Schedule of Accreditation issued by United Kingdom Accreditation Service 21 - 47 High Street, Feltham, Middlesex, TW13 4UN, UK Benchmark Certification Ltd Issue No: 018 0125 Issue date: 10 August 2015 International House Contact: Chris Kulski George Curl Way Tel: +44 (0)2380 517 069 Southampton E-Mail: c.kulski@benchmark-cert.co.uk SO18 2RZ Website: www.benchmark-cert.co.uk Accredited to ISO/IEC 17065:2012 to provide product conformity certification Locations where certification activities covered by the above Accreditation Standard are undertaken Benchmark Certification Ltd International House George Curl Way Southampton SO18 2RZ Assessment Manager: NH2 Page 1 of 3 S c he dul e of Ac c r e di ta ti on issued by United Kingdom Accreditation Service 21 - 47 High Street, Felt ham, Mi ddl esex, TW 13 4UN, UK Benchmark Certification Ltd 0125 Issue No: 018 Issue date: 10 August 2015 Accredited ISO/IEC 17065:2012 to provide product conformity certification DETAIL OF ACCREDITATION Product Microgeneration Scheme. Supply, design, set to work, commissioning and handover of Solar Heating Systems Solar Photovoltaic Systems Heat Pump Systems Micro Wind Generator Biomass Additional Requirements for MCS Installation Companies to become Green Deal Authorised Installation of following Green Deal measures: Condensing Boilers, Natural Gas-fired and Liquefied Petroleum Gas-fired Condensing Boilers, Oil Fired Heating and Hot Water Systems Controls Under-floor Heating Warm Air Heating (Natural Gas-fired and Liquefied Petroleum Gas-fired Warm Air Heating Systems) Loft Insulation Draught Proofing Heating System Insulation Installation of fixed low or extra-low voltage electrical installations in dwellings. Standard MCS 001 & MIS 3001 MCS 001 & MIS 3002 MCS 001 & MIS 3005 MCS 001 & MIS 3003 MCS 001 & MIS 3004 MCS 023 Issue 1.0 28/01/2013 PAS 2030:2012 Improving the energy efficiency of existing buildings Specification for installation process, process management and service provision. Edition 2 – December 2012 PAS 2031:2012 Certification of Energy Efficiency Measure (EEM) installation services Edition 1 - March 2012 DCLG Conditions of Authorisation 6 June 2012 and Competent Person Scheme ‘Benchmark Certification Limited’ in accordance with the Building Regulations 2010 (as amended) Installation of fixed low or extra-low voltage electrical installations in dwellings as a necessary adjunct to or arising out of other work being carried out by the registered person. DCLG Conditions of Authorisation 6 June 2012 and Competent Person Scheme ‘Benchmark Certification Limited’ in accordance with the Building Regulations 2010 (as amended) Assessment Manager: NH2 Page 2 of 3 S c he dul e of Ac c r e di ta ti on issued by United Kingdom Accreditation Service 21 - 47 High Street, Felt ham, Mi ddl esex, TW 13 4UN, UK Benchmark Certification Ltd 0125 Issue No: 018 Issue date: 10 August 2015 Accredited ISO/IEC 17065:2012 to provide product conformity certification Product Standard Installation of heating or hot water system connected to a heat-producing gas appliance, or associated controls. DCLG Conditions of Authorisation 6 June 2012 and Installation of a heating or hot water system connected to an electric heat source or its associated controls. Competent Person Scheme ‘Benchmark Certification Limited’ in accordance with the Building Regulations 2010 (as amended) Installation in a building of a system to produce electricity, heat or cooling— (a)by microgeneration, or (b)from renewable sources (as defined in European Parliament and Council Directive 2009/28/EC of 23 April 2009 on the promotion of the use of energy from renewable sources). DCLG Conditions of Authorisation 6 June 2012 and Competent Person Scheme ‘Benchmark Certification Limited’ in accordance with the Building Regulations 2010 (as amended) Installation of a wholesome cold water supply or a softened wholesome cold water supply. DCLG Conditions of Authorisation 6 June 2012 and Installation of a supply of non-wholesome water to a sanitary convenience fitted with a flushing device which does not involve work on shared or underground drainage. Installation of a sanitary convenience, sink, washbasin, bidet, fixed bath, shower or bathroom in a dwelling, which does not involve work on shared or underground drainage. Competent Person Scheme ‘Benchmark Certification Limited’ in accordance with the Building Regulations 2010 (as amended) END Assessment Manager: NH2 Page 3 of 3