Interworks EQ® Assembly Instructions 2041398 Revision C-11 Complete Series Master Packet Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Service. © 2011 Kimball International, Inc. T 800.482.1818 F 812.482.8300 System Assembly Instructions Interworks® EQ Page 1 of 1 Wall-Mount Connector Tools Required Tape Measure, Level, Wall Fasteners, Fastener Tools, two Panel Hinges (same height as Wall Mount), In-line Fill Cap for gap between Top Cap and Wall-Mount Connector Installation These instructions apply to installation of an Interworks Panel perpendicular to an existing wall. Wall fasteners are Installer’s responsibility, see below for fasteners specifications; Kimball does not assume responsibility for their use. To avoid leveling problems, identify high point of floor; adjust panel height to accommodate for the high point of the floor. Step 1 Step 2 Fasten Wall-Mount Connector • Level panel and put perpendicular to wall • Mark wall at top of side rail • Remove panel • Put wall-mount connector against wall mark, bottom should be at least 37⁄16" above floor Note: Fasteners are Installer’s responsibility. • Tack wall-mount connector through top hole Mark of Panel Side Rail Top • Level wall-mount Wall-Mount connector vertically Connector • Mark holes for fasteners at top, middle, and bottom • Attach to wall with appropriate fasteners Attach Panel • Remove panel top cap • Put panel against wall-mount connector • Make sure top of wall-mount connector and side rail align • Adjust glides for level • Fasten with two hinges Tip: Sometimes it helps to release side rail, install hinges, then engage the side rail. Hinges Step 3 Top Cap 3-7/16" Minimum Recommended Fasteners Dry Wall: Must be at least 5⁄8" thick. Use 3⁄16" hollow wall fasteners or 3⁄16" toggle bolts with countersunk flat head machine screws. Wood Studs: Must be nominal 2" x 4" size, on no more than 24" center with maximum height of 14 feet restrained at floor and ceiling. Use #10x2" countersunk flat head screws. Metal Studs: Must be “C” channel, 20 gauge, on no more than 24" center. Maximum height of 14 feet restrained at floor and ceiling. Use 3⁄16" hollow wall fasteners or 3⁄16" toggle bolts with countersunk flat head machine screws. Concrete: Use concrete wall anchors with #10x11⁄2" countersunk flat head machine screws. Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Service. Part No. 2041391 Revision B-07 T 800.482.1818 F 812.482.8300 In-line Fill Cap Printed in U.S.A. © 2007 Kimball International, Inc. Fill Cap • Insert in-line fill cap • Replace top cap Assembly Instructions Interworks® EQ Page 1 of 3 Panel Set Up and Panel to Panel Connection Tools Required Level, 1⁄2" Wrench or Channel Locks, Screwdriver Installation Important: Level panels throughout installation. If stackable panels are to be installed as well, please, review the Stackable Panel Assembly Instruction sheets first for preparation tips. Note: Installation must be in accordance with the National Electrical Code and local codes. Electrically interconnected panels need to be mechanically connected. These instructions apply to tackable acoustical, glass, and tackable sectional panel. Two people are recommended, start installation at panel intersection at high spot on the floor within layout. If panel configuration includes Traxx®-mounted or wall mounted panel, start installation with that panel. Step 1 There are two ways to create a 90° panel connection: Unpack Panels • Remove top cap (locate carpet gripper and cable tie) • Remove panel hinges and wireway covers Step 2 Hinge • With panels in a straight line • Adjust glides; panels must be level and aligned to each other • Connect panels by inserting one hinge Top Cap Panel Hinges Hinge Step 2 Alternate Open Hinge • With one hinge in panel side rail, open hinge 180° by running a non-marring object down the entire hinge/panel edge • Remove hinge from panel side rail Open Entire Length of Hinge Wireway Cover Closed Hinge (removed) Ali liggnm nmeent Clip Leveling Glide Hinge Opened to 180º Carpet Gripper (shipped under Top Cap) Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Service. Part No. 2041381 Revision E-09 Panel Side Rail (top view) Assembly Instructions Interworks EQ Page 2 of 3 Panel Set Up and Panel to Panel Connection, continued Step 3 Hinge/Alignment Clip • Swing wing panel beyond 90° • Insert alignment clip in stationary panel, gently tap with mallet, if needed • Pull wing panel back to 90°, engage alignment clip, gently tap with mallet Stationary Panel Panel Connection with Alignment Clip Usage Note: Alignment clips are required for panel stability Corner/L Alignment Clip Alignment Clip Straight 90º Stationary Panel Corner/L Wing Panel Wing Panel Corner/L Alignment Clip Step 3 Alternate Panels and Alignment Clip • Align two panels at 90° • Adjust glides to level panels • Insert alignment clip into both panels, gently tap with rubber mallet if needed • Fully insert hinge, double check levelness of panels Straight/T 4-Way 120º/3-Way 120º/V Corner/L Alignment Clip Hinge Step 4 Step 5 In-Line Straight Connection • Insert straight alignment clip • Adjust leveling glides Connect Panels • Fully insert panel hinges • Plumb/level panels • Install in-line and connector top caps • Install panel top caps • Once location of station is approved, install (1) carpet gripper per panel Panel Hinge Straight Alignment Clip Carpet Gripper Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Service. Part No. 2041381 Revision E-09 Assembly Instructions Interworks EQ Page 3 of 3 Side Rail Removal Tools Required Phillips Screwdriver Loosening Panel Side Rail Figure B • Remove end trim if installed. (Figure A.) • Remove side rail screws. (Figure B). • When re-installing side rail screws, do not over-torque or side rail may deform. (Figure C). Figure A Side Rail Screws End Trim Figure C Printed in U.S.A. © 2009 Kimball International, Inc. Over Torquing May Bow Side Rail T 800.482.1818 Frame F 812.482.8300 Side Rail Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Service. Part No. 2041381 Revision E-09 Assembly Instructions Interworks® EQ Page 1 of 2 Panels – Finish Channels Tools Required Flathead Screwdriver, Rubber Mallet (non-marring) Installation These instructions apply to installation of finish channels and top caps in the configurations shown. Finish channels are required at exposed junctions. It is easiest to install finish channels as adjacent panels are assembled. Top caps and base covers can be installed last. Vocabulary 3-Way (Hi-Lo) Corner Straight (Hi-Lo) 3-Way Corner 120º V Top Cap 90º 3-Way (Hi-Lo) C5 or C6 Finish Channel Base Covers Panel Connections and Alignment Clip Usage Note: Alignment clips are required for panel stability. Alignment clips fit into alignment brackets near the base of the panel. Corner/L Alignment Clip 4-Way (used in 3-way hi-lo configurations) Straight/T (used in 3-way configurations Corner/L (used in 90° applications) 120º/V Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Service. Part No. 2041392 Revision C-09 120º Assembly Instructions Interworks® EQ Page 2 of 2 Panels – Finish Channels, continued Step 1 Top-Down Method (if enough overhead room) • Slide finish channel into side rail grooves • Push down to alignment brackets/clip at the top of the wireway Note: Flex do NOT bend channel Snap-in Method–Corner or 120° Connections Only (if not enough overhead room) • Pivot panel inward to narrow the junction opening • Push into side rail grooves • Bend and push into opposite side rail • Push panels back to snap in finish channel Note: Do NOT bend channel horizontally Top Cap Finish Channel A Finish Channel B A B Step 2 Alignment Bracket Base Cover Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Service. Part No. 2041392 Revision C-09 Printed in U.S.A. © 2009 Kimball International, Inc. T 800.482.1818 F 812.482.8300 Base Covers • Insert one end of base cover into wireway cover • Pull opposite wireway cover outward • Push base cover in • Tap wireway cover into base cover slot Finishing • Install finish channel top caps • Replace necessary panel top caps and wire covers Assembly Instructions ® Interworks EQ Page 1 of 2 Supplemental Brackets and Spacer Tools Required Drill-drive, 1⁄4" Socket for self-tapping screws provided, 4" Extension Installation These instructions apply to installation of: Supplemental Brackets for the panel connections shown; Supplemental Bracket Spacer to compensate for depth difference between cable channels of a 10P Tackable Acoustical panel and 11P Models. Supplemental Bracket Supplemental Bracket and Spacer • Remove panel top cap, lift and rotate away from panel • Place supplemental bracket down into cable channel • Align panels • Use provided self-tapping screws to attach – 2 screws per each panel (For Difference in Cable Channel Depth) • Remove panel top cap, lift and rotate away from panel • Place supplemental bracket spacer into deeper cable channel • Place 1" from vertical wall, attach with supplied screws • Position supplemental bracket into cable channel • Align spacer bracket screw holes with supplemental bracket holes • Align panels • Use provided self-tapping screws to attach supplemental bracket to bracket spacer and panel – 2 screws per each panel Finishing • Replace panel top caps Finishing • Replace panel top caps Self-Tapping Screw Self-Tapping Screw Supplemental Bracket Spacer L Supplemental Bracket L Supplemental Bracket Interworks EQ Panels Interworks EQ 10P Tackable Acoustical Interworks EQ 11P Panels or 10P Sectional Panels 1" Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Service. Part No. 2041394 Revision D-10 Assembly Instructions ® Interworks EQ Page 2 of 2 Supplemental Brackets and Spacer (continued) Supplemental Bracket and Spacer (For Hinged Door Installation) • Remove top caps from door and adjacent panels. • Place a door shim in the top channel on each side of the door panel. Align end of shim with the verticle frame member of the door panel. Door shim is NOT screwed to the door panel top channel. • Place supplemental bracket spacer in the adjacent panel. Align end of spacer with the vertical frame member of the adjacent panel. • Use provided self-tapping screws to attach the spacer to top channel. • Position supplemental bracket into the top channel of each panel, aligning holes in the bracket with the holes in the spacer and door shim. • Use provided self-tapping screws to attach the bracket to the spacer in the adjacent panel and the top channel of the door panel. Finishing • Replace panel top caps Self-Tapping Screw L Supplemental Bracket Spacer Door Shim Door Panel Vocabulary L Bracket S Bracket T Bracket X Bracket 120º Y Bracket 120º V Bracket Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Service. Part No. 2041394 Revision D-10 Bracket Spacer Door Bracket Spacer Printed in U.S.A. © 2010 Kimball International, Inc. T 800.482.1818 F 812.482.8300 Adjacent Panel Assembly Instructions Interworks®EQ Page 1 of 1 Panels – Door Panels Tools Required Level, Screwdriver, 1⁄2" Wrench or Channel Locks, Drill-Driver, 1⁄4" Socket, 4" Extension Installation These instructions apply to Interworks EQ hinged doors. Two people are recommended for installation. Door knob must be installed into the door using manufacturer’s instructions. Doors cannot be placed adjacent to glass panels. Double check correct door hinge/swing has been specified: Right hinge, the door will swing away from you to the right. Left hinge, the door will swing away from you to the left. Step 1 Step 2 Door Panels • Install door knob, reference manufacturer’s instructions • Shut and lock door • Adjacent Panels must be level and have carpet grippers installed – if not, doors may not open and close properly • Connect door panel frame to adjacent panels (see Panel Set Up Instructions) • Level door frame – the reveal around perimeter of door should be even • Supplemental Brackets and Spacers MUST BE USED. (see Supplemental Brackets and Spacer Instructions, Reference No. 2041394) Recommended Hinged Door Configurations 18" wall-mounted panel Adjacent to Corner Supplemental Brkts & Spacers Supplemental Brkts & Spacers Left Hinge Door Adjacent to Three-Way/T Use “L” Bracket for all “L”, “X” and “T” Connections Right Hinge Door Structural Wall Threshold Turn to Lower Cover Turn to Secure Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Service. Part No. 2041388 Revision C-10 Printed in U.S.A. © 2010 Kimball International, Inc. • Lower threshold to floor, by adjusting lower hex nut secured to glide • Secure threshold position with upper hex nut • Snap cover over glide access area T 800.482.1818 F 812.482.8300 Step 3 Assembly Instructions Interworks® EQ Page 1 of 1 Panels – End Trim (Full and Hi-Lo) Tools Required Rubber Mallet (non-marring) Installation These instructions apply to installation of: End Trim required at ends of stackable panels, and at end of panel run. End Trim • Rest bottom of trim on: lower panel or alignment channel • Insert one side of trim into hinge channel • Compress trim, press into opposite hinge channel Hi-Lo End Trim Printed in U.S.A. © 2009 Kimball International, Inc. T 800.482.1818 F 812.482.8300 Full Height End Trim Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Service. Part No. 2041389 Revision C-09 System Assembly Instructions Interworks® EQ Page 1 of 1 TRAXX® Starter Kit Includes Wall-mount connector, 60" visual privacy tape, two spacers, weld nut(s) and Traxx screw(s) – two each for 66" and 80"H kits, one for 34" and 62" kits Tools Required Tape Measure, Phillips Screwdriver, Level, Wall Fasteners, Fastener Tools, two Panel Hinges (same height as kit), In-line Fill Cap for gap between Top Cap and Traxx Installation These instructions apply to installation of an Interworks EQ Panel perpendicular to installed Traxx. Attach kit to Traxx and/or wall at minimum of two points. Wall fasteners are Installer’s responsibility, see below for fasteners specifications. Kimball does not assume responsibility for their use. To avoid leveling problems, identify high point of floor; adjust panel height to accommodate for the high point of the floor. Step 1A Step 2 Traxx Attach Panel • Remove panel top cap • Put panel against wall-mount connector • Adjust glides for level • Fasten with two hinges Traxx WallMount Connector Hinges Weld Nut WallMount Connector Panels 66" or above Privacy Tape Step 3 In-line Fill Cap Step 1B For Panels 66" or higher with Traxx in upper and lower positions • Follow first four bulleted items in Step 1A • Fasten weld nut to upper Traxx Panels Less than 66" Top Cap Spacers 3-7/16" Minimum Recommended Fasteners Dry Wall: Must be at least 5⁄8" thick. Use 3⁄16" hollow wall fasteners or 3⁄16" toggle bolts with countersunk flat head machine screws. Wood Studs: Must be nominal 2" x 4" size, on no more than 24" center with maximum height of 14 feet restrained at floor and ceiling. Use #10x2" countersunk flat head screws. Metal Studs: Must be “C” channel, 20 gauge, on no more than 24" center. Maximum height of 14 feet restrained at floor and ceiling. Use 3⁄16" hollow wall fasteners or 3⁄16" toggle bolts with countersunk flat head machine screws. Concrete: Use concrete wall anchors with #10x11⁄2" countersunk flat head machine screws. Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Service. Part No. 2041390 Revision B-07 T 800.482.1818 F 812.482.8300 Fill Cap • Insert in-line fill cap • Replace top cap Printed in U.S.A. © 2007 Kimball International, Inc. Attach Wall-Mount Connector For panels less than 66" high or Traxx in lower position only • Attach wall-mount connector on Traxx so bottom of connector is at least 37⁄16" above floor • Cut and attach two strips of privacy tape (approx 281⁄2") to connector below Traxx • Level wall-mount connector vertically • Tighten weld nut • Insert fastener through bottom wall mount hole and two spacers Note: Wall fasteners are Installer’s responsibility. • Fasten to wall Assembly Instructions Interworks®EQ Page 1 of 3 Stackable Panel Tools Required Level, Screwgun with #2 Magnetic Phillips Bit (2 1⁄2" minimum long), 3⁄8" Socket or Wrench Installation For stackable panels two people are recommended. Base panel top cap will be moved on top of assembled stackable panel. In track of base panel, insert set of mounting brackets, (note proper orientation of brackets). Connection bolts join base panel and stackable panel securely. Step 1 Prep Support Panel • Remove top cap from base panel. • Remove panel hinges from stackable panel. (Detail A) • Use screwdriver to spread apart top channel and insert mounting brackets into channel. Center tab on bracket against inside edge of cable slot on channel frame. Fasten brackets to channel frame with screwgun and self tapping screws.(Detail B) Detail A Stackable Panel Hinges Connecting Bolts Detail B Self Tapping Screws Lower Mounting Bracket w/Threaded Insert Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Service. Part No. 2041383 Revision C-10 Lower Mounting Bracket w/Threaded Insert Assembly Instructions Interworks®EQ Page 2 of 3 Stackable Panel, continued Step 2 Step 3 Prep Stackable Panel Assembly • Remove tiles from stackable panel. - On fabric stackers, push tile up against top of J channel on stacker frame until bottom of tile clears lip of lower J channel. Tilt bottom of tile outward then pull down to remove it. - On glass stackers, remove the non-glass frame half as described above. Remove the glass frame half by first removing the screws from the retaining clips which secure the glass frame to the stacker frame. Remove the retaining clips, and then remove the glass frame half as described above. Install Stackable Panel Assembly • Lower stacker assembly onto the base panel. The round tubes from the stacker panel go into the vertical tubes of the base frame. Lower both sides of the stacker panel simultaneously to prevent binding. • Insert connection bolt through holes in bottom cross-member of stackable panel, and fasten into lower mounting bracket installed previously in Step 1. • Tighten connection bolt. Do not overtighten. Stop when bottom cross-member begins to deform. Connecting Bolts Remove screws from retaining clips Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Service. Part No. 2041383 Revision C-10 Assembly Instructions Interworks®EQ Page 3 of 3 Stackable Panel, continued Step 4 Step 5 Reinstall Hinges Note: If stackable panel will be loaded on one side, go to Step 5. • After stackable panels are installed on base panel install panel hinges between stackable panels. • Replace panel top caps. Stiffener Bracket • Cut 10" from base panel hinges (cut must be straight and level). • Install shortened hinges into base panels. • Install stiffener bracket into stackable panels and base panels. • Replace panel top caps. Stackable Panel Hinges Stiffener Bracket Stackable Panels Stackable Panel (loaded on one side) Base Panels Base Panels Cut 10" from Hinges Printed in U.S.A. © 2010 Kimball International, Inc. T 800.482.1818 F 812.482.8300 Base Panel Hinges Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Service. Part No. 2041383 Revision C-10 Assembly Instructions Interworks®EQ Page 1 of 1 Sectional Panel Tiles, Top Cap and Wireway Cover Tools Required Level, Screw Gun Installation Tile instructions apply to sectional panels. Two people are recommended, start installation with bottom tiles and work upwards. Communication hardware and receptacles must be installed. Top cap and base wireway instructions apply to tackable acoustical, glass and sectional panels. To remove tiles, reverse step order. Step 1 Step 2 Install Sectional Tiles • Start with bottom tiles and work up • Insert top edge of tile into upper “J” channel on frame • Rotate bottom of tile flat against panel frame • Slide tile downward until completely seated in lower “J” channel Glass Tiles • Tile half with glass: insert top edge into top “J” channel • Insert retention clip (one per vertical edge) between glass frame and panel vertical, rotate, fasten with screw (provided) • Tile without glass: Same as Step 1 Glass Tile (half w/glass) Retention Clip: (insert, rotate, fasten) Self-Tapping Screw (provided) Glass Tile (half without glass) Step 3 T 800.482.1818 Top Cap Connector Step 4 Base-Wireway Cover Bracket Base-Wireway Cover • Engage slot in wireway cover to bottom of bracket • Lift up on wireway cover and press up over top of bracket Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Service. Part No. 2041382 Revision B-09 Bracket Base Wireway Cover Slot Printed in U.S.A. © 2009 Kimball International, Inc. Mid-Wireway Cover Install Top Cap and Connector • Insert connectors at panel-to-panel connections • Install top caps F 812.482.8300 Fabric Tile System Assembly Instructions Interworks® EQ Page 1 of 1 Privacy Panel Tools Required Level, Pencil Kit Includes Privacy Panel, Attachment Bracket, Double-sided Tape, Caster, Pivot Bracket with Carpet Gripper Installation These instructions apply to installation of a Privacy Panel. You can install the Privacy Panel at any point across the face of an Interworks EQ Panel. Step 1 Step 2A Pivot Bracket and Caster • If necessary for installation on non-carpeted floor, pry carpet gripper out of pivot bracket • Replace with double-stick tape • Insert pivot bracket and caster into bottom of privacy panel • Seat firmly Attachment Bracket • Stand privacy panel against panel • Mark edge-width on top cap • Remove top cap • Cut double-sided tape to width of mark Top Cap Step 2B • Fold tape lengthwise, stick to inside and outside of top cap • Remove backing • Press attachment bracket firmly onto tape Caster Pivot Bracket Double Stick Tape Double-sided Tape Carpet Gripper Top Cap Step 4 Level Privacy Panel • Adjust position of pivot bracket and caster to level the privacy panel • Level in open and closed positions • When leveled, press down to anchor pivot bracket Pivot Bracket Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Service. Part No. 2041393 Revision B-07 F 812.482.8300 Attachment Bracket T 800.482.1818 Attach to Panel • Insert attachment bracket into privacy panel on the pivot bracket side • Replace top cap onto panel Attachment Bracket Printed in U.S.A. © 2007 Kimball International, Inc. Step 3 Privacy Panel Top Cap Assembly Instructions Interworks® EQ Page 1 of 1 Power Entries: Side, End, Corner and Straight Tools Required Screwdriver, Rubber Mallet Installation Base power is available in side, end, corner and straight options to bring power to panel. Installation process will vary depending on panel configuration and electrical requirements. End, corner and straight power entries procedures are similar, end one is shown. Connect to power source in compliance with all local and national electrical codes. Note: Installation must be in accordance with the National Electrical Code and local codes. Electrically interconnected panels need to be mechanically connected. This system may be connected to more than one source of supply. No single circuit may be powered by more than one source. Do not interconnect system electrical power from different feed units. Be certain all sources are disconnected prior to any servicing. Step 2 End/Corner/Straight Base Power Entry • Insert power entry into PDA, listen for snap making sure it is seated firmly • Install base-wireway cover • Install power entry cover PDA Step 1 Side Base Power Entry • Determine proper orientation of conduit • Remove proper receptacle knockout on base-wireway cover • If data/communication is to be installed, remove knockouts • Insert module base into power distribution assembly (PDA) listen for snap making sure it is seated firmly Note: Occupies one receptacle location • Install base-wireway cover • Insert conduit plug through knockout and engage in module-base • Install power entry cover Field Cut End Trim to top of Wireway Plate for Base Power Entry Module Base PDA End/Corner/Straight Power Entry Power Entry Cover Power Entry Cover A A Receptacle Knockout Conduit Plug Receptacle Knockout Data Port Knockout B Data Port Knockout Install Wireway Cover • Engage slot in wireway cover to bracket • Press wireway cover up over bracket Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Service. Part No. 2041386 Revision C-09 Bracket Base Wireway Cover Slot T 800.482.1818 Receptacle and Data Port Knockouts • Reference layout for receptacle and data access locations • Firmly tap edges of knockout (A) • Rotate knockout until free (B) B Printed in U.S.A. © 2009 Kimball International, Inc. Step 3 F 812.482.8300 Conduit Assembly Instructions Interworks®EQ Page 1 of 2 Power Distribution and Receptacles Tools Required Level, Screwdriver, Rubber Mallet Installation Sectional panel shown with tiles removed for clarity. Instructions apply to both tackable acoustical panels and sectional panels. Important: Check to make sure panel run is level, prior to base wireway installation. Note: Installation must be in accordance with the National Electrical Code and local codes. Electrically interconnected panels need to be mechanically connected. Step 1 Step 2 Remove Wireway Covers • Bottom Wireway - Grasp covers and firmly pull free • Mid Wireway - Slide tile up against top rail, tilt bottom out, then pull down • Re-install after all powerand data installations Power Distribution Assembly (PDA), Receptacles • Insert PDA alignment clip, listen for snap making sure that it is seated firmly, repeat at other end • Slide receptacle firmly into PDA, listen for snap making sure that it is seated firmly Frame Slot Power Distribution Assembly (PDA) Receptacle Face Plates (Taped to inside of Mid-Wireway Cover) PDA Alignment Clip Mid-Wireway Cover Paint Hanger Holes on Bottom Power Distribution Assembly (PDA) Receptacle Knockout Receptacle Base-Wireway Cover Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Service. Part No. 2041384 Revision D-10 Receptacle Assembly Instructions Interworks®EQ Page 2 of 2 Power Distribution and Receptacles (continued) Step 3 Step 4 Receptacle Face Plates (Mid-Wireway Only) • Remove receptacle face plates taped to inside of metal mid-wireway tiles • Place face plates on receptacles Receptacle and Data Port Knockouts • Reference layout for receptacle and data access locations • Firmly tap edges of knockout (A) • Rotate knockout until free (B) B Face Plate (Taped to inside of Mid-Wireway Cover) A A Receptacle Receptacle Knockout Data Port Knockout B Mid-Wireway Cover Re-Install Wireway Cover • Engage slot in wireway cover to bracket • Press wireway cover up over bracket Bracket Base Wireway Cover Slot Printed in U.S.A. © 2010 Kimball International, Inc. T 800.482.1818 F 812.482.8300 Re-Install Metal Tile • 2 Holes on edge of tile go on bottom Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Service. Part No. 2041384 Revision D-10 Systems Assembly Instructions Interworks® EQ Page 1 of 1 Shared Neutral Wiring Diagrams NOTE: Provide these wire diagrams to the electrical contractor. 120/208V WYE 3 PHASE 8-10 Shared Neutral Interworks EQ: 3 and 1 Configuration 8-Wire: Receptacles; 1; 2; 3; 4 ▲ Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Service. Part No. 2041401 Revision A-07 Printed in U.S.A. © 2007 Kimball International, Inc. 120/240V 1 PHASE 8-10 Shared Neutral Interworks EQ: 2 and 1 Configuration 8-Wire: Receptacles; 1; 3; 4 ▲ T 800.482.1818 F 812.482.8300 120/208V WYE 3 PHASE 8-10 Shared Neutral Interworks EQ: 2 and 2 Configuration 8-Wire: Receptacles; 1; 2; 3 ▲ ; 4 ▲ Assembly Instructions Interworks EQ ® 1 Panel-to Panel Jumper Cable and Transitional Jumper Cable Tools Required None Installation Note: Installation must be in accordance with the National Electrical Code and local codes. Electrically interconnected panels need to be mechanically connected. Jumper cables are used to pass power from panel-to-panel at panel base. Installation process will vary depending on panel configuration and electrical requirements. Replace wireway covers after all receptacles and power entries are installed. Connect to power source in compliance with all local electrical codes. Note: Power cannot be passed from panel-to-panel at the midwireway. Step 1 Panel to Panel Adjacent Step 2 Transitional Jumper Cable Previous 6 wire to 8 wire Previous 4 wire to 8 wire Insert jumper cable into power distribution assembly (PDA) with arrow pointed up listening for snap to make sure it is seated firmly Repeat with adjacent Interworks EQ panel Insert Interworks EQ end of jumper cable into PDA with arrow pointed up listening for snap to make sure it is seated firmly Insert previous system end of jumper into harness block Figure A Figure B Panel-to- Panel (10PEJA) Panel-to -Post -to -Panel (10PEJB) Corner (10PEJC) Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Care. 2041385, Revision C Assembly Instructions Interworks® EQ Page 1 of 3 Ceiling Power Entry and Power/Data Pole Tools Required Phillips-Head Screwdriver, Tape Measure, Drill and Bits, Hammer and Punch, Level, Ladder, Hacksaw, Utility Knife Installation These instructions apply to installation of: data channels to route wiring vertically between adjacent panels; power/data poles to route wiring from ceiling to panel run; connect power harness to power source in compliance with all local electrical codes. Note: Installation must be in accordance with the National Electrical Code and local codes. Electrically interconnected panels need to be mechanically connected. This system may be connected to more than one source of supply. No single circuit may be powered by more than one source. Do not interconnect system electrical power from different feed units. Be certain all sources are disconnected prior to any servicing. Vocabulary 1 Ceiling Power Entry Harness Power/Communications Pole Junction Box Ceiling Plates Power Harness (hardwired end) Upper Channel and Cover Data Channel Data Channel Top Cap Lower Channel and Cover Split Panel Hinge Data Channel and Cover Split Panel Hinge Power Harness (connector end) Base Cover Base Cover Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Service. Part No. 2041387 Revision B-08 Assembly Instructions Interworks® EQ Page 2 of 3 Ceiling Power Entry and Power/Data Pole, continued Step 1 Step 2 Shim Panel Hinge • Take one hinge that matches height of tallest panel in junction • Use utility knife to split hinge down middle • Slide hinge halves into open side rail slots • Install plastic alignment clip to connect panels at the base Open Knockouts • Put channel or pole into junction to measure where communication knockouts are needed • Open knockouts Remove Knockouts for Communication Routing Split Hinge Utility Knife Split Hinge Step 3 Step 4 Step 5 Cut Ceiling Tile (Pole Only) • Put pole against side rail and push up to ceiling • Level vertically • Mark ceiling tile and cut at mark Fasten Channel / Pole • Push the channel or pole down to sit on alignment clip • Fasten to side rail with provided #8-32 x 3⁄8" screws Fasten Upper Channel of Data Pole • If needed, trim top of channel for 5" minimum overhead clearance • Put bottom ceiling plate over upper channel • Push upper channel through ceiling tile hole • Place upper channel sleeve into lower channel Min. 5" Clearance Ceiling Tile Hole in Ceiling Tile Upper Channel Lower Channel Plastic Alignment Clip Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Service. Part No. 2041387 Revision B-08 Bottom Ceiling Plate Assembly Instructions Interworks® EQ Page 3 of 3 Ceiling Power Entry and Power/Data Pole, continued Step 6 Step 7 Power Harness (Top) • Above ceiling tile, put top ceiling plate over data pole • Align top and bottom ceiling plates, fasten with two #8 x 11⁄2" screws • Attach junction box to top of pole • Feed power harness through top of pole • Attach power harness to junction box • Fasten harness with hold-down clamps • Trim upper channel cover to length if needed, put through ceiling tile and snap into pole Power Harness (Bottom) • Fasten power harness into PDA (power distribution assembly) • Snap lower channel cover into pole • Install base cover plate Lower Channel Junction Box Power Harness (hardwired end) Top Ceiling Plate Bottom Ceiling Plate Upper Channel Power/Data Pole PDA Base Cover Plate Hold Down Clamp Power Harness Channel Cover Vocabulary 2 Corner/L In-Line Power/Communication Poles 3-Way 4-Way Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Service. Part No. 2041387 Revision B-08 Corner End Printed in U.S.A. © 2008 Kimball International, Inc. 3-Way T 800.482.1818 F 812.482.8300 Communication Channels Assembly Instructions Interworks® EQ Page 1 of 2 Chicago – Compliant Electrical Power Tools Required Drill-driver with #2 Phillips bit, Flathead screwdriver, Punch, necessary tools and testing equipment for connecting Interworks system to an original power source, Interworks Raceway Removal Tool (no charge – contact Customer Care team to order) Hardware Available (see drawing on right) Interworks Panels with Chicago Power Option: • Internal raceway with raceway covers modified to access Leviton style plugs Chicago Junction Box (J-Box): • Two-part J-box with two end caps (for end feed) • Eight #8-32 Phillips flathead undercut self-tapping screws Chicago Side Feed Plate: • Four side feed plates (use with Chicago junction box) J-Box Electrical Hardware Required Electrical installer must supply the following materials: • Electrical wire, 12 AWG copper, color-coded for circuits and grounding • 1⁄2" conduit, international metal hose AFS 1⁄2" trade size or equivalent • 1⁄2" connectors • Duplex receptacles, Leviton “Décor” #5325-1 or equivalent Internal Raceway (shipped assembled to panel) End Cap Side Feed Plate End Cap General Information Install Chicago-code electrical systems after the panel installation is complete. • Interworks panels with Chicago Power Option accept the Chicago Junction Box (J-box) Specify this J-box separately to allow necessary hardwiring of Chicago-code electrical components • The installer must read, understand, and adhere to these instructions and all appropriate electrical guidelines • Electrical system MUST be hardwired by an electrical contractor licensed by the City of Chicago • Hardware supplied by electrician MUST be U.L. listed • Electrical duplexes CANNOT be installed back-to-back Note: Installation must be in accordance with the National Electrical Code and local codes. Electrically interconnected panels need to be mechanically connected. Step 1 Remove Raceway Cover • Insert raceway removal tool into hole at top of cover • Lift up to release cover lock, repeat at other end of cover • Hold tool in lock-release position and pull top of cover away from panel Raceway Removal Tool Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Service. Part No. 2041395 Revision B-08 Assembly Instructions Interworks® EQ Page 2 of 2 Chicago – Compliant Electrical Power, continued Step 2 Step 3 Install Power In-Feed • According to electrical plan, decide how many power feeds the installation requires • Connect power entry points, one for each group of stations, with no more than ten (10) duplex receptacles per circuit • Remove knockouts to allow for in-feed of conduit: • For end-feed power, remove knockout(s) in J-box end cap(s) • For side-feed power, specify Chicago side feed plate(s) and remove knockouts • Install each half of the J-box onto the panel electrical raceway with screws provided • Install power entry conduit through knockout in end cap or side feed plate Install Chicago J-Boxes and Receptacles Panels specified with the Chicago power option have an internal raceway that accepts the Chicago junction box (J-box) Note: Electrician must provide Leviton receptacles (or equivalent) DO NOT install receptacles back-to-back • Install into rectangular knockouts provided in face of J-box so that plug faces outward, hardwire the receptacles using screws supplied with the duplexes • Install each half of the junction box onto the panel electrical raceway with screws provided • To continue hardwiring to the next panel, install 1⁄2" appliance flex jumper conduit and wire from the end cap to the end cap in the next panel PRIOR TO ENERGIZING: test the system for its ability to withstand dielectric voltage (high potential) per U.L. 1286, text #33 • Replace Raceway covers Internal Raceway (shipped assembled to panel) J-Box End Cap Internal Raceway (shipped assembled to panel) J-Box End Cap End Cap Side Feed Plate End Cap Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Service. Part No. 2041395 Revision B-08 T 800.482.1818 End Cap Printed in U.S.A. © 2008 Kimball International, Inc. Internal Raceway (shipped assembled to panel) J-Box F 812.482.8300 Conduit (hardwired to next panel) Assembly Instructions Interworks® EQ Page 1 of 2 New York City – Compliant Electrical Power Tools Required Phillips-Head Screwdriver with #2 bit, Flathead Screwdriver, Rubber Mallet, Punch, Wire Cutters, 12-Gauge Wire Nuts, necessary tools and testing equipment for connecting Interworks system to an original power source, Interworks Raceway Removal Tool (no charge – contact Customer Care team to order) Hardware Supplied (see drawing on right) • Electrical cable/harness to match power option specified • Internal raceway with junction boxes • Cover plate and end caps • Two raceway covers, one with power knock-out Internal Raceway Electrical Hardware Required Electrical installer must supply the following materials: • 3⁄4" O.D. x 18" long liquid tight flex conduit • Electrical wire, 12 AWG copper, color-coded for circuits and grounding • 1⁄2" conduit, international metal hose AFS 1⁄2" trade size or equivalent • 1⁄2" connectors General Information New York-compliant electrical power can be added under these conditions: • Use only the New York Retrofit Kit • Only Interworks EQ non-powered in-feed panels can accept the retrofit kit • Available in 30"W – 60"W panels only • Mid-height access not available • Installer must read, understand, and adhere to all appropriate electrical guidelines If you have questions concerning these instructions, please call Customer Care team • A licensed, approved electrician must perform installation End Cap J-Box Cover Plate Knockout Raceway Cover Jumper Cable Cautions • Installation must be in accordance with the National Electrical Code and local codes. • Disconnect ALL power to panels prior to servicing or installation, including removal of raceway cover. • Electrically interconnected panels need to be mechanically connected. • DO NOT interconnect panels powered from different feed units – this can cause shock and fire hazard. • This panel system may connect to more than one source of power supply. • No single circuit may be powered by more than one source. • A licensed, approved electrician must perform installation. Step 1 Step 2 Remove Wireway Cover of Non-Powered Panel Remove Existing Wireway Brackets • Remove wireway brackets from in-feed panel Wireway Bracket Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Service. Part No. 2041396 Revision B-08 Assembly Instructions Interworks® EQ Page 2 of 2 New York City – Compliant Electrical Power, continued Step 3 Step 4 Assemble Retrofit Raceway • Decide which raceway side will receive power in-feed • Attach cover plate to J-box on side that will receive in-feed • Install J-boxes and end caps into retrofit raceway kit • Install assembled retrofit raceway onto panel Electrical Junction to Infeed Panel • Insert the 3⁄4" liquid-tight conduit through raceway cover that has knockout (customer supplied) • Install conduit into J-box (couplers not provided), tighten fitting • Insert jumper cable through end cap and into J-box • Splice conduit wires to matching jumper cable wires (wire nuts not provided) • Connect to power distribution assemblies (PDAs) and jumper cables in remaining panels • Replace raceway covers Splice inside J-Box Internal Raceway End Cap Conduit J-Box Cover Plate Electrical Testing • BEFORE CONNECTING to building electrical power: • Determine which power option is to be installed – 3 and 1 or 2 and 2 • Test the system for its ability to withstand dielectric-voltage (high-potential) per U.L. 1286 Test #33 • Connect power input cables to power source in compliance with power option and all applicable electrical codes • Test the entire system for proper operation 3 and 1 (8-wire) 1 3 1 4 5 4 4 Hot 1 Hot 4 Hot 2 Hot NEU 2 Hot 5 Hot 3 Hot GRD NEU NEU GRD GRD GRD Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Service. Part No. 2041396 Revision B-08 2 1 Hot NEU Raceway Removal Tool 2 2 and 2 (8-wire) T 800.482.1818 Step 6 Remove Raceway Cover, if necessary, once installed • Insert raceway removal tool into hole at top of cover • Lift up to release cover lock, repeat at other end of cover • Hold tool in lock-release position and pull top of cover away from panel Printed in U.S.A. © 2008 Kimball International, Inc. Step 5 F 812.482.8300 Jumper Cable Assembly Instructions Interworks EQ Interworks EQ® Panel Tackboard Page 1 of 1 Figure A Tools Required ■ Phillips Screwdriver Package Contents ■ Tackboard with attached tracks ■ ■ 4 Hook Brackets 4 1⁄2" Phillips Head Screws Panel Tackboard Installation 3. 4. Hook bracket F 812.482.8300 2. Figure B Printed in U.S.A. © 2008 Kimball International, Inc. Figure C T 800.482.1818 1. Note: These instructions provide the basic information to install a panel tackboard onto Interworks panels. (Figure A). Tackboard can be equal to or greater than the width of the panel(s) onto which it will be installed. One person can perform all operations. Note: Panels must be properly installed and level prior to installation of tackboard. Turn tackboard face down. Locate two parallel tracks running the length of the component. Insert one hook bracket into each end of track, hooks to the outside and pointing down. (Figure B). Slide hook brackets into desired location along track to correspond to panel side rails and anchor with four 1⁄2" Phillips head screws provided if using full width. (Figure C). Insert into panel side rails at desired location. Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Service. Part No. 1741490 Revision E-08 Systems Assembly Instructions Footprint® Transaction Counter on Interworks® EQ Page 1 of 1 Figure A Tools Required Variable Speed Drill #2 Phillips Tip Bit Package Contents #10 x 1" Phillips Panhead Screws General Information ■ ■ ■ ■ ■ Counter Bracket, right Transaction counter width must equal panel width. Two sets of left and right handed support brackets are included with each counter top. One person can perform all operations. Panels and finish channels must be properly installed, squared and leveled prior to counter top installation. Route all communications prior to installing counter. Figure B Installation 1. Locate position where counter top will be installed into panel. Insert each set of left and right handed support brackets into top slot of panel side rail. (Figure A). Note: Panel top cap is not removed. All panel finish trim should already be installed. 2. Lay counter top onto brackets and center top approximately 6 1⁄2" overhang on either side of top. 3. Secure with #10 x 1" screws provided, two screws per bracket. F 812.482.8300 ■ Counter Bracket, left Transaction Counter 6 1⁄2" 6 1⁄2" Overhang each side Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Service. Part No. 1567904 Revision D-07 T 800.482.1818 ■ Printed in U.S.A. © 2007 Kimball International, Inc. ■ Assembly Instructions Footprint® Page 1 of 2 Bevel Profile Overhead Storage To Interworks® EQ Panels Figure A Lock Clip Tools Required ■ ■ Tape Measure Drill with #2 Phillips Bit ■ Rubber Mallet Right General Information ■ These instructions provide the basic information to install bevel profile overhead storage units onto Interworks EQ panels. ■ For ganging two side-by-side units, contact Customer Care. One person can perform installation, although for larger units, two persons are recommended. ■ Left Figure B Installation Units hang on the Interworks EQ panel via vertical hook brackets, which are part of the unit's side walls. A lock clip (designed for use with bevel profile overhead storage only) helps prevent unintentional removal from the panel. 1. Locate lock clip installed in upper rear corner of unit. Remove and reposition so unnotched flange aligns with second hook in rear bracket. (Figure A). 2. Determine vertical position at which unit will be located: - Panels feature a resilient, black slot mask which is pushed aside during bracket installation. - When hanging bevel profile overhead storage and shelf side-by-side, units look best when bottom edges are flush. Tip: To make top of overhead flush with top of panel, hang unit in uppermost side rail slot. 3. Insert hooks along rear left and right sides of unit into panel side rail slots at desired height. (Figure B). ■ Bevel profile units mount to Interworks EQ panel via vertical hook brackets at rear of unit (indicated by grey lines) Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Service. Part No. 1699144 Revision G-08 Assembly Instructions Footprint Installation (continued) “Ganging” Two Side-by-Side Units Page 2 of 2 Figure C 1. Locate pre-drilled holes. A support clip is required to balance load and for even spacing between units. Contact Customer Care to order. 1. Locate pre-drilled holes under units and ensure they are aligned. (Figure C). 2. Secure support clip using two #10x¹⁄₂" Phillips panhead screws provided. ■ Support Clip Printed in U.S.A. © 2008 Kimball International, Inc. T 800.482.1818 F 812.482.8300 2. Secure Support Clip with screws. Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Service. Part No. 1699144 Revision G-08 Systems Assembly Instructions Footprint® Page 1 of 2 Bevel Profile Half Height and Full Height Shelf To Interworks® EQ Panels Tools Required ■ ■ Tape Measure Drill with #2 Phillips Bit Full Height Shelf Only: 7. Lay unit flat with hooks of side walls facing you. Slide bookstop so bottom area (multiple holes) lines up with holes in back of shelf. Slot holes in top flange should slide over L-bracket, which are mounted on the side walls. Screw bookstop to back of shelf and to side wall L-brackets. Figure A ■ Rubber Mallet Right side wall Right side wall Bookstop General Information ■ ■ These instructions provide the basic information to assemble and install bevel profile half height and full height shelves onto Interworks EQ panels. One person is required to assemble units up to 48"W. For 54"W and larger units, two persons are recommended. Shelf Shelf Left side wall Full Height Shelf Left side wall Half Height Shelf Installation ■ 1. 2. 3. 4. 5. 6. Shelves are shipped Ready-to-Assemble (RTA) in four parts: shelf, left side wall, right side wall and bookstop. (Figure A). Lay right side wall on ground, rear attachment brackets/hooks facing toward you. (Figure B). Note: Flange on the inside of the side wall contains two assembly holes and a rounded tab. Position shelf perpendicular to side wall. Note: The underside of shelf contains a flange with holes and a square cutout corresponding to side wall holes and tab location. Align tab in side wall flange to square cutout in underside of shelf. Slide the side wall onto the shelf so tab disappears and flanges are even. Tap front of shelf gently with rubber mallet until holes in flanges are aligned. Repeat assembly for left side wall. Screw side wall to shelf using two screws provided, one per side. Note: An additional hole is provided for “ganging” two side-by-side units together. If you do not plan to gang the shelf to another unit, you may opt to further secure shelf using additional screws provided. (Figure B). Figure B Shelf Side wall Hole used for “ganging” Right side shown 1. Slide tab in flange of side wall into corresponding knockout in shelf. 2. Align holes and secure with screws provided. Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Service. Part No. 1699148 Revision B-07 Systems Assembly Instructions Footprint Installation (continued) Page 2 of 2 Figure D To Interworks EQ Panel Units hang on the Interworks EQ panel via vertical hook brackets, which are part of the unit’s side walls. 1. Determine vertical position at which unit will be located: - Panels feature a resilient, black slot mask which is pushed aside during bracket installation. - When hanging overhead storage and shelf side-by-side, units look best when bottom edges are flush. Tip: To make top of overhead flush with top of panel, hang unit in second slot from top of Interworks panel. 2. Insert hooks along rear left and right sides of unit into panel side rail slots at desired height. (Figure C). ■ 1. Locate pre-drilled holes. Ganging Bracket “Ganging” Two Side-by-Side Units A ganging bracket, specified separately, is required to balance load and for even spacing between units. 1. Locate pre-drilled holes under units and ensure they are aligned. (Figure D). 2. Secure ganging bracket using two #10x 1⁄2" Phillips panhead screws provided. ■ 2. Secure Ganging Bracket with screws. Full Height Shelf illustrated Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Service. Part No. 1699148 Revision B-07 Printed in U.S.A. © 2007 Kimball International, Inc. T 800.482.1818 F 812.482.8300 Figure C Systems Assembly Instructions Footprint® Page 1 of 3 Installing Cetra®/Interworks® EQ Panel Attachment Brackets to Lunar Overheads Figure A Tools Required ■ ■ #2 Phillips Screwdriver 1 ⁄4 " or 3⁄8 " Socket Driver ⁄16 " Hex Socket ⁄16 " Open End Wrench ■ 7 ■ 7 Package Contents ■ Cetra/Interworks EQ Panel Attachment Bracket (LH) ■ Cetra/Interworks EQ Panel Attachment Bracket (RH) ■ Doubler Bracket ■ 1 ⁄4 " Bolt, washer and nut Note: This instruction covers installation of panel attachment brackets to Lunar overheads that will be mounted on Cetra or Interworks EQ panels. All operations to assemble the bracketry can be done by one person, but it is recommended that a two person team assemble and install the units to the panel system. Important: Reference the assembly instruction “Lunar Overhead Storage, Flipper Door Cabinet” for assembly of the Lunar Overhead. The units are assembled in the inverted position. Moving the units without the bracketry attached can cause damage, therefore all bracketry in this instruction is installed with the overhead unit in the inverted position. 1. The assembled overhead unit is in the inverted position. (Figure A). 2. For Lunar overhead to be mounted on Cetra panel: The hook-type attachment brackets are right-handed and left-handed. The flange sides with the hooks orient toward the outer end of the overhead. Additionally, the doubler bracket mounts over the inboard face of the main bracket. The elongated end hook (rhino horn) is oriented towards the top of the case. All brackets are attached using ¹⁄₄" bolts, nuts, and washers. Take note of location of mounting holes and attach bracket and doubler bracket to unit as shown using three (3) bolts, three (3) washers, and three (3) nuts per bracket. Loosely secure the fasteners. (Figure B). Figure B Bottom Shelf Panel Attachment Bracket Doubler Bracket (Cetra only) Top Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Service. Part No. 1699194 Revision B-07 Rhino Horn Systems Assembly Instructions Footprint Page 2 of 3 Installation Figure C 3. Slide the attachment bracket OUTWARD to the extent of the slots. Slide the doubler bracket towards the top of the case. Hold brackets in position and tighten all fasteners securely. (Figure C). 4. Repeat Steps 2 and 3 to attach brackets to the opposite end of the case. (Figure D). 5. For Lunar overhead to be mounted on Interworks panel: Follow Step 2 but DO NOT attach the doubler bracket. 6. Slide the attachment bracket INWARD to the extent of the slots. Hold bracket in position and tighten all fasteners securely. (Figure E). Remember: Doubler brackets are NOT USED for Interworks panel mount. 7. Repeat Steps 5 and 6 to attach bracket to the opposite end of the case. Slide Attachment Bracket outward to extent of slots Slide Doubler Bracket towards top as far as possible Top Figure D Figure E Bottom Shelf Panel Attachment Bracket For Cetra, brackets mount at outer extent of slots Doubler Bracket (Cetra only) Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Service. Part No. 1699194 Revision B-07 For Interworks, brackets mount at inner extent of slots Systems Assembly Instructions Footprint Installation Page 3 of 3 Figure F Panel slots Figure G Printed in U.S.A. © 2007 Kimball International, Inc. T 800.482.1818 F 812.482.8300 8. To mount completed unit to Cetra: Carefully turn unit upright. It is recommended that two persons be used to lift the unit to its final position. Lift unit and tilt slightly backwards. Engage rhino hooks on attachment brackets into vertical panel slots on Cetra panel. Rotate unit down, making sure all other hooks on attachment brackets engage panel slots. Press down on unit to lock all hooks into position. (Figure F). 9. To mount completed unit to Interworks EQ: Carefully turn unit upright. It is recommended that two persons be used to lift the unit to its final position. Lift unit and tilt slightly backwards. Engage rhino hooks on attachment brackets into vertical panel slots on Interworks panel. Significant pressure may be required to install unit as a rubber slot mask is being forced aside with the action of the hooks going into the slots. Rotate unit down, making sure all other hooks on attachment brackets engage panel slots. Press down on unit to lock all hooks into panel. (Figure G). Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Service. Part No. 1699194 Revision B-07 Assembly Instructions Footprint Support ® Interworks EQ® Panel Mounted Worksurface 1 Figure C Tools Required Tape Measure Drill with torque option #2 Philips head bit #2 R-2 square screwdriver bit Installation Note: Panel mounted worksurface brackets are provided in two types, left or right. (Figures A & B). The top of the brackets should be located 22 3/4 " from the top of the wireway cover for standard height and 19 3/4" for typing height. (Figure C). 1. Insert hook on the top of bracket into the panel frame slot at a 45° angle. (Figure D). 2. Push the top of the bracket downward allowing locking tab to engage in the panel slot. (Figure E). 3. Install a bracket at each panel joint in the worksurface layout. Note: When installing the worksurface brackets along the center, you must alternate left brackets and right brackets to prevent a shortage of brackets. (Figure F). If you run short of either left or right brackets, refer to alternate installation diagram. (Figure G). Note: A structural cantilever must be used in place of the standard worksurface brackets when the open kneespace is greater than 48" for 1 3/16" surfaces and 60" for 1 9/16" surFigure A Left Figure D Figure F Figure B Right Figure G Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Care. 1847179, Revision D Figure E Assembly Instructions Footprint Support ® Interworks EQ® Panel Mounted Worksurface 2 Figure J Installation (continued) 4. Place worksurface on clean, solid surface, back side facing up. Install the flat brackets on the "main" worksurface, approximately 2" from front edge and approximately 6" from back edge of the adjoining worksurface using the screws provided. (Figure H). Ensure that the flat bracket attachment does not interfere with other brackets or components. Two flat brackets are required to join surfaces end to end or at a right angle. 5. Square all panels to aid in alignment and consistent reveals between worksurfaces and panels. (Figure I). 6. Lay the worksurface on the brackets. (Figure J). Tip: Use an undersurface component as additional support until the worksurface bracket is secured to the surface. 7. Lay adjoining worksurface onto brackets. Note: When attaching two surfaces at a right angle, there will be a 1/8" gap between the wire manager and panel. (Figure K). If there is no wire manager, the surfaces should align. (Figure L). 8. Attach adjoining worksurface to the flat brackets with screws provided. (Figure M). Eight screws required per bracket. 9. Adjust worksurface location to ensure alignment of surface joints with panel reveals, if applicable, and control gaps between panel and edges of worksurfaces. DO NOT press wire manager into panel. 10. Attach the worksurfaces to the worksurface brackets using the screws provided. (Figure N). A minimum of two screws Figure H Figure K Figure M Figure N Figure I Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Care. 1847179, Revision D Figure L Assembly Instructions Footprint® Page 1 of 2 Worksurface Cantilever Bracket for Interworks® EQ Panel Figure A Tools Required ■ ■ ■ Drill with Torque Option #R-2 Square Srewdriver Bit Rubber Mallet ■ ■ Tape Measure Level Standard Height Package Contents ■ 24" #8 x .75 Robinson Head Flakeboard Screw General Information ■ Cantilevers are required when placing two surfaces end to end, when open kneespaces are greater than 48" for 1 3/16" surfaces or 60" for 1 9/16" surfaces, or in configurations where standard panel worksurface bracket support is not possible. Cantilevers are designed so that a single bracket can share the load between two adjacent surfaces. They can be used as sole support for a worksurface. The top of the cantilever should be located 24" from the bottom of fabric for standard height (29" nominal). (Figure A). Figure B Installation 1. Insert hook on the top of cantilever into the slot on panel siderail at a 45˚ angle. (Figure B). 2. Push the top of the cantilever downward. (Figure C). Important: Use mallet to make sure bracket is seated and fully engaged. 45˚ Figure C 2 1 Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Service. Part No. 1847185 Revision D-09 Assembly Instructions Footprint® Installation (continued) Page 2 of 2 Figure E Note: Cantilevers (with cutout to inside) are required with corner surfaces. (Figure D) With use of split top corner surface, corner cantilevers (with cutout to outside) must be located under adjacent surfaces. (Figure E). Cantilevers can be used as required support when open kneespace is greater then 48" for 1 3/16" surfaces and 60" for 1 9/16" surfaces. (Figure F). 3. Attach worksurfaces with flat brackets and adjust alignment, if applicable. 4. Attach cantilever to worksurface with screws provided. Figure D Printed in U.S.A. © 2009 Kimball International, Inc. Kimball Office T 800.482.1818 F 812.482.8300 Figure F Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Service. Part No. 1847185 Revision D-09 Systems Assembly Instructions Footprint® Worksurface Support Panel, Return Support Panel Page 1 of 1 Figure A Return Support Panel (no filler panel) Worksurface Support Panel (includes filler panel) Tools Required ■ ■ ■ Variable Speed Drill #2 Phillips Tip Bit Level Package Contents Inside General Information ■ Inside Figure B Figure C These instructions provide the basic information to install a Worksurface Support Panel or Return Support Panel onto any worksurface. (Figure A). Installation Gusset Bracket F 812.482.8300 1. Worksurface support panel includes a filler panel. Remove filler panel by sliding up and out. (Figure B). 2. If using with gusset bracket, secure gusset bracket to support panel prior to installing to worksurface. (Figure C). 3. If using with modesty panel, secure modesty panel to support panel prior to installing to worksurface. (Figure D). 4. To install directly to surface, secure using three #10 x 1" screws, provided. (Figure E). 5. Reinstall worksurface support panel filler, if applicable. (Figure E). Figure D Figure E Modesty Panel Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Service. Part No. 1567912 Revision C-05 T 800.482.1818 ■ Outside Outside Support Panel 3 #10 x 1" Phillips Particleboard Screws Printed in U.S.A. © 2004 Kimball International, Inc. ■ Systems Assembly Instructions Footprint® Page 1 of 3 Worksurface End Panel Tools Required ■ ■ ■ Drill with Torque Option #2 Phillips Head Bit 6" Magnetic Phillips Tip Bit or, Screwdriver ■ ■ Tape Measure Level Package Contents ■ ■ #10 x 1" Phillips Panhead Particleboard Screws 1 ⁄4-20 x 3⁄4" Round Head Machine Screws ■ #10 x 1" Hex Washer Head Drill Tip Screws Installation - End Panel/Worksurface Brackets 1. Smooth side should be facing away from the worksurface being supported by the end panel. 2. Two L-shaped end panel/surface brackets secure end panel to worksurface. 3. Determine whether end panel will be left or right. Relocate glides as needed. 4. Place end panel smooth side down, glides closest to you. 5. Locate pre-drilled holes for attaching end/panel surface brackets. Secure end panel/surface brackets to end panel using #10x 1⁄2" screws. (Figure B). Note: Hole patterns differ for full end and half end panel. Figure A General Information ■ ■ ■ ■ ■ ■ ■ These instructions provide the basic information needed to install any metal end panel into an Interworks® EQ panel. Corner worksurfaces are predrilled to accept End Panel for installation in standard flush left/right position. Installation process is similar for both half end panel (18"D) and full end panel (24", 30"D). Full end panel is illustrated. Unsupported worksurface span must not exceed 60". Kimball will not assume liability for any improperly or inadequatedly supported worksurface. Instructions are provided to install worksurface at standard desk height (28³⁄₁₆" actual height). End panel is designed to secure (Figure A): a) Surface and panel at end of run when no wing panel is used or when undersurface is less than full depth/height. b) Surface and panel when full height undersurface support is required, e.g. with some corner applications. b) Sample Configurations (Brackets indicated by dotted lines) a) Figure B End panel can be used to “share” load between two surfaces. (See Page 3). Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Service. Part No. 1567913 Revision C-07 Systems Assembly Instructions Footprint Installation - End Panel/Side Rail Tie Brackets Page 2 of 3 Figure C 1. Two reversible end panel/side rail tie brackets seucre end panel to panel side rail. 2. Rear of end panel is open to accept two tie brackets. A notch in the opening corresponding to the width of the tie bracket. Internal structure of end panel has threaded nuts for installation of tie brackets. 3. Locate notches in rear of end panel. Insert bracket, hooks facing away from rear of end panel, flush against the notch at the rear of the end panel. 4. Using a minimum of 6" magnetic Phillips tip bit/screwdriver, secure brackets to end panel using 1 ⁄4"-20 screws, provided. (Figure C). Installation End Panel to Panel, Worksurface 1. Place end panel in desired location and insert hooks on brackets into panel side rail. (Figure D). Hooks are designed to engage the side rail slots in the “up” position; extend End Panel glides to secure End Panel. 2. Place worksurface on top of End Panel. Square and level, readjusting End Panel glides as needed. Front edge—worksurface should be slightly recessed from front edge of panel side rail. Rear edge—surfaces are flush against the panel. 3. You may or may not want to secure End Panel to surface just yet, depending on other brackets and undersurface storage being installed. Tip: All surfaces should be in place, squared and level before you screw in brackets to surfaces. This makes any minor adjustments easier. Note: When undersurface storage is installed adjacent to End Panel, storage and End Panel may be secured to worksurface at the same time through aligned holes in storage and End Panel/Surface Brackets. (Figure E). 4. Secure End Panel/Surface Brackets to worksurface using (four) #10x1" screws provided per bracket. Figure D Figure E (Rear view) Spacers Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Service. Part No. 1567913 Revision C-07 Systems Assembly Instructions Footprint Installation - One end panel to support two Page 3 of 3 Figure F worksurfaces (Rear view) Figure G (Rear view) Printed in U.S.A. © 2007 Kimball International, Inc. T 800.482.1818 F 812.482.8300 1. Additional set of End Panel/Surface Brackets is required. Contact Customer Care to order. 2. Install all (four) End Panel/Surface Brackets to End Panel, two per side. End Panel is predrilled on one side. To mark smooth side, measure hole patterns on pre-drilled side and transfer to smooth side. Drill holes. 3. Insert bracket, hooks facing away from rear of End Panel, flush against the notch at the rear of the End Panel. (Figure F). 4. Place end panel in desired location and insert hooks on the brackets into panel side rail. End panel should be centered on panel hinge. (Figure G). 5. Extend End Panel glides to secure End Panel. 6. Place surfaces onto End Panel (and other installed brackets). Ensure it is level and square. 7. Secure End Panel/Surface Brackets to surface using (two) #10x1" screws provided per bracket. Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Service. Part No. 1567913 Revision C-07 MODULAR CASEGOODS—End Panel Assembly Instruction Figure A General Information • These instructions provide the basic information to install an Interworks® End Panel, e.g. to create a freestanding desk. Glides • Arc worksurfaces are predrilled to accept End Panel in standard flush left/right position only. • For Rectangular and non-standard position, worksurface must be drilled. • Process is similar for both Full and Half End Panel. Full End Panel is illustrated. Holes for securing Modesty Panel • Half End Panel is often used to create a freestanding Corner desk. • When an Undersurface Lateral File is used, a Full End Panel is required to support desk on the same side as the File. Figure B • One person can perform all operations, although two may be required to handle larger, heavier units. Tools Required 1 • Drill with /8" and #2 Phillips tip bits • 5 /16" Hex socket • Level Hardware • Metal to worksurface: #10x1" Phillips pan head particleboard screws. • Metal to metal: #10x1/2" Hex washer head drill screws. End Panel Installation • End Panels include brackets for attaching to worksurface and predrilled holes to secure Modesty Panel (Figure A). Figure C 1. Determine location of End Panel, left or right. Relocate the two glides to the opposite side of support as needed. 2. For Arc worksurface, use predrilled holes as a guide. 1. 2. For Rectangular worksurface, inset End Panel approximately /8" from front and back of worksurface, and approximately 1 /16" from side of worksurface. 1 Secure front and rear End Panel/Worksurface Brackets to worksurface with four #10x1" screws per bracket (Figure B). 3. Turn End Panel upside down and align to installed brackets. Holes in the End Panel should be to the INSIDE and the glides should be facing UP. Secure loosely with two #10x1/2" screws (Figure C). NOTE: After you have installed the Modesty Panel, you need to retighten all screws. Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call your Customer Care Team. Tel. 800.482.1818 Fax 812.482.8300 Form No. HAIIWFS006B-01 Printed in U.S.A. © 1999 Kimball International, Inc. 1 Assembly Instructions Interworks®EQ Page 1 of 1 Field Removal and Installation of Monolithic Tackable Acoustical Tiles Tools Required Putty Knife, Utility Knife, Linoleum Roller or similar type roller (Available at most hardware stores.) Hard plastic applicator (Such as a credit card or small scraper.) Installation These instructions apply to Monolithic Tackable Acoustical Panels. Step 1 Step 2 Remove Existing Tile • Use a putty knife to pry tile free from “J” channels and existing tape. • After tile is removed, use a putty knife to scrape away any remaining fiberglass and PSA still stuck to the panel frame. It may help to “roll” old tape (PSA) off of metal with finger. Install New Tile • Apply PSA, 3M 6038 to Panel Frame as shown. Use the plastic applicator to press tape firmly against panel frame. See figure below for PSA application. • Remove backing paper from adhesive. • Insert bottom edge of new tile into bottom “J” channel. Ensure that tile is seated completely against bottom of “J” channel and is centered evenly. Do not allow tile to contact the adhesive yet. • Gently bow the tile outward slightly to allow it to slip into the top “J” channel, making sure that the tile is centered evenly in the top “J” channel. • Press tile flat against the panel frame, again making sure that it is centered evenly horizontally and the gap between the tile and side rail is consistent on both sides from top to bottom. • With a linoleum roller, or similar type roller, roll the tile where the adhesive was applied, being careful not to crush the tile and making sure that the roller stays on the horizontal cross members. Note: Diagram is for 66" and 80" panels. Same process applies to all other heights, except there is no upper cross-member to apply PSA. Apply PSA, 3M 6038 as shown to both sides of panel Printed in U.S.A. © 2010 Kimball International, Inc. T 800.482.1818 Full Height F 812.482.8300 Full Width Apply Verticle Tape to Flange of Side Rail Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Service. Part No. 2241236 Revision B-10