Procedure
Wet Pipe Systems: Use Model CPRTK-4
(With older-style ceiling mount, not Riser Mount (RM) style.)
1. Turn the two 1" ball valves (PCMS) or butterfly valve (PCMS-LP)
to closed position to isolate the coupon rack from the fire sprinkler
system.
2. Verify that the 1/2" drain valve is in the closed position.
the 1/2" drain plug.
Remove
3. Relieve system pressure from the coupon rack by opening the
drain valve slowly. Do not drain the coupon rack completely at
this time. Use a container or bucket to catch the escaping water.
CPRTK-4 kit shown
CPRTK-2
Stock number - 0090177 (For Dry Pipe and all Riser
Mount (RM) Styles)
CPRTK-4
Stock number - 0090178 (For older-style ceiling-mount,
NOT Riser Mount (RM) Styles)
Carefully read and follow the instructions and procedures provided
in this and referenced documents. Failure to do so will inhibit the
ability to provide accurate and complete test results.
Do not handle the coupons or probes with your bare hands. Use the
latex gloves provided.
The CPRTK contains necessary components to remove, replace, and
forward for analysis, the test coupons and water sample from a Potter
Corrosion Monitoring Station.
Test Kit Includes:
• Two C1010 Mild Steel Corrosion Coupons
(One for CPRTK-2)
• Two Corrosion Monitoring Probes (One for CPRTK-2)
• Two CDA 360 Non-Ferrous Brass Coupons (One for CPRTK-2)
• Corrosion Coupon Insertion Confirmation Sheet
NOTE: The water in the coupon rack will be pressurized to the
system pressure. After the system pressure has been relieved,
close the drain valve.
4. Fill the 120cc bottle by opening the drain valve slowly. Close the
1/2" drain valve.
5. Securely affix the cap to the bottle by making sure the cap screws
on tightly. Tape cap to bottle.
6.Drain the remaining water from the coupon rack through the 1/2"
drain valve into a container. Close the 1/2" drain valve. Re-install
the 1/2" plug into drain valve.
7. Locate the plastic document holder (should be attached to the
monitoring station). Locate the completed coupon insertion
confirmation sheet and original coupon envelopes. Find the
coupon envelope that corresponds with Outlet #1.
8.Remove the coupon holder from Outlet #1. Use a screwdriver
to loosen the plastic screw and nut. (See Fig. 1) Remove the
coupon from the coupon holder and place the coupon into the
corresponding original coupon envelope. Repeat this process on
outlet #5. (See Fig. 3)
DO NOT HANDLE COUPONS OR PROBES WITH BARE
HANDS.
9. Notify the fire system administrator to disable the fire panel
zone connected to the corrosion monitoring probe. Remove the
pressure switches from the corrosion monitoring probes on outlet
#3 and #6 (See Fig. 3). If a union was used between the pressure
switch and the corrosion monitoring probe you will not have to
disconnect the wiring to the pressure switch. Remove corrosion
monitoring probes from outlet #3 and #6 and discard.
Tools Required:
10.Remove the corrosion monitoring probe from the sealed
packaging using the latex gloves provided. Carefully remove the
protective cardboard sleeve. Apply Teflon tape to the 1” NPT male
pipe threads and install the new probe in the same outlet the old
probe was removed from.
• Pipe wrench or 14" adjustable wrench to remove and replace
coupon holders and probes.
11.Remove the new corresponding coupon from the new coupon
envelope. Do NOT discard the envelope.
• 120cc Bottle with Cap (Used for Wet Pipe Systems Only)
• One Pair of Latex Gloves
• Container used to drain water from the isolated coupon rack.
• Phillips head screwdriver to remove and re-install coupons to the
coupon holders.
• Teflon tape
• Ferrous/mild steel locations are for C1010 coupons.
• Non-Ferrous/Brass locations are for CDA 360 coupons.
12.Confirm the serial numbers on the envelope and coupon match.
Potter Electric Signal Company, LLC • St. Louis, MO • Phone: 866-956-0988/Canada: 888-882-1833 • www.pottersignal.com
Printed in U.S.A.
MFG. #5401176 - REV G
8/10
Page 1 OF 4
CPRTK
COUPON/probe
REPLACEMENT AND TEST KIT
13.Assemble the coupon on the coupon holder as shown in Fig. 1.
14.Apply Teflon tape to the 1” threaded bushing threads on the
coupon holder.
15.Insert and tighten the assembled coupon holder into the specific
location shown on the monitoring station label.
16.Repeat steps 11-15 for the remaining coupon holders (see Figs.
2-6).
17. Reconnect the wiring from the fire panel to the pressure switch if
Fig. 1 Corrosion Coupon Assembly
it was removed. Notify the fire system administrator to enable the
fire panel zone connected to the probe.
18.Verify that the isolation valves are in the open position and the
corrosion monitoring station is free of any leaks.
19.Place the coupons in the bottom of the original shipping container.
Place the water sample bottle in the top of the original shipping
container. Insert the foam container into the pre-addressed sleeve
and secure the tape. Ship the container next day air service to the
address on the enclosed shipping label.
Fig. 2 Corrosion Monitoring Probe
FLOW
Coupon orientation required on
dry pipe systems only.
DWG# 1176-5
1" NPT
SCRIBE LINE ON PLUG FACE
PARALLEL TO COUPON FACE
1/2" FEMALE
CONNECTION FOR
PS10-1 PRESSURE
SWITCH
DWG# 1149-2
Wet Pipe Systems with Riser Mount (RM) Version: Use
CRTK-2
1. Turn the 1” coupon rack isolation valve to the closed position to
isolate the coupon rack from the sprinkler system.
2. Verify that the 1/2" drain valve is in the closed position. Remove
the 1/2" drain plug.
3. Relieve system pressure from the coupon rack by opening the
drain valve slowly. Do not drain the coupon rack completely at
this time. Use a container or bucket to catch the escaping water.
NOTE: The water in the coupon rack will be pressurized to the
system pressure. After the system pressure has been relieved,
close the drain valve.
4. Fill the 120cc bottle by opening the drain valve slowly. Close the
1/2" drain valve.
5. Securely affix the cap to the bottle by making sure the cap screws
on tightly. Tape cap to bottle.
6.Drain the remaining water from the coupon rack through the 1/2"
drain valve into a container. Close the 1/2" drain valve. Re-install
the 1/2" plug into drain valve.
7. Locate the plastic document holder attached to the monitoring
station. Locate the completed coupon insertion confirmation sheet
and original coupon envelopes.
DO NOT HANDLE COUPONS OR PROBES WITH BARE
HANDS.
8. Notify the fire alarm administrator to disable the fire panel zone
connected to the corrosion monitoring probe. Remove the pressure
switch from the probe. If a union connection was used between
the pressure switch and the probe, it will not be necessary to
disconnect the wiring from the pressure switch. Remove the old
probe and discard.
9.Remove the corrosion monitoring probe from the sealed packaging using the latex gloves provided and carefully remove the
Printed in U.S.A.
protective cardboard sleeve. Apply Teflon tape to the 1” NPT male
pipe threads and install the new probe in the same outlet the old
probe was removed from. Install the pressure switch to the corrosion monitoring probe. Reconnect the wires from the fire panel to
the pressure switch if they were previously removed.
10.Remove a coupon holder from the monitoring station. Use a
screwdriver to loosen the plastic screw and nut (see Fig. 1). Remove the coupon from the coupon holder and place the coupon in
the corresponding original coupon envelope.
11.Notify the alarm administrator to disable the fire panel zone connected to the corrosion monitoring probe. Remove the pressure
switch from the probe. If a union connection was used between
the pressure switch and the probe, it is not necessary to disconnect
the wiring from the pressure switch. Remove the old probe and
discard.
12.Install the new probe in the same outlet the old probe was removed from. Install the pressure switch to the corrosion monitoring probe. Reconnect the wires from the fire panel to the pressure
switch if they were previously removed.
13.Remove the new corresponding coupon from the new coupon
envelope. Do NOT discard the envelope.
• Ferrous/mild steel locations are for C1010 coupons.
• Non-Ferrous/Brass locations are for CDA 360 coupons.
14.Confirm the serial numbers on the envelope and coupon match.
15.Assemble the coupon on the coupon holder as shown in Fig. 1.
16.Apply Teflon tape to the 1” threaded bushing threads on the coupon holder.
17.Insert and tighten the assembled coupon holder into the specific
location shown on the monitoring station label.
18.Repeat steps 10-17 for the remaining coupon holders (see Figs.
2-6).
MFG. #5401176 - REV G
8/10
Page 2 OF 4
CPRTK
COUPON/probe
REPLACEMENT AND TEST KIT
19.With the isolation and drain valves closed, open the air inlet valve
and charge the PCMS-RM with air pressure to about ½ the system
water pressure. Close the air isolation valve.
air pressure raises the water level.
21.Notify the fire alarm administrator to enable the fire panel zone
connected to the probe.
20.Open the system isolation valve and verify that the corrosion
monitoring station is free of any leaks. Also verify that the water
level in the corrosion monitoring station is at about the centerline.
The water level can be adjusted by adjusting the air pressure in the
monitoring station. More air pressure lowers the water level; less
22.Place the coupons in the bottom of the original shipping container.
Place the water sample bottle in the top of the original shipping
container. Ship the container to the address on the enclosed shipping label.
Fig. 3 Corrosion Coupon / Probe Installation Diagram Wet Pipe (Obsolete)
TOP
FERROUS/STEEL
CORROSION
COUPON
MOST
FREQUENT
UPRIGHT SPKR.
1
2
UPPER
CONNECTION
TO SPOOL
CORROSION
MONITORING
PROBE
NON-FERROUS/
COPPER/BRASS
CORROSION COUPON
3
4
9
5
FERROUS/STEEL
CORROSION
COUPON
CORROSION
MONITORING
PROBE
LOWER
CONNECTION TO
SPOOL
8
MOST
FREQUENT
PENDENT SPKR.
NON-FERROUS/
COPPER/BRASS
CORROSION COUPON
BOTTOM
MOST FREQUENT
SIDEWALL SPKR.
DWG# 1176-3
Dry Pipe Systems: Use Model CPRTK-2
removed from.
(With older-style in-line station, not Riser Mount (RM) style)
6.Remove the new corresponding coupon from the new coupon
envelope. Do NOT discard the envelope.
1. Notify the fire system administrator and close the system control valve. Shut down the supervisory air supply and relieve
system air pressure through the inspectors test valve. A water sample is not required for dry pipe systems.
•
Ferrous/mild steel locations are for C1010 coupons.
•
Non-Ferrous/Brass locations are for CDA 360 coupons.
7. Confirm the serial numbers on the envelope and coupon match.
2. Locate the plastic document holder (should be attached to the
monitoring station). Locate the completed coupon insertion
confirmation sheet and original coupon envelopes. Find the
coupon envelope that corresponds with Outlet #2. (See Fig. 4)
8. Assemble the coupon on the coupon holder as shown in Fig. 1.
9. Apply Teflon tape to the 1” threaded bushing threads on the coupon
holder.
3. Remove the coupon holder from Outlet #2. Use a screwdriver
to loosen the plastic screw and nut. (See Fig. 1) Remove the
coupon from the coupon holder and place the coupon into the
corresponding original coupon envelope.
7
6
10.Insert and tighten the assembled coupon holder into the specific
location shown on the monitoring station label.
11.Repeat steps 3-10 for the remaining coupon holders (see Figs. 2-6).
12.Reconnect the wiring from the fire panel to the pressure switch if it was removed. Notify the fire system administrator to enable the
fire panel zone connected to the probe.
DO NOT HANDLE COUPONS WITH BARE HANDS.
4. Remove the pressure switch from the corrosion monitoring
probe on outlet #4 (See Fig. 4). If a union was used between the
pressure switch and the corrosion monitoring probe you will not
have to disconnect the wiring to the pressure switch. Remove
corrosion monitoring probe from outlet #4 and discard.
13.Place the system back in service.
14.Verify that all valves are in the proper position and the corrosion
monitoring station is free of any leaks.
5.Remove the corrosion monitoring probe from the sealed packaging
using the latex gloves provided. Carefully remove the protective
cardboard sleeve. Apply Teflon tape to the 1” NPT male pipe threads
and install the new probe in the same outlet the old probe was
15.Place the coupon in the bottom of the original shipping container.
Ship the container to the address on the enclosed shipping label.
Fig. 4 Corrosion Coupon / Probe Installation Diagram Dry Pipe (Obsolete)
TOP
MOST FREQUENT
UPRIGHT
SPRINKLER
MOST FREQUENT
DRY SIDEWALL
SPRINKLER
1
6
2
FERROUS/STEEL
CORROSION
COUPON
Printed in U.S.A.
3
NON-FERROUS
COPPER/BRASS
CORROSION
COUPON
4
CORROSION
MONITORING
PROBE
BOTTOM
MFG. #5401176 - REV G
8/10
5
MOST FREQUENT
DRY PENDENT
SPRINKLER
DWG. #1176-4
Page 3 OF 4
CPRTK
COUPON/probe
REPLACEMENT AND TEST KIT
Dry Pipe Systems with Riser Mount (RM) version: Use
CRTK-2
1. Turn the 1” coupon rack isolation valve to the closed position to
isolate the coupon rack from the sprinkler system.
NOTE: A water sample is not required for testing coupons on dry
pipe systems.
2. Locate the plastic document holder attached to the monitoring
station. Locate the completed coupon insertion confirmation sheet
and original coupon envelopes.
DO NOT HANDLE COUPONS OR PROBES WITH BARE
HANDS.
probe was removed from. Install the pressure switch to the corrosion monitoring probe. Reconnect the wires from the fire panel to
the pressure switch if they were previously removed.
5.Remove a coupon holder from the monitoring station. Use a
screwdriver to loosen the plastic screw and nut (see Fig. 1). Remove the coupon from the coupon holder and place the coupon in
the corresponding original coupon envelope.
6.Remove the new corresponding coupon from the new coupon
envelope. Do NOT discard the envelope.
• Ferrous/mild steel locations are for C1010 coupons.
• Non-Ferrous/Brass locations are for CDA 360 coupons.
7. Confirm the serial numbers on the envelope and coupon match.
The monitoring station is under pressure. Use extreme care
when relieving pressure through the PCMS-RM drain or
through carefully loosening a fitting on DPCMS-RM.
3. Notify the fire alarm administrator to disable the fire panel zone
connected to the corrosion monitoring probe. Remove the pressure
switch from the probe. If a union connection was used between
the pressure switch and the probe, it will not be necessary to
disconnect the wiring from the pressure switch. Remove the old
probe and discard.
4.Remove the corrosion monitoring probe from the sealed packaging using the latex gloves provided and carefully remove the
protective cardboard sleeve. Apply Teflon tape to the 1” NPT male
pipe threads and install the new probe in the same outlet the old
Fig. 5 PCMS-RM
8. Assemble the coupon on the coupon holder as shown in Fig. 1.
9. Apply Teflon tape to the 1” threaded bushing threads on the coupon holder.
10.Insert and tighten the assembled coupon holder into the specific
location shown on the monitoring station label (see Figs. 2-4).
11.Repeat steps 5-10 for the remaining coupon holders (see Figs. 2-4)
12.Open the system isolation valve and verify that the corrosion
monitoring station is free of any leaks.
13.Notify the fire alarm administrator to enable the fire panel zone
connected to the probe.
14.Place the coupons in the bottom of the original shipping container.
Ship the container to the address on the enclosed shipping label.
Fig. 6 DPCMS-RM
(obsolete)
DWG# 1211-1
Printed in U.S.A.
MFG. #5401176 - REV G
8/10
Page 4 OF 4
Download