SGI Tech Data Checklist Application Information Checklist Queue Position Company Name Project Date of Original Application Appendix 1 to the large generation interconnection procedures Site Control Documentation reasonably demonstrating ownership, right to develop, option to purchase, leasehold or an exclusivity or business relationship between the applicant and the person/company owning the property that gives the applicant the right to construct a Generating Facility on the land. If Interconnection Customer owns the land, the most recent property tax receipt for the location would be an acceptable form of site control. Or, if Interconnection Customer so chooses, it may submit an additional $10,000 deposit in lieu of site control documentation. Operating State Laws Under which state does your company operate? Maximum MW Affected Systems to be completed by PacifiCorp. Estimated Generator Load CCM Needed ? Qualifying Facility Attestation and Signature Form to be completed by customer, provides notice if the output of the generation facility will be sold to PacifiCorp. Feasibility Study Checklist In-Service Date Point of Interconnection Description of the Point of Interconnection with PacifiCorp’s system. (If Applicable) Alternate Point of Interconnection Generator Information Provided All generator data on the interconnection request form, including machine MVA size, rated power factor, impedances and time constants, etc. Power Factor Rated power factor of the generation facility. Transformer Information Number of Transformers Transformers Size Transformer Impedance Winding Configuration Collector Substation Location of planned site (township and range or latitude and longitude numbers), and approximate distance from the Point of Interconnection. Radial Interconnecting Line data including distance and impedance (positive and zero sequence) of line from generating facility substation step-up transformer to Point of Interconnection. If there are multiple step-up transformers, and they are separated by more than 500 ft, include distance and impedance (positive and zero sequence) of the line that connects the transformers. System Impact Study Checklist All of the required items for a feasibility study, plus the below. Generator Data all induction generator data on the interconnection request form, including machine MVA size, rated power factor, impedances and time constants, etc. One line diagram showing the distribution system, wind turbine feeders, wind turbine locations, supplemental reactive compensation. Distances and impedances of all segments starting from low side of step-up transformer. If the collector system step-up transformer winding configuration is wye grounded on the high side and delta on the low side, then provide both positive sequence impedances, including charging impedances. OR, if the collector system step-up transformer winding configuration is wye grounded on the high side and low side, with a delta tertiary, then provide both positive and zero sequence impedances, including charging. Inverter Step-up transformer size, and impedance. Dynamic Stability Study Model A WECC approved standard model in Version 33.5 format Location/Size & Increments of supplemental reactive compensation. Commercial Operations Checklist As Built Data for distances and impedances of all segments – starting from low side of step-up transformer. If the collector system step-up transformer winding configuration is wye grounded on the high side and delta on the low side, then provide both positive sequence impedances, including charging impedances. OR If the collector system step-up transformer winding configuration is wye grounded on the high side and low side, with a delta tertiary, then provide both positive and zero sequence impedances, including charging. As-Built Data for wind turbine step-up transformer size, and impedance. As-Built Data for one line diagram showing the distribution system, location of wind turbine feeders, wind turbine locations, supplemental reactive compensation. As-Built Data for wind turbine model, compatible with PacifiCorp’s PTI PSS/E software. As-Built Data for location/size & increments of supplemental reactive compensation. Model Data for Customer’s system Per FERC order 661A Final Checklist Requirements Packet This packet will need to be completed 120 calendar days after the project goes in service. Notes: Attachments: