Department of Energy

advertisement
Provo City Energy Department Rate Schedules
Effective July 1, 2015
Schedule No. 1
Schedule No. 2
Residential
Billing Rate Code: EL1
Customer Service Charge
Energy Charge
Energy Charge
Energy Charge
$6.44 per Service Connection
$0.0860 per kWh for the first 500 kWh
$0.0999 per kWh per 501-1000
$0.1185 per kWh per all additional
Net Metering:
Billing Rate Code: EL3
Customer Service Charge
Energy Charge
Energy Charge
Energy Charge
$6.44 per Service Connection
$0.0860 per kWh for the first 500 kWh
$0.0999 per kWh per 501-1000 kWh
$0.1185 per kWh per all additional
General Service Distribution Voltage
Billing Rate Code EL15/EL18 (kVa)
Customer Service Charge
$29.57 per Service Connection (Demand Meter)
Energy Charge
$0.0437 per kWh
Demand Charge
$7.88 per kW for the first 5 kW
Demand Charge
$14.08 per kW per all additional
Schedule No. 3
Commercial Detached Buildings:
Billing Rate Code EL16
Customer Service Charge
Energy Charge
Demand Charge
Demand Charge
$29.57 per Service Connection (Demand Meter)
$0.0437 per kWh
$7.88 per kW for the first 5 kW
$14.08 per kW per all additional
Cable Supply:
Billing Rate Code EL17
Customer Service Charge
Energy Charge
Demand Charge
Demand Charge
$29.57 per Service Connection (Demand Meter)
$0.0437 per kWh
$7.88 per kW for the first 5 kW
$14.08 per kW per all additional
General Service Distribution Voltage (Optional Time of Use) **Closed Rate**
Billing Rate Code: EL14
Customer Service Charge
Energy Charge
On-Peak Demand Charge
Off-Peak Demand Charge
$29.57 per Service Connection
$0.0437 per kWh
$13.03 per kW
$4.57 per kW
Schedule No. 4 General Service Primary Voltage
Billing Rate Code EL20 / EL21 (kVa)
Customer Service Charge
$29.57 per Service Connection
Energy Charge
$0.0437 per kWh
Demand Charge
$12.35 per kW
Schedule No. 6 General Service - High Voltage
Billing Rate Code EL23/EL25
Customer Service Charge
Energy Charge
Demand Charge
$214.92 per Service Connection
$0.0347 per kWh
$13.95 per kW
1
Provo City Energy Department Rate Schedules
Effective July 1, 2015
Schedule No. 7
Private Outdoor Security Lighting (Not Metered) **Closed Rate**
Billing Rate Code(s): 1SL – 19SL
Light Fixture Type
Mercury Vapor Lamp
Schedule No. 8
Watts
125
175
250
400
750
High Pressure Sodium Vapor Lamps
70
150
Highway Lighting, Traffic and Other Signal System Service
Highway Lighting:
Billing Rate Code(s): EL7
Customer Service Charge
Energy Charge
Energy Charge
Energy Charge
Traffic and Other Signal Systems:
Billing Rate Code: EL5
Customer Service Charge
Energy Charge
Energy Charge
Energy Charge
Rate Per Month
Steel Pole
Wood Pole
n/a
n/a
$ 16.83
$ 13.60
$ 20.69
$ 16.83
$ 28.72
$ 24.85
n/a
n/a
$ 16.83
$ 12.97
$ 20.69
$ 16.83
$6.44 per Service Connection
$0.0860 per kWh per the first 500 kWh
$0.0999 per 501-1000 kWh
$0.1185 per all additional
$6.44 per Service Connection
$0.0860 per kWh per the first 500 kWh
$0.0999 per 501-1000 kWh
$0.1185 per all additional
Schedule No. 10 Temporary Service
Billing Rate Code EL13
Residential Schedule No. 1
Billing Rate Code EL10
Nonresidential Schedule No. 2
Schedule No. 11 Non-Residential – Non-Commercial Detached Buildings
Billing Rate Code: EL4
Customer Service Charge
Energy Charge
Energy Charge
Schedule No. 12
$15.34 per Service Connection
$0.0930 per kWh for the first 300 kWh
$0.1067 per kWh for all additional kWh
Private Outdoor Security Lighting (Not Metered)
Billing Rate Code(s): 1SL – 19SL
Light Fixture Type
High Pressure Sodium (HPS)
Metal Halide (MH)
Rate Per Month
Watts
Rate
150
$ 17.00
250
$ 20.50
400
$ 25.62
250
$ 20.86
400
$ 26.30
Light Emitting Diode (LED)
65
$ 26.65
35’ Wood Pole - $1385.00 up front cost or $118.57 for 12 monthly billings
25’ Steel Pole - $2055.00 up front cost or $175.93 for 12 monthly billings
Energy Only
100
150
200
250
400
1000
2
$ 3.26
$ 4.90
$ 6.53
$ 8.15
$13.05
$32.62
No Pole
$ 9.61
$ 11.20
n/a
n/a
$ 24.83
$ 6.06
$ 9.82
Provo City Energy Department Rate Schedules
Effective July 1, 2015
Schedule No. 20 Energy Cost Adjustment (ECA)
Due to volatile and unpredictable power costs, the Energy Department will determine an ECA approximately every 6 months, likely in
March and September of each year. The ECA is calculated to collect or refund the base power costs as calculated on cents per kWh
Basis. Prior to changing the ECA, notice will be given to the Administration and Municipal Council.
(See Rate Schedule 20 for exact formula to get the ECA)
Schedule No. 21 Telecom Debt Charge
Monthly Charge $5.351
Residential
Schedule No. 1
Commercial
Schedule No. 2
Schedule No. 3
Schedule No. 4
Schedule No. 10
Monthly Charge $10.00 + 2.3%
Industrial
Monthly Charge $2,000.00 +.34%
Schedule No. 6
1
A flat fee as required to generate the $268,000 rate amount after applying the rates above.
3
Download