CLIENT : N.M.M.C. Page 1 of 194 ARCHITECT : THE FIRM Navi Mumbai Municipal Corporation C.B.D., Navi Mumbai – 400 614 TENDER Tender Notice No. :- NMMC/ ELEC/ JCE/ 66 (03) /2014-2015 ELECTRICAL DEAPARTMENT Name of the Work: - Supply, Installation, Testing & Commissioning of HVAC System at Auditorium on Plot No. 37 at Sector 5, Airoli, Navi Mumbai. Sr. No. Description Period 1 E- Tender selling & Uploading Period 2 E- Tender submission Period 3 E- Tender Opening 12/03/2015from 10.00 A.M. onwards to 01/04/2015 Upto 13.00 P.M. 01/04/2015 from 15.00 P.M. onwards to 07/04/2015 Upto 15.00 P. M. 07/04/2015 Upto 16.00 Hours (If possible) Tender Price Rs. 10,000/- (Non – Refundable) Joint City Engineer Navi Mumbai Municipal Corporation, Head Office Building, Belapur, Navi Mumbai. ARCHITECT Issued to: ………………………… Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 2 of 194 Signature of Tenderer No. of Corrections ARCHITECT : THE FIRM Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 3 of 194 ARCHITECT : THE FIRM Name of the Work: - Supply, Installation, Testing & Commissioning of HVAC System at Auditorium on Plot No. 37 at Sector 5, Airoli, Navi Mumbai. Tender Notice No. :- NMMC/ ELEC/ JCE/ 66 (03) /2014-2015 INDEX Sr. No. 1 2 3 4 5 6 7 Signature of Tenderer Details Tender Notice Schedule A Detailed Tender Notice General Condition of Contract Special Condition of Contract Detail Specification Schedule – B No. of Corrections Page No. From To 05 05 07 10 11 33 35 97 99 107 109 177 179 194 Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 4 of 194 Signature of Tenderer No. of Corrections ARCHITECT : THE FIRM Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 5 of 194 Ö¾Öß ´ÖÓã²Ö‡Ô ´ÖÆüÖÖÖ¸ü¯ÖÖ×»ÖúÖ ¯»ÖÖò™ü ÖÓ. 1 ¾Ö 2, ÖÖê¾Ö¬ÖÔÖß “ÖÖîú, ü ÃÖꌙü¸ü -15‹, ÃÖß.²Öß.›üß., ²Öê»ÖÖ¯Öæ¸ü Ö¾Öß ´ÖÓã²Ö‡Ô - 4 0 0 6 1 4 ¤ãü¸ü¬¾ÖÖß Îú. : 27567001 27567002 ARCHITECT : THE FIRM Navi Mumbai Municipal Corporation Plot No. 1 & 2, Govardhani chowk, Sec.15A, C.B.D., Belapur, NAVI MUMBAI – 400 614. TEL. No. : 27567001 27567002 ×¾ÖªãŸÖ ×¾Ö³ÖÖÖ ü×Öü×¾Ö¤üÖ ÃÖã“ÖÖÖ Îú. ÃÖ¿Ö†/66/2014-2015 Ö¾Öß ´ÖãÓ²Ö‡Ô ´ÖÆüÖÖÖ¸ü¯ÖÖ×»ÖúÖ ´ÖÆüÖ¸üÖ™Òü ¿ÖÖÃÖÖÖ“Öê ÃÖÖ¾ÖÔ•Ö×Öú ²ÖÓÖ¬ÖúÖ´Ö ×¾Ö³ÖÖÖ, CPWD Øú¾ÖÖ ×ÃÖ›üúÖêú›üᯙ μÖÖêμÖ ŸμÖÖ ¾ÖÖÖÔŸÖᯙ ÖÖë¤üÖßéúŸÖ ¾Ö †Öã³Ö¾Öß Óú¡ÖÖ™ü¤üÖ¸üÖÓú›æüÖ ÖÖ»Öᯙ úÖ´ÖÖú׸üŸÖÖ Online ×Ö×¾Ö¤üÖ ´ÖÖÖ×¾ÖŸÖ †ÖÆüÖêŸÖ. Ö¾Öß ´ÖÓã²Ö‡Ô ´ÖÆüÖÖÖ¸ü¯ÖÖ×»ÖêúŸÖ online ×Ö×¾Ö¤êüú׸üŸÖÖ Next Tendering-Sify Technologies ‡Ô-™ëü›üظüÖ ÃÖÓÖÖú ¯ÖÏÖÖ»Öß (E-tendering) úÖμÖÖÔÛ¾ÖŸÖ ú¸üμÖÖŸÖ †Ö»Öê»Öß †ÖÆêü. ºþ. 3 »ÖÖ Øú¾ÖÖ ŸμÖÖ¯ÖêÖÖ †×¬Öú ¸üú´Öê“Öê úÖ´ÖÓÖú¸üߟÖÖ ÃÖ¾ÖÔ Óú¡ÖÖ™ü¤üÖ¸ü/¯Öã¸ü¾ÖšüÖ¤üÖ¸ü μÖÓÖÖÖ ‡Ô-™ëü›üظüÖ ÃÖÓÖÖú ¯ÖÏÖÖ»Öß´Ö¬ÖæÖ“Ö (‡Ó™ü¸üÖê™ü«üÖ¸êü) ×Ö×¾Ö¤üÖ Ö¸êü¤üß ú¸üÖ¾ÖμÖÖ“μÖÖ ¾Ö ³Ö¸üÖ¾ÖμÖÖ“μÖÖ †ÖÆêüŸÖ. ÃÖ¤ü¸üÆæ úÖ´ÖÖ“ÖÖ ÃÖÓ×Ö¯ŸÖ ŸÖ¯Ö¿Öᯙ ÖÖ»Ö߻֯ÖÏ´ÖÖÖê †ÖÆêü. †. Îú. 1. 2. 3. úÖ´ÖÖ“Öê ÖÖÓ¾Ö ¾Ö ×Ö×¾Ö¤üÖ ¯ÖÏúÖ¸ü †Ó¤üÖ×•ÖŸÖ ¸üŒú´Ö ¹ý. ‡ÃÖÖ¸üÖ ¸üŒú´Ö ¹ý. úÖê·μÖÖ ×Ö×¾Ö¤êü“Öß ¸üŒ ´Ö ‹ê¸üÖê»Öß ÖÖ™üμÖÖéÆü μÖê£Öê ×¾ÖªãŸÖ×¾ÖÂÖμÖú úÖ´Öê 4,18,41,795/- 2,09,300/- 10,000/ú¸üÖê. ‹ê¸üÖê»Öß ÖÖ™üμÖÖéÆü μÖê£Öê ¬¾ÖÖß, ¯ÖÏúÖ¿Ö, ÃÖß.ÃÖß.™üß.¾Æüß. ¾Ö ‡ŸÖ¸ü ×¾ÖªãŸÖ ×¾ÖÂÖμÖú 4,04,40,604/- 2,02,300/- 10,000/úÖ´Öê ú¸üÖê. ‹ê¸üÖê»Öß ÖÖ™üμÖÖéÆü μÖê£Öê ¾ÖÖŸÖÖÖããú×»ÖŸÖ 3,54,12,049/- 1,77,100/- 10,000/μÖÓ¡ÖÖÖ »ÖÖ¾ÖÖê. úÖ´ÖÖ“ÖÖ úÖ»ÖÖ¾Ö¬Öß 6 ´Ö×ÆüÖê 6 ´Ö×ÆüÖê 6 ´Ö×ÆüÖê ü×Ö×¾Ö¤üÖ ¯ÖãÛßÖúÖ ‡Ô-™ëü›üظüÖ (E-tendering) ÃÖÓÖÖú ¯ÖÏÖÖ»Öß“μÖÖ (www.nmmc.maharashtra.etenders.in) μÖÖ ÃÖÓêúŸÖ ãÖôûÖ¾Ö¸ü ¾Ö Ö´ÖÓã´Ö¯ÖÖ“μÖÖü (www.nmmconline.com) ÃÖÓêúŸÖ ãÖôûÖ¾Ö¸ ¯ÖÏÖ¯ŸÖ ÆüÖêŸÖß»Ö. ×Ö×¾Ö¤êü“Öê ÃÖÖ¤ü¸üßú¸Ö ÖÖ»Öᯙ ŸÖŒŸμÖÖŸÖ Ö´Öã¤ü êú»μÖÖ¯ÖÏ´ÖÖÖê www.nmmc.maharashtra.etenders.in μÖÖ ÃÖÓêúŸÖ ãÖôûÖ¾Ö¸ü Online ú¸üμÖÖ“Öê †ÖÆêü. ‡Ô-×Ö×¾Ö¤üÖ ¯ÖÏ×ÃÖ¨üß“ÖÖ ŸÖ¯Ö¿Öß»Ö ×¤üÖÓÖú. 12/03/2015, ÃÖúÖôûß 10.00 ¯ÖÖÃÖæÖ ‡Ô-×Ö×¾Ö¤üÖ ×¾ÖÎúß ¾Ö ³Ö¸üÖê (upload) úÖ»ÖÖ¾Ö¬Öß ×¤üÖÓÖú 01/04/2015, ¸üÖê•Öß ¤ãü¯ÖÖ¸üß 1.00 ¾ÖÖ•Öê¯ÖμÖÕŸÖ ‡Ô-×Ö×¾Ö¤üÖ ÃÖÖ¤ü¸üßú¸üÖ (submission) úÖ»ÖÖ¾Ö¬Öß ×¤üÖÓÖú 01/04/2015, ¤ãü¯ÖÖ¸üß 3.00 ¯ÖÖÃÖæÖ ×¤üÖÓÖú 07/04/2015, ¸üÖê•Öß ¤ãü¯ÖÖ¸üß 3.00 ¾ÖÖ•Öê¯ÖμÖÕŸÖ ‡Ô-×Ö×¾Ö¤üÖ ˆ‘Ö›üμÖÖ“ÖÖ ×¤üÖÓÖú פüÖÓÖú 07/04/2015,, ¤ãü¯ÖÖ¸üß 4 ¾ÖÖ•ÖŸÖÖ ¿ÖŒμÖ —ÖÖ»μÖÖÃÖ ×Ö×¾Ö¤üÖúÖ¸ÓüÖÖß úÖê¸üß ×Ö×¾Ö¤üÖ ±úÖò´ÖÔ ±úß, ‡ÃÖÖ¸üÖ †ÖÖ´ÖŸÖ ¸üŒú´Ö ¾Ö ÃÖê¾ÖÖ ¿Öã»ú †ÖòÖ»ÖÖ‡ÔÖ ¯Öê´Öë™ü Öê™ü¾Öê«üÖ¸êü ³Ö¸üÖ¾ÖμÖÖ“Öê †ÖÆêü. ¾Ö¸üß»Ö Ö´Öã¤ü ÃÖ¾ÖÔ ¿Öã»ú úÖêÖŸμÖÖÆüß ²ÖÑêú“Öê ›êüײ֙ü úÖ›Ôü, Îêú›üß™ü úÖ›Ôü †£Ö¾ÖÖ Öê™ü ²ÖÑúàÖ ´ÖÖ±ÔúŸÖ ³Ö¸üÖÖ ú¸üŸÖÖ μÖê‡Ô»Ö. ×Ö×¾Ö¤üÖ ±úÖò´ÖÔ ±úß ¿Öã»ú Ö´ÖÓã´Ö¯ÖÖ“Öê »ÖêÖÖ ×¾Ö³ÖÖÖÖŸÖ ÛþÖúÖ¸ü»Öê •ÖÖÖÖ¸ü ÖÖÆüß, μÖÖ“Öß ×Ö×¾Ö¤üÖúÖ¸ÓüÖÖß ÖÖë¤ü ‘μÖÖ¾Öß. úÖêÖŸÖßÆüß ×Ö×¾Ö¤üÖ Ã¾ÖßúÖ¸üÖê †£Ö¾ÖÖ ÖÖúÖ¸üμÖÖ“ÖÖ †×¬ÖúÖ¸ü †ÖμÖ㌟Ö, Ö¾Öß ´ÖãÓ²Ö‡Ô ´ÖÆüÖÖÖ¸ü¯ÖÖ×»ÖúÖ μÖÖÓÖß ¸üÖÖãÖ šêü¾Ö»Öê»ÖÖ †ÖÆêü. ÃÖÆü ¿ÖÆü¸ü †×³ÖμÖÓŸÖÖ Ö¾Öß ´ÖãÓ²Ö‡Ô ´ÖÆüÖÖÖ¸ü¯ÖÖ×»ÖúÖ Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 6 of 194 Signature of Tenderer No. of Corrections ARCHITECT : THE FIRM Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 7 of 194 ARCHITECT : THE FIRM NAVI MUMBAI MUNICIPAL CORPORATION HEAD OFFICE BUILDING, BELAPUR, NAVI MUMBAI SCHEDULE ‘A’ Tender Notice No. :- NMMC/ ELEC/ JCE/ 66 (03) /2014-2015 Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 8 of 194 ARCHITECT : THE FIRM Name of the Work: - Supply, Installation, Testing & Commissioning of HVAC System at Auditorium on Plot No. 37 at Sector 5, Airoli, Navi Mumbai. Tender Notice No. :- NMMC/ ELEC/ JCE/ 66 (03) /2014-2015 SCHEDULE ‘A’ 1 2 3 4 5 6 7 8 9 10 11 a b c Name of Tender Supply, Installation, Testing & Commissioning of HVAC System at Auditorium on Plot No. 37 at Sector 5, Airoli, Navi Mumbai. Estimated cost of work Rs 3,54,12,049 /Persons Responsible Shri Pravin H. Gade, Executive Engineer (Electrical) (9920062126) Shri Tanaji K. Shinde, Deputy Engineer (Electrical) (9987333589) Shri Sandip Thakur, Junior Engineer(Electrical) (9004100999) Architect/ Consultant THE FIRM The Commodity Exchange Building, Ground Floor, Plot No. 2,3 & 4, Sector - 19A, Vashi, Navi Mumbai - 400 705. Te: 022 – 27832129/ 30/ 31 E- Tender selling & From 12/03/2015from 10.00 A.M. onwards to 01/04/2015 Upto Uploading Period 13.00 P.M. during working hours downloaded from official web site (www.nmmc.maharashtra.etenders.in / www.nmmconline.com) of Navi Mumbai Municipal Corporation. Cost of each Tender Rs. 10,000/- to be paid by Net Banking/ any banks credit or debit form card. Earnest Money Rs 1,77,100/- to be paid by Net Banking/any banks credit or debit card/ Bank Guarantee. Pre-bid meeting shall be held on 30/03/2015 at 15.00 Hrs. at Head Office Building, Belapur, Navi Mumbai in the Conference of Joint City Engineer (N.M.M.C.). E- Tender submission 01/04/2015 from 15.00 P.M. onwards to 07/04/2015 Upto 15.00 P. Period M. E- Tender Opening 07/04/2015 Upto 16.00 Hours (If possible) Eligibility Criteria Registration Class A and above category with Public Work Department (PWD) or its equivalent Class with City & industrial Development Corporation (CIDCO)/ Central Public Work Department (CPWD) (As per dept. requirement) Copy of the relevant certificate should be uploaded. Turnover Average annual financial turnover during the last 3 Years, ending 31st March of the previous financial year should be at least 30% of the estimated cost. Audited Financial statements for previous (Y-1), (Y-2), (Y-3) year should be uploaded. Experience Experience of having successfully completed similar works during last 7 years ending last day of month previous to the one in which applications are invited should be either of the following. a) Three similar completed works costing not less than the amount equal to 40% of the estimated cost. Or b) Two similar completed works costing not less than the amount equal to 50% of the estimated cost. Or Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 9 of 194 ARCHITECT : THE FIRM a) One similar completed work costing not less than the amount equal to 80% of the estimated cost. Completion certificate should be uploaded d e f 12 13 14 15 16 17 18 19 Qualified Persons Joint Venture Documents to be uploaded/attached The contractor shall have following Engineers dedicated for this job at all times at site. Two Mechanical Engineers having minimum experience of 7years in Air-conditioning Works and setting & commissioning chiller plants. Joint Venture is not allowed. 1) CIDCO/ PWD/ CPWD registration 2) Power of Attorney for signing tender document, if applicable 3) Copy of partnership deed, if applicable 4) Bank Solvency (equivalent to 20% of estimated cost) 5) VAT Registration certificate 6) NMMC LBT Registration certificate 7) Undertaking of Tenderer on Rs. 100 stamp as per annexure – 2 8) Firm Details in Annexure-3 9) PAN Card Copy/Income Tax Number 10) Service Tax/ Works Contract Tax certificate copy 11) Company or Firm Registration Certificate (Shop Act/ Incorporation Certificates) 12) Works Experience certificate 13) Technical Staff detailed list as per Annexure-8 14) CA certified Last 3 years turnover certificate 15) Affidavit on Rs.100 stamp paper as per Annexure-9 16) List of plant and machinery as per Annexure-7 17) List of Work in hand as per Annexure-6 (All bidders are required to submit original Undertaking & Affidavit with all other uploaded documents for submission of bid and original bank guarantee towards EMD (if uploaded) up to 09/04/2015 within working hours in the office of Executive Engineer (Electrical) Zone – 2, 2nd Floor, Navi Mumbai Municipal Corporation, Plot No. 01 & 1A, Sector – 15, CBD Belapur, Navi Mumbai. The failure or omission to submit the original documents as said above shall disqualify the bidder for this bid and also debar the agency for issue of bids for further one year.) Validity period The offer of the Contractor shall remain valid for 120 days from the date of opening of tender. Initial Security Deposit 3% of the Contract sum in form of DD/ FDR/ BG/ Cash. Further Security Deposit, to be deducted from Running Bills 2 % of the Contract Sum Completion Period 6Months 1) Contract as a Whole :-Period of Completion:- 6Months (including monsoon) 2) Part or Groups of Items i) As a whole work :- 6Months (including monsoon) ii) As per approved bar chart Percentage to be charges as supervision charges for the work got executed through other means 24.50 Percent Defect liability Period 1year from the date of completion Others 1. General Conditions of Contract 2. Price Variation Clause 3. Special Conditions of Contract 4. Technical Specifications Type of Contract Capital work The agency will have to furnish an additional deposit equal to the percentage quoted by it Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. 20 Page 10 of 194 ARCHITECT : THE FIRM below 15% along with, the security deposit to be paid for the work, in case the agency qualifies for the work, i.e. in case the agency quotes 20% below the cost put to tender, it will have to furnish an additional deposit of 20-15 = 5% with the designated security deposit amount. Besides this, the agency will have to submit detailed rate analysis for each and every item in case it quotes below 10% cost put to tender. As per the construction labour welfare Cess Act 1996, a Cess of 1% of contract value towards the welfare of construction labour will be deducted from the bills. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 11 of 194 ARCHITECT : THE FIRM NAVI MUMBAI MUNICIPAL CORPORATION HEAD OFFICE BUILDING, BELAPUR, NAVI MUMBAI DETAILED TENDER NOTICE Tender Notice No. :- NMMC/ ELEC/ JCE/ 66 (03) /2014-2015 Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 12 of 194 ARCHITECT : THE FIRM DETAILED TENDER NOTICE 1.0 NOTICE INVITING TENDERS Online tenders are invited by and on behalf of Commissioner, Navi Mumbai Municipal Corporation (NMMC) from eligible Tenderers for the proposed work specified in the Schedule ‘A’. 2.0 2.1 ISSUE OF TENDER For work of Estimate amount less than Rs. 3 lakhs, Tender copy will be made available at E-tendering cell, Ground Floor, NMMC Head Office, Govardhani Chowk, Plot No.1, Sector-15A, CBD, Belapur from date of publish of Tender Notice or Contractor may buy tender book from E- tendering website www.nmmc.maharashtra.etenders.in or www.nmmconline.com. 2.2 For work of tender amount Rs. 3 lakhs & above, tender book will be issued online only though E-tendering Website www.nmmc.maharashtra.etenders.in or www.nmmconline.com 2.3 For work of tender amount Rs. 3 lakhs & above Price of Blank Tender form must be paid by Net Banking/any bank credit or debit card. 2.4 The Tender Document is non-transferable. Only the Tenderer who has purchased the tender form shall be entitled to bid in the Tender. 3.0 LANGUAGE OF TENDER / CONTRACT The language of the Tender shall be in English / Marathi and all correspondence, drawings etc. shall conform to the English/ Marathi language. 4.0 CLARIFICATIONS BY TENDERER AND PRE-TENDER CONFERENCE: 4.1 A Pre-Tender conference of all intending Tenders will be held at the scheduled date and time indicated in Tender-Notice/ schedule A. Intending Tenderers will be allowed to seek clarification and suggest suitable modifications in specifications, Conditions of Contract, etc. The Corporation will communicate such changes that are accepted by it, to all the intending Tenderers who have purchased the Tender Document from the Corporation. Only such changes that are so communicated shall be binding on the Corporation and all the Tenderers. 4.2 The Tenderer should get its doubts cleared during pre-bid meeting only, if provided in the Tender. In case no pre-bid meeting is to be held, the Tenderer should seek clarification of any doubt in writing seven (7) days before the last date for receipt of Tenders. 5.0 5.1 VALIDITY OF BIDS The Tenders will be valid for a period of 120 days from the date of its opening. 6.0 EARNEST MONEY 6.1 The Tenderer shall deposit the amounts indicated in the Tender Notice as Earnest Money Deposit (EMD)., In case of tender 3 lakh and above the Earnest Money shall be deposited in the form of Net Banking/any banks credit or debit card/ Bank Guarantee. For tender below 3 lakh, Earnest Money shall be deposited in the form of a fixed deposit with the Corporation or a bank guarantee as per format indicated in Annexure 1. The failure to deposit the Earnest Money shall disqualify the Tender and the Corporation shall exclude from its consideration such disqualified Tender(s). No interest shall be payable by the Corporation in respect of such deposited Earnest Money. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 13 of 194 ARCHITECT : THE FIRM The tenderer should refer user’s guide while depositing EMD though the e-tendering website www.nmmc.maharashtra.etenders.in 6.2 If the Corporation accepts the Tender, the Earnest Money shall be appropriated towards Security Deposit payable by the Tenderer in accordance with the Conditions of Contract. Alternatively on payment of the required amount of the Security Deposit and the execution of the Contract Agreement, the Earnest Money shall be returned to the Tenderer. 7.0 7.1 FORFEITURE OF EMD The Tenderer shall not revoke his Tender or vary its terms and conditions without the consent of the Corporation during the validity period of Tender, failing which the Earnest Money deposited by it shall stand forfeited to the Corporation without prejudice to its other rights and remedies and the Tenderer shall be disentitled to submit a Tender to the Corporation for execution of any work during the next twenty-four (24) months effective from the date of such revocation. 7.2 If the successful Tenderer does not pay the Security Deposit in the prescribed time limit or fails to sign the agreement bond, The Earnest Money Deposit will be forfeited by the Corporation. 8.0 8.1 REFUND OF EARNEST MONEY The Earnest Money of unsuccessful Tenderers shall be refunded after the successful Tenderer furnishes the required Initial Security Deposit to the Corporation and signs the Contract Agreement or within thirty (30) days of the expiry of validity period of Tenders, whichever is earlier. 9.0 9.1 COST OF TENDER The Tenderer shall bear all costs associated with the preparation and submission of its Tender. Price of Blank Tender form must be paid by Net Banking /any banks credit or debit card. 9.2 Tender Service Charges: The Tenderer shall bear all costs associated with tender services. The tender service is provided by M/s. SIFY Technologies ltd.-Nextenders India Pvt. Ltd. As per Govt. Rule No. DIT/file-2012/C.No. 273/39 dt. 19th January, 2013. Tenderer has to pay Rs. 882 + Taxes as tender service charges directly to the service providers. The Corporation shall in no case be responsible or liable for these costs, regardless of the conduct or the outcome of the Tendering Process 10.0 ELIGIBLE TENDERERS: 10.1 Only those Tenderers who fulfill the eligibility criteria as mentioned in Schedule A of the Tender are eligible to submit their Tenders for this work. The documents indicated against each of the eligibility criteria shall be required to be submitted along with the technical bid to establish the eligibility of the Tenderer. 10.2 The Corporation shall usually hold a Tenderer eligible for the Tender subject to the condition that the price tendered by him together with the value of outstanding work/ contracts under execution by him for the Corporation or any other employer shall not be more than four times the value of average annual turnover of works / contracts executed during the preceding three financial years ending 31st March. 11.0 SPARE CAPACITY OF WORK FOR TENDERING: The tenderer shall be eligible to submit the tender to the N.M.M.C. subject to the essential conditions that the price tendered by him together with the value of outstanding works under execution by him for the N.M.M.C. or any other employer shall not be more Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 14 of 194 ARCHITECT : THE FIRM than four times the value of the average annual turnover of works excluded during the preceding three financial years ending 31st March. 12.0 RELATION SHIP WITH CORPORATOR(S) Tenderer shall not be associated presently or in the past with any of the office bearer or Corporator of the Navi Mumbai Municipal Corporation or Member of N.M.M.C. either directly or indirectly as specified in section 10(f), (g) of BPMC Act. 1949. The Tenderer shall furnish an Affidavit on a Non-Judicial stamp paper of Rs.10/- If any information so furnished shall be found to be untrue or false, the tender shall be liable to be disqualified and the Earnest Money accompanying such tender shall stand forfeited to the N.M.M.C. If the information so furnished shall be found to be untrue or false during the currency of the contract the Tenderer shall be held to be in-default and the contract if any awarded to him shall be liable to be terminated with its consequences. 13.0 TIME OF COMPLETION The period of completion of Works is enumerated under Schedule ‘A’. The time of completion shall commence from the date of placing the Work Order or date of handing over the site whichever is earlier. The completion period is for all items of Work in all parts of Tender Documents and all such items required for the completion of the work including extra and excess items. The Tenderer shall submit his Bar Chart and Construction Methodology so as to complete the work in all respects in the period of completion specified in the Tender Notice. The project planning shall be submitted in PRIMAVERA format/ Microsoft Projects. 14.0 SCHEDULE OF RATES AND QUANTITIES 14.1 The tender has been drafted on the basis of pre-priced schedule of rates and quantities for different types of items. 14.2 All the tender items are priced as mentioned in Schedule ‘B’ 14.3 The contractors are expected to work out their own rates based on the detailed description of Schedule ‘B’ items, the specifications, drawings & conditions and finally arrive at the cost of work in appropriate places. The contractor shall insert percentage cost over or below the N.M.M.C. ’s cost to arrive at the contract value for the work in Schedule ‘B’. 14.4 In case of lump sum contract, the Tenderer should insert his Lump Sum cost as contract value for the work in Schedule ‘B’. 15.0 INSPECTION OF SITE AND SUFFICIENCY OF TENDER 15.1 The Tenderer is expected to work out their own rates based on the detailed description of items, the specifications, drawings and conditions and finally arrive at the cost of the Work/Service in the appropriate place. The Tenderer shall be deemed to have satisfied itself before tendering as to correctness and sufficiency of its Tender. The rates and prices quoted shall, except as otherwise provided, cover all its obligations under the contract and all matters and things necessary for proper completion and maintenance of the Works/Services. 15.2 Where necessary, before submitting its Commercial Bid the Tenderer should inspect and examine the site and its surroundings and shall satisfy itself about form and nature of the Site, the quantities and nature of the Work/Service and materials necessary for the completion of the Works/Services, means of access to the site, the accommodation it may Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 15 of 194 ARCHITECT : THE FIRM require, and in general, obtain all necessary information as to risk, contingencies and other circumstances which may influence or affect its Tender. 15.3 No extra charges consequent on any misunderstanding or otherwise shall be allowed. 16.0 MANNER OF SUBMISSION OF TENDER 16.1 Tenders estimated cost below Rs. 3 lakhs will be submitted in the Tender box kept at ETender cell, NMMC Head Office, ground floor, Plot No. 1, Govardhani Chowk, sec. 15A, CBD Belapur, Navi Mumbai 400 614. 16.2 Telex, cable or facsimile offers will be rejected. 16.3 The tenders estimated cost Rs. 3 lakhs & above shall be submitted online on www.nmmc.maharashtra.etenders.in 17.0 LAST DATE FOR SUBMISSION 17.1 Sealed Tenders shall be received at the address specified above not later than the time and date specified in Schedule ‘A’ of the Tender. 17.2 In the event of the specified date for the submission of Tender offers being declared a holiday, the offers will be received up to the appointed time on next working day. 17.3 The N.M.M.C. may, at its discretion, extend this deadline for submission of offers by amending the Tender Documents, in which case all rights and obligations of the N.M.M.C. and Tenderer will thereafter be subject to the deadline as extended. 17.4 Any Tender received by the N.M.M.C. after the deadline for submission of Tender prescribed by the N.M.M.C., pursuant to the clause above, will be rejected and / or returned unopened to the Tenderer. 18.0 MODIFICATION AND WITHDRAWAL OF OFFERS The Tenderer may modify or withdraw his Tender after its submission, provided that written notice of the modification or withdrawal is received by the N.M.M.C. prior to the closing date and time prescribed for submission of Tender. No Tender can be modified by the Tenderer, subsequent to the closing date and time for submission of Tender. 19.0 CONTENTS 19.1 Tenders are invited in two-envelope system. Both the envelopes shall be placed in another envelope which shall be sealed and submitted super scribing the name of Work & C.A. No. mentioned in the Tender Notice. 19.2 Full name and address of the Tenderer shall be written in the bottom left corner of each envelope. 19.3 The envelopes shall contain the following : Envelope No.-1. This should contain all the documents mentioned below. This Envelope may contain other documents also such as special conditions of tenders, Technical bids, drawings, etc as mentioned in the Tender’s Schedule- A. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 16 of 194 ARCHITECT : THE FIRM i) This should contain all the documents mentioned as below from ‘a’ to ‘o’. This envelope may contain other documents also such as Technical bids, drawings, any other as mentioned in the Tender notice. a) List of all the documents enclosed in the envelope. b) The scan copy of Tender form fee receipt or Demand draft/Pay Order (where it is downloaded from the official website). c) Undertaking in Annexure 2 duly signed by a person holding valid power of attorney d) Power of Attorney of authorized person to sign the Tender Document (clause20e) e) For tender less than 3 Lakh, EMD in the form of Demand draft/ Pay Order/ Bank Guarantee (as per clause 6.0 above) & for tender above than 3 Lakhs, EMD in the form of Net Banking/any banks credit or debit card/ Bank Guarantee. f) Attested copy of the valid registration certificate (as requested by the eligibility condition at Annexure ‘A’. g) Up-to-date valid Clearance Certificates for Income Tax, Sales Tax, VAT, NMMC LBT registration/NOC, Service Tax. h) Details of Company / firms in annexure - 3. i) The tenderer shall furnish a statement showing the type and magnitude of work done in the last 3 years as per Annexure -4. j) List of work in Hand as on the date of submission of this tender in annexure -5 k) List of work tendered as on the date of submission of this tender in annexure-6 l) List of relevant plant & machinery in annexure -7. m) Details of Technical personnel available with the contractor in annexure -8. n) Affidavit on a Non-Judicial Stamp paper of Rs. 100/- (annexure 9) o) Bank Solvency from Nationalized / Scheduled Bank Envelope No.-2 (Financial Tender) - This envelope shall contain the complete set of Tender document along with the corrigendum, addendum if any issued duly filled in and initialed on each page and signed by the tenderer(s) at prescribed places of the Tender Documents including signature of witness (Unconditional). The financial bid in Schedule – B should be written both in figure & words at appropriate places. Covering Envelope Both the envelopes 1 & 2 shall be put together in common sealed envelope subscribing on it, name of Work, Tender Notice NO., C.A. No., Name and address of the Tenderer. 20.0 IMPORTANT POINTS TO BE NOTED BY THE TENDERER a) On receipt of blank Tender form the Tenderer should ensure that no corrections or over writings or erasures are left to be attested by the competent authority of the N.M.M.C. b) The Financial Tender shall be inclusive of all taxes, Octroi, Local taxes, etc. complete as applicable and shall be borne by the Tenderer for the Work and claim for extra payment on any such account shall not be entertained. Any change that will be made in the Tender paper by the competent authority after issue of the Tender will be intimated to the Tenderer in the form of Corrigendum/ Addendum for incorporating the same in the Tender before submitting the Tender. c) Price – bid should be written both in words and figures, at appropriate places. d) No alterations and additions anywhere in the Tender Document are permitted. If any of these are found, the Tender may be summarily rejected. The tenderer should get his doubts cleared during the pre-bid meeting only if provided in the tender. In case no pre-bid meeting is to be held the tenderer should seek clarification on any doubt in writing 7 days before the last date for receipt of Tenders. e) In case of firm, each partner or power of attorney holder shall sign the Tender and the signatures shall be attested as witness by a reputed person in the space provided for the purpose. The attested copies of power of attorney of person signing the Tender Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. f) g) h) i) 21.0 21.1 Page 17 of 194 ARCHITECT : THE FIRM shall be enclosed with the Tender. The power of attorney shall be signed by all partners. In case of private limited/public limited companies, the power of attorney shall be supported by Board resolutions and appropriate and adequate evidence in support of the same shall be provided. All pages and pasted slips should be signed by the Tenderer and corrections, if any must be signed. No page shall be added or removed from the set of Tender Document. Tenderer shall be deemed to have studied the scope of Works / Items / Quantities / Rates, all plans, specifications, terms and conditions, shall inspect and examine the site and its surrounding and shall satisfy himself before submitting his Tender as to the nature of the ground and subsoil (so far as is practicable), the form and nature of the site, nature of the Work and materials necessary for the completion of the Works and means of access to the site, the accommodation he may require and in general shall himself obtain all necessary information as to risk, contingencies, obligations under the Contract and all matter and things necessary for proper completion and maintenance of the Works. No extra charges consequent on any misunderstanding or otherwise shall be allowed. A declaration and an undertaking to this effect should be signed by the Tenderer in the form attached at Annexure-15 The Tenderer shall submit the Tender which satisfies each and every condition laid down in this Tender notice, failing which the Tender will be liable to be rejected. Conditional Tenders will be rejected. CORRUPT OR FRAUDULENT PRACTICES The N.M.M.C. requires that the Tenderers under this Tender observe the highest standards of ethics during the procurement and execution of such contracts. In pursuance of this policy, the N.M.M.C. defines for the purposes of this provision, the terms set forth as follows: a) “Corrupt practice” means the offering, giving, receiving or soliciting of anything of value to influence the action of the public official in the procurement process or in contract execution; and b) “Fraudulent practice” means a misrepresentation of facts in order to influence a procurement process or an execution of a contract to the detriment of the N.M.M.C., and includes collusive practice among Tenderers (prior to or after Tender submission) designed to establish Tender prices at artificial non-competitive levels and to deprive the N.M.M.C. of the benefits of free and open competition 21.2 The N.M.M.C. will reject a proposal for award if it determines that the Tenderer recommended for award has engaged in corrupt or fraudulent practices in competing for the contract in question; The N.M.M.C. will deem a firm ineligible, either indefinitely or for a stated period of time, to be awarded a contract if it at any time determines that the firm has engaged in corrupt and fraudulent practices in competing for, or in executing, a contract. 22.0 MANNER OF OPENING OF TENDER For the work, amounting less than Rs. 3 lakhs, the Tender received before the time and date specified in the Tender Notice will be opened as per the specified program in the office manually as mentioned in the Tender Notice (If Possible). The tenders will be opened in the presence of Tenderers or their authorized representatives who choose to remain present. The envelop no. 1 will be opened first and eligibility of each bidder will be scrutinized. Those bidder found to be eligible as per criteria given in chapter 4 will be conveyed for opening of financial bid i.e. envelop no.2. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 18 of 194 ARCHITECT : THE FIRM For the Work of Rs. 3 lakhs & above, tender will be open online in the presence of Higher Authority of Tender Committee and E-tendering Administrator. 23.0 PROCESS TO BE CONFIDENTIAL Information relating to the examination, clarification, evaluation and comparison of Tenders and the award of a Contract shall not be disclosed to Tenderers or any other person not officially concerned with such process until the award to the successful Tenderer has been announced. 24.0 PRELIMINARY SCRUTINY The N.M.M.C. will scrutinize the offers to determine whether they are complete, whether any errors have been made, whether required technical documentation have been furnished, whether the documents have been properly signed, and whether the offers are generally in order. Prior to detailed evaluation the N.M.M.C. will determine the substantial responsiveness of each offer to the Tender Documents. For purposes of these Clauses, a substantially responsive Tender is one that confirms to all the terms and conditions of the Tender Documents without material deviations. The N.M.M.C. determination of Tenderer’s responsiveness is to be based on the contents of the Tender offer itself without recourse to extrinsic evidence. A Tender determined as not substantially responsive will be rejected by the N.M.M.C. and may not subsequently be made responsive by the Tenderer by correction of the nonconformity. The N.M.M.C. may waive any minor infirmity or irregularity in a Tender, which does not constitute a material deviation. This shall be binding on all Tenderers and the N.M.M.C. reserves the right of such waivers. 25.0 CLARIFICATION OF OFFERS To assist in the scrutiny, evaluation and comparison of Tenders, the N.M.M.C. may, at its discretion, ask some or all Tenderers for technical clarification of their Tender. The request for such clarifications and the response shall be in writing. To speed up the Tender process, the N.M.M.C., at its discretion, may ask for any technical clarification to be submitted by means of facsimile by the Tenderer. In such cases, original copy of the document describing the technical clarifications must be sent to the N.M.M.C. by means of courier / in person 26.0 REJECTION OF TENDERS The Tenders are liable to be rejected if the Tenderer: Does not submit the price of the tender in the form of original cash receipt/ DD/ pay order. Does not submit EMD. Does not submit undertaking on Rs. 100/- stamp paper. (Annexure - 2) Does not disclose the full names and address of all his partners in case of a Partnership Concern; Does not submit the information as called for in Annexure – (3 to 8) Does not submit affidavit on Rs. 100/- Stamp Paper. (Annexure - 9) Fails to initial corrections; Fails to fill completely all the proforma provided in the Tender including proforma of Submission of Tender and percentages and amount columns in Schedule – ‘B’. Tries to contact the N.M.M.C. on any matter relating to its Tender, or tries to influence the N.M.M.C. in its decision on Tender evaluation, Tender comparison or Contract award from the time of the Tender opening to the time of contract is awarded. Stipulates any condition in the Tender; Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 19 of 194 ARCHITECT : THE FIRM Stipulates the validity period less than what is stated in the form of Tender; Does not quote rates inclusive of all taxes, octroi local taxes. Does not sign every page of Tender with seal of company / firm; Does not submit document for eligibility criteria mention in Schedule A. 27.0 SHORT – LISTING OF TENDERERS The N.M.M.C. shall notify the date of opening of the commercial bid to all the Tenderers. On such notified date Envelope No. 2 of all the Tenderers which fulfill the criteria as mentioned in Para 17 above will be opened on the notified date and the amount quoted in the tender document shall then be read out. 28.0 OPENING OF COMMERCIAL OFFICE The N.M.M.C. shall notify the date of opening of the commercial bids to all the tenderers. On such notified date the envelope no. 2 will be opened and the rates in schedule B or percentage above / below the estimate shall then be read out. 29.0 ACCEPTANCE OF TENDER 29.2 Acceptance of Tender on behalf of the N.M.M.C. shall be done by an officer(s) to whom the powers are delegated by the Joint City Engineer. 29.3 The N.M.M.C. is not bound to accept the lowest or any Tender. The N.M.M.C. reserves the right to reject any or all Tenders received without assigning any reason whatsoever. 29.4 The right to split up the work in two or more parts is reserved by the N.M.M.C. and also the right to award the work to more than one agency is reserved by the N.M.M.C. 30.0 INTIMATION TO SUCESSFUL TENDERER The acceptance of Tender may be communicated to the successful Tenderer in writing or otherwise either by the Tender opening Authority or any Authority in the N.M.M.C. 31.0 SECURITY DEPOSIT / PERFORMANCE SECURITY 31.1 Successful Tenderer shall pay a Security Deposit equal to the Amount indicated in the Schedule A of the Detailed Tender Notice as security for due fulfillment of the contract, within seven (7) days after receipt of intimation in writing of acceptance of Tender. 31.2 The mode of making this deposit is as under. a) Initial Security Deposit: A sum, which along with the Earnest Money as mentioned in schedule ‘A’ the sum shall be paid within 15 days after receipt of intimation in the writing of acceptance of Tender. It is optional to the Tenderer to make the initial Security Deposit in any one of the following ways: i. wholly in cash; or ii. wholly in form of National Saving Certificate pledged in favour of the N.M.M.C. or bank guarantees/fixed deposit from Nationalized/Scheduled Banks in the enclosed format or iii. Partly in cash and partly in form of National Saving Certificate pledged in favour of the N.M.M.C. or Bank guarantees/fixed deposit from Nationalized/ Scheduled Banks in the enclosed format. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 20 of 194 ARCHITECT : THE FIRM b) Retention Money:The remaining amount of the Security Deposit (if applicable as per Schedule A) shall be recovered from the Tenderer’s running bills at the rate of five (5) percent and such retention together with the Initial Security Deposit made as aforesaid shall not exceed the total amount of security deposit maintained as per the clause 26.1 after which such retention will cease. c) All compensation or other sums of money payable by the Contractor under the terms of the contract or any other account whatever, may be deducted from or paid by the sale of a sufficient part of the Security Deposit/ retention money or from the interest arising there from any sums which may be due to many become due to contractor by the N.M.M.C. on any account whatsoever and in the event of his security deposit/ retention money being reduced by reason of any such deduction or sale aforesaid, the contractor shall within 15 days of receipt of notice or demand from the Joint City Engineer make good the deficit. In the event of such deposit having been made by the Contractor by delivery of the N.M.M.C. by the guarantee of the bankers of the contractor under any of the provisions of the contract becoming subject to or liable for any penalty for causing damages liquidated or unliquidated or of the said deposit becoming forfeited or any breach or failure or determination of contract then and in such case the amount of any such penalty or damage and the deposit so forfeited is not previously paid to the Municipal Commissioner under and in terms of the said guarantee. 32.0 STAMP DUTY, LEGAL AND STATUTORY CHARGES It shall be incumbent on the successful Tenderer to pay stamp duty for the Contract agreement, as applicable on the date of the execution. 33.0 EXECUTION OF CONTRACT DOCUMENT 33.1 The successful Tenderer after furnishing Initial Security Deposit, is required to execute an Agreement in duplicate in the form kept at Annexure-B of Volume-III of this Tender Document on a stamp paper of proper value. The proper value at present is Rs.100/-. The agreement should be signed within 15 days from the date of acceptance of the Tender. The Contract will be governed by the Contract agreement, the General Conditions of the Contract (G.C.C.), and the Special Conditions of the Contract and other documents as specified in the C.O.C. 33.2 It shall be incumbent on the successful Tenderer to pay stamp duty for the Contract Agreement, as applicable on the date of the execution. 34.0 LICENCES The successful Tenderer should comply statutory instructions of contract labour & will be required to produce to the satisfaction of the Joint City Engineer a valid contract labour license issued in his favour under the provision of the Contract Labour (Regulation and Abolition) ACT 1970, before starting the Work. On failure to do so, the acceptance of the Tender is liable to be withdrawn and also the Earnest Money is liable to be forfeited. 35.0 RIGHTS OF THE N.M.M.C. 35.1 The N.M.M.C. reserves the right to suitably increase/ reduce the scope of work put to this Tender. In case of a Rate Contract, the N.M.M.C. does not in any way guarantee the quantity for which an order may be placed and the Tender quantity may only be treated as indicative. The right to split up the Work in two or more parts is reserved by the Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 21 of 194 ARCHITECT : THE FIRM N.M.M.C. and also the right to award the Work to more than one agency is reserved by the N.M.M.C. 35.2 In case of any ambiguity in the interpretation of any of the clauses in Tender Document or the Contract Document, interpretation of the Clauses by the N.M.M.C. shall be final and bindings on all Parties. 36.0 INTERPRETATION OF THE CLAUSES IN THE TENDER DOCUMENT / CONTRACT DOCUMENT In case of any ambiguity in the interpretation of any of the clauses in Tender Document or the Contract Document, interpretation of the clauses by the N.M.M.C. shall be final and binding on all parties. 37.0 NOTICE TO FORM PART OF CONTRACT Notice of Tender and these instructions shall form part of the contract. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 22 of 194 ARCHITECT : THE FIRM Annexure – 1 FORM OF BANK GUARANTEE BOND 1. In consideration of the Navi Mumbai Municipal Corporation (hereinafter called ‘NMMC’) having agreed to exempt _____________________________ (hereinafter called “the said Operator / Contractor / Tenderer / Supplier (s)’) form ___________________________ for (hereinafter called “the said Agreement”) of security deposit for the due fulfillment by the said Tenderer as per the terms and conditions contained in the said Agreement, and on production of a Bank Guarantee for Rs.___________ (rupees _____________________________ only). We, (indicate the name of bank) __________________________________ (hereinafter referred to as ‘the bank’) at the request of ______________________ the Operator / Contractor / Tenderer / Supplier (s) do hereby undertake to pay the NMMC an amount not exceeding Rs. ___________________________________ against any loss or demand caused to or suffered or would be caused to or suffered by the NMMC by reason of any breach by the said Operator / Contractor / Tenderer / Supplier (s) of any of the terms or conditions contained in the said agreement. 2. We_________________________ do hereby undertakes to pay the (indicate the name of the bank) amounts due and payable under the guarantee without any demur, merely on a demand from the NMMC stating that the amount claimed is due by way of loss or damage caused to or would be caused to or suffered by the NMMC by reason of breach by the said Operator / Contractor / Tenderer / Supplier (s) of any of the terms or conditions contained in the said Agreement or by reasons of the Operator / Contractor / Tenderer / Supplier (s) failure to perform the said Agreement. Any such demand made on the bank shall be conclusive as regards the amount due and payable by the Bank under this guarantee. However, our liability under this guarantee shall be restricted to an amount not exceeding Rs.__________ (Rs.__________________________________________________________in words) 3. We, undertake to pay to the NMMC any money so demanded not withstanding any dispute or disputes raised by the Operator / Contractor / Tenderer / Supplier (s) in any suit or proceeding pending before any Court or Tribunal relating thereto our liability under this present being absolute and unequivocal. The payment so made by us under this bond shall be a valid discharge of our liability for payment there under and the Operator / Contractor / Tenderer / Supplier (s) shall have no claim against us for making such payment. 4. We, (indicate the name of Bank) further agree that the Guarantee herein contained shall remain in full force and effect during the period that would be taken for the performance of the said Agreement and that it shall continue to be enforceable till all the dues of the NMMC under or by virtue of the said Agreement have been fully paid and its claims satisfied or discharged or till the Municipal Commissioner of NMMC certifies that the terms and conditions of the said Agreement have been fully and properly carried out by the said Operator / Contractor / Tenderer / Supplier (s) and accordingly discharges this guarantee. Unless a demand or claim under this guarantee is made on us in writing on or before the Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 23 of 194 ARCHITECT : THE FIRM ………………………. we shall be discharged from all liability under this guarantee thereafter. 5. further We, (indicate the name of Bank) agree that the NMMC that NMMC shall have the fullest liberty without our consent and without affecting in any manner our obligations hereunder to vary any of the terms and conditions of the said Agreement or to extend time to performance by the said Operator / Contractor / Tenderer / Supplier (s) from time to time or to postpone for any time or form time to time any of the powers exercisable by the NMMC against the said Operator / Contractor / Tenderer / Supplier (s) and to forbear or enforce any of the terms and conditions relating to the said agreement and we shall not be relieved from our liability by any such variation, or extension being granted to the said Operator / Contractor / Tenderer / Supplier (s) or for any forbearance, act or commission on the part of the NMMC or any indulgence by the NMMC to the said Operator / Contractor / Tenderer / Supplier (s) or by any such matter or thing whatever which under the law relating to sureties would but for this provision, have effect of so relieving us. 6. This guarantee will not be discharged due to the change in the constitution of the Bank or the Operator / Contractor / Tenderer / Supplier (s). 7. We, (indicate the name of Bank) lastly undertake not to revoke this guarantee during its currency except with the previous consent of the NMMC in writing. Dated the ………………. day of ……………………….. 20 For ………………………………………………………….. (Indicate the name of Bank) Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 24 of 194 ARCHITECT : THE FIRM Annexure – 2 UNDERTAKING (On a Rs. 100/- Stamp Paper) This information/ documents submitted by us are true to our knowledge and if the information / documents so furnished shall be found to be untrue or false, the Tender shall be liable to be disqualified and our Earnest Money accompanying Tender will be forfeited. Having examined the tender document including all the annexure, the receipt of which is hereby duly acknowledge, we the undersigned, state that the specifications, etc. of this tender have been carefully studied and understood by me / us before submitting this Tender Also I / We are aware that if the information / documents found to be untrue or false during the currency of contract, our contract is liable to be terminated. ........................................................... I / We hereby declare that I / We have made myself / ourselves thoroughly conversant with the sub-soil conditions regarding all materials (Such as stone, murum, sand etc.) and labour of which I / we have based my / our rates for this work. The Specification, conditions bore result and lead of materials on this work have been carefully studied and understood by me / us before submitting this Tender. I / we undertake to use only best materials approved by the Joint City Engineer N.M.M.C. or his duly authorized assistant, before starting the work and to abide by his decision. A demand draft no. ___________________ dated __________ from the Nationalized / Scheduled Bank at _____________ in respect of the sum of Rs. _________________ is herewith forwarded representing the Earnest Money. I / We agree that the amount of Earnest Money shall not bear interest and shall be liable to be forfeited to the N.M.M.C., should I / We Fail to (i) Abide by the stipulation to keep the offer open for the period of 120 days from the date fixed for opening the same and thereafter until. It is withdrawn by me / us by notice in writing duly addressed to the authority opening the Tenders. (ii) Security Deposit as specified in Scheduled ‘A’ and within the time limit laid down in 24 of detailed tender Notice. The amount of earnest money may be adjusted towards the security deposit or refunded to me / us if so desired by me / us in writing unless the same or any part thereof has been forfeit as aforesaid. Should this Tender be accepted I / we hereby agree to abide by and fulfil all the terms and provisions of the conditions of contract annexed hereto so far as applicable and in default thereof to forfeited and pay to N.M.M.C. the sum of money mentioned in the said conditions. Demand Draft No. ................................................ Dated .................. from the Nationalized / Scheduled Bank at............................................ In respect of the sum of Rs........................ herewith forwarded representing the Earnest money (a) the full value of which is to be absolutely forfeited to N.M.M.C. should I / we not deposit the fill amount of security deposit specified in the Detailed Tender Notice. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 25 of 194 ARCHITECT : THE FIRM Tenderer ..................................................................... Address ...................................................................... ....................................................................... For GL CONSTRUCTIONS (P) LTD. Tenderer ................................... day of ........................20 Signature of Tenderer (Witness) .......................................................................... Signature of Witness Address ............................................................................ .................................................................................... Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 26 of 194 ARCHITECT : THE FIRM Annexure –3 Details of Tenderers 1. Name of Tenderer 2. Address 3. Telephone 4 Fax 5. E – Mail 6. Details of Proprietor/Partners/Directors Name 7. Address Qualification and Experience Financial Performance Turnover Profit Copy of Audited financial statements attached (Yes/No.) Previous Financial year (Y-1) 2nd Previous Financial year (Y-2) 3rd Previous Financial year (Y-3) 8. Registration Details 9. Certification Details 10. Details of Black List & Litigation (if any) 11. Remarks Details of Manufacturing unit. (Where Applicable) 1. 2. 3. 4. 5. 6. Exact Location of Manufacturing facility Products Produced Manufacturing Capacity (Product –wise) Details of ISO Certification obtained. (Copies to be attached.) Actual Production / sales of quoted items during last two years Brief Description of facilities for inspection, testing and quality assurance. Note: - The turnover amount should be certified and audited by CA of firm and separate sheet should be enclosed Signature of Authorized person Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 27 of 194 ARCHITECT : THE FIRM Annexure – 4 Details of Works carried out by the Contractor (last 3 years) including magnitude. Name of the Contractor: Sr. No. Name of Work Type of Work 1 2 3 Name of Department & Address 4 Cost of Work Date of starting 5 6 Stipulated Actual Remarks date of date of completion completion 7 8 9 Note: -The turnover amount should be certified and audited by CA of firm and separate sheet should be enclosed Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 28 of 194 ARCHITECT : THE FIRM Annexure – 5 List of Work in Hand as on the date of submission of this Tender Sr. No. 1. Name of Work 2. Signature of Tenderer Name of Dep’t. & Address 3. Work In Hand Tender Cost 4. Anticipated Date of Completion Remark 6. 7. Actual Cost No. of Corrections 5. Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 29 of 194 ARCHITECT : THE FIRM Annexure – 6 List of Works tendered as on the date of submission of this Tender Sr. No. Name of Work 1. 2. Works tendered for Name of Department & Address Estimated Cost 3. 4. Date when decisions expected 5. 6. Remark 7. Note: 25% to 50% estimated amount shall be consider based on stipulated period of completion Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 30 of 194 ARCHITECT : THE FIRM Annexure –7 List of relevant plant and machinery Sr. No. 1 Name of equipment 2 A) Immediately available B) Proposed to be procured for Work. Signature of Tenderer No. of units 3 Kind and make 4 Capacity 5 No. of Corrections Age & Conditions 6 Present Location 7 Remarks 8 Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 31 of 194 ARCHITECT : THE FIRM Annexure – 8 Details of Technical Personnel available with the Contractor Name of the Contractor: Sr. No. Name of Personnel Technical Qualification Whether Working in field or in office Experience of execution of similar Works 1 2 3 4 5 Signature of Tenderer No. of Corrections Period for which the person is Working with the contractor 6 Remarks 7 Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 32 of 194 ARCHITECT : THE FIRM Annexure – 9 AFFIDAVIT (On a Rs. 100/- Stamp Paper) I/We hereby state that we are aware of the provisions of section 10(1) 10(f) and (g) of the BPMC Act, 1949, which are reproduced below, and solemnly state that we have no partnership with or any share with any Corporator of the corporation in our Company and are not associated presently or in the past with any of the office bearers or Corporator of the Navi Mumbai Municipal Corporation, either directly or indirectly. Extract of Sec 10 of BPMC Act 10 (1) Subject to the Provisions of Section 13 and 404, a person shall be disqualified for being elected and for being a councillor. 10 (f) * subject to the provisions of sub-section(2), has directly or indirectly, by himself or his partner any share or interest in any Contract or employment with, by or on behalf of the N.M.M.C.*. 10 (g) * Having seen elected a councillor is retained or employed in any professional capacity either personally or in the name of a firm in which he is a partner or with whom he is engaged in a professional capacity in connection with any cause or proceeding in which the N.M.M.C. or the Joint City Engineer is Interested or concerned”. We are aware that the above information if found to be untrue or false, we shall be liable to be disqualified and the Earnest Money accompanying the Tender shall stand forfeited to the N.M.M.C. We are also aware that if the information produced above is found to be untrue or false during the currency of the Contract, we shall be held to be in default and the Contract, if any awarded to us, shall be terminated with all its concurrence. Tender Address Date the Witness Address Date the Signature of Tenderer __________________________ __________________________ __________________________ _______________day of _______20 __________________________ __________________________ __________________________ _______________day of _______20 No. of Corrections Signature of Tenderer Signature of Witness Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 33 of 194 ARCHITECT : THE FIRM Annexure - 10 Manufacturer's Authorization Form (MAF) No._____________ dated _________ To, The Joint City Engineer Navi Mumbai Municipal Corporation, C.B.D, Navi Mumbai - 400 614. Dear Sir, Tender Reference No. ____________ We ____________________________ who are established and reputable manufacturers of _____________________ having factories at _________and ____________do hereby authorize M/s.______________________________ (Name and address of Agent / Dealer) to offer their negotiate and conclude the contract with you against the above invitation for tender offer. We hereby extend our full guarantee and warranty as per terms and conditions of the tender and the contract for the goods and services offered against this invitation, for the goods and services offered by the above Agent / Dealer. In case our above authorized Agent / Dealer is unable to supply the goods and services during the period of the contract to the satisfaction of the Navi Mumbai Municipal Corporation, we undertake to unilaterally fulfill the contractual obligations of the said Dealer /Agent either directly or through another Dealer/ Agent. Yours faithfully (Name) for and on behalf of M/s. ____________ (Name of manufacturers) Note: This letter of authority should be on the letterhead of the manufacturing concern and should be signed by a competent person of the manufacturer. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 34 of 194 Signature of Tenderer No. of Corrections ARCHITECT : THE FIRM Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 35 of 194 ARCHITECT : THE FIRM NAVI MUMBAI MUNICIPAL CORPORATION HEAD OFFICE BUILDING, BELAPUR, NAVI MUMBAI GENERAL CONDITIONS OF CONTRACT Tender Notice No. :- NMMC/ ELEC/ JCE/ 66 (03) /2014-2015 Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. 1 S i n g u la r P l u r al. 2 G e n d er 3 D e f in i t i o n s Page 36 of 194 ARCHITECT : THE FIRM GENERAL CONDITIONS OF CONTRACT PART - I INTERPRETATI ONS AND DEFINI TION S an d Where th e con tex t so r equi r e s , w or d s imp o r tin g s in g u l ar s h a l l als o me a n t h e p lu r a l an d v i c e v er s a . the W o r d s i mp or t in g t h e ma s c u l i n e g en d e r s h a ll a l s o in cl u d e th e f e min i n e g en d e r . ( a) ‘ C o r p o r atio n ‘ s hal l me an s N a vi M u mb a i Mu n ic ip a l C o r p o r at i o n a s in co rp o r a te d u nd e r th e B P MC A c t, 1 9 49 . (b) T h e ‘ M u n i c i p al C o m mi s s io n e r ’ sh a ll me a n t h e M u nic ip a l C o mmi s s io n e r o f th e Co r p o r at i on , f o r th e ti me b ein g h old in g th at o f f ic e an d a lso h is su c cesso r a n d s h a l l i n c l u d e a ny o f f ic e r a u th o r i z e d by h i m. ( c) T h e ‘ En g i n e e r ’ s h a l l mea n th e Joint City Engineer a p p o in t ed f or th e ti me b e in g o r any o t h er of f i c e r o r o f f i cer s o f t h e C o r p o r atio n w h o may b e au th o r iz e d b y t h e C o mmi s s i on e r to c ar r y ou t t h e f u n ct io n s o f th e E n g in e er . ( d) ‘ E n g i n e e r ’ s Re pr e s e n t a t i v e’ s h a l l me a n E x e c u t i v e E ng i n e e r / D e p ut y E n g in e er / S e c t i o n a l E n gin ee r /J u n io r E ng i n e e r o r a ny o th er mu n ic i p a l e mp loy e e or e mp lo y ee s a pp o i n te d f r o m ti me to ti me b y t h e ‘ E n g i n e er ’ to p er f o r m t h e d u t i e s s e t f o r th i n Cl au s e N o . 66 h e r eo f an d g en er al ly t o as s i s t th e E n g i n e er f o r t h e p u r p o s e of th e c on t r ac t an d w h o s e a u th o r i t y sh a l l be n o t if i ed in w r it in g to th e contractor by the Eng ine er. ( e) T h e ‘ C o n tr a c t ’ s h al l m e a n th e t e nd e r an d a c c ep t a n c e t he r eo f an d th e f o r ma l ag r e e me n t if a ny , ex e cu t e d betw een the Contractor, an d the Co rporatio n together w i th th e d o c u me n t s r ef e r r ed to th er e i n in c l u d i n g t h es e c on d i tio n s an d a p p en d i c e s an d a n y s p ec i a l c o n d it io n s , t he s p e c i f i c a t i o n s , d e s i g n s , d r a w in g s , p r ic e s c h ed u l es, b il ls o f q u an t it i e s an d s c h e d u l e o f r at e s . A ll t h es e d o cu me n t s ta k e n t o g et h er s h a l l b e d e e me d to f o r m o n e C o n tr a c t an d s h a ll b e co mp le me n t a r y to o n e an o th e r . The ord er of p rec eden ce in case of d is cr epan ci es s h al l b e as u n d er , 1 . C o n t r a c t A g r ee men ts . 2 . T h e l etter of A ccep tan c e. 3 . N o t ic e i n v it in g T en d e r & I ns tr u c t i o ns to T e n d er e r . 4 . S p e c i a l C o n d it io n s o f C o ntr a c t . 5 . T h e G e n er a l C o n d it i on s o f C o n tr a ct. 6 . Schedul e o f Rat es & Quantities . 7 . The T ech nic al spec ifica tions. 8 . T h e D r a w i n gs 9 . S c h e du l es & A n n e x u r e s . ( f ) T h e ‘ C o n tr a ct o r ’ s h a l l me a n th e in d i v id u a l o r f i r m o r c o mp a n y w h eth er in c or p o r a t e d o r n o t, u n d e r ta k in g t h e Works and shall includ e l e gal repr esentat iv es of s uch i nd i v id u a l o r p e r s o n s co mp os in g s u ch f ir m o r u n in c o r p o r a t e d co mp a n y or su c c es s o r s o f su ch f ir m o r c o mp a n y as th e c a s e may b e an d p er mi t t ed a s s i g n s o f s u c h in d i v i d u a l or f i r m o r co mp an y . Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 37 of 194 ARCHITECT : THE FIRM ( g) ‘ C o n tr a ct s u m’ me an s t h e s u m n a me d i n th e le t t e r o f a cc e p t a n c e in clu d i n g p hy s ic al c o n t i n gen ci e s s u b j e c t to s u c h add i ti o n th e r e t o o r d e d u c t i o n th e r e- f r o m as ma y be mad e u n d e r th e p r o v i s io n s h e r ein af t er c on t a i n ed . N o te : T h e co n tr a c t s u m s h a ll in c lu d e t h e f o l lo w i n g : 1. (a) I n the c ase o f percentag e r at e contr act s, th e es t i ma t ed v a lu e o f W o r ks a s me n tio n ed in t h e ten d er ad jus ted by the Con tra ctor's p ercentag e. ( b ) I n th e ca s e o f ite m r at e co n tr acts , t he co s t o f th e W o r k ar r i v ed at a f ter e x t e n s io n o f th e q u an t i t i e s sh o w n in sch ed u le o f ite ms / qu an ti ti es by th e it e m r a t e s q u o t e d b y the ten d er e r f o r v ar i o us it e ms an d s u m ma t io n o f th e e x te n d ed c os t o f ea c h i t e m. ( c) I n cas e o f lu mp s u m c on t r a c t, t h e s u m f o r w h i c h t en d er is a cc ep t ed . 2 . S p e ci a l di s c o u n t / R e b at e / T rad e d i s c o un t of f e r ed b y th e tend er er if any and a cc epted by the Co rporation. 3 . A d d i tio ns o r d e l e t i o n s th a t a r e a c c ep t e d af t er O p e n in g o f t h e t en d er s . 4 . P hy si ca l c o n ti n g en c ies , if an y a n a c c e p t e d b y t he Co r p or a ti o n . ( h) ‘ E x ce p ted r i s k s ’ ar e r is ks d u e to r io t s ( o t h e r w i s e th a n a mo n g C o n tr a cto r s ’ e mp lo y ees) a n d c iv i l c o mmo t i o n ( in s o fa r as b o t h t h e s e a r e u ni n s u r ab le) , w ar ( w h et h er d e c l ar e d or n o t ) , in v as i o n , a c t o f f o r e i gn e n e mi es , hostilities , civ il w ar, rebellio n , revolution, insurrection , mil i t ar y o r us u r p e d p o w e r , an y a c t of g ov e r n me n t , d a ma g e f r o m a ir c r a f t , a c ts o f g o d , s uch a s e ar t hq u a k e, l ig h tn i n g an d u n p r e c e d e n ted f lo o d s an d o th e r c au s e s o v er w h i c h t h e C o n tr a cto r h a s n o co n tr o l an d a c c ep t ed a s s u ch b y th e C o mmi s s io n e r . ( i) Th e ‘ S ite’ mea n th e lan d an d o th er p l ac es , mo r e s p e c i f i c al ly men ti o n ed in th e sp e c i al co n d i t io n s o f th e ten d er , o n , u n d e r , in o r th r o u gh w hich t h e W o r k s o r te mp orary Works are to be ex ecuted an d any other lands an d p l a c es pr o v i d ed by th e C or p o r a t i o n f o r w o r k in g space or any o ther purpos e as ma y be spe cific ally d es ig n at e d i n th e c o n tr a ct as f o r min g p ar t of t h e s i te. ( j) ‘ Ur g en t W o r k s ’ sh a l l me a n an y me as u r e s w h i ch in t h e o p in i o n o f th e E n g in e er be c o me n ec e s s a r y d uri n g t h e p r og r e s s o f t h e Wo r k to o b v i a t e an y ris k of ac c i d e n t o r f ai lu r e or w h i c h b e c o me n e cessary for security . (k)The ‘Works’ shal l mean the t asks to b e executed in accord ance w ith th e con tra ct or p art( s) thereof, as th e c a s e may b e , a n d s h a l l i n c l u d e al l e xtr a o r a d d it io n a l, al ter ed o r s ub s titu t ed Wo r k s as r equ ir ed f or p er fo r man ce o f th e c o n tr a ct . ( l) ‘ C o n s tr u c t i o n P l an t ’ s h al l me a n a ll ap p l i an c es or t h in g s o f w h at ev er na t ur e r eq u i r e d i n o r a b o u t t h e e x e c ut i on , co mp l e t i o n o r ma i n te n an c e o f t h e W o r k s o r te mp o r ary W o r k s ( as h er e in af t er d ef in e d ) b u t sh al l n o t in c l u d e mat er i als o r o th e r th in g s i n te n d ed t o fo r m o r fo r min g par t of th e W o rks . ( m) ‘ Te mp o r a ry Wor k s ’ s ha l l mea n al l te mp or ar y ta s k s o f ev e r y k i nd r eq u i r ed in or ab o u t ex ec u t i o n, co mp l e t io n o r Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. 4. 5. Page 38 of 194 ARCHITECT : THE FIRM mai n t e n a n c e o f th e W o r k . ( n) ‘ D r a w i n g’ sh a ll me an th e d r a w i n g s r e f er r e d t o in t h e s p e c i f i c at io n a n d an y mo d i f i c a t i o n o f s u c h d r aw in g s ap p r o v e d in w r it in g by th e E n gin e e r a n d s u c h d r aw in g s as ma y f r o m ti me to t i me b e f u r n i s h e d o r ap p r o v ed in writing b y the Engi neer. ( o) ‘A p pr o v e d ’ sh a l l me an a p p r o ve d i n w r it i ng i n c lu d in g s u b s e q uen t co nf i r ma t i o n o f p r e v i ou s v er b a l ap pr o v a l an d “A p pr o v a l” s h a l l me a n ap p r o v al i n w r i tin g i n clu d in g a s af o r e s a i d . (p ) ‘S p e ci f ic a t i on ‘ me a ns th e sp e c i fi c a t i o n r e f er r e d t o in t h e ten d er an d an y mo di f ic a ti o n t h e r e o f o r ad d i tio n o r d ed u c t i o n th e r e t o a s may f r om t i me t o ti me b e f u r n i s h ed o r ap p r o v ed in w r i t i n g by E ng in e er . ( q) “ T en d e r ” mea n s th e C o n tr a cto r ’s p r ic e d o f fer t o th e C o r po r a ti o n f o r th e e x ecu ti o n a n d c o mp l et io n o f t h e W o r k s a n d th e r emed y i n g o f any d ef e ct s th er e i n in accord ance with t he p rovi sion of the Cont rac t, as a c c ep t ed by th e L e t t er o f A cc e pt a n c e . (r ) ‘ Let t er of A cc ep t an c e’ me an s th e fo r mal a cc ep t an c e b y th e Corporation. ( s ) ‘ C o mme n ce me n t D at e’ mea n s th e d a t e u p on w h i ch t h e C o n tr a c t o r r ec eiv es t h e n ot ic e to c o m me n c e th e w o r k is s u ed b y th e E n g in e e r p u r s u a nt to C l a u s e 8 0. ( t) T i me f o r C o mp l e t i o n ’ me an s th e ti me f o r c o mp l et in g t h e ex e c u t io n o f an d p a s s i n g th e T es t s o n Co mp le t i o n o f th e Works or any S ect ion or p art thereof as state d in th e C o n tr a c t ( o r as e x t e n d e d u n d e r C l a u s e 83 c a l cu l a t ed f r o m t h e Co mme n c e me n t D at e. ( u ) T h e ‘ A n n e x u r e ’ r e f er r e d t o in th e s e c o nd i ti o n s s hal l mean th e r elevan t annexure app end ed to th e tender p ap er s is s ued b y the C o r p o r a t io n . P A R T – II INSTRUCTIONS TO CONTRACTOR Scope of Work The Work to be car ried o u t u nder the Contract s hall, except as o th e r w is e p r o v i d ed in th es e c o n d it io n s , in c lu d e a l l lab o u r , ma t e r ia ls , to o ls , p l a n t , e q ui p me n t an d t r an s p o r t w h ich ma y b e re q u ir e d in p r ep ar at io n o f an d f o r an d i n th e f ul l a n d e n t ir e Ex e c u t io n an d c o mp l e t io n o f t h e W o r ks . The descr iptions g iven in th e sch edule of Works/ ite ms / q u an t it i e s , an d t h e B i l ls o f Q uan t it ies s h a ll , u n le s s o th e r w is e s ta t e d , b e h e l d to in c l u d e w as t a g e o n ma t e r i a ls , carriag e and c art age, carry ing in, return of e mpti es, hoist ing, set ting, f i tt ing and fixing in position and all oth er lab o u r n e c es s ar y in a n d f o r t h e f u l l an d e n tir e ex e cu t i o n an d c o mp l e t io n a s af o r es a i d in a c co r d a n c e w it h go o d p r a c ti c e & r e co g n i z e d p r i nc i ple s Co r r u pt o r T h e C o r p o r atio n r e q u ir e s t h at t h e b id d er s /su p p l i e r s / F r a u d ul e n t co n t r a c to r s u n d er t h i s t en d er o b s e r v e t h e h ig h e s t st a n d ar d s P r a ct i c e s o f et h i c s d u r i ng th e p r o cu r e me n t a n d e xe c u t i on of such co n t r a c ts . I n p u r su a n c e o f th i s p o l i cy , th e Co r p o r at i o n d ef i n e s f o r th e p ur p o s e s o f th i s p r o vis i o n , th e t er ms s e t f or t h as f o l lo w s : a) “ co r r u p t p r ac t i c e ” me an s th e o f f e r in g , g iv i ng , r ec eiv in g o r so l i c i ti ng o f an y th i ng o f v a lu e to i nf l u en c e th e a ct io n Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. 6. I n ti ma t io n to Suc c e ssf ul T en d e r er s 7. S e c ur i ty D e p o s it 8. F o r f e itu r e o f Security Deposit Signature of Tenderer Page 39 of 194 ARCHITECT : THE FIRM o f th e p u b lic o ff icial in th e p r o cu r e me n t p r o cess o r in c on t r ac t e x e c u t i o n ; an d b ) “ f r au d u l en t p r a c t i c e ” mea n s a mis r e p r es en ta t i o n o f f a c t s in o rder to in fluen ce a procuremen t process or a e x e c u t i o n o f a co n tr a c t to th e d et r i me n t o f t h e Co r p or ati o n , and in c lu d es co llus iv e p r ac ti ce a mon g b id d e r s ( p r io r t o or a f ter b id s ub mi s s io n ) d e s ig n e d t o e st a b l i s h b id p ric es at a r t i fi c ia l n o n - c o mp e t i t i v e l e v el s a nd t o de p r iv e th e Co r p o r at io n o f th e b en e f i ts of th e f r ee an d o p en co mp et i t i o n ; T h e C o r p o r a t io n w il l re j e c t a pr o p o s a l f or aw ar d if i t d et er mi n e s th a t th e B i d d er r eco mm en d e d f o r aw a r d h a s en g ag ed i n co r r u p t o r f r a ud u l en t p r a c t i c es in co mp e t in g f o r th e c o n tr a ct in q u e s t i o n ; Th e Co r p o r at io n w il l a f i r m in e li g ib l e , ei th e r in de f i ni t e l y o r f o r a sta t ed per io d o f ti me , to b e awarded a co ntra ct if it at any ti me d e ter mi n es tha t th e f ir m h as en g a g e d in co r r u p t an d f r a u d u le n t p r a c t i c es in co mp e t in g f o r , o r in e x ec u ti n g , a co n t r ac t. The acc e ptanc e of ten d er may be co mmu ni cated to t h e S u cc e s s f u l T en d e r e r in w r i ti ng o r o th e rw ise ei t h e r by t he ten d er op e n in g a u t h o r i t y o r a n y a ut h o r ity i n th e C o r p o r a ti o n . Th e Co n t r a c to r s h a l l p ay a s ecu r ity dep o s i t eq u al to f iv e p er c en t o f th e co n t r a c t su m as s e cu r i t y f o r d u e f ulf il l me n t o f th e c o n tr a ct, u n le s s o t h er w i s e s t a t e d in th e t e n d e r d o cu me n t s . T h e mo d e o f mak i n g th is d ep o s it is as u n d er . Initial or contract d eposit a su m, w hich alon g w ith the e a r n es t mo n e y a lr e ad y p ai d , a mou n ts t o th r e e p e r c e n t o f t h e co n tr ac t s u m s h al l b e p aid w ith in 1 5 d ay s after r ec eip t of int i mat ion in w ritin g o f acce ptan ce of ten d er. It is option a l to th e co n t r a c to r t o ma k e th e c o n tr ac t d ep o s i t in o n e o f t h e o th e r o f t he f o ll o w i n g w ay s : i) W h o ll y in c as h o r . ii) W h o ll y in f o r m o f N a tio n a l s av i n g C e r t if i ca t e p le d g ed i n f av o u r o f t he C o r p o r a ti o n o r Ban k G u a r an t e e s / F i x ed d e p o s i t f r o m N a ti on a l i z ed / S c h ed u l ed B an k s in t h e en clos ed for mat. ii i) P ar tly in cash an d p ar tly in f o r m o f N ation al s av in g C e r t i f i c at e p l e dg e d in f a v o ur o f th e Co r p o r at i on o r Bank Guaran t ees / F ixed d eposi t from N ation ali zed / S c h e du l e d B a n k s in th e en c lo s e d f o r ma t Reten t io n Mo n ey : T h e r e ma i n in g a mo u nt o f th e s e cu r i ty d e p o s i t i. e.2 % s h a l l b e r e c o v er ed f r o m th e C o n t r a c to r ’ s ru n n i n g b i l l s at th e r ate of f ive perc en t and such r eten tion t ogeth er w ith th e contract d eposit mad e as aforesaid shall no t ex ce ed in the aggregate fiv e p er c ent of the con tra ct s u m after whic h such retention wil l c ease. A ll co mp en s atio n o r o th er su ms o f mo n ey p ay ab le by th e co n t r a c to r un d e r t h e t er ms o f th i s co n t r a c t o r a n y o t h er a c co u n t w h a ts o e v er , may b e d e d u ct ed f r o m o r p a id b y th e s a l e o f a s u f f i c ien t p ar t o f th is s e c u r ity d ep o s i t/ r e t en t io n mo n e y o r f r o m t h e in t er e s t aris i n g t h e r e f r o m o r fr o m a ny s u ms w h i c h ma y b e d u e o r may be c o me du e to C o n tr a cto r No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. 9. 10. 11. 12. 13. 14. Page 40 of 194 ARCHITECT : THE FIRM by th e Cor p o r a ti o n o n a ny ac co u n t w h at s o e v er , r et en t io n M o n ey b e in g r ed u c ed by r e a s o n o f any s u ch d e d u c t i o n o r s a l e as a f or e s a id , th e co n t r a c to r s h a l l w it h in 1 5 d ay s o f r ec eip t of no tice o f d e ma n d f ro m th e En g ine er ma k e g oo d th e d ef ic i t. I n th e ev en t o f th e s aid d ep o s it h av in g b een mad e by th e co n t r a c to r by d e liv er y to th e Co r p o r at i on o f th e G uar a nt e e o f th e B a n k e r s o f th e C o n tr a cto r , a n d o f th e con t r a c t o r u n de r an y of t h e p r o v i s io n s of t h is co n t r a c t be co mi n g su b je ct to o r liab le f or any p en al ty fo r d a ma g es l iq u id ated o r u n li q u id a t e d o r of th e s a i d d e po s i t b e co mi n g f o r f e it e d an y b r ea c h o r f a il ur e o r d e t er min at i o n o f co n t r a c t , t h en , an d in s u ch c a s e t h e a mo u n t o f a ny su c h p en a l t y o r d a mag es a n d t h e d ep os i t s o f o r f ei t ed i s n o t p r ev i ou s ly paid to th e M un i c i p a l Co mmis s i o n er , sh al l i m m ed i a t e l y o n d e man d b e p a id b y th e s a i d B a n k er s t o an d may b e fo r f e i t e d by th e Mu ni c ip a l Co mmi s s i on e r u n de r an d i n te r ms o f sai d Guar ante e E xecution of Th e s u cc es s f u l te n d er e r a f ter f ur n i s h in g I n it i a l S e c ur i ty C o n tr a c t D e po s it , is r e q u ir e d to ex e c u te an A g r e e me n t in d u p li c a t e D o c u men t in th e f o r m a t t a ch e d w ith th e t e n d e r d o cu me n t s o n a s t a mp p ap er o f p r o p er v al u e. T h e p r o p er v al u e a t p r e s en t is R s . 1 0 0/ - . T h e ag r e e m en t s h o u l d b e si g ned w it h in o n e mo n t h f r o m th e d at e o f a c c e p t a n ce o f th e t e n d e r I ssue of W ork Wo r k Ord er w ill b e issu ed af t er ex ecu tio n o f co n tra c t Order docu men t. Co n tr a c t T h e C o n t r a c to r s h a l l b e f u r n is h e d , f r e e of c h ar g e , t w o D o c u men t s certified true cop ies o f the contra c t docu me n ts and al l f ur t h er dra w i n g s w h i ch ma y b e is s u e d d u r in g t h e p r o g r e s s o f th e W o r k . N on e o f th es e d o c u me n ts sh al l b e u se d b y t h e C o ntr a c t o r f o r any p u r p o s e o th e r th a n t h a t o f th is c o n tr a c t . I n d e mn i t y B o nd T h e c o n tr a cto r s ha l l r eq u i r e to ex e cu t e a n I n d emn ity Bond f or s at is f a c to r y p erf o r ma n c e o f t h e e n t i r e p r o j e c t o n S ta mp p ap er o f Rs .1 0 0 / - i n th e f o r ma t as p e r A n n e x ur e ‘D ’. T h i s I nd e mn i t y Bon d s ha l l r e ma i n in f o r ce f o r p er i o d me n ti o n e d in S ch edu le ‘A’ as D efec t Li abi lity P eriod after co mp l et io n o f t h e p r o je c t. L ic en c es T h e s u cc e s s f ul te n d er e r s h o u l d c o mp l y st a tu t or y in s tr uctio n of contract labour &will b e r eq u ired to p roduce to t he s a t i s f a c t i o n of th e E n g in e er a va l id co n t r a c t l ab o u r li c enc e iss u ed in h i s f a vo u r u n d er t h e p r o v i s i o n o f th e Co n t r a c t L a b o u r Li c e n c e ( R e g u l a ti o n an d A b o li ti o n ) 1 9 70 , b e f o r e starting the Work. O n f ailu re to do so, the acc ept ance of th e t en d e r is l ia b l e to b e w ith d r a w n an d a l s o th e ear n es t mo n e y i s l i a b l e to b e f o r f ei t e d . D etai ls to be The C o n t r ac to r s h al l tr e a t th e d e t a i ls o f th e Co nt r act as C o n f id e n t i a l private an d confid ential, s av e in s o far as may b e nec es s ary f or th e p u r p o s es t h er e of , a n d s ha l l no t p u b l is h or dis c l o s e th e s a me o r a ny p a r ti cu l ar s t h er e of i n a ny tr a de o r te ch n i c a l p ap er or els ew h e r e w ith ou t th e p r ev i o us co n s e n t i n w r it i n g of the E n gineer. If any dispute ar ises as to th e n e cess ity o f an y pu b lic a ti o n o r d i s c lo s u r e f o r t h e p u r p os e o f t h e co n t r a c t th e s a me s h al l b e r e f er r e d to th e Co r p o r at i o n w h o s e d e t e r min a ti o n s h a l l b e f i na l . Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 41 of 194 15. O f f i cia l S e c r e c y 16. A s s ig n me n t 17. S ub-lettin g 18. Ch a ng e s Constituti on 19. P o w er o f A t to r n e y 20. Co n tr a c t o r s S t af f Signature of Tenderer ARCHITECT : THE FIRM Th e Co n t r a c t o r s h a l l , w h e n ev er r e q u i r e d , ta k e n ec es sar y steps to e ns ure that all perso n s e mp lo y ed on any Work in co n n e c t io n w it h th is C o n t r a c t h av e n o t i c ed th a t th e I n d i a o ff i ci a l S e c r et s A c t 1 92 3 ( X IX o f 19 2 3) ap p l i e s t o th e m an d s h a l l co n t in u e to ap p l y e v e n af te r ex e cu t io n o f s uch W o r k u n der C o n tr a ct. T h e C o n tr a c t o r sh a l l n o t a s s i g n tr a n s f er o r a t t e mp t to as s ig n , tr an s f er t h e C o n tr a c t or a n y p a r t th er e o f , o r an y b en ef it o r in t er e s t t h er e in o r th er e u n d e r o t h e r w i s e t h an by a ch ar g e in f av o r o f th e Co n t r ac t o r ’ s b an k e r s o f an y M o n ey d ue or to b e c o me d u e u n d er t h is c o n tr a ct, w i t h o u t th e p r i o r w r itten ap p r o v al o f t h e Co mm i s s i o n e r . The Cont ractor shall n ot sub -let o r atte mp t to sub- le t th e w h o le o f t h e W o r k s . E x c ep t w h er e o t h e r w is e p r ov i d ed b y th e C o n tr a ct, t h e C o ntr a c t o r s h a ll n o t su b - l et a n y p a r t of th e W o r k s w it h o u t th e p r i o r w r itten ap p r o v al o f th e En g in e er , w h i c h sh a ll n o t b e u n r e a s o n a b l y w it h - h e l d , an d su ch a pp r o v a l, if g iv e n , s h a ll n o t r e l i ev e th e C o n t r a c to r f r o m an y l i ab i l i ty or o b li g a t io n u n d er def au l t s an d n e g l e cts o f any su b co n t r a c to r , h i s a g e n t s , s e r v a n t s o r W or k men a s f u l ly as if th e y w er e t h e a ct s , d ef a u lt s o r n e g l e c t s o f Co n t r a c to r hi s ag e n ts , s e r v an t s o r W o r k me n . P r o v id e d a lw ay s th a t t h e e n g ag e me n t o f lab o ur o n a p ie c e w o r k basis or la b o u r w it h ma t e r i a l n o t t o b e in c o r po r a t e d in th e W o r k sh al l n o t b e d e e me d t o b e a su b le tt in g u n d er t h is C l au s e . T h e C o nt r ac t or s h a ll b e r es p o n s ib l e f o r o b s er v a n ce b y hi s s u b - co n t r a c to r s o f t h e f o r e go i n g pr o v i s i o n s in W h e r e the c o n tr a cto r is a p ar t n e r s h i p f i r m, th e pr i o r a p p r o v a l i n w r i tin g o f th e C o mmi s s i o ne r s h a l l b e o b ta in ed b ef o r e an y c h an g e is ma d e i n t h e c o n s ti tu t io n o f the f ir m. W h er e t h e c o n tr a c t o r is a n ind i v id u a l or H indu U n d iv i d e d f a mi l y b u s in e s s c o n c e r n s u c h app r o v a l a s af oresaid s h al l l ik e wis e b e o b tained b ef ore th e contr actor en t er s in t o an y par tn e r s h ip a g r ee me n t w h er e u nd e r t h e p ar tn er sh i p f ir m w o u ld h av e t h e r igh t to car ry o ut th e Wo r k h er e b y u nd er t ak e n by th e co nt r a c t or . I f p r io r ap p r o v al a s af oresaid is not o bta in ed the con tract sh all b e d ee me d to h av e be e n a s s i g n ed in c on t r av e n t i o n o f th e Cl a u s e N o . 10 8 h er e o f an d th e sa me a c ti o n may b e tak e n an d th e s a m e co n s e q u en c es s ha l l en s ur e as p r o v id e d f o r i n th e s a i d co n d i tio n. T h e co n t r ac to r sh a l l n o t i s s u e a n y kin d o f p o w er o f at to r n e y in f a v o u r o f h is ba n k er s f o r r ou t in e p ay men ts t o th e co n tr a c to r s th r o u g h B an k . The Contr actor sh all e mploy in and about th e e xecution of Works only s uch persons as are s k illed and are experi en ced in th e ir sev eral tr ades and the Engineer s hall b e at l ib er ty to o b j e ct to an d r e q u i r e th e Con t r a c to r to r e mo v e f r o m t he W o r k s a n y p e r s o n , e mp lo y ed by th e C o n tr a cto r in o r ab o u t th e e x e c u tio n o f t h e w o r k s , w ho in th e o p in i o n o f t he E n g i n e e r mi s co n d u ct s h i ms e lf o r is in co mp e t en t o r n eg l ig e n t in th e p r o p er p er f o r ma n c e o f h i s d u t i es a n d s u ch p er s o n s h al l n o t b e ag ain e mp lo y ed u p o n th e W o r k s w it h o u t No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. 21. Co n tr a c t o r s ’ S u p e r vi s i o n 22. E mp loy ment L ab o u r Page 42 of 194 of ARCHITECT : THE FIRM p er mis s io n o f t h e E n g in e er . The C o n t r ac to r s h a l l h i ms e l f s u p e r v is e th e e x e cut i on of W o r k s & s h a l l a p p o in t co mp et en t ag e n t ap pr o v e d by th e E n g i n e e r to a c t i n h i s st e a d . I f , in th e o p i n i o n o f th e E n g i n e e r t h e Co n t r a c t o r h i ms e lf n ot h av e s u f f i c i e n t k n ow le d g e an d e x p er i en c e to b e c a p ab l e o f r ec ei v in g in s t r u c t io n s o r can n o t g i v e h is f u l l at t en t io n to t he W o r k s , th e C o n tr a cto r sh al l a t h is o w n ex p e n s e , e mp l oy a s hi s accr edit ed ag en t an Engin eer or a su itab ly qualified an d exp er ien ced per s on appr oved by the E ngine er . T he na me o f th e a g en t s o ap p o in t ed , a l o ng - w i t h th e q u a lif i c at io n s , ex p erien ce and address shall be co mmu n icated to t he Engineer. The agent shall b e a responsible p er son ad e q u a t el y o r g a n isa t i o n b y th e Con t r a c to r to t a k e d e c i s i o n o n s it e a n d t o s p en d mo n ey if r e q uir ed f o r p r ocu r in g ma t e r ia l an d l a bo u r et c . t o c a r r y o u t E mer g en c y W o r ks in th e in t er e s t o f th e W o r k , if s o r eq u i r ed b y th e E n g in e er . O r d er s g i v en to C o n tr a c to r ’ s ag e n t sh a l l b e c on s id e r e d t o hav e th e s a me force as if thes e ha d been g iven to t h e C o ntr a c t o r h i ms e l f . If the C ontractor f ai ls to appoin t a su ita ble ag en t as d ir e ct ed by t h e E n g in e er , t h e E n g in e er sh a l l h a v e f u l l p o w er s t o su s p e n d t h e ex e cu tio n o f th e Wo r k s u nti l su ch d at e as a s u it ab l e ag en t is a pp o i n t e d a n d t h e C on t r ac to r shal l b e h eld resp onsible f or the d elay so caused to t he Works. The C o n tr a c t o r s h a l l e mp l oy th e la b o u r in s uf f i ci ent n u mb e r s t o ma in t a i n t he r eq ui r e d r a t e o f p r o g r es s an d o f q u al it y to en s u r e W o r k ma n s h ip , o f th e d eg r e e s p ec if i ed in the C on t r a c t an d t o th e s at is f a c t i o n o f t he E ng i n e e r . T h e C o nt r ac t or s h a l l n o t e mp lo y in c on n e c t i o n w i th t h e W o r k an y ch i ld w h o h as n o t co mp l e te d h i s 1 5 th y ea r o f ag e . H e s h a l l a l s o n o t e mp l o y a n ad o l esc e n t w h o h a s n o t co mp l e t e d his 1 8 th y ear u n le s s h e is cer ti f ied f i t f o r W or k as a n ad u l t a s pr e s c r i b e d u n d e r c l a u s e ( b ) o f s u b- s ec tio n ( 2 ) o f s ec tio n 6 9 o f th e F act or i es A ct, 19 4 8 . 23. Co mplian ce with L ab o u r Regulation. Signature of Tenderer The Contractor shall make h is o wn arrangeme nt f or th e en g ag e me n t of a l l l a b o ur l o c a l o r o th e r w is e . The Contractor shall indemnify the Corporation or any ag e n t, s er v a n t o r e mp lo y e e o f Cor p o r a t i on f o r a n y l ap s e s o n t h e p a r t o f c o n t r a c t o r o n a cc o u n t o f n o n - c omp l i a n c e o f ab o v e r e f er r e d a c ts . T h e co n tr a c to r sh a l l p ay f a ir an d re a s o n ab l e w a g es to t h e W o r k men e mp l o y e d by h i m, f or th e c o n tr a ct u n de r t a k e n by h i m. I n th e e v en t o f any d is pu t e ar is i n g b e tw een t h e co n t r a c to r an d h i s W o r k men o n th e g r o u n d s th a t th e w ag es p ai d ar e no t f air an d r e a s o n a b l e , th e d i s p u te sh a ll b e r ef e r r e d w i th o u t d el ay t o th e E n g in e e r , w h o s h a l l d e ci d e th e s a me . T h e d ec i s i o n o f th e En g in e e r s hal l b e co n clu s i v e an d b in d i n g o n t h e co n t r ac to r b ut su ch d e c is io n s h al l n o t in any w ay aff e ct th e co n d i t i o n s in th e c o n t ra c t r e g ar ding t he p ay men t t o b e mad e b y C o r po r at i on a t th e sa me s an c t i o n e d ten d er r at es . No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 43 of 194 ARCHITECT : THE FIRM T h e e mp l oy e e s o f t h e co n t r a c to r an d t h e s ub - c o n tr a cto r in n o c as e sh all b e tr e at ed as th e e mp lo y ees o f t h e C o r p o r a ti o n a t a n y po i n t o f t i me. S A L I E N T F E A T U R E S OF S O ME MA J O R LA B O U R LAWS A PPLICABLE TO ESTABLISHMENTS E N G A GE D IN BU IL D I N G A ND OTH E R C O N S TRU C T I O N W OR K. ( i) W o rk m a n C o m p e n sa t io n A c t 1 9 2 3. T he A ct p r o vid es f o r co mp en s at io n in cas e of i nju ry by a cc id en t ar i s i n g o u t o f a n d du r i n g th e co u r s e o f e mp l o y me nt. ( ii ) P ay m e n t o f Gr a t u it y A c t 1 97 2 . G ratu ity is p ay ab le to an e mp loy ee under th e A ct on s a t i s f a c t i o n o f c e r ta in co n d i t i o n s o n s e p a r a t i on if an e mp lo y e e has c o mp l e t e d 5 y ear s s erv i c e o r mor e or on death at the r at e of 15 day s w ages f or ev ery comp l et ed y ear o f s er v i ce. Th e A ct is ap p lic ab l e to al l establish men ts emplo y ing 10 or mo re e mp loy ees. ( ii i) E m p l o ye e s P F a n d M i s c e l la n e o u s P ro v i s io n A ct , 1952. T he A c t p r o v id e s f o r mo n t h ly c o n tr i b u t i o n s by t he e mp lo y e r p l u s W o r k er s @ 1 0 % o r 8 . 3 3 % . T h e b e n e f i t s p ay ab le u n der th e A ct ar e ( a) P e n s i on o r f a mi l y p e n s i o n o n r e ti r e me nt o r d e a t h a s th e c ase may b e. ( b ) D e p o s i t l i n k ed in s u r a n c e o n t h e d e a th i n h a r n e s s o f the Worker. ( c) P ay me n t o f P F a cc u mu l at i on o n r et ir e me n t/ d ea th ( iv ) M a t e r n i t y B e n e f i t A ct 1 9 5 1 A ct p rovides for le av e a n d so me o ther b en ef its to wo men emp loy ees in cas e of confin e ment o r mi s carriag e etc. ( v) C o n t r a ct l a b o u r ( R e g u l a t i o n a n d A b o li t i o n ) A c t 1 9 7 0 . T he A ct p rovides for certa in w elfare me as ure s to b e p r o v id e d by th e co n tr a ct o r t o co n tr a ct l a b o ur a n d i n c as e t he co n t r a c to r f ai ls to p r ov i d e, th e s a me ar e r e q u i r e d to b e p r o v id ed b y the P r in c ip a l E mp l o y er by la w . T h e princip a l e mploy er is required to tak e Cer t ificate of R e g i s t r a t i o n a n d t he C o n tr a c to r is r e q u ir e d to ta k e a L ic en c e f r o m t h e d es ig n a ted O f f i c er. Th e A ct is a pp l i c a b l e to th e es t a bl is h me n ts o r C o n tr a cto r o f p r in c ip l e e mp lo y e r if t h ey emp l o y 2 0 o r mo r e co n t r a c t l ab o u r . ( vi ) M in i m u m W a g es A ct 1 9 7 0 T he Co n t r ac to r s h a l l s e e t h at th e p r o v i s io n s se t fo r u n d er th e M in i mu m W a g es A ct and Contract R e gu l a t io n an d A b o li t i o n A c t 1 9 7 0 w it h th e M a h ar as h tr a C on t r a c t L ab o u r ( r eg u l at io n an d a bo l i t i on ) R u l e s 1 9 7 1 as a m en d ed f r o m ti me t o ti me a r e f u l ly c o mp l i e d w it h by h i m a n d s h a ll mai nt a in n e c es s ar y r eg i s t er s a n d r e co r d s f o r p ay me n t o f w a g e s , o v er t i me , etc. mad e to h is W orkme n as require d by th e C o n c i l i at i o n O f f i cer ( C en t r a l ) , Mi n i s try o f La b o ur , G o v e r n me nt o f I n d i a , o r s u c h o t h e r or g a n i z at io n p er s o n appoin ted by the Central or S tate Gover n men t. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 44 of 194 ARCHITECT : THE FIRM (vii) P a ym e n t o f W ag e s A c t 19 3 6 I t l ay s d ow n as to b y w h a t d at e th e w a g es ar e to be p aid, w h e n i t w i ll b e p aid an d w h at d ed u c ti o n s c a n b e ma d e f r o m t h e w a g es o f t h e W o r k e r s . (viii) E q u a l R e m u n e ra t io n A ct 1 9 7 9 T he A c t p r o v i d es f o r p ay me n t o f eq u al w ag e s fo r Wor k o f eq ua l n atu r e to M al e & F e mal e W o r k e r s an d n o t fo r mak ing d iscri mi n at ion ag ains t Fe ma le e mp loy ees in th e mat t e r s o f tr an s f e r s , tr a in in g an d pr o mo ti o n s et c . ( ix ) P a y m en t o f B o n u s A ct 1 9 6 5 T he A c t is a p p li c a b le to a l l e s t ab lish men t s e mp l oy in g 2 0 o r mo r e W o r k me n . T h e A c t p r o v id e s f o r p ay me n ts o f annu al bo nus s ubject to a mini mu m o f 8 .33% of wages a nd ma x i mu m o f 2 0 0 % o f w a g es to e mp l o y ee s d r a w in g R s . 3 , 5 00 / - P . M . or l e s s . Th e b o nu s to b e p a id t o o r e mp lo y e e s ge t t i n g R s . 2 5 0 0 / - P . M . ab o v e u p t o 3 5 0 0 /P . M . s h al l b e W o r k ed ou t b y t ak in g w a g es as Rs . 2 5 0 0 /P . M . o n ly . Th e A ct d o e s n o t ap p l y t o c e r ta in establish men ts. The new ly set up est abl ish ments ar e exe mp ted f or 5y ears in cert ain cir cu ms t anc es. So me o f the S tate Govern me nt h av e r educ ed th e e mp loy ment s iz e f r o m 2 0 t o 1 0 f o r th e p u r p os e o f a pp l i c a bi li t y o f th e Act. ( x) I n d us t r ia l D is p ut es A ct 1 9 4 7 T he A c t lay s do w n th e ma ch in er y and p r o ced u r e f o r r es o lu t i o n o f in d u s t r i a l d i s p u t es, in w h at s i t u a t io n s a s t r ik e o r l oc k - o u t b e c o me s i ll eg al an d w h a t ar e th e r eq u i r e me n t s f or l ay in g o ff or r et r en c h in g th e e mp lo y ees o r cl o s in g d o w n th e est a b l i s h me n t. ( x i ) I nd us tr i a l E m p l oy m e n t (S t and i n g Or d e rs ) A c t 1 9 46 I t i s ap p l i c a b l e to a l l e s t ab l is h me n ts e mp l o y in g 1 0 0 0 o r more Wo r k men ( emp loy ment s ize re duced by so me o f t he S t a te s an d C e n t r a l G o v er n men t t o 5 0 ) . T h e A c t p r o v id e s f o r lay in g d o w n r u l es go v e r n in g t h e c o n d it io n s o f e mp lo y men t b y th e e mp l oy er or ma t t er s p r o v id e d in t he A ct a n d g e t t h e s a me c er t if ied b y t he d e s i g n a t ed Authority . ( x i i ) Tra d e U n i o n s A c t 1 9 2 6 T he A c t lay s d ow n th e p r o c e d u r e f o r r e g i s tr a t i o n o f t r a d e u n i o ns of W o r k me n an d e m p l oy e r s . Th e tr a d e u n io n s r e g ist er e d u n der th e A c t h av e b e e n g iv e n c e r t a i n i mmu nities fro m civ il and cri min al liab il it ies. ( x i i i) C h ild la b ou r ( p r o h ib it i o n an d reg u l a t i o n ) A c t 1 9 8 6 T he A c t p r o h ib i ts e mp l oy me n t o f ch i ld r e n b el o w 1 4 y ea r s of ag e in c e r t a in oc c up a t i o n a n d p r o ce s s e s an d p r o v id e s f o r r eg u l a t io n o f e mp lo y me n t o f ch i ld r e n in al l o th e r o cc u p at io n s an d p r o c e s s e s . E mpl o y me n t o f ch i ld l ab o u r is p r o h ib i t e d i n B u il d in g a n d C o n s t r u ct io n I n d u s try . ( x i v ) I n te r - S t ate M ig r a n t W o rkm e n ’ s ( R eg u l a t io n o f E m p l o ym e n t & C on d i t io n s of S e r vi c e ) A c t 1 9 7 9 T he A ct is appl ic able to an est ablish men t w hich e mp lo y ees 5 o r mor e in t er - state mi g r an t Wo r k men t hr o u g h a n in t e r me d i ar y ( w ho h as r ecr u it ed W o r k me n in one st ate f or emp loy ment in the establish ment s itu at ed in anoth er stat e). T he in ter -s tate mi g rant Work men, in Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. 24. S a f ety P r o v is i o n s 25. P r o v is io n o f F i r s t- A id B o x 26. A p p r e nt i c e s 27. P e r s o n n el . Signature of Tenderer Page 45 of 194 ARCHITECT : THE FIRM an estab li sh men t to which th is A c t b eco mes ap plic ab l e, are r equired to b e provided certa in fac il it ies s uch as h o u s in g , me d i ca l aid , t r a v el i ng e x p en s e s f r o m h o me upto the es tab lish ment and ba ck, etc. ( x v) T h e B u i ld in g & o t h e r C o nst r u ct i o n Work e r s ( R e g u la t i o n o f Em p lo y me n t a nd C o nd iti o n s o f S e rv i c e ) A c t 1 9 9 6 a n d t h e C es s A ct o f 1 9 96 A l l th e es t a b l is h m e n ts w h o car r y on any b u il d in g o r o th e r co n s t r u ct io n W o r k a n d e mp loy s 1 0 o r mo r e W o r k e r s a r e c o v e r ed un d e r t h is a c t . A l l s u ch establish men ts are r equ ired to p ay c ess at rat e no t exce ed ing 2% of t h e co st o f cons tru ct ion as may be n o ti f i e d by th e G o v e r n me nt. T h e e mp lo y er o f t h e establish men t is r equired to p rovide s af ety me asures a t t he B u i ld in g o r C o n s t r u c t i o n W o r k and o th e r w e lf a r e measures , such as Can t eens, F irst-A id facilities, A mbu lan ce, H ousing acco mmo d ation for Worker s near t he W or k p l a c e e tc . Th e e mp lo y er t o w h o m the A c t appl ies has to o b tain a reg is tration ce rtificat e fro m t h e R e g i s t er i n g O f f i cer ap p o i n t e d by th e G o v er n men t. Th e C o n t r a c to r s h a l l a t h is o w n e x pe n s e ar r an g e f o r t h e s a f e ty p r ov is i o n s in d i c a te d in A n n ex u r e ` A ’ o r as r e qu i r e d by th e En g i n e e r , i n r e s p e ct o f a ll l a b ou r d ir e ct ly or in d ir e ct l y emp lo y e d f o r per f o r ma n c e o f th e Works and shall provide al l f acilities in connect io n ther ew ith. In case th e Contra ctor f a il s to mak e arrange men ts and provide n e cess ary facilities as aforesaid, th e E n g in e er sh a l l b e en t i tl e d to d o s o an d r ec o v er t he co s t s ther eo f fro m the Co n tractor. T h e c on tr a c to r s h a l l, a t h i s o w n co s t , p r ov i d e an d mai n t a i n at th e s i t e o f W o r ks a s t an d ar d f ir s t ai d b o x a s d ir e c t ed an d ap p r o v ed by th e E n g in e e r fo r th e us e o f h i s o w n a s w ell a s th e Corporation`s s taff on site Th e Co n t r a c t o r s h a l l c o mp l y w i th th e p r o v is i o n o f th e A p p r en t i c e A c t, 1 9 6 1 , an d th e r u l e s an d o r d er s i s s u ed th er e u n de r f r o m t i me t o t i me. T h e c o ntr a c t or sh al l d u r i n g t h e ter m of this ag r ee me n t mai nta in as a par t o f hi s o r g a n i z a t i on a sy st e m o f ap p r en t i c es hip f o r t r ain in g cr afts me n as may b e approved by the En g ineer. Th e ap p r e n t i c e s ar e to b e en g a g e d a n d t r a i n ed i n t h e b u il d i n g cr a f t / tr ad es . Th e n u mber o f ap p r en t i c es to b e en g a g ed s h al l b e d ec i d e d an d g o t ap p r o v ed f r o m t h e o f f i c e o f t h e D i r e c t o r o f T e ch n i c a l E d u c a tio n an d S t at e A p p r e n ti c es h i p A d v is o r , M a h ar as h tr a S t a t e , D h o b i T a l ao , B o mb a y – 4 0 0 00 1. F a ilu r e o n p a r t o f co n t r ac t o r to o b s e r v e th e st ip u la t io n o f t h es e co n d i tio n s s h al l b e de e me d to b e f a i l u r e to e mp l o y a s u f f ic i e n t n u mb e r o f p r o p er a n d e f f ic i e n t W o r kme n a n d al l th e r i g h t s a n d r e me d ie s of th e C o m mi s s i o n e r t h er e i n p r o v i d ed in c lu d i n g th e p o w e r to d e t e r mi n e t h e co n t r ac t s h al l b e a p p li c a b l e in s u ch c ase . Th e Co n t r a c to r sh al l a l s o be lia b le fo r a ny p e c u n i a r y liab i l i ty ar i s in g o n a ccoun t of an y v io l at io n b y h im o f t h e p r o v is i o n s o f th e A ct . Th e Co n t r a c t o r sh a l l e mp lo y t h e k ey p e r s o n n e l n a me d in th e s ch e d u l e o f ke y p e r s o nn el ( A nn e x u r e ‘ B ’ ) o r o t h e r p er s o n n e l a p pr o v e d by th e E n g in e e r to c ar r y o u t th e No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. 28. T e mp o r ar y S i te O f f i ce f or t h e E n gin e er ( F or W o rk s C o s t in g A b o v e R s . 5 0 L a ck s Only ) 29. Co n tr a c t o r ’ s O f f i ce N e a r W o rk s 30. P er mi ssio n for E r ec tio n & R e mo v a l o f O f f i ce o n Co mp le ti on of W o rk 31. U s e o f Mu n ic ip al L an d Signature of Tenderer Page 46 of 194 ARCHITECT : THE FIRM f un c t io n s . T he E n gin e er w i ll a pp r o v e an y p r o p os ed r ep l ac e me n t o f k e y p e r s o nn e l o n ly i f th e i r q u al if i c a tio n s , ab i li t i es a n d r e l e v an t ex p er i e n c e ar e s ub s tan ti a l ly eq u a l t o o r b e tt e r t h an t ho s e o f th e p er s o n n el lis te d in t h e s c h ed u l e . T h e C o n tr a cto r sh a l l a t hi s o w n co s t a n d t o th e s a t is f a ct i o n o f th e E n g in e er , p r ov i d e a s it e o f f ic e o f n o t le s s th a n 2 5 S q . M t r . W it h b r ic k w al l s , p las t e r i n g i n s i de, r o u g h s h ah a b ad f lo o r in g a nd o n e w r it in g t a b le w i th s i x c h ai r s an d l ar g e s i z e s te e l c u p b o a r d . H e s h a l l a ls o ma k e n ec es s ar y a r ran g e me nt s f or dr i n k in g w at er a n d e l e ct r i c co n n e ct io n a n d lo c k in g ar r a n ge men t . U p o n c o mp l e t io n o f th e w h ol e w o r k a n d a f t e r c l e ar i n g t h e site and upon expiry o f defect liability p eriod, t h e C o ntr a c t o r s hal l r e mo v e th e si t e o f f ic e an d t a k e p os s es s i o n o f th e f u r n it u r e an d cu p b o a r d s p r o v id e d b y h i m in t h e co n d i tio n it w a s o n th e d at e o f r ec e i v in g b a c k th e s a me . T h e Co n t r ac to r s h a l l h av e an o f f i c e n e ar t h e W o r k s a t which not ice fro m the Eng in eer may be served and shal l, b et w e en t h e h o ur s o f s u n r ise a n d s u n s e t o n a ll W o r k in g d ay s, h av e a c l e r k o r s ome o t h er o r g a n i z a t i on p er s o n alw ay s p r es e n t at s u ch o f f i c e u p on w h o m su c h n o ti c e s may b e s er v e d a n d s e r v i c e o f any n o t i c es le f t w i th s u ch c l er k o r o th e r o r g an i z a t i o n p er s on o r a t s u c h o f f i c e s h a ll b e d e e me d g o od s e r v ic e u p o n t h e C on tr a c to r . T h e C on tr a c to r sh a l l o b t a i n p er mi s s i o n f o r er e c t io n o f si t e o f f i ce, c e me n t g o d o w n , st o r e, e t c. o n p a y me n t o f n ec es s ar y ch a r g es a s d e ma n d ed b y th e co n cer n e d au th o r i t i es as p e r th e p r e v a i lin g r u les . T h e ce me n t g o do w n , Wa t ch man cabin s, etc. sh all be p rovid ed as d irected and shall be r e mo v ed by th e C o n tr a c t o r o n c o mp l e t i o n o f th e W o r k a t th e ir co s t. ( a) T h e Co n tr a ct o r s h al l n o t b e p er mit t e d to e n t e r o n ( o t h er t ha n f o r in s p e c t io n p ur p o s e s ) or ta k e p o s s e s s i o n o f s it e u n ti l i n s tr u c t e d to d o s o by t he E n gin ee r in w r i ti n g . T h e p o r t i o n o f th e s i t e to b e o c c u p i e d by t h e C on t r a c to r shal l be d efin ed a nd/or ma rked o n the s it e p lan, f a il ing which th ese sh all be indi cated b y the En gineer. T h e C o ntr a c t o r s hal l o n n o ac c ou n t b e a ll o w e d to ex te n d h i s o p er a tio n s b ey o n d t h es e a r e a s . T h e u s e o f s u ch p or t io n o f th e s i t e sh al l b e al lo w e d f r ee o f an y le a s e r e n t d u r in g s c hed u l e d t i me p e r io d f o r t h e c o mp l e t io n o f th e W o r k . H o w e v er at th e ex p i r y of th e st ip u l a t ed p er i o d o f t h e W o r k , as may b e e x t e n d e d f r o m t i me t o ti me , Co n tr a ct o r h as t o p ay c h ar g e s f o r t h es e f a c i l i ti e s as p e r th e p r ev a i l in g r a tes lev ied by the Corporation for use of public uti li ty places. The Con tractor w ill b e allo w ed to use th e l and for the p u r p o s e o f sh e d s , o f f i ces t h er e o n f or t h e ms e lv e s an d f o r th e E n g i n e e r an d h is su b o r d i n a t es a n d s h all r e mov e t h e s a me f r o m th e g r o un d on th e co mp le t io n o f th e Wo r k s , or when required to do so, by the E ngin eer after r eceiving 7 d ay s no t ic e . H e s h a l l mak e g o od any d a ma g e w h ic h ma y h av e b e e n d o n e an d r es to r e to g o o d c o n d i t i o n a n y th in g w h ich ma y h av e b e e n d is tu r b ed d u r i n g t h e p e r i o d o f h i s occupatio n . H e s hal l n o t u s e o r al lo w t o b e u s ed an y su c h g r o u n d , s he d s No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. 32. W at er S u p p l y f o r Corporation W o rk 33. E le c t r i c S u p p ly 34. Co n tr a c t o r to P r o t ec t th e W o r k 35. F e n cin g , W at ch i n g an d L ig h t in g 36. Co n tr a c t o r ’ s Lia b ilitie s & I n s ur a n c e Signature of Tenderer Page 47 of 194 ARCHITECT : THE FIRM o r o f f i ces , o r any po r ti o n of th e si t e o f th e Wo r k s , f o r any o th e r p ur p o s e th a n th e c a r r y in g o u t o f W o r k s u n d er t h i s Contract, failing w h ich ch arges app li cable w ill b eco me p ay ab le i n th e ev e n t o f t h e r e b ein g o n p lo t o r g r o u n d o r in s u f f i ci e n c y of g r o u n d b el o n g in g to th e Co r p o r a t io n av ailab l e for the abov e purpose, the Contractor s hal l p r o v i d e o t h er s u c h g r o u n d a t h i s o w n co st . The Con tractor shall in any case pay all tax es which may h av e to b e p a i d in r es p e c t o f a ll g r o u n d , sh e d s o r o ff i c e s u s ed as a b o v e , a n d a l l th e l i c e n s e f e es , et c . , th a t may b e d e man d e d f o r th e st o r ag e o r o t h er w i s e o f th e v a r i o u s ar tic les as per rules in force. The C o n t ra cto r s h al l p r o v i d e , i f n e c e s s ary o r i f r eq ui r ed o n th e s ite all t e mp o r ary accesses th er eto and shall alter, ad o p t an d ma in t a i n th e s a me as r e q ui r ed f r o m t i me to t i me an d s h al l t ak e u p an d c l ea r t h e m a w ay as a n d w h e n n o lo n g e r r e q u ir e d an d ma k e g o o d a l l d a mag e d o n e t o t h e s i t e . The con tr actor h as also b e a llowed at t he sole discretion o f th e c o r p o r a t io n t o sta ck ma t er i al r e q u ir e d f o r ex e c u t i o n o f w o r k in co r p o r atio n lan d o u t o f the p r oj e c t ar ea o n p a y me n t of n ecess ary charges as per corpora ti o n rules for use of r o a d s p u b li c u t i l i t y p l a c e s . T h e w at e r w i ll n o t b e s u p p l i ed b y th e Co r po r a tio n . T h e C o ntr a c t o r ha s to mak e h i s o w n ar r an g e me n ts f o r s u p p ly of w a t e r . H o w e v e r o n av a i l ab i li t y o f w at e r i t c a n b e s u p p l i e d at th e o r g a n i z a t io n C o r p ora t i o n r a t e an d t er ms an d co n d i tio n s . N o p o w e r co n n e c t i o n s h a l l be p r o v id ed . Th e Cont r a c to r s h al l mak e at h i s o w n co s t h i s o w n ar r a ng e me n t f o r p ow er co n n e c t io n , if r eq u i r ed . T h e co n t r ac to r s h a l l mak e hi s o w n ar r an g e me n ts fo r p r o t e c t in g t h e W o r k / p r o te ct io n ag e i s t o b s t r u ct io n s f r o m an y a n ti- s o ci a l e l e me n ts b y tak in g a t h is / th ei r co s t p o l i c e p r o t e c t io n o r su ch o t h er l eg al me t h o d s th r o u g h law en f o r cin g au th o r i ti es an d th at th e Co r po r atio n s hal l n o t b e li ab l e to co mp en s a t e th e co nt r a c t or o n t h is a c c o u n t. T h e C o r p o r a ti o n w o u ld o n l y f or w a r d th e ap p l i c a t i o n o f th e contr a c to r to th e p o l i c e D e p t . W i t ho u t an y l ia b i l ity agains t th e Corporation on th is account. T h e C o n t r ac to r sh a l l p r ov i d e a n d ma i n t a i n at h i s o w n ex p ense all l ights, guards , f encing and w atching when an d w h er e n e c e s s a r y or a s r e qu i r ed by th e E n gi n e e r f o r th e p r o t e c t io n o f th e s a f ety a n d c o nv e n i e n c e o f th o s e e mp l o y ed o n th e W o r k s o r th e p u bl i c . I n t h e ev e n t o f f a i lu r e o n t h e p ar t o f th e C o n tr a c to r , t h e E n gin e e r ma y w ith o r w ith o u t n o ti c e to th e Co n t r a c to r p u t u p a f en c e or i mp r o v e a f en c e alr ea d y pu t u p o r p r o v id e a n d/ o r i mp r o v e th e lig h tin g o r ad o p t su c h o t h e r me a s u r e s a s he ma y d e e m n e c e s s a r y , an d al l th e co st o f such p rocedu r es as ma y be adopted by the Engineer shall be b orne by the Contractor . In addition th e Engineer may i mp o se such f ines o r penal ty as the E ngin e er may d e e m r e as o n ab l e , un d e r Cl a us e N o . 5 3 . F r o m co m me n c e m en t to c o mp l e t i o n o f th e W o r ks , t he Contr a c t o r s h a l l t ak e f u l l re s p o n s ib i l i t y fo r t h e c a r e t her eof and for taking precautions to prevent l o ss or d ama g e and to No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. (Car Polic y ) Signature of Tenderer Page 48 of 194 ARCHITECT : THE FIRM mi n i miz e the loss or da mage to th e g reat es t ex te nt p o s s ib l e and s h all be li abl e for any da ma g e o r loss th at may h app en to t h e W o r k s o r any p a r t th er eo f . T h e p o l i cy so o b t a i n ed s h a l l co v e r en t ir e p er i od o f const ru c t i o n (i n c l u din g a l l e x t e ns io n s ) a n d als o s h al l cover the D efe cts Liabil it y period. Th e p o li c y sh a ll b e f o r t he t ot a l C o n tr a ct S u m. B e f o r e co m me n c i n g ex e cu t io n o f th e W o r k, th e Co n tr a ct o r s s h a l l w i th o u t in a n y w ay li mit in g h i s o b li g a t i on s an d r es p o n s i b i l i t i e s u n d e r t h i s c o n d it io n , in s u r e a g a i n s t an y d a mag e l o s s o r in ju r y w h ich may o c cu r to an y p r o p e r ty ( P r iv a t e , G o v er n me n t an d /o r Co r p o r a t i o n ) o r t o an y p er s o n ( I n c lu d i n g any emp l o y e e o f th e Co r p o r a ti o n ) b y or ar i s in g o u t o f th e c o n tr a c t . A l l in s u r a nc e s ( C a r P o l i c y ) to b e aff e ct e d b y th e C o ntr a c t o r s an d / or h i s s u b - c o n tr a c t o r s s h al l b e t ak e n o u t w i th D i r e c t o r a t e o f I n s u r a nc e , M a har as h tr a S ta te o n ly . In c a s e , ho w e v e r , a p ar t icu la r as p e c t is n o t co v e r ed u n d er t h e p o li cy to b e o b ta i n e d f r o m th e D ir e cto r at e o f I n s u r an c e, Mahar ash tr a s tate, the Con tr actor w ill be allowed to h av e such insu r an ce f rom other insurance co mp any with th e p r i o r p er mi s s io n o f th e C o mmi s s i o n er . I f th e Co n tra cto r h as a b lan ket in su r an c e p o lic y f o r all his W o r k s a n d th e p o l i cy c o ver s all th e it e ms to b e in s u r e d under thi s conditio n, the sai d policy shal l be ass igned by th e C o n t r a c to r , i n f a v o u r o f t h e C o r po r a ti o n ; p r o vid ed , h o w ev e r , i f an y a mo u nt is p a y a b l e u n d er th e po l ic y by t he in s u r e r s in r es pe c t o f Wo r ks o t h er th a n th e W o r ks u nd er th i s Co n t r a c t, th e s a me may b e r e c o v er e d by th e Con t r a c t o r d ir e ct ly fr o m t h e i n s u r er s . T he a mo u n t o f c l a i m t o t h e ex t en t p a y men t ma d e b y Co r p o r at i o n s h al l b e d ir e ct ly r ei mb u r s e d t o C o r p o r a ti o n by i n s u r er . Provided alw ay s that the Co ntractor s hall not b e entitl ed to p ay men t u n d e r th e a b o v e p r ov i s i o n s in r e s p e c t o f s u ch lo s s or d a mag e as h ave been o cc as ion ed b y any fail ure on hi s p ar t to p er f o r m h i s o bl i g a t i o n s u nd e r th e Co n t r a c t o r n o t tak ing pr ecautions to prev e nt los s o r da mag e or mini mi z e th e a mo u n t o f s u ch l o s s or d a ma g e. Where a Corporation`s Building or p art th er eof is r ented by th e Co n tra cto r o r is allow ed to b e u sed by h im, h e s h al l in s u r e th e en ti r e b u ild in g if t he b u il d in g o r an y p a r t t h e r eo f is u s e d b y h i m f o r th e p u r p o s e o f s to r i n g o r u s i n g ma t er i a l s o f co mb u s ti b le n a t u r e a s to w h i ch t h e d e c is i o n o f th e E n g i n e e r s hal l b e f i n al an d b in d i ng . T h e C o n t r a c to r s ha l l in d e mn i fy an d k e e p ind e mn i f i e d t h e C o r p o r a ti o n a g a i n s t a ll lo s s es an d c l a i ms f o r in j ur i es o r d a mag e to a n y p er s o n o r an y p r o p er t y w h ats o e v e r w h i c h may ar i s e ou t o f o r in co ns eq u e n c e o f th e co n s t r u c tio n an d ma i n t en an c e o f th e W o r k an d ag a in s t a ll c l a i ms, d e man d s , p r o c e ed i n g s , d a mag es , co st s , c h ar g e s an d e x p en s e s w h ats o e v er in r e s p e c t o f o r i n r el at io n t her eto . P r o v id e d a lw a y s th a t n o t h in g h er e i n co n ta i n e d s h a l l b e d e e me d to r en d e r t h e C o n t r a c to r l i ab l e f o r o r in r e s p ec t o f or to th e Corporation ag ainst any co mp ensation o r dama g e caused by the Ex c epted Risk s. No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. 37. Co n tr a c t o r to Preserve Peace Signature of Tenderer Page 49 of 194 ARCHITECT : THE FIRM T h e C o n tr a c to r s h a l l at a ll ti me s in d emn i f y th e C o r p o r at i o n ag a in s t a ll c l a i ms , d a ma g es or co mpen s a ti o n u n d er t h e p r o v i s i on s o f P ay men t o f W a g es A c t 1 93 6 , M i n i mu m W ag e s A c t 1 9 4 8 , E mp l oy er s L i ab i l i ty A ct 1 9 3 8 , th e Wo r k me n ’ s C o mp e n s a t io n A c t 1 9 23 , In du s tr i a l D i s p u t e A c t 1 94 7 , I nd i a n F a c t or i es A ct 1 9 4 8 a n d M at er n i ty B e n ef i t A c t , 1 96 1 o r any mo di f ic a t i o n s th er e o f an d r u les mad e th e r e u n d er f r o m t i me to t i me o r as a c on s eq u e n c e o r an y a cc id e n t o r in jury to any Work man or other p er sons in or about t he Wo r k s, wh eth er in th e e mp lo y men t of t h e Co n tr a cto r o r n o t, save and excep t wh ere such a ccident or in jury have r esult ed f r o m an y a c t o f t h e C o r p or a t i o n , th eir ag en ts o r ser v a n ts , an d a ls o ag a in s t al l c os t, c h ar g e s a n d e x p e ns es o f any s u i t, action or p roceed ings arising out o f such accid ent or injury and ag ain st all su m or su ms which ma y with th e consen t of th e C o n tr a cto r b e p a id to c o mpr o mis e o r co mp o u n d an y such claim w i thou t li mi ti ng h is o bligat ions and liab ilities as ab o v e p r o vi d e d. T h e C o n tr a cto r sh al l in s u r e a g a i n s t a l l cl ai ms d amag es o r co mp ens ation p ay able und er the v ario us a c ts me n t i o n ed a b o v e o r an y mo d if i c a ti o ns th er e o f or any o th e r law r e l a t i n g t h e r e t o . T h e af or es aid in s u r an c e po l icie s shal l provide th at they shall not b e can cel ed till th e C o m mi s s i o n e r h a s a g r e ed to t h eir can ce ll a t i on s . T h e C o n tr a c t o r sh al l p r o v e to th e E n g i n e e r f r o m t i me to ti me th a t h e h a s tak e n o u t al l th e in s u r a n c e p o l i c i e s r ef e r r e d t o a b o v e an d h as p a i d th e n e ce s s a r y p r e mi er f o r keeping the po lic ies al iv e t il l the ex p iry of the D ef ect s L i ab i li ty P e r io d a f t e r co mp l e tio n of W o r k f o r a p er i o d o f n o t ex c e e d in g 1 2 mo n t hs as p e r d i r e c t i v es o f D i r e c to r a t e o f I ns u r a n c e , M a h ar a s h tr a S ta t e . T h e Co n t r a c to r sh al l en s u r e t h a t si mi l a r in s u r a n c e p o l i c ies ar e t ak en o u t b y his s u b C o n tr a c t o r s ( if a n y ) and sh al l b e r es p o n s i b l e f o r any cl a i ms o r los s es to th e Co r p o r at i o n r es u l t i n g f r o m t h ei r f a ilu r e to o b t a in a de q u at e in s u r an c e p r o t e c t io n in co n n e c t i o n th e r eo f . Th e Co n tr a c t o r s h a l l pr odu c e o r c a us e to b e p r o d uc e d by h i s S u b- C on t r actor ( if any ) as th e cas e ma y be, the rel evant policy or polici es an d p r e miu m r e c e i p ts a s an d w h e n r e q u ir e d by t h e E ng i n e e r . I f th e Co n tr a ct o r a n d / o r h is s u b - C o n t r a c to r s ( i f a ny ) s hal l fail to effect and k eep in force th e in su rance referred above f or any o th e r i n s u r a n c e w h i c h h e /th ey may req u i r e t o ef f e c t u n de r th e te r ms o f C o n t r a c t th e n a n d in any su ch cas e th e C o m mi s s i o n e r may w i th o u t b e in g b o u n d t o ef f e c t an d k e e p in fo r c e any su c h i ns u r a n c e a n d p ay pre miu m o r p r e mi er as may be n e c es s ar y f o r th at pu r p o s e an d f r o m ti me to ti me d ed u c t th e a mo u n t s o p ai d b y t h e C o r p o r a ti o n p lu s 2 0 p er c e n t o f p r e mi u m o r p r e mi er a mo u n t as s e r v i c e ch a r g es f r o m an y mo n ey due or w hich ma y b eco me due to the Contractor or r e co v e r t h e s a me as d eb t fr o m th e C o n t r a c to r. T h e C o n tr a cto r sh a l l a t al l t i mes d u r in g t h e p r o g r es s o f t h e W o r k ta k e a l l r e q u is i t e p r ec au t io n a n d u s e h is b es t en d eav o r s f o r p r e v en t in g an y r i o to u s o r u n la w f u l b eh av i o r by o r a mo n g s t th e W o r k e r s an d o th er e mp lo y e d o n t h e W o r k s an d f o r th e p r e s er v a ti o n o f p e a c e and p r ot e c t io n o f th e in h a b it an t s an d s e c u r i ty o f p r o p er t y in th e No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. 38. P r o t ec t i o n o f T r ees 39. Maintena n ce of Under- ground Util ity Services 40. P r e cau ti o n s f or W o rk s i n T h or o u g h - F a r e s Signature of Tenderer Page 50 of 194 ARCHITECT : THE FIRM n ei g h bo r h o o d o f th e Wo r k s . H e sh al l al s o p ay th e ch a r g e s o f s u ch s p e ci al p o l i c e ( if a n y ) as th e E n g i n e e r ma y d e e m neces s ary . T r e es d es ig n a t e d b y the En g i n e e r s h a l l b e p r o t e ct ed f r o m d a mag e d u r i n g t h e c ou r s e o f t h e W or k an d e a r t h l ev e l w i th i n o n e me t er o f e a ch su c h tr e e s h a l l n o t b e ch an g e d . Where n e cess ary , such trees s h al l b e p rote cted by te mp o r a r y f e n c in g . A l l s uch c o s t s h al l b e b o r n e by th e Contrac tor. All th e underground utili ty s er vices s uch as w ater p ip es , g as p ip es , d r a in s , s ew er s , ca b les e t c . , w h i ch ma y b e me t u p in o r ab o u t an y ex c av a ti o n , s h a ll if t h e E n g i n e e r de e m i t p r a c ti c a b l e , b e p r o p er l y ma i n t a i n ed an d p r o te c ted by th e C o ntr a c t o r h i ms e l f o r t hr o u g h o th e r a g en c y by me an s o f s h o r in g , str u t t i n g , p l an k i n g o v e r , p a d din g o r o t h er w i s e as d ir e ct ed by th e E n g i n e e r d ur i n g th e p r o g r e s s o f th e Wo r k w i th o u t c la i mi n g a ny e x tr a c h ar g e s . A ny d a ma g e t o th e s e u n de r g r o un d ut i l i ty s e r v i c es s h a l l b e i mme d i a t e l y r e me d i ed by th e Co n tra cto r o r by oth er ag en cy at h is o w n co st, failing which the Engine er may w ith or w ithout notic e ad o p t su c h me asu r e s as h e may d ee m n e ces s a r y a t th e r is k an d c o s t o f t h e C o n tr a c t o r . If o n t h e o t h er h a nd , t h e E n g i n e e r co n s i d er s i t i mp r a c t i ca b l e f o r th e Co n tr a ct o r t o ma int ain any such underground utili ty services a nd that th e ex i g en c i e s o f t h e W o r k n e c e s s i t a t e, th e b r e ak i n g d o w n , r e mo v al o r d iv e r s io n o f t h e s aid u t i l i ty s e r v i c es , th e co s t o f s u ch b r e a ki n g d o w n , r e mov a l o r d iv er sio n in c l u d in g th a t o f r eb u i ld i ng , r e p la c i n g , div e r t i n g a n d r ei n s t a t in g o f any s u ch u ti li ty s e r v ic e s sh a l l b e p a id to th e C o n tr a c t o r if d o n e by h i m. H ow ev e r , t h e co s t of p r o vi d in g p u mp s , ch u tes o r o t h er ap p l i a n c e s as th e E n g i ne e r ma y d i r e c t f o r th e r ai s i n g o r te mp o r a r y p as s ag e o f th e w a te r o r s e w a ge an d th e cos t o f p u mp i n g o u t o r r e mo vin g a s o f t en a s t h e E n g i n e e r may d ir e ct, an y w ater o r sew ag e w h ich may escap e f r o m an y such u n d erg ro u n d u t i l i t y s e rv ic e s , s h a l l b e b o rn e by t he Contrac tor. T h e t en d e r er s h a l l co n t ac t al l t h e pu b l i c b o d i es , et c. to k n ow t h e u n d e r - g r o u n d s er v i c e s th a t may b e e n c o u n t er e d by hi m / th e m dur ing the ex ecu tion of th e W ork and accou nt for the consequenc es o f the site r es tra i nts w h ile sub mi tt in g th e ir t en d e r s . N o c o mp e ns at i o n / co s t sh a l l b e p a y ab l e o n a c co u n t o f an y u n de r - g r o u n d s er v i c e s w h ic h o b s tr u c ts th e W o r k an d c au s e d el ay . Wh ile th e ex e cu ti on o f any Wo r k is in p r o gr ess in an y s tr e et o r t h o r o u g h f ar e t h e C o n tr a cto r a t h is o w n co s t s h a l l ma k e ad eq u a t e p r o v i s io n f o r th e pas s a g e o f t r a f f ic , fo r secu r ing safe access to all p re mis es approach ed f ro m su ch s tr e et o r t h or o u g h f ar e , an d fo r an y d r ai n a g e , w at e r s u p p ly , o r me a n s o f lig h t in g o r an y o t h er u ti l i ty s e r vi c e w h ich ma y b e in t e r r u p te d b y r e aso n o f ex e cu t io n o f th e Work. When ev er i t may be ne cess ary to stop the tr affic in an y s t r ee t o r th o r o u g hf a r e pe r mis s i o n mu s t f i r s t b e o b ta in ed f r o m t h e E n g i n e e r an d th e C on t r a c t or s h a l l t h en put up such b arriers and ad o p t such o t h er measu r es o r tak e prec au t io n s as ma y be necessary or as th e E ngine er may No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. 41. T raffic 42. P u mp in g o u t W at er Signature of Tenderer Page 51 of 194 ARCHITECT : THE FIRM d ir e ct f o r r eg u l a t io n of tr a f f i c . Th e W o r k s h al l in su c h c a s e s b e ex e c u t ed n i gh t an d d ay o r fo r as lo n g a p er i o d a s p rac ti cab le if so o r d er ed b y th e En g in e er , an d w ith su ch s p eed & v i g ou r as h e ma y req u i r e , s o th a t th e t r a f f ic ma y b e i mp ed ed f o r as sho r t a ti me as p o ssi b le. Th e Con tr ac to r shal l re move the b arrier s as soon as the n ec essity f or th e m h as c e a s e d . C a r e s h a l l b e ta ke n b y t he C o n tr a c t o r to c a u s e th e le a s t p o s s ib l e o b s t r u ct io n to tr a f f i c du r i n g th e p r og r e s s o f t h e W o r k. The con tractor shal l h av e to mak e al l nec es sary ar r a n ge men t s fo r r eg u l a t in g tr a f f ic d a y an d n ig h t d u r i ng t h e p er i o d o f c o n s t r u c tio n a n d t o th e en ti r e s a tis f ac tio n o f E n g i n e e r . T hi s in c lu d e s co n st r u ct io n an d ma in t en an c e o f d iv e r s io n s , i f n ec e s s a r y , a t n o ex t r a c o s t to t h e Corporati on. T he c ontractor s hall provide n ecess ary cau t io n boards, b arricad es, flags and lights, w at ch me n etc. s o as to co mp ly wi th l a t es t Mo t o r V eh i c l e Ru les an d R eg u l a t io n s an d f o r tr a f f i c s af e ty . T h e c o n t r a c to r sh a l l b e r e s p o ns ib l e for all c lai ms o f a cc id ents w hich may ar is e due to h is n eg l ig e n c e w h eth er i n r eg u l a t in g t r a f f ic o r in s t a c k in g ma t e r ia l s on r o a d o r by any o th e r r e a s o n . The Contractor w il l be r equi red to p rovide and operate a t h is ow n co s t al l p u mp s , en g i n es an d ma c h in e r y r eq u i s it e to k e e p th e tr e n ch es f o r th e s e w e r , d r a in s o r f o un d at io n s an d al l o th er e x cav at io n s c l e ar o f w ater w h et h er su b s o il w at e r , s to r m w a s te o r le a k ag e fr o m t a n ks , w e l ls, d r a i n s , s ew er s , w a t e r - ma i n s , tid e w at e r et c . s o th a t th e r e may b e n o a c cu mu la t i o n of su c h w at er a n d n o s e t t in g o u t ma y b e d o n e, n o ma s o n ry may b e la id , n o co n c r e t e d e po s i t e d , n o jo i nt s ma d e an d n o me a s u r e me nt s tak e n in w at er . T h e pu mp in g s h al l be con t in u e d s o lo n g af te r th e ex e cu t i o n o f any p o r t io n of th e W o r k as th e E n g in e er may co n s i d er n e c es s ar y f o r th e W o r k to set. F o r th e p u r p o s e o f k e e p i n g th e e x c a v at io n s as d r y as p o s s i b l e t h e W or k w o u ld , if n e c es s ar y b e d i v id e d in t o se c t io n s o r s e p ar a te p o r t io n s a s p er b e s t En g i ne e r i n g p r ac t i c e s an d t e mp o r a r y d a ms w i l l h av e to b e p u t u p by the Co n tr a cto r , s u mp s f o r th e s u c t i o n p ip e s t o Wo r k i n , w il l h av e to b e e xc a v a t ed b y th e C o ntr a c t o r at s u ch d is t a n c e s ap ar t an d to s u c h d e pth s as t h e as p er be s t E n g in e er i ng p r a c t i c e s . W h en th e W o r k p r o g r e s s e s o t h er s u mp s mu s t , f r o m ti me to t i me , b e ex c av a ted by the C o n tr a cto r , d is u s ed s u mp s b e in g f i ll ed u p by h i m w i th d r y r u b b le c ar e f u l l y h a n d p a ck e d to t h e s a t i s f a c t i o n o f th e E n g in eer . T h e C o n tr a cto r w ill n o t b e p ai d ex tr a f o r an y t e mp o r a r y d a ms o r s u mp s o r th e i r r e mov al o r r ef i ll in g n o r wi l l s u c h Wo rk s b e t aken i n t o me a s u r e men t i n an y w ay , u n l es s oth er w ise p r ov i d ed . The Con tractor shall no t allo w any accu mu latio n of w ater ei th e r f r om t h e D i s c h a r g e o f h is d ew a t er i ng p u mp s o r hi s w a t e r c o n n e c t i o n s o n s it e o f h is W o r k . T h e C o n t r a c t or s h a l l mak e p r o p e r p r o v is io n f o r l e a d in g t h e pu mp ed d isch arge to th e nearest w ater en tra n ce, sto rm w a t e r d r ain , ma n h o l es , o r w a t e r c o u r s e by mea n s o f a w o o d en o r G . I . c h an n el o r h o s e p ip e. U n d er n o cir cu ms ta n c es t h e d i s c h a r g e w i l l b e a l lo w e d to f low , al ong No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. 43. S t o r ag e o f E x plo s i v e s 44. F acilit ies to the O t h er C o n tr a c t o r s 45. P r e v en t io n o f Mosquito Breeding at C o n s t r u c t i o n S it e 46. S an it at ion 47. N o t to A l l o w Huts Signature of Tenderer Page 52 of 194 ARCHITECT : THE FIRM a p a v ed s u r f a c e. I f a n ac cu mu la ti o n is u n av o i da b l e, i t s h al l b e tr e a t e d w ith i n s e c t i c id e s to t h e s at i s f ac t i o n o f th e E n g i n e e r . I n c as e o f f ai lu r e to d o th is o n th e p ar t o f Contrac tor s uch accu mu lat ion shall be trea ted by the Corporation at th e r isk an d cost o f the Contr actor. Th e contr a c to r s s h o u ld n ot e th a t u n d e r n o c i r c u ms ta n ces any p ay men t f o r p u mp ing o u t w a t e r fi n d in g i t s w ay in to tr e n ch e s , h i l l c u tt i n g , ex c av a te d p i ts , W o r k s s i t e et c. f r om what e v e r s o u r ces w i l l b e p er mis s ib l e u n le s s o th e rw i s e T h e C on tr a c to r s h a l l o b t ain t h e p r ev i o u s pe r mis s i o n of th e co mp eten t au th o r ity su ch as t h e Ch ief o f F ir e S er v i ces fo r th e S i te, ma n n er a n d me th o d o f s t o r i n g e xp l o s iv e s n e ar t h e s it e o f W o r k . A ll h a n d l i n g o f ex p l o s iv e s , in c l u d in g s to r a g e, tr a n s p o r t s h a l l b e c ar r ie d o u t u nd e r th e r u l es ap p r o v ed b y th e “E xp losives D epart men t of the Govern me nt ”. The con tra ctor shall, in a cco rdance with th e r eq uire me nts of the E ngineer, afford all reas onable f ac ilit ies to oth er C o ntr a c t o r s e n g ag ed co n t e mp o r a n eo u s l y o n s ep a r a t e C o ntr a c t s i n co n n e ct io n w i t h th e W o r k s an d f o r d ep ar t me n t a l la b o u r an d lab o u r of a n y o th e r p r o p e r ly o r g an i za t i o n au t ho r i ty o r sta t ut o r y b o dy w h ich may b e e mp l o y ed a t th e S it e o n ex e c u t i on o f a ny W or k n o t in c lu d e d in t h e C o n tr a c t o r of any Co n tr a ct w hic h t h e Corporati on may enter in to in conn ection with o r ancillary to t h e W o r k s . ( i) T he c o n tr a cto r sh al l o n t h e r es p e c t iv e co n s t r u c t i o n s it e i ns t a l l mo s q u it o p r o o f an d a c c es s ib le w a t er s to r a g e tan k s or to co v er / p r ot ect the p r es ent w at er s to r ag e t an k s p r o per l y . (ii)The contractor s hal l p eriodi ca lly g ive larv aec idal tre at men t to w a ter sto r ag e t an k s, sit es o f w ater stag n ation , wat er co llection. (iii)Any expend i ture th a t may be in curred b y th e C o r p or a ti o n to en su r e th a t th e ab o v e co n d i t io n s ar e fulf ill ed by the contr actor w ill be d ebitable to c o n t r ac to r s a c co u n t an d w i l l b e r e c o v er ed fr o m t he b i l l s o f th e c o n tr a ct o r f r o m t i me t o t i me . T h e C o n t r ac t or sh a ll, at h is o w n co s t , ma k e a l l n ec es s ar y p r o v i s i on s f o r h ea l t h an d s a f et y o f h i s lab o u r / e mp lo y ees. H e s h al l, w h en r e q uir ed by th e En g i n e e r , p r ov i de p r o p er la tr i n es a n d u r i na l s to th e s a t is f a ct io n o f t h e E n g in e er in such n u mb er s an d i n s u ch l o c a l i t i e s as h e ma y re quir e, an d sh al l tak e all ste p s nec ess ary to co mp e l hi s lab o ur / e mp lo y e es to r eso r t t o su c h l a t r i n es a n d u r in a ls , an d s h a l l d is mi s s f r o m h is e mp lo y men t an d r e m o v e f r o m th e W o r k s an y o n e de t e c t e d o b ey in g t h e c a l l s o f n a t u r e in an y p la c e o th e r t h a n th e con v en i e n c e s al lo t t e d f o r s u c h p u r p o s e s . T h e s a id la t r i n es s h a l l b e u n d e r th e s up e r i n t en d e n c e an d o r d e r s o f t h e E n g in e er o r hi s s u b o r d in a t e s . T h e C o n tr a cto r sh a l l , o n n o a c c o u n t, a l l o w a n y hu ts to b e er e ct ed o n Co r po r a tio n p r o p er t y u n le s s o t h er w i s e p er mi t t ed by th e E n g i n e e r in w r itin g , to b e in ha b it e d af t e r su n s e t b y an y o n e e xc e pt th e w a t c h me n r e q u ir e d f o r t h e W o r k s , an d none of h is e mp l o y ees, exc e pt such w atch men a s aforesa id, s h al l s l e e p a t n ig h t o n a n y par t o f th e W o r k s . I n c a s e o f a ny No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. 48. 49. 50. 51. 52. Page 53 of 194 ARCHITECT : THE FIRM o f f e n ce c o mmi t t e d by any o f t h e l ab o u r or e mp lo y e e s of t h e C o ntr a c t o r ag a i n s t an y o f the p r o v i s i o n s o f t h i s co n d i t io n th e Contr a ctor shall be liable to a p enalty not exceedin g Rupe es H undered f or ev ery such o ffen se and th e sa me s ha ll b e ch ar g e d t o t h e a c c o u n t o f th e Co n t r a c to r . T r ea s u r e T r o v e All fos sils, co ins, ar ticles of v alu e o r antiqui ty and F o s s ils et c. s tr u c tu r a l and o t h e r re ma i n s th ing s o f g e o l o g i c al o r ar ch aeolo gical interest d is co vered in o r upon th e site s h all b e abs o lu te p r op e r t y of t h e C o r p o r atio n an d th e C on t r a c t o r s h al l d u l y p r e s e r v e th e m a n d s h a l l t ak e p r e c au t io n s to p r e v e n t h i s W o r k men or any oth e r p e r s o n f r o m r emo v in g o r d a mag in g an y s u c h a r t i cl e s o r th i n g a nd s h a l l i mme d ia t e ly u p on dis c o v er y th er e o f an d b e f o r e r e mo v a l ac q uai n t t h e Engineer w ith such d iscov er y and shall fro m time to ti me d el iv er th e s a me to s u c h p er s o n o r p er s o n s as t h e E n g in e er may f r o m t i me to t i me a p p o i n t to r e c e iv e th e s a me a t t h e exp en s e o f th e C o r p o r a tio n . P aten t’ R i g ht and The co n tractor s hall s ave h ar mles s and ind emn ify the Roy alti es Corporati on fro m and ag ain st a l l cla i ms and p roceedin g s f or o r o n a c c ou n t o f i nf r i n g e men t o f a n y P at e n t r i g h ts , d es i g n tr a d e mar k o r n a me o f ot h er p r o t e c t e d r ig h t s i n r es p e ct o f an y co ns tr u c t i o n a l p l an t , ma c h in e W o r k , o r ma t e r ia l u s e d f o r o r in c o n n e c t i o n w i t h th e Wo r k s o r a n y of the m an d fro m and ag ai nst al l cl ai ms, proceedin gs, d a mag es , co s t s , ch a r g e s an d e x p e n s es w h at s o ev er in r es p e c t th e r eo f or in r el a tio n th e r et o . E x c e p t w h e r e othe r w is e s p ec i f i e d, th e co n t r ac to r sh a l l p a y all t o nn a g e a n d o th er roy alti es, r ent and o ther p ay men ts o r co mp ens at ion, if any , f o r g et t i n g s t o n e, s a n d , g r a v e l, c l ay or o th e r mat er i al s r eq u i r e d f or t h e W o r k s o r a ny o f th e m. Quarry i) Q u a r ry f or ex t r a c t i o n of mu r u m, s t on e , r ub b l e o r an y o th e r ma ter i a l s h a l l n o t b e ma d e av a i l a b l e b y th e c or p o r a t i o n th e c o n tr a cto r h as to mak e h is o w n a r r a n g e m en t s f o r q u a r r y a t h i s co s t . ii) T h e s u c c e s s f u l te n d er e r s h a l l s u b mi t q u a r r y p er mi t f r o m the co mp etent au tho rity before st ar t ing the Work P h o t o gr a p h s o f N o ph o t o g r a p h s o f t h e W o r k o r a ny p a r t th e r e o f o r The Works eq u i p me n t e mp lo y ed th e r eo n s h a l l b e t ak e n o r p er mi t t ed by the con tra ctor to be tak en b y any of his e mp loy ees or an y e mp lo y e es o f h i s su b - con t r a c t or w i th o u t th e p r i o r ap pr o v a l o f th e E n g i n e e r in w r itin g a n d n o s u ch p h o to g r a p h s s h a ll b e p u bl i s h ed o r o t h er w i s e cir c u la t e d w i t h o u t th e ap p r o v a l o f th e E n g in e e r i n w r itin g . N o tic es to Lo c al ( i) T he co n t r a c to r sh a l l c o mp l y w ith an d g iv e al l n o t i c e s Bodies r eq u i r ed u n d er a n y G o v e r n ment A u t h o r i t y , I ns t r u men t, r u le o r o r d e r mad e u n d e r a ny A c t o f p ar l ia me n t, s t a t e l aw s or a n y r eg u la ti o n o r By e- la w s o f an y loca l a ut h o r i t ie s o r p u b l i c u ti li t i e s c o n c e r n r e l a t in g to W o r k s . H e s h a l l b e f o r e ma ki n g a n y v ar i at i on f r o m th e co n t r ac t draw ings n ecess itated by such co mp lian c e give to th e E ng i n e e r a n o ti c e giv in g r eas o n s f o r th e p r o p os ed v ar i at i on a n d o b t a i n ed E n gin e e r ’ s in s t r u ct io n s t h er e o n . ( ii ) T h e co n tr a cto r s h al l p a y an d in d e mn i f y t h e C o r p o r at i o n agains t any liab il ity in respect of a ny fees o r charg es p ay ab le u n d e r an y A ct o f p a r lia me nt , st a t e la w s o r any Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. 53. N o t ic e s 54. U s e o f B .I . S . S p e ci f i c a t io n s Page 54 of 194 ARCHITECT : THE FIRM G o v e r n me nta l I n s tr u men t r u l e o r o r d e r any r eg u l a t io n s o r by e- l aw s o f an y lo ca l a u t h o r i ty o r p u b li c u ti l i ty con cern i n respe ct of the Wo rks. S u b je c t as o th e r w i s e p r o v id ed i n th i s co n tr a c t al l n o ti ce to be giv en o n b e h a l f o f th e C o rp o r a ti o n an d a l l o t her act i ons to b e t ak en on its b ehalf may be g iven or tak en by th e E n g i n e e r o r a ny off i c e r f o r th e ti me b e in g e n t r u s t e d w i t h th e f un ct i o n s , du t i e s a n d p o w e r s o f th e E n g in e er . A l l in s t r u c t io n s , n o t i c es an d c o m mu ni c a t io n s et c . un d e r t h e co n t r a c t s h a l l b e g i v e n in w r i t i n g a n d if s e n t b y re g i s t e r e d p o s t to th e l a s t k n ow n p l ac e o r ab o d e o r b u s i n e s s o f t h e C o ntr a c t o r s h al l b e d e e me d to h a v e b ee n s e r v ed o n t h e d a t e w h en in t h e o r d i n ar y cou r s e o f po s t t h ese w o u ld h a v e b e e n se r ved o n o r d eliv e r ed t o h i m. I n c a s e w h er e n o p a r ti c u l ar s pec if i c a t i o n is g i v en f o r an y ar t i c l e to b e u s ed u n d er th e co n t r a c t, th e r el ev a n t s p ec i f i c a t io n , w h e r e o n e B. I . S . e xi s t s , o f th e Be au r o o f I nd i a n S t a n da r d s s h a l l a p p ly . P A R T – II I WORK PROCEDURE 55. 56. 57. P o s s es s io n o f Site and Ac c e ss T h er e to . T h e C o r p o r atio n w i ll, w i t h th e E n g i ne e r ’ s n o t i c e t o co mmence th e Works, g iv e to the Con tractor possession of th e S i t e . S u ch ac c e s s , as is in ac co r d a n c e w i th t h e C o n tr a c t , is to b e pr ovid ed by th e Co rp o r a ti o n as may be req u i r ed t o en ab le the Contr actor to co mmen ce and p roce ed w ith the ex e cu tio n o f th e W o r ks in acc or d a n c e w i t h th e p r o g r a mme r e f er r e d t o in C lau s e 8 6 i f an y , a n d o th e r w is e i n a c c o r da n c e w i t h s uch r ea s o n ab l e p r o p o s a ls a s the Co n tr a c t o r s h al l, b y n o ti c e t o the Eng ine er make. T h e C o r p o r atio n w i l l , f r o m t i me to ti me as t h e W o r k s p r o c e ed , g i v e to th e Co n t r a c to r po s s es s io n of s u ch f ur t h er p o r t io n s o f t he S i t e as ma y b e r e q u ir e d to en ab l e t h e C o ntr a c t o r to p r oce ed w i th th e ex e c u tio n o f th e Wo r k s w ith d u e d is p at ch in a cco r d an c e w i t h s u c h p r o g r a mme o r proposals, as the ca se may be. F a il u r e t o G i v e T h e co n tr a c to r sh o u ld n o t e t h at th e s i t e fo r W o r k may b e P o s s es s io n ma d e av a il ab l e b y th e C o r p or a ti o n i n f u ll o r in p ar t an d th a t th e co n t r a c to r sh al l p lan h is W o r k s t o co mme n su r a t e w ith th e h an din g o v er th e s ite. N o c lai m o f co mp en s at io n o n a c co u n t o f d e la y in mak i n g a v a il a b l e t h e S i te sh a l l b e p ay ab le t o the co n tr a ct o r . H o w e v er , t i me ex te n s io n f o r co mp l e t i n g th e W o r k s h al l b e g i v en t o th e Co n tr a ct o r i n case of su ch del ay . U n f o r es ee ab l e I f , h o w e v er , d u r i n g t h e e x e c u t i o n o f th e Wo r k s th e P hy s i ca l C o ntr a c t o r en co u n t e r s p h y s ic al o b s tr u c t i o n s o r p hy sica l Ob str uctions or co n d i tio n s , o t h er th a n c l i mat i c co n d it io n s o n th e S it e , Condition s w h ich o b s t r u ct io n s or co n d it i o n s w e r e , in h is o p in i o n , n o t foreseeab le by an exp erien ced contra ctor, the Contrac to r sh al l f o r th w ith giv e n o tic e th er eo f t o th e E n g in e er . O n r ec ei p t o f su c h n o ti c e , th e E n gi n e e r sh al l , if i n h is o pin io n s u ch o b s t r u ct io n s o r c o n d i t i o n s c o ul d n o t h a v e b e en r ea s o n ab l y f o r es ee n by an ex p e r i e n c e d c o n tr a c t or , af t er d u e co n s u l ta t i o n w it h t h e Co n tr a cto r , d et e r mi ne : an y ex t e n s i o n of ti me t o w h ic h th e C o n t ra c to r i s en t i t l e d u n d er C l aus e 8 0. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 55 of 194 58. D r aw ing s : C u s t o d y of D r a w i ng s 59. One co py Drawing to Kept on Site. 60. D iscrep anci es i n D r aw i n g s o r S p e ci f i c a t io n s 61. E ngine er to have P o w e r to I s s u e F u r t her Dr a w in g s o r I ns tr u c tio n s Signature of Tenderer of be ARCHITECT : THE FIRM T h e D r aw in g s s h a l l r e mai n i n t h e s o l e cu s t o dy of E n g in e e r , but tw o co p i es th e r eo f ’ s h a l l b e f u r nis h e d to t h e C ont r act or f r e e o f ch ar ge . T h e Co n tr a ct o r s h a ll p r o v id e a n d ma k e a t h is o w n e x p en s e a n y f u r th e r c op i es r e q u i r ed by h i m. A t t h e co mp l e t i o n o f th e C o nt r a c t, the Co nt r ac t or s h a ll r e tu r n to th e E n g in e e r a l l d r a w i n g s p r ov i d ed u n d er t h e C o n tr a ct . O n e c op y of th e d r a w in g s , f u r n i s h e d t o th e Co n tr a ct o r s a s af or e s a i d , s h al l b e k ep t b y th e C on tra c to r o n t h e s i t e an d the s a me shal l at a ll reas onabl e times b e avai lab le for in s p e ct i on an d u s e by th e E n g in e er an d th e E n g in e er ’ s R ep r e s en t at iv e an d by a ny o t h er p er s o ns o r g a n iz a t i on by th e E n g in e e r i n w r itin g . T h e d r a w i n g s an d s p ec if i c a t i o n s ar e t o b e co n s id e r e d a s mu tu al ly exp l an a to ry o f ea ch o th e r, d etail ed d r aw in g s b ei n g f o l l o w ed i n p r ef e r en c e to s ma l l s ca l e d r a w in g s an d f ig u r ed d i me n s i o n s in p r e f er e n c e to s ca l e an d s pe c i a l co n d i tio n s in p r e f er e n c e to g e n er al c on d i tio n s . S pe c i a l co n d i tio n s or d i me n s io n s g i v en in t h e s p e c i f i c a t i on s s h a l l s u p er s e d e a l l e ls e . S h o u ld a n y d i scr ep an c i e s , h o w e v er ap p ear , o r sh o u l d a n y mis u n de r s t an d i ng ar is e as t o th e me a n i n g a n d i mp o r t o f th e s a id s p e c i f i c at io n s o r d r a w in g s , o r as to me a n in g an d a s to t h e to t h e d i me n s i o n s o r t h e q u al it y of t h e ma t e r ia ls o r th e d u e an d p r o p er e xe c u t i o n o f th e W o r k s , o r a s to t h e mea s u r e m e n t o r q u al it y an d v al u a t io n o f th e W o r k s ex e c u t e d u n d e r th is C o n t r a c t, o r a s extr a t h e re up o n t he s a me s h a ll b e e x p l a i n e d by the Engineer b e b indin g upon the Con tractor and Contractor s h al l ex e c u t e th e W o r k ac c or d i n g s u c h ex p l an a t i o n ( s u b je c t as af o r es a id ) a n d w i th o u t ex t r a ch ar g e o r d ed u ct i on to o r f r o m th e co n tr a c t an d s h a l l a l s o d o a l l s u ch W o r k an d th i n g s as may b e n e ce s s a r y f o r th e p r o per c o mp l et io n o f W o r k s as i mp l i e d b y t h e D r aw in g s an d S p ecif i c a ti o n s , e v e n th o u g h s u c h Wo r k s an d th i n g s ar e n o t sp e c i f i c al ly s h own an d d es cr i bed in the sa id D r a w in g s an d S p e ci f i c at i on s . T h e final decision o f th e Co mmis sioner in c as e a r eference b e ma d e to h i m un d e r C la u s e N o . 8 9 be b in d in g u p o n t h e C o ntr a c t o r and Co n tr a c t o r sh a ll ex ecu t e th e Wo r ks a c co r d i n g t o su c h e x p l a n at i o n ( s u b je ct t o af o r es a id ) a n d s h al l als o d o a ll s u c h Wo r k s an d r eq u i r ed th in g s as may b e n e c es s ar y f o r t h e p r o p er c o m p le t io n o f W o r ks a s i mp l ie d b y th e d r a w i n g s an d s p e c i f i c at i o n s , e v e n th o u g h s u ch Wo r k s an d th i n g s ar e n o t sp e c i f i c al ly s h o w n a n d d e s c r ib e d i n th e s a id d r aw i n g s an d s p e ci f i c at i o n s . T h e E n g in e e r s h a l l h av e th e p o w e r an d au t h or i t y f r o m ti me to t i me a n d a t a ll ti me s to mak e an d is s u e s u c h f u r t h er drawings an d to give such further in s t r u c t io n s an d d ir e c t io n s a s may ap p e ar to h i m n ec es s a r y or p r o p e r f o r th e g u i d an c e o f th e Co n tr a c t o r an d t h e g o o d an d s u f f i c ie n t ex ecu tion of the W orks according to ter ms of th e spec ifi cat ions and Contractor shall receiv e, ex e cu t e obey an d b e b o un d by th e s a me , a c c o r d in g t o th e tr u e in t en t an d me a n i n g th e r eo f , as f u l ly an d ef f e c t u al ly a s th ou g h t h e sa me h ad acco mp a n ied or h ad b een men tion e d or r eferred to in t h e s p e c i f i c at io n . T h e En g i n e e r may al s o a l t er o r v ary th e l ev e ls or po s it i o n o f any W or k s co n t e mp la t e d by t h e No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. 62. 63. 64. Page 56 of 194 ARCHITECT : THE FIRM spec ifi cat ions, or may order any of the Works conte mp l at ed th er eb y to b e o mi tted, w ith or w ithou t th e substitution o f an y o t h er W o r k s in lieu t h e r eo f , o r may o r d er a n y W o r k o r an y p o r tio n o f W ork ex e cu t ed o r p a r t i a l ly e x ec u t ed , t o b e r e mo v ed , ch ang e d o r al t e r ed , an d if n e e d f u l , may o r d er th a t o th e r W o r k s s h al l b e su b s t i t u t e d i n s te ad t h er e o f an d d if f er e n ce o f e x p en se o c c as io n e d b y an y s u c h d i mi n u ti o n o r al t e r a t io n so o r d e r ed an d d i r e c t e d s h al l b e ad d ed t o o r d ed u c t e d f r o m th e a mo un t o f t h is C o n t r a c t a s p r o v i d e d u n de r th e Cl a u s e N o. 1 0 1 a n d 1 0 2 . N o Wo r k w h ich r a d i c al ly ch a n g es t h e or i g in a l n atu r e o f th e Co n t r ac t s h al l be o r d e r e d by the E ngineer a nd in the even t of any d evia tion b ein g o r d e r ed w h ich in th e o p in ion o f t h e C o n t r a c to r c h an g e s th e o r i g in a l n atu r e o f Co n tr a c t h e s h al l n ev er t h e l e s s c ar r y i t o u t an d d i s a gr e e m e nt as to th e n atu r e of th e W o r k an d th e r a t e to b e p a id t h er e f or e s h al l b e r e s o l v ed in a cco r d a n c e with Clau se N o .114. T h e t i me f o r c o mp l et io n o f th e W o r k s , s h a l l i n t he ev en t o f an y devi ations res ulting in addi tio n al cost over the C o ntr a c t S u m b e in g o r d e r ed , b e e x ten d ed o r r ed u c ed r ea s o n ab l y by th e E n g in e er . T h e E n g in e er ’ s d e c i s io n in t his case sh al l be fin al. L ev els A l l l e v els r e f e r r ed t o in co n n e ct io n w i th th es e Wo r k s ar e b as e d o n G r eat T r i g o n o me t r i c s u r v e y ( G . T .S . ) lev e ls . T h e C o ntr a c t o r s h o u l d a ls o k e ep t h e l e v el in g ins tr u ment i n go o d W o r k i ng c o n di ti o n t h r o u gh o u t th e p e r i o d o f co n s t r u ct io n W o r k o n s it e. T he co n t r a c t o r sh al l ma k e ar r a n g e men t o f Total Survey Statio n as and when requ ired on si te. S ett ing O u t th e T h e E ng i n e e r sh a l l su p p ly d i me n s io n ed d r aw i n g s , lev el s W o rk . an d o th e r i nf o r ma t i o n n e c es s ary to en a ble t h e C on t r a c to r to s e t o u t th e w o r k s . T h e C o n tr a c to r s h a l l p r o v i d e al l se tt in g o u t ap p ar atu s a t h i s o w n co s t , s u ch a s le v e li n g i n s t r u me n t s in goo d w o rk i n g c o n d it io n a n d a p pl i a n c e s , a l l p e g s, r angin g r od s , lo n g me a s u r in g r o d s , mar k e d me t e r s a n d or g a n i z at io n an d e a c h me t er an d o r g a n iz a t io n n u mb e r ed , p o t s an d s i g h t r ai ls , b o n i n g r o d s , mo u lds , t e mp l a t e s , to t a l s t a t io n et c . to g e th e r w ith an y r e aso n a b l e n u mb er o f lab o u r e r s th a t may b e re q u ir e d a nd s e t o u t th e w o r k a n d b e r es po n s i b le f o r th e accur acy of the sa me . Th e Contrac tor shall ame nd a t his o w n c o s t and to th e s a tis f ac t io n o f th e E n gi n e e r a ny e r r o r f ou n d a t an y st a g e w h ic h ma y ar i s e th r o u g h in a c c u r a t e s e t t in g ou t . T h e Co n tr a c t o r s h a l l p r o t e c t an d pr e s e r v e al l b en ch ma r k s u s ed in s et t i n g o u t th e w o r k till th e en d o f Defects Liabi lity p eriod un les s th e Engineer d irects it s e a r ly r emo v a l . C on t r a c to r sh o u ld a ls o k e ep l e v el in g in s t r u me n t in g oo d w o r k i ng c o n d i t i o n t hr o u g h o u t th e p er i o d o f c on s tr u c t i o n w o r k on s it e. Works Cl o s e d N o Wo r k s h al l b e do n e b e t w ee n su n s et an d s u n r is e o r o n B e tw e e n S u n s e t S u n d ay or M un i c ip a l h o lid a y s an d e x c e p t w i t h t h e s pe c ia l a n d S u n r ise o r o n s a nc t io n o f th e E n g in e er in w r it in g p r e v io u s l y o b t ain ed an d S u n d ay s an d th e w i th h o ld i n g of su c h s a n ct io n s sh a l l b e n o g r o u n d o f Ho lida y s co mp l a in t o n th e p ar t o f co n t r a c to r or c au s e f o r co mp en s a tio n to h i m, o r e x cu s e f o r n o t co mp l e t i ng t h e W o r k w ith in t h e c o n tr a ct p e r i o d . T he p e r io d w i t h i n w h i c h th e Wo r k h as to b e c ar r i ed o u t an d co mp let ed h as b e en Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. 65. 66. W ork to be in Accordan ce with C o n tr a c t . D u t ies and Powers of the E n gin e er ’ s Represen tativ e Signature of Tenderer Page 57 of 194 ARCHITECT : THE FIRM f ix e d in t er ms o f t h i s c lau s e w it h th e p r o vis i o n th a t t h e to t al n u mb er of h o u r s o f W or k p e r mi s s i b l e s h a l l n o t ex ce e d 4 8 h o u r s in a w e e k an d i n n o c as e mo r e t h a n 8 h o ur s o n an y W o r k i ng d a y , th e a c t u a l ti me w i th i n w h ich t h e s a id h o u r s s h al l b e Wo r k ed b ei n g s u b je c t t o mu tu a l ar r an g e me n ts w i th th e C o n t r a c to r at t h e c o mme n c e me n t o f th e W o rk s o r f r om ti me to t i me as may be required an d provided th at al l W o r k s s hal l b e st o pp e d f o r re s t a n d mea ls f o r o n e h o u r a t ab o u t mi d - d ay excl us iv e o f t h e p er mi s s ib l e h o u r s a f or e s a i d f or t h e W o rk s . T h o u g h s a n c t i o n ma y b e ac c o r d e d to th e Co n t r a c to r to W o r k on d ay s a n d at t i me s o t h er w i s e n o r mal ly n o np er mis s ib le u n d e r th i s C o n tr a c t , th e C o n tr a c t o r s h al l b e r eq u i r e d t o b e ar th e c os t fo r su ch s u per v is io n a s in t h e opinion o f th e Eng ineer may b e necessary at th ese ti mes. I t s h o u ld b e d i s ti n ct ly u nd er s t o o d t h a t th e gr a n ti n g o f p er miss io n to W o r k ex t r a h o ur s o r t o W or k on S u n d ay s an d h o li d a y s w il l be e n ti r e l y at th e d i s c r e t io n o f t h e E n g in e er and cann ot be c lai me d b y the contr actor as a mat ter o f r ig h t. I f on th e o t h e r h a n d t h e E n g in e er r eq u i r e s t h a t th e W o r k shal l b e p r oc e ed e d w ith o n d ay s and at ti mes othe r w is e n o r ma l l y n o n-p e r mis s i b l e u n d e r th i s co nt r act th e co n t r a c to r sh a l l p r o c eed w i th th e Wo r k b u t h e w i ll n o t b e r eq u i r e d i n su ch ca s es to be a r th e co s t o f t h e M u n ic ip a l es t a b l i s h me n t e mp lo y e d at t h e t i me . T h e co n t r a c to r a t a ll ti mes d u r in g t h e c o n t i n u an c e o f thi s co n t r a c t s h al l in a l l h i s d e a l in g s w ith lo c a l l ab o u r f or th e ti me b ein g e mp loy ed on th e Works conte mp l at ed b y this co n t r a c t h a v e d u e r eg ar d to a ll l o c a l f e s t iv a ls an d r e l i g io u s o r o t h er cu s to ms a nd al l d is p u t es , ma tt er s a n d qu e s t io n s ar i s i ng b et w e en th e co n t r a c to r an d any o f h i s agent o n t h e o n e h an d a n d a n y l o c a l l a b o u r o n t h e o th er h an d w i th r es p e ct t o an y ma t t e r o r th in g in a n y w ay c o n n e c t e d w i t h th i s co n tr a ct s h a ll b e d e c id e d by the Co mmi s s i o n er w hos e d e c is io n s h al l b e f i n a l an d b in d i n g on al l p a r t i e s . The Con tractor shall ex ecute and co mp le te the W orks and re medy any d efects therein in strict accordan ce with t h e Contrac t t o the s at is fac tion of the Eng in eer. T h e d u t i e s o f t he r ep r e s en t a t i ve o f th e En g i n e e r ar e to ch e ck , w a t ch an d s u p e r v i s e W or k an d t o te s t a n d ex a mi n e an y mat e r i al to b e u s e d o r W or k ma n s h i p e mp l o y ed in c o nn e c t i on w i th the Wo r k s . H e s h al l h a ve n o a u th o r i ty to r el i e v e th e Con t r a c to r o f an y o f his d u ti es o r o b li g a t io n s u n de r th e co n tr a c t n o r to e x c e p t as e x p r es s ly p r ov i de d h e r e u n de r o r e ls e w h e r e i n th e co n tr a c t to o r der a ny W or k involving delay or any extra p ay men t b y the Corpor ation o r to ma k e a ny v ar i at i o n o f or i n th e W o r k s . F a ilu r e o f th e r e p r es e n t a t i v e o f the E n g i n e e r to d is ap p r o v e an y Work o r mat er ial sh all not p re ju dice the power o f th e Engineer th er e a f ter to d is ap p r o v e su c h W or k or ma t e r ia l a n d to o r d er th e p u l lin g do w n , r e mov a l o r br e a k in g u p t h er eo f. I f t h e co n tr a ct o r s h a l l b e d is s a t is f i ed w i th an y d e ci s io n o f the repr esentat iv e o f the Engine er he s h al l be enti tl ed to r ef e r th e ma t t er t o th e En g in e e r w ho s h al l t h er e up o n No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 58 of 194 67. E n gi n e er ’ s Decision 68. I nstructio n s C o n tr a c t o r 69. W o r k O r der B o ok 70. Manag e ment M e e ti n g 71. Materials Signature of Tenderer to ARCHITECT : THE FIRM co n f i r m, r ev e r s e o r v ar y s u c h d e cis i o n. T h e w ho l e o f th e Wo r k s h all b e u n d e r th e d i r e c t i o n o f th e E n g i n e e r , w h o s e d e cis i o n sh al l b e f in a l, co n clu s iv e a n d b in d i ng o n all p ar t i es to th e co n t r a c t, o n al l q u e s t io n s r el at in g t o th e con s tr u ct i on a n d mea n i n g o f p lan s, W o r k in g d r a w i n g s , s ec ti o n s an d s pe c ifi c a ti o n s co n n e c t e d w ith t h e Work. The Contractor or his ag en t s h all be i n attend a n ce at th e s it e ( s ) d u r i n g a l l W o r k i n g h o u r s an d s h a ll s u p e r v is e t h e ex ecu tio n of the Works w ith such additional as sistance in each tr ade as th e Engin ee r may consider n ecess ary . O r d er s g i v en to th e Contractor’s ag e n t s hal l b e co ns id er ed to h a v e th e s a me f o r c e as if th ey had b e en g iv e n t o t h e C on t r a c to r h i ms elf . T h e E n g i n e e r s h al l c o mmu n i c at e o r co nf i r m h i s in s tr u c t i o n to th e Co n tra ctor in respe ct o f the ex ecution o f Work in a “W o r k s s i t e o r d er Bo o k ” ma in t ain ed i n th e o f f i c e o f th e Engineer an d th e Co n t r a c to r o r h i s a u t h o r iz ed r ep r e s en t a t iv e sh a ll co n f i r m r e ce ip t o f su c h in s t r u ct io n s b y s ig n i n g th e r e l e v a n t en t r i e s i n th i s b o o k . I f r eq u i r ed b y th e Contrac tor h e sh all be f urni shed a ce r tified tr u e copy o f s u ch in str u c t i o n ( s ) . I f th e Contractor f a il s to co mp ly with the i n struction (s ) of the Eng ineer , th e Engineer may i mp o se th e d aily p enalty o f Rs.500 (Rupees F iv e H u n d r ed ) f o r e a c h o f s u ch d e f a u lts . Th is p en al t y w il l n o t p r e j u d ic e th e r ig h t o f t h e M u n ic i p al C o m mi s s io n e r o r the Eng ine er to cl ai m co mp e n sat ion. A W o r k or d e r b o o k sh al l b e mai n t a in e d o n s i t e an d i t s h al l b e th e p r o p er t y o f Co r p o r a t io n a n d t he Co n tr a c to r sh al l p r o mp tl y si g n o r d er s g i v e n th er e in by E n g i n e er or h i s r ep r e s en t a t iv es an d h is s u p e r io r of f i c e r s an d c o mp ly w ith th e m. T h e Co n tr a cto r s h al l r ep or t th e co mp li an c e in go o d ti me so t h a t i t c a n b e c h e c k e d . Th e co n t r a c to r w i ll b e al lo w ed t o c o p y o ut in s t r u c t i o n th e r e i n f r o m t i me to ti me. E i th e r th e E n g in e er o r th e Co n t r a c t o r s may r e qu i r e t h e o th e r to at t e n d M a n ag e me n t me e t in g . T h e b u s in e s s of a ma n ag e men t me e t i n g s h a ll b e to r e v i e w th e p l a n s fo r r e mai n in g W or k s . E n g i n e e r s s h al l r e c or d th e b u s i n e s s o f ma n ag e me n t me e t i ng s an d i s to p r ov i d e co p i es of his r e co r d to th o s e at t e n d in g th e me e t i n g s . T h e r es p o n s i b il ity o f th e p ar t i e s f o r a c t i o n s to b e ta k e n is to b e d e cid ed b y th e En g i n e e r e it h e r at th e man age men t me et in gs or after the ma nag e ment me e t i ng s an d s ta te d in w r i ti n g to al l w h o a tt en d t h e me e t i n g s . ( a) Material to be p r ov id ed b y th e Co n tr acto r : T h e C o n t r a c to r s h a l l , at h is o w n e x p en s e, p r o vid e al l ma t e r ia l s req u ir e d f o r t he W o r k s . A l l ma t e r ia ls to b e p r o v i ded by th e C o n tr a cto r sh al l b e i n co n f o r mi t y w i th t h e s p e ci f ic a t io n s la id d o w n i n th e co n t r a c t an d th e C o n t r a c to r sh al l, f u r n is h p r o of to t he satisf acti o n of th e E n gin eer th at th e mat er i als so co mp ly . C o ntr a c t o r sh a l l p r o d u ce p r o o f v iz. c h al la n s , b il ls , v o uc h er s et c. so a s to en s u r e th a t t h e ma t e r i a l w a s b r o u gh t on sit e an d quantiti es u sed as p er the n or ms , sp ecifi cation s No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 59 of 194 ARCHITECT : THE FIRM et c. O f f ic er s o f t he C o r p o r a ti o n c o n c er n e d w it h th e W or k s ha l l be en t i t l e d a t an y ti me to in s p e ct an d ex a mi n e an y mater i al in t en d e d to b e u s e d in o r o n t h e W or k s ei th er o n th e s i te o r at f a c to r y or Wo r ks h op o r o th e r p l a c es w h er e s u ch ma ter ials are ass e mb led, f ab r ica ted or manuf ac t ured or at an y place (s) w h er e thes e ar e lay ing or from whi ch thes e ar e being ob tain ed and the Con tr actor shal l giv e such facilit ie s as ma y b e r eq u ir e d f o r su ch in s p e c t i o n a n d e x a mi n at io n . T h e ma t e r i a ls b r ou g h t o n s it e o u ts i d e W or k i n g h o u r s s ha l l be st ack ed s ep arat ely till they are insp ect ed b y th e E n g i n e e r o r h is r e p r es en t a t iv e. A l l ma t e r i a ls br o u g h t to t h e s it e sh al l n ot b e r e mo v ed o f f th e s i te w i th o u t th e p r i o r w r i tt en a p p r o v a l o f t h e E n g in e er . Bu t w henev er the W or ks ar e f inal ly co mple ted th e C o ntr a c t o r s hal l a t h i s o w n e x p en s e f o r th w i th r e mo v e f r o m th e s it e al l s u r p lu s mat e r i als o r ig i n a l ly s u p p li e d by h i m. The Contr actor sh all, at h is o w n expen se and without d el ay , s u p p ly t o the E n g in e er s a mp l e s o f ma t e r i a ls pr o p o s e d to b e u s ed in th e W o r k s . T h e En g i n e e r sh a ll w ith in s e v e n d a y s o f s u p p ly o f s a mp le s or w i th i n s u ch f u r t h er p e r i o d as h e may r eq u i r e a n d in t i ma t e d to t h e C o n t r a c t o r in w r it i n g, in f o r m th e C o n tr a cto r w h e th e r th e s a mp l es ar e ap p r o v e d by h i m o r n o t. I f th e s a mp les a r e n o t ap p r ov e d th e Con t r a c to r sh a l l f or t h w i th a r r an g e to s u p p l y to th e E n g in e er f o r ap pr o v a l fresh sa mp les co mp ly ing w ith th e sp e cification s laid d o w n in the con tract. T h e E n g in e er sh al l h av e f u l l p o w er s t o r e qu i r e r e mo v al o f an y o r all o f th e mat e r i a l s b r o u g h t to s i t e b y t he C on t r a c t o r w h ich is no t in a cc o r d an c e w ith t h e c o n tr a ct s p e cif i c a t io n s o r w h ic h d o n o t co nf o r m i n ch a r ac t e r o r q u a li ty to t h e s a mp l es a p p r ov e d b y h i m. I n c as e o f d ef a u lt o n th e p a r t o f th e C o n tr a c to r in r e mo v in g th e r e j e ct ed ma t er i a l s , t h e E n g i n e e r sh al l b e a t l i b e r ty to h a ve th e m r e mo v ed by o t h er me a ns . T h e E n g in e e r sh a l l h a v e f u l l p o w er s t o p r o c u r e o th e r p r o p e r ma t e r ia ls to b e s u b s t i tu ted f o r r eje ct e d ma t e r ia l s a n d in th e e v en t o f t h e C on t r a c to r re f u s i ng to co mp ly ; he may c au se th e sa me to b e s up p lied b y o th er me a ns . A ll co s t s , w h i ch ma y a tt en d u p o n s u ch r e mo v a l an d / o r s u b s t i tu t i o n , s h al l b e b o r n e by t h e C o n tr a cto r . S u b je c t as h er e in a f t e r p r o v id e d i n Cl a u s e N o . 9 8 a l l ch a r g e s o n ac co u n t o f O ctr oi , te r min al o r s al es ta x an d o t h e r du t i e s o n mat er i al o b t a in e d f o r t h e W o r k s f r o m any so u r ce s h al l b e b o r n e by th e C o n t r a c to r . Th e E n g in e er sh al l b e en t it led to h av e tes ts c ar r ied ou t as spec ifi ed in the co n tr act for any ma terials supp li ed by the C o ntr a c t o r o th e r th an th o s e f o r w h ich a s st a ted a b o v e, satisfacto ry proof has already been p ro duced, at the cos t o f th e C o n tr a cto r an d th e Co n tr a ct o r s h al l p r o v i d e a t h i s ex p ense all f aciliti es w hich the Engineer may require for the purpo se. I f n o tes t s ar e s p ec if ied in t he co n tr act, an d su ch tes ts a r e r eq u i r e d by the E n g in e er th e Co n tr a cto r s h al l p r o v id e a l l f ac il it i e s r e q u ir e d f o r th e p u r p o s e an d ch a r g e s f o r th e s e t e s t s s h a l l b e b o r n e by t h e C o n tr a cto r o n l y i f th e t est s disc los e that th e s aid mat eri als ar e n o t in ac co r d an ce with Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 60 of 194 72. S to ck Materials R e q u i r ed of 73. P r o d u ct i o n V o u c h er s of 74. P l an t E q uip me n t and’ Signature of Tenderer ARCHITECT : THE FIRM th e p r o v i s io n o f th e co n t r a c t. The cos t o f the ma teri als co nsu me d i n test sh all b e bor ne by the Contractor in all cases ex cept when o therwis e p r o v i d ed . F o r c ar r y in g o u t te s t s o n s o i l, c e me n t, s an d , ag gr e g at e , b r i c k a n d c o n cr e t e et c. th e s t a n d ar d w i ll b e as p r e s cr i b e d in r el ev a n t I . S . Th e En g i ne e r ma y d i r e c t t h e C o n tr a cto r s t o g et th e s a mp l es o f mat er i als tes ted in CI D CO , P WD , V J TI, I I T, o r a n y a p p ro v e d l a b or a t o ry o ut o f t h o s e a c c r ed i t ed b y N a tio n a l A cc r ed i t a tio n B o ar d o f La b o r ato r i e s , G o v t. o f India. T h e r es u lts of the tests sh al l be b ind ing on th e C o ntr a c t o r and Co r p o r a t io n . I n cas e th e Co n tr a c t o r d i s p u t e s th e r es u l t s o f te s t s , i t i s o p en f o r h i m to as k f o r th e r etes t in g i n w h ic h c a s e t h e co s t s h al l b e b o r ne by t h e Contrac tor. T he d ecis ion of th e Eng ine er on ac cep t abi li ty o r re - tes t i n g by Co r p o r a t io n o r te s t in g ag a i n in d ep e n d en tly in V J T I or II T w il l b e b in d i ng o n b o th th e p ar t ies to th e co n t r a c t. ( a) T h e Co n t r a c to r sh al l at h i s o w n ex p en s e p r ov i d e an d f u r ni s h hims e l f w i t h s h ed s an d y ar d s in s uch s i t u a t io n s a nd in su ch n u mb e r s a s , i n th e o pin io n o f th e E n g in e er are requ i s ite f or c arry ing out th e Works under this contr ac t, and th e C o ntractor shal l ke ep at each o f such sheds an d y ards a sufficien t quantit y of mat er i als in s t o ck s o as n o t to d e l a y t he c a r r y i ng o u t th e Wo r k s w i th d u e ex p e d i t io n a n d t he E n g i n e e r an d h is s u b o r d in a t e s s ha l l h a v e f r e e a c c e s s t o th e s a i d s h e d s o r y ar d s a t any ti me f o r th e p u r p o s e o f in s p e c t in g t h e s t o ck o f ma t er i al s s o k ep t in h an d an y ma t er i a l o r ar ti c l e, w h i ch th e E n g in eer ma y o b je ct t o , s h a ll no t b e b r o u g h t u p o n o r u s e d i n th e W o r k b u t s h a l l b e f o r t h w i th r e mo v e d f r o m th e s h e ds o r y ar d s by th e C o n tr a cto r at h i s o w n c os t. T h e C o n t r a c to r w i ll h o w e v er b e al lo w ed t o u s e f o r t he a b o v e p u r po s e th e c o mp l et ed p o r t i on o f th e b u il d in g s i f a v ai l a b le. ( b) G e n e ral : Ce me n t b r o u g h t o n s i t e b y t h e C on tr a c to r s s h al l b e s t o r e d in w a t er p r o o f g o d ow n w i th t w o lo c k s o n e a ch d o o r . T h e k e y o f o ne l o ck o f e a ch d o o r s h al l r e m a in w i th the Engin e er o r his represen tativ e an d th at o f the oth er lock w ith the Con tractor’s o rgan is at ion ag en t at site o f W o r k s s o th a t c e me n t . is r e mo v e d f r o m t h e g o d o w n o n ly a cc o r d i n g to d a i ly r e q uir e me nts w i th t h e k n o w l ed g e o f b o th t h e p ar t i e s . T h e C on t r ac to r sh a l l , p r o d u c e al l qu o t a t io n s, i n vo i c e s v o uc h er s a nd a c co u n t s o r re ce ip t s e t c. to p r o v e th at t h e ma t e r ia l s s u pp l ie d by h i m a r e in co n f o r mit y w i t h th e s p ec i f i c a t io n s l a i d d o w n i n th e Con t r a c t an d t h e s a me ar e b r o u g h t t o th e s it e a n d ut i l i z e d o n t h e s a id W o r k s . T h e C o n t r a c to r s h a l l ar r a ng e at h is o w n ex p e n s e a ll to o l s , p la n t a n d eq u i p me n t r eq u i r ed f o r ex e c u t i on o f Wo r k s . I f r eq u i r e d by the Co n t r a c to r a n d if a v a i lab le t h e C o r p o r at i o n may s u p p ly s u c h o f t h e t o o ls , p l an t an d e qu i p me n t a s a r e av a i l ab l e, to th e C o n tr a cto r at th e r a t es an d t e r ms t o b e spec ified by the Engineer. No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 61 of 194 75. I nspectio n A p p r o v al 76. U n c o v er i n g an d M a k in g G o o d 77. Co n tr a c t o r Search Signature of Tenderer & to ARCHITECT : THE FIRM N o to o l s , p lan t an d equ i p men t on c e br o u g h t t o th e W o r k s it e sh al l b e r e mo v ed w i th o u t th e w r i tte n p er mis s io n o r o r d e r o f th e E n g in e er , u n t i l h e h as c e r t i f ied th e c o mp l et io n o f t h e W o r k. I f any T ools , P lan t s a n d e q u i p me n t b r o u gh t on s i t e , a r e i n th e o p i n i o n o f th e En g i ne e r in ef f i ci e n t , ba d o r o f in f e r io r q u al it y o r a r e u n s u i t ed f o r th e W o r ks t he n s u ch t o o ls , p la n t an d e q u i p me n t s h a l l n o t b e u se d o n t h e W o r ks b ut s h a ll b e r e mo v ed by th e Co n t r a c to r at h is o w n e x pe n s e w it h i n tw en ty f ou r ho u r s af t er th e serv i ce o f a w ritte n o r d er or n o ti c e f r o m th e E n g in e er t o t h at ef f ec t an d f r e s h to o l s , p la n t a n d e q u i p me n t b e s ub s ti tu t ed i n l i e u o f th a t or d e r ed to b e r e mo v e d by th e E n gi n e e r . A l l W o r ks e mb r a c in g mo r e th a n o n e p r o ces s sh al l b e s u b je ct t o ex a mi n a t io n a nd a p p r ov a l a t e a ch st a g e th e r eo f an d th e C o n tr a cto r sh a l l g i v e d u e n o t i c e t o th e E n gi n e e r o r his organi zat ion rep r esen tativ e when each stag e i s ready . In d efau lt of s uch notice, th e Eng in ee r s hal l b e enti tl ed to ap p r a is e th e q u al i t y a n d e x t e n t t h er e o f . N o Wo r k s h al l b e c o v er e d u p o r p u t o u t of v i e w w i th o u t th e ap p r o v a l o f th e E n g i n e e r o r h is o r g a n i z at io n r e p r e s e n ta tiv e an d t h e C o n tr a c t or sh al l af f o r d f u ll o p p o r tu n i ty f o r ex a mi n a t i o n an d me as u r e me n t o f an y W o r k w hi c h i s ab o u t to b e co v er ed u p o r o u t o f v i ew an d f o r ex a mi n at i on o f f ou n d a tio n be f o r e p er ma ne n t W o r k is p l a c ed t h e r eo n . T h e C o n tr a cto r s h a l l g iv e d u e n o t i c e to th e En g i n e er or h i s o r g a n i z a t i on r e p r e s e n t a ti v e w h e n ev e r an y su ch W o r k o r f ou n d a tio n is r ea d y f o r ex a mi n a t io n an d th e E n g ine e r o r his r ep r e s en t a t iv e sh a ll w i th o u t u n r e as o n a b le d el ay , u n l ess h e co n s i d er s it n e c e s s a r y an d i n f o r ms th e C o n tr a cto r in w r itin g a c c o r d in g l y , at t e n d f o r th e pu r p o s e o f ex a mi n i n g an d mea s u r in g s u c h W o r k or ex a mi n i n g s u ch f o u n d at io n s . I n th e ev e n t o f th e f ai lu r e o f th e C o nt r a c t or t o g iv e s u ch noti ce h e shal l, if r equired by the En g ineer, u ncov er such W o r k at t h e C o n t r a c t or ’ s e x p en s e . D e par t me n ta l o f f i c e r s c o n c e r n e d w i th th e Wo r k s s hal l h a v e p o w er s a t an y t i me t o ins p e c t ex a mi n e any pa r t o f th e W o r k s an d th e C o n t r a c to r s h al l g i v e s uch f a ci l i ti es as m ay be requ ired for s u ch ins pectio n & ex a mination. N o p ar t o f th e Wo r k s sh a l l b e co v e r ed u p o r p u t o u t o f v i e w w i th o u t t h e ap pr o v al o f th e En g i ne e r . T h e C o n t r a c t o r s h a l l u n co v er any p a r t of th e W o r k s an d /o r ma k e o p en i n g in o r th r o u g h t h e s a me as th e E n g in e er ma y f r o m t i me to ti m e d ir e ct fo r h is v e r i f i c a t i o n a n d s h al l r e in s t a t e a n d ma k e g o od s u c h p ar t t o th e sa t is f a c t i o n o f the E ng i n e e r , if an y s u ch p a r t has b e e n co v er ed u p o r pu t o u t o f v ie w af t er b ei n g a p p r o v e d by th e E n g in e er an d is su b s e q u e n t ly f ou nd o n u n co v e r i n g t o b e ex e c u t ed in a cc o r d an c e w i t h t h e co n t r a c t, th e e x p en s e s o f u n co v e r in g a n d /o r ma k i n g o p en i ng s in o r th r o u g h , re i ns ta tin g a n d mak in g g o o d t h e s a me sh al l b e b o r n e b y t h e C o r p o r a ti o n . I n a n y o th e r c as e al l s u c h ex p e n s es s hal l b e b o r n e by th e C o nt r a c t o r . T h e Co n t r ac to r sh al l , i f r e q uir ed by th e E n g in e er in w r itin g , se ar c h u n d er th e d i r e c t i o n o f th e E n g in e er f o r t he c a u s e o f a n y d ef e c t , i mp er f e ct io n o r f a u l t ap p e a r i ng d u r i n g No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. 78. D ef au l t C o n tr a c t o r C o mp l i a n ce 79. U r g en t W o rk s Page 62 of 194 of in 80. Co mme n ce me n t T i me 81. E x te n s io n T i me Co mple ti on t o M o ns o o n. of f or due ARCHITECT : THE FIRM th e p r o g r es s o f th e Wo r k o r in t h e p er i o d o f mai n t e n an c e. U n les s s u ch d efe c t, i mp er fe ct i on o r f a u lt sh al l be o n e fo r w h ich t h e C o n tr ac t or is l i a b l e u n d er t h e co n t r a c t, th e c o s t o f th e W o r k car r i e d o ut b y th e Con t r a c to r in s e ar c h in g a s af o r e s a i d s h a l l b e b or n e b y th e C o r p o r at io n . I f s u c h d e f e c t, i mp er f e ct i o n o r f a u lt s h a ll b e o n e f o r w h i c h C on t r a c to r is li ab l e as a f o r e s a id , th e co s t o f th e Wo r k c a r r i ed o u t in s e ar c hi n g a s af o r es a id sh al l b e b or n e by th e Co n tr a c t o r an d he shall in such case repair, rect ify and ma ke good such d ef e ct, i m pe r f ec t i o n or f a u lt, a t h is o w n ex p en s e. I n ca s e of d e f au l t o n t h e p a r t o f th e C o n tr a cto r in c ar r y in g o u t s u c h i ns tr u c t i o n w it h in th e ti me s p e ci f i e d th e r e i n o r , i f not, w i th i n a r e a s o n a bl e t i me , t h e C o r p o rat i o n s hall be en t it l e d to e mp loy an y o t h er p er s o n s t o c a r r y ou t th e s a m e an d a l l c o s ts c o ns eq u e nt th e r e o n o r in c i d e n t a l t h e r eto s h a l l, af t er d ue c o n s u l t a tio n w i th th e C o r p o r a t io n a n d t h e C o ntr a c t o r , b e d e t e r min ed by th e E n g i n e e r an d s h al l b e r ec o v er a b l e f r o m t h e C on t r a c to r b y t h e C o r po r a ti o n f r o m an y mo n ie s d u e o r t o b e c o me d u e to t h e C o n t r a c to r an d t h e E n g i n e e r s hal l n o t i f y t h e C o n t r a c to r ac co r d i n gl y . I f any U rg en t W o r k ( in r es p ect w h er e o f th e d ec is io n o f t h e E n g i n e e r s h a l l b e f i n a l an d b i n d i ng ) b ec o me s n e c es s ar y an d th e C o n tr a cto r is u n ab l e or un w il l i n g at o n c e t o c ar r y it o u t, t h e E n g in e er ma y by his o w n o r o t h er W o r k p eo p l e carry it out as h e may consider nec es sary . I f th e u r gen t W o r k sh al l b e s u ch as t h e C on t r a c t o r is liab l e u n de r th e co n tr a ct to c a r r y ou t at h i s e xp en s e a l l ex p ens e in c u r r e d on by th e Co r p o r at io n s h a l l b e r e co v e r abl e f r o m the Contr a ctor and b e ad jus ted o r se t off agains t any s u m p ay ab le t o h i m. PA R T – IV TIME SCHEDULE AND DELAYS T h e t i me al lo w e d f o r ex e c u t i o n f o r t h e W o r k s a s s p ec if i e d in th e c o n tr a ct d o cu men ts sh all b e th e ess en c e o f t h e co n t r a c t. T h e e x e c u tio n of t h e W o r k s sh a l l co m me n c e f r o m th e d a t e sp e cif i e d by t he E n g in e e r in w ri t i n g . I f t h e C o ntr a c t o r f a il s o r n e g l e ct s to c o mme n c e t h e e x e c u t i o n o f th e W o r k s a s af o r es ai d , t h e C o r p o r a t i o n s ha l l w it h o u t p r e j u d i ce t o an y o t h er r i g h t o r r e me d y b e a t l i b er t y to f or f e it th e s ecu r ity dep o s i t a b s o lu t e l y . I n any c a s e w h er e th e t i me p r e s c rib ed f o r c o mp l et io n o f an y w or k is e x clu s iv e of mo ns o on p e r i o d . N o n ew tr e n ch W o r k sh ou ld b e st a r t e d af t e r 1 5 t h M ay an d ex is t i n g t r e n c h e s ar e requ ired to be r einst ated by 3 1 s t M ay ev er y y ear . The sit e s hall be clear ed in al l respec t including re mo val of s u r p lu s mat er i a l o n o r b ef o r e 1 0 t h J u n e o f e v e r y y ear . The mo n s o o n p e r io d s h al l b e d e e med t o b e f r o m 1 0 t h Ju n e to 3 0 t h Sept. of the cal end ar y ea r. H o w e v er , if t h e C o n tr a cto r is p e r mi t t e d by the E ng i n e e r to W o r k d u r in g a n y mo n s o o n . Pe r io d , al l su ch p er i o d s h a l l b e tak en in t o ac co u n t f o r t h e c al cu l a t in g th e c o n tr a ct p e r i o d o n p r o - r at a b a s i s as u n d e r . Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 63 of 194 ARCHITECT : THE FIRM C o s t o f W o r k d one d u r in g mo n s o o n ----------------- x N o . of d ay s o f T o t a l co s t o f Contract p er i o d C o nt r a c t W o r k I n t h e ev en t o f t h e Co n t r a c to r f ai l in g to co mp ly w it h th i s co n d i tio n. H e s h a l l b e li a b l e t o p a y as co mp en s a tio n as s ta t ed in C l au s e N o . 9 0 . I f t h e w o r k b e d e l a y ed b y – ( a) F o r c e me a s ur e s u c h as a ct s o f G o d , a c t o f p u b li c en e my , a ct of g o v er n me n t , f l o o d s , ep id e mic s et c. o r ( b) A b n or ma l ly b a d w ea th e r , o r ( c) I S er i o u s lo s s o r d a ma g e by fi r e o r ( d) C iv il co mmo t io n , lo c a l co mb i na t io n o f w or k me n, s tr i k e o r lo c k o u t a f f e c t i n g any o f th e tr ad es e mp lo y ed o n t h e w o r k , or ( e) D e l a y o n th e p a r t o f o t h er Co n t r a c t o r o r t r ad e s men e ng ag ed by th e Mu n i c i p a l C o r p or a t io n i n ex e cu t in g w o r k s n o t f o r min g p ar t o f t h e co n t r a c t o r ( f ) T h e r e a s o n s s tat e d in co n d i ti o n N o 8 4 a nd 8 5 . ( g) A ny oth e r ca u s e, in th e ab s o lu te dis c r e t i o n o f th e E ng i n e e r . T h e n u p o n th e hap p en i n g o f any s u c h e v en t c a u s in g d el ay , the Con tractor shall i mmed i at ely give notic e ther eo f in w r itin g t o th e E n g i n e e r b u t sh a l l n e v e r th e l e s s u s e co n s t an t ly h is b e s t en d eav o r s to p r e v en t o r ma k e g o o d t h e d el ay a n d s h all d o al l th a t may b e r e as o n a b le r eq u i r e d to th e s at is f a c t i o n o f t he E ng i n e e r to p r o c e ed w i th th e w o r k . R eq u e s t f o r ex t e n s io n o f ti me , to b e e l ig i b l e f o r co n s i d er a t i o n s h a ll b e ma d e by th e C o n tr a cto r in w r it in g w ith in 1 4 ( f ou r tee n ) day s of th e h ap p en in g o f the ev en t causing d elay . The Contr act or may also, if p r actic ab l e in d i c a t e i n su c h a r eq u e s t t h e p e r io d f o r w h ich e xt e n s io n i s d es i r ed . I n a n y s uc h c a s e, th e en g in e er may gi v e a f a ir r ea s o n ab l e ex t e n s i o n o f ti me f o r co mp le tio n o f i n div id u a l it e ms o r gr o u p s o f ite ms o f wo r k f o r w h i ch s e par at e p e r io d s of co mp l etion ar e s p ecifi ed in the co n t rac t o r th e conta ct as w h o le . T h e d e ci s i o n o f the En g i n e e r in r e g ar d to t h e ex t en sio n w ill b e co mmu n ica ted to th e Co ntr actor in w r itin g w i th i n a r e a s o n a b l e t i me an d th e Co n tr a cto r s h a l l als o b e p ai d su ch co mp en s a tio n th a t in t h e op i n io n o f t h e Engineer is fair and reasonab l e to cover the delay s r es u l t i n g f r o m th e p r o v i s io n s u n d er t h e s u b c l a u s e- e ab o v e. Th e t i me ex t en d e d f o r co mp le t in g th e w o r k shal l b e t h e es s en c e o f th e co n t r a c t f o r th e p e r io d e x t e nd e d . ( a) O n a w a r d of th e co n tr a c t , th e Co n tr a ct o r s h al l s u b mi t t he t i me s c h ed u l e f o r th e W or k s in t h e ‘ f o r m o f P E R T N e t W o r k s o r Ba r ch ar t in P r ima v e r a F o r mat o r M i cr o s o f t P r o j e c t s . T h is s h a l l b e l i n k e d t o t h e BI M mo de l b y the co n t r a c to r s B I M c o - o r d i n a t o r . (b ) T h e sc h ed u l es s h a l l b e p r e p ar e d i n d i r e c t r el a t i on s to t h e t i me s t at e d i n th e c o nt r a c t d o cu me n ts f o r co mp l e ti o n o f i t e ms or g r o u p s o f ite ms o f W o r k a n d o r th e co n t r a c t as a whole. It sha ll indica te the d ates of co mme nc e me n t a nd c o mp l e t io n o f v a r io u s a ct iv i ti es o f th e Wo r k an d E f f e ct iv e da y s = 82. E x te n s io n T i me due U n f o r es ee n ev en ts 83. N etw o rk S c h ed u l e & M o n t h ly P r o gre s s Reports Signature of Tenderer of to No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. 84. 85. 86. 87. Page 64 of 194 ARCHITECT : THE FIRM s h o u ld c o n t a i n n o a c t iv i t i es w i th d ur a ti o n g r e at er t ha n 2 8 d ay s. M il e s to n e s w o u l d b e so d et e r mi n e d th at a t l e a s t 1 0 p er c en t o f th e ev ents a r e mi l e s t o n es and n o t w o mil es t o n e s ar e mo r e t h an 3 mo n t hs a p a r t. T h e E n g in e er may a p p r o v e th e S c h ed u l e a s su b mi t t e d o r su g g es t mo dif i c at i o n s as h e th i nk s n e c es s a r y . Th e Co n t r a c to r s h a l l mo d if y the ch ar t a cco r d i n g ly an d o b ta i n E n g in e er ’ s a pp r o v a l. ( c) T h e f i n a l i ze d N e t w o r k may be a men d e d f r o m t i me to ti me, if f elt n e cessary by the Contractor, with th e a pp r o v a l o f th e E n g in e er . (d)A f ixe d s u m s h a ll b e h eld in abey anc e at the ti me of t he n ex t in ter i m p ay men t for n o n - a t t a in men t of e ac h mi l e sto n e in t h e N e tw o r k a nd s ha l l b e r e l e as ed o n ly o n co mp l e t i o n o f th e W o r k af t er d ed u c ti n g t h e co mp ens ation for del ay if there is Co ntractor’s fault as p er p r o v i s io n i n Cl a u s e N o . 8 6 a n d p en a l t y co v e r ed u n d er C l a u s e N o . 5 3 . T he f ix e d s u m s h al l b e: Rs . 1 0 , 0 00 / - f o r all co n t r ac ts o v er R s . 2 5 L a kh s a nd u p to t he v al u e o f R s . 1 0 0 L a kh s . Rs . 2 0 , 0 00 / - f o r all c o n tr a c t s o v er R s . 1 c r o r e a n d u p to t he v al u e o f R s . 5 cr o r es Rs . 3 5 , 0 00 / - f o r al l c o n tr a c t s o v er R s . 5 c r or e s an d u p to t he v al u e o f R s . 1 0 c r o r es. Rs . 5 0 , 0 00 / - f o r a ll co n t r a c ts o v e r R s . 1 0 cr o r e s . If the att ain ment o f the mil es tones is d el ay ed f or r eason n o t at t r ib u t ab l e to t h e C o n t r a c to r s n o mon ey s w i ll b e held in abey an ce. D i s r u p ti o n of T h e C o n t r ac t or s h a l l g iv e w r it t en n o ti c e t o t h e E n g in e er P r o gr es s f o r La c k whenev er p l a nn i n g o r pro gr e s s o f th e W o rk s is l ik ely to be o f D r aw ing s . d el ay ed or d is r up t e d u n l es s a n y f ur t h er d r aw i n g o r or d er , in c lu d i n g a d i r e c t i o n , ins tr u c t i o n o r a p p r o va l , i s is s u e d b y the Engin eer w ithin a re as onable ti me. Th e n o ti ce s h al l in c lu d e d et a ils o f th e d r a w i n g o r o r d er re q u ir e d a n d o f w hy an d b y w h en i t is r e q u ir e d a nd o f an y d e lay or d is r up t i o n lik el y to b e s u f f e r e d if i t i s l a t e . D elay s of I f by r ea s o n o f any f ailu r e o r i n ab i li t y of th e En g i n e e r to D r a w i ng s is s u e w i th in a t i me r eas o n ab le in al l th e cir cu ms tan c es an y d r a w i n g or o r d e r r e q ues t ed b y th e C o n tr a c to r in a cc o r d an c e w i th th e cl a u s e 8 4 of th i s co n d it i on th e Con t r a c to r su f f e r s d el ay , th en t h e E n g in e er s ha l l t ak e s u c h d el ay in to a c c o u n t in de t er min in g any ex t en s i o n o f ti me to w h ic h th e C o ntr a c t o r is e n ti tl ed u n d er s u b- c l a u s e ( g ) o f C l a u s e N o . 8 2 h e r eo f . N o mo n et a r y c la i m w il l b e e n t e r t a in ed on th i s accoun t. Mo n t h ly R ep o r t T h e C o n t r a c t o r s w i l l b e r e q ui r e d to s u b mi t th e mo n th ly progress reports b y the 2 n d d a y of th e f o llo w i n g mo n t h t o th e E n gi n e e r . F a i l u r e o n t h e p ar t o f t h e C o n tr a cto r to s u b mi t mo n th l y r e p or t in ti me w i ll a t tr a c t a c t i o n a s p er Clause No.83. Rate of P r ogr e ss. I f f or a n y re a s o n , w h i ch d o es n o t en t i t l e th e Contractor to an ex t en s i o n o f ti me , th e r at e o f p r o g r es s o f th e W o r k s o r an y S e ct i o n i s at a ny ti me , i n th e o p i n io n o f th e En g in e e r , to o s l o w to c o mp l y w ith t h e T i me fo r Co mp l e ti o n, th e Engineer shall so notif y th e Contracto r w ho shall th er eupon Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. 88. S uspension W o rk 89. S t o p p ag e A l ter at i on Res trict io n W o rk . Signature of Tenderer Page 65 of 194 ARCHITECT : THE FIRM tak e s u ch s t ep s a s ar e n e c e s s a r y , s u b je ct to th e co n s ent o f th e E n g in e er , to ex p ed i te p r o g r es s s o as to co mp ly w ith th e Ti me f or Co mp leti on. T he Contracto r s hall no t b e entitled to an y ad d it io n a l p ay men t f o r t ak in g s u ch s t e p s . I f , as a r es u l t o f an y n o ti c e g iv en by th e En g i n e e r u n de r t his C l a u s e, t h e C o n tr a cto r co n s i d e r s t h at it is n e c e s s ar y to d o an y W o r k at n i g h t or o n lo c a l l y r eco g ni z ed d a y s o f r e s t , h e s h al l b e e nti tl ed to se e k th e co n s e n t o f th e En g i n e e r so t o d o . P r ov i d ed t h at i f an y s t ep s , t a ke n by th e C o n tr a cto r in me e t i ng h i s o bl i g a t i o n s u n d er th is C l a u s e , i n vo l v e t h e C o r p o r a ti o n i n ad d it i on a l s u p e r v isi o n c o s t s , s u ch co s t s s h al l b e d et e r mi ned b y th e E n g i n e er an d s h al l b e recov erable fro m the Con tr actor, and may be dedu cted by th e Co r p o r atio n f r o m a n y mo nies d u e o r to b e co me d u e to th e C o n t r a c to r an d th e E n g in e er sh a l l n o ti f y t h e Contrac tors accordingly . of ( a) T he C on t r a c to r s h al l, o n r e c e ip t o f th e o r d er in w r itin g o f th e E n g in e er , su s p e n d t h e p r o g r ess o f th e W or k s o r a ny p ar t t h er e o f f o r s uch t i m e an d i n s u c h man n e r as t h e E ng i n e e r ma y co n s i d er n e c es s ar y f o r an y of t he f o llo w i ng r e aso n s : (i) O n ac c o u n t o f c o n ti n u ed n o n - c omp l i a n c e o f th e i n s tr u c ti o n s o f th e E n g i n e e r o r a ny oth e r d e f a u l t o n t h e p a rt o f t h e C o n t r a c to r , or (i i) f o r p r o p er ex e c u t io n o f th e W o r k s o r p a r t th er eo f fo r r e as o n s o t h er t h a n t h e d e f a ul t o f th e C o n tr a c t o r , o r ( ii i ) f o r s a f et y o f t h e W or k s o r p ar t th e r eo f . T h e Co n t ra c to r s h a l l , d u r in g s u c h s u spens i on, p r o p er ly p r o t e c t a n d s e cu r e th e W o r k s to t h e e x t e n t n e ces s a r y an d c a r r y o u t the i n s tr u c t i o n s g iv e n in th a t b eh alf b y th e E ng in eer . ( b) I f t h e s u s p e n s i o n i s or d e r ed f o r r e as o n s ( i i) an d ( ii i) i n sub-para ( a) abov e, the Contr actor shall be en titled to an ext ens io n o f ti me eq u al to th e p er io d o f ev ery su ch suspensio n p lus a reason ab le t i me a s d ecid ed by the E ng i n e e r . I I f th e su s pen s i o n i s o r d e r ed fo r r e a s o n s o f ( i) in s ub - p a r a ( a) ab o v e , t h e E n g in e er sh a l l h a v e p o w e r s to s u s p e nd t h e p ay men t u n de r th e co n t r a c t . S uc h s u s p e n s i on o f p a y me n t may b e co n t in u ed u n t i l d ef au lt s h al l h a v e b een r e c t i f i e d . / I f at a n y t i me af t e r th e ex ec u tio n t h e c on t r a c t d o c u me n t s / the Eng in eer shal l f or any re ason whatso ever ( other th an of d ef a u lt o n t h e p a r t o f C o n tr a c to r f o r w h ic h th e co r p o r atio n is en t i tl ed to r e s c in d th e co n t r ac t) d es i r es t h a t th e w h o le o r an y p a r t o f th e W o r k sp e ci f ie d in t h e t en d e r s h o u ld b e suspended for any period or that the w hole or p art of th e Wor k s h ou ld n ot b e c a rr ie d o u t , a t al l h e s h a l l give to t h e C o ntr a c t o r a n o ti c e in w r it i ng o f s uch d es i r e an d u p o n t h e r ec ei p t o f s u ch n o t i c e th e C o n tr a c t o r s h a l l f o r t h w i th s u s p e nd o f s to p th e W o r k w ho l ly o r in a r t as r e q uir ed , af t er havin g d u e r e g a r d t o th e a p p rop ri at e s t ag e a t w hi ch t he W o r k s h ould b e s t o p p ed o r s u s p e n d ed s o as n ot t o c a us e an y da ma g e o r in j u ry to th e W o r k alr e ad y d o ne o r end a n g er th e s a f e t y th e r e o f p r ov i d ed th a t t h e d e c is i o n o f th e Engin eer as to th e s tag e at w h ich th e Wo r k o r any par t of i t No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 66 of 194 ARCHITECT : THE FIRM co u l d b e o r co u l d h a v e b een s af e ly st o p pe d o r s u s p e n d ed s h al l b e f in a l an d co n clu s iv e a g ain s t th e C o n t r a c to r . T h e Contractor shall h ave no cl ai m to any p ay men t or co mp en s a tio n w h at s o e v er b y r e a s o n o f o r in p u r s u an c e o f an y n o ti c e a s af o r e s a id , on a c c o u nt o f an y s u s p e n s i o n , s to p p a g e o r c u r t a i l me n t e x c ep t to t h e e xt e nt sp e c i f i ed h er e in a f t e r . W h e r e th e t o t a l s u s p en s i o n o f W o r k o r d er e d a s af o r e s a i d contin u ed f o r a c o n ti n u es p eri o d ex c e e d in g 9 0 day s t he C o n t r a c t o r sh a l l b e l ib er ty to w i t h d r a w f r o m t h e co n t r a c tu al o b lig at io n s u n d e r th e c on t r a c t s o f a r a s it p er t ain s to u n ex e cu t ed p a r t o f t h e W o r k by g iv i n g a 1 0 d a y s p r i o r n o ti c e i n w r it in g t o th e E n gi n e e r , w i th i n 3 0 d ay s o f th e e x p ir y o f t h e s a id p er i o d o f 90 day s , o f such i n t en t i o n an d r e q u i r i ng th e E n g i n e e r to r e c or d th e f in a l me a s u r e me n t o f th e W or k alr e a d y d o n e an d to p ay f i n a l b il l. U p o n g i v in g s u ch n o t i c e t h e Co n t r a c to r s h al l b e d e e me d to h av e b e e n ch a r g ed f r o m h i s o b li g at io n s to co m p le t e th e r e ma i n in g u n ex ecu t e d W o r k u n de r h is con t r ac t. O n r ec e i p t o f s u ch noti ce the Engi neer shall p roc eed to c o mp l et e th e me a su re men t s an d ma k e s u ch p a y me n t s as may b e f i nal ly d u e to t h e C o n tr a c t o r w ith in a per io d o f 9 0 da y s f r o m t h e r ec ei p t o f su ch n o t i c e in r es p e c t o f t h e W o r k a lr e ad y d o n e by th e C o n tr a cto r . S uch p ay men t sh al l n o t in an y ma n n er p r e j u di c e t h e r i g ht o f th e Co n tr a cto r to a n y f ur t h e r co mp en s a tio n u n d e r th e r e ma i n in g p r o v is io n s o f this cl au s e. W h e r e t h e E n g in e er r eq u i r ed th e C o n tr a c t o r to s u s p en d t h e W o r k f o r a p e r i o d i n ex ces s o f 3 0 d ay s at a n y ti me o r 6 0 d ay s in t h e ag g r e g a t e, th e Co nt r a c to r s h al l b e en ti r e t o ap p l y t o t h e En g i n e e r w i t h i n 3 0 d ay s of t h e r es u mp t io n o f W o r k af t e r su ch s us p e n s i o n f o r p ay me n t o f c o mpo s it io n t o the ex tent o f pecun iar y loss suffered by him in r es pect o f W o r k i ng ma c h i n er y r e mai n id e a l o n t h e s i t e o f a c c o u n t o f h is h av in g an d to p ay th e sal ary or w ag es o f , lab ou r en g ag ed by h i m d u r in g th e s a id p er i od o f su s p e n s i o n provided alw ay s that th e Co ntractor s hall no t be entitl ed to an y cl ai m in r esp e ct o f any su ch W or k in g ma ch i nery , s alary o r w a g e s f o r th e f i r s t 3 0 d a y s w h et h er con s e c u ti ve o r i n t h e ag g r e g a t e o r su c h s u s p en s i o n o r in r es p e c t o r any s u s p e ns io n w h at s o ev er oc c a s i o n ed b y u n s a ti s f a c t o r y W o r k o r any o th e r d ef a u lt o n h i s p a r t. T h e d e c i s i on o f t h e Engineer in this r eg ard shal l b e f inal a nd con clusive ag a in s t th e C o n t r a c to r . I n t h e ev e n t of – i) A ny to t al s t o p p ag e o f Wo r k o n n o t i c e f r o m E n g in e er u n d er s u b cl a us e i n t h a t b eh a lf . ii) W it h d r a w a l b y t h e C o n tr a cto r f r o m t h e c o n t r a c tu a l o b li g at io n s co mp l e te t h e r e mai n in g u n e x e c u t e d W o r k u n d er s u b cl a us e o n a cc o u n t o f co n t in u ed su sp e n s i on o f Wo r k f or a per i o d ex ceed ing 90 day s. It s hall be open to the Contrac tor, w i th i n 9 0 d ay s f r o m t h e s er v i c e o f ( i) th e n o t i c e o f s t o p p ag e of W o r k o r ( ii ) th e n o t i c e o f w ith d r a w a l f r o m t h e co n t r ac tu a l o b li g at io n s un d e r t he c o n tr a ct o n a c c o u nt o f th e Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. 90. L iq u i d a t e d D a mag e s Delay . Signature of Tenderer Page 67 of 194 f or ARCHITECT : THE FIRM c on t in u ed s u s p en s i o n of W o r k ( ii i) n o t i c e u n d e r cl au s e 2 0 ( 1 ) r es ul t in g i n s u ch curt ai l me nt to produce to th e E n gine er s a tisfac tory d o cu me n t ar y evid e n c e t h at he h ad p u r ch a s e d o r ag r e ed t o p u r c h a s e ma t e r i a l f or u se in t h e co n t r ac t e d W o r k , b ef o r e r e c eip t b y h i m o f th e n o t i c e o f s t o pp a g e , s u s p e n s io n o r c ur t ai l me n t a n d r e q u ir e G o v er n men t to t ak e o v e r o n p ay me n t s u c h ma t e r ia l a t th e r at e d d et e r mi n e by th e E n g i n e e r pr o v i d ed , ho w ev e r , s u c h r a t e s s h a l l in n o cas e ex c eed th e r a t e s a t w h i c h th e s a me w a s a cq u ir e d by th e Co n tr a c t o r . T he c o r p o r a t io n s h al l ther eaf ter tak e ove r the ma terials so o ffered , provided t h e q u an t i t i e s o f f er e d , ar e n o t in ex c es s o f t h e r eq u i r e me n t s o f th e u n ex e cu t ed W o r k as s pe c if i ed in t h e a cc ep ted te nd er a n d ar e o f q u al it y a n d sp e c i f i c a t io n s approved by the Engineer. I f th e Co n t r a c t or f a i l s to co mp l e t e th e W or k s an d c l e ar t h e S it e on or b e f or e t h e C o n tr a ct or e x t e n d ed D a t e ( s ) /p e r io d ( s ) o f co mp l e t i o n , h e s h a ll , w i t h o u t p r e j u d i c e to an y o th e r r i g h t or r e med y o f Co r p o r atio n o n a c c o u n t of such breach, pay as agre ed c o mpens ati on, a mo unt c a l c u l a t e d a s st ip u l at ed b e lo w ( or su c h s ma l l e r a mo u n t a s may b e f i x ed by th e E n g in e e r ) o n th e C o n t r a c t V alu e o f t h e w h o le W o r k o r on th e Co n tr a ct V a lu e o f th e i te m o r g r ou p of items o f Work for w hich separ ate period of co mpletion ar e giv en in the con tr ac t and of w hich co mp letion is d el ay ed f o r e v e r y w ee k th a t t h e w h o l e o f th e Wo r k o f it e m o r g r o up o f ite ms o f W or k con c er n e d r e mai n s u n c o mp l et ed , ev en thou gh th e co ntract as a w h ol e be co mp leted b y th e co n t r a c t o r t h e e x ten d ed d at e o f co mp le t i o n . F o r t his purpose the ter m “Contract V alu e” sh all b e th e v alu e o f th e W o r k at C o n tr a c t Ra t es as o r d er e d i n c lu d in g t h e v al u e o f al l d ev i a ti o n s or d e r ed : ( a) C o mp l e t i o n p e r io d f o r @ 1 p e r c e n t( o r ig i n al ly st ip u l a t e d p er w e e k o r a s ex t e n d e d) n o t e x ce ed in g 6 mo n th s ( b) C o mp l e t i o n p e r i o d f o r @ 1/2 p ercen t ( a s o riginal ly s t ip u la t ed pe r w ee k a s ex t e n d ed ) ex c e e d in g 6 mo n t h s and not e xceeding 2 y ear s (c)Co mpl etion period (as @ ¼ percent origin all y stipulat ed p er w e ek o r as ex t en d ed ) exc e ed in g 2 y e ar s th e u n d er noted p er centag e o f the Con tra ct V al ue o f the it e m o r g r o u p o f ite ms o f W o r k f or w h ich a s ep ar ate p er io d o f co mp let io n is g iv en . W h en th e d e l a y i s n o t a f u l l w e ek o r i n mu l t i p l e o f a week but involves a fraction of a w eek the co mp ensatio n p ay ab le f o r t h at f r a ct io n s h al l b e p r o p o r t io n a l t o th e n u mb e r o f d a y s in v olv e d . P r o v id e d a l w ay s t h at th e to t a l a mo un t o f co mp e n s at io n f o r del ay to be p aid this conditio n shall no t ex ceed ( a) C o mp l e t i o n per io d ( a s 1 0 p e r c e n t o r i g in a ll y st ip u l at ed o r as e x t e n d ed ) . N o t e x c e ed i n g 6 mo n th s ( b) C o mp l e t i o n p e r i o d 7 ½ p er c en t ( as o r i gin al ly stip u la t e d o r as ex t e n d e d ) ex c ee d in g 6 mo n th s an d n o t ex c eed in g 2 y ea r s ( c) C o mp l e t i o n p e r io d 5 p e r c e n t( a s o r ig i n al ly s t ip u l a t ed o r No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 68 of 194 ARCHITECT : THE FIRM as ex t en d ed ) exc eeding 2 y ear s The a mo unt o f l iqu ida ted d amag es ma y b e ad jus ted s et o ff ag a in s t an y s u m p ay a b l e to th e Co n t r a c to r u n de r th i s o r an y other contract w i th the corporation o r f ro m th e se curi ty d ep o s i t o f th e C o n t r a c to r en ti r e l y a t th e d i s cr e t i o n of th e co r p o r at io n . PART – V B I L L S A N D PA YME N T S 91. Metho d Measure men t 92. Re co r d s an d Measure men t Signature of Tenderer of E x c ep t w h er e an y g e n er a l o r d et ai le d d e s c r i p tio n o f t h e Work in b il ls of q u a n t i t i es o r s ch e d u l e of Works/it ems / qu an t ities express ly s how n to th e contr ary , b il ls o f q u an t it i e s s h a l l b e d e e med t o h a v e b e en p r ep ar ed an d mea s u r e men t s s h al l b e tak en in a cco r d an c e w i t h th e procedure s et forth in the s chedule of r ates /sp ecifi c at io n s n o tw i th s t a n din g a ny p r o v isio n i n t h e r e l ev a n t s t an d ar d Method of Measuremen t or any gen eral o r lo cal custo m. I n th e c as e o f ite ms , w h ic h ar e n o t co v er e d by t h e s c h e d u l e o f r at es / s p e c if i c a t i o n s , me as u r e me n t s h a l l b e ta k en in a c co r d an c e w i th th e re l ev a nt S t a n d a r d sp e cif i c a t io n s publis h ed by PW D G o v t . o f Ma h a r a s h tra and f o r the w or ks n o t co v er e d in t h i s p u b li c a ti o n ; me a s u r e me n ts sh al l b e tak en a s p er th e co d e s b y B u r e au o f I n d i an s t an d a r d s . The C o n t ra c t o r s h a l l s u b mi t to t h e E n g i n e e r th e mont hly s ta t e me n t s o f t he e s t i mat ed v a lu e o f th e w o r k c o mp l e t e d less th an the cu mu lativ e a mo unt c ertified p r evi ously . The mo nth ly stat emen ts shal l b e in the b ill f or m s p ecified by th e E n g in e er an d it s h a l l b e s u b mi t t e d o n o r b efo r e t he d a t e in s t r u c t ed by th e E n g i n e e r . T h e s e m o n th l y b i l l s s h a l l b e s u p p o r t e d w i th d e t a i l e d mea s u r e m e nt s fo r th e g r o s s q u an t ity o f th e w o r k d o n e d u ly d e d u ct i n g th e gr o ss q u a n t i ty p ai d in t h e p r e v io u s b i l l . T h e Co n tr a ct o r is pe r mit te d to co p y d o w n th e co r r ec tio n s in t h e b il ls p a i d a s p er t h e Engineers certification. U pon rece i pt of the b ill and me a s u r e men t s b y the C o n t r a c t o r s , th e En g i n e e r sh a l l a c ce p t as o ther wise st ated as ce rtain an d deter min e by me a s u r e men t th e v al u e i n ac co r d a n c e w it h th e con t r ac t o f work done in a ccordan ce th e rewith. A l l i t e ms h a v in g a f i n an c i a l v al u e s h al l be en t e r ed in me a s u r e men t B o ok et c . a s p r e s c r ib e d by th e co r p o r atio n s o th a t a co mp l e t e r e c o r d is o b ta in e d of all th e Wo r k s p er f o r me d u nd e r th e co n tr a c t . Meas ur e ments s hall be t ak en join tly by th e Eng i ne er o r hi s o r g a n i z a t i on r ep r e s en t a t i v e a n d by th e Co n tr a cto r o r h i s o r g a n i z a t i on r ep r e s en t a t iv e . Be f o r e t a k i n g me a s u r e me n t s o f an y w o r k th e E n gi n e e r or t he p er s o n d ep u t ed b y h i m f o r t h e purpose shall g ive a r eason able n o tice to th e Co n tr actor. I f th e C on tr a c to r f ai l s to at t e n d o r s e nd an o r g a n i z at io n r ep r e s en t a t iv e fo r me a s u r e m en t af t er su ch a n o t i c e o r f a il s to co u n t e r s i g n o r t h e o b j e c t io n w ith in a w ee k f r o m t h e d a t e o f me as u r e men t, th en in an y s u ch ev en t me as ur e men t tak en by th e E n g in e er o r by th e p e r s o n dep u te d b y h i m s h a l l b e tak en to b e corre ct me asure ments o f the w o rks and shall b e binding o n th e C o n t ra c to r . T h e C o n tr a c t o r s h al l, w it h o u t an y ex t r a ch ar g e , pr o v i de as sistance w ith every applia nce an d o ther thin g s n ecessary No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. 93. P ay men ts o f Bil ls a n d O th e r C l ai ms 94. F u l l P r o v i s io n s Signature of Tenderer Page 69 of 194 ARCHITECT : THE FIRM f or me a s u r e me n ts. M e as u r e me n ts s h al l be s i gn e d an d da t e d b y b oth p a r t i e s e a ch d ay ( o f t a kin g me as ur e me n t) o n t h e s i t e o n c o mp l e t io n o f me a s u r e me n t. The p ay ment of b il ls and o ther cl ai ms aris ing out o f th e co n t r a c t w il l be mad e b y Ac c ou n t P a y ee Ch eq u e d r aw n i n th e n a me o f ‘ A g en c y . Th e r a t es in s e r t e d b y th e co r po r a tio n a g a in s t v ar io u s it e m s o f W o r k d et a i l ed in v a r io u s p ar t s of s c h ed u l e d s ha l l b e dee me d to inc lud e every allo wanc e ne cessary , w ithout ex tr a me a s u r e men t o r ch a r g e f o r me e t i n g t h e r e q u ir e me n t o f v ar i o us c o mp o n e n t s / p a r ts o f t h e co n tr a c t d o c u men t s ( v i z p ar t i c u la r sp e cif i c a t io n s , P W D o f st a n d a r d sp e c i f ic a t io n s , Mahar ash tra s ched u le o f rates, MO ST specifi cations, BIS spec ifi cat ions, Special Cond itions , prea mb les and notes to s c hed u l e o f it e ms d es c r ip t io n o f s c h ed u l e i t e ms w h ic h s h al l al l b e r e a d to g eth er an d a ny o r o f t h e f o l l o w in g u n le s s s p ec i f i c a l ly pr ov i d ed f o r th e co n t r a r y . a) C o mp l i a n c e w i t h al l th e co n d it io n s of co n t r a c t in c lu d in g G e n er a l C o n d i tio n s o f C o n t r a c t , s ch e d u le o f r at e s an d Q u a n ti ti es , P a r ti cu l ar S p ec i f i c a t io n s , D r aw in g s i nc l ud i n g N o tes t h er e o n , S p ec i f i c a t i o n s in s ta n d ar d S p e ci f i c a t io n s o f P W D o f Mah a r as htr a an d M J P r e l ev a n t I n d ia n S tan d a r d S p ec if i c a t i o n s w h e r e v er ap p l i c ab l e. However, in cas e of any d iscrep ancy between d rawing a nd t e n d e r , th e te n d er i t e m an d s p e ci f i c a t i on s h al l p r ev a il . I f th e r e i s di s c r ep a n cy in te n d er s p e c i f ic a t io n s , t he o r d e r o f p r e f e r en c e s h a ll b e 1 s t specificat ion of M a h ar as h tr a S ta t e P W D , M JP , M O S T a n d l a s t ly B I S . b ) A l l l ab o u r , ma t er i a l s , t oo l an d p l an t s , e q uip me n ts an d t r a n s p o r t w h ich ma y b e r e q uir e d in p r e p ar a t i o n f o r an d in the ful l and entire exe cu tion and c o mpl et ion of the Works includ ing wastag e of mat er i als, c arriag e an d c ar t ag e , c a r r y i n g i n , r et u r n o f e mp t ies , h o i s ti n g , se tt in g , f ix t u r es a n d f i tt in g s i n po s it i o n . c) Lo c al co n d it io n s: N atur e o f W o r k s, lo cal f ac il it ies fo r supply of labour and ma t er ials acces sibility ’s to sites a nd a ll oth er ma t t e r s ef f e ct in g th e ex e cu t i o n an d co mp let io n of the Works d ) D u t ie s et c : P ay me n t s of any O ct r o i, T er mi n a l T a x , S a l e s T ax , Tu r n o v er T a x , Co n t r a c t S a l e s T a x , T o ll T ax , G r o u n d R e n t, R o y al ty , En v i r o n me n t a l C es s , L o c a l Bodies Cess, Tax es o r any duties on ma t er ials obtain ed f o r t h e W o r k s an d a ny d u ti e s in r es p e c t o f p at en t r i g h ts . e) S u p er v i s i o n : Co mp et e n t s u p er v i s i on o f th e W o r k f) Labour: R e a s o n ab l e t e r ms an d c o n d it io n s of emp loy me nt, l iability to pay co mp ens at ion, W ages as per sta tut ory enactmen t’s, te mpor ary acco mmodation , s a n i t a t io n , c o mp l i a n c e w ith c o n tr a c t lab o u r a c t 19 7 0 ( R eg u l a t i o n a n d A b o l i t io n ) . g ) W a t er : P r o v is i o n o f al l w at er r e q u ir e d in c lu d i n g t e mp o r a r y plu mb i n g an d co n n e ct io n . h ) Te mp or a r y W o r k S h op s , S tor e s , O f f i ces , L ab o u r C a mp s e t c . P r o v is i o n s o f s u ch s tr u c t u r es r eq u i r e d f o r e f f i c i e n t e x e c u t i o n o f th e Wo r k s an d r e mo v in g a n d c l e a n in g u p No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 70 of 194 ARCHITECT : THE FIRM s ite o n co mp l et ion o f Wo r k s . i) Precau tio ns Against Risks: Precau tio ns to prevent loss o r d a ma g e f r o m a l l o r an y r i s k , in s u r a n c e o f s h e d s o r any temporary acco mmo dation provided by th e c or p o r a t i o n w a t c h in g an d lig h tin g , p r o v i s i o ns p er t a i n in g t o t h e G e n er a l C o n d it i on s o f C o n tr a c t . j) N o t ic es , F ees et c. : C o mp l i a n c e w it h st a t u to r y p r o v is io n s o f r e g ula t i o ns an d / or by e law s o f a ny lo c a l au t h or i ty a nd / o r a n y p u b li c s e r v i c e co mp any o r a u th o r i ty af f e c t ed by th e W o r k s . k ) S e tt in g th e W o r k s i n clu d in g al l a p p ar a tu s r e qu i r ed . l) S i te D r ai n ag e : R e mo v a l o f al l w a t e r th at may a c c u mu l at e d u e to s p r in g , s u b so i l w a t e r , f lo o d /t i d e s an d a ny o t h er c au s e s o n th e s it e d u r in g th e p r og r e s s o f th e W o r k . m) Execut io n of W ork in Work man lik e mann er, f acilities for inspection et c. n ) R e c t i f i c a t i o n o f ba d Wo r k : Re ct if i c a t i o n a n d / o r r e mo v a l a nd r e c on st r u ct io n o f any Wo r k w h i c h ( a s d e c i d ed b y t he E n gi n e e r ) h as b e e n ex e cu t ed w it h u n s o u nd o r i mp er f e ct mat er i a l s o r u n s k il le d W or k ma ns h i p o r o f a q u al it y in f e r io r to th a t c o n t r a c t e d f o r , w h eth er d u r in g c on s tr u c t i o n o r r eco n s tr u c t i o n pr i o r to th e ex p i r y of t h e D e f ec t L i a b i l i t y p e r io d . o ) R es p on s ib il i ty f o r d a ma g e s an d l o s s o f al l co n s t r u ct io n mat er i als et c., at the sit e until h a nding ov er to the c orp o r a t i o n. p ) R e mo v a l o f Ru b b is h : R e mov al o f Ru b bis h & d e b r is & c l e an i n g o f an y d irt b ef o r e h an d i ng o v er al l c o mp l et io n of woks. q ) C l e a n i n g s i t e an d Wo r k s : R e mo v al b y th e Co nt r a c t or of f the s it e, of any tools , p lats & mat er ials and s w eepin g b u il d in g , w as h in g f l o o r s , c l e a n in g jo i ne r i e s & r e mo v al o f s p l as h es o f as p h al t le a vi n g t h e w h o le s it e ne a t an d tidy . r ) Co mp letion: Co mp leting th e Work to the s atisfaction of the En g i n eer o n o r b ef o r e stip u l at ed th e d at e o f co mp let io n . s) Difficul t position: A cc essibi lity o r otherw ise to s it e, e asy o r d if f ic u l t p o s it io n i n W o r k s . t) E r r o r s : R e ct if i ca ti o n o f al l d ef e ct s d u r i n g co n st r u ct io n & d e f ec t l iab il i t y per i od t o t h e s a t isf a ct io n o f E n g i n e e r . u ) Cu r ved W or k s et c. W o rk s of an y q uan tity , s ize o r sh ap e w h e th er l e v e l , in c l i n e d , c u r v ed , b at ter ed e t c . v ) M a k er ’ s I n s t r uct io n : Co mp li an c e w it h ma k e’ s ins tructions in th e case o f proprietary articl es , f ac tory mad e goo d of precast ite ms . w ) W a s t e: A l l w a s t e lap s , s e a ms , join ts ( r o u g h o r f a ir c ut t in g ) s tr a ig h t / r a k i n g , c ir c u lar an d ma k in g g o o d . x ) A r tif ic i a l Li g hts : To i n c l u d e al l l i g h t in g /K e r o s e n e o r ele ctr ic p ower as the cas e may be w hen need a rises for use of l ig h t in g w h i l e c a r ry i n g o u t W o rk s . Co n s tr u c t i o n of ap p r o a c h e s to th e s i t e o f W or k. M a k in g a r r a n g e m en t s f o r p r o p er a c c es s to W or k s in t h e f o r m o f stairs, l ad d er s , lifts etc. as o rdered b y the Eng in e er – in – C h a r g e f o r pr op er s u p e r v is io n s , t es t i n g an d o r i ns p e c t i o n of Wo r k s in c l u d in g mat e r i al d u r in g Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 71 of 194 95. I n te r i m P a y men t 96. Mo d i f ic a t io n I n ter i m Certifi cat e. 97. I n co me T ax 98. P ay men t o f Taxes Signature of Tenderer of ARCHITECT : THE FIRM cons tr uct ion & def ect li ab ility per iod. I nte r i m b i ll s sh a l l b e s u b mi t t ed b y th e Co n tr acto r f r o m ti me to t i me (b u t a t an i n t e r v al o f n o t le s s th a n o n e mo n t h ) f or th e W o r k s e x e c u t ed . T h e En g i n e e r sh a l l a r r a n g e to h a v e th e b i l ls v e r if i ed b y t ak i n g o r c au s i n g to b e t a k en , w h e r e neces s ary , the r eq u isite me asure me n t o f Work. The jo i n t measure men t sh al l not b e an excuse f o r the Co ntractor to s u b mi t in t e r me d ia t e b i l l s at mo n th ly o r in t e r v a l s n o t le s s th a n a mo n t h . A l l in t er i m b i l ls s h a l l b e f ir s t s u b mi t t ed b y th e C o n tr a cto r w i t h d e t a i l e d me a s u r e me n ts an d t h er e a f t er o n ly th e E n g in e e r o r h is o r g an i z a t i o n r e p r es e n t a t iv e s h al l c a r r y o ut jo in t v er i f i c a t io n s o r o t h er w i s e o n r e c o r d in t h e me a s u r e men t bo o k b ef o r e c e r t i f i c at io n o f th e b i l l s . Pay men t on accou n t for a mount ad mi s s ible shall b e ma d e o n th e E n g i n e e r cer tif y in g t h e s u m t o w h i ch th e Con t r a c t o r is cons id e red entitl ed b y w ay of interi m p ay me n t for al l t he Wo r k exe cu ted , a f ter d ed u cting th er e f ro m th e a mo u n t alr ea d y paid , t h e s e cu r it y d e p o s it /r e t e n tio n mo n ey an d s uc h o th e r a mo u n t s a s ma y b e d e d u ct ib l e o r r eco v er a b le in t e r ms of the con tr act. N o in t e r i m p a y me n t w i l l b e ad mi t t e d u n t i l s u ch ti me t h e C o ntr a c t o r h a v e f u l ly c o mpl i e d w i th t h e r e q u ir e me n t o f t h e C o nd i ti o n 8 4 c o n c e r nin g su b mis s io n a n d a p p r o v a l o f N e tw o r k S ch e d ul e f o r th e W o r ks , as d et a il ed i n Co n d it io n 83. A f ix e d s u m s h a l l b e h e l d i n ab ey an c e a t th e t i me o f n e x t in t er i m p ay men t f o r n o n at t ain me n t o f e a c h mi les t o ne in t h e N e t w or k an d s h al l b e r e l e a s e d o n l y o n a tt ai n men t o f th e s aid milestone A n in t er i m c er t if i c a t e g iv e n r e l a t in g to W o r k d o n e or ma ter ial d eliv er ed may b e mo d if ied o r co r r ec ted by any subsequen t interi m certificate or b y the fin al certific ate. N o cer t if ic a te o f t h e E n g in e er s u p p o r tin g a n in t er i m pay men t shall of its elf b e con clusiv e ev iden ce th at an y W o r k o r mat e r i a ls t o w h i ch it r el a t e s is / a r e in a cc o r d a n c e w ith th e co n tra ct. The Contractor shall pay Indian Inco me Tax on al l p ay men t s ma d e t o h i m u n d er th e Co n t r a c t, o th e r t h an r ei mb u r s e me n ts ma d e to h i m by th e Co r p or a tio n to c o v e r p ay men t by Co n tr a cto r o f mi n o r cu s to m d u t i e s e t c . , o r any o th e r p ay me n t w h i c h t h e C o n t r a c to r may ma k e o n t h e C o r p o r a ti o n ’ s b e h a l f . U n d e r t h e p r o v isi o n s of S e c. 1 9 4- C o f th e I n d ia n I n c o me T ax A ct , th e Co r p o r atio n is r eq u i r e d to de d u ct T ax w i t h su r c ha r g e at s o u r c e at p r ev a i l in g r at e s fro m th e g ross amo unt of each bi ll sub mit ted. A ny ex p atr i a t e si te s t af f o r st a f f no t n o r mal ly r es i d e n t s o f In d i a, e mp lo y e d by t h e C o n t r a c to r sh a l l p ay p e r s o n al I nc o me T a x o n a ll mo n e y e ar n e d an d p a i d in I n d ia . T h e Co n t r a c to r s h a l l p er f o r m s u ch d u t i e s in re g a r d to s u ch d e d u ct io n s th e r eo f as may b e imp o s e d o n h i m b y su ch l aw s an d r eg u l at io n s . The contractor shal l p ay all t he taxes d irectly to r es p e c t i v e o r g a n i z a t i on s & t o th e G o v e r n men t. T h e C o r p o r at io n s h a l l not take any responsibility f or any k ind of tax p ay men t to th e G o v e r n men t o r s e mi G o v er n me n t b o d ie s a t a ny p o i nt o f ti me . No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. 99. 100. 101. D e d u c t io n o f Contra ct S ales T ax / T u r n o ve r tax . P r o v is io n a l S u ms. Ra te s f o r E x c e s s i n I t e ms . Signature of Tenderer Page 72 of 194 ARCHITECT : THE FIRM The prices quot ed by the Contractor shall include all cu s t o ms d u t i e s , i mp o r t d u ti es , ex c i s e d u ti es , b u s in e s s tax es , in co me an d o th er tax es th at may b e lev ied in accord ance to th e laws an d regulation in-force on t h e C o ntr a c t o r ’ s E q ui p men t, ma t er i a l s , s u p pl i e s ( p er man e n t, te mp o r a r y an d co n su ma b l es ) to b e u s e d o n o r f u r n is hed u n de r th e co n tr a c t an d o n th e s e r v i c es to b e p e r f o r med u n de r th e con t r ac t. N o t hin g i n th e co n t r ac t s h a l l r e li ev e t h e contr a c to r f ro m h is r es p o n s ib i l i ty t o p a y an y ta x th at m ay b e l ev i ed o r o n pro f i ts ma d e by h im i n r e s p e c t o f t h e co n t r a c t. T h e c o n tr a cto r sh a l l per f o r m su ch d u t i es i n r e g a r d to su c h d ed u c t i o n s th e r eo f as may b e i mp os ed o n h i m b y s u ch la w s an d r eg u l at io n s . Char g es on ac co u n t of O ctroi, ter mi nal or S ales T ax and o th e r du t i e s o n mat er i al o bt a in e d f o r t he W o r k s f r o m an y s o u r ce in c l u d i n g t he t a x a p p l i c ab l e as p er M ah a r as h t r a S a les T ax A ct o n t h e tr a n s f er o f p r op e r ty in t he g o o d s in v o l v e d i n th e ex e cu t io n o f W o r ks con t r ac t ( r e - en a c t e d ) A ct, 1 99 1 etc. sh a ll b e b or n e by th e Co n tr acto r . U n d er th e p r o v i s i on s o f th e Ma h ar a s h tr a S a l es T a x A ct, t h e C o r p o r a ti o n i s r eq u ir e d to d e d u ct T u r n o v er T a x at s o ur c e a t th e rat es prevailing at th e t ime of p ay men ts. T h e co n tr a cto r s h al l s u b mit f o r m – 3 1 o r s u c h o th er f or ms as ar e p r e s cr i b ed u n d e r t he s a i d ac t w h i ch is r e q u ir e d t o b e p r o d u c ed by t h e p r i n c i p l e e mp lo y e r in th e e v e n ts o f an y notic e by th e S a l e s Ta x D e p a rt me n t w i th i n o n e mont h of iss u e of lett er of ac ceptan ce. T h e C o nt r ac t or s a r e r eq ui r e d to pr o d u c e t he i r r e g is t r at i o n f or co n t r a c t s al es ta x /tu r no v e r t ax t o th e d e p ar t me n t b e f o r e r el ea s i n g th e 1 s t R. A . b il l f o r th e W o r k ex e c u t e d by them, f ai l i n g w h ich , n o p ay me n t s h a ll b e r e l ea s e . ( 1) ” P r o v is io n a l s u m” me a n s a su m in clu d ed i n th e co n t r a c t and so d esign at ed in the Bi ll of Q uantiti es f or the e x e c u t i o n o f W o r k o r su p p ly of go o d s , ma t e r i a ls o r s e r v i c es o r f o r co n t in g e n ci es , w hi c h s u m may b e u s ed , i n w h o l e o r in p ar t , o r n o t a t al l, at t h e d ir e ct i o n an d d is cr et i o n o f th e E n gi n e e r . T h e co n t r a c t p r ic e s h a l l inc lud e only such a moun ts in respect of the Work, s u p p ly o r s e r v i c e t o w h i ch s u c h p r o v i s i o n a l s u m r e l a t e as th e E ngineer shall approve o r det ermin e in a ccord ance with thi s claus e. (2) In r espect o f every provision al su m t h e En gine er s h al l hav e power to or der to ex ecute th e W ork, inclu d in g g o o d s , mat er i a l s o r ser v i c e s t o b e s u p p l i e d by th e Contra cto r. The co ntract p r ic e s hall includ e th e value of s u c h W o r k ex e cu t e d o r s u ch g o o d s , mat e r i a l o r s e r v i ce s s u p p li e d d e t e r mi n e d i n a c c o r d an c e w i t h C l au s e N o . 1 02 . ( 3) T h e C o n tr a cto r s h a l l p r o d uc e al l q u ot a t i o n s , i n v oi c es , v o u ch er s an d a c c o u n ts o r re c e ip t s in c o n ne c ti o n w i th exp enditu re in resp ect of provision al s u ms . Q u an t i t i e s s h o w n i n th e ten d e r ar e a p p r o x i ma t e a n d n o cl ai m sh all b e en te r tained f o r quant it ies of w ork ex ecu t ed b ei n g e i t h er mo r e o r l e s s th a n t h o s e e n ter ed i n t h e t en d er o r es tima t e . For p u rp o s e of th is co n t r a ct, the No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. 102. Ra te s f o r E x tr a I t e ms . Signature of Tenderer Page 73 of 194 ARCHITECT : THE FIRM v ar i at io n s / d ev i at io n s in c a r r y i n g o u t th e i t e ms o f w o r k shal l not ex ceed p lus or min us 25 perc en t of co n tra ct su m. T h e d e v ia ti o n /v a r i a ti o n i n th e q u a n ti ty o f in d i v id u a l i t e ms s h al l n ot b e ta k en as d e v ia t i o n o r va r i at io n i n th e co n t r a c t. The diffe r en c e be t ween th e total v al ue o f the work d on e an d th e C o n tr a c t su m as d ef i n e d a b o v e w i ll b e o n ly b e co n s i d er e d f o r d ev i a t i o n/v ar i at io n . The Contractor shall arrive a t th e rat es after careful ly p r e p a r i n g th e r a t e an al y s is t a kin g i n t o co n s i de r a t i o n s i t e co n d i tio n s . F o r i n c r e a s e u p t o 25 p ercent ov er t he qu an tity s h o w n i n th e b i l l o f q u an t i t ies s h a l l b e p a i d a t, t h e r a t e me n ti o n ed i n th e bi l l o f qu a n t i ti e s . H o w e v er , i f t h e q u an t ity i n cr e as e s b ey o n d 25 p er c en t o f qu a n t i ty sh ow n in th e b ill of quantit ies th e excess quantity bey ond 25 percen t s h al l b e p r i c ed a s u n d e r : The r at e s hal l b e worked out b ased on s ch edu le r a te wi th C o ntr a c t o r ` s q u o te d p er c en ta g e o r cu r r en t d i s t r i c t s c h ed u l e of r at es w ith o u t C o n t ra c to r `s q u o t e d p e rc e n t a g e, whi ch ev er is l es s. Rates for such addition al al tered or, s ubstituted Work s hall be d eter mined as follo w s: i) I f r at e f o r ad d it i o n a l, al t e r ed o r s u bs ti tu t ed i t e m of W o r k is specifi ed in th e bil l o f quant ities and rat es, th e C o n tr a c t o r sh al l c a r r y o u t th e ad d i t i o n a l , al t e r ed o r s u b s t it u t e d it e m at th e s a me r a t e , s u b j e ct to 1 0 0 a b o v e. ii) I f r a t e f o r a ny a d d it io n a l, al t e r ed o r s u b s ti t u t e d i te m o f Work is not inclu d e d in the b ill of quanti ti es an d rates, s u c h i t e m o f W o r k s h a l l b e c ar r i ed o u t at th e r el ev a n t C o r p or a ti o n ’ s s ch e d u l e of r a te s ( P u b li c works D e p ar t me n t and M. J . P . s c h ed u l e o f r a t e s fo r Th a n e District) prevailing at th e ti me of execu t ion of extr a W o r k ( Q uo t ed p e r c e nt a g e w i ll no t b e a pp l i c a b l e ) ii i) I f th e r ate f o r any ad d it io n a l, al ter ed o r s u bs titu t ed i t e m o f W o r k c a n n o t be det er mi n e d in t h e ma n n er s p e c i f i e d in ( i ) & ( ii ) ab o v e, o r th e r at e s o d et er min ed i s f o u n d to be u n r e a s o n ab l e, th e n th e Co n t r a c to r w i ll b e p ai d at s u ch f a ir an d r ea s o n a b l e r a te s as W o r k e d o u t b y t he E n g i n e e r o n t h e b as is o f ma t e r ial , l ab o u r an d o p er a tio n s o f co ns tr u c t i o n eq u ip me n t r e q u ir e d to e x e c u t e t h e it e m an d a l lo w i n g 1 0 p er c en t t o co v e r p r o f i t s an d o v er h e a d c h a r g es . (iv)The C o ntractor s hall sub mi t to th e Engin eer h is d eta il ed r at e an al y s is f o r c a r r y in g o ut v ar i a t io n du ly s up p o r t ed w i th q u o t a t i o n s an d o th e r s u pp o r t in g d o cu me n t s w i th i n 7 d ay s o f w r it t e n i n s t r u c ti o ns to c ar r y ou t v ar i a t i o n s . I f the C o n tr a c to r’ s q u o t a t io n i s u n re as o n ab l e , th e E ngineer orders the v ar iatio n and ma kes ch an g e to the contr ac t p r ic e w h ich i s b a s e d o n h i s o w n f o r e cas t o f t h e v ar i at i on s o n th e C o n t r a c to r ’ s co s t. I n c as e , th e r a t e s d e c i d e d by th e E n g in e er a r e no t a c c ep t ab l e to t h e C o n tr a c t o r, h e sh al l co n t i n u e w i t h th e w o r k an d mai n t a in co n t e mp o r ary r e co r d s o f ac t ua l ex p en s es o n day - to-day b asis w ith jo in t ass ess ment/ v erif ication . T he C o n t r a c t o r is n o t en ti tl e f or p a y men t of ac tu a l e xp en s e s as p e r jo i n t r ec o r d s ad d e d w i t h 1 0 % f or p r of i t No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. 103. O v e r p ay men t an d U n d e r pa y men t 104. P ay men t o f F i n al Bi ll Signature of Tenderer Page 74 of 194 ARCHITECT : THE FIRM and ov erheads. D is agre e me n t with the r at e fix ed by the E ng i n e e r sh al l b e in f o r me d by t h e C o n tr a c t o r b e f o r e c o m me n c i n g t he w o r k o f v ar i at io n s , f a il in g w h i ch t h e r at e fi x ed by t he E n gin e e r s h a l l b e f i n a l an d b i n d i n g o n the p art ie s to contract. Whenev er any clai m f or th e p ay ment o f a s u m to th e C o r p o r a ti o n r is es o ut o f or u nd e r t h is co n t r ac t ag a ins t th e C o ntr a c t o r th e s a me may b e d e d u c t e d by th e Co r p o r at i o n f ro m an y s u m th en du e o r w h ich a t an y ti me th er eaf ter ma y b e c o me d ue to t h e C o ntr a c t or u n d er th i s co n t r a c t an d f ai l i n g th a t u n d er any co n tr a ct w ith th e C o r p o r a ti o n o r f r o m an y ot h er su m d u e to t h e C o n tr a cto r f r o m t h e C o r p o r a ti o n ( w h ic h may b e a va i l a b l e w i th th e Co r p o r ati on ) o r f r o m h is s e c u r it y d ep o s i t/ r et en t io n mo n e y , or h e s h a l l p ay th e cl a i m on d e ma n d . T h e Co r p o r at i o n r e s er v e s th e r i g h t to c ar r y ou t p os t pay men t au d i t an d t e c h n ic a l ex a mi n a t io n o f th e f i nal bi l l inc lud i n g al l s u p p o rt i ng v o u c h e r, a b s t r a c ts e t c . Th e C or p o r a ti o n f u r th e r re s e r v es th e r ig h t to en f o r c e r ec o v ery o f a ny over p ay men t w h en d e te c t ed . I f as a r es u l t o f s u ch au d i t a n d t e c h n i c a l e xa min a ti o n an y o v er p ay ment is d i s c o v er e d i n r es p e c t o f any W or k d o n e by th e C o n tr a cto r o r a ll e g e d t o h a v e b e e n d o ne by h i m u n d er th e C o n t r a c t , i t s h a ll b e r e c o v er e d by t h e Co r p o r a t io n f r o m th e C o n tr a cto r by a n y o r al l o f t h e me t h o d s p r e s cr i b ed ab o v e o r i f u n d e r pa y men t is d i s c o v e r e d th e a mo u n t s h a l l b e duly paid to th e Co ntractor b y th e Corporation. P r o v id e d t h a t th e af o r es a i d r i g ht o f th e C o r p o r atio n t o ad jus t o v erpay ment ag ainst a moun t d ue to th e Contractor u n de r an y o t he r co n t r a c t w i t h Co r p o r atio n s h a l l no t ex t en d b ey o n d t he p er io d o f tw o y e ar s f r o m th e d a t e of p ay men t o f the fin al bil l o r in case th e final bill i s a “Minu s” bil l, fro m the d at e o f the a mo unt pay ab le b y the Contra cto r u nder the “M inus ” bill is co mmu ni cated to th e Contractor. A ny a mo u n t d u e t o th e C on tr a c to r u n d er this c o ntr a c t f o r u n de r p ay me n t may b e ad ju s t e d a g a i ns t a mo u n t th e n d u e o r which may at an y time thereafter beco me due b ef ore p ay men t i s to t h e Co n t r a c to r , f r o m h i m to C o r p o r atio n o n an y other contract o r A /C whats oev er F in a l j o in t me asu r e me n t a lo n g - w it h re p r es en ta t i v e s o f t h e C o ntr a c t o r s h o ul d b e t ak en , re c o r d e d an d s i gn ed b y the C o n t r a c t o r s . Co n tr a cto r sh o u l d s u b mi t th e f i n a l b i l l w it h i n 1 mo n th o f p hy sic a l c o mp l e t i on o f th e W o r k. If t h e Contractor f ails to sub mit th e fin al b i ll w ith in 1 month, t h e C o r p o r a ti o n s t af f w il l p r ep a r e th e f i n al b i l l b a s e d o n t h e join t mea s ur e ment w ithin n e xt 3 mon t hs . Engineer’s d ecis ion s hal l b e final in respe ct o f cla i ms fo r d ef e ct an d p e n d in g cl a i ms a g ain s t C o n t r a c to r s . N o f ur t her cl a i ms sh o u l d b e ma d e b y th e Co nt r a c t or af t er su b mis s i o n of the f in al b ill an d th es e s h al l b e d ee me d to h av e been w a iv e d a n d e x t i n g ui s h e d . P a y men t o f th o s e i t e ms o f t h e b il ls in r e s p e c t o f w h ich t h e r e i s n o dis p u t e an d of it e ms in d is p u t e, fo r qu a n t i t i e s a n d r at es a s ap p r o v e d b y t h e C o m mi s s i o n e r s h a l l be ma d e w i th i n a r e a s o n ab le p er i o d a s may b e n e c e s s a ry f or th e p ur p o s e o f v e r if i c a ti o n e tc. No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. 105. 106. 107. Page 75 of 194 ARCHITECT : THE FIRM A f ter p a y me n t o f t h e f i n a l b il l as af o r es a i d h as be e n ma d e, the Con tr actor may , if h e so d es ir es, re cons id er h is posit ion in re s p e c t o f a d i s p u te d p o r t i o n o f th e f i n al b i l l an d if h e f ails t o d o s o w i th i n 8 4 d a y s , h is d is p u t ed cl a i m s h al l b e d e a l t w i th as p r o v i d e d in th e co n t r ac t. P r i ce V a ri a t i o n P r ic e V ar ia t io n C l a u s e sh a l l b e app l ic a bl e a s p e r co n d it io n Cl au se of Contra ct as at tached. Re ceip ts to be Ev e r y r e cei p t f o r mo n ey w h ich may be co me p a y a b le o r fo r S i g n ed i n F i r m’s an y secu rity w hich may be co me transfer able to th e N a me by an y O n e C o ntr a c t o r u n de r th es e p r e s e n t sh a l l, if sig n e d i n t h e o f th e P ar t n er s p ar t n e r s h i p n a me b y a ny o n e o f th e p a r tn e r s , b e a g o od an d s u f f ic i e n t d is ch a r g e to the Co mmis s i o n e r a n d C o r p o r at i o n in r e s p ec t o f t h e mon e y o r s e c u r i t y p u r p or t i ng t o b e a c k n o w le d g ed th e r eb y , an d i n the ev ent o f d e a t h o f an y o f th e p ar tn er s d u r in g t he p e n d en c y o f t h is co n t r a c t , it is hereby expres sly agreed tha t e v ery receip t b y any o n e o f th e s u r v i v in g p a r tn e r s sh a ll, if so s i g n ed a s af o r e s a i d , b e g o o d an d s u f f ic i en t d is ch ar g e a s af o r e s a i d p r o v i d ed th a t n o th in g i n th is c l a u s e co n t a in e d s h a l l b e d e e me d to pr e ju d i c e o r ef f e c t a n y c l a i m w h i ch th e C o m mi s s i o n e r o r th e Co r p o r at io n may h er e af t er h a v e ag a in s t th e l e g al r e p r es e n ta t i v e s of a n y p a r tn e r s s o dy i n g o r in r espect o f any br ea ch o f an y of the conditio n s ther eof, p r o v i d ed a l s o th at n ot h in g i n th is c l a u s e co n t a i n e d s h al l b e d e e me d p r e j u di c e o r af f e ct th e r e s p e c t iv e r i g h ts o r o b li g a t io n s of th e C o n t r a c to r a n d o f th e l eg a l represen t ativ e of an y deceas ed Contra ctors int erest. PA R T-V I TERMINA TION OF CONTRACT & SETTEL EMENT OF DISPUTES Cancell at ion of I f t h e C o n tr a ct o r : C o n tr a c t i n F u l l (a) At any ti me mak es defau l t i n proceed ing with t he W ork o r in P a r t. w i th d u e di l ig e n c e an d con t i n u e s t o d o s o af te r n o t i c e in w r i ti n g o f f o u r teen d a y s f r o m th e E n g in e er ; o r b) Co mmi t s de f a ul t in co mp l y in g w it h an y o f t he t er ms and c on d i tio n s o f co n t r a c t an d d o e s n o t r e me d y it w it h i n fourteen d ay s after a notice in w riting is g iven t o h i m in t h a t b eh a l f by th e E n g in e e r , o r ( c) F a ils to co mp l et e t he W o r k s o r it e ms w i th i nd i v id u a l d at e s of co mp l e t io n , o n o r b ef o r e t h e d a t e ( s ) o f co mp let io n , an d d o es n o t co mp l et e th e m w ith in th e p er i o d s p e c i f i e d in a n o t i ce g iv e n in w r i t in g i n th at b eh alf b y th e E n g in e e r , o r ( d) S h a ll o f f e r o r g iv e o r ag r ee to g iv e to any person in C o r p or a ti o n ’ s S er v i c e o r to a ny o t her p er s on o n his b eh alf an y g i f t o r c o ns id e r a t io n o f an y k in d a s an i nd u c e me nt o r re w a r d f o r d o in g o r f o r b e ar i n g t o d o o r f o r h a v in g d o n e o r f o r b o r n e to d o a n y ac t i n re l a t io n t o t he o b t a i n in g o r ex e c u t i on o f th i s o r an y o th e r co n t r a c t f o r t h e C o r p o r atio n , o r (e) Shall obt ain a con tract w ith the Corpo r ation as a resul t o f r i n g t en d e r i n g o r o th e r n o n - bo n a - f id e me t h o d s o f co mp e ti ti v e t en d er i n g o r f ) b e in g a n in d i v id u al o r a f i r m, an y p ar t n er th e r eo f , s h a l l a t an y ti me b e ad ju d g e d i n s o lv e n t o r h a v e a r ec ei v in g o r d er o r o r d e r f o r ad min i s t r a t io n o f h i s es t a te ma d e Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. 108. Page 76 of 194 ARCHITECT : THE FIRM agains t him or sha ll t ake an y proceedings f or liquidatio n o r co mpo s i t io n ( o t h er than vo l u n t a r y l i qu id a t io n f o r th e p u r p os e o f a ma l g a mat io n o r r eco n s t r u c t i o n ) u nd e r an y i ns o lv e nc y act f o r th e ti me b e in g i n fo r c e or ma k e an y c on v e y anc e o f a s s i g n men t o f h i s ef f e c t s o r co mp o s it io n o r ar r an g e men t f o r th e b e n ef i t o f h is cr e d i to r s o r p u r p o r t s o to d o , o r if any ap p li c a t i o n b e ma d e u n d e r an y Insolvency A ct f or the ti me being in f orce for th e s e q u es t r a t io n o f h i s es t a t e o r if a t r u s t d e e d b e e x e cu t ed by hi m f o r h is cr e d i to r s , o r g ) Bein g a c o mp a n y , sh al l p a s s a r e s o lu t io n o r th e co u r t s h a l l mak e an o r d e r f o r t h e l i qu i d at io n o f h i s af f a ir s , o r a r e c e iv e r o r a ma n ag e r o n b eh alf of th e d e b en t u r e h o ld e r s s h a l l b e ap p o i n t e d o r c ir c u ms t an c es s h al l aris e w hi ch ent itl e th e Cou r t or d ebentur e h o lders to appoin t a receiver o r a Man ag er, or h ) sh a ll s u f f e r a n e xe c u t i on b ei n g l ev i ed o n h i s g o o d s an d a l l o w it to b e co n t i nu e d f or a per i od o f 2 1 d a y s, o r A s s ig n s , tr a n s f er s , su b l e ts ( eng a g e me nt of la b o u r o n a p ie c e W o r k b as i s o r lab o u r w i th ma ter i a ls no t t o b e i nc o r p o r a t ed in t h e W o r k , s h al l n o t b e d e e me d to b e s u b letting) o r at te mp t s to assi gn, tr ansf er o r s ub-let th e ent ire W orks o r any portio n ther eof w ithout the prio r written approval of the Commis s ion er; th e C o mmi s s i o n e r may , w i th o u t p r e ju d i c e to an y oth e r r i g h t or r e med y w hich shall hav e accrued or shall a ccrue ther eaf ter to the C o rporatio n by w ritten notic e can ce l t he c o n t r a c t as a w h o l e o r o n ly s u c h i t e ms of W o r k in d ef au lt f ro m th e co n tra ct. i) I n th e c as e o f ab an d o n men t o f t h e w o r k o w in g to se r io u s illness or d eath of the Contractor. A ction when In the cases men tion ed in abov e claus e N o. 107 th e whole of S ecurity Engin e e r, o n b e h a l f o f t he N . M . M . C s h a l l h a v e pow er to D ep o sit is to b e ad o p t an y o f th e f ol l ow in g f o r ce s , a s h e may d e e m b es t f o r f ei te d suit ed to the in teres t of th e N . M.M.C. ( a) T o r e s c in d th e co n t ra c t ( f o r w h ich r e s c iss io n n o ti c e in w r i ti n g t o th e Co n tr a c t o r u n d er th e h e a d o f E n g in e e r sha l l b e co n c lu s i v e ev i d e n c e) an d i n th at cas e th e s e cu r ity dep o s i t o f th e C o n t r a c t or sh al l s t a n d f o r f e it e d a nd b e ab so l u t e ly at th e d isp o s a l o f N . M . M .C. (b ) T o c ar ry ou t Wo r k or any p art o f t he d ep ar tmen t al ly d eb i tin g th e Co n t r a c to r w i t h th e co s t of th e W or k , e xp en d i t u r e in cu r r e d o n t o o l s a n d p l a n and ch a r g es o n a dd i tio n a l su p e r v i s o r y s t af f i n c l u d in g th e co s t o f Wo r k charge es t ab l is h me n t e mp l o y ed for g e t t in g the u n ex ecu t e d p ar t o f th e W o r k co mp l e t ed an d c r e d it in g h i m w it h th e v alu e of th e W o r k d o n e d ep a r t me n t a l ly in a l l r e s p e c t s to o r d e r th a t th e Wo r k o f th e Co n t r a c to r b e mea s u r ed u p an d to ta k e s u c h pa r t t h er e o f as s h a l l b e o n execut ed out of his hands, and to give it to anoth er C o n tr a c t o r to c o mp l e t e, in w h i ch c a s e a l l e x p en s e s i nc u r r ed o n ad v er t i s e me n t f o r f i x in g a n ew c o n tr a ct in g a g e n c y , ad d i t i o n a l s u p er v i s o ry s t af f i n clu d in g t h e co s t of W ork ch arge establish men t and a cos t o f Work execut ed by the n ew contrac t ag en cy w ill be d ebit ed to Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. 109 110. A c t io n W h e n th e P r o gr es s o f any P a r ti cu l ar P o r t io n o f th e W o rk is U n s a t is f a ct o r y Co n tr a c t o r Re ma ins Li ab l e to P ay C o mp e n s a tio n i f A c t io n n o t T a k e n Under Clause 108 and 109 Signature of Tenderer Page 77 of 194 ARCHITECT : THE FIRM t he C o n t r a c t or an d t h e v al u e o f th e W o r k d o n e o r e x e c u t e d th r o u g h a n ew C o n t r a c t or sh al l b e c r e d i t e d t o t he C o n tr a c t o r in th e s a me ma n n er a n d a t t h e s a me r at e s a s if i t h ad b ee n ca r r ie d o u t by th e C o n tr a cto r u nd e r th e t er ms o f h i s co n t r a c t . T h e c e r t if i ca t e o f th e E n g i n e e r a s t o th e co s ts an d o th er a ll i e d e x p en s e s s o i nc u r r ed an d a s t o th e v a lu e of t h e W o r k s o d o n e d e p ar t me n t a l l y an d s h a l l b e f i n a l an d c o n cl u s iv e ag a in s t th e C o nt r a c t o r . The c ert ifica te of the E ng in e er as to all th e cos t o f the Wo r k an d o th er ex pen ses in cu r red as af o r es aid f o r o r in g et ti n g t h e u n e x e c u t e d W o r k d o n e b y th e n e w C o n t r a c to r an d a s to th e v al u e o f th e W o r k s o d o n e s ha l l b e f in al an d c o nc l us iv e a g ai n s t th e Co n t r a c to r . I n c a s e t h e c on t r a c t s h a l l b e r e s c i n d ed u n d er c la u s e ( a) a bo v e th e C o n t r a c to r sh al l n o t b e en t it l e to r eco v e r o r b e p aid , an y su m f o r any Wo r k th e r ef o r e a c t u al ly p er f o r me d by h i m u n d er th i s co n tr a c t u n l ess a nd u n ti l the Eng ineer shall h av e cer tif i ed in w riting th e p er f o r ma n c e o f th e s u c h W o r k an d t h e a mo u n t p a y ab l e to h i m in respect th er eof and he shall o n ly b e entitled to b e p a i d th e a mo u n t so c er tif i ed i n th e ev en t o f e it h er o f t he cu r s e s r e f er r e d t o in c l a u s es ( b ) o r (c) b e i n g ad o p t e d a nd th e c o s t o f t h e ex e c u t e d d ep a r t me n t a l l y o r th r o u g h a n ew C o n t r a c to r an d o th e r al l i e d ex p en s es ex c e ed i n g t h e v al u e o f th e su c h W o r k cr e d it ed to th e Co n tr a cto r th e a mo u n t o f ex c e s s s h a l l b e d e d u c t e d f r o m a n y mo n e y d u e to the Contractor, by corporation und er the Contractor o th e r w i s e h o w s oe v e r o r f r om h i s s e c u r i ty d ep o s i t or th e sale p roc eeds th ereo f provided, howev e r , that Contractor shall hav e no c laim ag ainst co rporation ev en if t h e c er t if i e d val u e o f W o r k d o ne d ep a r t men t a l ly o r t h r ou g h a n ew Contra ctor e xc eed th e certified cost of s u ch Work a nd al li ed ex p e n s es , p r ov i d e d alw ay s th a t w h i c h e v er o f t he th r e e co u r s e s men t i o n ed i n cl a u s e s ( a ) , ( b ) or ( c ) is a do p t ed b y t h e E n g i n e e r , t h e Co n tr a c to r sh al l h av e n o c l a i m to c o mp e ns at i o n f o r a n y lo s s su sta i n e d b y h i m b y r ea s o n h i s h a v in g p u r ch a s e d o r pr o cu r e d an y ma t e r i a ls, o r en t er e d in to an y en gag eme n ts, o r mad e an y ad v an ce o n a c c o u n t o f o r w ith a v i e w to th e ex e cu t io n o f th e W o r k o r th e p er f o r ma n c e o f th e co n tr a ct . I f th e p r o g r es s o f an y p a r tic u l a r p o r tio n o f t h e W o r k i s u n s at is f a c to r y t h e c o n d i t io n s men t i o n ed i n cl a u s e 1 0 8 ( b) , b e en ti tl e d to lak e ac t io n u n d er c l a u s e af t er g i v in g t h e C o ntr a c t o r 1 4 d ay s n o t i c e i n w r it in g . Th e Co n t r a c t o r w il l hav e no clai m for c o mp ens ati on, for an y los s s usta in ed b y h i m o w in g t o s uch a c t i o n . I n any ca s e in w h i c h an y of th e p o w e r s c o n f er r e d up o n t h e Engin e e r by c la u s e s 1 0 8 & 10 9 h e r e o f s h al l h a v e beco m e ex e r cis a b l e a n d th e s a me sh a l l n o t h av e be e n ex er c i s ed th e non exer cise ther eo f s hall no t cons ti tut e a w aiv er of any of th e co n d i t i o n s th er eo f an d su ch p o w e r s s h a l l n o t w ithst and ing th e e xcis abl e in the ev e nt of any f u tur e c as e o f d e f au l t by t he C o n tr a c t o r fo r w h ic h u n d e r a n y cl au s e h er e o f h e is d e c l ar e d l i a b le t o p a y co mp ens at io n a mo un t i n g to th e w h o l e o f th is s e cu r i t y d e p o s i t a n d t h e li a b i l i t y o f th e No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. 111 112 113 Page 78 of 194 ARCHITECT : THE FIRM C o ntr a c t o r f or p as t a n d f u t u r e co mp e n s a t i o n s h a l l r e ma i n u n af f ec t e d . P o w e r to ta k e I n th e ev e n t o f E n g i ne e r t ak i n g a ct io n u n d er s u b cl au s e s ( a ) possessio n o f or o r ( c ) c l a u s e 1 0 8, h e ma y if he so d es i r es , tak e p o s s es s i o n r e qu i r e r e mov a l o f al l an y t o o ls a n d p la n t, ma t er i al s and s to r e in o r up o n or s el l th e W o r k o f t h e s i t e th er eo f o r bel on g i n g to t h e C o ntr a c t or , C o n tr a c t o r s o r p r oc u r ed by hi m a nd in t en d ed t o b e u s e s f o r th e p l an t . ex ecu tio n of the W ork or any p art th ereof pay ing or al lo w in g f o r th e s a me in a c c o u n t at t h e c o n tr a ct r ate s o r i n the c as e o f contract r at es not b eing appli cab le at curre nt ma rk et rat es to be certif ied by the Eng in eer w hos e certificate ther eof shall be final. In the alternativ e t h e E n g i n e e r may af te r g i v in g n o t i c e in w r it in g t o t h e C o ntr a c t o r o r h i s c l e r k o f th e Wo r k f o r e man o r o t h er au t h o r i s e s ag en t r e q u i r e s h i m to r e mo v e s u c h to o l s an d p la n t, ma t e r i a l , o r s t o r e s f r o m t h e p r e mi s e s w i t h i n a ti me t o be sp ecified in s uch not ic e and in the ev ent of th e C o ntr a c t o r f a il in g t o co mp ly w it h an y su c h r eq u i s i t io n , th e E n g i n e e r ma y r e mo v e t h e m a t th e C o n t r a c t o r ’ s ex p e ns es o r sell the m by aucti ons o r privat e sale on acco unt o f th e C o ntr a c t o r an d a t t h is r is k in a ll r e s p e c t an d th e c e r t i f i c a t e o f th e E n g in e er as to th e e x p e n s e s o f a ny s uc h re mov a l an d th e a mo unt o f the proceeds and expen sed on any such sale s h al l b e f i n a l and co nc l u s iv e a g a in s t th e C o n t r a c t o r . N o I n t er e s t f o r I t is ag r e ed tha t th e Co r p o r atio n o f o r its En g ine er o r Delay ed Officer shall no t be liable to p ay any interes t or d ama g e P ay me n ts D u e to w i th r es p e c t to an y mo n ey s o r b a l a n c e w h ich may b e in it s Di spute s etc . o r its En g i n e e r ’ s o r o f f i c e r ’ s h a n d s o w in g t o an y d i s p u t e o r d if f er e n ce o r cl ai m o r mis - u n d e r s ta n d in g be t w e e n t h e C o r p o r a ti o n o f o r i ts E n g i n e e r o r O f f ic e r o n th e o n e h an d and th e Contracto r on th e other, o r with r es pe ct to any d el ay o n t h e p ar t o f th e Co r p o r at i o n o f N av i M u mb a i o r i t s Engineer o r Officers in making periodical or f in a l p ay men t s o r i n an y o th e r r e s p e ct w h a t e v e r . P ay me n t t o th e Co n t r a c to r o f t h e a mo u n t d u e u n d er e a ch o f th e interim p ay men t cert if icate is sued by the Engineer s hal l b e ma d e by the Co rp o r a ti o n w it h in 4 5 ( F o r ty F iv e ) d a y s if such c er t ificate b ei n g deliv er ed. If th e Corpora tion ma ke s la te p ay men t, th e Co n tr ac to r is to b e p a id int er est on th e la t e p a y me n t in th e n ex t p a y me n t . In t er e s t s h a l l b e calcula ted fro m the date b y which th e p ay men t sh ould h av e b e e n ma d e u p to th e d a t e w h e n th e l a t e p a y me n t is ma d e at 6% p er annu m. I t is a ter m und er this contract th at p ay men t o f in te r e s t i n ex c e s s o f 6 % i s b a r r ed on any a mo u n t p ay ab le to t he C o n tr a ct o r o n a n y a cc o u n t. I t is d is t i n c t l y u n de r s t o od a n d ag r e e d b etw e en th e p ar t ie s h er e to th at p ay me n t fo r Wo r k alr e ady ex ecu ted b y th e C o ntr a c t o r is no t a c o n di t io n p r e c ed e n t u n d er th i s co n t r ac t f or t h e e x e c u t i o n o f th e r e ma i n in g W o r k . J u r i s d ic ti o n I n ca s e of an y cl a i m, d i s p u te o r d if f e r en c e a r is in g in r es p e ct o f a co n tr a ct , th e ca u s e o f ac tio n th e r e o f s h a l l b e d e e me d t o hav e a r i s e n i n N av i M u mb a i an d al l l eg a l p r o c e ed i n g s in r es p ec t o f an y s u ch c la i m, d is p u t e o r d if f er e n ce s h all b e in s t i t u t e d i n a co mp e t e n t co u r t i n th e City of Navi M u mb ai on ly . Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. 114 F i n al it y of Decision and N o n - A r b i tr a b il i t y 115 A r b i tr a t i o n 116 L aw s G o v er n i n g T h e Co n tr a ct 117 Page 79 of 194 ARCHITECT : THE FIRM S E TTLEMENT O f D ISP UTES I f a d i s p u te / d is pu t e s o f an y k i nd w h ats o ev e r ar is e s b et w e en t h e C o n t r a c t o r an d E n g in e er s r ep r e s en t a t iv e th e s a me s h a l l b e r e f er r e d t o th e En g i ne e r f o r h i s d ecis i o n w i t h det ailed justifi c at io n. S uch referen ce s h all be st ated th at i t is in p u r s u a n c e t o th is cl au s e f o r r e vi e w a n d giv in g d e c is io n s by th e E n g in e er s . Th e En g in e er s h a l l g ive hi s decis ion within 1 4 day s of rece ipt of noti ce. If eith er p arty is no t s a t i s f ie d w i t h t h e d e c i s i o n of t h e E n g in e er o r t h e E n g i n e e r f a il s to g iv e th e d e ci s i o n w i t hi n th e p e r io d o f 1 4 d ay s f r o m t h e d at e o f r e c e i p t o f n o t i c e u n d e r t h i s c l a u s e , su ch a dis p u te may b e r ef err e d to A r b itr ation as p er Cl aus e N o . 11 5 . E x c ep t w h er e , o th e r w is e p r ov id e d f o r in t h is c on tr a ct, a l l q u es t io n s an d d i s p u te s r el a t in g t o th e me a n in g o f in s t r u c t io n h e a r in bef o r e me n tio n e d o r as to any o th e r q u es t io n , cl a i m, r ig h t , ma t t e r o f h an d i n g w h a ts oe v e r , if a n y ar i s i n g o u t o f o r r e l a t in g t o th i s c o n tr a ct, s p e ci f i c a t i o n , es ti ma tes, Ins tr uct ions, orders o r thes e co n d itions o r o th e r w is e c o n c e r n i n g t h e w o r k s , o r t h e ex e cu t i o n o r f a il u r e to ex e cu t e th e sa m e w h e r e a r i s i n g d u r in g th e p r o g r es s of th e w o r k o r af t er c o mp let io n o r ab an d o n men t th er eo f o f any ma t t e r d i r e c t l y o r in d ir e ct ly co n n ec t e d w it h th i s a g r e e me n t s h al l b e r e f er r e d t o th e so l e A r b i tr a t i o n o f th e M u ni c ip a l C o m mi s s i o n e r o f N a v i M u mb a i Co r p or a t i o n , C. B. D . , N a v i M u mb a i an d i f th e Mu n i c i p al C o mmi s s io n e r is u n ab l e o r unwilling to a ct as s u ch , th en the matt er in dispu te sh al l b e r ef e r r e d to s o l e A r b i tr a t i o n o r su c h ot h er p e r s o n ap p o in t ed by the Municip al co mmiss i oner who is w illin g to act as s u ch A r bi tr a to r . I n cas e, t h e A r b i tr a to r s o a p p o i n t e d i s unable to act f or any reasons, th e Municip a l Co mmission er in the event o f su ch in abilit y shall ap point another p erso n to a ct as A r bitrat or in ac cordance with th e ter ms of th e contract. Such p erson s hal l b e entitl ed to proceed wi th t h e referen ce fro m th e st ate at w hich it was left b y his prede cessors. It is also a ter m of t his con tra ct th at n o p er s o n o t h e r t h an a p e r s o n ap p o in te d by th e M u n ic ip a l C o m mi s s i o n e r a s af o r e s a id s h o u ld a c t a s a n A r b it r ato r . A s af or esaid th e p r o visi o n s o f th e ar b it r atio n an d con ci l i a ti o n a ct 1 9 9 6 o r a n y s t at u t o r y mo d i f i cat i on or Reen ac t ment thereo f and the rules mad e th ere un d er and for th e t i me b e in g i n f o r ce sh al l ap p l y to th e ar b itr at i o n p r o c e ed i n g s u n d e r t h is c l au s e . T h i s co n t r ac t s h a l l b e g o ve r n ed b y the I n d i a n La w s f o r t h e ti me b ein g in f o rce . P A R T – VII WORK COMPLETION & DEFECT LIABILITY Clear an c e of S it e U p o n t h e i s s u e of any T a ki n g o v e r c e r ti f ic at e th e o n C o mp l et io n C o ntr a c t o r s h a l l c l e a r aw a y an d r e mo v e f r o m t h at p ar t o f the s ite t o which such T aking-over Cert ifi cate re lates al l C o ntr a c t o r ’ s eq u ip me n t , su rp l u s ma t er i a l s , r u b b i s h an d te mp o r a r y W o r k s o f ev er y k in d , and le a v e s u c h p ar t of th e s it e an d W or k s c l e a n an d i n a W o r k ma n l i k e c o nd i ti o n to th e s a t i s f a c t i o n o f th e E n g in e er . I f th e C o ntr a c t or d o e s n o t cl e a r th e s i t e w i th i n 1 5 d ay s all ma t er i al w i l l b e Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. 118. S u b mis s io n s of F i n al C o mp l e t i o n D r a w i ng s . 119. Co mp l e ti o n Certifi cat e Signature of Tenderer Page 80 of 194 ARCHITECT : THE FIRM co n f i s ca t e d an d n o c o mp e ns at io n s h a l l b e p a id a nd t h e s i t e w i ll b e cl e a r ed at r i s k an d co s t o f t h e C o n t r a c to r . O n co mp l e t i o n of t h e W o r k , th e Co n t r a c t o r s s h al l f u r n is h f r e e o f co s t 1 s et o f R. T . F . o f f i n a l co mp l et i o n d r aw in g s an d 6 bo u n d s e t s o f c o p ie s o f d r aw in g s , s h ow in g a l l t h e d et a i ls c h e c k ed an d s i g n ed b y th e E n g in e er w i th i n 2 mo n t h s o f co mp le ti o n o f W o r k s . T h e p ay me n t o f f in a l b i l l s h a l l b e ma d e to t h e Contr actors af t er receipt o f abov e s ets. In c as e th e C on tr a c to r f ai l s to s u b mi t t h e c o mp l et io n d r aw i n g s , a co mp en s a tio n at th e r at e o f R s . 5 0 0 0/ - p er d r aw in g s h a l l b e r ec o v er e d f r o m t h e f i n al b i l ls ( 1) A s s oo n a s W or k i s co mp le t e d , t h e C o n t r a c to r s h al l g i v e n o ti c e o f s u ch c o mp l e t io n t o th e E n g i n e e r and w ith in 2 8 (Tw enty -eight) day s of r eceip t o f such n otic e th e E ng i n e e r sh al l in s p e c t th e W o r k s an d s h al l f u r n ish t h e Co n tr a cto r w ith a c er tif i ca te o f co mp le tio n in d ic atin g ( a) t h e d a te o f co mp le tio n ( b ) th e d ef e cts t o b e r e c t if i e d by th e C o n tr a c to r , a n d /o r ( c) i t e ms f o r w h i c h p a y men t shall be ma d e a t r ed u ced r a tes. When sep ara te periods of c o mp l e t io n ha v e b e en sp e c i f i e d f o r i t e ms or g r o u ps o f ite ms , th e Engin eer s hal l iss ue s ep ara te co mp l et io n c er t if i c a te s f o r s uch i t e ms or gr o up s o f i t ems . N o c er t if i c a te of co mp l et io n s h a l l b e is s u e d , n o r th e Wo r k s be cons i d er ed to be co mp l et e till the Con tr actor s hal l h av e r e mo v ed f r o m th e p r e mi s e s o n w h ich t h e W o r ks h a s b e e n ex e c ut e d, al l s c af f o l d i n g , s h ed s an d su r plu s mat er i als , ex c ep t s u ch as r e q u ir e d f o r r e ct if i c a t i o n o f d ef e cts , r u b b is h an d al l h u t s a n d s a n i t a r y ar r a n g e me n t s r eq u i r ed f or h is W or ke r s o n th e s it e i n co n ne c t i on w i th t he ex e cu t io n o f Wo r k s as s ha l l h av e b e e n e r e c ted by th e C o n tr a c t o r o r th e W o r k me n an d c le a n e d a ll d ir t f r o m a l l p ar t s o f b ui l d i n g ( s ) in , u p o n o r ab o u t w h ic h th e Wo r k has be e n ex e c u te d or o f w h ich h e may have h ad possession for the p u rp o s e o f e x e cu t io n th e r eo f a nd c l e an ed f lo o r s , gu t t e r s a n d d r a in s , e a s ed d oo r s an d s a s h es , o il ed an d f a s t en i n g s , l ab el e d t h e key s cl ea r ly a nd h an d e d th e m o v er to th e E n gi n e e r o r h i s r ep r e s e n t a tiv e an d ma d e t h e w ho l e p r e mi s e s f it f o r i m med i at e o c c u p at io n o r u s e to t he s at is f a c t i on of t h e E ng i n e e r . I f th e C o n t r a c to r s h al l f a i l t o co mp ly w i th an y o f th e re q u ir e me n ts o f th i s C o n d it io n a s af o r e s a i d , o n o r b ef o r e th e d a t e o f co mp le ti o n o f Wor k s , t h e E n g in e er may at th e ex p en se o f th e Co n tr a cto r f u lf i ll su ch r eq u i r e me n t s an d d i s p o s e o f a l l th e s u r p l u s ma t e r ial an d r u b b is h e tc. a s h e t h in k s f i t a nd th e Co n tr a ct o r s h al l h av e no c l a i ms in r e s p e ct o f an y s u ch ma t e r i a l ex c e p t for any sum ac tua ll y r ealis ed by the sale th er eof less th e c os t of f u l f il lin g th e r e q u i r e me n t s a n d a n y o th e r a mo u n t t ha t may b e d u e f r o m th e C o n tr a cto r . I f th e ex p en s e o f f u lf i ll in g s u ch r e q u ir e me n t is mo r e th an t h e a mo u n t rea lis es on such d isposal as aforesai d, the Contractor sha l l fo rt h w ith o n d e man d p ay s u c h e x c e s s . T he Co n tr a cto r ` s n oti c e o f co mp l et i on a s af o r e s a id s hal l hav e to acco mp anied with o ne s et o f tracings o f final c o mp l e t io n d r aw in g s o n R T F a n d s i x b o u n d s e t s o f No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. 120 121 122 Page 81 of 194 ARCHITECT : THE FIRM c op i es o f a s b u i l t dr a w i n gs , BI M mo de l f ai l i n g w h i ch the no t ice s h a ll b e de e me d to h av e n o t b een i s s u ed a t all. ( 2) If at any ti me b e f o r e co mp l e t i o n o f th e en ti r e W o rk , i t e ms or g r o u p s o f i t e ms fo r w h i c h sep a r at e p er io d s o f co mp let io n h ave b e en s pe c ified, h av e b een c o mp l et ed, t he E n g in e er w i t h th e co n s e n t of th e Co nt r ac t o r t a k e s p o s s e s s i o n o f a n y p a r t o r p ar t s of t h e s a me ( a n y s u ch p ar t o r p ar t s b e i n g h er e in a f te r in th is c o n d it io n r ef e r r ed t o as " t h e r e le v an t p ar t " ) th e n n o t- w it h s ta n d in g a ny th in g ex p r e s s e d o r imp l i e d e ls e w h e r e in this contr ac t. ( a) W it h in 2 8 d ay s of d ate o f co mp l e t io n o f s u ch i t e m s o r g r o u p of i te ms or p o s s e s s i o n of t h e r e l e v a n t p ar t t he E n g in e er sh a l l is s u e a c o mp l et io n c er t i f ic a t e f o r t he r e l e v an t p a r t p r o v id ed th e C o n t r a c to r f u lf i l l s h is o b l ig a t i o n f o r r el ev an t p a r t a s in s u b - par a ( 1 ) ab o v e ( b ) The defects l iab ilit y period in respect o f such it e ms an d r e lev an t p ar t s h all b e d e e me d to h av e co mmen ced f r o m t h e c er t if i ed d at e o f co mp l e t i o n o f su ch i te ms o r relevan t part as th e case may be. ( c) F o r t h e p u r p o s e of as c er t a i n in g c o mp e n s a t i o n f o r d e l a y u nd er C la u s e N o . 8 8 i n r e s p e c t o f an y p e r io d d u r i n g w h ic h th e W or k s ar e n o t co mp l et e d th e r el ev an t p ar t s h a ll b e d e e me d to f o r m a s ep ar at e it e m o r gr o u p , w ith d at e of co mp le t io n a s g iv e n i n th e c o n tr a c t o r as ex t e n d e d u n d e r C l a u s e N o .8 0 an d actu al d at e of co mp letion as c ertifi ed by the E n g in eer u n d e r t h is c o n d i t io n . ( 3) If a ny par t o f t h e W o r k s h al l h a v e b e en s ub s ta n ti a l ly co mp let ed and s h a ll have s ati sfac torily pass ed a ny f inal test that may be p rescrib ed und er th e contract, th e E ng in eer may is su e a c er tif i ca te o f co mpl etion in r es p ect of th at p ar t of th e W o rk s bef o r e c o mp l e t io n o f t h e w h o l e W or k s a n d u p o n th e i s s u e o f such cer tific at es , t h e Contr actors sh all b e d e e me d to h av e u n d er t ak e n t o co mp le t e a n y o u ts ta n d in g W or k s in t ha t p a r t o f th e W o r k s d u r in g th e p er i o d o f ma i n t e n a n c e . T aking Over of C o r p o r a ti o n w i ll ta k e o ve r th e W o r k at an y stag e w h en e v er W o rk r eq u i r e d i n th e in te r e s t o f p u b li c b y g i v in g 10 d ay s n o ti c e to t h e C o n tr a ct o r . D efec ts Liabi li ty T h e C o n t r ac to r sh al l b e r e s p o ns ib l e to ma k e g o o d a n d P e r io d r e med y at h i s o w n ex p e n s e w it h in su ch p e r io d a s may b e stipu la ted by the E ngineer a ny defect s which may dev e lop or b e no ticed b efor e th e expiry o f the period me ntioned in th e S c h e d u le ` A ' h e r e t o f r o m c er t if i e d d at e of c o mp l et i o n an d i n t i m a t i o n of w hic h h a s b e en s e n t to th e C on t r a c t o r w i th i n 7 da y s of ex p ir y o f the s a id p e r io d b y let t e r s e n t by h an d d el i v e r y o r by r eg i s t e r e d p o s t . L iab ility f or If it s hal l appear to the Eng ine er o r to h is r ep res ent at iv e a t D e f ec t s or an y ti me d u r i ng co n s t r u c t i o n I mpe r f e c tions o r r e co n s t r u ct io n o r du r i n g t h e d ef e c t s ‚ l iab il i t y pe r io d , an d R e ct if ic a tion th a t an y W o r k h a s b e en ex e c u t ed w i t h un s ou n d , i mp e r f e c t T h er e o f o r u n s k i ll f ul W o r kman s h ip o r th a t a ny mat er i al o r a r t i cl e p r o v i d ed by th e Co n tr a cto r f o r ex e c u t io n of th e r e o f t h e Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. 123 Maintena nce Signature of Tenderer Page 82 of 194 ARCHITECT : THE FIRM W o r k is un s ou n d o r o f a q u a l it y in f er i o r to th a t c o n tr a ct e d for, o r otherwise, not in accordan c e w ith th e Contrac t, or th a t an y d e f e c t, s h r in k a g e o r o t h er f a u l ts h a v e a p p e a r e d in th e W o r k ar i s in g o u t o f d e f ec tiv e o r i mp r o pe r ma te r i a ls o r W o r k man sh i p , th e Co n t r a c to r sh al l, up o n re c e i p t o f n o t ic e i n w r it in g in t h a t b e h a l f f r o m th e E n g i n e er f or t h w i th r ec t ify o r r e mov e o r re c o n s tr u ct th e W o r k s o s p ec i f i e d i n w h o l e o r p a r t, a s t h e c as e may r e q u ir e o r , a s the c as e may b e, and / or r emo v e the mat eri als or article s s o s pe c i f i ed an d pr o v i d e o th e r p r o p er a n d s u it a b l e ma ter ials o r art icles at h is o w n ex p en se n o t w ith stan d in g th a t th e s a me may hav e b e en in ad v er t e n tly p as s ed , cer t if i ed an d pa i d f o r , an d i n th e ev e n t of h is f ai li n g t o d o s o w ith i n th e p er i o d t o b e s p e ci f i e d by th e E n g in e er i n h is n o t ic e af o r e s a i d t h e E n g in e er ma y r e c t i f y o r r e mo v e an d r eex ecu t e t h e W o rk an d/o r re mo v e an d r ep l ace w ith o th er s th e mat er i als o r ar t icles co mp la in ed o f , as th e ca se may b e, by o th er mea n s at th e r is k an d co s t o f th e Co n tr a cto r . I n case of r epairs a nd ma inten anc e Work, splash es an d droppings f ro m whitew ashing, p ai nting etc. shall b e re mo v ed and su rfaces clean ed si mu lt an e ous ly with co mp l e t i o n o f th e s e i t e ms o f W o r k in i n div id u a l r o o ms, quar te rs o r p r e mis es et c . w h ere th e W o rk is d o n e, w i t ho ut w a it in g f o r co mp l e t i o n o f al l o th e r i t e ms o f W o r k in t h e contrac t. In cas e the Co ntractor fails to co mp ly w ith r eq u i r e me n t o f th i s co nd i tio n , th e E n gin e e r sh a l l h a v e t h e r ig h t to g et th e W o r k d o n e by o th e r me a n s at th e r isk an d co st o f th e Co n tra c to r . The Eng i neer shall giv e three d ay s noti ce in w riting to t he C o ntr a c t o r b e f o r e t a k in g s u c h a ct io n . The E n g i n e er r e s e r v e s th e rig h t to d e c id e th e rat es and p r i c es o f t h e W o r ks as ex ecu t ed b y o th e r me a n s at th e r i s k an d c os t o f th e Co n t r ac to r . The co st and exp enses th ereby incurred on the Works and als o s u c h p e n al ty a s th e E n g i n e e r may i mp os e f o r s u ch w r o n g f u l co n d u c t o f th e Co n t r a c to r (w h ich pen a l t y , t h e E n g i n e e r sh a l l b e co mp et e n t to i mp o s e an d a g ain s t t h e i mp o s it io n o f w h i c h o r th e amo u n t th er e o f by t h e E n g in e e r an ap p e a l sh a l l l i e on l y t o th e Co mmis s io n e r w i t h i n se v en d ay s of th e o r d er in th a t b eh alf o f t h e En g in e er an d t he d e c is io n s o f t h e C o mmis s io n e r s h a ll b e f in a l a nd bin d in g u p on th e C o n tr a c t o r ) may b e de d u ct e d f r o m an y mo n ey du e or to beco me d u e to th e Con tr a ctor, und er this o r an y other co n t r a c t b e tw een th e C o n tr a c t o r a n d th e C or p o r a t i on . The Cont rac tor s hall ma in t ai n th e f in i s hed surface of th e road f or a p eriod as spe cified in Contract d o cu men t, aft er th e co m p le tio n o f W o r k w it h o u t any ex tr a co s t to co r p o r at io n ir r e s p e c t i v e o f th e d es ig n s , s t a n d ar d s a n d s p ec i f i c a t io n s an d a c tu al t r a f f ic e t c. Th e Co n t r a c t o r s h a l l get th e p o thol es f illed up w ith as ph alt mi x mat eri als an d ke e p th e r o ad s u rf a c e in g o o d c o n d i t i o n th r o u g hout th e y ea r . 5 p er c en t a mo u n t o f th e to t al W o r k d o n e s h al l b e w i t h h el p f r o m r u n n in g a cc o u n t b i l l f o r t h e p e r i o d s p e cif i e d in the Contr act do cu ment fro m the d at e of co mp leti on of Work as main te n an ce ch arges o f mai n ta ini n g and k e ep ing th e No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. 124 125 126 Page 83 of 194 ARCHITECT : THE FIRM r oa d in g o o d co n d i t i o n . T h i s 5 p er c e nt a mo u n t w ith h eld t o w a r d s mai n t e n an c e ch arges shall b e a llowed to b e r epl aced w ith B an k g u ar a n t e e or o th e r r e co g n iz e d f o r ms at i n t e r me d ia t e st a g e, if s o , d es i r e d in w r itin g . T h is mai n t e n an c e ch a r g e s s h a l l b e in ad d itio n to s ecu r ity d ep o sit. O n co mp letio n o f th e W or k in all r es p ects, ne c ess ar y cer tif ic at es w ill b e is su ed by th e E n g i n e e r an d th e de f e c t l i a b il it y p e r io d w il l b e co u n t e d f ro m th e d at e o f iss u e o f su ch c er t if ica tes. A ll d a ma g e s d u r i n g ex e cu t io n s ha l l b e ma d e go o d by th e Co n t r a c to r a t his co st. He w ill be r esponsible f or an y damag e to th e road s u r f ac e i n clu d in g B . T . su r f ac e in r ai n y s e a s o n a n d d u r in g construction and g u aran te ed maintenan ce p eriod and n o s e p a r at e p ay men t w i l l b e ma de f o r r es or t in g s u c h d a ma g e s , D e f e c ti v e W or k i s liab l e t o b e r e j e c t e d at an y s tag e. T h e C on tr a c to r o n n o a c c o u n t c a n r e f u s e t o r e ct if y d ef e ct s me r ely on reas ons that f urth er Work has b een carried ou t. No extra p ay ments shall be mad e for such re ctifi cat ion. D efec ts Liab ili ty The Con tract sh all not b e co nsider ed as co mp leted un ti l a Certifi cat e Defec ts L iab il ity Certif ic at e shall hav e b een si gned b y the E n g i n e e r an d d e liv e r ed t o th e Co n tr a c t o r , s ta ti n g th e d a t e on w h ic h th e Contractor shall hav e co mp leted his o b li g a t io n s to ex e c u t e a n d c o mp l e t e th e Wo r k s an d r e me dy an y defects therein to the Eng ineer’s satis fac tion. The D efects Liab i lity Certif icate sh al l be g iv en by the E n g i n e e r w ith in 2 8 d ay s af t er t he ex p i r at io n o f th e l at e s t s u ch p e r i o d , o r as s o o n th e r e a f ter as an y W o r ks in s t r u ct ed , p u r s ua n t to Cl au s e s 1 2 1 a n d h av e b e en c o mp l e t ed to t h e sa tisf a c t i o n o f th e En g i n e e r, P ro v i d ed t h a t th e i s s ue of th e D e f e c ts L ia b i l i t y Ce r t i f i c at e s h a l l n o t b e a c o n d i t io n p r e c ed e n t to p a y men t to t h e C o n tr a c t o r o f t h e R e t en t i o n M o n ey . U nfulfilled N o tw ith s t a n d in g t h e i s s u e o f th e D e f ec ts Li ab i l i t y O b l ig a tio n s C er t if i c a t e t h e C o n tr a c to r an d th e Co r p o r a t io n s h a l l r e ma i n li ab l e fo r th e fu l f i l l me n t o f an y o b l ig a t i o n in c u r r e d u n d e r th e p r o v i s i o n s o f th e C o n tr a ct p r i o r to th e i s s u e o f th e D e f e c ts L i a b i l i t y Cer t if ic a t e is iss u e d an d , f o r t h e p u r po s e s o f d et e r mi n i n g t h e n a t u r e an d e x ten t o f an y s uch o b li g a t io n , the Co n t r a c t s h al l b e d e e me d to r e ma i n in f o r c e b et w e en t h e p ar t ies t o th e C o n t r a c t. N o t w ith s t an d in g th e iss u e of the D efect s Liab ility Cer tificate th e Contractor an d th e Co r p o r atio n s h al l re mai n liab le f o r th e f ul f ill me n t o f an y o b l ig a t i o n in c u r r e d u n d e r th e p r o vi s i o n s o f t h e Contract p rior to the is sue of the D efects L iab i lity C er t if i c a t e is is s u e d an d , f o r th e pu r p o s e s o f d e t e r mi n i n g th e n a tu r e an d ex te n t o f any s u ch o b l ig a ti o n , t he Co n t r a c t s h al l b e d e e me d to r e mai n in f o r c e b e t w een t he p a r ti es to the Contr act. Ref un d of T h e a mo u nt o f s e c u r it y d e p o s it lo d g e d b y a Con t r ac t o r Security Deposit s h al l b e r e f u n d e d al o n g w i t h th e p ay men t of t h e f in a l b i l l , o r af te r t h e ex pi r y o f the d e f e c t l i a b i l i ty p er i od w h i ch ev e r is la t er u nle s s th e E n g in e er is o f th e o p in i o n th a t i n o r d er to saf e g u ar d ag ai n s t d ef e c t s a n d p en d i n g c l a i m s ag a in s t th e C o ntr a c t o r it is n e c e s s a r y to r e t ai n mo r e a mo u n t r e t a in e d as r et en t io n mo n e y . Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 84 of 194 ARCHITECT : THE FIRM ANNEXURE ‘A’ (See Condition 24) Safety Provisions 1. Suitable scaffolds shall be provided for workmen for all that cannot safely be done from the ground, or from solid construction except such short period work as can be done safely from ladders. When a ladder is used an extra mazdoor shall be engaged for holding the ladder and if the ladder is used for carrying materials as well, suitable footholds and handholds shall be provided on the ladder and the ladder shall be given an inclination not steeper than ¼ to 1 (¼ horizontal and 1 vertical). 2. Scaffolding or staging more than 3.25 meters above the ground or floor, swung or suspended from an overhead support or erected with stationary support, shall have a guard rail properly attached, belted braced and other wise secured at least 1 meter high above the floor or platform of such scaffolding or staging and extending along the entire length of the outside and ends thereof with only such openings as may be necessary for the delivery of materials. Such scaffolding or staging shall be so fastened as to prevent it from swaying from the building or structure. 3. Working platform, gangways, and stairways shall be so constructed that they do not sag unduly or unequally, and if height of a platform or gangway or stairway is more than 3.25 meters above ground level or floor level, it shall be closely boarded, have adequate width and be suitably fenced as described in 2 above. 4. Every opening in floor of a building or in a working platform shall be provided with suitable means to prevent fall or persons or materials by providing suitable fencing or railing with a minimum height of 1 meter. 5. Safe means of access shall be provided to all working platforms and other working places. Every ladder shall be securely fixed. No portable single ladder shall be over 9 meters in length. Width between side rails in a rung ladder shall in no case be less than 30 cm for ladder upto and including 3 meters in length. For longer ladders this width shall be increased by at least 6 mm for each additional 30 cm of length. Uniform step spacing shall not exceed 30 cm. Adequate precaution shall be taken to prevent danger from electrical equipment. No materials on any of the sites shall be so stacked or places as to cause danger or inconvenience to any person or the public. The Contractor shall provided all necessary fencing and lights to protect public from accidents and shall be bound to bear expenses of defence of every suit, action or other proceeding at law that may be brought by any person for injury sustained owing to neglect of the above precautions and to pay any damages and costs which may be awarded in any such suit, action or proceedings to any such person or which may with the consent of the Contractor be paid to compromise any claim by any such person. 6. Excavation and Trenching:- All trenches, 1.5 metres or more in depth , shall at all times be supplied with at least one ladder for each 30 metres in length or fraction thereof, ladder shall be extended from bottom of trench to at least 1 metre above surface of the ground sides of a trench which is 1.5 meters or more in depth shall be stepped back to give suitable slope, or securely held by timber bracing, so as to avoid the danger of sides collapsing. Excavated material shall not be placed within 1.5 meters of edge of trench or half or depth of trench, whichever is more. Cutting shall be done from top to bottom. Under no circumstances shall undermining or under cutting be done. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 85 of 194 ARCHITECT : THE FIRM 7. Demolition: Before any demolition work is commenced and also during the process of the work a. All roads and open areas adjacent to the work site shall either be closed or suitably protected. b. No electric cable or apparatus which is liable to be a source of danger over a cable or apparatus used by operator shall remain electrical charged, c. All practical steps shall be taken to prevent danger to persons employed, from risk of fire or explosion, or flooding. No floor, roof or other part of a building shall be so overloaded with debris or materials as to render it unsafe. 8. All necessary personal safety equipment as considered adequate by the Engineer shall be available for use of persons employed on the site and maintained in a condition suitable for immediate use, and the Contractor shall take adequate steps to ensure proper use of equipment by those concerned. a) Workers employed on mixing asphaltic materials, cement and lime mortars/concrete shall be provided with protective footwear, hand gloves and goggles. b) Those engaged in handling any material which is injurious to eyes shall be provided with protective goggles. c) Those engaged in welding works shall be provided with welder’s protective eyeshields. d) Stone breakers shall be provided with protective goggles and protective clothing and seated at sufficiently safe intervals. e) When workers are employed in sewers and manholes, which are in use, the Contractor shall ensure that manhole covers are opened and manholes are ventilated at least for an hour before workers are allowed to get into them. Manholes so opened shall be cordoned off with suitable railing and proided with warning signals or boards to prevent accident to public. f) The Contractor shall not employ men below the age of 18 and women on the work of painting with products containing lead in any form. Whenever men above the age of 18 are employed on the work of lead painting the following precautions shall be taken; g) No paint containing lead or lead products shall be used except in the form of paste or readymade paint. i) Suitable face masks shall be supplied for use by workers when paint is applied in the form of spray or surface having lead paint dry rubbed and scrapped. ii) Overalls shall be supplied by the Contractor to workmen and adequate facilities shall be provided to enable working painters to wash during and on cessation of work. 9. When work is done near any place where there is risk of drowning, all necessary equipment shall be provided and kept ready for use and all necessary steps taken for prompt rescue of any person in danger and adequate provision made for prompt first aid treatment of all injuries likely to be sustained during the course of the work. 10 Use of hoisting machines and tackle including their attachments, anchorage and supports shall conform to the following: (a) (i) These shall be of good mechanical construction, sound material and adequate strength and free from patent defects and shall be kept in good repair and in good working order. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 86 of 194 ARCHITECT : THE FIRM (ii) Every rope used in hoisting or lowering materials or as a means of suspension shall be of durable quality and adequate strength, and free from patent defects. (b) Every crane driver or hoisting appliance operator shall be properly qualified and no person under the age of 21 years shall be in charge of any hoisting machine including any scaffold winch or give signals to operator. (c) In case of every hoisting machine and of every chain ring hook, shackle, swivel and pulley block used in hoisting or lowering or as means of suspension, safe working load shall be ascertained by adequate means. Every hoisting machine and all gear referred to above shall be plainly marked with safe working load. In case of hoisting machine having a variable safe working load, each safe working load and the conditions under which it is applicable shall be clearly indicated. No part of any machine or of any gear referred to above in this paragraph shall be loaded beyond safe working load except for the purpose of testing. (d) In case of departmental machine, safe working load shall be notified by the Engineer, as regards Contractor’s machine the Contractor shall notify safe working load of each machine to the Engineer whenever he brings it to site of work and get it verified by the Engineer. 11. Motors, gearing, transmission, electric wiring and other dangerous parts of hoisting appliances shall be provided with efficient safeguards, hoisting appliances shall be provided with such means as will reduce to the minimum risk of accidental descent of load, adequate precautions shall be taken to reduce to the minimum risk of any part of a suspended load becoming accidentally displaced. When workers are employed on electrical installations which are already energized, insulating mats, wearing apparel such as gloves, sleeves and boots, as may be necessary, shall be provided. Workers shall not wear any rings, watches and carry keys or other materials which are good conductors of electricity. 12. All scaffolds, ladders and other safety devices mentioned or described herein shall be maintained in a safe condition and no scaffold, ladder or equipment shall be altered or removed while it is in use. Adequate washing facilities shall be provided at or near places of work. 13. These safety provision shall be brought to the notice of all concerned by display on a notice board at a prominent place at the work spot. Persons responsible for ensuring compliance with the Safety Provisions shall be named therein by the Contractor. 14. To ensure effective enforcement of the rules and regulations relating to safety precautions, arrangements made by the Contractor shall be open to inspection by the Engineer or his representative and the inspecting officers. 15. Notwithstanding the above provisions 1 to 14, the Contractor is not exempted from the operation of any other Act or Rule in force. 16. Complete continuous barricading of G.I. sheet height 1.5 mtr. with the ground clearance of 0.60 mtr. from the ground level and completely supported by M.S. angles (As per design & instructions by the engineer) must be provided. For works of concrete and asphalt road, this should be maintained till completion of work. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 87 of 194 ARCHITECT : THE FIRM ANNEXURE ‘B’ (SEE Condition No. 27) DETAILS OF KEY PEROSNNEL WITH TENDERER WHO ARE PROPOSED FOR THIS CONTRACT Sr. No. Description of category Name 1. 2. 3. Qualification Professional experience and details of works carried out 4. 5. Since how long in service with tenderer Remarks 6. 7. SIGNATURE OF TENDERER: Date: Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 88 of 194 ARCHITECT : THE FIRM Eò®úÉ®úxÉɨÉÉ {ÉjÉ xÉ´ÉÒ ¨ÉÖƤÉ<Ç ¨É½þÉxÉMÉ®ú{ÉÉʱÉEäòSÉä ´ÉiÉÒxÉä ºÉ½þ ¶É½þ®ú +ʦɪÉÆiÉÉ xÉ´ÉÒ ¨ÉÖƤÉ<Ç ¨É½þÉxÉMÉ®ú{ÉÉʱÉEòÉ, xÉ´ÉÒ ¨ÉÖƤÉ<Ç. ------------------------------------------------------------------------------- Eò®úÉ®ú ʱɽÖþxÉ näùhÉÉ®ú EòÉ®úhÉä Eò®úÉ®úxÉɨÉÉ Ê±É½ÚþxÉ näùiÉÉä EòÒ, xÉ´ÉÒ ¨ÉÖƤÉ<Ç ¨É½þÉxÉMÉ®ú{ÉÉʱÉEòÉ ºlÉɪÉÒ ºÉʨÉiÉÒ `ö®úÉ´É Gò.-------------/¨ÉÉ. +ɪÉÖCiÉ ªÉÉÆSÉÒ ¨ÉÆVÉÖ®úÒ ÊnùxÉÉÆEò / / 201 +x´ÉªÉä ----------------------------------------------------- ----------------------------------------------------------------------------------------------------------------- EòɨÉÉSÉÒ ÊxÉÊ´ÉnùÉ ¨ÉÆVÉÚ®ú ZÉɱÉÒ +ɽäþ Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 89 of 194 ARCHITECT : THE FIRM :2: iªÉÉ|ɨÉÉhÉä +ɨ½þÒ ´É®úÒ±É Ê`öEòÉhÉÒ {ÉÖføÒ±É ¶ÉiÉÔ´É®ú ¤ÉÉÆvÉÒ±É +ɽþÉäiÉ. 1. EÆòjÉÉ]õnùÉ®úÉSªÉÉ näùªÉEòÉiÉÚxÉ +xÉɨÉiÉ ®úCEò¨É ¨½þhÉÚxÉ EÆòjÉÉ]õ ®úCEò¨ÉäSªÉÉ 5 ]õCEäò ®úCEò¨É näùªÉEòÉiÉÚxÉ Eò{ÉÉiÉ Eò®úhªÉÉiÉ ªÉä<DZÉ. 2. VÉxÉ®ú±É ]åõb÷®ú xÉÉä]õÒºÉ "¶ÉÖvnùÒ{ÉjÉɺɽþ' ÊxÉÊ´ÉnùÉEòÉ®úÉÆxÉÉ ºÉÖSÉxÉÉ ºÉ´ÉÇ +]õÒ ºÉÉvÉÉ®úhÉ +]õÒ, °ü{É®äú¹ÉÉ iÉ{ɶÉÒ±É,ÊxÉÊ´ÉnùÉ nùºiÉBä´ÉVÉ ´É κ´ÉEÞòiÉÒ {ÉjÉ ´É EòɪÉÉÇnäù¶É xÉÆ. -------------------Ênù. / /200 ½äþ ºÉ´ÉÇ Eò®úÉ®úÉSÉä EòÉMÉnù{ÉjÉ +ºÉiÉÒ±É. 3. EÆòjÉÉ]õnùÉ®úÉxÉä +É{ɱÉä EòÉ¨É ÊxÉvÉÉÇ®úÒiÉ ´Éä³äýiÉSÉ Eäò±Éä {ÉÉʽþVÉä. 4. ¨É½þÉ{ÉÉʱÉEòÉ EÆòjÉÉ]õnùÉ®úÉxÉä |ÉiªÉIÉ Eäò±É䱪ÉÉ EòɨÉÉSÉÒä ®úCEò¨É ¶Éäb÷¬Ú±É ®äú]õ / EòÉä]äõb÷ {ɺÉç]äõVÉ|ɨÉÉhÉä EÆòjÉÉ]õnùÉ®úÉºÉ näù<DZÉ. 5. ¨É½þÉ{ÉÉʱÉEäòxÉä VÉ®ú EÆòjÉÉ]õnùÉ®úÉºÉ EòÉähÉiÉÒ½þÒ ºÉä´ÉÉ Ênù±ªÉÉºÉ iªÉÉSÉÒ ®úCEò¨É EÆòjÉÉ]õnùÉ®úÉxÉä ¨É½þÉ{ÉÉʱÉEäòºÉ nähù Éä MÉ®úVÉäSÉä +ɽäþ. 6. ºÉnù®ú EòɨÉÉSªÉÉ ºÉÆnù¦ÉÉÇiÉ BJÉÉtÉ ´Éä³äýºÉ Ê´É´ÉÉnù ÊxɨÉÉÇhÉ ZÉɱªÉÉºÉ iÉÉä Ê´É´ÉÉnù `öÉhÉä / ¨ÉÖƤÉ<Ç xªÉɪÉɱɪÉÉÆSªÉÉ ½þqùÒiÉ iªÉÉSÉÉ ÊxÉ´ÉÉb÷É ½þÉä<DZÉ. ´É®úÒ±É ºÉ´ÉÇ ÊxÉªÉ¨É ´É +]õÒ +ɨ½þÒ EòɳýVÉÒ{ÉÚ´ÉÇEò ´ÉÉSɱªÉÉ +ºÉÚxÉ iªÉÉ +ɨ½þɱÉÉ {ÉÚhÉÇ{ÉhÉä ¨ÉÉxªÉ ´É ¤ÉÆvÉxÉEòÉ®úEò +ɽäþiÉ. ½þÉ Eò®úÉ®úxÉɨÉÉ ¨ÉÒ ®úÉVÉÒJÉÖ¶ÉÒxÉä ʱɽÚþxÉ Ênù±ÉÉ +ɽäþ. Ê`öEòÉhÉ :- ºÉÒ. ¤ÉÒ. b÷Ò., ¤Éä±ÉÉ{ÉÚ®ú, xÉ´ÉÒ ¨ÉÖƤÉ<Ç - 400 614.. ÊnùxÉÉÆEò :- Signature of Tenderer / /2014 No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 90 of 194 ARCHITECT : THE FIRM :3: ºÉÉIÉÒnùÉ®ú Eò®úÉ®úxÉɨÉÉ Ê±É½ÚþxÉ näùhÉÉ®ú 1. º´ÉÉIÉ®úÒ º´ÉÉIÉ®úÒ (EÆòjÉÉ]õnùÉ®ú) xÉÉÆ´É : ________________________ {ÉkÉÉ : ________________________ xÉÉÆ´É : ________________________ : _______________________ {ÉkÉÉ : ________________________ : ________________________ : ________________________ : ________________________ 2. º´ÉÉIÉ®úÒ xÉÉÆ´É : ________________________ {ÉkÉÉ : ________________________ : ________________________ : ________________________ ¨ÉxÉ{ÉÉ ®ú¤É®úÒ Ê¶ÉCEòÉ º´ÉÉIÉ®úÒ :{ÉnùxÉÉ¨É :- ºÉɨÉÉxªÉ ¨ÉÖpùÉ ºlÉɪÉÒ ºÉʨÉiÉÒSªÉÉ JÉɱÉÒ±É nùÉäxÉ ºÉnùºªÉÉƺɨÉIÉ ºÉɨÉÉxªÉ ¨ÉÖpùÉ =¨É]õÊ´ÉhªÉÉiÉ +ɱÉÒ +ɽäþ. Signature of Tenderer xÉÉÆ´É : ________________________ º´ÉÉIÉ®úÒ : _______________________ xÉÉÆ´É : ________________________ º´ÉÉIÉ®úÒ : _______________________ No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 91 of 194 Signature of Tenderer No. of Corrections ARCHITECT : THE FIRM Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 92 of 194 ARCHITECT : THE FIRM ANNEXURE `D’ INDEMNITY BOND ON STAMP PAPER OF VALUE OF Rs. 100/In consideration of Navi Mumbai Municipal Corporation incorporated under BPMC act 1949 and having its office at Head Office Building, 2nd Floor, Plot No. 01, Sector – 15A, C.B.D., Navi Mumbai - 400 614. (hereinafter referred to as the Corporation, which expression, shall unless it be repugnant to the context or meaning thereof includes its successors or assigns) having awarded to M/s_______________________________________________________________Partnership/Pr oprietorship/Pvt. Ltd./Ltd. Firm carrying in such name and style the business of construction (hereinafter to after to as the contractor which expression shall unless) repugnant to the context or meaning thereof, includes its partners or Partner/Proprietor for the time being or its surviving Partner or his heirs and executor) for the work of at an_____________ percent above / below estimated cost of Rs.________________________ and in compliance with one of the terms and conditions of the said Contact. We, M/s ___________________________________________being the Contractor do hereby agree and undertake and indemnify and save harmless the Corporation in consequence for the manufacturing defect, patent manufacturing defect and construction defect found in the constructed work at any time in a defect liability period of ______ years with the grant of completion certificate by the Corporation to the contractor in accordance with and subject to the provision of the said contract. It is hereby agreed and declared that the Joint City Engineer of the Corporation or any officer acting as such Joint City Engineer of the Corporation shall be the Competent Authority to decide upon the question as to the defects in the construction of works and the remedy to be applied by the contractor for their rectification at his cost and his decision shall be final, conclusive and binding upon both the Corporation and the Contractor, provided that the Joint City Engineer shall so decide after giving an opportunity to the Contractor to represent his case. We hereby agree and undertake irrevocable and unconditionally to carry out duly each and every decision, order, direction or instruction as may be issued by the said Joint City Engineer or as the case may be, the officer of the Corporation in his behalf and to rectify properly and promptly the defect found by him. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 93 of 194 ARCHITECT : THE FIRM FOR AND ON BEHALF OF M/S_____________________________ _______________________________________________________ Place: - _________________ Date: - __________________ SEAL Notary, Maharashtra State Before me Notary, Maharashtra State Noted and Registered at _____________________ Serial Number _____________________ For & on Behalf of Corporation Accepted By. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 94 of 194 ARCHITECT : THE FIRM ACCOMPANIMENT TO THE GOVERNMENT RESOLUTION PUBLIC WORKS DEPARTMENT NO. CAT/06/04/148, DATED: 16/05/2005 PRICE VARIATION CLAUSE If during the operative period of the Contract as defined in condition (I) below, there shall be any variation in the consumer price Index (New Series) for Industrial Workers for Mumbai Center as per the labour Gazette Published by the Co mmi ssio n er of Labour, Government of Maharashtra and/or in the whole-sale Price Index for all commodities prepared by the office of Economic Advisor, Ministry of Industry, Government of India, or in the price of petrol / oil and lubricants and major construction materials like bitumen, cement, steel, various types of metal pipes etc., then Subject to the other conditions mentioned below, price adjustment on account of 1) 2) 3) 4) 5) 6) 7) Labour component Material Component Petrol, Oil and Lubricants Component Bitumen Component HYSD/ Mild Steel Component Cement Component C.I. and D.I. Pipes Component Calculated as per the formula hereinafter appearing, shall be made. Apart from these, no other adjustment shall be made to the contract price for any whatsoever. Component percentages as given below are as the cost of work put to tender. Total of Labour, Material & POL component shall be 100 and other component shall be as per actuals. Sr. No. 1 2 3 4 5 6 7 8 Items Labour Component (K1) 49% 42% 37% 25% 41% 39% 27% 25% For New Road Works For WBM Road For WBM & Asphalting Road For Asphalting Road Works For Drainage Works For Bridge Works For Building Works For Concrete Road Works Bitumen Component HYSD & Mild Steel Component Cement Component C.I. and D.I. Pipe Component Material Component (K2) 47% 49% 56% 61% 52% 58% 72% 63% Pol Component (K3) 4% 9% 7% 14% 7% 3% 1% 12% Actual Actual Actual Actual Note: If Cement, Steel, Bitumen, C.I. & D.I. Pipes are supplied on Schedule ``A’’ then respective component shall not be considered. Also if particular component is not relevant same shall be delete. 1. Formula for Labour Component : V1 = 0.85P K1 X L1 – L0 100 L0 Where, V1 = Amount of price variation in Rupees to be allowed for Labour component Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 95 of 194 ARCHITECT : THE FIRM P = Cost of work done during the quarter under Consideration Minus the cost of cement, HYSD and Mild Steel, Bitumen C.I. and D.I. Pipes calculated at the basic star rates as applicable for the tender, consumed during the quarter under consideration. The star rates shall be considered for the preparation of estimate or at the time of comparison with new DSR. K1 = Percentage of Labour Component as indicated above. L0 = Basic Consumer Price Index for Mumbai center shall be average consumer price index for the quarter preceding the month in which the last date prescribed for receipt of tender falls. L1 = Average consumer price index for Mumbai centre for the quarter under consideration. 2. Formula for Material Component: V2= 0.85P K2 x M1 - M0 100 M0 Where, V2 = Amount of price variation in Rupees to be allowed for Material Component P = Same as worked out for Labour Component K2 = Percentage of Material Component as indicated above. M0 = Basic wholesale price index shall be average wholesale price Index for quarter Proceeding the month in which the last date prescribed for receipt of tender falls. M1 = Average wholesale price index during the quarter under consideration.1` 3. Formula for Petrol, Oil and Lubricant Component: V3= 0.85P K3 x P1 – P0 100 P0 Where, V2 = Amount of price variation in Rupees to be allowed for POL Component P = same as worked out for Petrol, Oil and Lubricant Component K3 = Percentage of Petrol, Oil and Lubricant Component P0 = Average price of HSD at Mumbai during the quarter preceding the month in which the last date prescribed for receipt of tender falls. P1 = Average price of HSD at Mumbai during the quarter under Consideration 4. Formula for Bitumen Component : V4 = Qb (B1 – B0) Where, V4 = Amount of price variation in Rupees to be allowed for Bitumen Component. Qb = Quantity of Bitumen (Grade) in metric tones used in the permanent works and approved enabling works during the quarter under consideration. B1 = Current Average ex-refinery price per metric tonne of Bitumen (Grade…) under consideration including taxes (Octroi, excise sale tax) during the quarter under consideration B0 = Basic rate of Bitumen in Rupees per metric tonne as considered for working out value of P or average ex-refinery price in rupees per metric tonne including taxes (Octroi, excise, sales tax) of Bitumen for the grade of bitumen under consideration prevailing quarter preceding the month in which the last date prescribed for receipt of tender falls, whichever is higher. 5. Formula for HYSD & Mild Steel Component : V5 = S0 (SI1 – SI0) x T SI0 Where, Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 96 of 194 ARCHITECT : THE FIRM V5 = Amount of price variation in Rupees to be allowed for HUSD / Mild Steel Component S0 = Basic rate of HYSD / Mild Steel in Rupees per metric tonne as considered for working out value of P SI1 = Average steel index as per RBI Bulletin for the quarter under consideration SI0 = Average of Steel Index as per RBI Bulletin for the quarter Preceding the month in which the last date prescribed for receipt of tender falls. T = Tonnage of Steel used in permanent works for the quarter under consideration 6 Formula for Cement Component : V6 = C0 (CI1 – CI0) x T CI0 Where, V6 = Amount of price escalation in Rupees to be allowed for cement component. C0 = Basic Rate of cement in Rupees per metric tonne as considered for working out P value Cl1 = Average Cement Index published in the RBI Bulletin for quarter under consideration Cl0 = Average of Cement Index published in the RBI Bulletin for quarter proceeding the month in which the last date prescribed for receipt of tender falls. T = Tonnage of Cement used in the permanent works for the quarter under consideration. 7. Formula for C.I./D.I. Pipe Component : V7 = Qd (D1 – D0) Where, V7 = Amount of price escalation in Rupees to be allowed for C.I./ D.I. component. D0 = Pig Iron basic price in Rupees per tonne during the quarter under consideration (Published by IISCO) D1 = Average Pig Iron Price in Rupees per tonne during the quarter under consideration (Published by IISCO). Qd = Tonnage of C.I./D.I. Pipes used in the works during quarter under consideration. The following conditions shall prevail: (i) The operative period of the Contract shall mean the period commencing from the date of work order issued to the Contractor and ending on the date on which the time allowed for the completion of the works specified in the Contract for work expires, taking into consideration the extension of time, if any, for the completion of the work granted by The Engineer under the relevant clause of the Conditions of Contract in cases other than those where such extension is necessitated on account of default of the Contractor. The decision of the Engineer as regards the operative period of the Contract shall be final and binding on the Contractor. Where any compensation for liquidated damages is levied on the Contractor on account of delay in completion or inadequate progress under the relevant contract provisions, for the balance of work from the day of levy of such compensation price adjustment amount shall be worked out by pegging the indices, L, M, C, P, B, SI and CI to the levels corresponding to the date from which such compensation is levied. (ii) This price variation clause shall be applicable to all Contracts in B1/B2& C form but shall not apply to piece works. The price variation shall be determined during each quarter as per formula given above in this clause. (iii)The price variation under this clause shall not be payable for the extra item required to be executed during the completion of the work and also on the excess quantities of items payable under the provision of Clause 38/37 of the contractor from B1/B2 resp. since the rates payable for the extra items / or the extra quantities under clauses are to be fixed as per current DSR or as mutually agreed to yearly revision till completion of such work. In other words, when the completion / execution of extra items as well as extra quantities under Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 97 of 194 ARCHITECT : THE FIRM clauses 38/37 of the contract from B1/B2 extends beyond the operative date of the DSR then rates payable for the same beyond the date shall be revised with reference to the current DSR prevalent at the that time on year basis or revised in accordance with mutual agreement there on, as provided for in the Contract, whichever is less. (iv) This clause is operative both ways, i.e. if the price variation as calculated above is on the plus side, payment on account of the price variation shall be allowed to the Contractor & if it is on the negative side, the Government shall be entitled to recover the same from the Contractor and the amount shall be deductible from any amounts due and payable under the contract. (v) To the extent that full compensation for any rise or fall in costs to the Contractor is not entirely covered by the provision of this or other clauses in the contract, the unit rate and prices included in the contract shall be deemed to include amounts to cover the contingency of such other actual rise or fall in costs. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 98 of 194 Signature of Tenderer No. of Corrections ARCHITECT : THE FIRM Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 99 of 194 ARCHITECT : THE FIRM NAVI MUMBAI MUNICIPAL CORPORATION HEAD OFFICE BUILDING, BELAPUR, NAVI MUMBAI SPECIAL CONDITIONS OF CONTRACT Tender Notice No. :- NMMC/ ELEC/ JCE/ 66 (03) /2014-2015 Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 100 of 194 ARCHITECT : THE FIRM SPECIAL CONDITIONS OF CONTRACT 1.0 GENERAL A systems approach may be adopted for construction of the pavement, and the Method Statement for carrying out the work, detailing all the activities including indication of time cycle, equipment, personnel etc., shall be got approved from the Engineer before the commencement of the work. The above shall include the type, capacity and make the batching and mixing plant besides the hauling arrangement and paving equipment shall be adequate for a paving rate of at least 1000 sq.m.in one day. 2.0 POWER OF ATTORNEY: The contractor shall not issue any kind of power of attorney in favour of his bankers for routine payments to the contractors through Bank. 3.0 UNDER GROUND UTILITY All the underground utility, services such as water pipes, gas pipes, drains, sewers, cables etc, which may be met up or about any excavation shall if the Engineer – In – Charge deem it practicable, be properly maintained and protected by the contractor by means of shoring, strutting, planking over, padding or otherwise as erected by the Engineer – In – Charge during the progress of the work without claiming any extra charges. Any damage to these underground utility services shall be immediately remedied by the contractor at his own cost, failing which the Engineer – In –Charge may with or without notice adopt such measures as he may deem necessary at the risk and cost of the contractor. The contractor shall contact all the public bodies etc. to know the underground services that may be encountered by him during the execution of work and account for the consequences of the site constraints while submitting their tenders. No compensation/ cost shall be payable on account of any underground services which obstructs the work and cause delay. 4.0 Contractor shall be responsible for obtaining necessary permission/approvals from other departments like Tree Authority. If there is delay in obtaining such approval/permissions, only time extension will be granted and no escalation shall be paid for this delayed period. 5.0 PROGRAMME OF WORK The Contractor shall submit a Work Plan that shall include, but not be limited to the following: (a) General description of the arrangements and methods proposed by the Contractor to carry out the Works: (b) Detailed list of the Contractor’s resources (Plant, equipment, vehicles, materials, laboratory, workshop, professional personnel, specialists, labour, organization chart, etc.) assigned to the Works: (c) Time schedule of the mobilization and deployment of the required resources and their estimated average production rates to complete the Contract within the Time for Completion (d) The programme required under the Conditions of Contract; Clause 83 of Conditions of Contract. (e) Cash-flow statement showing anticipated payments due under the Contract. The programme shall be a linked and resourced Gantt chart produced on approved Project Programming software (supported versions of Microsoft Project or Primavera) and shall show the following: (f) The order in which the Works are to be constructed; (g) Design periods (if applicable) (h) Submission and approval periods for design, shop drawings, D&M manuals, record Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 101 of 194 ARCHITECT : THE FIRM drawings, etc; (i) Detailed activities for each task such as excavation, bedding, R.C.C works, backfilling, reinstatement, block work, finishing works etc; (j) Procurement, installation and commissioning periods for electrical works (k) Power and other services connections; (l) Tests before and after (if applicable) completion. The Contractor shall programme his work in accordance with the Contract and in such a way that he shall not impede any other Contractor working on or adjacent to the Site. For sewerage works, unless otherwise instructed by the Engineer, the Contractor shall programme his works such that he commences at the downstream manholes and continues upstream in a logical sequence. The programme of work shall identify when access to areas of live plant are required and when shutdowns are required. The EIC/ Architect shall give his comments on the programme within 7 days of its submission. The Contractor shall not commence the Permanent Works until the Engineer has approved his programme of work. The approval by the Engineer of the programme of work shall not relieve the Contractor of any of his duties or responsibilities under the Contract. The Programme shall be submitted in electronic format using the latest version in common use (e.g. compact disk) and as a paper print. The paper print may hide (roll up) activities for individual tasks in order to reduce the size and number of prints required. The disk copy shall be fully detailed. The Contractor shall also submit details of the method in which he intends to carry out the Works for the following where relevant: • • • • • • • • • • • • • • • • • • Traffic management including diversions and signage. Maintenance of vehicular and pedestrian access to properties. Diversion of utilities. Excavation and support of the sides thereof. Fencing and protection of excavations. Safety of the public. Safety of the workforce, safe working systems, safety awareness, first aid, personal protective equipment. Site security. De -watering of excavations and disposal of ground water. Sewage over-pumping. Working in live sewers and confined spaces. Transportation, lifting, stacking and storage of materials. Site clearance and house-keeping. Temporary works. Testing of Contractor’s lifting equipment. Testing of installed equipment. Commissioning of installed equipment. QA & QC procedures, document and inventory control. Method Statements shall also be provided for any other activities when requested by Engineer. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 102 of 194 ARCHITECT : THE FIRM 6.0 REVIEW MEETINGS The Contractor or his Authorized representative (approved by the EIC) shall attend all the review meetings conducted by competent authority from time to time without any extra cost and shall also remain present as and when required during checking of works at site. 7.0 PHOTOGRAPHS OF THE WORKS: No photographs of the Work or any part there of or equipment employed thereon shall be taken or permitted by the contractor to be taken by any of his employees or any employees of his sub- contractor without the prior approval of the Engineer in writing and no such photographs shall be published or otherwise circulated without the approval of the Engineer in writing. 8.0 NOTICES TO LOCAL BODIES: i) The contractor shall comply with and give all notices required under any Government Authority, Instrument, rule or order made under any Act of parliament, state laws or any regulation or Bye-laws of any local authorities or public utilities concern relating to Works. He shall before making any variation from the contract drawings necessitated by such compliance give to the Engineer a notice giving reasons for the proposed variation and obtained Engineer’s instructions thereon. ii) The contractor shall pay and indemnify the N.M.M.C. against any liability in respect of any fees or charges payable under any Act of parliament, state laws or any Governmental Instrument rule or order any regulations or bye-laws of any local authority or public utility concern in respect of the Works. 9.0 NOTICES: Subject as otherwise provided in this contract all notice to be given on behalf of the N.M.M.C. and all other actions to be taken on its behalf may be given or taken by the Engineer or any officer for the time being entrusted with the functions, duties and powers of the Engineer. All instructions, notices and communications etc. under the contract shall be given in writing and if sent by registered post to the last known place or abode or business of the Contractor shall be deemed to have been served on the date when in the ordinary course of post these would have been served on or delivered to him. 10.0 DOCUMENTATION: The Contractor's shall be responsible for preparing the final record as built drawings and submit the same to the Architect/ EIC for approval. During the course of the Works the Contractor shall therefore maintain a detailed record of all challenges in order to facilitate accurate preparation of “as-built” drawings and to ensure that these drawings are in all respects a true record of the installation. The Contractor shall furnish the following documents to the N.M.M.C. and the Contractor's quoted price is deemed to be inclusive of the same. (a) All final drawings and Micro films and Compact Discs of all approved drawings and "as built' drawings and calculations shall be supplied by the Contractor free of cost. (b) A "Maintenance Manual" describing access arrangements, important obligatory precautions from the point of view of structural safety, and procedure for minor and major repairs of each component of the project, renewals of finishes and treatments periodically shall be supplied by the Contractor free of cost. (c) A “Quality Assurance Manual” covering designs and drawings, mix-designs, materials testing, soil and rock properties, statistical quality control, etc. shall be prepared by the Contractor free of cost well before starting the work. (d) A “Construction Manual” covering various aspects of construction methods, difficulties faced and how they were overcome during execution etc, shall be supplied by the Contractor free of cost at the time of finalization of work. (e) The following MORTH and IRC publications shall be referred for basic maintenance activities for road and bridges respectively: Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 103 of 194 ARCHITECT : THE FIRM I) MORTH Manual for Maintenance of Roads IRC – New Delhi – 1989. II) IRC–SP–35-1990, Guidelines for Inspection and Maintenance of Bridges, New Delhi – 1990. (f) The specifications for items of repairs and maintenance shall be those adopted for construction mentioned earlier and shall generally conform to latest version of manual of maintenance of roads published by I.R.C. (g) The operation and maintenance manual shall include a maintenance and management plan for trees, shrubs, turfing and hedges to sustain their development in a manner pleasing in appearance. (h) The Contractor shall install fixtures and fastenings provided by the N.M.M.C. for housing any instrumentation that may be useful for the N.M.M.C. at his cost. Fixing arrangement for internal and external lighting shall be got approved from competent authority and executed. 11.0 SHOP DRAWINGS: The contractor shall prepare the shop drawings and get the same approved from the Engineer – In – Charge/ Architect/ Consultant. 12.0 FACILITIES AND CO-OPERATION: In the case of works indicated on the drawings but not included in the Contract, the Contractor shall provide necessary facilities and co-operation for any Sub-Contractor or Supplier who may be approved by the Owner. The Contractor shall do all the cutting, filling or patching of his work that may be required to make its several parts come together properly and fit it to receive or be received by work of other Contractors shown upon or reasonably implied by the drawings and specifications for the completed structure, and he shall make good after them as the Consultant may direct. Any cost caused by the defective or ill-timed work shall be borne by the party responsible therefore the Contractor shall not endanger any work by cutting, excavating or otherwise altering the work and shall not cut or alter the work of any other Contractor save with the consent of the Consultant. 13.0 TECHNICAL STAFF AT SITE: Contractor shall have following Engineers dedicated for this job, all times at site. 1 Two Mechanical Engineers having minimum experience of 7years in Airconditioning Works and setting & commissioning chiller plants. 14.0 PROJECT SIGN BOARD The Contractor shall provide and erect a Project Sign Board at the location of the approved site compound of size as mentioned by the Architect/ EIC and the same shall have the Project Details, Consultant Details and Presentation Views given by the Architect. This shall be provided by the Contractor and shall be positioned so as not to cause hindrance to the movement of vehicular or pedestrian traffic. The signs shall be mounted on sturdy metal frames, be mobile and reusable, and shall be illuminated at night. The Contractor shall produce drawings of his proposed signboards for the Engineer’s approval. The minimum acceptable drawing size for approval shall be A3. In addition, the Contractor shall obtain all necessary approvals from the relevant authorities prior to erection. The Contractor shall be responsible for the structural stability of the signboards but shall submit details of his proposals for support to the EIC for approval. The Contractor shall maintain, move and adapt the signboards as required during the progress of the Works and shall remove them upon completion. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 104 of 194 ARCHITECT : THE FIRM The Contractor shall provide and erect 4 Nos. standard signboards. 15.0 INSPECTION AND HANDOVER PROCEDURES Pre-Requisite for Final Inspection The Contractor shall complete the following to the satisfaction of the Engineer before requesting the pre-handover Inspection: (a) Submit final manufacturer certification, guarantees, warranties and similar documents (b) Submit operating certificates, final inspection and test certificates and similar releases enabling full and unrestricted use of the Works (c) Submit record drawings, operation and maintenance manuals, final project photographs, property surveys and similar physical items (d) Complete submittal of record documents (e) Make final changeover of locks and deliver the keys to the Engineer (f) Complete start-up, testing of system, and training of the Employer’s operations and maintenance personnel; submit equipment operating data as well as all test reports and test data required by the Contract (g) Dismantle and remove temporary facilities and services from the Site; this includes utilities, construction tools, buildings and facilities, mock-ups, and similar elements (h) Complete final cleaning (i) Repair and restore exposed finishes which have been marred or otherwise damaged (j) Handover all spare parts, tools and maintenance equipment (k) In Network Projects, partial handling over would be acceptable, if it completely met all the above mentioned requirements When the Contractor has completed and cleaned the Works to the satisfaction of Engineer the Contractor shall request a final inspection. The request shall be forwarded to Drainage Department by the Contractor's Representative and a suitable date for the inspection shall be arranged. The Contractor, EIC, Maintenance Department shall be present. A list of outstanding items (if any) shall be agreed and issued to the Contractor. Upon completion of the listed outstanding items a further inspection shall be requested by the Contractor, the request shall be forwarded to Maintenance Department by the Engineer’s Representative and a suitable date for the inspection shall be arranged. The Contractor, Engineer’s Representative, Maintenance Department shall be present. A list of any items still outstanding shall be issued to the Contractor. If any of these are deemed to be significant the Contractor shall complete these items and then request another inspection as described in above. In respect of pumping station or Works involving mechanical equipment if items outstanding are deemed not to be significant or if no outstanding items remain then a 7 day commissioning and running test shall be initiated. On completion of all tests and agreement by the Engineer’s Representative that the plant is considered operable then it shall be handed over. A 14 day training period for the Maintenance Department staff on the operation of the pumping station shall commence. For works that have no mechanical or electrical equipment if the outstanding items are deemed not to be significant or if no outstanding items remain the Works inspected shall be handed over. Maintenance Period Final Inspection During the last month of the Period of Maintenance the Engineer will notify the Maintenance Department that the Maintenance Period is about to expire. An inspection of the Works by the EIC, Maintenance Department, and the Contractor shall be undertaken to verify that all outstanding items have been completed. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 105 of 194 ARCHITECT : THE FIRM 16.0 INSURANCE OF THE WORKS AGAINST FIRE, ETC.: 16.1 (a) The Contractor shall in the joint names of the Owner and Contractor insure against loss or damage by fire, storm, tempest, lightning, flood, earthquake, aircraft or anything dropped there from, aerial objects, riot and civil commotion for the full value thereof all work executed and all unfixed materials and goods intended for, delivered to and placed on or adjacent to the work, but excluding temporary building plant, tools and equipment owned or hired by the Contractor or any subcontractor and shall keep such work materials and goods so insured until Virtual Completion of the Work. Such insurance shall be with insurers approved by the Consultant and Contractor shall deposit with the Consultant the policy or policies and the receipts in respect of premiums paid and should the contractor make default in insuring or continuing to insure as aforesaid the owner may himself insure against any risk with respect of which the default shall have occurred and deduct a sum equivalent to the amount paid by him in respect of premium from any moneys due to or to become due to the contractor. Provided always that if the contractor shall independently of his obligations under this contract maintain a policy of insurance which covers (interalia) the said work, materials and goods against the aforesaid contingencies to the full value thereof then the maintenance by the contractor of such policy shall if the Owners interest is endorsed thereon, be a discharge to the contractor's obligation to insure in the joint names of the owner and contractor and the production by the Contractor as and when may reasonably be required by the Consultant of a current certificate of insurance form the company or firm which shall have issued the said policy shall be a discharge of the Contractor's obligation to deposit with the Consultant a policy or policies and the receipts in respect of premiums paid. The Contractor shall also take out the Third party insurance policy to the tune of Five Lacs. (b) Upon settlement of any claim under the insurance aforesaid the contractor with the due diligence shall restore work damaged, replace or repair unfixed materials or goods which have been destroyed or injured, remove or dispose of any debris and proceed with the carrying out and completion of the work. All moneys received from such insurance shall be paid to the contractor by installments under certificates of the Consultant issued at the period of interim certificates named in the appendix to these conditions. The contractor shall not be entitled to payment in respect of the restoration of work damaged, the replacement and repair of any unfixed materials or goods and the removal and disposal of debris other than the moneys received under the said insurance. 16.2 All work executed and all unfixed materials and goods intended for, delivered to an placed on or adjacent to the works (except temporary buildings, plant, tools and equipment owned or hired by the contractor or any sub-contractor) The Contractor shall be solely responsible for all the material and workmanship regards loss or damage by fire, storm, tempest, lightning, flood, earthquake, aircraft or anything dropped there from, aerial objects, riot and civil commotion. 16.3 The existing structure together with all the contents thereof and the works and all unfixed materials and goods intended for, delivered to and placed on or adjacent to the works (except temporary buildings, plant, tools, and equipment owned or hired by the contractor or any sub-contractor) shall be at the sole risk of the Contractor as regards loss or damage by fire, storm, tempest, lighting, flood, earthquake, aircraft or anything dropped there from, aerial objects, riot and civil commotion, and the Contractor shall maintain adequate insurance against that risk if any loss or damage affecting the work or any part thereof or any such unfixed materials or goods is occasioned by any one or more of the said contingencies. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 106 of 194 ARCHITECT : THE FIRM (A) (i) The contractor with due diligence shall reinstate or make good such loss or damage and proceed with the carrying out and completion of the works. (ii) The Consultant may issue instructions requiring contractor to remove and dispose of any debris. 17.0 SITE OFFICE INFRASTURCUTRE: The Contractor shall at his own cost and to the satisfaction of the Engineer, provide a site office of not less than 25Sq.mtr. With brick walls, plastering inside, rough Shahabad flooring and one writing table with six chairs and large size steel cupboard. He shall also make necessary arrangements for drinking water and electric connection and locking arrangement. Upon completion of the whole work and after clearing the site and upon expiry of defect liability period, the Contractor shall remove the site office and take possession of the furniture and cupboards provided by him in the condition it was on the date of receiving back the same. Telephones The office shall be equipped with a telephone facility. A second telephone line shall be provided for facsimile machine Computer Equipment, Printers and Plotter The Contractor shall provide 1 desktop computers complying with 21” LCD colour monitors. The computers shall comply with the following: Desktop Intel Pentium 4 3.06 GHz processor • 512MB DDR RAM • 16 MB AGP Card (Not Shared) • 100 MBPs Ethernet network card • Min no. 2 USD ports • 80GB Hard disk • 56k Modem • Read/Write CD Rom drive • 21”LCDMonitor The Contractor shall provide one number colour printer of the laser jet type suitable for A4 and A3 size paper. It shall be quiet in operation (HP 5550N or similar) The Contractor shall provide one number monochrome printer shall be laser jet type suitable for A4 and A3 size paper. It shall be quiet in operation (HP 5100TN or similar). 18.0 MAINTENANCE OF WORK ORDER BOOK A work order book shall be maintained on the site and it shall be the property of Employer and the Contractor or his authorized representative shall promptly sign orders given therein by the Engineer or his authorized representative and comply with them. The compliance shall be reported by Contractor to the Engineer in sufficient time so that it can be checked. The blank work order book with machine numbered pages in triplicate with perforated sheet for two copies to be detached shall be provided by the Engineer for this purpose. The Contractor shall be supplied the first and carbon copy. The contractor shall depute his representative not below the rank of Project Manager to attend periodic review meetings notified by the Engineer. The Engineer shall record the business of meeting and is to provide copies of his record to those attending meeting and to the Employer. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. 19.0 Page 107 of 194 ARCHITECT : THE FIRM WORKING METHODS AND PROGRESS SCHEDULE i. A quality assurance procedure covering all aspects of the work shall be adopted for this work to ensure the desired quality. Details of the procedure shall be decided by mutual consultation between the Engineer and the Contractor at the start of the Works. ii. The Contractor shall submit within the time stipulated by the Engineer in writing, the details of actual methods that would be adopted by the Contractor for the execution of any item as required by the Engineer at each of the locations, supported by necessary detailed drawings and sketches including those of the equipment and machinery that would be used, their locations, arrangements for conveying and handling materials etc. and obtain prior approval of Engineer well in advance of starting of such item of work. iii. The Engineer reserves the right to suggest modifications or make complete changes in the methods proposed by the Contractor, whether accepted previously or not, at any stage of work, to obtain the desired accuracy, quality, safety, and progress of work which shall be binding on the Contractor and no claim on account of such change in method of execution will be entertained by the Employer, so long as Specifications of the items remains unaltered. iv. The Contractor shall furnish sufficient plant, equipment and labour as may be necessary to maintain the progress schedule. The working and shift hours for operations to be done under the Employer supervision shall be such as may be approved by the Engineer. They shall not be varied without the prior approval of the Engineer. The Contractor shall provide necessary lighting arrangements etc., for night work, as directed by the Engineer without extra cost. v. The Contractor shall submit the progress of work in prescribed forms and statements at periodical intervals in the form of progress charts, forms, statements and/or reports as may be approved by the Engineer. vi. The Contractor shall maintain Performa, charts, details regarding machinery, equipment, labour, materials, and periodical returns thereof as may be specified by the Engineer. 20.0 MOCK UPS: Prior to fabrication, construct mock-ups for each type of component/ assembly and form of construction and finish required to verify selections made under sample submittals and to demonstrate aesthetic effects as well as qualities of materials and execution. Simulate all types of surrounding finish materials for mock-ups. Build mock-ups to comply with the following requirements, using materials indicated for final unit of work. a. b. c. d. Locate mock-up in the location indicated or, if not indicated, as directed. Demonstrate the proposed range of aesthetic effects and workmanship. Obtain approval of mock-ups before start of final unit of work. Retain and maintain mockups during construction in an undisturbed condition as a standard for judging the completed work. e. Approved mockup may become part of completed works if undisturbed and approved by the Engineer at time of substantial completion Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 108 of 194 Signature of Tenderer No. of Corrections ARCHITECT : THE FIRM Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 109 of 194 ARCHITECT : THE FIRM NAVI MUMBAI MUNICIPAL CORPORATION HEAD OFFICE BUILDING, BELAPUR, NAVI MUMBAI TECHNICAL SPECIFICATIONS FOR HVAC WORKS Tender Notice No. :- NMMC/ ELEC/ JCE/ 66 (03) /2014-2015 Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 110 of 194 ARCHITECT : THE FIRM General guideline for Technical specifications: The Technical Specifications contained herein shall be read in conjunction with the other Bidding Documents. The specifications for various items to be followed are as per M.O.R.T.H. Latest revision and “Maharashtra P.W.D. Standard Specification”. In the absence of any definite provisions on any particular item in the aforesaid specifications, and additional specifications given herein after, reference may be made to at least I.R.C. Codes of practice. B.I.S. specification and Indian Railway Codes in that order. Where even these are silent the construction and completion of the items shall conform to the Sound engineering practice and in case of dispute arising out of the interpretation of the above, the decision of the City Engineer shall be final and binding on the Contracts. In brief the order which the specifications of the work are to be followed shall be as follows: 1. Ministry of Road Transport and Highways Specification for Road and Bridge Works latest revision. 2. Maharashtra P.W.D. Standard Specifications. 3. Indian Roads Congress Specifications. 4. Bureau of Indian Standards Specifications. 5. Indian Railway Standard. 6. Sound Engineering Practice. The abbreviations I.R.C., M.O.R.T.H., B.I.S. shall be considered to have the following meaning: 1) M.O.R.T.H.- Ministry of Road Transport and Highways specification for Latest Revision. 2) I.R.C. - India Road Congress. 3) B.I.S. - Bureau of Indian Standards. The code of practice, standards and specifications applicable shall be those existing as on the month prior to the last date for submission of tender. In so far as any stipulations made herein conflict or are inconsistent with any of the provision of M.O.R.T.H. Latest revision, I.R.C. Codes of practice, the stipulation made herein shall prevail. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 111 of 194 ARCHITECT : THE FIRM TABLE OF CONTENTS SR. NO. DESCRIPTION 1 GENERAL 2 STANDARDS & SPECIFCATIONS 3 BASIS OF DESIGN & SYSTEM DESCRIPTION 4 AIR CONDITIONING WORK 5 VENTILATION WORKS 6 EQUIPMENT AND MATERIALS 7 INSPECTION, TESTING AND COMMISSIONING 8 LIST OF APPROVED MAKES 9 ABBREVIATIONS 10 ATTACHMENTS Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. 1.0 Page 112 of 194 ARCHITECT : THE FIRM GENERAL The Services inside a Building constitute an important facet in its construction, since they dictate the day-to-day Comfort, Health, Safety, Security and the Operating Expense of its inhabitants over its entire life span. The Services have been conceptualized in close co-ordination with the Architectural, Planning and Design Philosophy and the Structural Parameters to produce a Concept, which is an Integrated Whole. The geographic location of the building, its orientation and the surrounding environment have been given due consideration in working out design details. Conservation of Energy & Water on one hand and Optimization of Resources on the other hand are some of the important factors which have been considered in our design. Our inter-disciplinary expertise is effectively utilized in harnessing various emerging technologies and we claim that we create ECO-Friendly (GREEN) Building that are Intelligent to the changing needs of the inhabitant systems, the internal dynamics of the Building vis-à-vis the prevalent external climatic conditions. We are always sensitive to the Need and Social Responsibility of maintaining the ecological balance in nature. The building consisting of following areas:SR. NO. 1 2 3 Signature of Tenderer FLOORS BASEMENT-1 BASEMENT-2 GROUND FLOOR Ht (mtr) 3.20 3.45 4.9 4 FIRST FLOOR 4.9 5 SECOND FLOOR 3.6 6 THIRD FLOOR 3.6 7 FOURTH FLOOR 3.6 8 TERRACE LEVEL No. of Corrections TYPE OF USAGE CAR PARKING, PUMP ROOM CAR PARKING, PUMP ROOM MAIN ENTERANCE LOBBY, ADMINISTRATION & BMS ROOM SPILL OUT AREA, MAIN ENTERANCE LOBBY SPILL OUT AREA, REHERSAL ROOM CABIN ENTERANCE LOBY, SPILL OUT AREA, AUDITORIUM LOBBY, AUDITORIUM (FROM GROUND TO FOURTH FLOOR) AC PLANT ROOM Signature of N.M.M.C. Officer CLIENT : N.M.M.C. 2.0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Page 113 of 194 ARCHITECT : THE FIRM STANDARD SPECIFICATION The followings terms have been used in the tender specifications, drawings etc. ISI :- Bureau of Indian Standards. ASHRAE :- American Society of Heating Refrigerating & Air-conditioning Engineers. ISHRAE :- Indian Society of Heating Refrigerating & Air-conditioning Engineers. ASME :- American Society of Mechanical Engineers. ASA :- American Standard Association. B.S. :- British Standards. The codes, regulation as detailed below shall be followed in this contract:IS 659 : 1964 (reaffirmed) Safety code for air-conditioning (revised) amendment 1 1991) Safety code for mechanical Refrigeration IS 660 : 1963 (reaffirmed) 1991) Testing of refrigeration Compressors IS 5111 : 1993 Air-cooled heat exchangers (amendment 1) IS 10470 : 1983 (reaffirmed 1991) IS 8148 : 1976 Packaged Air-conditioner (reaffirmed 1991) Hermetic compressors IS 10617 : Part I, II & III 1983 (reaffirmed 1991) Suppliers data sheet for clean air equipment IS 12357 : 1998 (laminar flow) Thermostats for use in refrigeration etc. IS 11338 : 1965(reaffirmed 1991) Code of practice for design and construction of IS 11338 : 1965 (reaffirmed 1991) flue chimneys. Metal Duct Work IS: 665/SMACNA Steel for general structural purpose IS 2062 : 1992 Piping Work Is 1239 Part I & II 1990/1992 IS & BS : 3601 Welding IS 3589 Refrigeration As per ASHRAE / ISI / ISHRAE Hot Dip Zinc Coated Steel Tubes IS 4736 : 1968 Gate Valves for Water lines IS 778 : 1980 Copper Alloy Gate Globe Check Valve for IS 778 : 1980 water lines Butterfly Valve IS 13095 : 1991 Steel Pipe flanges IS : 6392 Gaskets IS 638 : 1979 (reaffirmed 1993) Mild steel tubes & fittings IS 1239 Part I & II Colour code for the identification IS 2379 : 1963 of pipe lines Specific requirements for the IS 4064 (Part II) 1978 direct switching of the individual motors. PVC insulated (HD) Electric Cables for IS : 1554 (Part II) working voltage up Including 1 100 Volts. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 Page 114 of 194 HRC Cartridge fuse links upto 650 Volts. Starter Inspection and testing of Installation Three phase induction motors PVC insulated (heavy duty) cables for working voltage up to 1.1. KV and up to 11 KV Grade respectively. Code of practice for electrical wiring installations. Code of practice for earthing Horizontal centrifugal pumps Centrifugal fans (1st. Division) Wrought aluminium & aluminium alloy sheet and strip for general engineering-purposes. Mild steel tubes, tubular and other wrought steel fittings. Bourden tube pressure and vacuum gauges. Glossary of terms used in refrigeration and airconditioning. Code for practice for standard for selection of standard worm and helical gears. Three phase induction motors. Specification for single phase small A/C & universal motors Specifications for flame proof motors Circuit breaker A.C Contactors for A,C for voltage up to 1100 V. Low voltage switch gear and control gear assemblies. Code of practice for selection of starters for AC induction motors Specification for cables glands Code for selection, installation & maintenance of switch gear and control gear. Conduits for electrical installations Permissible limits of noise level for rotating electrical machines. Code of practice for installation and maintenance of motors Code of practice for selection of standard worm and helical gear boxes. Electrically welded steel pipes for water, gas and sewage. Gum metal gate, globe and check valves for general purposes. Wrought aluminum and aluminum alloy steel and strips for general engineering purposes. HRC cartridge fuse links upto 650 volts PVC insulated (heavy duty) electric cables for working voltage upto & including 1 100 watts. Method for testing Panel type air filters for AC purposes Signature of Tenderer No. of Corrections ARCHITECT : THE FIRM IS 2208 : 1976 IS 9554 (Part I) 1979 IS 732 (Part II) 1979 IS : 325 IS 1554 : 1981 Part I & II IS 732 : 1989 IS : 3043 : 1966 IS : 1620 IS 4894 : 1987 (reaffirmed 1991) IS : 737 IS : 1239 IS : 3624 IS : 3615 IS : 7403 IS : 325 IS : 996 IS : 2148 IS 2516 : 1980 Part I & II IS 2959 : 1975 IS 8623 : 1993 Part I & II IS 3914 IS 4821 IS 10118 : 1982 Part I to IV IS 9537 : 1981 Part I to IV IS 12065 : 1987 IS 3106 : 1966 IS : 7403 IS : 3589 IS : 778 IS : 737 IS : 2208 IS : 1554 (Part I) IS 7613 : 1975 (reaffirmed 1991) Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 115 of 194 58 59 Unbonded glass wool for thermal insulation Expanded polystyrene for thermal insulation purposes. 60 Propeller type AC Ventilation fans 63 Electrical axial flow fans SAFTEY CODES The following IS codes shall he followed: Safety code for mechanical refrigeration Safety code for air conditioning Safety code for scaffolds & ladders Code of practice for fire precaution in Welding & cutting operations Code for safety procedures and practices in electrical works Safety code for constructions involving Use of hot bituminous material Safety requirements for wall openings, railings etc. Code of practice for safety and health 1. ARCHITECT : THE FIRM IS 3690 : 1874 ( 1st. Revision) IS 4671 : 1984 (reaffirmed) ( 1st revision) IS 2312 : 1967 (reaffirmed 1991) IS 3588 : 1987 (reaffirmed 1991) IS 660 IS 659 IS 3696 Part I & II, 1966) IS 3016 IS 5216 IS 5916 (1970) IS 4912 (1978) IS 3696 (1966) BASIS OF DESIGN: Geographical location (based on the data mentioned in ISHRAE handbook): Site location Latitude Altitude NAVI MUMBAI 18°5’ N 10M above MSL Ambient Conditions (based on the outdoor design data mentioned in ISHRAE handbook): DB WB RH (°C) (°F) (°C) (°F) (%) Summer 38 100 27.8 82 47% Monsoon 30 83 28.5 86 86% Winter 18.3 65 14.4 58 65% Indoor Design Conditions: Comfort Air Conditioning: DB : 23ºC ± 1ºC (73ºF ± 2ºF) RH : Not Exceeding 60% Auditorium : DB : RH : 23°C ± 1°C (73°F ± 2°F) Not Exceeding 60% Note: 1.1 Lift machine room will be air conditioned through Split A/C units if required by the Elevator Manufacturer. 2.1 REFRENCE STANDARDS: The entire System will be designed in accordance with the following Standards: National Building Code. ASHRAE Application 2000 & ASHRAE Fundamentals 2004 Indoor Air Quality as per ASHRAE 62-1999. ISHRAE Codes. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 116 of 194 ARCHITECT : THE FIRM Duct construction standards as per relevant BIS Codes, IS 655:1963 Motor control centers, Motors, Cabling, wiring and accessories as per BIS code Cable Insulation – IS 8130, IS 5831. Earthing system as per BIS Code – IS 3043; IS 732 3.1 ESTIMATED AIR CONDITIONING LOADS:- a. ASSUMPTIONS: Sr. Description No. 1 Floor to floor height (General) : As per architectural layout 2 Occupancy 3 4 5 Fresh air in conditioned areas Lighting load (Heat Addition to space) External Walls 6 Glass in Conditioned Areas : Unitized Glazing - DGU 7 Roof –U Value (After Insulation) Indoor Conditions : 0.12 BTU/Hr. sqft .Deg. F 8 b. Estimated Value : Auditorium -380, Other area – 35 sq.ft/ per person. : 15 Cfm/ person. : 1.5watts/sq.ft : 230 mm thick solid Blocks : As described earlier HEAT LOAD CALCULATIONS: Summary of the Heat Load Calculations for the building is summarized below: Sr. No. 1 2 3 4 5 6 7 8 Name of Area Ground Floor First Floor Second Floor Third Floor Fourth Floor Audi – Level 1 Audi – Level 2 Audi – Level 2 TOTAL Signature of Tenderer Occupancy Area Lighting Appliances Nos. sq.ft. Load (watt) 10104 5115 4406 3212 6650 2841 7554 5585 45466 Load (watt) 15286 0 0 0 0 0 0 0 15286 193 98 84 61 127 226 300 384 1473 6736 3410 2937 2141 4433 1894 5036 3723 30309 No. of Corrections DeHumidifide cfm 11773 5411 3122 3877 15942 6558 11423 21168 132917 Total Tonnage cfm tr 11773 5411 31122 3877 15942 6558 11423 21168 297274 Signature of N.M.M.C. Officer 44 18 13 12 44 43 62 75 311 CLIENT : N.M.M.C. Page 117 of 194 ARCHITECT : THE FIRM 4.1 DESIGN PARAMETERS: a. Chillers: The performance of the chillers shall be based on the following parameters: Sr. No. Description Value Temperature of chilled water entering chiller 12 deg C (54 deg F) 1 Temperature of chilled water leaving chiller 7 deg C (44 deg F) 2 Fouling factor for chiller in FPS unit 0.0005ft²h ºF/BTU 3 Fouling factor for condenser in FPS unit 0.001ft²h ºF/BTU 4 Refrigerant for Chillers R-134A/R-407a 5 Coefficient of Performance for Screw Chillers Exceeding 5.5 6 b. Air Handling Units: Sr. No. Description Maximum face velocity across filters 1 Maximum face velocity across cooling coils 2 Maximum fan outlet velocity 3 Maximum fan speed 4 Maximum fan motor speed 5 c. Piping Design: Sr. No. Description Maximum velocity for Header 1 Maximum velocity for others 2 3 Maximum friction d. Ducting Design: Sr. No. Description Maximum flow velocity – Other Areas 1 Maximum flow velocity – Audi 2 Maximum friction 3 4 Maximum Velocity at supply air outlet Maximum Velocity at supply air outlet 5 5.1 EQUIPMENT SELECTION: a. Chillers: Value 500 FPM 500 FPM 1000 FPM 1000 RPM 1440 RPM Value 6 FPS 8 FPS 5ft Per 100ft (5m Per 100m.) Value 1500 FPM 1000 FPM 0.1”WG Per 100 ft 300 FPM (Audi) 500 FPM Area) (Other Based on the economics of the Water cooled Rotary Screw chillers, we have proposed to go in for Water Cooled Rotary Screw Chillers. The Air-conditioning heat load of Auditorium is 180TR and the total load is 311 TR. Considering the load profile variation, following capacity of Chiller is selected. 3Nos. x 150 TR Water Cooled Rotary Screw Chillers (2 working + 1 Standby) b. Primary Chilled Water and Condenser Water Pumps: End Suction Back Pullout type Primary Pumps will be provided to each chiller for Primary Chilled water and Condenser Water distribution. Stand-by pumps will be provided for each type of circulation. i. Primary Chilled Water Pumps: Signature of Tenderer Primary Pumps: End Suction Back Pullout type: 3 Nos. x 10 HP, 423gpm (2Working + 1 standby). No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. c. Page 118 of 194 ARCHITECT : THE FIRM ii. Secondary Chilled Water Pumps End Suction Back Pullout type: Secondary Pumps: 3Nos. x 15 HP, 423gpm (2Working + 1 standby).- Zone I iii. Condenser water Pumps End Suction Back Pullout type: 3Nos. x 20 HP, 629 gpm (2 Working + 1 standby) Induced Draft Cooling Towers : We propose to install induced draft cooling towers for heat rejection from the water cooled chillers. These are proposed to be installed on the terrace of the building. The following capacity of cooling towers would be selected: d. 6.1 Ventilation: The Parking Area in the basement shall be mechanically ventilated with 15 Air changes per hour in normal conditions and 30 Air changes per hour for Fire Condition. The parking area will be ventilated through ducts connected to the Centrifugal fans. The Exhaust air from the basement will be taken out on the ground level through underground trench and will be exhausted through the Stall board. The location of the Stall board will be decided in consultation with the Architect. All the toilets, kitchen, pantry will be ventilated by mechanical ventilation. All the external staircases will be mechanically pressurized. SYSTEM DESCRIPTION: A Centralized Chilled Water Air Conditioning System has been proposed to provide year round thermal environment control for the proposed buildings. Some of the key components of the Air-Conditioning System are outlined in the following paragraphs: 1 Chillers: 2 The proposed Chillers will be State-of-the-Art, Water Cooled Rotary Screw Chillers, using R-134A / R407a. Chiller with VFD is proposed in view of optimizing the design. The proposed Chiller configuration will have one stand-by units. Chilled System: The proposed Chiller packages will be of Water Cooled Rotary Screw Chillers, using eco-friendly R-134A/ R410a refrigerants, with each chiller shall house multiple compressors (at least two no.). A diversity of 80% has been used for selection of the chillers with a view to optimize the design. The proposed chiller will have one stand by unit .This is meant to operate during non peak hr. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. 3 High efficiency Double skin air-handling units that generate minimum noise will be provided for each area. Each Unit will be provided with Pre-filters as per the indoor conditions to be achieved. The Air Handling Units shall be provided with 2-way modulating valves to control the volume of chilled water flowing through the coils in response to the room temperatures vis-à-vis the set points. All the AHUs catering to the variable loads will be provided with VFDs for energy saving. AHU room walls will be acoustically treated so as to prevent disturbance to adjoining office spaces All fans selected for the system will be High Efficiency fans, with Fan Efficiencies greater than 75% and the Motor efficiencies Air Distribution System: 6 Chilled water distribution shall be through a Primary/ Secondary pumping system. The primary pumps shall be provided one for each chiller. Secondary pump is proposed for Zone –I (Audi) & Zone –II (Other Area). VFD will have provided on each secondary pump The insulated Chilled water to various zones shall be pumped through insulated chilled water pipes through secondary pumps All pumps selected for the system will be High Efficiency Pumps, with Pump Efficiencies greater than 75% and the Motor efficiencies > 85%. Air-Handling Units: 5 ARCHITECT : THE FIRM Chilled Water Distribution System 4 Page 119 of 194 Air will be distributed through a network of Insulated Supply and Return Ducts installed in the ceiling spaces. Conditioned supply air will be discharged through Supply Air Grilles and Diffusers spaced so as to ensure even temperature in the entire conditioned space. The layout of grills ,diffusers will be coordinated with overall ceiling plan conceptualized by architect/ interior design Motorized Smoke Dampers, actuated by smoke detectors will be provided in the Supply and Return Ducts, to prevent spreading of smoke to adjoining areas in the case of a Fire. These ducts shall be installed in the common air conditioned spaces like lift lobbies and main entrances. Control System The entire HVAC system shall be controlled through state of art of microprocessor based Control panels which will be ultimately integrated with IBMS systems that has been conceived to control /coordinate operation of all services at optimum level Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. 3.0 Page 120 of 194 ARCHITECT : THE FIRM AIR CONDITIONING WORK SCOPE OF WORK AND EXCLUSIONS: The HVAC Contractors scope of work shall include all items of work as per these specifications, all applicable Code & Standards, drawings, terms and conditions of contract etc. and briefly described in Schedule of Quantities. This shall include, but not be restricted to the following: Centralised Water Cooled Chilling Units with Pumps, Motors and Drives Chilled Water Piping in the Plant Area and from the Plant Area to the AHU Rooms / FCU’s with fittings, pressure testing of all system. Insulation for Chilled Water Piping after satisfactory pressure testing of all chilled water piping system. Air Handling Units with motors, Electrical Starter Panels and control valves including installing Drain Piping. Ducting including provision of suitable dampers with power points and conducting work from its starter panel, grilles, diffusers, insulation etc Main Electrical AC Panels and other electrical works, including AHU Starter Panels, Electrical Switchgear, Power and Control cabling, Earthing etc. for the Central Chillers and AHU’s, including termination of cables in the panels. All Minor Masonry, Carpentry and Civil works such as cutting opening in Masonry Walls, Internal Partitions, RCC Slabs, Chasing on Walls, etc. and making good the same to match existing works / décor shall be done by the Contractor, wherever asked for by the Engineer-in-Charge / PMC. Providing floating foundations for all equipment as necessary, Foundation bolts, Vibration Isolators, Base Frames etc. for mounting the Chillers, Pumps, AHU’s and other equipment as per Approved foundation drawings. All other works associated with above items as per specifications, drawings and conditions of contract and the Navi Mumbai Fire Brigade requirements except those specifically excluded. Unless otherwise indicated in Schedule of Quantities, the Contractor's scope of work shall also include the following items of work and services which shall be arranged by the Tendere wherever required. Provisions of adequate AC, 3 phase, 415 V, 50 HZ supply with earthing for electrical panels of HVAC systems as per drawings (Power cables of adequate rating along with earthing). Provision of drain points for AHU rooms, plant rooms upto nearest as directed by the Engineer etc. Smoke / Heat detection systems for actuation of fire dampers etc. Making Major Openings in Shear Walls, Beams, Columns etc. for Ducts and Pipes and Cables and making good the same. BASIC REQUIREMENTS: Details of spaces to be air conditioned, space temperatures, humidity, occupancy, lights and equipment loads etc. are indicated below and the Tender Drawings. All AC systems shall be designed for peak summer and monsoon ambient conditions. The Air conditioned areas are proposed to be grouped into several Air Handling Unit based systems as indicated below, depending on usage of area/ and operating convenience and as per the drawings. Tenderers shall ensure that all equipment offered by them fit into the spaces allotted and shown in the tender drawings with adequate space being available for maintenance and ease of operation. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 121 of 194 ARCHITECT : THE FIRM SUGGESTED SYSTEM DESIGN AND INSTALLATION: 4.0 Air Cooled Rotary Screw Chiller shall be installed at the terrace block. The Chilled Water from these chillers shall be circulated to Air Handling Units / Fan Coil Units located on each Floor. The Air conditioning requirements are proposed to be met by Individual Air Handling Units / Fan Coil Units located in the AHU Room or lofts etc, as indicated in the Drawings. The individual Air Handling Units / Fan Coil Units shall be fed with Chilled Water being circulated from the Centralized Chillers through insulated pipes. Fresh Air Inflow control to the Air Handling Units shall be by means of Control Dampers. Manually Operated Volume Control Dampers shall be provided in Supply ducts as required to provide means of balancing airflow. The design Dry Bulb (DB) temperatures for various areas served by the Air Handling Units (AHU) shall be controlled by temperature sensors and motorized two way valves. The cooling coils shall generally be capable of maintaining room temperature and incidentally meeting the humidity levels specified where no specific humidity controls are specified. Based on details given above and other parts of these specifications and drawings, the successful tenderer shall estimate peak heat loads for each area and for each season and select the equipment to meet the desired temperature and humidity conditions as specified in the Tender. The heat loads estimated by Consultants for summer for various areas and floors are indicated in Table appended with this section of specifications and are for tenders guidance only. Quantities of supply air are based on assumed by-pass factors of coil (and desired coil Apparatus Dew Point (ADP). VENTILATION WORKS: SCOPE OF WORK AND EXCLUSIONS: The Contractor's Scope of work for Ventilation & Smoke Exhaust Installation shall include all items of work as briefly described in Schedule of Quantities and shown on the drawings. This shall include, but not be restricted to the following: Centrifugal fans, Axial Fans etc. Sheet metal duct work, etc. Electrical works including Motor Control Centre (MCC) panels, Power and Control wiring etc. as required. Cabling from a Single Main Ventilation Fan Panel to the fans being catered to. Minor Masonry, Carpentry and Civil works such as cutting / opening in Masonry Walls, RCC Slabs, Internal Partitions, Chasing on Walls, etc. and making good the same to match existing works / décor shall be done by the Contractor, wherever asked for by the Engineer-in-charge. Providing foundation, Foundation bolts, Vibration Isolators, Base Frames etc. for mounting the Fans. All other works associated with above items such as supports, painting etc. as per specifications and drawings read in conjunction with terms and conditions of contract and the requirements of the Local Fire Brigade. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 122 of 194 ARCHITECT : THE FIRM EXCLUSIONS: Unless otherwise indicated in Schedule of Quantities, the Contractor's Scope of work shall exclude only the following items of work that shall be arranged by the client through other agencies Provision of single-phase points and earthing for all single phase fans. Smoke / Heat Detection system for actuation of fans. BASIC REQUIREMENTS: The mechanical ventilation, emergency smoke exhaust and pressurization system installation shall comply with requirements of the Local Fire Brigade. Details of spaces covered under mechanical ventilation systems shall be as given below and as shown in the Drawings. BASIS OF DESIGN AND EQUIPMENT INSTALLATION: 5.0 The proposed rate of supply and / or exhaust air from various mechanically ventilated area are indicated. The exhaust ducts may be designed for air velocities of not more than 1,500 fpm for normal ventilation. The fan selection shown is based on outlet air velocities not exceeding 2500 FPM at normal duty. Both Ladies and Gents Main Toilets are proposed to be provided with exhaust ducting. A single propeller in line fan shall exhaust the stale air through the shaft to the outside. Static pressures of the fans shown in the Schedule of Quantities are approximate external pressures and indicate that these fans are ducted / have filter resistance etc. Tenderers should check the total static pressures and offer suitable fans. All fans shall have sufficient static pressures to overcome pressure drops across ventilators, filters, ducts, dampers, grilles etc. The location of fans and duct routing wherever applicable are shown in the drawings. Tenderers shall ensure that all equipment offered by them can be installed into the spaces allotted and shown in the drawings with adequate space being available for maintenance and ease of operation. EQUIPMENTS AND MATERIALS: TECHNICAL SPECIFICATIONS: SCREW CHILLING MACHINE: Design Parameters a. Purpose b. Type of chiller c. Type of compressor d. Chilled Water Outlet Temperature e. Chilled Water Inlet Temperature : f. Refrigerant g. Cooling media h. Fouling Factor a. Condenser b. Chiller Signature of Tenderer : : : : : : : Chilling Water for HVAC Hermetic / Semi Hermetic Screw 6.0°C 11.0°C R-134a Water : : 0.044 (Sqm-K)/kW 0.018 (sqm-K)/kW No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 123 of 194 ARCHITECT : THE FIRM Chilling Units Chilling machines shall be with single/multi Screw type compressor and complete with following items and / or any additional items required for its proper functioning. (a) Unit shall have Hermetic / semi-hermetic type twin Screw compressor with internal muffler and check valve. Compressor shall be energy efficient. (b) Motor. (415 Volts 10%, 50 Hz 5%, 3, AC) (c) Water Cooled condenser with accessories and supports and pressure relief valve. (d) Shell and tube water type chiller with accessories and supports and anti freeze device. (e) Control panel with diagnostics and BMS interface/cards/ports. (f) Refrigerant piping. (g) Full charge of eco friendly refrigerant (R-134a) & lubricant oils (factory charged). (h) Full load factory testing of chilling unit as per ARI conditions. (i) Lube oil pump with motor, oil separator, oil heater and interconnected lube oil piping with strainers and fittings. (j) Electronic Expansion Valve. The chilling machine shall be factory assembled gas charged and internally wired and shall be ready for use at site. The testing will be witnessed by purchaser and consultant’s representative. The chilling units must be widely used with proven records & shall be energy efficient. Due consideration shall be given for less power consuming units. Compressor The compressor shall be rotary screw positive displacement hermetic/semi-hermetic type compressor. (a) The compressor housing shall be made of high-grade low porosity cast iron or fabricated plates steel precision machined to provide minimal clearance for rotors. (b) The main bearings shall be anti-friction tapered roller bearing to carry both radial and thrust loads to reduce power and increase reliability. (c) Oil separator and oil return shall be designed to ensure proper oil return to the compressor without getting collected in the condenser / chiller even at minimum load. Oil system shall include pre-filter and internal filter capable of filtration to 3 microns. Unit shall have oil reservoir to assure constant supply of oil to bearing at all time (even in case of power failure). A check valve shall be provided in compressor housing to prevent rotor backspin during shut down. (d) Compressor should be provided with fully modulating control to work from 100% to 10% of full load. (e) Motor cooling shall be provided by direct liquid injection and protected by internal overload thermistor. The compressor shall be provided with following minimum safeties: High motor winding temperature cut out Low oil pressure cut out Anti-reverse rotation Anti-freeze protection Compressor over current High oil temperature cut out High discharge pressure cut out High discharge temperature cut out Low suction pressure cut out Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 124 of 194 ARCHITECT : THE FIRM Anti recycle Single Phase Preventer (a) The compressor shall be factory tested with dry nitrogen against leak at pressure of 30 Kg/cm2(g) or as per approved standard practice of manufacturer for 2 hours and there shall be no leakage to valves, casing etc. (b) Chilling unit having more than one compressor shall have independent refrigerant circuit. Motor The motor shall be 2-Pole, class F insulation, IP55 protection, continuous duty, induction type, energy efficient type and shall be refrigerant cooled for semi hermetic / hermetic compressor. Motor full load amperes at design conditions should not exceed the indicated amperes. Motor shall be factory mounted and directly connected to the compressor to provide compressor / motor alignment. The complete motor / compressor assembly should be statically and dynamically balanced. The starter for the motor shall be soft starter or as per approved data sheet. The starter should include all necessary safety devices, i.e. overload relays, under voltage release and single phase preventing devices. Lubrication System An adequate oil supply will be made available to compressor at all times. An immersion oil heater will be provided to effectively remove oil from refrigerant. An external replaceable cartridge filter will be provided, along with manual isolation stop valves for ease of servicing. Provision shall be provided to remove oil from evaporator which may have reached evaporator. The oil shall be returned back to compressor automatically. Condenser The condenser shall be mechanically cleanable shell and tube type with removable heads. The tubes shall be internally enhanced seamless copper tube and shall be rolled into tube sheets. The condenser shall be complete in all respects and shall be provided with water in and out temperature and pressure sensors. Provision for fixing mechanical pressure gauges is required in addition to electronic sensing. Condenser shall have refrigerant relief device on the shell side (refrigerant side) as per ASHRAE safety code. Condenser shall comply with ASME section VIII, division 1 code for unfired pressure vessels / GB Code. Tubes & shell shall be tested at 200 PSIG & 300 PSIG pressure respectively. Condenser shall be able to store the full refrigerant charge of the system during pump down and it shall be with isolation valves. All the ferrous parts in touch with cooling water to be painted with two coats of epoxy paint prior to assembly. Water velocity shall not exceed 12 FPS in tubes. Evaporator Evaporators shall be mechanically cleanable shell and tube type with removable (individually) heads. The tubes shall be internally enhanced seamless (without Joints or U bend) copper and shall be rolled into tube sheets. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 125 of 194 ARCHITECT : THE FIRM The evaporator shall be complete in all respects and shall be provided with chilled water in and out sensors for temperature & pressure. Provision for fixing mechanical pressure gauges is required in addition to electronic sensing. The evaporator shell shall incorporate a refrigerant level sensing device. It shall also have drain and vent arrangement. In the event of the chilling unit having, more than one compressors, there will be equal number of independent refrigeration circuits. (If one circuit fails it should not affect working of other circuits). Chiller shall have refrigerant relief device on the shell side (refrigerant side) as per ASHRAE safety code. Evaporator shall comply with ASME section VIII, division 1 code for unfired pressure vessels / GB Code. Tubes & shell shall be tested at 200 PSIG & 300 PSIG pressure respectively. Evaporator and the cold refrigerant pipes to be neatly insulated with elastomeric nitrile rubber / XLPE insulation and weatherproof coating / painting as per manufacturer’s standard. Chilled water velocity shall not exceed 12 FPS in tubes. Refrigerant Circuit The following components shall be provided in the Refrigerant lines. (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) Oil separator & Oil Heater. High & low side pressure relief valve. NRV at compressor discharge and liquid line shut off valves. Charging port shall be provided with Shut off valve. Liquid line filters cum dryer. Moisture indicating sight glass. Control valve for flooded chiller refrigerant expansion (electronic type). Suction and discharge valves for each compressor. Refrigerant and lube oil to be factory charged. Additional valve to facilitate removal of refrigerant. Suction strainers to prevent any debris during system maintenance. Controls, Diagnostics and Safeties: 1. Controls: a) Unit controls shall include as a minimum: Inbuilt Microprocessor compatible with BAS, LOCAL/OFF/REMOTE switch and graphical diagnostic display with soft keypad. b) Shall be capable of performing the following functions: 1) Automatic compressor’s lead / lag switching. 2) Capacity control based on leaving chilled fluid temperature with return fluid temperature sensing, Leaving Temperature required is 9 °C & setting shall be + 0.2 °C c) Display of following parameters: Date & Time Entering Temp / Leaving Temp of Chilled Water Entering Temp / Leaving Temp of Chilled Water Evaporator refrigerant temperature Condenser refrigerant temperature Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 126 of 194 ARCHITECT : THE FIRM Discharge temperature Evaporator pressure Condenser pressure Display of percentage of full load operation at any time Incoming voltage & motors Amps Load in percentage, superheat & percentage of motor current Oil pressure, Oil temperature Operating hours Fault history (last 6) with time/date 3) Access to the set points through ID and password recognition. 4) Operating parameters shall be stored in non-volatile memory to eliminate reprogramming the chiller. Control system shall have a RS485 serial output port. 2. Diagnostics: a) Display module shall be capable of displaying set points, time system status (including system ready to start, system running, system safety shut down, system auto start, temperatures, pressures, and percent loading) and any alarm or alert conditions. Alarm shall be generated in different colours for different type of indication. b) Control module, in conjunction with the microprocessor, shall be capable of displaying the output of a run test to verify operation of every switch, sensor potentiometer and compressor before chiller is started. 3. Safeties: a) Unit shall be equipped with all necessary components, and in conjunction with the control system shall provide the unit with protection against the following:1) Evaporator low pressure 2) Condenser high pressure 3) Discharge high / low temperature 4) Low oil seal differential pressure 5) Anti-freeze protection 6) Loss of refrigerant charge 7) Anti-reverse rotation 8) Low chilled water temperature 9) Low oil pressure (each compressor circuit) 10) Condenser pressure transducer out of range 11) Voltage imbalance 12) Ground Current 13) Thermal overload 14) High pressure 15) Electrical overload 16) Electrical and control power failure 17) Auxiliary safety – Contacts closed 18) Loss of phase 19) Current imbalance 20) Low and high oil temperature 21) Oil clogged filters 22) Time delay between consecutive starts for motor protection Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 127 of 194 ARCHITECT : THE FIRM 4. Electrical Requirement a) Electrical Power supply shall enter the unit at a single location. b) Unit shall be suitable for 415V 10%, 3 phase, 50Hz 3% power supply with combined voltage & frequency variation of 10%. c) Unit shall be shipped with factory control & power wiring installed. d) Control wiring shall be 230/110 V A.C derived from 415V, AC through CVT for constant control voltages. Chiller shall have its own step down voltage arrangement. e) Unit shall be provided with differential pressure switch/flow sensors so that power is disconnected in case of failure of chilled water flow through Chiller. f) Unit shall be equipped with factory installed microprocessor controlled minimum load control capable of operation up to 20% capacity, without any problem. g) The chiller microprocessor step-less controls should be able to keep the Leaving Chilled water temperature (LWT) within a band of ± 0.2 °C from the base temperature 0 °C. It should be possible to change the base temp (LWT) if desired by client. h) The unit shall be provided with Soft starter. 5. Special features & Accessories a) Unit shall be provided with weather proof flow switch at chiller outlet as safety interlock to prevent operation of machine without evaporator water flow. b) Unit shall be provided with hour run meter to monitor operating hours. c) Unit shall be provided with catwalk grid for easy access to all components for servicing. d) Mechanical Gauge Kit – Factory fitted mechanical dial gauges for discharge, suction and out pressure indication in addition to transducer pressure display. e) Anti vibration mounts, open spring isolator mounts with levelling screws and fixing down holes. f) Cooler flange kit – Factory fitted cooler companion flanges including fasteners and gaskets. VENDOR'S SCOPE: 1.0 Chillers complete in all respects with following: Signature of Tenderer Refrigerant Screw compressor complete with accessories like - Suction and discharge stop valves - Step-less / automatic capacity control - Crank case oil heater (Electric) with thermostat - Hermetic / Semi-Hermetic type Motor and Soft Starter. - Base frame for motor, compressor, condenser & chiller assembly Shell & tube water cooled condenser with accessories like - Drain valve - Purge valve - Safety valve on shell / Relief valve - Sensors for in/out water temperature and pressure - Specified safeties. Shell & tube chiller with accessories like - Drain valve - Venting arrangement No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 128 of 194 ARCHITECT : THE FIRM Safety valve Flooded chiller expansion of refrigerant control Specified safeties. All above mounted on common skid Necessary Insulation for piping and chiller as specified. (Nitrile rubber / XLPE insulation with weatherproof coating). Necessary structural supports, nuts/bolts, foundation bolts and other hardware items for equipment and piping work, vibration isolators etc. Painting – Shop & Field Electrical panels & instrument / controls including VFD/Soft starter. Specialist electrical vendor shall provide 415V, 3 phase, 4 wire, 50 Hz, AC power supply in the incoming of electrical panels. Shall include all the necessary ports/cards and accessories to make the microprocessor based control panel compatible with purchaser’s BMS system (ASHRAE BACnet / Modbus Protocol). All power & control cabling within the package skid. Consumables like - First charge of Refrigerant (R-134a) - First charge of lubricating oil (supplied oil should be available with Indian Oil Companies / Indian based Multi National Companies). - Commissioning Spares (As per Manufacturer) Supply, Unloading, Lifting, Shifting, Positioning on foundation, erection, testing and commissioning of the chilling units. Full load and part load testing of chiller units and validating with committed data. Technical catalogues, literature, Performance curves & rating chart of all equipment have to be given with the offer to verify selection of equipment & the data furnished with the offer. Operation and Maintenance manual along with chiller. All calibrated instruments except flow meter required for performance testing are to be included in the vendor’s scope. All Test Certificates. Water flow switch for Chilled water line. Victaulic coupling (if required for bidder’s machines). Anchor Bolts and Vibration isolations pads. Coordination with client, consultants, HVAC low side contractor, civil contractor, electrical contractor, BMS contractor. All commissioning documents as per manual. INSPECTION & TESTING: Vendor shall submit their Quality Assurance Plan along with their offer. Inspection and testing shall be carried out in accordance with approved Quality Assurance Plan, which shall be prepared in line with applicable code and their specific requirements. The inspection shall be carried out as per approved Inspection Plan. Prior to commencing equipment installation, installer shall inspect hoist ways, hoist way accesses/openings, space for the unit, its foundation etc., as constructed, shall verify all dimensions and examine supporting structure and all other conditions under which unit is to be installed. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 129 of 194 ARCHITECT : THE FIRM Factory Inspection & Type Running Test At least one Chiller to be factory inspected prior to despatch for single point 100% load. Vendor shall submit inspection schedule well in advance to the Client. It shall be client’s prerogative whether to witness the test or provide a waiver. GUARANTEE Mechanical Guarantee Mechanical guarantee shall be for proper design, workmanship and materials of construction for all manufactured as well as bought-out items. Vendor shall give guarantee for the complete scope of supply for a period of 12 months from the date of successful handover. Any parts found defective during guarantee period shall be replaced by the vendor free of cost. Vendor to specifically confirm that necessary spares including critical spares can be made available by air freight, in a reasonable time. Performance Testing of Chillers Field performance testing of chiller shall be carried out by the vendor, after 300 hours of trouble free operation of the plant to full satisfaction of the client. The performance test shall be carried out for 72 hours continuous operation. During this period capacity of chiller shall be demonstrated as per the data given by the vendor. Following parameters shall be checked and measured during performance testing: (a) Actual Refrigeration capacity in TR of the plant. (The vendor must indicate the actual refrigerating capacity of chiller based on (Chiller LWT= 7.0/12°C), Condenser EWT=32.0°C) (b) Chilled water flow rate through the chillers. (c) Cooling water flow rate for condenser. (d) Power consumption for the Refrigerant compressor at various loads (100%, 90%, 80%, 70%, 60%, 50% etc.). Input KW per ton to be compared with claimed values at various % loads. (e) Chilled water pressure drop across the chiller (i.e. evaporator). (f) Cooling water pressure drop across the condenser. No negative tolerance on capacity of the system shall be acceptable. There shall not be any positive tolerance on power consumption of compressor. The plant shall be deemed to have been commissioned only after compliance of the above tests. TEMPORARY PROTECTION DURING TRANSPORTATION Selected protective shall suit the equipment and also the climatic conditions during transit and storage (e.g. high humidity, extreme cold, rapid temperature changes etc.) If the manufacturer considers that his equipment should not be stored in the packages or crates used for transportation, this shall be stated on the advice note and the boxes shall be painted with a bright yellow band at least 75 mm (3 inch) wide. Bare metal surfaces of critical nature, like machined surfaces, shall be protected against mechanical damage after coating with appropriate protective lubricating grease. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 130 of 194 ARCHITECT : THE FIRM External surfaces of mechanical equipment and electrical motor shall be prepared and finish painted in accordance with the supplier’s normal standard. Bearings normally grease lubricated shall be packed with appropriate grease. The method employed to prevent damage to bearings due to vibration and shocks in transit shall be submitted for approval of Client/Consultant. The recommendations indicated above are of general nature only and supplier shall follow the specific instructions and safety recommendations of the manufacturers of any protective medium selected. These recommendations shall not absolve the supplier from his responsibilities. DEVIATION All deviations to the specification, scope of work should be highlighted in “Confirmation to Compliance of Requisition” sheet only. Deviation in any other form, in another place shall not be considered and it will be presumed that this offer is in line with tender. SPECIAL TECHNICAL REQUIREMENTS i. Vendor should take specific notes to the following to avoid any communication gap : a. List of jobs, where similar machine with similar arrangement installed. b. Details of service centre nearest to the site with key personnel. c. Delivery time (Transit Schedule) and Indian Port where machine shall be delivered. d. Computerised selection as per technical parameters given in the tender on which machine is to be tested at factory. e. Utility and other requirements for smooth supply, installation, testing and commissioning (required from Client / Consultant). f. Before bidding, it is preferred that vendor shall visit the site, meet the client and well understand the Client’s requirement, to arrange all resources for on time and smooth completion of work. ii. ASHRAE Modbus / BACnet output from chiller control panel. Printer port shall be available with microprocessor panel. iii. In case of machine is not fully charged with refrigerant and oil from factory then it shall be shipped with positive charge refrigerant / inert gas. iv. List of recommended spare parts required for two years with firm prices. v. Any activity / equipment / components not covered in specification but necessary for the machine shall be included and highlighted in offer. vi. If chiller supplied shall not meet committed data, chiller shall be rejected and vendor shall supply the required machines of adequate capacity within 4 – 6 weeks time without any cost implication. vii. After sales services like attending any type of Breakdown within 24 hr. viii. Noise level of any equipment shall not be more than 80 dBA at 1m distance from equipment. ix. Coordination with Client, Consultant, HVAC Low Side contractor, Civil contractor etc. x. In case of any contradiction in specification / standard given in tender client/consultant’s decision shall be final. xi. Foundation details with clear indication of vibration isolation pads shall be provided along with GA drawing. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 131 of 194 ARCHITECT : THE FIRM COOLING TOWER: 3.2.1 Scope of Work This specification covers the design requirement, materials, constructional feature, manufacture & supply, installation, testing, commissioning of FRP Cooling Towers. 3.2.2 Codes & Standards The design, materials, manufacture, testing & performance of cooling tower shall comply with all currently applicable codes, regulation & standards in the locality where the equipment is to be installed. The cooling tower shall also conform to the latest application of International Standards. 3.2.3 Types & Capacity of Cooling Tower The cooling tower shall be induced draft, cross / counter flow type conforming to their respective specification & of rectangular / square profile. Each cooling tower actual capacity shall be 400 TR. 3.2.4 Constructional Feature of Cooling Tower The induced draft cross / counter flow FRP cooling tower shall be complete with FRP casing, fill, internal supporting structure, drift eliminators, fan, fan motor, hot water distribution system & cold water basin. All steel components including assembly hardware shall be hot dip galvanized. Suitable access shall be provided for the inspection & maintenance of fan. The design of louvers, fill & drift eliminators shall ensure minimum resistance to flow of air. The induced draft propeller fan of the cooling tower shall be direct / gear driven by TEFC squirrel cage motor located outside the moist air stream. The fill sheet includes both louvers and drift eliminators & the louvers should prevent water from escaping the fill sheets to assure proper & efficient heat transfer throughout wide variations in the airflow. Drift losses for the cooling tower should not be more than 0.02% of the circulated water. Suitable screens between the side of the coldwater basin & the base of the fill should be provided to prevent foreign materials in the circulating water flow & should be easily removable. The fan motor shall be suitable for 415 volts ±10%, 3 phases, 50 Hz ± 5%, AC supply conforming to IP 55. Cold Water Basin The cold-water basin shall be a deep fibre glass reinforced sump on which cooling tower structure shall be supported Basin fittings shall have the following. i) Bottom Outlet. ii) Screened suction assembly fixed to the basin. iii) Drain at underside of suction, suction side sheet. iv) Overflow fixed to inside of casing side sheet. v) Ball type automatic make-up water valve. vi) Equalizing connection & balancing valves for multiple CTs as required. vii) Quick Fill arrangements Mechanical Equipment The cooling tower shall be provided with low speed, low noise, and acoustically treated fans running at lower RPM through gear reducer or direct driven. Fan speed shall not be more than 750 RPM. Fan shall be of the propeller type lightweight rotor fitted with multiple aerofoil blades. The entire fan assembly shall be statically and dynamically balanced. Fan shall be driven by TEFC motor suitable for 415 volts ±10%, 3 phases, 50 Hz ± 5%, AC supply conforming to IP 55. Fan motor shall be energy efficient motor weatherproof construction, designed and selected to operate in humid air stream. Fan guard shall be provided to prevent birds from nesting during idling periods. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 132 of 194 ARCHITECT : THE FIRM G.S.S canopy shall be provided over the fan motor for protection against rainwater. Care shall be taken that fan air is not restricted. Motor terminal box shall be made watertight. VFD shall be provided for each motor if specified in BOQ. Fillings: The Fillings shall be made of corrosion proof and rigid film in cross fluted design and arranged in square / rectangular form and shall be elevated from the floor of the cold water basin to facilitate cleaning and easy replacement. They shall be arranged in such a manner to ensure negligible resistance to airflow and to eliminate backwater spots and prevent fouling trough scales that may form. In order to reduce carry-over losses through entrapment of water droplets in air stream, PVC drift eliminators shall be installed. Distribution Header Hot water distribution system shall comprise of header and branch arms system. 3.2.5 Accessories The cooling tower basin shall be provided with automatic float valve with a stop valve for continuous make up water flow, quick fill arrangement with stop valve, over-flow and drain connections with stop valves. A hot water bleed connection to the drain line through a stop valve shall be provided. It shall be connected to the drain line below the drain stop valve. Steel ladders shall be provided in such a manner and location as necessary to give safe and complete access to all parts of tower requiring inspection. Each ladder shall be made of iron sides and 16 mm straps and shall be bolted to the tower on the top and grouted in masonry at the bottom end. All Hardware used shall be of stainless steel. All pipe connections shall be hot dip galvanized and double flanged. Painting All exposed steel surfaces shall be given two coats of epoxy paint & the colour finish of cooling tower shall as per Architect’s decision. 3.2.7 Performance Data: The complete performance ratings and power consumption at varying outdoor wet bulb temperatures shall be submitted and verified at the time of testing and commissioning of the installation. The Capacity of the cooling tower shall be computed. 3.2.8 Testing: Cooling tower being critical equipment for proper functioning of chillers, strict quality control is required. Capacity of the cooling tower shall be computed from the measurements of water flow, incoming/outgoing water temperatures and ambient air wet bulb temperature using accurately calibrated thermometers. Computed ratings shall conform to the specified capacities and quoted ratings. Power consumption for cooling towers shall be computed from measurements of incoming voltage and input current. 3.2.9 Technical Requirements of Cooling Tower a) Capacity of cooling tower at PC WB temperature b) No. of Cooling Tower As Per BOQ c) Type of cooling Tower FRP Induced Draft d) Entering water temp PPC 36.00 e) Leaving water Temp PPC 32.00 f) Water flow GPM 628 g) Type of fan Propeller h) Material of fan Cast AL i) Type of motor Weather proof Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 133 of 194 ARCHITECT : THE FIRM PUMPS: General:Each pump shall be end suction, top discharge, single stage, back-pull out construction and centrifugal type. Each pump shall be capable of at least 5% head increase by changing the impeller of larger size. The noise level of each pump and its driver should not exceed 80 dBA at 1m distance from the equipment. Vibration level of the complete assembly (due to rotating parts) shall be less than 6.3 mm/s (RMS). Painting, wherever required, shall be carried out as per manufacturer’s standard Capacity:All pumps shall be of capacity & size in accordance with the requirements indicated in the Data Sheets. The equipment shall be capable of developing the required total head at rated capacity. The pump shall be suitable for parallel operation & should not overload in single pump operation. Casing:Pumping casing shall be of heavy section grained cast iron, making possible complete servicing of rotating parts without breaking piping or motor connections. Motor to pump connection shall be of the flexible spacer coupling type. Suction passages shall be such to promote smooth entry to impeller and increased efficiency. The casing jointing faces shall be fully machined and shall be with a gasket. Pump casing shall be designed to withstand discharge pressure plus static head of system. Casing shall be tested to withstand a hydrostatic test pressure of 1.5 times the maximum allowable working pressure. Each pressure casing shall be provided with drain and vent connections with isolation valves Impeller:The pump impeller shall be of bronze hydraulically balanced and passages smooth finished for minimum friction and maximum efficiency. Wherever rings are fitted to the impeller, these shall be of the same material as of impeller and shall be secured from relative movement by tongue and groove fittings. Each impeller shall be dynamically balanced to a grade less than 6.3 mm/s as per ISO 1940 along with any other unmachined rotating parts on proper balancing equipment so as not to cause any vibration Bearings and Bearing Housings:a) Bearings shall be so designed as to take the necessary radial load as well as the net hydraulic axial thrust. Bearings shall be lubricated properly. b) Bearings shall be designed for at least 10000 hrs. with continuous operation at rated condition. c) Bearing housings shall be arranged so that bearings can be replaced without disturbing pump drives or mountings. Bearing housings shall be equipped with replaceable labyrinth end seals and deflectors where the shaft passes through the housing. Shaft and Seals:The pump shaft shall be of High tensile steel, protected by S.S sleeves. Shaft shall be finished to close tolerance for the impeller, coupling & bearing diameters. The impeller, pulley & shaft sleeves shall be firmly secured to the shaft by key / lock nut. The shaft size shall be calculated on the maximum combined shear stress. The shear stress shall not exceed 30% of the elastic limit in tension or 18% of ultimate tensile strength, whichever is higher. The shaft shall be sealed by faster fitted Mechanical seal. The seal shall allow zero leakage. A drip well to the nearest drain shall be provided beneath the shaft seal. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 134 of 194 ARCHITECT : THE FIRM Drive Motors:The Drive motors shall be designed as per motor data sheets and specifications for motors attached with enquiry. Motors shall be of IP-55 (EFF-1 Rating) protection. Maximum rating out of the following two conditions shall be governing factor for deciding the motor rating a) End of Curve Power b) Percentage of rated absorbed power at pump shaft. Pump Absorbed Power (BKW) Less than 22 22 to 55 Over 55 Motor rating (Kw) 125% of rated pump BKW 115% of rated pump BKW 110% of rated pump BKW Coupling:Pump / Motor coupling shall be flexible spacer type to allow dismantling without disturbing the pump & motor positions. Coupling guard shall be provided of 20 SWG mild steel sheet finish bolted to common base. Each coupling shall be designed, considering a service-factor of 1.5 over motor KW rating. Base Plates:Base plates shall be fabricated of mild steel. Base plate shall be fabricated for accommodating pump, its drive motor and the accessories. Base plate accommodating pump, drive motor and other accessories shall be rigid and stable so that alignment is not affected under normal working condition. Alignment:All pumps shall be factory-aligned prior to shipment by the manufacturer. Prior to testing, the pump alignment may be verified for each pump with a dial indicator within 0.05 mm for each pump. Painting:All pumps, motors and bases shall be supplied with approved finish. Paint that becomes marred during shipment or erection shall be cleaned off, coated with enamel paint to match the adjoining areas. Performance Data:Each pump shall deliver not less than the quantity of water specified against the total head of the system as installed. The system total head stated in the specification is given as guide only. The contractor shall supply with his tender a copy of the guaranteed characteristic performance curves for each pump. The required NPSH at duty point shall be less than the available NPSH. Testing:Pump performance shall be computed from the measurement of water flow and pressure differential across the pump. Flow measurement shall be by an accurately calibrated water flow meter and pressure by an accurate compound pressure gauge. Measured results shall conform to the specified capacities and quoted ratings. Power consumption shall be computed from measurements of incoming voltage and input current. Fittings and Pressure Gauges:Pumps shall be fitted with two air valves, two grease lubricators, drain plug and water seal connections. Pressure gauges at suction and delivery connection shall be flanged type and discharge shut-off valve and discharge check valve conforming to relevant Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 135 of 194 ARCHITECT : THE FIRM specification shall be provided with each pump. Pressure gauge at pump discharge must be provided with snuffer/pulsation damper. INSPECTION & TESTING: Vendor shall furnish QAP for approval. This plan, as approved by Client /consultant, shall form basis of inspection. Vendor shall obtain despatch instruction from the Client before despatch of equipment. The Client/Jacobs reserves the right to inspect any component, material and complete equipment and may reject, which is defective in workmanship or design otherwise unsuitable for the use and the purpose intended, or which is not in accordance with the intent of the contract. Raw material and finished product shall be tested by destructive and non-destructive examination before, during and after manufacture of the equipment. Any imperfections shall only be repaired upon consultation with the Client. The Vendor shall, on demand by the Client, remedy or replace at his own expense any such defective or unsuitable component / item / equipment. The Vendor shall intimate the Client two weeks in advance when the component/ item/ equipment is ready for inspection in the Vendor’s shop and / or his sub-vendor’s shop. Inspection must be carried out within the stipulated time. Client’s inspector shall at all times have access to all parts of shop where equipment is being manufactured and shall also be provided with all reasonable inspection facilities by the Vendor and his sub-vendors. SHOP TEST:11.1 Hydrostatic and running / performance tests shall be conducted as per applicable standard. 11.2 The running / performance test of one pump from a set of identical pumps shall be witnessed by Client/ Jacobs or their authorised representative. 11.3 Pump casing shall be hydro-statically tested with water at ambient temperature at 1.5 times maximum allowable working pressure 11.4 Hydrostatic test shall be maintained for a minimum period of 30 minutes. The hydrostatic test shall be witnessed by Client/ Jacobs. 11.5 Performance test shall be conducted at a minimum of five capacity points from shut-off to maximum flow. One additional point with the discharge valve fully open is required. 11.6 Acceptable tolerance of actual versus guaranteed pump performance shall be as follows:There shall be no negative tolerance on head. Vendor to furnish guaranteed power consumption figures with no positive tolerance. Impeller shall be dynamically balanced at rated speed. Dynamic balancing shall be witnessed by Client/ Jacobs or their authorised representative. 11.7 Unless otherwise specifically agreed upon, pumps shall be tested at the rated speed specified in the General Arrangement Drawing with calibrated test motor at least for 2 -hour to obtain complete data including capacity, head, power absorbed and NPSH(R) 11.8 NPSH test, if required, shall be conducted for one pump at a minimum of five capacity points from minimum to maximum capacity. The maximum capacity shall be 110% of rated capacity. 11.9 During NPSH test the onset of cavitations shall be indicated by a 3% drop in difference head. 11.10 Pumps shall be released for shipment unless shop-test data and performance test curves are approved by Client / Jacobs. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 136 of 194 ARCHITECT : THE FIRM 11.11 The various tests carried out shall be properly recorded, plotted & shall be extra polated for speed, specific gravity, viscosity etc. Such documents duly signed by vendor’s inspector & Client/ Jacobs’s inspector shall be submitted to Jacobs with requisite number of sets for their record. GUARANTEE Mechanical Guarantee: Mechanical guarantee shall be for proper design, workmanship and material of construction for all manufactured as well as bought out items to be supplied by Vendor. Vendor shall stand mechanical guarantee for the complete scope of supply for a period of 12 months from the date of commissioning or 18 months from the date of supply, whichever is earlier. Any parts found defective during guarantee period shall be repaired/ replaced by Vendor, free of cost. Performance Guarantee: The equipment shall be guaranteed for satisfactory performance at operating condition of the data sheet and performance curve. Field checks on performance, when made by client, shall be made within the agreed time of initial operation. The Following parameters shall be guaranteed:a) Capacity b) Total Head c) Rated Power d) NPSH required TEMPORARY PROTECTION DURING TRANSPORTATION All protection shall be such that equipment may be stored in the open area. Suitable cover / packing shall be provided to prevent any damage due to weathering for a period of at least six months from the date of despatch. Selected protective shall suit the application and also the climate conditions during transit and storage. If the Vendor considers that his components should not be stored in the packages or crates used for transportation, this shall be stated on the advice note and the boxes shall be painted with a bright yellow band at least 75 mm (3 inch) wide. The recommendations mentioned above are of general nature only and Vendor shall follow the specific instructions and safety recommendations of the manufacturers of any protective medium selected. These recommendations shall not absolve the Vendor from his responsibilities. QA / QC REQUIREMENTS Typical QAP along with offer. Project Specific QAP for approval, after order. Copies of all sub-orders required. Access of client’s / consultant’s QA / QC engineers required during manufacturing. Concession request in case of non-compliance of Order AIR HANDLING UNIT The Air Handling Unit shall be double skin construction draw through type comprising of various sections such as mixing box, Pre-filter sections with filters (EU-4), coil section with cooling coil, face & by pass dampers, supply air dampers, return air dampers, fresh Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 137 of 194 ARCHITECT : THE FIRM air dampers, exhaust air dampers, blower section with DIDW backward curved blower & motor, VFD for all AHU’s and necessary controls instruments, etc. All Air Handling Units shall comprise of minimum of the following sections: a) Leak proof Double skin AHU of minimum 25 mm thick (nominal) PUF panel with thermal break profile for indoor mounted AHU’s. b) Leak proof Double skin AHU of minimum 50 mm thick (nominal) PUF panel with thermal break profile for outdoor mounted AHU’s. c) DIDW Backward curved Centrifugal Blowers. d) Electrical motor as per the Blower selection. e) Cooling coils as per Schedule of Equipment. f) Flanged type filters of specified efficiency & locations as specified in the Schedule of Equipment. g) Insulated S.S. Drain Pan of required size with drain plug in the bottom of the coil. (Refer Clause No. 8.6 for slope of drain pan and gauge of SS). h) All volume control dampers shall be of Aluminium anodised, oppose blade with aerofoil design, must be low leakage. Casing of damper to be of 16 SWG. Geared operator with self lubricated bearings/ bushes shall be provided for dampers. If link operators are given then linkage to be mounted such that insulation is complete all over and suitable for motorised operation. i) All filters shall be of standard sizes like 610 x 610, 610 x 305, and 305 x 305 (all sizes are in mm). j) Flame retardant, water proof neoprene impregnated flexible connections. k) Construction shall be Single Decker type only. l) Canopy with all fixing arrangement to be provided for all AHU/TFA/EXHU/VU installed at terrace. Canopy shall be made out of 2 mm thick corrugated aluminium sheet. Projection of 600 mm on each side to be provided with aluminium sheet. The above arrangement shall be suitable for maximum wind velocity at site. All components shall be housed in leak proof sheet metal casing. Casing of units shall be provided with thermal barrier. Capacity:Air Handling Units capacities (Cooling Coil and Blower capacity) shall be as per data sheets. Housing/Casing:The housing/casing of Air Handling Unit shall be of double skin type. The frame work shall be of extruded aluminium hollow sections having covered inside corner with thermal break feature to minimize condensation during high ambient humidity conditions. The frame shall be assembled (so as using Peralluman joints) to make a strong, sturdy and self supporting framework for different sections. Casing of AHU shall be made out of 25 mm thick (nominal) double skin construction for indoor mounted AHUs and 50 mm thick for outdoor mounted AHUs. Inner skin shall be 0.8mm thick GSS & outer skin shall be 0.8mm thick pre plasticized pre coated sheet (filled with high density PUF). For flameproof AHU’s inner skin shall be 1.0 mm thick GSS & outer skin shall be 1.0 mm thick pre plasticized pre coated sheet (filled with mineral wool insulation). Mineral wool insulation shall be injected/filled of minimum 96 Kg. /cum. density in double skin panels. K factor not exceeding 0.02W/M0C. Necessary reinforcement in panel shall be provided by the vendor. The casing shall withstand leak test as per SMACNA Class 6 standards. The manufacturer should demonstrate the pressure testing of the casing at works to meet these Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 138 of 194 ARCHITECT : THE FIRM standards. Suitable space in AHU shall be provided for easy maintenance / easy access of each section. These panels shall be fixed to the extruded aluminium framework preferably using quarter-turn latches actuated by a simple tool. EPDM fin rubber gaskets will be fixed in built-in groove of extruded aluminium profile to make the panel fixing airtight. Suitable airtight access door/panels with nylon hinges and locks shall be provided for access to various sections for routine maintenance. Hinges shall be made of die cast aluminium with stainless steel pivots. Handles shall be made of ‘C’ Type glass filled hard nylon and to be operational from both inside and outside of the unit. AHU locks shall be low projection, Tool Operated, Half turn Cam type and glass filled nylon construction. The entire housing shall be mounted on GSS channel framework using pressure die cast aluminium jointers. Ribbed neoprene rubber pads as vibration isolators shall be provided for AHUs. Access panel for the fan section shall be provided with limit switch interlocked with fan motor & aluminium wire mesh for protection. The inspection & access panels shall be hinged type. The hinges shall be casted, powder coated zinc alloy. Flushed locks & handles shall be of galvanised steel. Weather Proof Lamp (CFL type) and view window in Access door of each accessible section will be provided. (In flameproof areas, weather proof, frame proof lamp (CFL type) shall be provided). Belt Driven Backward Curved DIDW Centrifugal Blower:The fan shall be backward curved double inlet, double width centrifugal type. Wheel shall be fabricated from heavy gauge carbon steel in welded construction duly epoxy painted. The housing shall be fabricated from galvanised steel. The fan impeller shall be mounted on a solid shaft made of minimum C40 carbon steel supported to the housing with steel frame and heavy duty ball bearings. The fan impeller shall be statically and dynamically balanced as per ISO 1940 & AMCA 204/3-G2.5 Standards. The fan outlet velocity shall not exceed 9.30 m/sec. Fans shall be tested as per AMCA 210. The fan shall be selected for highest efficiencies and a noise level less than 85 dBA in free field conditions at 1 meter distance. The fan and motor assembly along with drive package shall be mounted on a common extruded aluminium frame work with antivibration mounts (preferably spring isolators of minimum 80% efficiency). Fan outlet shall be connected to the casing with fire retardant fabric acting as a flexible connection for anti vibrations. The blower shall confirm to AMCA certification. Vendor shall submit calculation of internal static pressure drop of AHUs for checking. While selecting fan frequency shall be kept close to 50 Hz and RPM shall be preferably within ± 10% of designated RPM of motor. Motor and Drive:Motor shall be factory assembled mounted inside the AHU casing on slide rails, with screw drive for easy belt tensioning. Motor bearings shall be of ball or roller type, grease or lubricant sealed for life. Fan and drive shall be earthed to prevent accumulation of static charge. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 139 of 194 ARCHITECT : THE FIRM Fan motor shall be suitable for 415 10% V, 50 cycles, 3 phase squirrel cage totally enclosed fan cooled type with IP-55 (EFF-1 rating) protection. The motor shall be with class F insulation. Motor design shall permit quiet operation and maximum efficiency. The fan shall be of most efficient type in totality so that the power consumption and noise level is minimal. Fan motor capacity shall be selected 10% above on motor BKW. The motor shall be minimum IP-55 protection class. Cooling Coils:Chilled water coil shall have 12.5 mm to 15mm diameter tubes minimum 0.50 mm thick with aluminium fins having anti corrosive coating, firmly bonded to copper tubes assembled in SS frame. The coil shall be brazed to copper header for water inlet & outlet. All brazing works at the header shall be carried out by holding the coil vertically to achieve clean finish. Fins shall be firmly bonded by hydraulic expansion or passing bullets for minimum thermal contact with fins. Fin spacing shall be 12 fins per inch. Face and surface areas shall be such as to ensure rated capacity from each unit and such that air velocity across each coil shall not exceed 150 meter per minute (MPM). The coil shall be pitched in the unit casing for proper drainage. Each coil shall be factory tested at 21 kg per sq. cm. (g) air pressure under water. Coil shall be pre-charged with Nitrogen at time of delivery of the unit. Coils shall be provided with copper header and steel adopters (with MS mating SORF flanges) to facilitate its connection at site with steel water pipes. The drain pan shall be duly extended beyond chilled water coil depth by 500 mm. Necessary arrangement will be provided to slide the coil in the AHU. Drain pan shall be removable type to facilitate its cleaning. Drain pan externally insulated with self stick 15 mm thick closed cell polyethylene insulation made of 18G stainless steel with dual slope (1:10) to facilitate fast removal of condensate and avoid microbial growth will be provided under the chilled water coil. Filters:The design, manufacture, erection, inspection & testing of Air Filters shall comply with all currently applicable statues, regulation and safety codes in the locality, where the Air filter are to be installed. Nothing in this specification shall be construed to relieve the contractor of his responsibility. In particular the equipment shall conform to the latest edition of standard indicated elsewhere in the tender document. In case of any conflict in the standard and this specification, the decision of the purchaser shall be final & binding. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 140 of 194 ARCHITECT : THE FIRM Design Parameters of Filters:Parameter Type Grade Efficiency Recommended size Air flow cfm Initial P (mm) WG (clean condition) WG Final P (mm) WG (clogged condition) Casing Sealing of medium Medium No. of folds Pre Filter Flange type EU-4 (G-4) 90% down to micron 610 x 610 x 50 2000 cfm 4 mm Fine Filter Flange Type EU-7 (F-7) 10 90% down to 3 micron 610 x 610 x 305 2000 cfm 8 mm 10 mm 20 mm Aluminium Anodised Epoxy or equivalent Aluminium Anodised Epoxy or equivalent Synthetic medium supported by HDPE mesh and aluminium mesh 20 Nos. Imported Synthetic medium supported by HDPE mesh and aluminium mesh 20 Nos. Sample testing at Mfr’s No Yes works Packing Yes Yes (Individually) Test Method BS-6540-Part-I / EN- BS-6540-Part I / EN-779 / DIN 779 / DIN Washable Yes Yes Type of fixing Flange type Flange type Safety Features Each Air Handling Unit must have safety features as under; a) The Fan Access Door shall be equipped with micro-switch inter locked with fan motor to enable switching off the fan motor automatically in the event of door opening. b) All the AHUs shall also be provided with external Power Button for starting of the AHU Lamp inside while AHU is ON to visualize the Fan & Motor while in operation. c) The Access Door shall further have wire mesh screen of G.I. as an added safety feature bolted on to the unit frame. d) Fan and motor base shall be properly earthed from the factory. e) All screws used for panel fixing and projecting inside the unit shall be covered with PVC caps to avoid human injury. Accessories a) Fire Retardant Flexible joints/Anti vibration joints shall be provided. b) Each AHU shall be provided with laminated coloured AHU GA drawing duly pasted on AHU showing all the components. c) Pressure measuring ports with dead nut shall be provided across each section to monitor the pressure drops. d) All volume control dampers shall be of Aluminium anodised, oppose blade with aerofoil design, must be low leakage. Casing of damper to be of 16 SWG. Geared operator with self lubricated bearings/ bushes shall be provided for dampers. If link Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 141 of 194 ARCHITECT : THE FIRM operators are given then linkage to be mounted such that insulation is complete all over and suitable for motorised operation. Testing At Works of AHUs Manufacturers shall demonstrate Run Test at their works (Air quantity v/s static pressure and Leak Test) of at least one AHU of each capacity (To be decided by purchaser / consultant). Testing and Inspection The manufacturer shall conduct tests at his works and site, dimensional & constructional check required to ensure that all the equipment furnished shall confirm to the requirement of the specification & in compliance with the requirement of the applicable codes. Performance testing for DIDW blower shall be carried out. Static/Dynamic balancing of all rotating parts shall have to be conducted. Efficiency of all filters and motors shall be tested as per relevant code. Test certificates & reports shall be made available to the buyer before dispatch of the equipment & the representative of buyer shall be given full access to all the tests. Schedule of tests to be given in advance. Performance of individual component shall be tested after complete installation at site. This test shall be carried out to determine the performance requirement as stipulated in the specification. Seller shall make necessary arrangements for arranging all necessary instruments at free of cost to carry out the site performance test to the specified standards. Performance test at site will consist of an uninterrupted running of the system for min 72 hours at design conditions. Supplier at his own cost shall make good any item malfunctioning during this period. Erection & Commissioning: Erection & commissioning of the complete unit at site is the responsibility of the supplier. The seller shall be required to keep the commissioning crew at site on free of cost basis for a period of at least 07 days after the start-up of the plant and the test run (of minimum 72 hours) shall be conducted during this period. CHILLED WATER CASSETTE UNITS CONSTRUCTION FEATURES Cabinet The CASSETTE AIR CONDITIONERS air-conditioners comprise of two cabinets viz. indoor unit and condensing/outdoor unit. Indoor unit shall house air handling fan, cooling coil, insulated drain tray and filter. The unit shall be of heavy gauge steel, corrosion resistant, finished with synthetic enamel paint and thermally and acoustically insulated with resin bonded fibreglass or equivalent material. Suitable drain connection shall be provided for removal of condensate collected inside the drain tray under cooling coil. The access panels shall be easily removable. Condensing/outdoor unit shall house compressor and condenser and shall be of heavy gauge corrosion resistant carbon steel and shall be suitable for mounting in open space (e.g. on terrace or on outside wall). COOLING COIL AND FILTER The cooling coil shall be of direct expansion type with copper tubes and aluminium fins. This shall be minimum three (3) rows deep and with minimum three (3) fins per centimetre. The air before it enters the cooling coil shall be filtered by dry and cleanable type filter. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 142 of 194 ARCHITECT : THE FIRM REFRIGERATION PIPING AND CONTROLS The refrigeration piping shall be complete with externally equalised thermostatic expansion valve, liquid line strainer, dehydrator with replaceable drying agent and liquid line shut-off valve. For refrigerants R-134a/Equivalent, copper tubes to IS 10773 shall be used. Fittings and pipe joints shall conform to the requirements of ANSI B 31.5. The piping shall be designed for an internal pressure representing the most severe condition of coincident pressure and temperature expected in normal operation. D-X WALL MOUNTED SPLIT UNITS Scope Supplying, erecting and testing Split type room air-conditioner of specified TR capacity, conforming to I.S.1931, having one / two air handling units Hi-wall / ceiling (suitable for false ceiling) mounting type having cooling unit and the outdoor condensing unit connected with 12 / 9 mm copper piping upto 6 meter duly insulated and 3 core copper flexible cord of required length etc. with stand for condensing unit, complete with testing etc. (Conforming to IS:1391 Part-I & Part-II with all amendments and as per BEE higher Star rating) suitable for operation on single phase, AC supply, 230/250 Volts 50 Hz, using best quality compressor, and fitting in position s per site situation and as directed by site engineer, duly connected to supply, and marking of S. No. and date of erection. Variable Frequency Drives: Scope of Work The scope of this section comprises the supply, installation, testing & commissioning of variable frequency drives conforming to these specifications and in accordance with Bill of Quantities. The VFD should be specially designed & applicable for HVAC field & general-purpose product shall not be acceptable. Certification UL, CE VFD Design Requirements 1 2 3 4 5 6 Voltage Variations 380-480V Nominal supply frequency 50 Hz ± 5% True Power Factor (λ) > 0.9 at nominal rated load Displacement P.F. (cos φ) > 0.98 Short circuit current rating 100 kA RMS Harmonic current control 5% non-saturating dual reactors on both rails of DC bus. Swinging chokes which do not provide full harmonic filtering throughout the entire load range are not acceptable. VFDs with saturating (non linear) DC reactors to provide additional 3% AC chokes. 7 EMC Compliance (for emission and immunity) a) For powers ≤90 kW: Shall comply with requirements of IEC 61800-3 : 2004, Category C1 with 50m motor cable. b) For powers >90 kW: Shall comply with requirements of IEC 61800-3 :2004, Category C2 with 50m motor cable. 8 VFD rated continuous output current Meet or exceed the normal rated currents of standard IEC induction motors 9 Torque mode Variable torque. Not programmable in constant torque mode for variable torque fan and pump applications 10 Torque ratings a) Starting torque: 135% for 0.5 seconds b) Overload torque: 110% for 1 minute Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 143 of 194 ARCHITECT : THE FIRM 11 Cable lengths 12 13 15 16 17 18 19 20 a) Upto 150 m for screened /armoured cable b) Upto 300 m for unscreened / armoured cable type To allow for SWA (Single Wire Armour) cable & MICS (Mineral Insulated Copper Sheath) cable in the motor circuit. V/f ratio Dynamically varying; fixed V/f curves not acceptable Energy optimization function Automatic energy optimization algorithm, which continuously adjusts the applied voltage based on load and speed. Output power switching without any interlocks and damage to VFD Motor tuning function Automatic, without having to decouple the load and motor. Signal Isolation Galvanic Isolation between power and control circuitry System response time < 2 ms Motor noise reduction Adjustable carrier frequency modulation. VFDs with fixed switching frequency not acceptable Ramp time Programmable from 1 to 3,600 seconds. VFD Service Conditions 1 Ambient Temperature with full VFD rated output current: 2 Relative Humidity 3 Max. altitude above sea level 4 AC line voltage variation 5 VFD enclosure protection 6 Aggressive environment 7 Vibration VFD Protective Features 1 Motor overload protection 2 Protective functions 3 Function at input phase loss 4 Function at over temperature 5 Function at over load 6 Alarm log 7 Dry pump detection 8 End of curve protection VFD Interface Features 1 Customer interface 2 Display type 3 Auto – Manual operation Signature of Tenderer a) For powers ≤90 kW : 45 P0 PC without derating b)For powers >90 kW : 40 P0 PC without derating 0 to 95%. non condensing Upto 1000m without derating U+U 10% of nominal with full output IP20/IP21/IP 55 integral with no additional cabinets Class 3C2 1.0 g Class 20 IP2Pt electronic motor overload protection with automatic compensation for changes in motor speed. Against input transients, loss of AC line phase, output short circuit, output ground fault, over voltage, under voltage, VFD over temperature and motor over temperature. Auto derate and warning. Should cause no damage to VFD Automatically reduce carrier frequency or auto derate. Automatically reduce output current to a preprogrammed Value. Record last 10 alarms with description of alarm, date & time. Automatically detect and trip during a dry running situation or no flow condition, when used in pumping application Detect and display a warning or trip when encountering an end of curve situation, when used in pumping application Identical interface for full range of VFDs in a project Graphical, alphanumeric, 6 lines, back lit Control panel to have inbuilt Hand – Off –Auto Keys No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 144 of 194 4 Programming assistance key 5 Protection against 6 Parameter up load /down load 7 Languages 8 Indicating lamps ARCHITECT : THE FIRM Key for displaying on-line context sensitive assistance for programming and troubleshooting. 2 level password protection for read & write unauthorized access to prevent unauthorized access. Control panel with program up load / down load function and also size / rating independent parameters. English Red FAULT light, yellow WARNING light and a green POWER- ON light. 3.11.7 VFD HVAC Features 1. Quick set up 2 HVAC application menus 3 4 5 6 Menu with factory preset typical HVAC parameters Fan, Pump, and Compressor menus specifically designed to facilitate start-up of these applications. Speed control using 3 feedback A three-feedback PID controller to control the speed of the signals VFD 3 – zone control Sum, difference, average, compare to common set point or compare to individual set point and select min. or max. deviating signal Square root function of feedback Calculate the square root of any / all individual feedback Signal signals so that a pressure sensor can be used to measure air flow PI programming Auto tuning PI controller to facilitate faster Commissioning 7 Installation of pressure sensor near Actively adjust its set point based on flow, to facilitate such to output of pump installation 8 Independent PID 8 Independent PID 9 Floating point control interface 10 Meter displays 11 Display of feedback signals 12 Sleep mode 13 Run permissive circuit 14 Loss of load detection 15 Real time clock Signature of Tenderer Controllers Three Nos. additional PID controllers to control controllers. damper and valve positioners in the system and to provide set point reset To increase/decrease speed in response to contact closures. 5 simultaneous meter displays on LCP Display all connected feedback signals and its set points, in and set points their own engg. units (e.g. :bar / P0PC etc.) Programmable and be able to stop the VFD in the following situations: a) Output frequency drops below set “sleep” level for a specified time, b) External contact commands that the VFD go into Sleep Mode, or c) Detects a no-flow situation. Receive a “system ready” signal before starting and also be capable of initiating an output “run request” signal to the external equipment. Monitor a broken belt / loose coupling and indicate via keypad warning, relay output or serial communication. This function shall be based on torque and shall have a proof timer. Integral feature and shall be capable of: a) Display current date & time on control panel b) Start / stop, change speed depending on time No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. 16 Energy log 17 Load profile 18 Sequential logic controller 19 Cascade controller for 20 Automatic restart 21 Adjustable ramp time 22 Catching a spinning fan 23 Programmable current limit 24 Start Delay 25 Critical frequency lock out Page 145 of 194 ARCHITECT : THE FIRM c) Time stamp all faults d) Program maintenance reminders based on time Function to monitor energy consumption pattern over programmable hours, days & weeks Store a load profile to assist in analyzing system demand and energy consumption To perform logic functions which has logic operators, comparators and timer functions. To control one variable speed motor and 2 fixed speed multiple motors motors. Software to have full functionality and not just on/off To automatically restart on receiving power after a power failure To avoid nuisance tripping, automatically adjust the ramp times. To have a flying start function to effectively control an already spinning fan – in both forward and reverse direction. Programmable for site / application requirement. Shall be able to program for trip after an adjustable time A programmable start delay shall be provided. a) Semi automatic setting of lock out range. b) 4 such lock out ranges to be provided. VFD Input & Output 1 Digital inputs 2 Digital outputs 3 Relay outputs At least 4 programmable digital inputs At least 2 programmable digital outputs At least 2 programmable relay outputs (Form C 240 V AC, 2A) with adjustable on/off delays. 4 Analog inputs At least 2 programmable analog inputs, independently selectable for Voltage (0-10V DC) or Current (4-20mA) inputs 5 Display of analog signal The Local Control Panel to display each analog signal in its engg. units for troubleshooting & setup. 7 Optional I/O modules Possible to order additional I/Os including DIs, DOs, ROs, AI, AOs and Ni 1000 / Pt 1000 inputs. 8 Serial com interface for AI/DI Capable of reading the status of all analog and digital inputs of the VFD through serial bus communications 9 Serial com interface for AO/DO Capable to command all digital and analog outputs (including options) through the serial communication bus 10 Fire over ride mode On receipt of a digital fire input, override all other local or remote commands, ignore most normal safety circuits including motor overload, display FIREMODE, select forward or reverse operation and speed source or preset speed. VFD Serial Communications 1 The VFD shall include a standard EIA-485 communications port and capabilities to be connected to the following serial communication protocols at no additional cost and without a need to install any additional hardware or software in the VFD: a) Metasys N2 b) Modbus RTU 2 VFD shall have standard USB port for direct connection of Personal Computer (PC) to the VFD. The manufacturer shall provide no-charge PC software to allow complete Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 146 of 194 ARCHITECT : THE FIRM setup and access of the VFD and logs of VFD operation through the USB port. It shall be possible to communicate to the VFD through this USB port without interrupting VFD communications to the building management system. 3 The VFD shall have provisions for an optional 24 V DC back-up power interface to power the VFD’s control card. This is to allow the VFD to continue to communicate to the building automation system even if power to the VFD is lost. Technical requirement of Fans Propeller Fans The Propeller Fan blades shall be aluminium / pressed steel of aerofoil design for high fan efficiency and static pressure. Rubber mounts shall be provided between the mounting frames and brackets. The fan motor shall be totally enclosed type. Propeller fan shall be direct-driven, three or four blade type, mounted on a steel mounting plate with orifice ring. Mounting Plate shall be of steel construction, square with streamlined venturi inlet (reversed for supply applications) coated with baked enamel paint. Mounting plate shall be of standard size, constructed of 12 to 16 gauge sheet steel depending upon the fan size. Orifice ring shall be correctly formed by spinning or stamping to provide easy passage of air without turbulence and to direct the air stream. Fan Blades shall be constructed of aluminium or steel. Fan hub shall be of heavy welded steel construction with blades bolted to the hub. Fan blades and hub assembly shall be statically and dynamically balanced at the manufacturer’s works. Shaft shall be of steel, accurately ground and shall be of ample size for the load transmitted and shall not pass through first critical speed thru the full range of specified fan speeds. Shaft Motor shall be standard (easily replaceable) permanent split capacitor or shaded pole for small sizes, totally enclosed with pre-lubricated sleeve or ball bearings, designed for quiet operation with a maximum speed of 1000 rpm for fans 60 cm dia or larger and 1440 rpm for fans 45 cm dia and smaller. Motors for fans above 0.4 Kw shall be suitable for 415±10% volts, 50 ±6%cycles 3 phase power supply, and for smaller fans 0.4Kw and below shall be suitable for 220 ± 6% volts, 50 cycles single phase power supply. Motors shall be suitable for either horizontal or vertical service as required. Accessories - The following accessories shall be provided with propeller fans : Wire guard on inlet side and bird screen at the outlet. Fixed or gravity louvers built into a steel frame at the outlet. Regulator for controlling fan speed for single phase fan motor. Single phase preventers for 3 phase fans. The fan motor should be suitable for IP-54 protection Axial Fan The Axial flow fans shall be Tube Axial type fans connected to the duct & shall be of floor / ceiling / wall mounted type as specified in the data sheet. The system shall contain following components: Casing Impeller Drive Motor Noise and Vibration Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 147 of 194 ARCHITECT : THE FIRM Casing The cylindrical casing should be made from welded carbon steel sheet. The inlet & outlet of the casing shall be fitted with flanges for ductwork connection & other accessories as required. The surface finish shall be Powder coated. Impeller The impeller shall have blades of an aerofoil design. Blades shall be mounted on streamlined hub. The impeller shall be statically and dynamically balanced. The blade of axial flow fan shall be made of die cast aluminium alloy. The blade angle shall be set at manufacturing place & shall also have facility to modify later. The impeller assembly shall be fixed on the shaft by means of a double cone type expansion bush. The design shall facilitate the alteration of blade angle without disconnecting the hub from the motor shaft. Drive Motor The fan shall be directly driven by TEFC sq. cage induction motor. The fan motors shall be energy efficient (EFF-1) 415±10% volts 50HZ ± 5%, 3 phase TEFC SQ.Cage induction motor. The motor shall be specially designed for quiet operation & motor RPM shall be as given in data sheet. Drive motor shall be rated at least 15 % higher than the power requirement at duty point or 10 % higher than the maximum power requirement at selected speed, whichever is higher. Starting torque requirements of fan shall also be considered while selecting the motor. Noise & Vibration Noise level produced by any rotating equipment individually or collectively shall not exceed 85 dB (A) measured at a distance of 1.5 metres from the source in any direction. The overall vibration level shall be as per zones A and B of ISO 10816-1. Balance quality requirement shall be G 6.3 conforming to ISO 1940/1. CABINET TYPE FANS These units shall be of sectionalized construction fabricated from 16 gauge steel sheets, consisting of fan section, and damper section and filter section if supply air or Fresh air is required. For floor mounted arrangement, the fan shall be mounted on G.I. support with antivibration mountings and sit on concrete plinth. For ceiling mounted arrangement, the fan shall sit on anti-vibration mountings fixed on steel mounting frame. Threaded suspension rods with lock nuts shall be used for level adjustment. Anti-vibration mounting shall be selected to cater for different point load of the fan at four corners. Fan Section The fan section shall contain one or more centrifugal fans, the wheels being mounted on a common shaft and secured by hub assembly. The shaft shall be of lightweight tubular design. The shaft shall be hot rolled steel or forged steel. Fan wheels and the shaft shall be statically and dynamically balanced. The fans shall be of the forward- curved, double inlet, and multiblade type. Fan blades shall be constructed of aluminium or steel. Fan hub shall be of heavy welded steel construction with blades bolted to the hub. Fan housing shall be made of die-formed steel Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 148 of 194 ARCHITECT : THE FIRM sheets with lined stream inlets. Fan discharge shall be horizontal or vertical as required. Bearings shall be sealed – in ball type, self-aligning rubber/steel blocks and located externally. Drive Motor An adjustable mounting base for installing the motor shall be provided either on the side or top of fan section, as required. Drive to the fan shaft shall be through V-belts. Fan motor shall be TEFC squirrel cage with class B insulation conforming to IP 44 if fan is installed indoor; and class F insulation confirming to IP55 if fan is installed outdoor and as per Motor data sheet. Motor nameplate rating shall exceed Bhp rating including losses by a minimum of 10%. It shall be mounted on adjustable bracket fixed on the side or top of the fan section. The bracket shall be ample size to hold a motor of the next larger size. The fan drive package shall consist of fan pulley, adjustable motor pulley, V-belts and removable wire guard. Pulleys shall be multisheaved with matching V-belts of anti static and oil resistant quality. Belt guard shall be of M.S painted with anti corrosive paint with heavy gauge wire net and firmly fixed to the fan section. Unit shall be equipped with full sized damper wherever required of indicated in the drawings/data sheets. Dampers shall be of multi-leaf, opposed blade, inter locked design with one manual control point. Damper blades shall be made from 1.5 mm thick sheets and shall rotate in brass/ nylon bushes. Filter Section (If required) Filter section shall be of V-type designed to receive 50 mm thick filters. Filters shall be cleanable dry metal type and shall be 50 mm thick. Air velocity through filter face shall not exceed 106 M/min with pressure drops not exceeding 5mm WG. Filters shall fit snugly to prevent bypass. Filter cells shall be easily removable from access openings provided on either ends. The section shall have flange attachment to duct work as required. Filters of synthetic fabric or other materials, if offered, shall be treated to impart flame and fire retardant properties and shall be resistant to bacterial and fungal attack. Filter shall be of min. 90% efficiency down to 10 microns particle size. Noise and Vibration Noise level produced by any rotating equipment individually or collectively shall not exceed 65 dB (A) measured at a distance of 1.5 meters from the source in any direction. The overall vibration level shall be as per zones A and B of ISO 10816-1. Electricity A terminal box suitable for connecting external 3 phase, 4 wire cable shall be provided. Deviation by Vendor Vendor shall strictly adhere to the scope of supply. However deviations if any shall be specifically and separately listed in the offer. In absence of this deviation list shall be presumed that the vendor’s offer is in full conformity with Buyer’s requirement and there is no deviation. General Vendor shall guarantee the Fans for smooth optimum operation for min.1 requirement) after handover. Any failure in guarantee period shall be attended by Vendor within 24 hours. Vendor shall provide matrix of resolution time for various breakdowns along with Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 149 of 194 ARCHITECT : THE FIRM offer. Spares, consumables, any other material/ labor and any special tools and tackles required for rectification of Fans for satisfactory operation during guarantee period shall be in vendor's scope. Vendor shall provide list of spares along with price to be maintained by client after the guarantee period is over. This specification is a general guideline. However, vendor shall have the full responsibility to provide suitable instrument for measurement and control of the parameters for an optimum continuous operation. Test / Inspection Inspection and testing shall be as per vendor’s standard QAP as commented and approved Client. CHILLED WATER PIPING & VALVES Chilled / Condenser water pipes shall be "Heavy" Class “C” M.S. Black ERW pipes & shall conform to IS: 1239 & IS: 3589 with latest amendments. The Wall thickness of pipe sizes less than 150mm as per IS 1239, for 150mm and above as per IS 3589 shall be as follows Nominal Pipe Dia in mm Wall Thickness of Pipe in mm a) 25 b) 32 c) 40 d) 50 e) 65 f) 80 g) 100 h) 125 i) 150 j) 200 k) 250 l) 300 m) 350 n) 400 o) 450 p) 500 q) 600 r) 700 s) 900 4.00 4.00 4.00 4.50 4.50 4.80 5.40 5.40 5.40 6.00 6.00 6.00 6.00 6.00 6.00 6.00 8.00 8.00 8.00 Drain water / make up water pipes shall be "B" Class GI Pipe & shall conform to IS: 4736. The pipes shall be sized for individual liquid flow & shall ensure smooth noiseless balanced circulation of fluid. All piping and their steel supports shall be thoroughly cleaned and primer coated before installation. Pipe Fittings (Elbows, Caps, Reducers, Tees) The pipe fittings for screwed piping shall be malleable iron and for piping with welded joints shall of weldable quality. Also the fittings shall be suitable for same pressure ratings as for the piping system. For BW fittings sizes up to 150 mm material shall be ASTM A 234 WPB & for sizes > 150 mm same as pipe. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 150 of 194 ARCHITECT : THE FIRM For SW fittings sizes up to 40 mm material shall be ASTM A 105. All bends up to sizes 150 mm dia shall be ready made of heavy duty wrought steel of appropriate class. All bends in sizes 150 mm and above shall be fabricated from the same dia. and thickness of pipe in at least four sections and having a center in radius of at least 1.5 times diameter of pipes. The dead ends shall be formed with flanged joints & shall have 6mm thick blank between flange pair for 150 mm and over. Union & Flanges All flanges shall be of CSA105N/IS-2062 Gr.B material. The dimensional standard shall be as per ASME B 16.5. The Pressure rating shall be as per ASME B16.5 CL150 (19.6 Bar G at 0 deg temperature) upto 600 mm (24”). A. Flanges / unions shall be provided on horizontal pressure piping at spacing not exceeding 18.0 m (60 feet). B. Grooved mechanical couplings and fasteners shall be used only in accessible locations. C. Unions or flanges shall be installed downstream of valves and at equipment or apparatus connections. Flanged pair shall be used on all such equipments which are required to be isolated or removed for service for example condenser / chilled water pumps, chilling m/c, AHU etc. The gasket material shall be of Spiral wound/ NBR duly reinforced with Armid fibers. Installation The contractor on the award of the work shall design the piping installation and prepare detailed working drawing showing the cross section, longitudinal section, details of fittings, location of isolating drain and air valves, instruments etc. for approval. Care shall be taken to provide expansion loops or joints to take care of expansion or contraction due to temperature changes. Work shall be started only after the drawings have been approved in writing by the Engineer-in-Charge. Proper additional precautions shall be taken as directed by Engineer for vibration isolation of piping, passing through sensitive areas. Piping shall be properly supported or suspended from stands, clamps, hanger’s etc. as required. The contractor shall adequately design all the racks, saddles, clamps, hanger’s etc. and be responsible for their structural integrity. Following procedure to follow for piping installation: Install chilled water and equipment drains, and overflow piping in conformance with ASME B31.9. Route piping in orderly manner and maintain gradient. Route parallel and perpendicular to walls. Install piping to maintain headroom and neither interfere with use of space nor take more space than necessary Group piping whenever practical at common elevations Install piping to allow for expansion and contraction without stressing pipe, joints, or connected equipment Provide access where valves and other equipment are not exposed. All valves shall be installed in accordance with the manufacturer's instructions and with sufficient clearance and access for ease of operation and maintenance. Install valves with stems upright or horizontal, not inverted. Sleeve and caulk pipes penetrating exterior walls or interior bearing walls. Provide waterproof installation for exterior walls. Provide UL/FM approved throughSignature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 151 of 194 ARCHITECT : THE FIRM penetration fire stop system, when penetrating fire rated barriers (i.e., walls, floors, etc). Pipe relief valves to nearest floor drain. Install a union in the piping after each relief valve. Slope water piping and provide drain valves at low points Provide automatic air vents in closed piping systems at high point. Provide isolation ball valve at inlet connection. Above Grade Piping: Unless otherwise noted, provide ball valves in piping 2 inches and smaller, butterfly valves in piping 2 1/2 inches and larger, and gate valves with standard male capped hose connection, for equipment and drain valves. Provide globe valves for throttling applications. Each support will be isolated from supported pipe or fittings by anti-vibration springs or non-deteriorating and durable lines of rubber or neoprene. The gasket material shall be of Spiral wound/ NBR full face duly reinforced with Armid fibers. Pipe supports shall be of steel, adjustable for height and primer coated with rust preventive paint and two finish coats. Spacing of pipe supports shall not be more than that specified below: Nominal Pipe Size (mm) Spacing (m) 12 and 15 20 and 25 32, 40, 50 and 65 80, 100 and 125 150 and above 1.25 2.00 2.50 2.50 3.00 Extra support shall be provided at the bends and heavy fittings like valves to avoid undue stresses on the pipes. Pipe hangers shall be fixed on walls and ceiling by means of metallic or expansion fasteners. Vertical risers shall be parallel to walls and column lines and shall be straight and plump. Risers passing from floor to floor shall be supported at each floor by clamp or collars attached to pipe with a 12 mm thick rubber pad. Risers shall also have suitable elbow or concrete pipe support at the lowest point. Pipe sleeves of 50 mm or larger diameter shall be provided wherever pipes pass through walls and the annular space filled with felt and finished with retaining rings. All pipes using screwed fittings shall be accurately cut to the required sizes and threaded in accordance with IS: 554 and burrs removed before lying. Open ends of the piping shall be blocked to avoid entrance of foreign matter. Wherever reducers are to be made in horizontal runs, eccentric reducers shall be used. If the piping is to drain freely in other locations, concentric reducers may be used. Flanged inspection pieces 1.5 meters long, with bolted flanges on both ends, shall be provided not more than 30 meter centres, to facilitate future cleaning of all welded pipes. All buried pipes shall be cleaned and coated with zinc chromate primer and bitumen paint, then wrapped with three layers of fibreglass felt, each layer laid in bitumen. All supports, members, any kind of structure works required for installation shall be included. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 152 of 194 ARCHITECT : THE FIRM Painting All ferrous components of the piping system shall be provided with one coat of approved primer and two coats of paint of approved quality and colour insulated piping and valves etc. shall also be provided with painting in a similar manner. Testing of Pressurised Piping Pipes shall be jointed, plugged and shall have been in position for at least 24 hours, before the tests are carried out. Piping shall be tested for line, gradient and water tightness. Labour and necessary testing instruments such as gauges, pumps etc. shall be provided by the Contractor as directed by the Superintendent. A minimum of two (2) # identical pressure gauges shall be installed at extremities of the piping circuit to be tested. Piping shall be filled with clean fresh water, leaving all high points open to allow for purging of air. System shall be pressure tested using manual pumps in increments of 25 % of the test pressure. A standing period of 10 minutes shall be allowed after each pressure increment. Pressure testing using motor driven pump shall not be permitted. System shall not be over-pressurised under any circumstance. Calibrated pressure relief valves shall be installed in the tested circuit, if the test pressure is close to the maximum permissible working pressure of any of the system components. Valves and control devices shall be kept in the open position, during. After completion of pressure test, valves shall be closed, one at a time, starting from the pressure release end, so as to ensure tightness of the valve. Piping shall be tested with water at a pressure of 103 kPa (150 psig) or 1.5 times the system working pressure, whichever is greater, but limited to 1,379 kPa (200 psig). Pressure shall be maintained for at least 4 hours. Temperature of the circuit shall be recorded along with the pressure readings and pressure fluctuations due to ambient temperature variations shall be allowed for. Joints shall be checked for leaks by swabbing with a dry tissue. Drop in pressure to the order of 10 kPa (1.5 psig) per hour, but without any visible leaks, shall be considered as acceptable. Chilled / hot water coils and control valves shall not be subjected to the test pressure. Piping shall be tested in segments during the progress of the work. An official log book shall be maintained for recording the tests carried out on sections of piping, including test pressure, date of test and approval signature of Superintendent's representative witnessing the test. Testing for Weld joints will be as per Dye Penetration Test. Equipment, instruments, services and labour required to perform the test shall be provided by Vendor. Drains Drain water / make up water pipes shall be "B" Class GI Pipe & shall conform to IS: 4736. The drain pipes shall be provided at specified low points in the system. 25 mm dia gate valve with the same size GI piping upto the nearest drain or floor trap shall be provided for each drain point. The piping shall be pitched towards the drain points. Air venting valves shall also be connected to the nearest floor trap/drain through equal sized GI pipe. Balancing After completion of the installation, all water system shall be adjusted and balanced to deliver the water quantities as specified or quoted or as directed. Instruments required for this water balancing shall be accurately calibrated before taking any measurements. Calibrated orifices and portable flow meters shall be used to balance the water flow. Orifices used for testing and balancing shall be installed with straight length upstream and downstream as recommended by the manufacturer and shall be left Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 153 of 194 ARCHITECT : THE FIRM permanently installed in the system. Water circuit permanently marked after balancing is completed so that they can be restored to their correct position, if disturbed. Complete certified balancing report shall be submitted to the Engineer for evaluating and approval. Upon approval, four copies of the balancing report shall be submitted with completion drawings and documents. Protection during Construction Ends of piping shall be kept closed with factory manufactured plugs or blind flanges with integral indicating flags, to prevent the entry of foreign matter, during the progress of the work. Such plugs or flanges shall be removed on completion of the works. Piping surface shall be protected from splashes of cement, plaster, paint and similar construction materials. Piping shall be blown out using dry compressed air, prior to testing. Valves and Strainer Butterfly Valves Butterfly valves shall be of PN 16 rating as per IS 13095 preferably with fixed linear design to suit duty and flanges as per IS 6392 Table "E". Valves of sizes 32 mm and above diameter shall be made of cast iron close end body, cast iron epoxy coated disc, Nitrile Seat and SS 410 Stem with Teflon bush. Valves up to 150mm NB shall be with detachable hand lever operation whereas valves above 150 mm NB shall have warm gear operation. These valves shall be installed in condenser / chilled water lines, make up / drain water piping lines. All valves shall be supplied with factory test reports and the manufacturer must have test facilities at their works. Balancing Valves The balancing valves shall be capable for measuring, regulating and isolating the flow. The balancing valves upto 65 mm dia shall be of gunmetal screwed type and 80 mm dia and above shall be CI double flanged type. All other internals shall be non-corrosive material preferably of forged brass. The port opening shall permit precise regulation of flow rate, by accurately measuring the pressure drop across the port. The valve shall be complete with two ports for connections to a mercury manometer, to measure the pressure drop, as well as drain port. The spindle shall have a shielded/concealed locking screw to avoid the tempering of the setting after balancing. The valves must have easily accessible pressure drop measuring facility. The balancing valve shall have indication of number of turns on hand wheel preferably digital type. Valve will have flanged/screwed end connection. The balancing valve shall be used in lieu of butterfly/gate/globe valves and shall be suitable for working at 16 kg/ cm2 g. working pressure and suitable for temperature range (-) 5 °C to 100 °C. Technical Data:Working Pressure Test Pressure (Body) Test Pressure (Seat) Type : : : : 16 Bar 24 Bar 16 Bar Double Regulating Material of Construction (Gun Metal upto 80 mm dia.) Body : Cast Gun Metal (IS 318 Gr. LTB2) Bonnet : Cast Gun Metal (IS 318 Gr. LTB2) Hand Wheel : Aluminium Alloy / CI Seat Seal : Teflon Spindle : Brass Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 154 of 194 ARCHITECT : THE FIRM Pressure Test Cocks : Brass Drain Cocks : Brass End Connection : BSP Screwed Material of Construction (Cast Iron 100 mm dia & above) Body Hand Wheel Upper Disc Lower Disc Seat Seal Bonnet Stem Pressure Test Cocks : : : : : : : : IS 210 Gr. FG 260 MS / CI FG 220 SS 410 SS 410 EPDM CIFG 260 SS 410 MS Electro Plated Check Valves The dual plate check valves shall be used for horizontal / vertical run of pipes & shall conform to PN 16 rating . The valve design shall confirm to API 594 and tested as per ANSI SERIES. The valves shall have cast iron body, and SS 410 plates, SS 410 Shaft & Nitrile Seat. All valves shall be supplied with factory test reports and the manufacturer must have test facilities at their works. Ball Valves Ball valves shall be of full-port type with stem sealing by bolted packing of glands and “O” ring seals. The valve body shall be of cast steel. It shall be with extended stem. The valves shall be suitable for a working pressure of 10 Kg/cm2 (g) and a test pressure of 16 Kg/cm2 (g). The material specifications for the ball valve shall be as given below: Sr. No 1. 2. 3. 4. 5. 6. 7. 8. 9. Name of part Body Trim Ball Seat Stem Stem Seal Body Seal Gland packing Lever Specifications CS A216-WCB SS 304 AISI 316 Virgin PTFE AISI 316 35% Carbon filled PTFE PTFE AISI 304 Steel rust proofed Ball valve shall be selected < 32 mm dia. above 32 mm dia butterfly valve shall be selected. Gate Valve Gate valves shall conform to IS-14846:2000.The Gate valve shall be with non-rising spindle & bolted bonnet. The valves shall be Manufactured as per IS14846:2000 (superseding IS: 780/IS 2906). The material specifications for the Gate valve shall be as given below: 1. 2. 3. 4 5. 6 7 Signature of Tenderer Body Spindle Body seat ring & Wedge Body Seal Gland Packing End connections CS A216-WCB SS as per AISI 410 SS as per AISI 410 Disc facing ring ASTM A216 Gr. WCB +13% Cr. Steel Graphite Gland Packing Below 50 mm-screwed. 50 mm & above flanged end, to be drilled as ANSI B16.5. No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 155 of 194 ARCHITECT : THE FIRM 8. Pressure rating PN =1.6 Nn/mm2 9. Gasket Compressed Asbestos Fibers to IS-2712-1979 10 Hand wheel CI Gr. 200 as per IS 210-1993 Strainers Strainers shall be of the approved ‘Y’ type for sizes upto 150mm, 200mm and above shall be of T-type, with C.I. or fabricated steel bodies designed to the test pressure specified. The Y-strainer shall be fabricated out of MS `Heavy’ class pipe two size higher than that of strainer pipe size. Flanges as per BS 10 shall be provided at inlet & outlet of connections. The body shall be pressure tested at 10Kg/Sq. cm and shall be hot dip galvanized. Permanent magnet shall be provided in the body of the strainer to arrest MS particles. Filter element shall be of nonmagnetic 20 gauge SS sheet with 3 mm perforation. Strainer shall be provided at inlet of each AHU & chilled water pumps, Pot Strainer body shall be fabricated out of MS plate IS 226. Thickness of sheet shall be as per size of the strainer chamfered pipes with flanges shall be provided at inlet / outlet connections of the strainer. The tangential entry of water shall create a centrifugal action and due to velocity shall separate sediments and deposit on the inner surface of filter element and at bottom of the Strainer. Butterfly valves shall be provided at inlet/ outlet connections as shown in drawing and included in BOQ. The strainer body shall have two separate chambers properly sealed to avoid mixing of filtered and unfiltered water. A powerful magnet shall be provided in the body to arrest MS particles. Filter element of Pot Strainer shall be of non magnetic 18 gauge SS sheet properly reinforced to avoid damage of the element. A cone with sufficiently large drain pipe with butterfly valve shall be provided at the bottom chamber to flush-out foreign particles. This arrangement shall avoid frequent opening of Pot Strainer for cleaning of filter element. Gauge connection shall be provided at inlet and out let connection. A set of MS flanges with tongue and groove arrangement and neoprene rubber gasket shall be provided on the top cover and Pot Strainer flange with sufficient bolts and nuts to make the joint water tight. Bearing loaded lope cover lifting and swinging arrangement shall be provided. The pot strainer body shall be properly de-rusted and epoxy coated from inside and outside. Manufacturers Test Certificate shall be provided with each Pot Strainer. Size of various Pot Strainer, Filter Element and Thickness of MS sheet shall be as under. Pipe Size Thickness (mm) 50 80 100 125 150 200 250 300 350 400 450 500 600 700 Signature of Tenderer Pot Dia Pot HT (mm) 300 350 450 500 540 610 800 1000 1190 1350 1518 1690 2000 2200 (mm) 400 450 500 600 700 815 955 1105 1300 1500 1700 1800 2200 2400 Element Dia. (mm) 200 250 300 330 360 400 550 750 895 1020 1060 1100 1500 1600 No. of Corrections Element HT (mm) 240 250 280 340 390 470 510 580 678 785 890 900 1160 1300 MS Plate (mm) 6 6 6 8 8 8 8 8 12 12 12 12 12 12 Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 156 of 194 ARCHITECT : THE FIRM Installation of Valves Valves shall be installed with stem upright or horizontal, not inverted; except with the written permission of the Superintendent, for each location. Valves shall be same size as pipeline, except where shown otherwise on the Contract Drawings. Gate, ball or butterfly valves shall be used for shutoff and to isolate equipment, risers or branches serving two or more cooling terminals. Globe / plug valves shall be used for throttling service. Non-lubricated plug valves shall be used only when shut-off or isolating valves are also provided. Drain valves shall be installed at system low points and at the foot of risers. In-line spring loaded check valves shall be installed at the discharge of pumps. Valves shall be pad-locked in open or closed position with leather straps, as required. Appropriate valve gland packing, sealing and gasket materials shall be selected for the temperature and pressure encountered. Delivery, Storage and Handling Products shall be delivered to site, stored and protected under provisions of the Technical Specifications. Pipes shall be stored on elevated racks and the ends kept closed with factorymanufactured plugs to prevent the entry of foreign matter. Plastic and rubber products shall be stored out of direct sunlight. Valves shall be delivered and stored in shipping containers with labelling in place. Further: 1. Plug and ball valves shall be kept in open position and gate / globe valves in closed position to prevent damage to valve seats Flange / thread protectors shall be retained on the valves, until installation, to prevent damage to the flange faces / threads Pressure gauge Pressure gauges of 100 mm dial with ‘U’ tube & gauge cock shall be provided at the following locations: a. All pumps-suction & discharge. b. Equipment inlet & outlet. c. ‘U’ tube shall be of brass with chromium plate. Pressure gauges shall conform to IS: 3624. Thermometer Dial type thermometer min. 100 mm shall be provided at the inlet and outlet of all heat exchangers as specified to measure water entering and leaving temperatures. The thermometers shall be installed in thermo-wells. Thermometer shall be of appropriate range and shall be calibrated before installation. Thermometers for insulated piping shall be installed in extended thermo-wells to avoid damage or deformation of the insulation. Wherever, specified dial type thermometer shall be provided. Air Venting Air vents shall be provided at the top most point of piping system for air venting. A ball valve shall be provided for air vents for air release. The sizes of air release shall be as specified hereunder. All such valves will be measured and paid. Mains Air release valve Upto 100 mm 20 mm 125 and above 25 mm However, wherever automatic air venting device is specified, the size of auto air vent shall be as per manufacturer’s recommendations. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 157 of 194 ARCHITECT : THE FIRM Insulation General CHILLED WATER & CONDENSATE DRAIN PIPING THERMAL INSULATION The material shall be thermocole pipe section (TF Quality) of requisite thickness as specified in the B.O.Q. The thickness shall be 25 mm for drain piping and 50 mm for the chilled water circulation pipes. APPLICATION For over ground laying following steps to be followed: i) ii) iii) iv) v) Clean the surface thoroughly with wire brush and make it free from dirt, oil. Grease and other foreign material. Apply one coat of bitumen based adhesive and allow it for drying for 15-20 minutes. Once the adhesive is dry but sticky to touch, apply the pipe section. Press the insulation section tightly over the entire’ surface to make stronger bond between the pipe and insulation. Apply sealant in the jointing section. Apply vapour barrier on the outer surface of the insulation material. Wrap the surface with chicken wire mesh and finish the surface by sand cement plaster having a mixing ratio of sand to cement as 4:1 (min). For underground piping insulation follow the above steps from (i) to (iv) including one additional step: Apply tarfelt /fiberglass tissue with semi hot bitumen 85/25 or 95/10 grade. Overlap joints (75 mm) with semi hot bitumen uniformly. Apply a coat of hot bitumen @ 1.8 kg/m2 (approx.) over tar felting. For condensate drain piping above procedure shall be followed. For valves, fittings etc. in the chilled water line, same thickness as specified earlier for pipe run shall be followed. TECHNICAL REQUIREMENTS OF AIR SIDE Sheet Metal Works Scope The scope of this section comprises supply, fabrication, installation and testing of all sheet metal ducts. a. Governing Standards Unless otherwise specified here, the construction, erection, testing and performance of the ducting system shall conform to the b. Raw Material Ducting All ducting shall be fabricated of LFQ (Lock Forming Quality) grade prime G.I. raw material furnished with accompanying Mill Test Certificates. Galvanizing shall be of 180gms/sq.m. (total coating on both sides) In addition, if deemed necessary, samples of raw material, selected at random by owner’s site representative/consultant representative shall be subject to approval and tested for thickness and zinc coating at contractor’s expense (from a competent test laboratory like NPL or equivalent) time to time. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 158 of 194 ARCHITECT : THE FIRM The G.I. raw material should be used in coil-form (instead of sheets) so as to limits the longitudinal joints at the edges only irrespective of cross-section dimensions. Duct Connectors and Accessories All transverse duct connectors (flanges/frame/Bracing/cleats) and accessories/related hardware shall be zinc-coated (galvanised). Fabrication Standards The duct work shall be fabricated out of galvanized sheet, class VIII conforming to IS 277-1962 (revised). The fabrication of duct shall strictly conform to IS 655- 1963. The thickness of the sheet shall be as follows. Maximum side mm 1 Up to 300 Thickness of Type of transverse joint sheet mm connections 2 3 0.63 S drive, pocket or None bar slips, on 2.5 m centre S drive, pocket or bar slips on 2.5m centre. 301 to 600 0.63 S drive, 25 mm pocket or 25 mm 601 to 750 bar slips on 2.5 m centre drive, 25 mm bar slips on 2.5 m centre. 751 to 1000 0.80 40 x 40 mm angle connection or 40 mm pocket or 40 mm bar slips on 2.5 m centre. 1001 to 1500 0.80 50 mm bar slip, with 35 x 3 mm bar reinforcing on 2.5m centre 1501 to 2250 1.00 40 x 40 mm angle connections or 40 mm pocket or 40 mm bar slips, 1m maximum centre with 35 x 3 mm bar reinforcing. 2251 and 1.25 50 x 50 mm angle connections above or 40 mm pocket or 40 mm bar slips. 1m maximum centre with 35 x 3 mm bar reinforcing. Bracing (if any) 4 None 25 x angle joint 40 x angle joint. -do- 25 x 3 mm 1.2m from 40 x 3 mm 1.2m From 40 x 40 x 3 mm angle 60 cm from joint. 40 x 40 x 3 mm angle 40 x 40 3 mm angle 50 cm from joint. Ducts 2250 mm and larger require special field study for hanging and supporting methods. The following points should be also taken into account while fabrication of ducts. All ducts shall be supported from the ceiling/slab by means of MS rods of dia. 9 mm with MS angle at the bottom. The ducts may be suspended from the ceiling with the help of dash fasteners. Provision of necessary supports with materials shall be arranged by the Contractor. The rubber gasket shall be installed between duct flanges in all connections and joints. The duct work can be modified in consultation with the Consultant to suit actual site conditions in the building. All flanges and supports should be primer coated on all surface before erection and painted with aluminium paint thereafter. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 159 of 194 ARCHITECT : THE FIRM Note In case angle iron supports are not feasible to be installed for supporting of the ducts, where limitation of suitable height of the false ceiling is not available then the Contractor shall support the ducts with MS flats of atleast double the thickness of the angle iron supports as specified in ISI standards. Also slip joints may be provided instead of flange type joints. No additional charges on these accounts shall be payable to the Contractor. Duct Construction The fabricated duct dimensions should be as per approved drawings and all connecting sections are dimensionally matched to avoid any gaps. Duct Construction shall be in compliance with relevant static norms as per IS-655 Documentation & Measurement for Ducting All ducts fabricated and installed should be accompanied and supported by following documentation: For each drawing, all supply of ductwork must be accompanied by computer-generated detailed bill of materials indicating all relevant duct sizes, dimensions and quantities. In addition, summary sheets are also to be provided showing duct area by gauge and duct size range as applicable. Measurement sheet covering each fabricated duct piece showing dimensions and external surface area along with summary of external surface area of duct gauge-wise shall be provided by vendor. All duct pieces to have a part number, which should correspond to the serial number, assigned to it in the measurement sheet. The above system will ensure speedy and proper site measurement, verification and approvals. Testing The complete duct system shall be tested for air leakage & complete air distribution system shall be balanced in accordance with air quantities indicated on the approved drawings Dampers Dampers shall be opposed blade type. Blades shall be made of double skin airfoil extruded aluminium sections with integral gasket and assembled within a rigid extruded aluminium alloy frame. All linkages and supporting spindles shall be made of aluminium or nylon, turning in teflon bushes. In case of automatic dampers, sealed ball bearings shall be provided, in place of teflon bushes. Manual dampers shall be provided with a bakelite knob for locking the damper blades in position. The dampers shall be low leakage airfoil having frame of 125 x 25 x 3mm thick extruded Aluminium sections and blades 160mm wide, minimum. 1.2mm thick extruded aluminium airfoil. The linkage shall be plated steel blade brackets, brass rollers and galvanised steel rods. Neoprene Rubbers Seals at tips of blades shall be provided. Stops shall be aluminium at head and sill. The motorised dampers shall be provided with motors and electrical wiring as required. Every damper shall have an indicating device clearly showing the damper position at all times. Low leakage dampers shall be tested at 100mm water gauge pressure and shall not exceed 1.5% of the maximum design air volume flow rate at the maximum design air total pressure. All supply air outlets shall be fitted with a volume control device, which shall be located immediately behind the outlet and shall be fully adjustable from above the false ceiling. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 160 of 194 ARCHITECT : THE FIRM Volume control device for circular outlets shall be opposed blade radial dampers in conjunction with equalising grid. Opposed blade dampers shall be used for square and rectangular ceiling/ wall outlets and intakes. VCDs shall be fabricated of minimum 18 G GSS or AL and shall be of robust construction. VCDs shall be of single blade type for round duct and opposed blade type for rectangular duct. VCDs shall have a locking device mounted outside the duct to hold the VCDs in a fixed position without vibration. Fully open and fully closed position shall be marked for easier operation of VCDs. Motor operated VCDs shall be provided, if specified. Actuator for dampers shall develop sufficient torque for easy operation of VCDs. VCDs shall be provided with Teflon or brass bushing for blade shaft as specified in data sheet A. Motor operated VCDs shall be provided with Teflon bushing or brass bushing or sealed ball bearing for blade shaft. Fire Dampers All supply & return air ducts in air handling units in main branches shall be provided with approved fire dampers of at least 90 minutes fire rating. All crossing of Fire rated walls fire dampers are provided at plant room crossings and at all floor crossings. Fire damper blades shall be one piece folded high strength galvanised steel construction. In normal position, these blades shall be gathered and stacked at the frame head providing maximum air passage and preventing passing air current from creating noise chatter. The blades shall be held in position through fusible links (UL certified). In case of fire, the intrinsic energy of the folded blades shall be utilised to close the openings. The thrust from closing of the damper shall operate a limit switch mounted in the bottom frame of fire damper within the duct; closing of this limit switch shall shut off the power supply to the air handling unit stopping all air flow instantaneously. No hinges or blade linkages shall be permitted which may give way under heat or air pressure. Fire damper blades and outer frames shall be of 16 G GSS or AL construction. The damper blades shall be pivoted on both ends using chrome plated spindles in self lubricated bronze bushes. Stop shall be provided on top and bottom of damper housing made of 16 G GSS or AL. For preventing smoke leakage, side metallic compression seals shall be provided. Fire damper shall be provided with factory fitted sleeves. Access doors shall be provided within the duct in accordance with the manufacturer’s recommendation. Fire dampers shall be flanged both sides and access panels shall be provided in the ducting at each fire damper on the upstream side. The open or closed status of the damper shall be clearly indicated outside the casing for inspection purpose. Dampers shall be sized so that the nominal free air area when in the open position is not less than the connected duct free air area. Dampers shall be installed so as to form part of a continuous barrier to passage of fire when in a closed position. Where a fire damper cannot be fitted immediately adjacent to the firewall, the section of ducting between damper and wall shall be of at least the same metal thickness and fire rating as the damper casing. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 161 of 194 ARCHITECT : THE FIRM Dampers shall be self-supporting in case of duct destruction due to heat. Care shall be exercised that the frame be set so that the closing device will be accessible. Suitable hand openings with tightly fitted covers shall be provided to make dampers accessible for inspection and maintenance. Damper and its actuator shall also have a UL555S elevated temperature rating of 350deg.F. Electric Actuator of suitable Torque shall be factory mounted and tested. The actuator shall be suitable for 24V supply. Each fire/smoke damper shall be equipped with a controlled closure quick detect heat actuated release device to prevent the instantaneous closure of the damper associated with spring loaded fusible link. The electronic heat detector shall be equipped with a device to indicate OPEN and CLOSE position of Damper blades through a suitable linkage attached to the damper blades. Reset button and Test button to check damper operation will be part of this accessory. Minimum 2 Nos. of fusible link shall be tested at site. Motorized Combined Smoke & Fire Dampers - Spring Return Type a) All supply air Ducts in AHU room crossing shall be provided with approved make fire and smoke dampers of at least 90 minutes fire rating certified by CBRI, Roorkee as per UL555:1973. b) The fire damper blades & outer frame shall be formed of 1.6 mm galvanized steel sheet. The damper blade shall be pivoted on both ends using chrome-plated spindles in self-lubricating bushes. Stop seals shall be provided on top & bottom of the damper housing made of 16G Galvanized steel sheet. For preventing smoke leakage side seals will be provided. In normal operating conditions damper blade shall be held in open position with the help of a 24 V operated electric actuators thereby providing maximum air passage without creating any noise or chatter. c) The damper shall be actuated through electric actuator. The actuator shall be energized with the help of a signal from smoke detector installed in AHU Room / R. A. Duct. The fire damper shall close due to temperature rise in S. A. Ducts through the electric temperature sensor, which is factory set at 165 °F. d) Each motorized smoke cum fire damper shall have its own panel which will incorporate necessary circuit required to step down voltage available from UPS or emergency power supply to show status of the damper (open or close), to allow remote testing of damper, indication in event of damper closure due to signal from smoke sensor / temp. sensor & reset button. Additional terminal will be provided to have audio cum video signal in Central Control Room. e) Damper actuator shall be such that it should close the damper in the event of power failure automatically and open in the same in case of Power being restored. f) The fire Damper shall be mounted in fire rated wall with a duct sleeve 600 MM long. The sleeve shall be factory fitted on fire damper. The joints at sleeve end shall be slip on type. Minimum thickness of GI Sheet shall be 18G. g) The damper shall be installed in accordance with the installation method recommended by the manufacturer. Motorized Fire damper shall be supplied with a control panel to be mounted on the wall near the damper with following functions; 24V power supply to Damper actuator using 230V 1Ph. 50Hz.A.C supply To activate Damper actuator based on signal from Central Fire control Panel/Duct mounted smoke detector. To indicate damper status Close/Open. To provide auxiliary contacts to stop AHU fan motor in event of closure of damper. To provide auxiliary 24V contacts for remote Damper status indication. Interconnecting wiring between Control panel and damper actuator shall be done by HVAC contractor in accordance with Manufacturer recommendations. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 162 of 194 ARCHITECT : THE FIRM Supply and Return Air Grills (SAG & RAG) and Ceiling Diffusers For conventional HVAC system rectangular wall outlets or ceiling diffusers shall have a flanged frame with the outside edge returned or curved and fitted with a suitable flexible neoprene gasket between the concealed face of the flange and the finished wall face/ceiling. The core of supply air register shall have adjustable from louvers parallel to the longer dimension to give upto 22.5 vertical deflection and adjustable back louvers parallel to the shorter dimension to achieve a horizontal spread air pattern of at least 45. Return air of lines shall have only front louvers. The outer framework of the grilles shall be made of not less than 1.25 mm steel sheet or 1.67 mm aluminium sheet. The louvers shall be 0.64/0-80 mm aluminium sheet. Louvers may be spaced at 18 mm or as advised by the Engineer. Size of louvers will be selected for achieving desired air movement & air throw keeping room circulation factors in mind. The supply and return air grills and ceiling diffusers shall be made of powder coated extruded aluminium sections. The supply air grills / diffusers shall be provided with screw operated opposed blade volume control device made of MS duly black painted. All grills / diffusers shall have soft continuous rubber / foam gasket between the periphery of the grills / diffusers and surface on which it has to be mounted Grills and diffusers constructed or extruded aluminium sections shall have grille bays set straight, or deflected 15 or 30 or as required. These shall be assembled by mechanical interlocking of components to prevent distortion. These grills and diffusers shall have a rear set of adjustable bars, perpendicular to face bars for deflection purposes. Linear Supply and Return Grills The linear continuous supply / return air grills shall be made of powder coated extruded AL construction with fixed horizontal bars. The thickness of fixed bar louvers shall be 5mm in front and the flange shall be 20mm wide with round edges. The register shall be suitable for concealed fixing and horizontal bars of the grills shall mechanically crimp from the back to hold them. Diffusers Diffusers shall be square, round or rectangular with faceplates matching the ceiling grid as specified, manufactured from pressed or spun steel or aluminium sheet metal. The square / rectangular ceiling diffusers shall be made of powder coated extruded aluminium construction with flush fixed pattern. The diffusers shall have Anti-Smudge ring and spring loaded removable central core in various pattern for air flow direction. The diffusers shall be mounted by concealed screw fixing arrangement. Ceiling diffuser shall be equipped with fixed air distribution grids, removable key operated volume control dampers and anti-smudge rings. The extruded aluminium or SS 304 diffusers shall be provided with removable central core and concealed key operation for volume control damper. Linear diffusers shall be of extruded aluminium construction. The Jet type Round Diffusers shall be of adjustable, powder coated extruded AL construction with , colour & other parameters shall as per approved by Project In-charge. Testing & balancing After installation of the entire air distribution system is completed in all respects, all ducts shall be tested for air leaks (as per specified standard) prior to insulation application. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 163 of 194 ARCHITECT : THE FIRM Before painting the interiors of conditioned spaces, air distribution system shall be allowed to run continuously for 48 hours for driving away any dust or foreign material lodged within ducts during installation. The entire air distribution system shall be balanced using pitot tube or hot wire, flow hood method. Measured air quantities at fan discharge and various outlets shall be identical to or less than 3 percent in excess of, those specified and quoted. Leakage in each air distribution system shall be within 3 percent, so that supply air volume at each fan shall be identical to, or no greater than 3 percent in excess of the total air quantity measured at all supply outlets served by the fan. Branch duct adjustments shall be made by volume or splitter dampers. Dampers shall be permanently marked after air balancing is completed so that these can be restored to their correct position if disturbed at any time. Complete air balance report shall be submitted to the supervisor for scrutiny and approval and four copies of the approved balancing report shall be provided with completion documents. Test / Inspection Inspection and testing shall be as per vendor’s standard QAP/Test certificate as commented and approved by Client. INSULATION Insulation of Duct SCOPE This section deals with the supply, application, testing of insulation both thermal and acoustic to be applied in duct, pipes as well as underdeck of the exposed roof. All the materials shall conform to relevant National/ International Standard. The material shall also be tested from Govt. Laboratory for thermal conductivity as well as for fire retardency. DUCT THERMAL INSULATION (ALUMINIUM FACED) The material shall be fibre glass. The minimum density of the material shall be 32 kg/m3 and thermal conductivity at 10°C mean temperature shall not be less than 0.030 W/M2K. The material shall be thermally stable (at least upto 100°C). The material shall conform to the following: Moisture content Water Absorption Shot content Fire behaviour Thermal stability Mould Growth Recovery after compression Less than 2% / in accordance with IS3144/BS2972 As above Nil/ in line with IS 3144/BS2972 Self extinguishing & non-dripping No distortion or cracks upto at least 100°C Conforming to IS3144 More than 95%/ conforming to IS8183/BS3958 Part5 The insulation thickness for duct under various conditions are furnished below which shall be adhered to by the tenderer: Condition a) b) c) d) Thickness of fibreglass insulation (Except Audi) Supply duct insulation when return air is being 25mm taken through the false ceiling Supply air duct insulation when R.A. is taken 50mm through duct Return air duct 25mm Return air duct when taken through non-air 50mm conditioned area but inside bldg. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 164 of 194 e) Return air duct when taken through non-air conditioned space but outside bldg. Condition a) Supply duct insulation when return air is being taken through the false ceiling b) Supply duct acoustic insulation with Glass wool rigid board. ARCHITECT : THE FIRM 50mm Thickness of fibreglass insulation (Audi) 19mm 25mm APPLICATION a) Duct surface to be cleaned thoroughly. b) Apply two coats of adhesive as recommended by the manufacturer. c) Fix fibre glass insulation material of desired thickness. d) Fix self-adhesive aluminium tape of 50 mm width, on all longitudinal and transverse joints. e) Fix PVC strap of 19 mm width at every 300 mm center to center distance along the length of the duct. i. Measurement of surface dimensions shall be taken properly to cut closed cell elastomeric rubbers sheets to size with sufficient allowance in dimension. i. Material shall be fitted under compression and no stretching of material shall be allowed. ii. A thin film of adhesive shall be applied on the back of the insulating material sheet and then on to the metal surface. iii. When adhesive is tack dry, insulating material sheet shall be placed in position and pressed firmly to achieve a good bond. iv. All longitudinal and transverse joints shall be sealed as per manufacturer recommendations. v. Fix self-adhesive aluminum tape of 100 mm width on all longitudinal / transverse joints. vi. Finally fix PVC straps of 19mm width at every 300mm centre to centre. Acoustic Insulation: DUCT ACOUSTIC The material to be used for duct lining shall be 12 mm thick fibre glass rigid board of density 48 Kg/m³ & covered with 26gauge thick perforated aluminum sheet. The lining of initial length of the duct shall be done as shown in the tender layout drawings & shall be carried out as follows: a. Clean the duct piece thoroughly b. To apply two coats of CRPX compound. c. Fix the fiber glass of suitable thickness & cover with fiber glass tissue paper. d. Cover the insulation board with 0.5mm thick perforated aluminium sheet with at least 20% to 25% perforations e. Secure the aluminum sheet with GI frame work with cadmium coated self taping screws with washers AHU ROOMThe wall and Ceiling of all AHU rooms shall be acoustically treated as follows:a) A framework of GI shall be fastened to the walls / ceiling. b) A bit mastic adhesive to be applied on the surface. c) 50 mm thick resin bounded fiberglass mats be stuck on the surface. d) RP Tissue paper to be provided above the fiberglass. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 165 of 194 ARCHITECT : THE FIRM e) 30 G perforated aluminum sheets with 2.5 mm dia holes at staggered centers to be fixed by GI screws and washers to the angle iron framework. Under deck Insulation Under deck Insulation with Extruded Polystyrene with Overlap Edge Ceiling of exposed roof shall be provided with under deck insulation as per following specifications & as specified in the Schedule of Quantities. a) Clean the surface & apply the adhesive on it. b) Fix 50 mm Extruded Polystyrene with Overlap Edge of density 32 Kg/CMT with the help of adhesive. c) Apply adhesive between all longitudinal and transverse joints of Extruded Polystyrene. d) Fix the Extruded Polystyrene finally with the help of rawl plug & dash fasteners in ceiling. TECHNICAL SPECIFICATION FOR ELECTRICAL ITEMS Electrical Motors Scope of Work The scope of this section comprises the supply, installation, testing &commissioning of all types of motors used for HVAC Units conforming to these specifications and in accordance with Schedule of Quantities. The motor installation, wiring & its control shall be carried out in accordance with the specifications as detailed below. Motors The motor shall be of the following design and should run at all loads without any appreciable noise or hum. Totally enclosed fan cooled Sq. Cage. Enclosure and type of motor shall depend upon duty and usage unless otherwise specified. a) The winding of motors shall be class ‘B’ insulation and suitable for local conditions. The insulation of motors shall confirm to IS: 325/1978. b) All motors shall comply with IS:325, IEC-34.1 or BS – 2313, IEC-72.1 for foot mounted motors. c) The rating of the motor shall be as indicated in the Schedule of Quantities. The motors shall be selected on the basis of ambient temperatures and allowable maximum temperature rise. d) Motor above 1HP shall be three phase unless otherwise specified. e) All motors shall be rated for continuous duty as per IS: 325. Motor shall be suitable for operation on 415 volts ± 10% volts, 50 ± 5% Hz three phase AC supply (or 230 ± 10% volts, 50 ± 5% Hz for single phase AC supply). f) Motors shall be provided with cable box to receive Aluminum conductors, PVC insulated, PVC sheathed and armored cables. g) All motors shall be provided with combination of ‘Ball and Roller Bearing’. Suitable grease nipples for regressing the bearing shall be provided. Installation of Motors a) The motor and drive machine shall be fixed on slide rails to facilitate belt and other adjustments. b) Vibration isolation arrangement shall be provided. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 166 of 194 ARCHITECT : THE FIRM c) The installation of motor shall be carried out as per IS:900. d) The motor with driving equipment shall be mounted on foundation and connected to each other with flexible coupling with guard in condenser & chilled water pumps. e) All motor shall be wired as per specifications. Earthing of motor frame shall be done with GI strips as specified in ‘Schedule of Quantities’. f) All motors shall be tested at manufacturer’s works as per I.S. standard and test certificates shall be furnished. g) All motors after AC contractor shall test installation at site for vibrations, heating and electrical insulation resistance Motor Control Centre, Ventilation Sub Panel, Power & Control Cabling, Earthing etc. Scope of Work The scope of this section comprises the supply, installation, testing & commissioning of Motor Control Centre, Ventilation Panels, AHU Sub Panel, power / control cabling & earthing work shall be carried out as per the specification given below and in accordance with Schedule of Quantities. All work shall confirm to Indian Electricity Act (amended up to date), I.S. code of practices, local rules and regulations etc. The codes & standard to be followed shall be as given below:• • • • • • • • • • • • • • • BIS 13947 (Part 4) - AC contactors up to 1000V BIS 13947 - AC Circuit Breakers BIS 2705 - Current Transformers BIS 3156 & 4146 - Potential Transformers BIS 4064 - Air break switches for voltage not exceeding 1000V BIS 13947 - Control switches BIS 1822 - Motor duty Switches BIS 12021 - Specification for control transformer BIS 8623 - Factory built assembly of switchgear & control gear BIS 13947 (Part I) - Degree of protection for enclosure BIS 3842 - Specification for electrical relays for AC system BIS 13707 - Specification for HRC fuses BIS 5082 - Wrought Al. and Aluminium alloys, bars, rods, tube and sections for electrical purposes BIS 13947 (Part 1) - General requirement for switchgear & control gear for voltage not exceeding 1000V BIS 3231 - Electrical relays for power system protection Motor Control Centre / Ventilation Sub-Panel Motor control centre shall be floor mounted extendable type & Ventilation subpanel shall be wall mounted type. The sheet steel (CRCA) used for fabrication shall be of 2.0mm for load bearing members and 1.6mm for non-load bearing members. The panels shall be supplied with required base channels. These panels shall be cubical sectionalized type, totally enclosed dust & vermin proof. Gaskets shall be provided in all joints to prevent dust to reach the internals of the panels to make it completely dust proof. The degree of protections for panels shall be IP 52 for indoor applications and IP 65 for outdoor applications as per IS:2147. These panel (MV) shall be suitable for voltages up to 500 volts, three phase 50 Hz, 4 wire supply capable of functioning satisfactorily in temperature ranging up to 45 to 50 degree centigrade and rupturing capacity suitable for connected load & design should be type tested for 42 KA fault level. All joints of panels shall be welded and braced as necessary to provide a rigid support for all components. The base channel provided in the floor mounted MV panel shall be 100mm x 50mm x 6mm & a clear space of 200mm between the floor and the bottom most part of the unit Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 167 of 194 ARCHITECT : THE FIRM shall be provided. The panel shall be correctly positioned. Self- threading screws shall not be used in the construction of control panels. Appropriate knock-out holes of proper sizes shall be provided for incoming and outgoing cables. The facility for bottom or top entry of cables in the panels shall be provided. Necessary cables clamps shall provided for holding the cables in position. All power/control wiring inside the panel shall be colour coded and control wiring ferruled for identification purpose. All labeling shall be provided in engraved anodized aluminum strips on the front face of the panel. Each circuit breaker shall be housed in separate compartments. It shall have steel sheets on top and bottom of compartment. The steel sheet hinged door shall be interlocked with the circuit breaker on the “ON” position. When the breaker is on the “ON” position, suitable preventive measures shall be provided, such as interlocks, to prevent the breaker from being drawn out. When the breaker is in “ON” position steel sheet shall be provided between the tiers in the vertical section. The door of this compartment shall not form part of the draw out arrangements. Bus-Bars The bus-bar and its connections shall be aluminum Electrolytic grade E-91 as per IS: 5082 and shall be of rectangular section. These should be suitable for full load current for phase bus-bar and neutral bus-bar shall be of half rated current capacity. The bus-bar should have provision on either side for extension. The bus-bar should be sleeved with colour coded heat shrinkable PVC sleeve. Bus-bar supports shall be of fibre glass reinforced thermosetting polyester having in built and tracking barriers to break the path of conducting dust through moulded ribs. In panels bus-bar connections shall be done by drilling holes with cadmium coated bolts and nuts. Extra cross section shall be provided to compensate drilling of the holes. Insulated aluminum strips of suitable size of full rated current capacity shall be used for interconnecting bus-bar and breaker. A horizontal / vertical wire way shall be provided for interconnecting control wiring between different vertical sections. The terminal blocks shall be used for outgoing terminals and neutral link at a suitable located place in the control panel. Separate compartments for outgoing and incoming cable shall be provided. The current transformers of all instruments shall be mounted with terminal blocks .All live parts including incoming and outgoing link / terminals should be totally shrouded by means of non hygroscopic and fire retardant material. Air Circuit Breakers The circuit breaker shall be capable of making and breaking the specified fault currents without straining or damaging any part of the switchgear. The breakers shall be air break, motorized / manually operated as specified in BOQ and draw out type. All feeders of rating 800A and above shall be ACB and of fully draw out type. The circuit breaker shall be stored energy closing type, manual/electrically operated with tripping mechanism. The circuit breaker shall be provided with 4 NO + 4 NC of auxiliary potential free contacts required for indication, control, interlocking and other purposes. All contacts shall be wired to a terminal block. Circuit breakers with stored energy closing mechanism shall be capable of making the rated short-circuit current, when the stored energy is suitably charged by a spring. It shall also be capable of closing on no-load without suffering undue mechanical deterioration. The maximum make- time shall also not be exceeded. The direction of motion of the handle, for manual spring charging shall be marked. A device indicating when the spring is charged fully shall also be provided. Motors and their electrically operated auxiliary equipment for charging a spring shall operate satisfactorily between 85% and 110% of the rated supply voltage. The breaker operating mechanism should store energy for O-C-O operation and shall not, in any case, get stuck in closed position during this cycle. After failure of power supply to the motor, at least one open close-open operation of the circuit breaker shall be possible. The breaker operating mechanism shall be electrically and mechanically trip-free in all positions. All ACBs shall be provided with microprocessor based trip unit for protection against Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 168 of 194 ARCHITECT : THE FIRM overload, short circuit and earth faults. The releases shall be communicable to other systems on an open communication protocol. The Communication Port shall be provided in front/back. The circuit breakers shall be suitable for locking in fully isolated condition. Following interlocks and features shall be provided so that a) Truck can be moved within panel only when CB is off. b) CB can be closed only when the test (or) service limit switches permits. c) Breaker compartment door cannot be opened when the CB is in Service/test position. d) Breaker cannot be put in to service position with compartment door open. e) Earth slide beyond the test position till trolley is drawn out. Closing and tripping coil shall operate satisfactorily under the following conditions of supply voltage variation: a) Closing coils – 85% to 110% of rated voltage. b) Trip coils – 70% to 110% of rated voltage Moulded Case Circuit Breakers The MCCBs shall confirm to the latest applicable standards. MCCBs in AC circuits shall be of four pole construction arranged for simultaneous four pole manual closing and opening. Operating mechanism shall be quick-make, quick-break and trip free type. The ON, OFF and TRIP positions of the MCCB shall be clearly indicated and visible to the operator. Operating handle for operating MCCBs from door of board shall be provided. MCCB terminals shall be shrouded and designed to receive cable lugs for cable sizes relevant to circuit ratings. MCCBs shall incorporate time delay devices to ensure that it will tolerate harmless transient overload unless this is well in excess of 25% of its rated value for a sustained period. The circuit breaker shall be provided with 2 NO + 2 NC of auxiliary potential free contacts required for indication, control, interlocking and other purposes. All contacts shall be wired to a terminal block. The breaking capacity of MCCB’s shall be as per the design requirements. Miniature Circuit Breakers Miniature Circuit Breaker shall comply with IS-8828-1996/IEC898-1995.Miniature circuit breakers shall be quick make and break type for 230/415 VAC 50 Hz applications with magnetic thermal release for over current and short circuit protection. The breaking capacity shall not be less than 10 KA at 415 VAC. MCBs shall be DIN mounted. The MCB shall be Current Limiting be type (Class-3). MCBs shall be classified (B,C,D ref IS standard) as per their Tripping Characteristic curves defined by the manufacturer. The MCB shall have the minimum power loss (Watts) per pole defined as per the IS/IEC and the manufacturer shall publish the values. The housing shall be heat resistant and having a high impact strength. The terminals shall be protected against finger contact to IP20 Degree of protection. All DP, TP and TPN miniature circuit breakers shall have a common trip bar. Rotary Switch / Selector Switch / Switches / HRC Fuses / Starters / Single Phase Preventers / Toggle Switch These shall be of approved make and conforming to relevant ISI standard. The rupturing capacity of HRC fuses should not less than 80 KA and in case of switches it should be 60 Amps maximum. Current Transformer The current transformers shall have accuracy of class I and 5P10 / 10P10 and suitable VA burden for operation of the connected meters and relays. Overload Relays All the motors shall have overload relay protections conforming to relevant IS. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 169 of 194 ARCHITECT : THE FIRM Time Delay Relays These shall be adjustable type with time delay adjustments of 0-180 or as per manufacturers standards. Indicating Lamps And Metering These shall confirm to BS37 & BS39. All meters shall be flush mounted and draw-out type. The indicating lamp shall be filament type and with very low burden & economy resistor. Voltmeter And Ammeters Motor Control Centre (MV Panel) shall have flush type voltmeter & ammeter of size 96 x 96 mm. Push Button Stations These shall be suitable for panel mounting and accessible from front without opening. These shall be provided for manual starting and stopping of motors/equipments as per normal practices. The contacts shall be suitable for 6AMP current capacity. Name Plate Suitable anodized Aluminium name plate of 1.2 mm thick shall be provided on all the Switchboards and individual compartments. Conduits These shall be preferable made of mild steel, stove enameled from inside and outside with minimum wall thickness of 1.6 mm for conduits up to dia of 25mm and 2 mm for conduits above 25 mm diameter. Cables Cable shall be supplied inspected, laid, tested and commissioned in accordance with drawings, specifications, relevant Indian Standards Specifications and cable manufacturer's instructions. The cable shall be delivered at site in original drums with manufacturer's name clearly written on the drum. The cables shall comply with the latest edition of the following standards • BIS: 7098 (PART-I) - XLPE Cables - LT • BIS: 8130 - Conductors for insulated electric cables & flexible cords. • BIS: 3975 - Mild steel wires, strips & tapes for armouring of cables. • BIS: 10418 - Wooden drums for electric cables. • BIS: 10810 (PART 58) - Oxygen Index test The material of cable shall be as follows:a) The MV power cable of 660/1100 V. grade shall be XLPE insulated Aluminum conductor armoured cable. b) The MV control cables shall be PVC insulated copper conductor armoured stranded cable. c) The HT power cable of 11 KV grade shall be XLPE insulated Aluminum conductor armoured cable. Laying Of Cables These shall be laid as Indian Standard code of practice. All cables shall be laid on 16G GI Perforated U shaped Channel 40mm x 20mm cable trays. In case more than one cable is running, then proper space in between the two cables shall be provided to avoid loss of current carrying capacity. While cables are running on walls, proper saddles must be provided. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 170 of 194 ARCHITECT : THE FIRM Wire Sizes Single stand PVC-copper conductor wires shall be used inside the control panel for interconnecting different components. All wires shall be neatly dressed and coloured beads shall be provided for easy identification in control wiring. The minimum size of control wiring shall be 1.5sq.mm. Testing of panels as per code of practice shall be done at works by Employer / Architect before inspection & dispatch to site. Drawings Necessary drawings of all control panels and wiring of equipment etc., shall be submitted by the contractor for approval of the Engineer in Charge. On final completion of job and before handing over of AC System As Built Drawings shall be submitted to the Department. Testing All equipment and components supplied may be subjected to inspection and tests by the client / consultant or his authorized representatives during manufacture, erection / installation and after completion. No tolerances shall be allowed other than the tolerances specified or permitted in the relevant approved Standards, unless otherwise stated. If the guaranteed performance of any item of equipment is not met and / or if any item fails to comply with the specification requirement in any respect whatsoever at any stage of manufacture, test or erection, the client / consultant may reject the item, or defective component thereof, whichever he considers necessary. The complete electrical installation shall be tested in accordance with relevant IS codes in presence of Electrical Supervisor of the client before commissioning of plant. Painting of Panels All sheet metal enclosures shall be powder coated only after de-rusting & hot dip phosphating degreasing etc. at works only. NOTE: Rubber mats of 1100 volts shall be laid in front of all switch boards. Sizes of Power Cabling The following size of power cabling shall be used only: HP of Motors Cable size a) Up to 5 HP 3c x 4sq.mm aluminum conductor armoured cable. b) 5 to 7.5 HP 3c x 6sq.mm aluminum conductor armoured cable. c) 10 to 15 HP 2no. 3c x 6sq.mm aluminum conductor armoured cable. d) 20 to 25 HP 2 Nos. 3 x 16sq.mm aluminum conductor armoured cable. e) 30 to 35 HP 2 Nos. 3c x 25sq.mm aluminum conductor armoured cable. f) 40 to 50 HP 2 Nos. 3c x 35sq.mm aluminum conductor armoured cable. g) 60 HP 2 Nos. 3c x 50sq.mm aluminum conductor armoured cable. h) 75 HP 2 Nos. 3cx 70sq.mm aluminum conductor armoured cable. i) 100 HP 2 Nos. 3cx 95sq.mm aluminum conductor armoured cable. j) 125 HP 2 Nos. 3cx 120sq.mm aluminum conductor armoured cable. Capacity Of Relays And Contacts The following capacity relays and contacts shall be used for various rating of motors: Type of Starter Contactor Overload Relay Contactor Phase Relay Range a) 50/60 HP Motor Star Delta Starter 70 Amp. 30 - 50 Amp. b) 40 HP Motor Star Delta Starter 45 Amp. 20-33 Amp. c) 30 HP Motor Star Delta Starter 45 Amp. 20-33 Amp. d) 25 HP Motor Star Delta Starter 32 Amp. 14-23 Amp. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. e) f) g) h) i) Page 171 of 194 ARCHITECT : THE FIRM 20 HP Motor Star Delta Starter 32 Amp. 14-23 Amp. 15 HP Motor Star Delta Starter 25 Amp. 9-15 Amp. 10 HP Motor Star Delta Starter 16 Amp. 6-10 Amp. 7.5 HP Motor D.O.L. Starter 16 Amp. 9-15 Amp. 5 HP Motor D.O.L. Starter 16 Amp 6-10 Amp. Earthing The earthing of all equipments shall be carried out by Copper strips / wires as mentioned in Bill of Quantities. All panels / three phase motors shall be earthed with two number distinct and independent Copper strips / wires of the following sizes: 1. Motor upto 5.5 KW 3 sq. mm Copper Wire 4 mm dia GI Wire 2. Motor 7.5 to 18.75 KW 4 sq. mm Copper Wire 6 mm dia GI Wire 3. Motor 18.75 to 50 KW 25x3 mm Copper Strip 25x6 mm GI Strip 4. Motor 51 to 89 KW 25x6 mm Copper Strip 32x6 mm GI Strip The earthing connections shall be connected to main earth station or main earth grid. The earth connections shall be connected to equipments after removal of paint, grease etc. 6.0 Inspection and Testing i. All equipment and components supplied may be subjected to inspection and tests by the Consultant / Client or his authorized representatives during manufacture, erection/installation and after completion. The inspection and tests shall include but not be limited by the requirements of this contract document. Prior to inspection and testing, the equipment shall undergo pre-service cleaning and protection. ii. Tenderers shall state and guarantee the technical particulars listed in the Schedule of Technical Data. These guarantees and particulars shall be binding and shall not be varied without the written permission of the Consultant / Client or his authorised representatives. iii. No tolerances shall be allowed other than the tolerances specified or permitted in the relevant approved Standards, unless otherwise stated. iv. If the guaranteed performance of any item of equipment is not met and / or if any item fails to comply with the specification requirement in any respect whatsoever at any stage of manufacture, test or erection, the Consultant / Client or his authorised representatives may reject the item, or defective component thereof, whichever he considers necessary; and after adjustment or modification as directed by the Consultant / Client or his authorised representatives, the Consultant shall submit the item for further inspection and /or test. v. The acceptance of the Consultant / Client or his authorized representatives of inspection and / or test results shall not prejudice the right of the Consultant or his authorised representatives to reject an item of equipment if it does not comply with the contract document when erected, does not or prove completely satisfactory in service. VI. The Consultant / client’s representative shall be responsible for the timely transmission of the relevant and appropriate sections of the contract document to manufacturers and AC Contractors for the proper execution of all tests at their works as per contract specifications. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 172 of 194 ARCHITECT : THE FIRM Tests at Manufacturer’s Works i. All tests to be performed during manufacture, fabrication and inspection shall be agreed with the Consultant or his authorized representatives prior to commencement of the work. The AC Contractor shall prepare the details of the schedule and submit these to the Consultant / Client or his authorised representatives for endorsement. It must be ensured that adequate relevant information on the design code/standard employed, the manufacture /fabrication/assembly procedure and the attendant quality control steps proposed are made available to the Consultant / Client or his authorised representatives who will mark in the appropriate spaces his intention to attend or waive the invited tests, or inspections. AC Contractor shall arrange inspection and factory witness test for chiller. ii. A minimum of fifteen days’ notice of the readiness of equipment for test or inspection shall be provided to the Consultant / Client or his authorised representatives by the AC Contractor (whether the tests be held at the Subcontractor of AC Contractor’s works). The subject items should remain available for Consultant / Client or his authorized representatives’ inspection and test up to a minimum 10 days beyond the agreed date of witnessing the test. Every facility in respect of access, drawings, instruments and manpower shall be provided by the Subcontractor and AC Contractor to enable the Consultant / Client or his authorized representatives to carry out the necessary inspection and testing of the Plant. iii. No plant shall be packed, prepared for shipment, or dismantled for the purpose of packing for shipment, unless it has been satisfactorily inspected, all tests called for have been successfully carried out in the presence of the Consultant / Client or his authorised representatives or approved for shipment, or alternatively inspection has been waived. iv. Functional electrical, mechanical and hydraulic tests shall be carried out on completed assemblies in the works. The extent of these tests and method of recording the results shall be submitted to, and agreed by, the Consultant / Client or his authorised representatives in sufficient time to enable the tests to be satisfactorily witnesses, or if necessary for any changes required to the proposed program of tests to be agreed. v. The Consultant / Client or his authorised representatives reserves the right to visit the Manufacturer’s works at any reasonable time during fabrication of equipment and to familiarize himself with the progress made and the quantity of the work to date. vi. Within 30 days of completion of any tests, triplicate sets of all principal test records, test certificates and correction and performance curves shall be supplied to the Consultant / Client or his authorized representatives. vii. These test records, certificates and performance curves shall be supplied for all tests, whether or not they have been witnessed by the Consultant / Client or his authorized representatives or not. The information given on such test certificates and curves shall be sufficient to identify the material or equipment to which the certificate refers and should also bear the Contract reference title. viii. When all equipment has been tested, the test certificates from all works and site tests shall be compiled by the AC Contractor into volumes and bound in an approved from complete with index and four copies of each volume shall be supplied to Consultant / Client or his authorized representatives. ix. Stage wise inspection of equipment in factory in waived. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 173 of 194 ARCHITECT : THE FIRM Performance Tests at Manufacturer’s Works i. All equipment may be subjected to routine performance tests at the Manufacturer’s Works in accordance with the relevant ANSI, ASME, ASTM, BIS standard including operating tests of complete assemblies to ensure correct operation of apparatus and components. ii. Pumps, fans, compressor, and other rotating equipment shall be given full load tests, and run to 15% over speed for 5 minutes to check vibration. Main and auxiliary gear boxes shall be subjected to shock load tests and a six-hour endurance run at rated speed and maximum torque. iii. The AC Contractor shall submit single line diagrams including the layout of the Plant together with the location of test instrumentation and the principal dimensions of the layout. All calculations to derive performance data shall be made strictly in accordance with format given in the approved standards. Any alterations or deviations from the approved standard test layout or formulae shall be subjected to the prior endorsement of the Consultant / Client or his Authorised representatives. iv. The performance test shall be conducted over the full operating range of the pump to a closed valve condition and a minimum of five measurement points covering the full range shall be taken. Curves indicating Quality vs. Head, Quantity vs. Power absorbed, and Quantity vs. Pump efficiency shall be provided. In addition a curve of the NPSH required vs. Quantity shall be provided except when the suction conditions do not require this test. Any proposal for the omission of this test shall be to the endorsement of the Consultant / Client or his authorised representatives. v. On completion of the tests the AC Contractor shall submit a report showing the test results obtained together with the curves corrected to the site operating conditions. TESTING, ADJUSTING AND BALANCING The AC Contractor shall have a dedicated experienced, specialized, approved, testing and commissioning (T&C) team /agency responsible for coordination with other trades, preparation of T&C plan method statement & T&C procedures, organizing & scheduling the T&C activities along with the progress of works, supervision any re-testing, coordination with third parties for commissioning & certification, organizing & performing testing for satisfaction of all Statutory Bodies, T&C record documentation & handover General a. Testing, adjusting and balancing of heating, ventilating and air conditioning systems at site b. Testing, adjusting and balancing of HVAC Hydronic system at site. c. Testing, adjusting and balancing of exhaust system at site. Comply with current editions of all applicable practices, codes, methods of standards prepared by technical societies and associations including: ASHRAE: 2007 HVAC Application. d. AC Contractor shall submit a Test, adjust, balance procedure/method statements/charts for approval to Client. Performance a. Verify design conformity. b. Establish fluid flow rates, volumes and operating pressures. c. Take electrical power readings for each motor. d. Establish operating sound and vibration levels. e. Adjust and balance to design parameters. f. Record and report results as per the formats specified. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 174 of 194 ARCHITECT : THE FIRM REPORTS: Provide 3 copies of the complete balancing and testing reports to the department. Report shall be neatly typed and bound suitable for a permanent record. Report forms shall contain complete test data and equipment data as specified. FINAL DOCUMENTATION: The contractor shall leave the system operating in complete balance with water and air quantities as shown on drawings. Set stops on all balancing valves and lock all damper quadrants in proper position. Secure all automatic damper and valve linkages in proper positions to provide correct operating ranges. Proper damper positions shall be marked on ducts with permanent indication. Notify the department of any areas marginal or unacceptable system performance. The above tests and procedures mentioned herein are for general guidance and information only, but not limited to the provisions of conditions of contract and design/ performance criteria. Upon commissioning and final handover of the installation, the Contractor shall submit (within 4 weeks) to the Engineer-in-charge 6 (Six) portfolios of the following indexed and bound together in hard cover ring binder (300 x 450 mm). Comprehensive operation and maintenance manual As built drawings including one set on compact disc Test certificates, consolidated control diagram and technical literature on all controls. Equipment warranties from manufacturers Rating charts for all equipment Log books as per equipment manufacturers standard format List of recommended spares and consumables Any special tools required for the operation or the maintenance of the plant shall be supplied free with the plant. At the close of the work and before issue of final certificate of completion by the Engineer-in-charge, the contractor shall furnish a written guarantee indemnifying the department against defective materials and workmanship for the Defects liability period. Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. 7.0 Page 175 of 194 ARCHITECT : THE FIRM LIST OF APPROVED MAKES /BRAND OF VARIOUS HVAC WORK MATERIAL The contractor should distinctly understand that it will not be their prerogative to insist for using particular makes brand from the following list. The final selection will have to be done with the approval of Architect/ EIC. Sr. No. 1 Description Makes Water-cooled Screw Chilling Machine Air handling unit AHU Blower Air Filters (Fine Filters] Cooling Tower Pumps (Primary]_ Carrier/ Climaveneta /Dunham Bush / Voltas/ Kirloskar/ Trane/ York Ethos/Edgetech/Voltas/Zeco/Nutech/ Flaktwoods Comefri / Kruger / Nicotra/Green Heck FMI / SPECTRUM / AIRTECH /AHU manufacturer’s d Mihir/Bell/Advance/Paharpur Kirloskar/KSB/GRUNDFOSS/ BEACON/ M&P Secondary Pumps Three phase motors Inline Fans /Propeller/Axial / Centrifugal 10 MS/GI piping Kirloskar/KSB/GRUNDFOSS/ BEACON/Armstrong/ITT Crompton/ABB/ Siemens Kruger / Nicotra /Osterberg/ Gec/ Nadi 11 Butterfly valves Audco / Intervaive / Leader / Levcon / Advance / Rapid Cool / Flowcon / Crawley & Ray 12 Balancing valve Advance / Flowcon /T&A 13 Check Valve 14 Ball valve 15 2 way / 3way/ On-Off Modulating Valve Motorized Audco / Leader/ Rapidflow / Advance/ Kirloskar/ Zoloto/ Audco / Leader/ Rapidflow / Advance/ Kirloskar/ Zoloto/ Danfoss/ Honeywell / Johnson / Siemens / Bell controls / Anergy 16 Strainers ANERGY /Trishul/Emerald 17 Gl Sheet SAIL/TATA /Jindal 18 Pressure gauges Feibig/ H Guru 19 Automatic Air Vent valves ANERGY 20 “V” type thermometer EMERALD / FIEBIG 21 Pipe Insulation with nitrile bb 22 Propeller /Axial Flow Fans Armafelx, Kfelx & kfelx 23 Fibre glass rigid board 24 Expanded polysterene UP Twiga / Kimmco/ Lloyd / Ownes Corning Beardshell/ Modifoam. 25 Elastomeric Nitrile Rubber foamed tubes Armaflex/K-flex 26 Grilles/Diif./Fire dampers 28 Volume Control Damper 29 AHU/FCU Control valves Ravi Star / Dynacraft / Caryaire/Air pro/Airmaster RAVISTAR / DYNACRAFT/Cosmos/ Air pro / Airmaster Honeywell / Johnson / Belemo/siemens 30 Sensors / controllers Honeywell / Johnson / Siemens 2 3 4 5 6 7 8 9 Signature of Tenderer Jindal/Tata/Zenith FLAKT / NICOTRA No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. 31 32 33 34 Energy Recovery Ventilators MCB/ACB Valve Actuator Power & Control cable Page 176 of 194 Dessicant Rotor International L&T/GE/Siemens/ Schneider Jhonson/Honeywell/Siemens/Belemo CCI/Gloster / Finolex 35 Voltmeter/Ammeter A.E./IMP 36 Switches L&T/Siernens/ABB/GE/ Schneider 37 38 39 40 L&T/Siemens/GE A.E./Kappa L&T/Siemens/ GE/ Schneider L& T /Siemens/Gt/Schneider HRC fuse & fittings Current Transformer Contactors Overload Relays 41 Indicating lights 42 Panels (electrical) 43 Flex. Bellow 44 45 46 47 Variable speed drive with Ductable splits Non-ducted single phase Pressurisation Unit & Air Separator ARCHITECT : THE FIRM Vaishnu / EMCO CORI / Resistoflex/Easyflex/Kanwal ABB/DANFOSS/ Schneider Carrier//Blue Star/Voltas/Hitachi Carrier/Blue Star/Voltas/Hitachi ANERGY,/KD Agency 46 Flow meter 48 Fan Coil Unit/Cassette Units Eureka/Placks/Trac Chemtrols, Rosemount Caryaire / Suvidha Savier / Lloyd / Blue Star / Zeco / Waves / Edgetech /Media/ Sinco 49 Ductless Ventilation system Kruger/Nicotra/Airovent/System Air/Humidin 50 Flow Meter 51 Sound Attenuator 52 Pressure Differential i h Electrical Forbes Marshall/Krohne/Danfoss Green Heck & Carry Air Honeywell/ Johnson/ Siemens/ Switzer 53 Make of Electrical Panel, Console Panel ,HT &LT 54 M.C.C.B.& MCB Tricolite / System & Power Control /L&T/Schinder/ Equivalent L&T / GE / Siemens/MDS 55 Starters, Contactors, Push Buttons, 56 Single Phase Preventer L&T / GE / Siemens / BCH 57 Current Transformer 58 Rotary Switches A.E. / Kappa / Precise/ C & L&T / Siemens / GE / BCH 59 Selector & Toggle Switch Kaycee / L&T 60 Change Over Switch Elecon / L&T 61 HRC Fuse and Fittings L&T / Siemens / GE/ C & S 62 Voltmeter / Ammeter A.E. / IMP 63 XLPE insulated LT Cables 64 PVC pipes and accessories Finolex / Incab / Ravin Cables / Universal/Polycab/ KEI Precision / Avonplast / Grandlay / AKG / Modi / P l b Signature of Tenderer L&T / Minilec / Siemens No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. 8.0 Page 177 of 194 ARCHITECT : THE FIRM ABBREVIATIONS:AHRI American Heating Refrigeration Institute ISHRAE Indian Society of Heating, Refrigeration & Air-conditioning Engineers. ASTM American Society of Testing Materials ASME American Society of Mechanical Engineers ANSI American National Standards Institute IS Indian Standards SMACNA Sheet Metal & Air-conditioning Contractor National Association UL Under writers Laboratory BS British Standard Institution IEC International Electro-Mechanical Commission ISO International Organization of Standardization TEFC Totally Enclosed, Fan Cooled IP Ingress Protection AHU Air Handling unit FCU Fan Coil Unit PVC Polyvinyl chloride HDPE High-density polyethylene CFM Cubic foot per minute WG Water Gauge ISMC Indian standard mild channel Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 178 of 194 Signature of Tenderer No. of Corrections ARCHITECT : THE FIRM Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 179 of 194 ARCHITECT : THE FIRM NAVI MUMBAI MUNICIPAL CORPORATION HEAD OFFICE BUILDING, BELAPUR, NAVI MUMBAI SCHEDULE - B Tender Notice No. :- NMMC/ ELEC/ JCE/ 66 (03) /2014-2015 Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Quantity 1 1 3 ARCHITECT : THE FIRM Navi Mumbai Municipal Corporation Name of Work :- Supply, Installation, Testing & Commissioning of HVAC System at Auditorium on Plot No. 37 at Sector 5, Airoli, Navi Mumbai. Tender Notice No. :- NMMC/ELEC/ JCE/ 66 (03) /2014-2015 SUMMARY - B Description of Items Spec No. with Unit Rates Amount To be quoted by Tenderer Page No. (Rs.) (Rs.) Amount Percent below / quoted by above the Tenderer Estimated rates entered in col. 4 1 2 1 Page 180 of 194 2 3 Item No:1.0- Water Cooled Screw Chiller Item No:1.1- Ch. Water (in/out) 12 / 7 Deg C Fluid Flow - 267 USGPM Fouling Factor (Evaporator) Spec. As directed 0.018 (sqm-K)/kW Cond.Water (in/out) 32 / 36 Deg C, Fluid Flow - 400 USGPM Fouling Factor by Engineer-In(Condenser) 0.044 (Sqm-K)/kW 100TR at above conditions Charge Item No:1.1.1-Refrigeration Load 100 TR actual Item No:1.1.2- Quantity:Working Item No:1.1.3-Quantity:StandBy Items required Item No:1.1.4-BMS Compatibility Vibration Isolator: Item No:1.1.5-Rust Resistant Spring Isolators with neoprene pads for Water Cooled Chiller Item No:1.1.6-Victaulic Couplings (chilled water & condenser water) Sub- Total of Item No. 1.0 4 5 6 7 2957362.95 2957362.95 Nos Nos 5914725.91 2957362.95 0.0 Lot 0.00 0.0 0.0 Lot Sets 0.00 0.00 8872088.86 101918.30 101918.30 Nos Nos 203836.59 101918.30 8 Item No:2- Pumps Item No:2.1- Supply,Installation,Testing and Commissioning of CHILLED WATER PUMPS Spec. As directed (Primary) :Factory mounted cenrifugal Chilled water pump with electric Motor complete with TEFC ,IP by Engineer-In55 protection on a common base, suitable for 415±10%, 50 Cycle and all basic components , Couplings, Charge Coupling guard, High tensile steel shaft, Bronze impeller, Mechanical seal, Bronze shaft sleeves and wearing rings, bearings, Foundation bolts, Nuts, Supports and Corrosion-resistant finish etc. & all necessary accessories as per relevant std. Pumps shall be insulated with insulation of same material & thickness as the connected pipe. Aluminium cladding shall be provided for the insulation. All other parameters as per the technical specifications given in the tender. 2 1 Item No:2.1.1-Type of pump:End suction back pull out Centrifugal Pump Item No:2.1.2- 267 USGPM Item No:2.1.3- 35m Head Item No:2.1.4-Working Item No:2.1.5-Stand By Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 181 of 194 ARCHITECT : THE FIRM Item No: 2.2- Supply,Installation,Testing and Commissioning of CONDENSER WATER Spec. As directed PUMPS:Factory mounted centrifugal condensor water pump with electric Motor complete with TEFC ,IP by Engineer-In55 protection on a common base, suitable for (415±10%,& 50 Cycle), Couplings, Coupling guard, High Charge tensile steel shaft, Bronze impeller, Mechanical seal, Bronze shaft sleeves and wearing rings, bearings, Foundation bolts, Nuts, Supports and Corrosion-resistantfinish etc. & all necessary All other parameters as per the technical specifications given in the tender 2 1 Item No: 2.2.1-Type of pump:End suction back pull out centrifugal Pump. Item No: 2.2.2- 400 USGPM Item No: 2.2.3- 15 m Head Item No: 2.2.4-Working Item No: 2.2.5-Stand By 121887.01 121887.01 Nos Nos 243774.02 121887.01 671415.92 196379.25 196379.25 Nos Nos 392758.5 196379.25 589137.75 Sub- Total of Item No. 2.0 Item No:3- Cooling Tower Item No:3.1- Supply,Installation,Testing and Commissioning of INDUCED DRAFT FRP COOLING Spec. As directed TOWER for air conditioning system with Structural frame work, Cold water basin, Casing panels, Water by Engineer-Indistribution system, Connections, Fill media and drift eliminators, Air inlet louvers, Fan drive systems Charge including fan motors, Fans, Ladders and other complete accessories, Motor shall be suitable for 415±10% volts, & 50 cycles power supply. Tower shall be designed with high efficiency drift eliminators. Each tower cell must be installed with individual cold water basins and water discharge sumps to facilitate maintenance without causing distruption to the other cells in operation. All other parameters as per the technical specifications given in the tender. 2 1 Item No:3.1.1- Cell:Single Cell/ multi cell Item No:3.1.2- Flow:Counter Flow Item No:3.1.3- Level Controls:Required Item No:3.1.4- Drive:Direct Drive Item No:3.1.5- Cooling tower inlet temperature:36 deg. C Item No:3.1.6- Cooling tower outlet temperature:32 deg C Item No:3.1.7- flow 400 USGPM Item No:3.1.8- Refrigeration Load 100 TR Item No:3.1.9- Working Item No:3.1.10- Stand By Sub- Total of Item No. 3.0 Item No:4- Air Handling Units Item No:4.1- Supply,installation,testing and commissioning of Double skin double skin horizontal floor Spec. As directed mounted type Indoor Air Handling Unit 45 mm Thick PUF insulated panel of outer skin 0.6 mm GI Pre by Engineer-Inplasticized finish, inner skin 0.8 mm thick GI, fan section with forward / backward centrifugal fan and Charge motor suitable for 415+/-10%, 50 cycles, Coil section with 6R copper tube cooling coil with aluminium fins & 22 G SS drain tray, filter section with Cleanable Pre-filter with 90% efficiency down to 10 micron fire retarding canvass connection with volume control dampers, Internal and External supports, etc. & all necessary accessories as per relevant std. Coil size shall be selected for maximum face Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 182 of 194 ARCHITECT : THE FIRM velocity of 2.5m/s, filter shall be sized maximum face velocity of 2m/s. Maximum fan outlet velocity shall be 9.5m/s. AHU shall have a lamp with a switch for the maintenance. Sound level at 1m distance shal be less than 75 dBA.All other parameters as per the technical specifications given in the tender. Note : 1.All Recirculation AHUs will be with 6-row chilled water coil and treated fresh air units will be with Heat Pipe Technology. 4 4 Item No:4.1.1- 34TR, 13600 CFM ,50 mm Static pressure - Ground Floor Item No:4.1.2- TFA unit for Auditorium AHU with Heat Pipe Technology Item No:4.2- Ceiling suspended Air handling units supply,installation,testing and commissioning of Double skin ceiling suspended unit with 25 mmThick Spec. As directed PUF insulated panel of outer skin 0.6mm GI Pre plasticized finish, inner skin 0.8 mm thick GI, fan section by Engineer-Inwith forward / backward centrifugal fan and motor suitable for 415+/-10%, 50 cycles, Coil section with 6R Charge copper tube cooling coil with aluminium fins & 22 G SS drain tray, filter section with Cleanable Pre-filter with 90% efficiency down to 10 micron, Mixing box section, fire retarding canvass connection with volume control dampers, Internal and External supports, etc. & all necessary accessories as per relevant std. Coil size shall be selected for maximum face velocity of 2.5m/s, filter shall be sized maximum face velocity of 2m/s. Maximum fan outlet velocity shall be 9.5m/s. Sound level at 1m distance shall be less than 65 dBA..All other parameters as per the technical specifications given in the tender. 258400.00 142500.00 Nos Nos 1033600.00 570000.00 1 1 1 1 2 1 1 1 1 2 2 1 2 Item No:4.2.1- 18TR, 7200 CFM ,50 mm Static pressure - Ground Floor Item No:4.2.2- 10TR, 4000 CFM ,50 mm Static pressure - Ground Floor Item No:4.2.3- 18TR, 7200 CFM ,50 mm Static pressure - First Floor Item No:4.2.4- 4TR, 1600 CFM ,50 mm Static pressure - First Floor Item No:4.2.5- 21TR,8400 CFM ,50 mm Static pressure - Second Floor Item No:4.2.6- 8TR,3200 CFM ,50 mm Static pressure - Second Floor Item No:4.2.7- 4TR, 1600 CFM -,50 mm Static pressure - Second Floor Item No:4.2.8- 6TR, 2400 CFM -,50 mm Static pressure - Third Floor Item No:4.2.9- 4TR, 1600 CFM -,50 mm Static pressure - Third Floor Item No:4.2.10- 2TR, 800 CFM -,50 mm Static pressure - Third Floor Item No:4.2.11- 17TR,6800 CFM -,50 mm Static pressure - Fourth Floor Item No:4.2.12- 5TR, 2000 CFM -,50 mm Static pressure - Fourth Floor Item No:4.2.13- 3TR, 1200 CFM -,50 mm Static pressure - Fourth Floor 123120.00 85500.00 123120.00 38304.00 143640.00 76608.00 38304.00 57456.00 38304.00 29925.00 127908.00 47880.00 35910.00 Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos 123120.00 85500.00 123120.00 38304.00 287280.00 76608.00 38304.00 57456.00 38304.00 59850.00 255816.00 47880.00 71820.00 29925.00 25650.00 23940.00 Nos. Nos. Nos. 0.00 51300.00 71820.00 3030082 Item No:4.3- supply,installation,testing and commissioning of Ceiling suspended 4 way chilled water cassette unit along with all accessories and valve feetings..All other parameters as per the technical specifications given in the tender 0 2 3 Item No:4.3.1- 4.0 TR -1600 CFM Item No:4.3.2- 3.0 TR - 1200 CFM Item No:4.3.3- 2.0 TR - cassette unit Sub- Total of Item No. 4.0 Signature of Tenderer No. of Corrections Spec. As directed by Engineer-InCharge Signature of N.M.M.C. Officer CLIENT : N.M.M.C. 0 290 80 240 180 100 200 40 100 180 Page 183 of 194 Item No:5.0- Chilled Water piping supply,installation,testing and commissioning of Chilled water Mild steel pipes (Heavy Class) with all Spec. As directed necessary fittings like bends, elbows, tees, reducers, hanger, supports,etc and shall be clause B/Calss C as by Engineer-Inper IS 1239 upto 150mm dia and as per IS 3589. for 200mm dia & above.Insulation of chilled water pipes Charge with EPS of 24 kg/Cu.m density, TF quality, covered with 24G GI mesh, black polyethylene sheet and with 24G aluminium cladding for pipes upto 500mm All other parameters as per the technical specifications given in the tender a)Dia 200mm - (6.0 mm thick) b)Dia 150mm c)Dia 125mm d)Dia 100mm e)Dia 80mm f)Dia 65mm g)Dia 50mm h)Dia 40mm i)Dia 32mm j)Dia 25mm ARCHITECT : THE FIRM 2659.05 1863.90 1562.09 1261.13 893.48 726.75 574.56 555.75 530.10 495.90 Rmt Rmt Rmt Rmt Rmt Rmt Rmt Rmt Rmt Rmt 0.00 540531.00 124966.80 302670.00 160825.50 72675.00 114912.00 22230.00 53010.00 89262.00 1034.55 855.00 792.59 668.61 586.53 513.00 488.21 474.53 444.60 427.50 Rmt Rmt Rmt Rmt Rmt Rmt Rmt Rmt Rmt Rmt 0.00 247950.00 63406.80 160466.40 105575.40 51300.00 97641.00 18981.00 44460.00 76950.00 2347812.9 9456.30 8541.45 7370.10 6156.00 Nos Nos Nos Nos 0.00 222077.70 0.00 49248.00 Item No:5.1- Chilled Water piping Insulation Supply, installation, testing and commissioning of chilled water pipeline insulation with 2" thick termocole Spec. As directed pipe section(TF quality) covered with vapour barrier, chicken wiremesh and finished with 12 mm thick by Engineer-Insand cement plaster as per the technical specifications given in the tender . Charge 0 290 80 240 180 100 200 40 100 180 a)Dia 200mm - (6.0 mm thick) b)Dia 150mm c)Dia 125mm d)Dia 100mm e)Dia 80mm f)Dia 65mm g)Dia 50mm h)Dia 40mm i)Dia 32mm j)Dia 25mm Sub- Total of Item No. 5.0 Item No:6.0- Valves Item No:6.1- Supply,installation,testing and commissioning of Cast iron/Cast Steel butterfly valve Spec. As directed complete with isnulation ,gaskets, flanges etc., PN 16 class rating.All other parameters as per the technical by Engineer-Inspecifications given in the tender Charge 0 26 0 8 150 mm dia 125 mm dia 100 mm dia 80 mm dia Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. 4 12 Page 184 of 194 65 mm dia 50 mm dia ARCHITECT : THE FIRM 5728.50 5480.55 Nos Nos 22914.00 65766.60 21375.00 18810.00 Nos Nos 0.00 112860.00 38646.00 25987.73 19187.91 11384.33 12483.00 8614.13 6070.50 5899.50 Nos Nos Nos Nos Nos Nos Nos Nos 0.00 155926.35 0.00 45537.30 24966.00 60298.88 6070.50 47196.00 15304.50 11841.75 9678.60 8464.50 7686.45 7028.10 5916.60 0.00 Nos Nos Nos Nos Nos Nos Nos Nos 0.00 118417.50 0.00 33858.00 15372.90 49196.70 5916.60 0.00 22919.99 14838.53 Nos Nos 91679.94 29677.05 Item No:6.2- Supply,installation,testing and commissioning of Motorised butterfly valve & Actutor Spec. As directed complete with Insulation,gaskets, flanges etc., PN 16 class rating.All other parameters as per the technical by Engineer-Inspecifications given in the tender Charge 0 6 150 mm dia 125 mm dia Item No:6.3- Supply,installation,testing and commissioning following Balancing valves - (Class-150,PN- Spec. As directed 16), complete with insulation, all flow -measurement accessories and position indication, including by Engineer-Inmatching flanges and fasteners and as per specifications given in the tender Charge 0 6 0 4 2 7 1 8 150 mm dia 125 mm dia 100 mm dia 80 mm dia 65 mm dia 50 mm dia 40 mm dia 25 mm dia Item No:6.4- Supply,installation,testing and commissioning of Y-Type Strainer complete with insualiton Spec. As directed Cast Iron Valve body, Flanges, Bolts, Nuts, Gaskets, Filter, 2-3 mm perforation , 24 G thick Screen & PN by Engineer-In16 / PN 10 rating.All other parameters as per the technical specifications given in the tender Charge 0 10 0 4 2 7 1 1 150 mm dia 125 mm dia 100 mm dia 80 mm dia 65 mm dia 50 mm dia 40 mm dia 25 mm dia Item No:6.5- Supply,installation,testingand commissioning of 2 Way / 3 Way Valve assembly for AHU's Spec. As directed with modulating actuators. The valves and actuators for AHU's shall be compatible with insulatoin, BMS. by Engineer-InActuators shall be suitable to receive 0-10V or 4-20 mA signal from BMS,complete with thermostat & Charge control wiring, Flanges, Bolts, Nuts, Gaskets & PN 16 / PN 10 rating,. All other parameters as per the technical specifications given in the tender 4 2 80 mm dia 65 mm dia Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. 7 1 8 0 10 0 0 32 0 Page 185 of 194 50 mm dia 40 mm dia 25 mm dia Item No:6.6- Supply,installation,testing and commissioning of Dual plate Non return valve of PN 16 /PN Spec. As directed 10 rating. Insulation complete with insualtion & all other parameters as per the technical specifications by Engineer-Ingiven in the tender Charge 150 mm dia 125 mm dia 100 mm dia Sub- Total of Item No. 6.0 Item No:7.0- Supply,installation,testing and commissioning of Rubber Bellows PN 16 / PN 10 rating All Spec. As directed other parameters as per the technical specifications given in the tender by Engineer-InCharge 150 mm dia 125 mm dia 100 mm dia Sub- Total of Item No. 7.0 ARCHITECT : THE FIRM 11179.13 8977.50 8122.50 Nos Nos Nos 78253.88 8977.50 64980.00 10670.40 9866.70 6961.41 Nos Nos Nos 0.00 98667.00 0.00 1407858.39 10944.00 9866.70 9020.25 Nos Nos Nos 0.00 315734.40 0.00 315734.40 3334.50 2659.05 1863.90 1261.13 893.48 726.75 574.56 Rmt Rmt Rmt Rmt Rmt Rmt Rmt 0.00 212724.00 0.00 0.00 0.00 0.00 0.00 212724.00 299.25 Rmt 74812.50 74812.50 Item No:8.0- Condenser Water piping Item No:8.1- supply,installation,testing and installation of Condenser water Mild steel pipes (Heavy Spec. As directed Class) with all necessary fittings like bends, elbows, tees, reducers, hanger, supports,etc and shall be clause by Engineer-InB/Calss C as per IS 1239 upto 150mm dia and as per IS 3589. for 200mm dia & above.All other Charge parameters as per the technical specifications given in the tender 0 80 0 0 0 0 0 a)Dia 250mm - (6.0 mm thick) b)Dia 200mm - (6.0 mm thick) c)Dia 150mm d)Dia 100mm e)Dia 80mm f)Dia 65mm g)Dia 50mm Sub- Total of Item No. 8.0 250 Item No:9.0- Supply,installation,testing and commissioning of UPVC pipes insulated with 9mm thick Spec. As directed superlon foam insulation as per Technical specifcation given in Tender by Engineer-InCharge a)Dia 50mm Sub- Total of Item No. 9.0 Item No:10.0- Drain with standard ball valves of PN 10 Rating as per the technical specifications given in Spec. As directed the tender by Engineer-InCharge Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. 35 8 0 Page 186 of 194 ARCHITECT : THE FIRM a)Size :25 mm Dia b)Size :20 mm Dia C)Size :15 mm Dia 726.75 641.25 598.50 Nos Nos Nos 25436.25 5130.00 0.00 30566.25 Item No:11- Supply,installation,testing and commissioning of Automatic Air vents for condenser water Spec. As directed system.All other parameters as per the technical specifications given in the tender by Engineer-InCharge Sub- Total of Item No. 11.0 2137.50 Nos 21375.00 Item No:12- Supply,installation,testing and commissioning of 100 mm Dial type pressure gauges 0-10 Spec. As directed bar range with Ball Valve All other parameters as per the technical specifications given in the tender by Engineer-InCharge 2308.50 Sub- Total of Item No. 10.0 10 95 21375.00 Nos Sub- Total of Item No. 12.0 75 219307.50 Item No:13- Supply,installation,testingand commissioning of 100 mm Dial type Temperature Gauge 0-50 Spec. As directed deg C range & all other mounting accessories.All other parameters as per the technical specifications given by Engineer-Inin the tender Charge 1966.50 Nos Sub- Total of Item No. 13.0 1 Item No:14- EXPANSION TANK One expansion tank of HDP(sintex) with complete with insulation, as required. Capacity : 1000 liter Spec. As directed by Engineer-InCharge 42750.00 Nos 1800 1600 200 200 Item No:16.1- 24 G Item No:16.2- 22 G Item No:16.3- 20 G Item No:16.4- 18 G Sub- Total of Item No. 16.0 42750.00 42750.00 Item No:15- quick fill, make-up, level gauge,level switch, drain and overflow connections Sub- Total of Item No. 15.0 Item No:16- Ducting and Accessories - Air conditioning system Supply, Installation testing & commissioning of Factory fabricated Galvanized work Sheet metal duct as per IS Standerd along with all accessories and feetings.all other parametres as per the technical specification given in the tender. 147487.50 147487.50 Sub- Total of Item No. 14.0 1 219307.50 12825.00 Nos 12825.00 12825.00 625.00 725.00 1068.75 1539.00 Sq. m Sq. m Sq. m Sq. m 1125000.00 1160000.00 213750.00 307800.00 2806550.00 Spec. As directed by Engineer-InCharge Item No:17- Supply,installation,testing and commissioning of duct thermal insulation Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 187 of 194 2500 Item No:17.1- with 19 mm thick Nitrile Rubber covered with glass cloth and Vapour barrier protection. (For Audi) 1300 Item No:17.2- with 19 mm thick Nitrile Rubber covered with glass cloth and Vapour barrier protection.( For other Area) 1 2500 ARCHITECT : THE FIRM Spec. As directed by Engineer-InCharge Spec. As directed by Engineer-InCharge Item No:17.3- Sound Attenuator - For Supply and Return air ducting of Auditorium. (Greenheck/ Carryaire make or equivalent) Supply and fixing of sound attenuator as directed by architect/EIC at all levels including all leads and lifts. Spec. As directed The shop drawing of the sound attrenuator shall be submitted to architect for approval. by Engineer-InCharge Sub- Total of Item No. 17.0 Item No:18- Supplying and fixing of acoustic lining of duct with fibre glass rigid board of density 48 Spec. As directed Kg/m³ sealed in fibre glass tissue paper and covered with 26gauge thick perforated aluminium sheet by Engineer-Inand conforming to specification given in the tender. (For Audi). Charge 384.75 Sq. Mtr. 961875.00 513.00 Sq. Mtr. 666900.00 427500.00 lot 427500.00 2056275.00 384.75 Sq. m 961875.00 a) 25 mm thick fibre glass rigid board Sub- Total of Item No. 18.0 1000 Item No:19- Supplying and fixing of Room Accoustic Insulation using 50 mm thk. resin bonded fibre Spec. As directed glass wool of density 32 Kg/m³ supported with G.I. Section frame work covered with R.P.tissue paper & by Engineer-In26 G Aluminium perforated sheet as per specification mensioned in tender Fix 1"x1" x20swg Aluminum Charge Angles At All Corners & 1"x20swg.Aluminium Flat At All Vertical Joints. 961875.00 661.77 Sqmt. Sub- Total of Item No. 19.0 0 12 12 20 661770.00 Item No:20- Supply and fixing of underdeck roof insulation with 16 kg/m3 density T.F. quality Expanded Spec. As directed Polysterene pasted with bitumene/or equivalent as per technical specification given in tender. by Engineer-InCharge Sub- Total of Item No. 20.0 323.19 Item No:21- Supply and fixing of Al powder coated square diffusers with VCD All other parameters as Spec. As directed per the technical specifications given in the tender by Engineer-InCharge Sub- Total of Item No. 21.0 7267.50 Item No:22- Supply and fixing of Al powder coated square diffusers without VCD All other parameters Spec. As directed as per the technical specifications given in the tender by Engineer-InCharge Sub- Total of Item No. 22.0 6500.00 Item No:23- Supply & fixing of 4- way Swirl Diffuser with VCD made out of Aluminium alloy extrusion Spec. As directed with anodised matt black finish for auditorium. by Engineer-InCharge 14026.18 Signature of Tenderer No. of Corrections 661770.00 Sqmt. 0.00 0.00 Sq. m 87210.00 87210.00 Sq. m 78000.00 78000.00 Sq. m 280523.70 Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 188 of 194 ARCHITECT : THE FIRM Sub- Total of Item No. 23.0 280523.70 Item No:24- Supply & fixing of round type Jet Nozzles of Aluminium alloy extrusion for supply air of Spec. As directed following sizes. by Engineer-InCharge 0 17 300 dia 400 dia 0.00 4275.00 Nos Nos 0.00 72675.00 72675.00 6460.00 Sq. m 161500.00 Sub- Total of Item No. 24.0 25 40 35 Item No:25- Supply & fixing of Volume Control Dampers with Opposed blade dampers with 18G frame Spec. As directed & 20G blades All other parameters as per the technical specifications given in the tender by Engineer-InCharge Sub- Total of Item No. 25.0 Item No:26- Providing and fixing of aluminum Linear Bar Grills in powder coated finish, required angle Spec. As directed with Al.Opposed Blade Damper black mat coated. by Engineer-InCharge 150 mm Wide contineus. Sub- Total of Item No. 26.0 Item No:27- Fire & Smoke Dampers Providing and fixing of fire dampers with actuator for AHU as per UL555 Specification and Approved by Spec. As directed TAC and FIA (actuator quantified in bms and not to be included here) in GI construction by Engineer-InCharge Sub- Total of Item No. 27.0 161500.00 8075.00 Sq.m 323000.00 323000.00 9025.00 Sqmt. 315875.00 315875.00 Item No:28- BASEMENT CAR PARK VENTILATION SYSTEMS Item No:28.1- Exhaust Air units Fans Supplying, installing, testing and commissioning of smoke spill fans as per specifications.Fan shall be with Spec. As directed belt driven dual mode tube/vane axial centrifugal fan.Fan and casing shall be suitable for smoke exhaust by Engineer-Inapplication.Motor shall be mounted outside ,so that it is not exposed to smoke stream & thermally rated for Charge 250C for 3 hours as per [BS-7346 Part-2 : 1090] Class-B. Motors shall be suitable for 415+10% volts, 50 cycles , 3 phase AC supply an static pressure shall be as indicated . Fans shall be activated from fire signal from fire alarm system .Fan shall be with flexible fire proof flexibel connection at inlet and outlet. Fan will operate at 17000cfm, 10 mm st. pr at normal mode and deliver 34000 cfm at fire mode. 6 a)Capacity- 17000 CFM - 20mm Total static pressure at normal mode & 34000 cfm at Fire Mode. Item No:28.2- Impulse Jet fans - Tube axial type Signature of Tenderer No. of Corrections 394250.00 Nos 2365500.00 Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 189 of 194 ARCHITECT : THE FIRM Supply, Installation testing & commissioning of Tube axial type impulse jet fans complete with integral Spec. As directed inlet and outlet attenuators, protection grills, guards & mounting assembly , complete with electrical items. by Engineer-InFan motor (415 V, 50 Hz, IP 55 protection) shall be of 2 speed to operate on normal mode and fire mode. Charge The fan shall be suitable for ceiling mounting. The fans shall have fire rating of 250 deg C for 120 min. Price quoted shall be inclusive of CFD analysis.All other parameters as per the technical specifications given in the tender 24 2 a)Capacity 1900 CFM (Normal mode) & 3800 CFM (Fire mode) ( for further details please refer equipment schedule) Supply of Electrical cum PLC panel with feeders and satrters for Nos. 3 phase jet fans of 1.5 Kw X12 nos Spec. As directed dual speed motor, built in logic for 6 Nos. 3.7 Kw and 4 no.s 15 Kw single speed main exhaust fan. Each by Engineer-Inpanel should cater to 10 Nos. of Jet fans controlled by 5 Nos CO sensor. Each panel shall be with Charge L&T/other approved make switch gears, suitable incomer MCCB, Bus bar, PLC and necessary control wiring and indicators etc. Note : Co-relation of panel qty. to Qty. of Jet / Main Exh. & CO sensores shall be as per zoning. Each CO sensor shall cater to 2-3 Nos jet fans as per zoning. 1 Starter panel for 6 Nos. Dual mode fan 6 Nos. #7.5/15 Kw single speed main exhaust fans with necessary controllers & indicators. 1 Starter panel for Fresh air fan 1 Nos. #7.5Kw single speed for Lower Basement Spec. As directed by Engineer-InCharge 117762.00 Nos 2826288.00 190000.00 no 380000.00 175750.00 no 175750.00 26600.00 no 26600.00 Sub- Total of Item No. 28.0 4 Item No:29- Plant Room Ventilation Item No:29.1- Supply, Installation testing & commissioning of Propeller Fan 5774138.00 Spec. As directed by Engineer-InCharge 6000.00 Nos Sub- Total of Item No. 29.0 24000.00 24000.00 Item No:30- Toilets Exhaust Fans Item No:30.1- Supply, Installation testing & commissioning of Duct Inline fan with backward curve Spec. As directed impeller directly driven external rotor and sturdy motor suitable for continuous operation. The assembly by Engineer-Inshall be in position to install in either direction. The fan Motor shall be single phase electrical supply. The Charge Motor shall be built in thermal contact & Totally Enclosed, Fan Cooled (TEFC) Ingress Protection IP-54. The motor constructrution shall be such that speed variation is possible and as per the technical specifications given in the tender. 2 2 3 2 Item No:30.1.1Item No:30.1.2Item No:30.1.3Item No:30.1.4- Capapcity 600 CFM, 15 mm Total static pressure Capapcity 1100CFM, 15 mm Total static pressure Capapcity 1300 CFM, 15 mm Total static pressure Capapcity 100 CFM, 5 mm Total static pressure 14250.00 19000.00 17100.00 13300.00 Sub- Total of Item No. 30.0 Nos. Nos. Nos. Nos. 28500.00 38000.00 51300.00 26600.00 144400.00 Item No:31- Fresh Air Unit Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 190 of 194 ARCHITECT : THE FIRM Item No:31.1- Supply, Installation testing & commissioning of Single skin ventilation unit with backward Spec. As directed curved / forward curved centrifugal DIDW fan, Cleanable pre filter 90% efficiency down to 10 microns by Engineer-Inand outlet dampers with fire retarding Canvass connection. Outlet velocity shall be less than 9.5 m/s & Charge Suitable for out door applications. Sound level shall be less than 71 dBA @ 1m distance.All other parameters as per the technical specifications given in the tender 1 3 3 Item No:31.1.1- Supply Capacity 22500 CFM,25 mm Total static pressure for Lower Basement Item No:31.1.2- Supply Capacity 15600 CFM,35 mm Total static pressure for Staircse Pressurisation(ST-1, ST-2 & ST-3) Item No:31.1.3- Lift Well Pressurisation fans -4000 cfm, 25 mm static pressure Sub- Total of Item No. 31.0 350000.00 300000.00 Nos. Nos. 350000.00 900000.00 66500.00 Nos. 199500.00 1449500.00 427500.00 No. 427500.00 Item No:32- ELECTRICAL WORKS: Item No:32.1- Supply, installation, testing and commissioning of Cubical type sectinalised floor Spec. As directed standing Panel by CPRI apprved firms of 31 MVA fault capacity at 415 V complete with 4 by Engineer-Instrip, 630 A capacity Aluminium Bus - Bar Electrolytic grade E-91, cable alley, switchgears suitable Charge for AC-23 duty & of following capacity & as per specification given in the tender. a) INCOMER 630 A manually operated draw out type 4 Pole MCCB with overload, short ckt., earth fault, Spec. As directed protection release, with 144 mm (0 -630 A) ammeter with 3 CT and selector switch, 144 mm (0 - 500 V) by Engineer-InVoltmeter with selector switch, phase indication light with protection fuse, on / off / trip indicating light Charge with protection fuse. SET 02 OUTGOINGS Item No:32.1.1- For 3 Nos. Water-cooled Chilling Machine (3W+0S) 250 A manually operated draw out type 4P ACB with overload, earth fault protection with (0 - 800A) ammeter with three CT & selector switch, on / off / trip indication light with protection fuses. SET - 04 Item No:32.1.2- For 3 Nos. 11 Kw Chilled Water Pumps 63 A TPN MCCB with 32 A star delta starter, overload relay, start/stop push buttons, ammeter (0-60A) Spec. As directed with three CT & selector switch, on/off/trip indication lights with SP MCB, single phase preventer & auto / by Engineer-Inmanual mode selector switch. SET 03 Charge Item No:32.1.3- For 3 Nos. 11 Kw Condenser Water Pumps Item No:32.2- 63 A TPN MCCB with 25 A star delta starter, overload relay, start/stop push buttons, Spec. As directed ammeter (0-60A) with three CT & selector switch, on/off/trip indication lights with SP MCB, single by Engineer-Inphase preventer & auto / manual mode selector switch. SET - 04 Charge 1 For 3 Nos. (1 x 7.5 HP - Each Tower) Cooling Towers. Item No:32.3- ELECTRICAL SUB-PANEL FOR AHU'S & VENTILATION FANS Item No:1- Supply, installation, testing and commissioning of Cubical wall mounted type switch board Spec. As directed as detailed below & switch gears by Engineer-InCharge Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. 18 Page 191 of 194 Item No:32.4- 40 A TPN MCB with 16 A DOL starter, overload relay, start / stop push buttons, phase indication lights with protection fuse, on / off / trip indication lights with protection fuse, single phase preventer & auto / manual mode selector switch. Set - 01 Controls & interlocking accessories as required. Fan Motor UPTO 3.70 Kw ARCHITECT : THE FIRM 11875.00 NO. 213750.00 14250.00 NO. 213750.00 17575.00 NO. 70300.00 21375.00 NO. 42750.00 968050.00 1071.60 Rmt 128592.00 128592.00 510.15 475.00 272.65 237.50 Rmt Rmt Rmt Rmt 76522.50 71250.00 54530.00 35625.00 237927.50 Item No:32.5- 40 A TPN MCB with 25 A DOL starter, overload relay, start / stop push buttons, Spec. As directed phase indication lights with protection fuse, on / off / trip indication lights with protection fuse, single by Engineer-Inphase preventer & auto / manual mode selector switch. Controls & interlocking accessories Charge 15 as required. Fan Motor 5.5 Kw Item No:32.6- 40 A TPN MCB with 16 A Star Delta starter, overload relay, start / stop push Spec. As directed buttons, phase indication lights with protection fuse, on / off / trip indication lights with protection fuse, by Engineer-Insingle phase preventer & auto / manual mode selector switch. Controls & interlocking accessories as Charge required. 4 Fan Motor 7.5 Kw Item No:32.7- 63 A TPN MCB with 25 A Star Delta starter, overload relay, start / stop push Spec. As directed buttons, phase indication lights with protection fuse, on / off / trip indication lights with protection fuse, by Engineer-Insingle phase preventer & auto / manual mode selector switch. Controls & interlocking accessories as Charge required. 2 Fan Motor 9.3 / 11.0 Kw Sub- Total of Item No. 32.0 120 Item No:33- Supply,installation,testing and commissioning of 1100 V, Cu , PVC armoured cables with Spec. As directed gland,lugs and termination all other parameter as per techical specification mensioned in tender by Engineer-InCharge 3.5 C X 185 sq. mm Sub- Total of Item No. 33.0 Item No: 34- Supply,installation,testing and commissioning of 1100 V, copper armoured, PVC insulated Spec. As directed cables including Gland,Lugs & Termination all other parameter as per techical specification mensioned in by Engineer-Intender Charge 150 150 200 150 4 C X 10 Sqmm. 4 C X 6 Sqmm. 4 C X 4 Sqmm. 4 C X 2.5 Sqmm. Sub- Total of Item No. 34.0 Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 192 of 194 400 120 Item No: 35- Supply,installation,testing and commissioning of 1100 V, copper un-armoured, PVC Spec. As directed insulated cables includingearthing and cable trays for dressing whereever necessary. by Engineer-InCharge 2C X 1.5 Sq. mm 3C X 1.5 Sq. mm 2C X 2.5 Sq. mm 3C X 2.5 Sq. mm Sub- Total of Item No. 35.0 Item No:36- EARTHING: Item No:1- Supply, Installation, Testing and Commissioning of earthing for chiller,pumps,AHU's and Spec. As directed Fans.as per tender specification. by Engineer-InCharge 6 / 8 / 10 SWG GI double earthing 25 x 6 mm GI double earth strip RO 50 x 6 mm GI double earth strip 100 200 100 100 ARCHITECT : THE FIRM 152.00 166.25 161.50 173.85 Rmt Rmt Rmt Rmt 15200.00 33250.00 16150.00 17385.00 81985.00 23.75 142.50 Rmt Rmt 9500.00 17100.00 237.50 Rmt 0.00 Sub- Total of Item No. 36.0 26600.00 Item No:37- CABLE TRAYS: Item No:37.1- Supply and installation of ladder type/perforated type cable trays of the following sizes Spec. As directed fabricated out of perforated hot dip galvanised MS sheets of minimum 2 mm thick with 50 mm by Engineer-Inflange to be installed horizontally or vertically. Charge The cable tray shall be complete including cost of bends, elbows, cross, tees, reducers etc as per drawings/ site condition and rate shall include cost of anchor fasteners, screws, nuts, bolts and misc. other fixing hardware painting of support structure etc as required. 50 50 50 200 150 Item No:37.1.1- 450 mm wide Item No:37.1.2-300 mm wide Item No:37.1.3-150 mm wide Item No:37.1.4-100 mm wide Item No:37.1.5-50 mm wide 522.50 427.50 285.00 261.25 237.50 Sub- Total of Item No. 37.0 1 1 3 2 1 Item No:38-Supply and Installation of of VRF sytem for VIP Room and Multipurpose Hall of following Spec. As directed capacity. by Engineer-InCharge Item No:38.1-Out door unit (10HP + 8 HP) 18HP Item No:38.2-Cu piping with insulation Item No:38.3-Cassette unit with cordless remote 4 TR 3 TR Item No:38.4-Electrical Cabling (communication cable and supply cabling) Sub- Total of Item No. 38.0 Signature of Tenderer No. of Corrections Rmt. Rmt. Rmt. Rmt. Rmt. 26125.00 21375.00 14250.00 52250.00 35625.00 149625.00 200000.00 60000.00 200000.00 60000.00 70000.00 59000.00 38000.00 210000.00 118000.00 38000.00 626000.00 Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Signature of Tenderer Page 193 of 194 ARCHITECT : THE FIRM TOTAL FOR HVAC WORKS 35412049.17 SAY 35412049.00 No. of Corrections Signature of N.M.M.C. Officer CLIENT : N.M.M.C. Page 194 of 194 ARCHITECT : THE FIRM Navi Mumbai Municipal Corporation Name of Work :- Supply, Installation, Testing & Commissioning of HVAC System at Auditorium on Plot No. 37 at Sector 5, Airoli, Navi Tender Notice No. :- NMMC/ELEC/ JCE/ 66 (03) /2014-2015 SUMMARY - B SR. No. DESCRIPTION OF ITEMS AMOUNT PART A - HVAC 1.0 Water Cooled Screw Chiller 8872088.86 2.0 Pumps 671415.92 3.0 Cooling Tower 589137.75 4.0 Air Handling Units 3030082.00 5.0 Chilled Water Piping 2347812.90 6.0 Valves 1407858.39 7.0 SI T & C of Rubber Bellow 315734.40 8.0 Condenser Water piping 212724.00 9.0 SI T & C UPVC pipes 74812.50 10.0 Drain Arrangement 30566.25 11.0 SI T & C Automatic Air Vents 21375.00 12.0 Dial type pressure gauges 219307.50 13.0 Dial type Temperature Gauge 147487.50 14.0 Expansion Tank 42750.00 15.0 Drain and overflow connections 12825.00 16.0 Ducting and Accessories - Air conditioning system 2806550.00 17.0 SI T & C duct thermal insulation 2056275.00 18.0 SI T & C Acoustic Lining of duct 961875.00 19.0 Supply & Fixing Room Acoustic insulation 661770.00 20.0 Supply & Fixing under deck Roof insulation 0.00 87210.00 21.00 Supply & Fixing Aluminum powder coated square diffusers with VCD 78000.00 22.00 Supply & Fixing Aluminum powder coated square diffusers without VCD Supply & fixing of 4way Swirl Diffuser with VCD 280523.70 23.00 72675.00 24.00 Supply & fixing of round type Jet Nozzles of Aluminium alloy extrusion 161500.00 25.00 Supply & fixing of Volume Control Dampers with Opposed blade dampers 323000.00 26.00 Providing and fixing of aluminum Linear Bar Grills in powder coated 315875.00 27.00 Fire & Smoke Dampers Basement car park ventilation systems 5774138.00 28.00 24000.00 29.00 Plant Room Ventilation 144400.00 30.00 Toilets Exhaust Fans 1449500.00 31.00 Fresh Air Unit 968050.00 32.00 Electrical works: Supply,installation,testing and commissioning of 1100 V, Cu , PVC armoured cables 128592.00 33.00 237927.50 34.00 Supply,installation,testing and commissioning of 1100 V, copper armoured, 81985.00 35.00 Supply,installation,testing and commissioning of 1100 V, copper un-armoured 26600.00 36.00 EARTHING: 149625.00 37.00 CABLE TRAYS: Supply and Installation of of VRF sytem 626000.00 38.00 GRAND TOTAL 35412049.17 SAY 35412049.00 Total (Contractors Quoted Percentage (+/-) (In Word ………………………………………………………………………………………….....) Quoted Amount Rs. : (In Word ………………………………………………………………………………………….....) Signature of Tenderer No. of Corrections Signature of N.M.M.C. Officer