EWH Aspirator Client: Dr. John Webster Team Members: Lucas Vitzthum (Leader) Tyler Lark (BSAC) Nick Harrison (Communications) Fan Wu (BWIG) Feb March 30 –April 12th Progress Report #10 Problem Statement The objective of this project is to design a suction machine that can be manufactured from locally available materials with the ability to run off batteries, electrical power (when available) or human power. This device should provide the broadest range of possible applications while still remaining under the 100$ price limit. Last Week’s Goals • Tyler & Nick- Meet up in Green Bay. Shop for windshield wiper apparatus and car battery • Lucas & Fan- Meet it Minneapolis, purchase starting motor, flywheel. • Everyone-Look for parts that can be used as: joints and pin connectors • Keep in contact over spring break with findings Summary of Accomplishments Tyler and Nick went shopping for used automobile parts in green bay. Purchased a car batter and fan blower motor. (Cost= 25$ for both) Tested new equipment. Lucas went shopping at surplus stores in the twin cities. Purchased a receptacle, springs and plastic syringes. (Cost = 15$ for everything) Tested new equipment. Fan brainstormed backup ideas to go turn motor in to vacuum source. Came up with string/ bladder design. Met on Tuesday at ECB and showed findings from over break. Tested new equipment and found a locker for storage. Assigned goals for upcoming week(s). This week’s Goals • Lucas & Nick- Build/Find a fly wheel and create syringe piston prototype • Fan- Build bladder/string alternative design prototype • Tyler- Build one way valves for both prototypes • Everyoneo Have prototypes done by next week’s Tuesday group meeting o Contact Prof Webster about possibilities to easily alter voltage from batter in order to change the motor’s RPM. Project Timeline Form team, contact client, assign team 1/26 5/4 5/9 roles, set up client meeting Literature search, create problem statement, begin PDS, PDS, brainstorming, begin developing designs Brainstorming Decide on 3 design alternatives, prepare for mid-semester presentation Finish Mid-Semester Presentation Present, work on written report Hand in written report/PDS/ design notebooks. Decide on final design Work on final design Work on final design Spring Break Start EWH proposal Work on final design/ Begin testing Send EWH proposal to client and advisor Test prototype Finish EWH proposal Finish Testing prototype, begin preparing poster and paper Final Poster Presentation Hand in final written report and notebooks 5/11 Final meeting with advisors 2/2 2/9 2/16 2/23 3/2 3/9 3/16 3/23 3/30 4/6 4/13 4/20 4/27 Activities Lucas: Shopped for surplus parts (2 hrs) Tested new equipment ( 1 hr) Weekly Meeting (1.5 hrs) Total: 4.5 hours Fan: Weekly Meeting (1.5 hrs) Alternate design brainstorming (1hr) Total: 2.5 hours Tyler: Weekly Meeting (1.5 hrs) Shopped for used car parts ( 2 hrs ) Tested new equipment (1 hr ) Attended lecture (1.5 hr) Total: 6 hours Nick Weekly Meeting (1.5 hrs) Shopped for used car parts ( 2 hrs ) Attended lecture (1.5 hr) Total: 5 hours