ADDENDUM No. 1, December 31, 2015 RE: Johnson West Primary Power Ball State University BSU Project No. 2016-083.01 JW FROM: Ball State University Facilities Planning and Management Showalter Building 3401 North Tillotson Avenue Muncie, Indiana 47306 TO: Prospective Bidders This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents dated December 10th, 2015 as noted below. Acknowledge receipt of this Addendum in the space provided on the Bid Form This Addendum consists of three (3) Pages as items indicated below. CHANGES TO SPECIFICATIONS: 1. Table of Contents – Delete Specification Section 01 74 19 Construction Waste Management and Disposal. This section was not issued and is not used. 2. Section 00 43 00 Bid Form Supplements – Delete reference to Appendix H – Supplementary Telecommunications Information. This appendix was not issued and is not used. 3. Section 16080 – Electrical Acceptance Testing a. Revise paragraph 1.01.A as follows: The Owner will perform all testing and inspections included in this section. Where references are made to a testing agency or tests by the Contractor, such tests will be performed by the Owner. The Contractor shall be responsible for correcting any deficiencies and replacing any failed cables, terminations, or other accessories discovered deficient by the Owner testing and inspections. b. Revise paragraph 1.01.D: The Contractor shall provide 72 hours advance notice to the Owner that the system is ready for testing. 4. Section 16100 – Ductbank and Manholes a. Add paragraph 1.01.C: Two-part manhole casting with solid lid and center access lid will be furnished by the Owner, installed by the Contractor. Grade ring risers shall be furnished and installed by the contractor. Addendum No.1 - Page 1 of 2 12/31/15 5. Section 16124 – Medium Voltage Cables a. Add paragraph 1.1.B: All testing included in this section will be performed by the Owner. 6. Section 16170 – Grounding and Bonding a. Add sub-section 1.12 as follows: 1.12 Copper Grounding and Bonding: A. Do not use any aluminum products. B. Mechanical connectors may be used inside manholes where accessible. Compression/crimp non-reversible connectors shall be used for any other locations. CHANGES TO DRAWINGS: 1. General – For clarification references to work by the “JB Contractor” refers to work by the Johnson Hall B/Schmidt Wilson contractor and is not part of this contract. This work is shown for coordination purposes. 2. General – For clarification references to work by the “MV Contractor” refers to work by this contractor under this bid, i.e. the Medium Voltage Contractor. The MV contractor shall perform all work shown on the bid documents unless specifically otherwise noted. 3. Sheet E1, Plan Note 7 – For clarification, the existing conduit in the tunnel to be used for pulling new circuit 12-5 cabling under alternate bid #1 is 4” GRC. There are also two (2) existing pull boxes in the tunnel to pull through. 4. Sheet E3, Right Center – Johnson, NW and Johnson A, SE Transformers: Do not remove the jumper circuit between the two transformers. Disconnect and park one end of the cable set as shown. Delete the drawing note indicating removal of the jumper cable and conduit. The Owner will furnish the parking insulators. 5. Sheet E6 Plan Title – Change “JOHNSON BLDG. UNIT B” TO “JOHNSON BLDG. UNIT A” in the plan title. Addendum No.1 - Page 2 of 2 12/31/15 GENERAL: 1. For those who attended the pre-bid conference the meeting agenda incorrectly showed the bid opening time as 11:00 am EDT. The bids will be opened at 11:00 EST (local time) on January 12, 2016 per the Notice to Bidders. 2. Oldcastle Precast Contact: Phil Hall phil.hall@oldcastle.com 317-670-1200 ATTACHMENTS: None. END OF ADDENDUM No. 1 Addendum No.1 - Page 3 of 2 12/31/15