Unitized “Quick Install”

advertisement
Bulletin DB-600A12
Unitized “Quick Install”
Switches for Transmission
Applications
Vertical Break Switches
Center Break “V” Switches
CLEAVELAND / PRICE INC.
14000 Rt. 993, Trafford, PA 15085 (724) 864-4177
FAX (724) 864-9040
Email: sales@cleavelandprice.com
Cleaveland/Price
“Quick Install” Transmission Switches
Cleaveland/Price “Quick Install” switches are
The switch ships from the factory fully adjusted with
unitized, phase-over-phase transmission switches that
the linkage set in toggle in the closed and open positions.
ship from the factory fully assembled and adjusted.
The switch stays in adjustment after installation, just as it
These unitized switches are available in vertical
was tested and operated at the factory.
break and center break designs and can be used in
sectionalizing, tap, and multi-way transfer applications.
“Quick Install” switches are supplied to meet
Vertical break switches are provided with an inclined
customers’ site requirements. The mounting frame is
jaw end insulator to shorten the base and reduce
designed to match mounting hole locations on new
switch weight. Center break
or existing steel or concrete poles.
switches are “V” type for the
Switch phase spacing is set to match the
smallest footprint, and to
transmission line conductor spacing. With
“Quick Install”
minimize steel weight. Two,
this customization, it is not necessary to
Transmission
three, or four unitized switches
refit conductors and money is saved on pole
can be installed on a pole to
cost by not having to install extra high poles
Switches
provide 2-way, 3-way, or 4-way
needed by rack type switch mounting.
switching. “Quick Install”
• Easy to install
switches are designed to
The switches are typically supplied with
• Low force operation
address issues that customers
standard strength porcelain insulators. At
• Consistent full contact
have with other transmission
voltages to 115 kV, vertical break switches
engagement on all
switch designs.
can be supplied with polymer insulators. On
three phases regardless
center break switches, polymer insulators are
of pole height and
Some customers have
available on 69 kV and 115 kV switches with
operating speed
difficulty getting switches into
a maximum short time peak rating of 65 kA.
• Cost effective
adjustment when mounted on
Consult the factory for higher short circuit
tall transmission poles. This
ratings.
is the result of the torsional
“windup” of the vertical operating pipe between phases,
Vertical break “Quick Install” switches can be supplied
which causes the three pole units to operate out of
with arc horns, Cleaveland/Price SuperwhipTM, or vacuum
sync. Cleaveland/Price has designed the “Quick Install”
or SF6 interrupters, depending on current interrupting
switches with “push-pull” interphase linkage so that the
requirements. Center break switches can be supplied with
three pole units always move in unison, regardless of
arc horns, quick break whips, or single bottle vacuum
the length of the vertical operating pipe.
interrupters for loop splitting application.
138 kV, 3000 A. “Quick
Install” center break switch
with porcelain insulators and
quick break whips, mounted
on a steel pole.
115 kV “Quick Install” vertical break
switch with polymer insulators and
quick break whips, mounted on a
concrete pole.
115 kV “Quick Install” vertical
break switch with vacuum
interrupters for full load break.
Switch Installation - It’s this easy!
1
2
The assembled switch is delivered
to site on a utility trailer. First step in
installation is raising the assembly off
of the trailer using a crane.
The unitized switches ship from the
Cleaveland/Price factory fully assembled and adjusted on their individual
mounting frames. Several switches can
ship on a flatbed.
3
4
The assembly is guided to the
transmission pole.
5
The switch assembly is secured to the
pole.
6
The vertical operating
pipe with guide
brackets attached is
raised into position.
7
The vertical operating pipe is
bolted to the switch operator
and the pre-installed gear box.
The interrupters (whips
or full load interrupters)
are installed and jumper
cables to the switch
terminal pads are
attached. No switch
adjusting is required!
Application Schematics
Tap
Unitized Tap Switch
Single-way
LINE IN
LINE IN
LINE IN
Centerbreak “V” Switch
LINE
LINE OUT
CB-AV
TAP
JUMPER ACROSS
TERMINAL
TAP
LINE OUT
PLAN VIEW
LINE OUT
VACUUM
INTERRUPTER
Two-way
WHIP
LINE
JUMPER ACROSS
TERMINAL
LINE OUT
PLAN VIEW
LINE OUT
“A”
WHIP
UNITIZED BASE
W/ SWITCHES
FACTORY ADJUSTED
LINE
TAP
STRAIN INSULATORS
BY CUSTOMER
1’- 2”
LINE IN
“A”
“A”
Three-way
LINE
UNITIZED BASE
W/ SWITCHES
FACTORY ADJUSTED
PUSH - PULL
JUMPERINTERPHASE ROD
TAP
PUSH - PULL
INTERPHASE ROD
TORSIONAL VERTICAL
OPERATING PIPE
“A”
1’- 3 ¼”
90° GEAR BOX
LINE
ELEVATION VIEW
4’- 0”
TAP
Four-way
90° GEAR BOX
TORSIONAL VERTICAL
OPERATING PIPE
CB-AV #4
CB-AV #3
JUMPER
CB-AV #2
CB-AV #1
ELEVATION VIEW
Voltage
Typical “A” Dim.
Switch Weight
69 kV
9 ft.
2800 lbs.
115 kV
12 ft.
3500 lbs.
138 kV
13 ft.
3900 lbs.
161 kV
14 ft.
4500 lbs.
Single-Way Unitized Configuration
Centerbreak “V” Switch
LINE IN
LINE IN
LINE OUT
LINE OUT
JUMPER
ACROSS
JUMPER
ACROSS
TERMINAL
TERMINAL
Vertical Break Switch
LINE IN
LINE IN
JUMPER
ACROSS
JUMPER
ACROSS
TERMINAL
TERMINAL
WHIPWHIP
VACUUM
VACUUM
INTERRUPTER
INTERRUPTER
PLANPLAN
VIEW VIEW
PLANPLAN
VIEW VIEW
“A”
“A”
LINE OUT
LINE OUT
“A”
LINE IN
LINE IN
UNITIZED
UNITIZED
BASEBASE
W/ SWITCHES
W/ SWITCHES
FACTORY
ADJUSTED
FACTORY
ADJUSTED
UNITIZED
BASEBASE
UNITIZED
W/ SWITCHES
W/ SWITCHES
FACTORY
ADJUSTED
FACTORY
ADJUSTED
LINE OUT
LINE OUT
“A”
LINE IN
LINE IN
“A”
“A”
LINE OUT
LINE OUT
“A”
PUSHPUSH
- PULL
- PULL
INTERPHASE
ROD ROD
INTERPHASE
LINE OUT
LINE OUT
90° GEAR
BOX BOX
90° GEAR
90° GEAR
90° GEAR
BOX BOX
1’- 3 ¼”
LINE IN
LINE IN
1’- 3 ¼”
“A”
- PULL
PUSHPUSH
- PULL
INTERPHASE
INTERPHASE
ROD ROD
TORSIONAL
VERTICAL
TORSIONAL
VERTICAL
OPERATING
OPERATING
PIPE PIPE
ELEVATION
ELEVATION
VIEW VIEW
TORSIONAL
VERTICAL
TORSIONAL
VERTICAL
OPERATING
PIPE PIPE
OPERATING
ELEVATION
VIEW VIEW
ELEVATION
Voltage
Typical “A” Dim.
Switch Weight
Voltage
Typical “A” Dim.
Switch Weight
69 kV
7 ft.
2100 lbs.
69 kV
5 ft.
2700 lbs.
115 kV
10ft.
2700 lbs.
115 kV
7 ft.
3200 lbs.
138 kV
12 ft.
3100 lbs.
138 kV
8 ft.
3500 lbs.
161 kV
14 ft.
3800 lbs.
161 kV
9 ft.
3800 lbs.
230/900
11 ft.
4600 lbs.
230/1050
13 ft.
5200 lbs.
Note: Weights are based upon a 1200 A. continuous rating, and
switch supplied with porcelain insulators and without interrupters.
2-Way Unitized Configuration
Centerbreak “V” Switch
LINE OUT
LINE OUT
LINE OUT
LINE OUT
“A”
30°
Vertical Break Switch
LINE OUT
LINE OUT
“A”
30°
WHIP
LINE OUT
LINE OUT
“A”
45°
“A”
45°
WHIP
JUMPER ACROSS
LOWERJUMPER
TERMINAL
ACROSS
LOWER TERMINAL
LINE IN
LINE IN
PLAN VIEW
PLAN VIEW
“A”
“A”
LINE IN
JUMPER ACROSS
TOP TERMINAL
JUMPER ACROSS
TOP TERMINAL
LINE IN
PLAN VIEW
“A”
PLAN VIEW
“A”
LINE IN
LINE IN
LINE OUT
LINE OUT
LINE IN
“A”
LINE IN
UNITIZED BASE
W/ SWITCHES
UNITIZED BASE
FACTORY
W/ADJUSTED
SWITCHES
FACTORY ADJUSTED
LINE OUT
LINE OUT
PUSH - PULL
INTERPHASE
PUSH ROD
- PULL
INTERPHASE ROD
PUSH - PULL
INTERPHASE
PUSH ROD
- PULL
INTERPHASE ROD
LINE IN
“A”
“A”
“A”
“A”
UNITIZED BASE
W/ SWITCHES
UNITIZED BASE
FACTORY
W/ADJUSTED
SWITCHES
FACTORY ADJUSTED
“A”
STRAIN INSULATORS
BY CUSTOMER
STRAIN INSULATORS
BY CUSTOMER
“A”
“A”
VACUUM
INTERRUPTER
VACUUM
INTERRUPTER
LINE IN
90° GEAR BOX
90° GEAR BOX
TORSIONAL VERTICAL
OPERATING
TORSIONALPIPE
VERTICAL
OPERATING PIPE
ELEVATION “A-A”
ELEVATION “A-A”
LINE OUT
LINE OUT
90° GEAR BOX
TORSIONAL VERTICAL
90° GEAR BOX
OPERATING
TORSIONALPIPE
VERTICAL
OPERATING PIPE
ELEVATION “A-A”
ELEVATION “A-A”
Voltage
Typical “A”
Dim.
Switch Weight
per Way
Voltage
Typical “A”
Dim.
Switch Weight
per Way
69 kV
7 ft.
2100 lbs.
69 kV
10 ft.
3100 lbs.
115 kV
10 ft.
2700 lbs.
115 kV
13 ft.
3700 lbs.
138 kV
12 ft.
3100 lbs.
138 kV
15 ft.
4100 lbs.
161 kV
14 ft.
3800 lbs.
161 kV
17 ft.
4500 lbs.
Note: Weights are based upon a 1200 A. continuous rating, and
switch supplied with porcelain insulators and without interrupters.
3-Way Unitized Configuration
Centerbreak “V” Switch
Vertical Break Switch
LINE OUT
LINE OUT
LINE OUT
LINE OUT
LINE OUT
LINE OUT
“A”
“A”
JUMPER ACROSS
JUMPERTERMINAL
ACROSS
TERMINAL
WHIP
WHIP
JUMPER ACROSS
JUMPERTERMINAL
ACROSS
TERMINAL
LINE OUT
LINE OUT
LINE IN
LINE IN
PLAN VIEW
PLAN VIEW
LINE IN
LINE IN
PLAN VIEW
PLAN VIEW
“A”
“A”
1’-1’2” 2”
VACUUM
VACUUM
INTERRUPTER
INTERRUPTER
LINE IN
LINE IN
UNITIZED BASE
UNITIZED
BASE
W/ SWITCHES
W/
SWITCHES
FACTORY
ADJUSTED
FACTORY ADJUSTED
LINE OUT
LINE OUT
“A”“A”
LINE OUT
LINE OUT
STRAIN INSULATORS
STRAIN
INSULATORS
BY CUSTOMER
BY CUSTOMER
“A”“A”
“A”“A”
LINE OUT
LINE OUT
PUSH - PULL
PUSH - PULL
INTERPHASE
ROD
INTERPHASE ROD
LINE OUT
LINE OUT
UNITIZED BASE
UNITIZED
BASE
W/ SWITCHES
W/
SWITCHES
FACTORY
ADJUSTED
FACTORY ADJUSTED
“A”“A”
PUSH - PULL
PUSH
- PULL ROD
INTERPHASE
INTERPHASE ROD
LINE IN
LINE IN
TORSIONAL VERTICAL
TORSIONAL
VERTICAL
OPERATING
PIPE
OPERATING PIPE
90° GEAR BOX
90° GEAR BOX
LINE OUT
LINE OUT
ELEVATION “A-A”
ELEVATION “A-A”
TORSIONAL VERTICAL
TORSIONAL
VERTICAL
OPERATING
PIPE
OPERATING PIPE
Voltage
Typical “A”
Dim.
Switch Weight
per Way
69 kV
7 ft.
2100 lbs.
115 kV
10 ft.
2700 lbs.
138 kV
12 ft.
3100 lbs.
161 kV
14 ft.
3800 lbs.
Note: Weights are based upon a 1200 A. continuous rating, and
switch supplied with porcelain insulators and without interrupters.
LINE OUT
LINE OUT
90° GEAR BOX
90° GEAR BOX
ELEVATION VIEW
ELEVATION VIEW
Voltage
Typical “A”
Dim.
Switch Weight
per Way
69 kV
12 ft.
3300 lbs.
115 kV
15 ft.
3800 lbs.
138 kV
17 ft.
4300 lbs.
161 kV
19 ft.
4700 lbs.
SCADA-ready Installations
A “Quick Install” switch can be manually operated with a swing handle or
a wormgear type operator, depending upon the type of interrupter supplied
on the switch. The switch may also be operated with a transmission class
motor operator for remotely operating the switch through a customer’s SCADA
system.
A SCADA-ready installation would consist of a “Quick Install” switch,
Cleaveland/Price BT-T motor operator, customer’s choice of RTU, provision for
customer’s choice of communication means, and any other specified equipment
such as sensors or fault indicators.
SCADA installation with
BT-T motor operator and
communication by satellite.
The BT-T operator is a 17,000 in-lb. torque
operator that will open or close a switch in 3.4
seconds with 180° rotation of the vertical
operating pipe. It comes with a padlockable
safety cover that protects operating personnel
from rotating parts and also prevents tampering
with the mechanism. A padlockable torque–relief
decoupler is also provided. The motor operator
is supplied with contacts that will indicate the
true switch position whether the vertical pipe is
coupled or decoupled. For manual operation,
a telescoping swing handle and handcrank are
supplied.
At locations where low voltage AC is not
available for charging the BT-T’s battery, a
complete solar charging package can be offered. Consult the factory for more
information.
BT-T motor operator
SCADA installation with
BT-T motor operator and
communication by radio.
“Quick Install” Options
Vertical Break Switches
kV Voltage
Center Break Switches
69
115
138
161
230
69
115
138
161
Quick Break Whips
X
X
X
X
Vacuum interrupters for full
load break
X
X
X
X
X
X
X
X
X
Single bottle vacuum interrupter for loop splitting
X
X
X
X
X
X
X
X
X
SF6 interrupters (porcelain
insulators and wormgear or
motor operator only)
X
X
X
X
X
Swing handle
X
X
X
X
X
X
X
X
X
Wormgear operator
X
X
X
BT-T motor operator
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
www.cleavelandprice.com
Download