The Fort Miller Co., Inc. Precast Pavement Construction Using The Super-Slab System ® October 31, 2013 The Fort Miller Co., Inc. Dan E. Moellman, P.E. The Fort Miller Co., Inc. • Located in upstate New York • Transportation products Highway barrier Schuylerville, NY Precast retaining walls Bridges Precast pavement slabs • Specializing in accelerated bridge construction • Developer and promulgator of the Super-Slab® Precast Pavement System The Fort Miller Co., Inc. Precast Concrete Pavement Slabs = Overnight Repairs 145,000 ADT 180,000 ADT I-287, Tarrytown, NY Cross Bronx Exp. 162,000 ADT BrooklynBrooklyn-Queens Exp. The Fort Miller Co., Inc. Overnight repairs for Failed Interstate Pavement! Pavement Shattered Slabs Failed Rapid Set Patches Heavily Faulted Slabs Pasadena, CA Hollywood, CA Pasadena, CA 210 Freeway, Pasadena, CA The Fort Miller Co., Inc. Urban Arterial & Intersection Pavement in Poor Condition 50 Year Old Pavement Many Utilities Poor Surface Drainage Shoved Black Top The Fort Miller Co., Inc. Precast Pavement BASICS Precast Slabs + Uniform Support + Match Road Surface + Effective Load Transfer Between Slabs ________________________________________________________________________________________________ ________________________________________________________________________________________________ Successful Long-term Repair The Fort Miller Co., Inc. Precast Pavement Emulates Cast in Place • • • • Full Bedding Support Load transfer Dowels Grade Control Slab Surface Geometry The Fort Miller Co., Inc. Overview of Current Precast Systems • Precast Prestressed Concrete Pavement (PPCP) Pre & post tensioned ( 250’+ assembly) Developed by FHWA (non-proprietary) • Top-Slot Jointed Systems (Michigan Method) Jointed – slab lengths 16’ + long Developed by FHWA (non-proprietary) Flowable fill or urethane foam support • Bottom-Slot Jointed System (Super-Slab®) Jointed – slabs 6’ to16’ Grade supported • Other systems are “appearing” The Fort Miller Co., Inc. Grade-Supported, Bottom-Slot Super-Slab® System • Simple slab-on-grade system • Standard dowels and tie bars (JRCP) • Built-in bedding grout distribution • Precision grading equipment • Warped and planar surfaces • 15,000 + slabs = 1,575,000 SF INSTALLED (78 projects, 27 lane-miles completed in 13 States + ONT & QUE) The Fort Miller Co., Inc. Controlled Fabrication Conditions Accurate Forms Accurate Piece Drawings Roller Screed - Accurate Top Surface Ideal Finishing (and curing) Conditions The Fort Miller Co., Inc. Grade Control & Slab Support – A Two - Step Process Secondary Bedding Primary Bedding Grade control rails placed to survey marks Precisely-Graded (to + 1/8”) and Compacted Fine Aggregate Material Grout Distribution Channel Foam Gaskets Proof Bedding Grout Fills Any Voids The Fort Miller Co., Inc. SuperSuper-Slab® Slab® Load Transfer Dowel System • Dowels engage slots in adjacent slab • Pump dowel group into ports Grout reaches 2500 psi in about 2 hours • Fill slots and joint between slabs • Dove-tail slot resists bar pop out Dove-tail-shaped slot The Fort Miller Co., Inc. Load Transfer Mechanisms –BottomBottom-Slot SuperSuper-Slab® Slab® (proprietary detail) • “CLEAN” TOP OF SLAB • STRONG CONNECTION • FAST – SLOTS CAST IN The Fort Miller Co., Inc. Indicators for Long Life Full scale load testing in California Test results show no cracks or distress Falling Weight Deflectometer Heavy vehicle simulator 143 Million ESALs (100 KN Load) 4.3 Million Cycles The Fort Miller Co., Inc. Slab Surface Geometry Warped Plane Single Plane • Slopes of opposite sides are equal • Slopes of opposite sides are un-equal The Fort Miller Co., Inc. At the Site • Lay out slab locations and limits • Cut and remove existing slabs May be a single or a multiple of single slabs • Install load transfer dowels and tie bars • Place, grade and compact bedding material Mainline or ramps • Place slabs At specified locations • Install dowel and bedding grout • Grind (if necessary) to achieve smoothness requirements The Fort Miller Co., Inc. Saw Cutting and Removal Cuts - Full Depth - Accurate Slab crab bucket Trucks - right size - right number The Fort Miller Co., Inc. Drilling for Dowels Mark Out (accurately) to Match Dovetail Slots 16 holes – 12 minutes The Fort Miller Co., Inc. Precision Grading is the Key! Super-Grading = Grading to 1/8th inch +, fully compacted • Thin layer (1/2”) fine bedding material • Grade – Compact - Grade • Provides “near complete” subgrade support without grout • Slabs can be opened to traffic before grouting Small Scale Grading Rail Supported and Hand Operated Auger H.O.G. MiniMini-H.O.G. Hand Operated Grader (H.O.G.) Shutter Screed The Fort Miller Co., Inc. Grading Patches With HandOperated Grader (H.O.G.) Three Steps (12 minutes) First Pass (high) Compaction Last Pass (done) The Fort Miller Co., Inc. Continuous Grading With Hand Operated Grader H.O.G. Three Steps First Pass (1/4” (1/4” high) Last Pass (done) Compaction (over 500 LF per night possible) The Fort Miller Co., Inc. Drilling for Dowels Mark Out (accurately) to Match Dovetail Slots 16 holes – 12 minutes The Fort Miller Co., Inc. Shipping and Placing • Size slabs for shipping 12’ Max. width Special permits • Ship in order – by mark number • Provide unloading lane / shoulder The Fort Miller Co., Inc. Placing Slabs – Continuous Crane Occupies New Slabs String Line Set Slab to String 12’ 12’ Lane & 10’ 10’ Shoulder (min.) The Fort Miller Co., Inc. Placing Slabs – Intermittent Center Slab in Hole (Single Slab Holes) Crane Occupies New Slab The Fort Miller Co., Inc. Grouting •Truck Truck (grout material & water) •Trailer Trailer (grout mixer/pump) •Short Short hose & nozzle •Pails Pails (for water measuring) •Barrels Barrels (for waste) Requires Grout Rig (Typically completed subsequent nights) The Fort Miller Co., Inc. Installing Dowel Grout Fill Dowel Slots and Joints First ContractorContractor-Designed Joint Dam The Fort Miller Co., Inc. Installing Bedding Grout PrePre-bagged Bedding Grout Flow Rate (Recommended) 15 - 20 Seconds Max. Keep Ports Full by “topping off” off” The Fort Miller Co., Inc. NJDOT & NYSDOT Specifications NJDOT Sec 453 – Full Depth Concrete Pavement Repair, Precast NYSDOT 704 -15 Precast Concrete Pavement Slab Systems • Fabrication Standard Drawings, Install Instructions, Trial Installation • Approved List NYSDOT EI 05-043 Precast Concrete Pavement Slab Systems – Design Guidance NYSDOT 502.15PF—18, Precast Concrete Pavement Slabs The Fort Miller Co., Inc. Intermittent Repairs (CPR) I- 90 Albany, NY I-676 Vine St Expressway Philadelphia, PA I-15 Salt Lake City, Utah I-95, New Rochelle, NY The Fort Miller Co., Inc. Continuous Tappan Zee Bridge Toll Plaza (Within + 1/8” 1/8”) Open for Rush Hour 2001 - 2002 (135,000 ADT) 3,000 SF / 8 Hour Shift The Fort Miller Co., Inc. Continuous - Mainline Placement Mainline I-15, Ontario, CA (200,000 VPD) The Fort Miller Co., Inc. Ramps Chicago, Il Brooklyn, NY Plan View Tarrytown Tarrytown, NY The Fort Miller Co., Inc. Intersections – Replacing Composite Pavement, – Rotterdam, NY - 2006 New & Old Undercuts Complex Geometry Replaced in 17 Nights! NY 7 Crosstown Connection The Fort Miller Co., Inc. Intersection Approaches – Replacing Full Depth Ashpalt, Ashpalt, Rockaway Blvd., Queens, NY – 2010 Farmers Blvd Guy R. Brewer Blvd. Intersection Approaches Only The Fort Miller Co., Inc. Bridge Approach Slabs (Existing Bridges) Binghamton, NY (2009) Cross Section at Abutment NY State DOT The Fort Miller Co., Inc. Bridge and Approach Slab Total Replacement US 46 Over Broad St., Clifton, NJ • Bridge replaced over two weekends - April 2011 Bridge Units • Two-span (40.2’, 40.2’) continuous, 28.76° skew • Precast Approach Slabs - tied to prefabricated bridge units Skewed Approach Slabs The Fort Miller Co., Inc. Bus Pad, Hollywood & Santa Monica Blvd. North Hollywood, CA Grading Last Slab Placing Finished, Next Day The Fort Miller Co., Inc. Industrial Driveways City of Mamaroneck, NY Continuous Access During Construction The Fort Miller Co., Inc. Brooklyn Bridge Approaches 2010 – 2013 Grading Placing Looking Towards Manhattan Looking Towards Brooklyn The Fort Miller Co., Inc. Alexander Hamilton Bridge West Approach, 2011 – 2013 Grading Lower Level Contractor Gets One Lane To Replace The Same Lane Placing, June 2012 The Fort Miller Co., Inc. Other Places for Fast-Track Precast Pavement • Under Bridges • Instrumented pavement Toll booth treadles • Weigh and Motion Stations • Round-Abouts • Utility corridors I-78 Interchange 14C Toll Plaza NJ Turnpike Authority, Jersey City, NJ The Fort Miller Co., Inc. Intermittent - Installation Rates • 8 hour work window • 12 – 15 slabs (12’ x 10’) per night • 5 hour work windows 7 – 9 slabs (12’ x 10’) per night • Dependent on work window length and spacing of repairs The Fort Miller Co., Inc. Continuous - Installation Rates 8 – 10 Slabs (1500 – 2000 SF) per Hour 12’ x 14’ slabs Average rate of over 6000 SF ( 500 Lane Ft.) per 8 hour shift – I-15, Ontario, CA • About one mile in two weeks Rates should improve As Contractors become more familiar Improved specialized equipment The Fort Miller Co., Inc. Smoothness • Small differences are expected Fabrication tolerance Grading tolerance • Super-Slab® finished surfaces + 1/8” May be acceptable for slow speed traffic • Grind for best International Roughness Index Diamond Grinding is an accepted and cost-effective practice The Fort Miller Co., Inc. Installed Costs (Bid Prices) • Intermittent Repairs About $ 238 to $ 450 per SY Similar to rapid-set concrete costs (in some states) • Continuous Installations About $ 238 to $ 400 per SY Up to 20% less than intermittent repair slabs • Varies greatly with Length of work window Size of project Local labor rates The Fort Miller Co., Inc. Compare with Conventional Fast-Track Concrete Actual Bid Prices (NY State) Item No. Description (SY) 502.2001 Saw Cutting $ 23.33 502.3101 Lift Out Removal $ 13.33 502.3301 Tie Bars $ 30.00 502.3201 D & A Dowels $ 30.00 502.3603 PCC Placement $ 175 - $ 238 Total $ 272 - $ 335 The Fort Miller Co., Inc. Pavement - Asset Management Strategies With Precast Available • Use quality precast material every time 40-year service life • Use maintenance dollars for good repairs, not temporary ones • Consider life cycle rather than first costs • Rather than patching, consider “intermittent total replacement” Keep adding on to good precast repair slabs • Consider “re-usable” precast pavement in utility-intensive areas The Fort Miller Co., Inc. New Developments in Super-Slab Precast Pavement The Fort Miller Co., Inc. Super-Dowel (Pat. Pending) Removable & Replaceable Enables Removable (& Replacable) Precast Pavement The Fort Miller Co., Inc. Incremental Total Replacement Using SuperSuper-Dowels Makes The Most of Our Existing Concrete Pavement Asset The Fort Miller Co., Inc. Super-Paver – A Re-usable Urban Pavement (RUP) System (Made Possible With Super-Dowels) • Light weight • 6’ x 6’ weighs 2 T • Vertically removable & replaceable • Warped as required to fit any surface • • Standard warps are in stock Removable and reusable (Designed specifically for utility-intensive urban highways and intersections) The Fort Miller Co., Inc. Slab Removal & Replacement Remove Slab Vertically and Clean SuperSuper-Dowel Utility Trench Replacing CleanedCleaned-up Slab Over New Dowels The Fort Miller Co., Inc. Slab Layout Possibilities • Remove slabs to work on utilities (Super-Dowels) • Clean up and replace removed slabs • Mix big and small SuperPavers as needed SuperSuper-Pavers Installed Over Utilities NYC DOT – Broadway Junction Van Sinderen Avenue The Fort Miller Co., Inc. Reasons for Using Precast Pavement • Heavy traffic Requires most durable repair Urban arterials most likely candidates • Long term detours and staging not options Access ramps, intersections prime candidates • Traffic volumes require short work windows If you have only 8 hrs., you need to strongly consider precast pavement If you have only 5 hrs., precast likely your best option The Fort Miller Co., Inc. Benefits of Precast Pavement Reduce construction-related traffic congestion Longer lasting pavement repairs – Asset Preservation 40+ years Reduced (long-term) repair costs “Get in, get out and stay out” “Incremental Total Replacement” – now possible Reduces field inspection time and cost Precast slabs – plant inspected Pre-engineered, pre-inspected slabs result in a superior finished pavement The Fort Miller Co., Inc. Benefits to Contractors Eliminates design and submittal of fast-track concrete mix NYSDOT requires 45 Days for approval Fewer risks in placement No finishing No curing time Immediately open to traffic Less weather sensitive – longer construction season Material costs known at bid time The Fort Miller Co., Inc. Super-Slab® Pavement BASICS Precast Slabs – Precision Engineered, Durable 40+ yr, Cost Effective + Uniform Support – Super-Grading, Fully Compacted Subgrade + Match Road Surface – Plane & Warped + Effective Load Transfer Between Slabs Dowels in Fully Grouted Dovetail Slots ___________________________________________________________________________________________________ ___________________________________________________________________________________________________ Successful Long-term Overnight Repair 15,000 Slabs = 25+ lane-miles The Fort Miller Co., Inc. Keys to Success (Still More to Learn) Good engineering Open minds Real partnering Question #1: What are the two types of concrete roadway repair made with Super-Slab® System? Answer: 1) Intermittent or patch repair installations 2) Continuous repair installations Question #2: How does Super-Slab® System accommodate complex pavement surface geometry? Answer: Using a combination of planar and non-planar slabs on a matching precision graded subbase Question #3: What is the shortest work-window to be used with Super-Slab® System? Answer: 5 Hours – 1:00 AM to 6:00 AM NYS Thruway Authority – I-95 New Rochelle, NY Thank You The Fort Miller Co., Inc.