metro air park | sacramento, ca

advertisement
METRO AIR PARK | SACRAMENTO, CA
Project Overview
Metro Air Park has 1,320 developmental acres, all of which are fully entitled. Located just east of Sacramento International Airport,
Metro Air Park is newly served by developed, full-access interchange connection to Interstate 5.
Metro Air Park sits 1 mile west of the Hwy 99 Interchange and 4 miles north of the I-80 Interchange. This master-planned business park is zoned for industrial,
manufacturing, distribution & high tech commerical use. Large plots are available, ranging from 3 to 123 acre for modern distribution facilities and/or
corporate campus sites.
Airport related inudustrial users are also supported. Environmental mitigation and permitting are complete, leaving the initial start-up costs low. Ground is
suited for immediate development.
|Zac Sweet | Lic. 01352800| zacsweet@buzzoates.com
P: 916.379.3828 | C: 916.717.4768 | 555 Capitol Mall | Ninth Floor | Sacramento, CA
The information contained herein is gathered from sources believed to be reliable. We cannot, however, guarantee its accuracy. All information should be verified prior to sale or lease.
buzzoates.com
Metro Air Park - Infrastructure Summary
• Metro Air Park is in Water Zone #5 and purchases water from the City of Sacramento.
• Metro Air Park has purchased an allotment of one million gallons per day (1MGD) of water and will purchase future allotments in 1MGD increments up to 9.3 MGD at full build-out.
• Currently there is 30” water transmission-main in South Bayou Road that serves the Sacramento International Airport (SIA)
and Metro Air Park. There is 24” T-main from South Bayou Road to the water tank and booster pump station. The first of two 2.5M gallon water tanks has been constructed along with the major water pipelines in Meister Way, Metro Air Parkway and Elkhorn Boulevard.
• Metro Air Park includes a total of 612.3 acres designated Manufacturing/Distribution with an average allocation of 3,400 GPD per acre.
• Metro Air Park has completed Phase 1 construction for the SSLS and SSFM. The SSFM consists of dual 16” pipes. These pipes will handle discharge at full build-out.
• Metro Air Park Phase 1 SS includes the SSLS with a capacity of 4.3MGD of which 1.4MGD is for SIA and 2.93MGD is for Metro Air Park.
• At 40% build-out, the SSLS will be upgraded to 7.3MGD of which 5.9MGD will be allocated to Metro Air Park.
• 69kV electrical is available along Power Line Road and West Elverta Road. An additional 69kV is planned on Lone Tree Road and Meister Way.
• Natural gas is supplied via 6” line.
|Zac Sweet | Lic. 01352800| zacsweet@buzzoates.com
P: 916.379.3828 | C: 916.717.4768 | 555 Capitol Mall | Ninth Floor | Sacramento, CA
The information contained herein is gathered from sources believed to be reliable. We cannot, however, guarantee its accuracy. All information should be verified prior to sale or lease.
buzzoates.com
Regional Map
Downtown Sacramento 9.7 miles
|Zac Sweet | Lic. 01352800| zacsweet@buzzoates.com
P: 916.379.3828 | C: 916.717.4768 | 555 Capitol Mall | Ninth Floor | Sacramento, CA
The information contained herein is gathered from sources believed to be reliable. We cannot, however, guarantee its accuracy. All information should be verified prior to sale or lease.
buzzoates.com
to Hwy 99
Site Plan
Elverta Road
1 166 acres - Zoned Commercial/Industrial
2 110 acres - Zoned Commercial/Industrial
3 91 acres - Zoned Commercial/Industrial/High Tech
4
4 69 acres - Zoned Commercial/Industrial/High Tech
3
Lone Tree Road
Powerline Road
Metro Air Parkway
2
W
l
tE
es
1
kh
o
rn
Bl
vd
.
to Hwy 99
Meister Way
|Zac Sweet | Lic. 01352800| zacsweet@buzzoates.com
P: 916.379.3828 | C: 916.717.4768 | 555 Capitol Mall | Ninth Floor | Sacramento, CA
The information contained herein is gathered from sources believed to be reliable. We cannot, however, guarantee its accuracy. All information should be verified prior to sale or lease.
buzzoates.com
to Hwy 99
Elverta Road
Site Plan
1 120 acres- Zoned Commercial/Industrial
2 110 acres- Zoned Commercial/Industrial
Building F
69,300 SF
Building C
72,000 SF
Building A
40,000 SF
Building G
100,000 SF
Metro Air Parkway
Building B
40,000 SF
Building E
63,750 SF
W
t
es
El
kh
n
or
Bl
vd
.
Lone Tree Road
Powerline Road
Building D
52,500 SF
1
2
to Hwy 99
Meister Way
|Zac Sweet | Lic. 01352800| zacsweet@buzzoates.com
P: 916.379.3828 | C: 916.717.4768 | 555 Capitol Mall | Ninth Floor | Sacramento, CA
The information contained herein is gathered from sources believed to be reliable. We cannot, however, guarantee its accuracy. All information should be verified prior to sale or lease.
buzzoates.com
Proposed Building Elevations
|Zac Sweet | Lic. 01352800| zacsweet@buzzoates.com
P: 916.379.3828 | C: 916.717.4768 | 555 Capitol Mall | Ninth Floor | Sacramento, CA
The information contained herein is gathered from sources believed to be reliable. We cannot, however, guarantee its accuracy. All information should be verified prior to sale or lease.
buzzoates.com
Download