Technical Associates Limited An ISO 9001:2008 Company Energising India since 1969… About Us Manufacturers of Power and Distribution Transformers Turnkey Transmission & Distribution EPC Projects We offer solutions spanning the full length of Transmission & Distribution Opportunities 2 About Us • Currently manufacturing transformers from 5 KVA, 11 kV up to 200 MVA 220 kV class. • Planned production of Power Transformers upto 765 kV at new plant in India. • Manufacturing Capacity 18,000 MVA Per Annum. • Turnkey Projects for building electrical substations, transmission & distribution lines upto 400 kV. Aggressive Targets, Confidence to grow 3 About Us: Milestones 1967: Technical Associates was founded as a partnership firm. 1973: Present manufacturing location at Lucknow established 1985: Indian Transformer Manufacturers’ Association (ITMA) set up with TAL as a founder member 1991: TA gets ISO 9000 certification for complete transformer manufacturing process 2001: TA becomes regular manufacturer of 40.0 MVA, 132 kV Power Transformers 2006: Turnkey Power Projects division set up for executing Transmission & Distribution EPC projects. 2007: Work commences on setting up a state of the art manufacturing plant in Sitarganj, Uttarakhand for manufacture of Extra High Voltage Power transformers up to 765 kV class. 2008: State of the art plant commissioned at Sitarganj (Uttarakhand). It will enlarge TAL’s transformer product portfolio to include EHV Transformers up to 765 kV; a quantum leap in manufacturing and technology. 2009: TAL Sitarganj Unit raised first Invoice. 2009: TAL commissions Vapour Phase Drying Plants and Impulse Generators (HAEFELY, Switzerland). 2010: Both plants of TAL certified for compliance with ISO 9001:2008 standard. 2011: TAL delivers it's first 100 MVA 220/132 kV Auto Transformer to APTRANSCO. 2011: TAL executes it's first export order for Power Transformers for ZESCO, Zambia. 2011: TAL manufactured 160 MVA, 220/132 kV voltage class Power Transformer and successfully Impulse tested by ERDA Vadodra. 2012: TAL executes export order for Power Transformers for Tokai Power Products Ltd., Bangladesh and Distribution Transformation for ABERME, Republic of Benin, West Africa. 2012: TAL installed UP's first 2 MWp Solar Photovoltaic Power plant in District Barabanki Inaugurated by Honorable Chief Minister of Uttar Pradesh. 2013: TAL executes export order for Power & Distribution Transformers for Energie du Mali, Africa. 2013: TAL received approval from RDSO for manufacturing and supply of Traction Transformers upto 30MVA, 220 KV. 2013: TAL Sitarganj unit approved by Power Grid corporation of India Ltd. (PGCIL) & NTPC. 2013: TAL testing facilities duly approved and accredited to NABL. 2013: TAL approved for repair of 400/220/132 KV Power Transformers by Power Grid corporation of India Ltd. (PGCIL). 4 Pan India Presence Plant Locations Sales Network 5 Overseas Supplies 6 Products Portfolio 7 Power Transformers 100 MVA, 220/132/11 kV Power Transformer S. No Rating Voltage Class 33 kV Power Transformer 1 3.15 MVA 33/11 kV 2 5 MVA 33/11 kV 3 6.3 MVA 33/11 kV 4 7.5 MVA 33/11.5 kV 5 8.0 MVA 33/11 kV 6 10 MVA 33/11 kV 7 20 MVA 33/11.5-6.25 kV 66 kV Power Transformer 1 12.5 MVA 66/11 kV 2 12.5/ 16 MVA 66/11 kV 3 20 MVA 66/11 kV 4 16/ 20 MVA 66/11 kV 5 25/ 31.5MVA 66/11 kV 132 kV Power Transformer 1 10/16 MVA 132/11 kV 2 12.5 MVA 132/11 kV 3 20 MVA 132/11 kV 4 20/25 MVA 132/33 kV 5 31.5 MVA 132/33 kV 6 40 MVA 132/33 kV 220 kV Power Transformer 12.5 MVA, 66/11 kV Power Transformer 1 60 MVA 220/132/11 kV 2 100 MVA 220/132/11 kV 3 160 MVA 220/132 kV 40 MVA, 132/33 kV Power Transformer 8 Distribution transformers – Three phase 8 MVA, 33/11 kV Distribution Transformer S. No Rating Voltage Class 1 10 kVA 11/0.433 kV 2 15 kVA 11/0.433 kV 3 16 kVA 11/0.433 kV 4 25 kVA 11/0.433 kV 5 40 kVA 11/0.433 kV 6 63 kVA 11/0.433 kV 7 100 kVA 11/0.433 kV 8 200 kVA 11/0.433 kV 9 250 kVA 11/0.433 kV 10 250 kVA 33/0.4 kV 11 300 kVA 11/0.433 kV 12 315 kVA 11/0.433 kV 13 400 kVA 11/0.433 kV 14 400 kVA 6/0.42 kV 15 400 kVA 11/0.42 kV 16 500 kVA 11/0.433 kV 17 630 kVA 11/0.433 kV 18 750 kVA 11/0.433 kV 19 1000 kVA 11/0.433 kV 20 1500 kVA 11/0.433 kV 21 2000 kVA 11/0.433 kV All the above rating can also be manufactured for 33 kV or 22 kV voltage range Transformers upto 300 kVA, 11/0.433 kV are generally manufactured with aluminum winding, though copper wound transformers can be manufactured if required Distribution Transformers (11 kV) Distribution Transformers (33 kV) Transformers of 315 kVA and higher ratings are with copper winding 9 Distribution transformers –Single phase wound core S. No Rating Voltage Class 1 5 kVA 6.3/0.240 kV 2 5 kVA 25/0.240 kV 3 5 kVA 11/¥3 kV/240 kV 4 10 kVA 6.3/0.240 kV 5 10 kVA 25/0.240 kV 6 10 kVA 11/0.250 kV 7 16 kVA 6.3/0.240 kV 8 25 kVA 6.3/0.240 kV 9 50 kVA 6.3/0.240 kV Transformer of 10 kVA are copper / aluminum wound Transformer of 16 kVA and higher rating can be made either with copper or aluminum or composite windings Transformer with primary voltage of 11 kV and intermediate ratings are also manufactured 10 Manufacturing Facilities 11 Manufacturing process Core Conductor Insulation Aluminum / Copper rod Press Board, Insulating paper, Permawood Bare Strip / Wire to size Slit paper, blocks, spacers, supports, strips CRGO Coil Tank fabrication Fabricated Tank Ready cut core Paper covering for Strip / Wire Coil winding LV & HV End frame fabrication Core assembly Coil pre heating & pressing Tanking Oil filling Core coil assembly Filtration Ratio check Testing Main assembly connections Inspection Ratio Check Vacuum Drying/ Vapour Phase Drying Dispatch 12 Manufacturing Facilities –Lucknow • Spread out over 8 acre area with ~ 6,000 sq. meters of covered sheds • Shops are of adequate height with liberal floor area and are equipped with E.O.T cranes and other material handling facilities • Separate facilities have been earmarked for assembly of Distribution and Power Transformers • TAL has invested heavily in backward integration and does in-house production of major raw materials – Core processing (Slitting, Cutting and Annealing) – Conductor manufacturing (Drawing, Annealing and Paper covering) – Transformer oil processing – Tank fabrications – Winding – Assembly and tanking • Manufacturing capacity of ~ 4,000 MVA per annum of mixed transformer ratings Distribution Transformer Bay Power Transformer Bay Power Transformer Test Station 13 Lucknow plant Winding Machines for handling heavy weight coil winding at variable speeds upto 10.0 MT capacity Core Cradles designed especially for high quality large Core Assembly 14 Lucknow plant Complete facilities for Insulation cutting/ processing 15 Lucknow plant Complete facilities for Drawing of Round/ Rectangular Copper/ Aluminium conductor for use in Transformer windings Multi Layer Paper strip covering machines for Winding conductor 16 Lucknow plant Cranes of 5, 10, 25, 35, 150 MT lifting capacity 17 New manufacturing facility at Sitarganj T2: 33 kV transformer assembly T9: Impulse Test Area T8: Fabrication T9: 220/ 400 kV Assembly T7: Core Slitting, cutting, annealing T1: 11 kV transformer assembly EHV Test Area T6: 66/ 132 kV Assembly & Testing T5: 66/ 132/ 220/ 400 kV Winding T4: Insulation Processing T3: Central Store New Plant in Uttarakhand, North India 18 Manufacturing facilities – Sitarganj • Spread out over 12.5-acre area and is fully equipped to manufacture EHV power transformers upto 765 kV voltage class • The manufacturing sheds occupy a total covered area of ~ 23,000 sq.m. ranging from 4 m to 24 m in height, and spans of 12 m to 24 m • The plant has been designed for optimal material and work flow, and integrated manufacturing operations with separate bays planned for: – Single phase and Three phase 11 kV distributions transformer – Three phase 33 kV distribution transformer – Three phase 66 & 132 kV power transformer – Single phase and three phase 220 to 765 kV power transformer • – Coil winding – Insulation processing – Mild steel fabrication – Impulse testing set-up Manufacturing capacity of 14,000 MVA per annum of mixed transformer ratings. Would be able to manufacture and deliver one 132 kV transformer per day Distribution Transformer Bay Material Handling Facility up to 300MT (2 X 150) Power Transformer Bay Power Transformer Test Station 19 New manufacturing facility at Sitarganj 20 New manufacturing facility at Sitarganj 21 66/132 kV Winding Area 22 66/132 kV Winding Area 23 66/132 kV Winding Area 24 66/ 132 kV - Assembly 25 66/ 132 kV - Assembly 26 100 MVA 220/132/11 kV Auto Transformer CCA 27 Autoclave & Vapour Phase Drying Oven (VPD) 28 132 kV transformers under test 29 132 kV transformers under test 30 66/132 kV test station 31 220/ 400 kV assembly with 2x150 MT EOT cranes 32 Impulse Test area: 1600 kVP, 160 KJ Impulse Generator 33 Design & engineering and R&D • EXPERT DESIGN & ENGINEERING TEAM • • TALಬs GM and senior consultant are both Ex GMs of BHEL The director of the design & engineering has been working with TAL for last 41 years Years of Experience S.No Designation Qualification 1 2 3 4 5 GM (Technical) M.E. (Elect) Sr. Consultant B.Sc. (Elect. Eng.) 45 Director B.E. (Elect. Eng.) 42 38 Plant Head B.E. (Elect.) 39 General Manager B.E. (Mechanical) 37 6 Deputy General Manager BE (Electrical Engg.) 14 7 Deputy General Manager Diploma in Electrical 15 8 Deputy General Manager B.Tech (Electrical) 18 9 10 Manager B.Tech (Mechanical) 20 Sr. Engineer B.Tech (Elect) 5 11 Sr. Engineer B.Tech (Elect)+Pursuing M.Tech 12 13 14 Sr. Draftsman B.A.+ ITI Sr. Draftsman B.A.+ ITI 5 Engineer BE(Power Electronics) 7 15 Engineer B. Tech (Electrical & E.) 2 16 Engineer Diploma in Mechanical 3 17 Trainee Engineer B.Tech (Mech)+Pursuing MBA 2 18 19 20 21 Trainee Engineer B. Tech (Mech.) 1 Trainee Engineer M.E. (High Voltage) 0.1 Trainee Engineer M.E. (High Voltage) 0.1 Draftsman ITI & Diploma (Mech) 3.6 6 • STRONG R&D • TAL has strong R&D team having capabilities of developing new products in house • All the products manufactured by the company have been developed in-house including the 220 kV & 132 kV transformers • The company has a fully computerized design office and all transformer designs are done on the basis of in-house developed software • For mechanical design, Computer Aided Design tools like AutoCad & Solidworks are used extensively • Large number of TAL transformers have successfully cleared Impulse Voltage Withstand Capability tests at 3rd party, Government accredited Laboratories like CPRI (Central Power Research Institute) • TAL also has some of the largest no. of transformers that have cleared 3rd party short circuit tests, amongst companies of TALಬs size 3 TAL has a very strong, highly experienced design & engineering and R&D team capable of taking new challenges 34 Testing facilities OVERVIEW Independent testing facilities for Power and Disttibution transformers at both Lucknow and Sitarganj plant. TAL’s Test lab has been assessed and accredited in accordance with the standard ISO/IEC 17025:2005 by National Accreditation Board for Testing Calibration Laboratories (NABL). All routine tests/Impulse test & Temperature rise tests as per IS2026/IEC60076 are performed in house using fully automated, computerized test benches & advanced testing software. TAL can also conduct specialized advance tests such as measurement of Partial Dischargge, SFRA etc. at its works. Short circuit tests are conductted at CPRI (Indiaಬs leading, independent test center). Impulse voltage withstand ability tests are carried out through two impulse generators (1600 kVp, 160 kJ and 900 kVp, 45 kJ) from Haefely, Switzerland with expandable capacity to test transformers of 765 kV voltage class. Impulse Testing Facility Testing with Yokogawa Power Analyzer 35 Our Quality Policy We, at Technical Associates, are committed to achieve total satisfaction of our customers by: Effectively implementing and continually improving the Quality System. Delivering on time, products conforming to agreed specifications at competitive prices. Collectively and individually striving to do things right – the first time and every time - both in personal life as well as at the workplace. Continuous up-gradation of technology and active involvement of all employees and associates in productivity improvement. 36 Turnkey Projects 37 Turnkey Projects • TAL Engineering Projects Division (EPD) was established in 2006 to enhance and capitalize Technical Associatesಬ strong presence in the power T&D sector • It undertakes complete execution of turnkey electrification projects from conceptualization , design, engineering, procurement, erection and commissioning • The tasks taken up by TAL EPD include Rural Electrification Works, Distribution & Transmission lines from LT (440 V) to 220 kV, and electrical Substations from 11 kV to 220 kV • Scope of works undertaken include: • • • • Complete design, engineering & planning Procurement & project management Erection / construction / commissioning / testing Handing over to customer / training • Works undertaken include: • • • • • • • Planning, erection and commissioning of HVDS network Rural electrification planning and commissioning Setting up of LT lines for urban / Rural networks Setting up of 11 kV distribution substations and lines Setting up 33/66/132/220 kV switch-yards and lines Energy auditing Planning, erection and commissioning of intelligent rural load management systems • Main strengths : • Experienced engineers, technicians & support staff from the field of project tendering, engineering, execution, erection, commissioning and testing High level of quality control • 66 kV Sub-station with TAL transformer 132 kV Sub-station under construction 66 kV Sub-station at Mohra, Haryana 38 Customers CUSTOMER SEGMENTS KEY CUSTOMERS Key customer segments catered by TAL include: • State (regional) electricity utilities • Overseas electricity boards. • Government & private power companies • Government and private power equipment manufacturing companies • Infrastructure companies • Other manufacturing companies 39 Partnering with us - the advanTAge • A proven track record • Historically proven capabilities in engineering / design • State-of-the-art infrastructure • 40 year old credibility • Close proximity Your Partner in Progress 40