INNOVATIVE SOLUTIONS FOR THE DEREGULATED ENERGY INDUSTRY NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION CHANGE ORDER #279 NAME: IDCWG DATE: November 19, 2008 SUMMARY: User Configurable Time Zones CHANGE REQUEST DETAIL: ORIGINATION DATE: November 12, 2008 SPONSOR: IDCWG REVISION: 1.0 Currently, the IDC uses a single time zone – Central Daylight Time (CDT). The IDCWG would like for the displayed time to reflect a user configurable time zone. Every occurrence of displayed time throughout the IDC should reflect (and indicate) the selected time zone as specified by the user. EVALUATOR'S SECTION: EVALUATOR'S NAME: OATI. DATE: November 18, 2008. PROPOSED CHANGE DESCRIPTION: OATI proposes to give users an option to set the viewing time zone of the IDC user interface. Users will set the time zone setting in the IDC Options page. The following time zones will be supported: AST – Atlantic Standard Time ADT – Atlantic Daylight Time APT – Atlantic Prevailing Time (auto adjust time zone between AST and ADT) EST – Eastern Standard Time EDT – Eastern Daylight Time EPT – Eastern Prevailing Time (auto adjust time zone between EST and EDT) CST – Central Standard Time CDT – Central Daylight Time CPT – Central Prevailing Time (auto adjust time zone between CST and CDT) MST – Mountain Standard Time MDT – Mountain Daylight Time MPT – Mountain Prevailing Time (auto adjust time zone between MST and MDT) PST – Pacific Standard Time PDT – Pacific Daylight Time PPT – Pacific Prevailing Time (auto adjust time zone between PST and PDT) Page 1 of 3 Open Access Technology International, Inc. 2300 Berkshire Lane North, Minneapolis, Minnesota 55441 Phone: (763) 201-2000 Fax: (763) 553-2813 sales@oati.net This document contains proprietary and confidential information of OATI, Inc. Do not copy or distribute without explicit permission of OATI, Inc. The user selected time zones will be displayed in the IDC User Interface pages in the silver-bar as indicated in the picture below, or in another clearly visible way. All date/time in all displays will be displayed in the user selected time zone. When users select a prevailing time zone, the IDC will automatically switch between Standard and Daylight Time Zones at 2 AM of the appropriate time zone. Yet, the IDC user interface will show either Standard or Daylight time zones, as appropriate. IMPACT OF REQUESTED CHANGE: PROJECT SCHEDULE: To be determined with the IDCWG. HARDWARE AND THIRD PARTY SOFTWARE: N/A. PROJECT MANAGEMENT: As per SSD. ACCEPTANCE TESTING: As per SSD. DOCUMENTATION: N/A. TRAINING: N/A. HELP DESK: As per Exhibit C in the IDC Operation Services Extension Agreement. INTELLECTUAL PROPERTY: The design and implementation of “User Configurable Time Zones” was developed exclusively by OATI using public domain ideas and expressions. OATI claims exclusive ownership of and retains all intellectual property rights in this design, implementation and software. OATI agrees to waive only its “User Configurable Time Zones” software license fee with respect to NERC during the term of the IDC Operation Services Agreement, excluding any software license fee for other OATI supporting software required for this Change Order. CONTRACT PRICE ADJUSTMENT: The Contract Price Adjustment associated with this Change Order is $19,200 (USD), which will be invoiced upon availability of changes in the Production Environment. VALIDITY DATE: This Change Order is available for approval until January 31, 2009. Page 2 of 3 This document contains proprietary and confidential information of OATI, Inc. Do not copy or distribute without express consent of OATI, Inc. APPROVED BY: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION: OPEN ACCESS TECHNOLOGY INTERNATIONAL, INC.: By: By: Name: Name: Sasan Mokhtari, Ph.D. Title: Title: President and CEO Date: Date: Page 3 of 3 This document contains proprietary and confidential information of OATI, Inc. Do not copy or distribute without express consent of OATI, Inc.