electrical contractor providing the electrical installation for Division 25
to be fully competent in the type of work described in these specifications
and to be familiar with the electrical and grounding requirements of this
type of installation.
Provide qualified personnel that have been trained for the installation of
electrical systems specific to DDC controls, instrumentation and
networking infrastructure.
Electrical contractor to hold a valid Master Electrical contractor license as
issued by the Province that the work is being constructed.
Part 2
Products
2.1
ENERGY MANAGEMENT AND CONTROL SYSTEM (EMCS)
.1
The new EMCS Building Controllers and Centralized Management System shall
be from the same manufacturer and product line.
.2
The EMCS shall have the capability of interfacing with third party control systems
including pump packages, air-handling units, energy metering systems and other
control systems provided they comply with open protocols such as ASHRAE
BACnet, Echelon Lonworks or Modbus.
.3
The graphics package of the EMCS Centralized Management System must be
based on the Niagara AX standard base library to ensure consistency within IO
buildings graphics.
2.2
EMCS - PRIMARY NETWORK
.1
EMCS communication at the primary level (Ethernet TCP/IP) will be provided in
conformance with:
.1
.2
.3
Ethernet standard.
TCP/IP protocol suite.
ASHRAE BACnet Standard 135-2010, Annex J with support for Internet
Protocol (IP) Addressing and common routers.
Part 3
Execution
3.1
GENERAL
.1
All controls shall be installed and adjusted by specialized technicians, regularly
employed by the EMCS manufacturer. All costs related to adjustments form
part of this contract.
23 Beechgrove Lane
Section 25 05 01
Heating-Cooling RTU Renewal
EMCS: GENERAL REQUIREMENTS
Project No. 1039236-270802
Page 8 of 9
.2
All controls components must be easily accessible for maintenance.
.3
3.2
Install all field devices in control cabinets.
MANUFACTURER'S RECOMMENDATIONS
.1
3.3
Installation: to manufacturer's recommendations.
ELECTRICAL INSTALLATION
.1
Complete installation in accordance with Section 26 05 00 - Common Work
Results for Electrical and the Ontario Electrical Safety Code.
.2
Modify starters to provide for EMCS as indicated on drawings. Refer to electrical
control schematics included as part of control design schematics on drawings.
Provide wiring schematics including additions, deletions to control circuits.
.3
Terminate wires with screw terminal type connectors suitable for wire size, and
number of terminations.
.4
Provide grounding for controls systems and the EMCS installation in accordance
with Division 26.
.5
Variable Frequency Drives (VFDs): mounting and 600VAC connections of all
VFDs are to be done by Division 26.
.6
Wiring:
.1
.2
.3
.4
.5
.6
.7
.8
.9
.10
Wiring must be continuous without joints.
All wiring shall be run in EMT conduit unless specified otherwise.
Maximum conduit fill not to exceed 50%.
Use of FT6 plenum-rated cables without conduits is only authorized in
accessible ceiling space, for connection of EMCS components (24V
power supply, room sensor, control valve, etc.) to an application-specific
digital controller (TCU) or local control unit (LCU).
When FT6 plenum cables are run without conduits, wiring must follow the
building lines and must be attached properly every 1.5 meters using
hooks (or Velcro) specifically designed for this purpose.
Hooks (or Velcro) must be fixed properly to the building structure and
must not be attached to existing building systems such as electrical
conduits, ductwork, piping, etc. or their associated hangers. The use of
tape or tie-wraps is prohibited.
Provide protection against the abrasion of cables when running FT6
plenum-rated cables to sensors or other accessories inside the wall.
Communication trunks and power wiring must be run in corridors, away
from closed offices.
Do not run exposed conduits in normally occupied spaces unless
otherwise indicated or unless impossible to do otherwise. Consultant to
review before starting Work.
Wiring in mechanical rooms, wiring in service rooms and exposed wiring
must be in conduit.
23 Beechgrove Lane
Section 25 05 01
Heating-Cooling RTU Renewal
EMCS: GENERAL REQUIREMENTS
Project No. 1039236-270802
Page 9 of 9
.11
Wiring sizes:
.1
120 V: #12AWG minimum.
.2
24 V: #18AWG minimum.
.3
Power loss through conductor shall not exceed 5%.
.7
Ethernet Network:
.1
.2
.3
3.4
All Ethernet cables, for connection of IP-enabled devices to the EMCS,
shall be supplied by Division 25 and certified by a Telecommunications
Specialist.
Division 25 is responsible for providing the EMT conduit infrastructure that
will be used to run Ethernet cables to EMCS and integrated devices.
In all cases, coordinate with the Telecommunications Specialist to ensure
the conduit infrastructure deployed complies with EIA/TIA standards.
PAINTING
.1
Clean and touch up marred or scratched surfaces of factory finished equipment
to match original finish.
.2
Restore to new condition, finished surfaces too extensively damaged to be
primed and touched up to make good.
.3
Clean and prime exposed hangers, racks, fastenings, and other support
components.
3.5
ADDITIONAL BANK OF HOURS
.1
Provide a bank of sixty (40) additional hours to perform system refinement,
optimization or additional work to the Contract. The bank must remain valid for a
period of twenty-four (24) months following the Final Acceptance date.
.2
Hours from this bank may also be used for future training purposes.
.3
All hours are additional to the work described in Division 25. All hours withdrawn
from the bank must be approved and signed by the Owner.
END OF SECTION
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
Part 1
General
1.1
RELATED SECTIONS
.1
1.2
Section 25 05 02
EMCS: SUBMITTALS AND REVIEW PROCESS
Page 1 of 2
Section 25 05 01 - EMCS: General Requirements.
SUBMITTALS
.1
In addition to submittals required in Division 01, provide all shop drawings and
closeout documentation in accordance with the requirements of this section.
.2
Shop Drawings: provide an electronic copy of shop drawings in PDF format.
.3
Closeout Documents: submit preliminary copy for Consultant’s review. Following
the review, make corrections as requested and provide (5) hard copies and (5)
“back-up” copy (PDF – multipage format) on DVD of the closeout documents.
Closeout documents must also be entered on the facility OWS.
1.3
SHOP DRAWING REVIEW
.1
Submit detailed shop drawings before start of installation and include following:
.1
.2
1.4
Detailed system architecture showing all points associated with the
Rooftop units.
Proposed graphic layout and Floor plan layout.
CLOSEOUT DOCUMENTATION
.1
Submit closeout documentation once system start-up, verification and
commissioning has been completed, in accordance with Section 25 05 11 EMCS: Start-up, verification and commissioning.
.2
Closeout documents to include final “Operations and Maintenance” manual and
all as-built data related to the completed EMCS installation, including:
.1
.2
.3
.4
.5
.6
.7
.8
.9
Corrected and updated version of all information requested in the shop
drawings reviews, in accordance with the as-built system.
All testing and commissioning reports, in accordance with Section
25 05 11 – EMCS: Start-up, verification and commissioning.
Copy of all system programs and documentation for their use.
Copy of all software programmed including database, graphics,
parameters, etc.
List of alarm limits programed (high and low for each type).
List of points assigned to schedule and event programs.
Updated floor plans showing location of new Rooftop Units.
Training documentation.
Certification and warranty of primary network (Ethernet TCP/IP).
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
1.5
QUALITY ASSURANCE
.1
Section 25 05 02
EMCS: SUBMITTALS AND REVIEW PROCESS
Page 2 of 2
Preliminary Design Review Meeting: Convene meeting to:
.1
.2
.3
Undertake functional review of preliminary design documents, resolve
inconsistencies.
Resolve conflicts between contract document requirements and actual
items.
Review "Sequence of Operations".
.2
System programmers (EMCS) to attend meeting.
.3
Consultant retains right to revise sequence or subsequent CDL prior to software
finalization without cost to Owner.
Part 2
Products
2.1
NOT USED
.1
Not Used.
Part 3
Execution
3.1
NOT USED
.1
Not Used.
END OF SECTION
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
Part 1
General
1.1
DEFINITIONS
Section 25 05 11
EMCS: START-UP, VERIFICATION AND
COMMISSIONING
Page 1 of 4
.1
For additional acronyms and definitions refer to Section 25 05 01 – EMCS:
General Requirements.
.2
AEL: ratio between total test periods less any system downtime accumulated
within that period and test period.
.3
Downtime: results whenever EMCS is unable to fulfill required functions due to
malfunction of equipment defined under responsibility of EMCS contractor.
Downtime is measured by duration, in time, between time that Contractor is
notified of failure and time system is restored to proper operating condition.
Downtime not to include following:
.1
.2
.3
1.2
Outage of main power supply in excess of back-up power sources,
provided that:
.1
Automatic initiation of back-up was accomplished.
.2
Automatic shut-down and re-start of components was as
specified.
Failure of communications link, provided that:
.1
Controller automatically and correctly operated in stand-alone
mode.
.2
Failure was not due to failure of any specified EMCS equipment.
Functional failure resulting from individual sensor inputs or output
devices, provided that:
.1
System recorded said fault.
.2
Equipment defaulted to fail-safe mode.
DESIGN REQUIREMENTS
.1
Confirm with Consultant that Design Criteria and Design Intents are still
applicable.
.2
Commissioning personnel to be fully aware of and qualified to interpret Design
Criteria and Design Intents.
1.3
SUBMITTALS
.1
Final Report: submit report in accordance with Section 25 05 02 – EMCS:
Submittals and Review Procedures.
.1
Include measurements, final settings and certified test results.
.2
Bear signature of commissioning technician and supervisor
.3
Report format to be approved by Commissioning Authority before
commissioning is started.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Section 25 05 11
EMCS: START-UP, VERIFICATION AND
COMMISSIONING
Project No. 1039236-270802
Page 2 of 4
.4
Revise "as-built" documentation, commissioning reports to reflect
changes, adjustments and modifications to EMCS as set during
commissioning.
.5
1.4
Recommend additional changes and/or modifications deemed advisable
in order to improve performance, environmental conditions or energy
consumption.
COMMISSIONING
.1
Carry out commissioning under direction and in presence of Commissioning
Authority, in compliance with Section 01 91 13 – Commissioning – General
Requirements and additional requirements of this section.
.2
Inform, and obtain approval from, Consultant in writing at least 7 days prior to
commissioning or each test. Indicate:
.1
Location and part of system to be tested or commissioned.
.2
Testing/commissioning procedures, anticipated results.
.3
Names of testing/commissioning personnel.
.3
Correct deficiencies, re-test in presence of Commissioning Authority until
satisfactory performance is obtained.
.4
Acceptance of tests will not relieve Contractor from responsibility for ensuring
that complete systems meet every requirement of Contract.
.5
Load system with project software.
.6
Perform tests as required.
1.5
COMPLETION OF COMMISSIONING
.1
1.6
Commissioning to be considered as satisfactorily completed when objectives of
commissioning have been achieved and reviewed by Consultant.
ISSUANCE OF FINAL CERTIFICATE OF COMPLETION
.1
Final Certificate of Completion will not be issued until receipt of written approval
indicating successful completion of specified commissioning activities including
receipt of commissioning documentation.
Part 2
Products
2.1
EQUIPMENT
.1
Provide sufficient instrumentation to verify and commission the installed system.
Provide two-way radios.
.2
Instrumentation accuracy tolerances: higher order of magnitude than equipment
or system being tested.
.3
Independent testing laboratory to certify test equipment as accurate to within
approved tolerances no more than 2 months prior to tests.
.4
Application: to conform to normal industry standards.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
Part 3
Execution
3.1
Section 25 05 11
EMCS: START-UP, VERIFICATION AND
COMMISSIONING
Page 3 of 4
PROCEDURES
.1
Test each system independently.
.2
Debug system software.
.3
Optimize operation and performance of systems by fine-tuning PID values and
modifying CDLs as required.
3.2
FIELD QUALITY CONTROL
.1
.2
Completion Testing:
.1
General: test after installation of each part of system and after completion
of mechanical and electrical hook-ups, to verify correct installation and
functioning.
.2
Include following activities:
Test and calibrate field hardware including stand-alone capability
of each controller.
.2
Provide point verification list in table format including point
identifier, point identifier expansion, point type and address, low
and high limits and engineering units. Include space on
commissioning technician and Consultant. This document will be
used in final start-up testing.
Final Start-up Testing:
.1
.3
.1
Upon satisfactory completion of tests, perform point-by-point test of entire
system under direction of Consultant and provide:
.1
Technical personnel capable of re-calibrating field hardware and
modifying software.
.2
Detailed daily schedule showing items to be tested and personnel
available.
.3
Commissioning to commence during final start-up testing.
.4
O&M personnel to assist in commissioning procedures as part of
training.
.5
Operate systems as long as necessary to commission entire
project.
.6
Monitor progress and keep detailed records of activities and
results.
Final Operational Testing:
.1
.2
To demonstrate that EMCS functions in accordance with contract
requirements.
In accordance with Section 01 91 13 – Commissioning – General
Requirements.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
3.3
DEMONSTRATION
.1
Section 25 05 11
EMCS: START-UP, VERIFICATION AND
COMMISSIONING
Page 4 of 4
Demonstrate operation of systems including sequence of operations in regular
and emergency modes, under normal and emergency conditions, start-up, shutdown interlocks and lock-outs.
END OF SECTION
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
Part 1
General
1.1
RELATED REQUIREMENTS
Section 26 05 00
COMMON WORK RESULTS FOR ELECTRICAL
Page 1 of 6
.1
All contractual documents.
.2
Obtain a copy of pertinent documents, read them attentively and determine
requirements based on the scope of work.
1.2
REFERENCES
.1
Canadian Standards Association (CSA)
.1
.2
.3
1.3
CSA C22.1- 15, Canadian Electrical Code, Part 1 (23rd Edition), Safety
Standard for Electrical Installations, Includes Update No. 1 (2015
CAN/CSA-C22.3 No. 1-10 (R2015), Overhead Systems.
CSA Z32-09(2014), Electrical Safety and Essential Electrical Systems in
Health Care Facilities, includes Update No. 1 (2010), Update No. 2
(2010).
SCOPE OF WORK
.1
Work Includes:
.1
1.4
In general, work consists of the supply of all required materials,
workforce, equipment and tools required to complete the electrical
installations as described in writing, plans, and specifications. Most
notably, work is comprised of:
.1
Supply and connection of all AC units
.2
AC unit GFI outlets
.3
Closed-circuit television (CCTV) system.
.4
Night shift system.
.5
Connection of electrical hardware.
RELATED WORK
.1
The following work must be carried out by following the prescribed requirements,
and is also included in other sections of the specifications:
.1
1.5
Mechanical work associated with the installation of the AC units
MATERIALS
.1
1.6
Unless stated to the contrary use new materials, without defect, and of the quality
required, bearing the appropriate approval labels by CSA, ULC, FM, according to
the specifications.
DOCUMENTS/SAMPLES TO SUBMIT FOR APPROVAL/INFORMATION
.1
Shop Drawings
.1
Submit the technical data sheets required in addition to the instructions
and the Manufacturer’s documentation. Technical data sheets must
indicate product information, nameplate, performance criteria, product
dimensions, product limitations.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
.2
.3
.4
1.7
Section 26 05 00
COMMON WORK RESULTS FOR ELECTRICAL
Page 2 of 6
Indoor and outdoor disconnect switches
GFI outlets and weatherproof enclosure
Submit for review fire alarm riser diagram, plan and zoning of building,
[under plexiglass] [in glazed frames] at fire alarm control panel and
annunciator.
WIRING TERMINATIONS
.1
2.6
Ensure lugs, terminals, screws used for termination of wiring are suitable for
either copper or aluminum conductors.
EQUIPMENT IDENTIFICATION
.2
Identify electrical equipment with [nameplates] [labels] as follows:
.1
.2
Nameplates: [plastic laminate] [lamicoid] [3] mm [thick plastic engraving
sheet] [melamine], [black] [matt white finish] face, [black] [white] core,
[lettering accurately aligned and engraved into core] [mechanically
attached with self-tapping screws].
Sizes as follows:
NAMEPLATE SIZES
Size 1
10 mm x 50 mm
One line
Size 2
12 mm x 70 mm
One line
Size 3
12 mm x 70 mm
Two lines
Size 4
20 mm x 90 mm
One line
Size 5
20 mm x 90 mm
Two lines
Size 6
25 mm x 100
mm
One line
Size 7
25 mm x 100
mm
Two lines
3 mm high
letters
5 mm high
letters
3 mm high
letters
8 mm high
letters
5 mm high
letters
12 mm high
letters
6 mm high
letters
.3
Labels: embossed plastic labels with [6] mm high letters unless specified
otherwise.
.4
Wording on [nameplates] [labels] to be approved by Consultant prior to
manufacture.
.5
Allow for minimum of twenty-five (25) letters per [nameplate] [label].
.6
Nameplates for terminal cabinets and junction boxes to indicate system and/or
voltage characteristics.
.7
Identify equipment with Size 3 labels engraved "ASSET INVENTORY NO.
[_____]" as directed by Consultant.
.8
Disconnects, starters and contactors: indicate equipment being controlled and
voltage.
.9
Terminal cabinets and pull boxes: indicate system and voltage.
.10
Transformers: indicate capacity, primary and secondary voltages.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
.11
Devices:
.1
.2
.3
.4
.5
1.8
Section 26 05 00
COMMON WORK RESULTS FOR ELECTRICAL
Page 3 of 6
Identify all electrical equipment with visible safety labels on the device
cover, the door of the device, or on the device frame.
Use the same device code as indicated on drawings.
Provide a list of all device identification for approval prior to the
manufacturing.
Assure that all device identifications are affixed to the equipment and that
they are in [English] and [French].
List of equipment to identify:
.1
AC units
.2
GFI receptacles
.3
Disconnect switches
.4
Electrical panels
WIRING IDENTIFICATION
.1
Identify wiring with permanent indelible identifying markings, [numbered]
[coloured plastic tapes], on both ends of phase conductors of feeders and branch
circuit wiring.
.2
Maintain phase sequence and colour coding throughout.
.3
Phases:
.1
.2
.3
.4
Identify with letters of size 5 cm in height, each phase A, B, C, N, on the
inside of each transformer entry point, each low-voltage switchboard, and
each motor control centre on all live components.
Identify components and assigned phases using the colour codes
outlined below:
Identification
120/208 V
120/240 V
347/600 V
Phase A
Red
Red
Red wih stripe
Phase B
Black
Black
Black with
stripe
Phase C
Blue
---
Blue with
stripe
Neutral
White
White
White
Ground
Green
Green
Green
Use yellow coloured wiring for lighting return switches and orange
coloured wiring for driver deflecting switches and inverters.
Use coloured tape placed at a distance of 150 mm from each end of the
conductors to identify drivers. Use coloured tape on each end of the
conductors inside junction and pull boxes.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
Part 2
Execution
2.1
EXAMINATION
.1
Verification of Conditions: verify that conditions of substrate previously installed
under other Sections or Contracts are acceptable for [_____] installation in
accordance with manufacturer's written instructions.
.1
.2
.3
2.2
Section 26 05 00
COMMON WORK RESULTS FOR ELECTRICAL
Page 4 of 6
Visually inspect substrate in presence of Consultant.
Inform Consultant of unacceptable conditions immediately upon
discovery.
Proceed with installation only after unacceptable conditions have been
remedied [and after receipt of written approval to proceed from
Consultant.
INSTALLATION
.1
Do complete installation in accordance with CSA C22.1 except where specified
otherwise.
.2
Do overhead and underground systems in accordance with CAN/CSA-C22.3 no.
1 except where specified otherwise.
2.3
NAMEPLATES AND LABELS
.1
2.4
Ensure manufacturer's nameplates, CSA labels and identification nameplates are
visible and legible after equipment is installed.
CONDUIT AND CABLE INSTALLATION
.1
EMT for indoor installation
.2
PVC for outdoor installation
.1
.2
.3
.4
.5
2.5
Television outlets: [400] mm.
Wall mounted speakers: [2300] mm.
Clocks: [2300] mm.
Doorbell pushbuttons: [1200] mm.
Poste d’appel de chevet : 1100 mm
Hôpitaux : lampe murale de chevet : 1800 mm
LOCATION OF OUTLETS
.1
2.6
The exact location of outdoor outlets is 600mm from ground to centerline
COORDINATION OF PROTECTIVE DEVICES
.1
Ensure circuit protective devices such as overcurrent trips, relays and fuses are
installed to required values and settings.
.2
Ensure circuit protective devices such as overcurrent trips, relays and fuses
match the required capacity values according to their labels.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
2.7
Section 26 05 00
COMMON WORK RESULTS FOR ELECTRICAL
Page 5 of 6
FIELD QUALITY CONTROL
.1
Load Balance:
.1
.2
.3
2.8
Measure phase current to panel boards with normal loads (lighting)
operating at time of acceptance; adjust branch circuit connections as
required to obtain best balance of current between phases and record
changes.
Measure phase voltages at loads and adjust transformer taps to within
2% of rated voltage of equipment.
Provide upon completion of work, load balance report as directed in
PART 1 – "ACTION AND INFORMATIONAL SUBMITTALS", phase and
neutral currents on panel boards, dry-core transformers and motor control
centres, operating under normal load, as well as hour and date on which
each load was measured, and voltage at time of test.
PERFORMANCE
.1
Electrical contractor to collaborate with other trades in such a way that the
performance of equipment can be tested in a timely fashion.
.2
Once testing of equipment is complete, devices can be adjusted in such a way to
obtain maximum efficiency.
.3
General Requirements:
.1
.2
.3
.4
.5
.6
.7
.8
.9
.10
.11
All testing must be completed in the presence of the engineer and to their
satisfaction.
The engineer may require their own testing prior to accepting the results.
For temporary testing, obtain written permission to perform the tests.
A written warning giving a notice of 48 hours to the engineer is required
prior to testing.
Provide the necessary devices, equipment, meters, materials, and
personnel required for the execution of testing throughout the project until
such a time as the engineer accepts the performance.
If a piece of equipment or a device does not operate as per the
manufacturer’s guarantee or the results of a test do not yield the desired
results, the faulty piece of equipment must be replaced without delay and
payment shall be deferred until the new piece of equipment is installed
and desired operating results are obtained.
Prevent dust, dirt, and other foreign materials from penetrating the
openings in installations and devices during the testing phase.
Provide the engineer with a certificate or a manufacturer’s letter
confirming that the power supply to the device has been installed to their
satisfaction.
Provide written confirmation of the results obtained from testing.
Testing trials must be completed and accepted prior to the installation of
thermal insulation.
Do not hide or recess any outlets, accessories, or devices until testing is
complete and results have been accepted.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
.4
Special Requirements:
.1
.5
.2
.3
.2
.3
.4
2.9
The owner and engineer reserve the right to examine equipment in use
and to assist in the testing to ensure factory device requirements are met.
Advice the engineer and owner at least one week in advance with the
exact date and time that testing will occur.
Provide two certified copies of testing reports to the engineer.
This testing will include the verification of:
.1
.7
The presence of the electrical contractor may be required for a test
conducted by another trade.
Factory Testing:
.1
.6
Section 26 05 00
COMMON WORK RESULTS FOR ELECTRICAL
Page 6 of 6
Integrity of the wire insulation and the voltage between the conductors to
the ground.
Differences in Voltage between ground and active points.
Resistance in the socket.
Polarity of the outlets.
Include with the submission, the cost associated with the prescribed testing
outlined in standard CSA Z32
DEMOLITION
.1
Remove and transport off-site all demolished equipment including the following:
conduits, boxes, outlets, switches, lighting devices, power distribution devices,
auxiliary systems, safety/warning communications systems, and all accessories.
.2
Remove wiring and conduits back to the panel.
.3
Seal all openings left in accordance with the requirements contained in article
"FIREPROOFING".
.4
Repair any power circuits, control wiring or communications wiring that may have
been damaged during demolition work.
2.10
REMOVAL AND RE-INSTALLATION OF EXISTING EQUIPMENT
.1
Remove and install all electrical devices, conduits and required conductors to
allow for the completion of architectural, mechanical, and structural work as
outlined in the drawings and specifications. Consult the drawings and
specifications of other disciplines as required.
END OF SECTION
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
Part 1
General
1.1
REFERENCES
.1
CSA International
.1
.2
.2
1.2
CAN/CSA-C22.2 No.18-98(R2003), Outlet Boxes, Conduit Boxes and
Fittings.
CAN/CSA-C22.2 No.65-13, Wire Connectors (Tri-National Standard with
UL 486A-486B and NMX-J-543-ANCE-03).
Electrical and Electronic Manufacturers' Association of Canada (EEMAC)
.1
.3
Section 26 05 20
WIRE AND BOX CONNECTORS (0-1000V)
Page 1 of 3
EEMAC 1Y-2-1961, Bushing Stud Connectors and Aluminum Adapters
(1200 Ampere Maximum Rating).
National Electrical Manufacturers Association (NEMA)
ACTION AND INFORMATION SUBMITTALS
.1
Submit in accordance with Section 01 00 10 – General Instructions.
.2
Product Data:
.1
1.3
Submit manufacturer's instructions, printed product literature and data
sheets for [wire and box connectors] and include product characteristics,
performance criteria, physical size, finish and limitations.
CLOSEOUT SUBMITTALS
.1
Submit in accordance with Section 01 00 10 – General Instructions.
.2
Operation and Maintenance Data: submit operation and maintenance data for
[wire and box connectors] for incorporation into manual, E&Es.
Part 2
Product
2.1
MATERIALS
.1
Pressure type wire connectors to: CAN/CSA-C22.2 No.65, with current carrying
parts of [copper] [copper alloy] [aluminum] [aluminum alloy] sized to fit [copper]
[aluminum] conductors as required.
.2
Fixture type splicing connectors to: CAN/CSA-C22.2 No.65] with current carrying
parts of [copper] [copper alloy] sized to fit [copper] conductors 10 AWG or less.
.3
Bushing stud connectors: to [EEMAC 1Y-2] [NEMA] to consist of:
.1
.2
.3
.4
.5
.6
Connector body and stud clamp for [stranded] [round] [copper]
[aluminum] [conductors] [tube] [bar].
Clamp for [stranded] [round] copper [conductors] [bar].
Clamp for [stranded aluminum] [ACSR] [conductors] [round aluminum
bar].
Stud clamp bolts.
Bolts for copper [conductors] [bar].
Bolts for aluminum [conductors] [bar].
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
.7
.4
2.2
Section 26 05 20
WIRE AND BOX CONNECTORS (0-1000V)
Page 2 of 3
Sized for [conductors] [tubes] [bars] as indicated.
Clamps or connectors for [armoured cable,] [Teck cable] [aluminum sheathed
cable,] [mineral insulated cable,] [flexible conduit,] [non-metallic sheathed cable]
as required to: CAN/CSA-C22.2 no.18.
WIRE CONNECTORS
.1
Mechanical connectors for conductor size 8 AWG or less, use Scotchlock
Electrical Spring Connectors from 3M or Marette from Thomas & Betts.
.2
Mechanical connection for copper-to-copper conductors of size 6 AWG or larger,
use type H split bolt connectors from Thomas & Betts.
.3
Mechanical connection for copper-to-Nual conductors of size 6 AWG or larger,
use type APS split bolt connectors from Thomas & Betts.
.4
Mechanical connection for Nual-to-Nual conductors of size 6 AWG or larger, use
type HPS split bolt connector from Thomas & Betts.
2.3
TERMINAL BLOCKS
.1
All wire connection in junction boxes and panels for fire-alarm, low-voltage
lighting control, other low-voltage systems, etc., will be made on terminal blocks
in sufficient quantities for each wire connection.
.2
Terminal blocks shall be from Wieland brand, model 9700B, 10 A, 300 V,
complete with DIN rail, end plates, identification, extremity flanges and jumpers.
2.4
ACCEPTABLE MANUFACTURERS
.1
Wire connectors:
.1
.2
.3
.2
3M
Burndy
Thomas & Betts
Terminal Blocks:
.1
.2
.3
Staffel
Weidmüller
Wieland
Part 3
Execution
3.1
EXAMINATION
.1
Verification of Conditions: verify that conditions of substrate previously installed
under other Sections or Contracts are acceptable for wire and box connector
installation in accordance with manufacturer's written instructions.
.1
.2
.3
Visually inspect substrate in presence of Consultant.
Inform Consultant of unacceptable conditions immediately upon
discovery.
Proceed with installation only after unacceptable conditions have been
remedied [and after receipt of written approval to proceed from
Consultant].
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
3.2
Section 26 05 20
WIRE AND BOX CONNECTORS (0-1000V)
Page 3 of 3
INSTALLATION
.1
Remove insulation carefully from ends of conductors [cables] and:
.1
.2
.3
.4
Apply coat of zinc joint compound on aluminum conductors prior to
installation of connectors.
Install mechanical pressure type connectors and tighten screws [with
appropriate compression tool recommended by manufacturer]. Installation
shall meet secureness tests in accordance with CAN/CSA-C22.2 no.65.
Install fixture type connectors and tighten to CAN/CSA-C22.2 no.65.
Replace insulating cap.
Install bushing stud connectors in accordance with [EEMAC 1Y-2] NEMA.
END OF SECTION
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
Part 1
General
1.1
REFERENCES
.1
Canadian Standards Association (CSA)
.1
1.2
Section 26 05 21
WIRES AND CABLES (0-1000V)
Page 1 of 3
CAN/CSA-C22.2 No.131-14, Type TECK 90 Cable.
PRODUCT DATA
.1
Provide product data in accordance with Section 01 00 10 – General Instructions.
Part 2
Products
2.1
BUILDING WIRES
.1
2.2
Conductors: stranded for 8 AWG and larger. Minimum size: 12 AWG.
TECK 90 CABLE
.1
Conductors:
.1
.2
Grounding conductor: Unless stated otherwise copper only
Insulation:
.1
.2
Cross-linked polyethylene (RW90 XLPE).
Voltage rating: 1 000 V [600 V].
.3
Tape: Mylar
.4
Inner jacket: polyvinyl chloride material.
.5
Armour: flat, interlocking, aluminum [galvanized steel].
.6
Overall covering: thermoplastic polyvinyl chloride, compliant to applicable
Building Code classification for this project.
.7
Fastenings:
.1
.2
.8
Connectors:
.1
.2
.9
Watertight, [explosion-proof] approved for Teck cable.
Indoor type teck cable connectors for indoor installation
Single conductor cable characteristics:
.1
.10
One hole, malleable iron, steel, aluminum, in humid areas, straps to
secure surface cables 50 mm and smaller. Two holes steel straps for
cables larger than 50 mm.
Channel type U supports for two or more cables. Threaded rods: 6 mm
diameter to support suspended channels.
Concentric ground conductor.
Multi-conductor cable characteristics:
.1
.2
Class B stranded copper conductors.
Class B stranded copper grounding conductor.
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
.3
2.3
Section 26 05 21
WIRES AND CABLES (0-1000V)
Page 2 of 3
Filling with non-hygroscopic material.
NON-METALLIC SHEATHED CABLE
.1
2.4
Non-metallic sheathed, copper ACM alloy cable type: NMD-90, FT-1 approved,
for the connection of circuits inside a housing unit. Size as indicated.
APPROVED MANUFACTURERS
.1
Teck Cables:
.1
.2
.3
Alcan (General Cable)
Nexans
Phillips
Part 3
Execution
3.1
FIELD QUALITY CONTROL
.1
Perform tests in accordance with Section 26 05 00 – Common Work Results for
Electrical.
.2
Perform tests using method appropriate to site conditions and to approval of
Consultant and local authority having jurisdiction over installation.
.3
Perform tests before energizing electrical system.
3.2
GENERAL CABLE INSTALLATION
.1
Supply and install wires and cables required for the connection of all electrical
equipment and devices to make them fully operational even if the wires or cables
are not specifically shown on the drawings.
.2
Do not fasten cables using plastic ties.
.3
Fasten cables in accordance to the Ontario Electrical Safety Code.
.1
.4
Maintain an equal spacing of at least the largest diameter of the cable
between each of the cables installed in open air or in the cable racks.
Maximum length of voltage drops. Size cables in accordance to table below.
APPENDIX II
MAXIMUM LENGTH (IN METERS) OF A BRANCHCIRCUIT
AT 120 V VERSUS VOLTAGE DROP
Rating in Amps (A)
Conductor Size
AWG
15
20
30
12
20
15
---
10
30
25
15
8
50
40
25
6
90
65
40
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
Section 26 05 21
WIRES AND CABLES (0-1000V)
Page 3 of 3
MAXIMUM LENGTH (IN METERS) OF A BRANCHCIRCUIT
AT 120 V VERSUS VOLTAGE DROP
Notes :
- For non-specified loads, refer to Chapter V – Electrical to
Construction Code of Quebec (Quebec Electrical Code
(table no. D3).
- Distance calculated for copper conductors at a
temperature of 60°C.
END OF SECTION
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
Part 1
General
1.1
NOT USED
.1
Section 26 24 16.01
PANELBOARDS BREAKER TYPE
Page 1 of 1
Not used.
Part 2
Products
2.1
PANELBOARDS
.1
All panels installed in mechanical and electrical rooms are existing.
2.2
BREAKERS
.1
2.3
Use breakers approved by the electrical panel’s manufacturer
EQUIPMENT IDENTIFICATION
.1
Type written updated legend
Part 3
Execution
3.1
INSTALLATION
.1
Connect loads to circuits.
.2
Connect neutral conductors to common neutral bus.
END OF SECTION
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Project No. 1039236-270802
Part 1
General
1.1
NOT USED
.1
Not used
Part 2
Products
2.1
RECEPTACLES
.1
Duplex GFI receptacles, 5-15 CSA Type R, 125 V, 15 A, grounded U socket to
conform to CSA C22.2 No. 42.
.1
.2
.3
White, brown or grey GFCI Leviton or equivalent
Weatherproof box Cooper TP 7010 or equivalent
Weatherproof cover, Leviton 5980 ULC transparent cover
Part 3
Execution
3.1
EXAMINATION
.1
Verification of Conditions: verify that conditions of substrate previously installed
under other Sections or Contracts are acceptable for wiring devices installation in
accordance with manufacturer’s written instructions.
.1
.2
.3
.2
Section 26 27 26
WIRING DEVICES
Page 1 of 1
Visually inspect substrate in presence of the Consultant.
Inform the Consultant of unacceptable conditions immediately upon
discovery.
Proceed with installation only after unacceptable conditions have been
remedied, and after receipt of written approval to proceed from the
Consultant.
Receptacles:
.1
.2
.3
Install receptacles on the new AC units at 600mm from ground to center
of device.
Do not block any AC unit access panels
Do not mount sideways
END OF SECTION
23 Beechgrove Lane
Heating-Cooling RTU Renewal
Section 26 28 23
DISCONNECT SWITCHES – FUSED AND
NON-FUSED
Page 1 of 1
Project No. 1039236-270802
Part 1
General
1.1
REFERENCES
.1
Canadian Standards Association (CSA)
.1
CSA C22.2 No. 39 -13, Fuseholder Assemblies
Part 2
Products
2.1
DISCONNECT SWITCHES
.1
Mechanically interlocked door to prevent opening when handle in "on" position.
.2
Fuse-holders: to CSA C22.2 No. 39, relocatable and suitable without adaptors,
for type and size of fuse indicated.
.3
Quick-make, quick-break action.
.4
ON-OFF switch position indication on switch enclosure cover.
.5
Intensive use type, to sudden opening and closing, with or without fuses, as
indicated, locked door in the closed position with the possibility of cancellation by
qualified personnel, possible lockout by three (3) padlocks, portfolio fuses class J
fuses, solid neutral, NEMA -1 housing inside, NEMA -3R and technical rooms
sprinklered and NEMA -4X outdoors, model H, series Cutler Hammer or
equivalent by Siemens.
Part 3
Execution
3.1
EXAMINATION
.1
Verification of conditions: verify that conditions of substrate previously installed
under other Sections or Contracts are acceptable for disconnect switches - fused
and non-fused installation in accordance with manufacturer's written instructions.
.1
.2
.3
3.2
Visually inspect substrate in presence of the Consultant.
Inform the Consultant of unacceptable conditions immediately upon
discovery.
Proceed with installation only after unacceptable conditions have been
remedied and after receipt of written approval to proceed from the
Consultant.
INSTALLATION
.1
Install disconnect switches complete with fuses if applicable.
.2
Do not block any access panels on the new AC units.
.3
Fasten outdoor disconnect switches using strut if required to ensure there is no
movement.
END OF SECTION