Application Information Checklist
Queue Position
Company Name
Project
Date of Original Application Appendix 1 to the large generation
interconnection procedures
Site Control
Documentation reasonably demonstrating ownership, right to
develop, option to purchase, leasehold or an exclusivity or
business relationship between the applicant and the
person/company owning the property that gives the applicant the
right to construct a Generating Facility on the land. If
Interconnection Customer owns the land, the most recent property
tax receipt for the location would be an acceptable form of site
control. Or, if Interconnection Customer so chooses, it may
submit an additional $10,000 deposit in lieu of site control
documentation.
Operating State Laws
Under which state does your company operate?
Maximum MW
Affected Systems
to be completed by PacifiCorp.
Estimated Generator Load
CCM Needed ?
Qualifying Facility Attestation and Signature
Form to be completed by customer, provides notice if the output of
the generation facility will be sold to PacifiCorp.
Feasibility Study Checklist
In-Service Date
Point of Interconnection
Description of the Point of Interconnection with PacifiCorp’s
system.
(If Applicable) Alternate Point of Interconnection
Generator Information Provided
All generator data on the interconnection request form, including
machine MVA size, rated power factor, impedances and time
constants, etc.
Power Factor
Rated power factor of the generation facility.
Transformer Information
Number of Transformers
Transformers Size
Transformer Impedance
Winding Configuration
Collector Substation
Location of planned site (township and range or latitude and
longitude numbers), and approximate distance from the Point of
Interconnection.
Radial Interconnecting Line data
including distance and impedance (positive and zero sequence) of
line from generating facility substation step-up transformer to Point
of Interconnection. If there are multiple step-up transformers, and
they are separated by more than 500 ft, include distance and
impedance (positive and zero sequence) of the line that connects
the transformers.
System Impact Study Checklist
All of the required items for a feasibility study, plus the below.
Generator Data
all induction generator data on the interconnection request form,
including machine MVA size, rated power factor, impedances and
time constants, etc.
One line diagram
showing the distribution system, wind turbine feeders, wind turbine
locations, supplemental reactive compensation.
Distances and impedances of all segments
starting from low side of step-up transformer. If the collector
system step-up transformer winding configuration is wye grounded
on the high side and delta on the low side, then provide both
positive sequence impedances, including charging impedances.
OR, if the collector system step-up transformer winding
configuration is wye grounded on the high side and low side, with
a delta tertiary, then provide both positive and zero sequence
impedances, including charging.
Inverter Step-up
transformer size, and impedance.
Dynamic Stability Study Model
A WECC approved standard model in Version 33.5 format
Location/Size & Increments
of supplemental reactive compensation.
Commercial Operations Checklist
As Built Data
for distances and impedances of all segments – starting from low
side of step-up transformer. If the collector system step-up
transformer winding configuration is wye grounded on the high
side and delta on the low side, then provide both positive
sequence impedances, including charging impedances. OR If the
collector system step-up transformer winding configuration is wye
grounded on the high side and low side, with a delta tertiary, then
provide both positive and zero sequence impedances, including
charging.
As-Built Data
for wind turbine step-up transformer size, and impedance.
As-Built Data
for one line diagram showing the distribution system, location of
wind turbine feeders, wind turbine locations, supplemental reactive
compensation.
As-Built Data
for wind turbine model, compatible with PacifiCorp’s PTI PSS/E
software.
As-Built Data
for location/size & increments of supplemental reactive
compensation.
Model Data for Customer’s system
Per FERC order 661A
Final Checklist Requirements Packet
This packet will need to be completed 120 calendar days after the
project goes in service.