M.P.RICE MILL COUMPOUND, OPP.MUKTIDHAM, SANAND. PHONE: 02717-222328 . THROUGH PUBLIC PRIVATE PARTNERSHIP WITH TRANSFORMERS & RECTIFIERS (INDIA) LIMITED AT: CHANGODAR, AHMEDABAD 1 | Page 1 SECTION-A: INFORMATION ABOUT IMC OF ITI GUJARAT STATE STATE/ UT 2 ITI (Name/Address) ITI,SANAND M.P.RICE MILL COMPOUND, OPP.MUKTIDHAM,SANAND. 3 Name of Principal Shri.R.D.Devmani Contact Details: 4 Phone no.: 02717-222328 E-mail: prlsananditi@yahoo.co.in Industry Partner Details of Nodal Officer Transformers & Rectifiers (India) Ltd Changodar, Taluka- Sanand, Dist: Ahmdabad Mr. T. Vijayan (Name/ Address) Transformers & Rectifiers (India) Ltd Designation in parent org.: General Manager (Tech) Contact Details 02717- 661661 (Name/Address) 5 - Phone: Fax: 02717-661716 E-Mail: tvijayan@transformerindia.com IMC Chairman Shri Jitendra .U. Mamtora (Name/ Address) Transformers & Rectifiers (India) Ltd Designation in parent org.: Chairman & Managing Director Contact Details 02717- 661661 - Phone: Fax: 02717-661716 E-Mail: jitendra@transformers.com 6 Affiliation of Industry Partner Member of CII 7 Details of Contact Person of Dr. Amitabh Srivastava above Industry body at: Director Western Region, Local level Gujarat office, State level 203-204, Sears Tower, Gulbai Tekara National level 8 Bank Account of IMC Society – Bank & Branch: Institute Development Plan Nr. Panchvati, Ahmedabad-6 SBI Sanand- Highway Branch Bank A/C no. 30543870961 2 | Page Institute Development Plan 3 | Page Composition of Institute Management Committee (IMC) Sr. No Name of member 1. Chairman of the IMC Shri Jitendra U. Mamtora 2. Secretary of the IMC (Principal of ITI) Shri R.D.Devmani 3. Members nominated by Ind. Partner Member 1 4. Member 2 Shri T.Vijayan 5. Member 3 Shri Rajiv Oza 6. Member 4 Prof.V.G.Patel Shri Satyen J.Mamtora Additional information about the member Transformer & rectifier (India) Ltd. Chairman & Managing Director Principal I.T.I Sanand Jt.Managing Director M:9227267007 General Manager Technical M:9227979503 General Manager -HR Trise Professor M:9227979563 Members nominated by State Govt. 7. Member 1 Shri N.R. Oza Principal I.T.I Sarkhej 8. Member 2 Shri Shri. Jajant Jethwa Emply Officer, Ahmedabad 9. Member 3 Shri R.D.Gohil S.I. (MD) ITI Sanand 10. Member 4 Shri Krunal Panchal Representative from Trainee MMV.BATCH-67 11. Member 5 Institute Development Plan Shri Jignesh Panchal Vice Principal, College of Fire Technology, Charrodi 4 | Page SECTION-B: EXECUTIVE SUMMARY OF THE DETAILS OF THE EXISTING ITI 1. Year of Establishment: 1993 2. Affiliation number given by DGE&T: As per Annexure – A 3. Building/Premises : 4. Total land area (in Sq.mts.) : Rented (Own building under cons.) 605.37 Sq.mts. 5. Total Constructed area (in Sq.mts.) : Office : 038.70 Sq.mts. Workshop: 567.30 Sq.mts. Hostel : N.A. 6.Types of industries available in the region : Auto 7. Whether Placement cell available in I.T.I : No 8. Percentage of passed out trainces cmployed/ self cmploycd during last two years 2006- 100% 2007- 81% 2008 – 100 % 9.Trades having high employment potential in The region : Fitter Mechanic Diesel Mechanic Motor Vehicle Wireman COPA Transformer Winder Welder Industrial Painting Surveyor D.C. with AutoCad 10. Trades having low employment potential in the region: Electronics 11. Total yearly fees collected from trainees (average of last two years Rs: 1, 33,300. 12.Revenue generated during last two years through other sources / activities (Pl.specify Rs 22,500 Year 2009 ) Trainees details (Trainees as on date) Total No. 177 Males 177 Females - Males 34 Institute Development Plan Sc Females - Males 01 ST Females - Males 84 OBC Females - 5 | Page Trades available in ITI No. of trainees Instructors Availability Training (out of filled posts) Trained Untrained 1st year 2nd year 3rd year Sanctioned Filled Vacant Total Fitter 20 19 - 02 02 - 02 01 01 MMV 20 19 - 01 01 - 01 - 01 MD 42 - - 02 02 - 02 01 01 Wireman 19 13 - 02 02 - 02 01 01 COPA 24 - - 01 01 - 01 - 01 Transformer Winder 20 01 01 01 _ 01 NCVT 14. Trade details: 15. Expenditure details:(Rs. in lacs) Expenditure of last two years Exp of the year 2008- 2009 Recurring 6.62 Non recurring This expenditure is done by H.O. Gandhinagar Institute Development Plan Exp of the year 2009- 2010 Recurring 7.40 Non recurring This expenditure is done by H.O. Gandhinagar 6 | Page SECTION C: SUMMARY OF THE FUTURE PLAN FOR UPGRADATION OF ITI: (I) Skill requirements of the region (1) How the skill needs of the region has been determined • Through study/survey By local survey • Data collected from Vaccant list of App. (2) Estimate of the yearly skill requirement (in terms of number of workers) Skill requirement For the region For outside the region which can be met by the ITI 300 Short term (1 to 3 year) 400 Medium term (4 to 7 year) 600 400 Long term (7 to 10 year) 800 500 (II) Proposed changes in training programmes: (1) Upgrade the ITI into a Centre of Excellence: .N.A. (2) Upgrade the following trades List of trades • • • • • • No. of units Fitter 02 MMV MD 02 02 Wireman COPA 02 01 Transformer winde 01 (3) Add the following trades List of trades No. of units • Transformer winder 01 • ET. 02 • COPA 01 • Welder 02 • Industrial Painting 01 • D.C with Auto Cad 01 • Surveyor 01 Institute Development Plan 7 | Page (4) Delete the following trades List of trades No. of units -- NIL -- -- NIL-- (III) Details of the additional resources required and the total loan amount sought by the IMC society under this scheme: 1. Total interest free loan amount sought: Rs.250 lakhs 2. Seed money to be used as corpus: Rs.100 lakhs 3. Manner in which the remaining amount is proposed to be used: Item For CoE For upgradation (b) 10 lacs (a) Civil works Equipment furniture Learning material etc. --NIL-- Recurring expenditure Total For new trades (c) 15 lacs Total a+b+c 25 lacs --NIL-- 30 lacs 60 lacs 90 lacs --NIL-- 20 lacs 15 lacs 35 lacs --NIL-- 60 lacs 90 lacs 150 lacs 4. Additional Manpower requirement: Sr. No. Trade Instructors Other staff 1 COPA 02 02-Peon 2 MMV 01 01-Store Keeper 3 ET 02 02-Watchman 4 5 6 7 Transformer winder D.C with AutoCad Surveyor Industrial Painting 02 01 01 01 8 Welder 01 (IV) Details of any revenue generating facilities proposed to be set up in the ITI: (1) Whether any Business Plan to generate revenue has been prepared? “NO” Institute Development Plan 8 | Page (V) Key Performance Indicators (KPIs) The details of the Key Performance Indicators set as targets under this scheme during next five years are as follows: Sl. No. 1. 2. 3. 4. 5. 6. Key Performance Indicators Base line in the year of release of loan % of applications 300 as compared to no. of seats % of enrolments as 130 compared to no. of seats % of dropout as compared 20 to no. of enrolments % of students passed out compared to 81 enroll students % of passed out students employed/ self employed 50 within one year of pass out Average monthly income of the 3000/employed/ self employed students Institute Development Plan for the year next to loan release year 2nd for year Target for 3rd for 4th year year for 5th year 400 450 500 500 550 130 130 130 130 130 15 12 10 08 05 90 95 95 98 98 60 70 80 85 98 3500/- 3700/- 4000/- 4500/- 6000/- 9 | Page SECTION D: DESCRIPTION OF THE MEASURES FOR IMPROVING THE PERFORMANCE OF THE INSTITUTE (a) What changes would you like to introduce for better management of the ITI? • Autonomy • Flexibility • More Financial Power & Man power • Permanent post of principal • Requirement of D.D.O in Institute • CCTV and Audio visual display set • Computerisation • E.M.F Implementation • I.S.O Certification (b) What sort of training do teaching and non-teaching staff of the ITI require? • For Teaching Staff –Training on Advance Technology, Communication, Spoken English, Computer Knowledge, Principle of Teaching, In Plant Training, Human Behavior, Personality Development, Memory Enhancement • For Non-Teaching Staff – Administrative Training, Knowledge of Financial rules and Regulations, Computer Knowledge, Positive Attitude, Human Relation Development, Organizing Office Records, Personality Development (c) What improvements in teaching and learning resources does the ITI require? • Multimedia Computer in each class room • Latest technical books, magazines, CDs with trade related educational software • Audio – Visual Aids like multimedia projector, OHP etc. • Satellite Dish TV set • P.A. system • White/ Green board in each theory room • Laptop • High tech teaching aids • Language lab • Library resources • Display Board Institute Development Plan 10 | Page (d) Can you improve the number of female students in ITI courses? How would this be done? • Wide publicity at village to village and adjacent town’s high schools and colleges • Increase female oriented courses • By motivation about the technical trades • To give Hostel and Transportation facilities • Counseling of females • Assuring security to females • By giving Uniform and Study materials • Advertisement in media (e) Can you improve the number of students from disadvantaged background in the ITI courses? How would this be done? • Yes. • By active counseling and motivation • Wide publicity in surrounding backward villages about importance of technical trades • To give Hostel and Transportation facilities • To start trades which are popular in disadvantaged background • By giving Uniform and Study materials • By giving more stipend • (f) How can you improve your linkages with the local labour market? Do you need to improve your linkages with labour markets outside your locality and if yes, how could you go about it? • Active role of I.M.C • Establishing Placement bureau having latest vacancy information regarding related industries • By Industrial Survey and Feedback • Inviting expert Faculties from Industries and related Educational fields • MOU with different progressive industries and industries’ association • • Regular feedback from IMC. Interaction with the local GIDC & Industrial Ass.surveys & tracer Studies. Institute Development Plan 11 | Page SECTION E: ACTION PLAN FOR UPGRADATION (a) Do you intend to establish a Centre of Excellence?: No Presently we have ranted building and not enough space. (b) In addition to above or otherwise Which trades would you prefer to upgrade? 1.Fitter 2.Wireman 3.MMV 4.MD 5.COPA 6.Transformer Winder Why did you choose these trades? MECHANICAL This sector is selected because in our region there are more avaibility of employement. ELECTRICAL Trade is also very popular.The above mention trade is offered job opportunity in Telmech,Swati switch Gear (c) What resources do you need to upgrade your institution as a CoE or to upgrade selected trades? (i)a. Civil works – describe and justify any civil works you want to • • • • • • • • • • • • • • • • undertake. New site for ITI building is in progress. To built an new Auto lab, Computer Lab is Urgently required. Prepare Audio – Video room, Theory class rooms as per CoE standard Construction of hostels in campus area Construction of Canteen Construction of Security Room/Clock Room Fabrication of vehicle parking facility Gardening and street lighting near campus area Fabrication of shades and flooring of open space inside the existing building Water Cooler with Aqua guard in premises as well as hostel & canteen Proper drainage and water supply lines Construction of potable water sump Establish Conference Hall and library room Fencing on Compound Wall P.O.P in all theory room, principal cabin, conference hall and administrative office. Wall Box Cabinat Institute Development Plan 12 | Page (ii) Equipment, Tools & other items – describe and justify all goods you want to procure. b. (a) Equipment 1.All tools and equipment as per syllabus. c. 2.All tools and equipments as per the requirement of latest d. technology. e. (b) Furniture f. g. (1) Workbenches,stools,glass boards,benches. h. (2) Chairs with Armrest for theory classes (3) (4) (5) (6) (7) (8) (9) Library & Conference Hall furniture Steel Cupboards,Library cupboards Cateen,Furniture Conference table Sliding window and lecturer stage in all class. Display board with cabinet fan (c) Books, Learning Resources and Software (1) Latest technical educational books (2) (3) (4) (5) and software. Personality development and English Communication books. Latest magazines and newspapers. Authorized software for Mech.,Ele.,Auto. Broadband connection. Multimedia Projector with accessories (d) Training of staff – describe and justify the training needed by your staff and indicate how this could be implemented. (Please fill up the Annexure to IDP) (i) Training of Teaching Staff • • (ii) All Teaching Staff should be trained in latest technical courses, communications skills, development, principle of teaching and computer They should be given training in industries to refresh their skills as per rapidly changing industry standards. trade related personality knowledge upgrade and and growing Training of Non-Teaching Staff • Non Teaching Staff should be trained for E-Governance, financial rules & regulations, purchase procedures, public relation and quality management for better and quick administration. Institute Development Plan 13 | Page (e) Additional Staff – describe and justify any additional staff you need (i) Teaching Staff (1) Additional Instructor. (2) Foreman/ Group Instructor. (3) Expert Guest faculties for all trades (4) Faculties for Spoken English, Communication Skills and Personality Development (5) Contractual Faculty (ii) Training of Non-Teaching Staff (1) Storekeeper (2) Clerk (3) Watchmen (4) Sweeper (5) Workshop Attendant (f) Consumables and Training Materials - describe and justify the consumables and any maintenance you need. • All consumable items and training materials are required as per standard • Multipurpose Xerox cum printer cum scanner machine • Copier machine • Fax machine • Multimedia Projector • Broadband facility for computer lab and library • Annual Maintenance Contract system is required for machineries and equipments in workshops as well as computers and computers peripherals Institute Development Plan 14 | Page SECTION F: YEARWISE BREAKUP OF RESOURCES REQUIRED (I) What finances do you need to procure the resources you described in the previous section? (a) for CoE: (figures in lakh ) Year 1 1. 2. 3. 4. 5. Civil Works Equipment Furniture Books, Learning Resources and Software etc. Sub Total (1+2+3+4) - - - - 6. Additional manpower 7. Consumables, Maintenance and Training Materials etc. 8. Misc. Exp.(Pl specify) 9. Sub Total (6+7+8) TOTAL (5+9) (b) for Upgradation of Trades: 1. 2. 3. 4. 5. 6. 7. 8. 9. Civil Works Equipment Furniture Books, Learning Resources and Software etc. Sub Total (1+2+3+4) Additional manpower Consumables, Maintenance and Training Materials etc. Misc. Exp.(Pl specify) Sub Total (6+7+8) TOTAL (5+9) Year 2 - Year 3 Recurring costs - Year 5 Total - - - - - - - - - - - - - - - - - - - - - Year 1 Year 2 03 - 05 05 05 01 03 16 - 01 01 01 01 01 03 02 05 05 21 Institute Development Plan Year 4 Non-recurring costs - Year 3 Year 4 Non-recurring costs 2.5 2.5 07 05 03 01 17.5 3.5 Recurring costs 1.5 1.5 Year 5 - - Total 10 15 10 05 40 01 05 01 01 05 02 02 02 10 4.5 22 4.5 08 04 04 20 60 15 | Page (c) for new trades: Year 1 01 02 Year 2 Year 3 Year 4 Civil Works Equipment Furniture - Non-recurring costs 10 05 03 15 12 03 10 07 Books, Learning Resources and Software etc. Sub Total (1+2+3+4) - 01 04 - 07 39 Year 5 Total - 15 30 20 2.5 2.5 10 26.5 2.5 75 01 05 03 04 05 06 07 08 Recurring costs 1.5 1.5 Additional manpower Consumables, Maintenance and Training Materials etc. Misc. Exp.(Pl specify) Sub Total (6+7+8) - 01 - 01 1.5 1.5 01 05 01 1.5 1.5 01 05 - 03 3.5 3.5 03 15 TOTAL (5+9) - 10 42.5 30 5.5 90 09 TOTAL requirement of funds (a) + (b) + (c) Year 1 1. 2. 3. 4. 5. 6. 7. 8. 9. Year 2 Year 3 Civil Works Equipment Furniture Books, Learning Resources and Software etc. Sub Total (1+2+3+4) 03 - 05 10 10 3.5 03 28.5 Additional manpower Consumables, Maintenance and Training Materials etc. Misc. Exp.(Pl specify) Sub Total (6+7+8) TOTAL (5+9) 01 02 02 02 02 02 04 05 08 08 36.5 Institute Development Plan Year 4 Year 5 Non-recurring costs 12.5 7.5 22 10 15 05 5.5 3.5 2.5 55 26 Recurring costs 2.5 2.5 Total 25 45 30 15 2.5 115 02 10 02 02 10 03 03 03 15 7.5 62.5 7.5 33.5 07 9.5 35 150 16 | Page SECTION G: MISCLLANEOUS a) How do you see the future of the Institute and what action would you suggest for achieving its growth and sustainability. The future of the institute is very bright and progressive if we continue to meet the industry standards and develop ourselves as per the standards of rapidly growing technologies. For this we need • Active participation of IMC industries • In plant training to trainees • Industrial visits • Open house • Expert faculties • Donation of machinery – equipments • Technical Staff training according to latest technology • Employer feedback • Placement facilities b) Any outstanding achievements/ success stories of the Institute? (1) E – Governance (2) Environment awareness ITI Principal (Secretary of IMC) Signature R.D.Devmani Principal ITI Sanand Institute Development Plan Industry Partner (IMC Chairman) Signature J.U.Mamtora Chairman & MD. Transformers & . Rectifiers (I) Ltd. 17 | Page Annexure to IDP Details of the Instructional Staff in the Institute Name of the Instructional Staff Instructor in which Area and how long Is the Instru ctor Traine d in Princi ples of Teachi ngPOT (Yes/ No) Is the Instru ctor Traine d in Trade area(s) (Yes/N o) 1. Shri D.J. Prajapati ITI.ET - 9427621215 07 year Yes No 2. Shri R.D.Gohil DAE - 9974016456 01 year Yes Yes 3. Shri A.A.Patel DME - 9228412492 02 years Yes Yes 4. S Shri U.T. Sindhi ITI ET - 9825549156 02 year Yes Yes 5. Shri A.K.Thakor DME - 9898318094 03 year Yes Yes 6. Shri R.K.Pancholi ITI.ET - 9924508710 01 years Yes No 7. Shri D.T.Bhatt ITI.MMV - 9427400113 02 years Yes No 8 Shri D.R.Parmar DCE - 9904081481 03 year Yes No 9. Shri M.I.Patel BAE - 9998823480 02 years Yes No 10 Shri U.C.Kagdekar S.S.C. - _ 06 Month - No Educational/ Technical Qualification Sl. No Institute Development Plan E mail ID Mobile No./ Phone No. 18 | Page Annexure – A AFFILIATION DETAILS OF I.T.I. – SANAND 1. NAME OF TRADE SANCTIONED UNITS Sr. No. FT 02 AFFILIATED UNITS AFFILIATION LETTER DETAILS 02 DGET 12/2/97 TC(PT) 16/10/97 DGET 12/2/97TC(PT) 2. WM 02 02 DGET 12/2/97 TC(PT) 16/10/97 DGET 12/2/97TC(PT) 3. MMV 02 02 DGET 12/2/97 TC(PT) 16/10/97 DGET 12/2/97TC(PT) 4 MD 02 02 DGET 12/1/02 TC 30/12/02 5 COPA 01 01 DGET 12/1/10 TC 28/8/10 Institute Development Plan REMARKS 19 | Page