OHFA vs. REAC Introduction The Uniform Physical Condition Standards (UPCS) are the foundation of HUD/PIH-REAC’s Physical Inspection Program. Creates the structure of the physical inspection. Establishes standardized definitions for inspectable items, the basis for electronic inspections via UPCS software. Provides a uniform, objective protocol for training inspectors performing inspections of all property types. PHYSICAL INSPECTION PROTOCOL 1 2 3 4 Receive inspection assignment Download property profile Confirm inspection Update inspection schedule 6 Meet with property representative 10 a. Identify sample buildings b. Enter generated sample units Verify/update property profile info. a. property, b. participant, c. certificate, d. area measures Inspect a. site, b.-d. building(s), and e. units Inspection Inspection Day Day 8 7 11 5 12 Confirm/verify inspection data Visually verify/update building information 13 Complete Notification of Exigent and Fire Safety Hazards Observed form (if needed) and provide a copy to property representative Travel to property 9 Generate sample 14 Upload completed inspection FREQUENCY of INSPECTIONS Per Part VII 24 CFR Parts 5 and 200 Uniform Physical Condition Standards and Physical Inspection Requirements for Certain HUD Housing; Administrative Process for Assessment of Insured and Assisted Properties; Final Rule http://portal.hud.gov/hudportal/HUD?src=/program_o ffices/public_indian_housing/reac/products/pass/pas s_fedreg FREQUENCY of INSPECTIONS FED: a newly endorsed multifamily property will receive its first physical inspection no earlier than 21 months but not later than 27 months from the date of final endorsement (FED – Final Endorsement Date). __________________________________________________________________________________________________________________ 3-2-1 Rule: Periodicity of inspections are either 3 years, 2 years or 1 year based on the designation a property receives as either standard 1, standard 2, or standard 3, on the basis of points on a 100 scale. • • • Properties receiving scores of 90 points or higher on a physical inspection will be designated as standard 1 and the next inspection will be based on an Ideal Future Date (IFD) 3 years from the date of the current inspection. Properties receiving scores of 80 points or higher but less than 90 will be designated as standard 2, and their next inspection will be based on an IFD 2 years from the date of the current inspection. Properties receiving scores of less than 80 will be designated as standard 3 and the next inspection will be based on an Ideal Future Date (IFD) 1 year from the date of the current inspection. Preparing for REAC • On Line Property Training • http://portal.hud.gov/hudportal/HUD? src=/program_offices/public_indian_h ousing/reac/products/pass/pass_trng/ onlinetrainingmf Preparation Recommendations • Review REAC Compilation Bulletin (http://portal.hud.gov/hudportal/documents/huddoc?id=Co mpBulletin4-0Ver31515.pdf • Conduct a complete (100%) inspection of the property. • Include all five inspectable areas: – – – – – Entire Site All Building Exteriors All Building Systems All Common Areas All Units * * All non-residential units are considered Common Areas and must be accessible. Preparation Recommendations (Cont) • Use software (Public Version DCD 4.0: http://portal.hud.gov/hudportal/HUD?src=/pr ogram_offices/public_indian_housing/reac/pr oducts/prodpass/dcd4.0) , paper or consultants. (Follow UPCS protocol.) • If an item exists, it must function as designed. • Test operation/function of all inspectable items. Preparation Recommendations (Cont) • Pay attention to Health and Safety items: • • • • • • Gas leaks, Exposed wires, Blocked egress, Expired fire extinguishers, Missing / damaged sprinklers – paint on sprinkler or missing escutcheon Missing/inoperable smoke detectors, etc. • Electrical: – All boxes subject to inspection regardless of location – All panels/fuse boxes must be made accessible – All other boxes will not be opened if secured • Blocked Access: – All individual living areas/rooms must have two means of egress SCORING The Goal Assign a score to the overall property condition based on the data collected by the inspector – Measure physical condition – Objective & consistent – Accommodates all property types & configurations Scoring is Based on Objective Data The REAC Data Collection Device (DCD) software enhances objectivity via its use of a ‘‘decision tree’’ model. Based on answers to questions, the software guides the inspector in recording the observed deficiency and based on the answers the software determines the severity level of the deficiency No Two Properties Are Alike (For example, if there are no Common Areas on a property, the other inspection areas become more important) Property Physical Condition Inspection Areas Site Health & Safety Deductions Building Building Exterior Wgt 15% 15% Wgt 18% 18% Building Systems Dwelling Units Common Areas 20% 35% 15% 23% 41% 0% Whole Point Deductions From Final Score 100% 100% Note: Building/Unit Counts Site CA Note: Different Possible Points Scoring Methodology Scores calculated based on: Area Points & Item Weight & Criticality & Severity Ranges are: Area Points Site = 15 Bldg Ext = 15 Item Weight Bldg Systems = 20 Dwelling Units = 35 Common Areas = 15 (Examples) Smoke Detector = 0 Damaged Ceiling = 4 Criticality Missing Toilet = 10 Misaligned Chimney = 15.5 (5) Critical = 5.0 (2) Contributes = 1.25 (4) Very Important = 3.0 (1) Slight Contribution = 0.5 (3) Important = 2.25 Severity (3) Most Severe = 1.0 (2) Severe = 0.50 (1) Least Severe = 0.25 HEALTH and SAFTEY Health and Safety (H&S) items are found throughout the inspection definitions. There are three basic categories of H&S, (a) NLT – Non Life Threatening (b) LT – Life Threatening (aka EHS) (c) Smoke Detectors which are included in the EHS Report but there are no points associated with Smoke Detectors. EHS Form for hard copy: http://portal.hud.gov/hudportal/documents/huddoc?id=D OC_26407.pdf CORRECTIVE ACTIONS • The Program Offices, Public Housing, Multifamily Housing and Office of Healthcare Programs are responsible for property corrective actions, including EHS items, following a physical inspection. • REAC Quality Assurance (QA) inspectors do complete reinspections for Multifamily (MF) properties with either scores < 30 which fall under the MF Departmental Enforcement Center (DEC) or scores < 60 where the property doesn’t get approval from MF concerning corrective actions. • REAC QA inspectors also complete inspections based on requests from the Program Offices for various reasons, normally related to risk. REPORTS REAC Physical Inspection Summary Report https://www.youtube.com/watch?v=zOIrUtP9554&feature=youtu.be http://portal.hud.gov/hudportal/HUD?src=/program_offices/public_indian_housing/reac/products/prodpass/dcd4.0 New easy to read and understand format More detailed and descriptive information New ‘decision column’ detailing how the inspector arrived at the deficiency Deficiency details section includes all multiple recorded deficiencies for a designated sub-area DCD 4.0 Software Report Enhancements DCD 4.0 Sample Inspection Report Inspection Snapshot # 500001 #500001 DCD 4.0 Sample Inspection Report Property Profile Includes property, building & unit details; Occupancy information and Bed Bug reports # 500001 DCD 4.0 Sample Inspection Report Participant information including presence indicator # 500001 DCD 4.0 Sample Inspection Report Score Summary High level # 500001 DCD 4.0 Sample Inspection Report Summary of Health & Safety deficiencies DCD 4.0 Sample Inspection Report Systemic Deficiencies # 500001 DCD 4.0 Sample Inspection Report # 500001 Building/Unit Summary DCD 4.0 Sample Inspection Report # 500001 Certificates DCD 4.0 Sample Inspection Report Score Details Explanation of score for property including source of points deducted # 500001 0.79 Note 3 deficiencies indicated for Walls with score deduction for 1 deficiency DCD 4.0 Sample Inspection Report # 500001 Decisions Column Lists the details on how the inspector identified the deficiency Note Deficiency Details Will include all multiple recorded deficiencies for an inspectable area / Under AC unit / Hallway 3 deficiencies recorded for Walls UD R e\ 1| An Overview of the REAC Physical Inspection Scoring Process REAC created this guide to present general information about HUD’s process for issuing scores for REAC’s assessments of the physical condition of HUD—assisted properties. Assessing the Physical Condition of HUD – assisted Properties One of REAC’s most important functions is to ensure that public housing properties and HUD—assisted multifamily properties are decent, safe, sanitary, and in good repair. Assessing the physical condition of HUD—assisted properties begins with the REAC Physical Inspection. Applying HUD’s uniform, consistent standards, known as the Uniform Physical Condition Standards (UPCS), REAC inspects a property and uses the results to develop a score for the property’s physical condition. The process works for all types and configurations of property. The REAC physical inspection emphasizes health and safety (H & S) deficiencies because H & S deficiencies are crucial to the well-being of residents. The Results of the Inspection The REAC physical inspection report generates this information: - scores for each of the five REAC physical inspection areas: site building exterior building systems common areas (if present) units an overall score for the property (a weighted average of the area scores minus deductions for H & S deficiencies) all of the deficiencies recorded by the inspector, their severity level, and the points deducted for each deficiency the estimated number of H & S deficiencies that would have been found if all buildings and units had been inspected The inspection report clearly shows the property owner: 2| An Overview of the REAC Physical Inspection Scoring Process the magnitude of the points lost by inspectable area the impact of H & S deficiencies on the score During a physical inspection, the inspector carries out these important functions: identifies deficiencies based on UPCS protocol Data Collection Device (DCD) version 4.0 software (aka RAPID) enhances objectivity because it uses a ‘‘decision tree’’ model. Based on answers to questions, the software guides the inspector in recording the observed deficiency and based on the answers the software determines the severity level of the deficiency. Photographs for deficiencies are taken and become part of the inspection (currently only photographs for level 3 deficiencies are taken) completes inspection electronically while on site provides property with a hard copy of all Exigent Health and Safety deficiencies identified during the inspection Deficiencies are the specific problems that the inspector observes / identifies for inspectable items — a hole in a wall, a damaged refrigerator, etc., for example— 3| An Overview of the REAC Physical Inspection Scoring Process REAC gives inspectors clear and objective observed deficiency (OD) decisions via the DCD software based on deficiency definitions which are consistent for every physical inspection. On site, inspectors use a hand-held computer to record identified deficiencies. How Critical is the Deficiency? A term used in the development of a physical inspection score is Criticality, which means one of five levels that reflect the relative importance of the deficiencies for an inspectable item. Appendix 1 in the HUD Physical Condition Scoring Notice and Revised Dictionary of Deficiency Definitions; http://portal.hud.gov/hudportal/documents/huddoc?id=pass4.0scoringnoticefr.PDF lists all deficiencies with their designated criticality levels, which vary from 1 to 5, with 5 being the most critical. Based on the criticality level, each deficiency has an assigned value that is used in scoring. Those values are as follows: 4| An Overview of the REAC Physical Inspection Scoring Process Among deficiencies for a given item, the more critical the deficiency, the more impact it has on the score. For example, if the severity level is the same, a clogged drain in the kitchen is more critical than a missing or damaged cabinet. In this example, the drain reduces the score more than the cabinet. The full impact of the criticality level on the score depends on the severity level and the item weight. How Severe is the Deficiency? The DCD software determines the severity of the deficiency — the extent of damage involved. The DCD determines the relative severity levels of each deficiency based on how the inspector answers questions concerning the defect in the Decision Tree for the specific deficiency. Using the answer to the questions, the DCD software assigns one of three severity levels for the specific potential observed deficiency (OD): For a given deficiency, Level 3 severity has more impact on the score than Level 1. The full impact of a severity level depends on the item weight and criticality level for a given deficiency. (Level 3 deficiencies deduct twice as much as Level 2 deficiencies and four times as much as Level 1 deficiencies.) 5| An Overview of the REAC Physical Inspection Scoring Process REAC – Physical Assessment Sub-System (PASS) Secure System takes the information from the uploaded inspection and applies a specially designed scoring system to assess the physical condition of the property. No scoring is done on the DCD, all scoring is completed behind the firewall at REAC. Property scores come from area points; the numbers of possible points in the five areas add up to 100. In the example, all inspectable items are present on the site and in each inspected building and dwelling unit: Each area contributes to the property score based on what is there to inspect. If, for example, there are no common areas, the points would be reallocated to add up to 100 in the following way: The chart below shows the reallocated property score. 6| An Overview of the REAC Physical Inspection Scoring Process The “Weights” To generate accurate scores, it is crucial to determine the relative importance of the various components of the inspection—which components are the most important, the next most important, and so on. The scoring system reflects the appropriate relative importance — the “weights”— of each area, item, and deficiency. HUD developed the weights based on the valuable advice and comments from a wide spectrum of knowledgeable people, including: professionals who have experience assessing the physical condition of properties representatives from the housing and public housing industries HUD professionals REAC combines the weights and inspection data to compute the score on a 100–point scale. Scoring a property’s physical condition depends on: the weights for inspectable areas (5 areas) the weights for inspectable items (8-17 per area) the criticality levels of the deficiencies the severity levels of the deficiencies These are the steps in the process REAC uses to come up with the overall property score: 1. Determine how many points are possible for each area to be inspected. 2. For each area, deduct points for the observed deficiencies. 3. Add up the area scores. 7| An Overview of the REAC Physical Inspection Scoring Process 4. Deduct points for H & S deficiencies. 5. For H & S deficiencies, add either a, b, or c to the score: If there are no H & S deficiencies, add a. If there are H & S deficiencies but none are life–threatening (NLT), add b. # If there is a life-threatening (LT) H & S deficiency, add c. # Note: These are also known as “Exigent Health and Safety” or “EHS” deficiencies and require immediate attention and correction. 6. If there is a smoke detector deficiency, the system adds an asterisk * to the score. Please see Example 3 on page 11 Here are some examples of scores and what they mean: Property Scores Defined Scores What they mean 95c - at least one LT / EHS defect otherwise excellent condition 55b* - an H & S deficiency that is not life-threatening a smoke detector deficiency poor condition 90a* - no H & S deficiency generally excellent condition a smoke detector deficiency If all the items are there to be inspected and all inspected buildings have the same number of units, we follow these steps: 1. Multiply the area points, item weight, criticality, and severity. 2. For a building deficiency, divide by the total number of buildings inspected. For a dwelling unit deficiency, divide by the number of units inspected. The result is the deduction for that deficiency. You also need to account for the items that were there to be inspected. For more on this, see A Technical Look at the Scoring Process starting on page 12. 8| An Overview of the REAC Physical Inspection Scoring Process Here are three examples where all items are there to be inspected: EXAMPLE 1 In this example, a deficiency in a ceiling will have a different impact on the score based on the number of inspected units. AREA: Dwelling Unit ITEM: Ceiling DEFICIENCY: Holes/Missing Tiles/Panels/Cracks Criticality Level 4, Severity Level 3 250 units (24 inspected units) First, multiply: 35 x 0.04 x 3.0 x 1.0 = 4.2 Then divide: 4.2/24 = 0.175 point deduction 15 units (10 inspected units) First, multiply: 35 x 0.04 x 3.0 x 1.0 = 4.2 Then divide: 4.2/10 = 0.42 point deduction 9| An Overview of the REAC Physical Inspection Scoring Process Example 2 In this example, the impact of a misaligned ventilation system varies based on the number of buildings. AREA: Building System ITEM: Domestic Water DEFICIENCY: Misaligned Chimney/Ventilation System Criticality Level 5, Severity Level 3 10 buildings First, multiply: 20 x 0.155 x 5.0 x 1.0 = 15.5 Then divide: 15.5/10 = 1.55 point deduction 5 buildings First, multiply: 20 x 0.155 x 5.0 x 1.0 = 15.5 Then divide: 15.5/5 = 3.10 point deduction 10 | A n O v e r v i e w o f t h e R E A C P h y s i c a l I n s p e c t i o n S c o r i n g Process Example 3 In this example, a smoke detector deficiency has no impact on the score no matter how many units are in the property, because the item weight is zero. AREA: Dwelling Units ITEM: Smoke Detector DEFICIENCY: Missing/Inoperative Criticality Level 5, Severity Level 3 250 units (24 inspected units) First, multiply: 35 x 0 x 5.0 x 1.0 = 0* Then divide: 0/24 = no point deduction 15 units (10 inspected units) First, multiply: 35 x 0 x 5.0 x 1.0 = 0* Then divide: 0/10 = no point deduction 11 | A n O v e r v i e w o f t h e R E A C P h y s i c a l I n s p e c t i o n S c o r i n g Process The physical condition scoring process is based on three elements: inspectable area inspectable items observed deficiencies The score for a property is the weighted average of area scores, with the area weights adjusted to take into account how many of an area’s inspectable items are actually present to be inspected. The area scores are calculated by deriving weighted averages of sub-area scores over buildings or dwelling units as appropriate. The sub-area scores are calculated by deducting points for deficiencies, based on criticality and severity levels. (Points also deducted for H & S deficiencies in the same manner.) Normalized Area Weights A property’s overall physical condition score is a weighted average of area scores. These are the approximate relative weights: These weights are assigned if all inspectable items are present for the site, each inspected building, and each inspected unit. When items are missing, the area weights are modified to reflect the missing items. If all of the inspectable items are missing—in a common area, for example—the weight of the common area is 0. 12 | A n O v e r v i e w o f t h e R E A C P h y s i c a l I n s p e c t i o n S c o r i n g Process For example, if half of the common area items are there to inspect, 7.5 points must be reallocated to the areas— including the common areas. The relative weights are reallocated or modified in the following way. The chart below shows the modified relative weights. Special Considerations The scoring methodology takes a number of issues into consideration: The scoring does not allow the site score or any sub-area scores for individual buildings or units to be negative. If they would have been negative, they are set to zero. This ensures that no single building or dwelling unit can affect the overall score more than its proportionate share of the whole. 13 | A n O v e r v i e w o f t h e R E A C P h y s i c a l I n s p e c t i o n S c o r i n g Process Buildings have different numbers of dwelling units. Buildings with more units have more impact on an area score than smaller buildings. Buildings and dwelling units have different features and amenities. The area scores and the overall score reflect only items that are present to be inspected. (The weights to calculate area and property scores are adjusted based on what is there to be inspected.) Buildings or units with more items present contribute more to area points. For example, two buildings have the same number of units. The building systems in one include an exhaust system with an item weight of 15.5; the other building does not have an exhaust system. Consequently, the building without an exhaust system contributes 15.5 fewer points to the overall building systems area score. 14 | A n O v e r v i e w o f t h e R E A C P h y s i c a l I n s p e c t i o n S c o r i n g Process Useful Websites for Reference http://www.hud.gov/offices/reac/products/pass/pass_fedreg.cfm - Fed Reqs http://www.hud.gov/offices/reac/products/prodpass.cfm - Physical Inspections http://portal.hud.gov/hudportal/HUD?src=/program_offices/public_indian_housing/reac/products/ prodpass/dcd4.0 - DCD 4.0 Website http://portal.hud.gov/hudportal/HUD?src=/program_offices/public_indian_housing/reac/products/ pass/pass_trng - Online Training https://www.federalregister.gov/articles/2012/08/09/2012-19335/public-housing-assessmentsystem-phas-physical-condition-scoring-notice-and-revised-dictionary-of - Fed Register Scoring Notice http://hud.gov/offices/reac/products/pass/PDFs/rapid4.0userguide.pdf - DCD 4.0 / RAPID (Record And Process Inspection Data) user Guide